2.5G.(8A) – 2.5G.(8B) Action Item

2.5G.(8A) – 2.5G.(8B) Action Item

State of California California State Transportation Agency DEPARTMENT OF TRANSPORTATION Tab 48 M e m o r a n d u m To: CHAIR AND COMMISSIONERS CTC Meeting: January 30-31, 2019 CALIFORNIA TRANSPORTATION COMMISION Reference No.: 2.5g.(8a) – 2.5g.(8b) Action Item From: STEVEN KECK Prepared by: Ron Sheppard, Chief (Acting) Chief Financial Officer Division of Rail and Mass Transportation Subject: FINANCIAL ALLOCATION AMENDMENTS FOR PROPOSITION 1B INTERCITY RAIL IMPROVEMENTS FUND PROGRAM PROJECTS ISSUE: Should the California Transportation Commission (Commission) approve the California Department of Transportation (Department) request to de-allocate savings of $617,000 in Proposition 1B – Intercity Rail (ICR) funds from the two projects listed below, due to cost savings at the completion of each project? RECOMMENDATION: The Department recommends that the Commission approve its request to de-allocate a total of $617,000 in Proposition 1B – ICR funding from the two projects listed below, due to cost savings at the completion of each project as follows: Current Revised District Amending Cost ICR Project Resolution Project Allocation - PPNO Resolution Savings Allocation Amount Raymer to Bernson Double Track: PS&E Design and 75-2098 ICR1B-AA-1819-02 ICR1B-A-1314-02 $6,500,000 $419,000 $6,081,000 engineering for double track from MP 453.1 to MP 446.8 on Ventura subdivision. Van Nuys North Platform: PS&E Design and 75-2113 ICR1B-AA-1819-01 ICR1B-A-1314-01 $4,000,000 $198,000 $3,802,000 engineering for second platform at the Van Nuys station. Total Savings $617,000 “Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability” CHAIR AND COMMISSIONERS January 30-31, 2019 CALIFORNIA TRANSPORTATION COMMISSION Reference No.: 2.5g.(8a) -2.5g.(8b) Page 2 of 2 BACKGROUND: The Proposition 1B – ICR program projects listed above have been completed and have cost savings. The implementing agencies for these projects are now requesting that the Commission reduce the currently approved Proposition 1B – ICR allocations, by the amount of cost savings, for each project. The proposed changes are reflected in strikethrough and bold in accordance with the attached revised vote boxes. FINANCIAL RESOLUTION: Be it Resolved, that the Proposition 1B – ICR funds currently allocated for each project is hereby amended by its cost savings, in accordance with the attached revised vote boxes. Attachments “Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability” CTC Financial Vote List January 30-31, 2019 2.5 Highway Financial Matters PPNO Project # Program/Year Allocation Amount Phase Budget Year Recipient Project Title Prgm’d Amount Item # RTPA/CTC Location Project ID Fund Type Amount by District-County Project Description Adv. Phase Program Code Fund Type 2.5g.(8a) Proposition 1B – Intercity Rail – State -Administered Rail Projects Resolution ICR1B-AA-1819-01 Amending Resolution ICR1B-A-1314-01 1 $4,000,000 Van Nuys North Platform Project PS&E 75-2113 2013-14 $3,802,000 The project will complete final design of a north platform at ICR / 13-14 304-6059 $4,000,000 the Van Nuys Amtrak station. Once constructed, this will add PS&E PTMISEA $3,802,000 Department of platform access to accommodate simultaneous bidirectional $4,000,000 30.20.090.000 Transportation passenger rail service at the Van Nuys Amtrak Station. A $3,802,000 LACMTA pedestrian underpass will also be constructed to provide 0012000136 75-Los Angeles safe passage to the platform. S (CEQA – SE; Section 21080 (b)(10): 7/9/13) (NEPA – CE; 6/24/13) (Concurrent programming amendment under Resolution ICR1B-P-1819-03) Outcome/Output: The project will replace the existing single sided platform with a new center platform to better serve and enhance safety for passengers and improve flow of Amtrak and Metrolink trains. Amend Resolution ICR1B-A-1314-01 to deallocate $198,000 of Proposition 1B ICR in PS&E to reflect cost savings at project closeout. CTC Financial Vote List January 30-31, 2019 2.5 Highway Financial Matters PPNO Project # Program/Year Allocation Amount Phase Budget Year Recipient Project Title Prgm’d Amount Item # RTPA/CTC Location Project ID Fund Type Amount by District-County Project Description Adv. Phase Program Code Fund Type 2.5g.(8b) Proposition 1B – Intercity Rail – State -Administered Rail Projects Resolution ICR1B-AA-1819-02 Amending Resolution ICR1B-A-1314-02 1 $6,500,000 Raymer to Bernson Double Track Project PS&E. 75-2098 2013-14 $6,081,000 On the Ventura County Line between Control Point (CP) ICR / 13-14 304-6059 $6,500,000 Raymer (MP 453.1) and CP Bernson (MP 446.8) on through PS&E PTMISEA $6,081,000 Department of to Northridge Station. Construct 39,000 linear feet of second $6,500,000 30.20.090.000 Transportation main line; main line track relocation, relay rail and drainage $6,081,000 LACMTA improvements; four No. 20 turnouts, four bridges and work 0012000130 75-Los Angeles on the Northridge Station platform. S (CEQA – SE; Section 15275, 7/22/13) (NEPA – CE; 1/14/14) (Concurrent programming amendment under Resolution ICR1B-P-1819-03) Outcome/Output: Completion of the construction project would add track capacity, improve travel times for Amtrak Pacific Surfliner Intercity passenger rail service, and operational on-time performance along the corridor. Amend Resolution ICR1B-A-1314-02 to deallocate $419,000 of Proposition 1B ICR in PS&E to reflect cost savings at project closeout. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us