Final Environmental Impact Assessment & Environmental Management Plan

Final Environmental Impact Assessment & Environmental Management Plan

FINAL ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN For Development of Economic Corridors, Inter - corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot - 3/Odisha & Jharkhand/Package - 2) Raipur - Vishakhapatnam (Ch. 0.000 - Ch. 124.661 km) (Length 124.661 km) in the State of Chhattisgarh under Bharatmala Pariyojana Project Proponent : NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways , Gov ernment of India ) Environmental Consultant : ENVIRO INFRA SOLUTIONS PVT. LTD. IN ASSOCIATION WITH CEMC PVT. LTD. Accredited by NABET (Quality Council of India) for EIA studies as ‘A’ Category Consultant Ph.: 0120 - 4151183 Email: [email protected] Website: www.enviroinfrasolutions.com QCI NABET certificate No. – NABET EIA/1922/ RA 0157 Development of Economic Corridors, Inter - corridors and feeder routes and Coastal road primarily to improve the efficiency of freight movement in India (Lot - 3/Odisha & Jharkhand/Package - 2) Raipur - Visakhapatnam (Ch 0.000 – Ch 124.661) (Length = 124.661 km) in the state of Chhattisgarh under Bharatmala Pariyojana NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) Table of Contents Section Contents Page No. No. CHAPTER - 1: INTRODUCTION 1 - 2 7 1.1 Project Background 1 - 1 1.2 Identification of Project and Project Proponent 1 - 1 1.3 Brief Description of the Project and its Importance to the 1 - 2 Country 1.3.1 Salient features of the project 1 - 2 1.4 Scope of the EIA/EMP Study (As per TOR) 1 - 5 1.5 Objectives of the Consultancy Services 1 - 6 1.6 Policies, Legal and Administrative Framework 1 - 7 1.7 Structure of the Report 1 - 12 1.8 TOR approved by MoEF&CC and its Compliance 1 - 13 CHAPTER - 2: PROJECT DESCRIPTION 1 - 30 2.1 Introduction 2 - 1 2.2 Need of the Project & Brief about the Project 2 - 1 2.3 Land Requirement for the proposed project 2 - 5 2.4 Water Requirement for the proposed project 2 - 5 2.5 Traffic Survey and Analysis 2 - 5 2.6 Traffic Management Plan 2 - 12 2.7 Details of the Structures proposed along the Proposed 2 - 14 Alignment 2.7.1 Details of the proposed bridges 2 - 14 2.7.2 Details of the proposed major/minor Junctions 2 - 17 2.7.3 Details of the proposed ROBs 2 - 19 2.7.4 Details of proposed Interchanges & Flyover 2 - 20 2.7.5 Details of vehicular, light and pedestrian underpasses 2 - 20 2.7.6 Details of the Proposed Box Culverts 2 - 23 2.7.7 Details of the proposed tunnel 2 - 29 2.8 Typical cross section 2 - 30 2.9 Cost Estimates 2 - 30 C HAPTER - 3 : DESCRIPTION OF ENVIRONMENT 1 - 79 3.1 Preparation of Questionnaires for Environmental 3 - 1 Parameters 3.1.1 Field Observation on Questionnaire 3 - 1 3.1.2 Screening, Testing & Monitoring of Physical 3 - 1 Environmental Factors 3.1.3 Secondary Available Data 3 - 5 3.2 Analyses, Compilation And Preparation of Report 3 - 6 3.3 Baseline Environmental Conditions 3 - 6 3.3.1 Physical/Natural Environment 3 - 6 3.3.2 Geographical Location of the project Highway 3 - 7 Enviro Infra Solutions Pvt. Ltd . 1 Development of Economic Corridors, Inter - corridors and feeder routes and Coastal road primarily to improve the efficiency of freight movement in India (Lot - 3/Odisha & Jharkhand/Package - 2) Raipur - Visakhapatnam (Ch 0.000 – Ch 124.661) (Length = 124.661 km) in the state of Chhattisgarh under Bharatmala Pariyojana NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 3.3.3 Land Use and Terrain 3 - 7 3.3.4 Climate and Micro - Meteorological Parameters 3 - 10 3.3.5 Natural Hazards and Vulnerability of the sub project area 3 - 12 3.4 Geology of the study area 3 - 13 3.4.1 Field study and Sampling locations 3 - 14 3.4.2 Soil Quality along the study area 3 - 17 3.5 Air Environment 3 - 18 3.5.1 Ambient Air monitoring locations 3 - 18 3.5.2 Ambient Air Quality along the study area 3 - 20 3.6 Noise Environment 3 - 25 3.6.1 Noise Monitoring locations 3 - 25 3.6.2 Noise monitoring along the study area 3 - 26 3.7 Water Environment 3 - 28 3.7.1 Water bodies within proposed RoW 3 - 28 3.7.2 Hydrology for the study area 3 - 29 3.7.3 Water Quality of the study area 3 - 38 3.7.3.1 Water Sampling Locations 3 - 38 3.7.3.2 Ground Water Quality along the Study Area 3 - 39 3.7.3.3 Surface Water Quality along the study area 3 - 41 3.8 Biological environment 3 - 42 3.8.1 Ecology and Biodiversity Study 3 - 44 3.8.2 Flora /Vegetation Study 3 - 44 3.8.3 Bio - diversity Study 3 - 44 3.8.4 Tree cutting 3 - 63 3.9 Socio - Economic profile of the study area 3 - 63 CHAPTER - 4: ANTICIPATED ENVIRONMENTAL IMPACTS & 1 - 39 MITIGATION MEASURES 4.1 Introduction 4 - 1 4.2 Potential Impacts on Soil 4 - 1 4.2.1 Loss of Productive Soil 4 - 1 4.2.2 Erosion 4 - 1 4.2.3 Contamination of Soil 4 - 2 4.3 Impacts on Water Resources 4 - 3 4.3.1 Modification of the Surface Water Flow 4 - 3 4.3.2 Modification of the Groundwater Flow 4 - 3 4.3.3 Rainwater Harvesting 4 - 4 4.3.4 Use of Local Water Supply 4 - 5 4.3.5 Water Quality Degradation 4 - 5 4.4 Impact on Ambient Air Quality 4 - 5 4.4.1 Impacts During Construction Phase 4 - 6 4.4.1.1 Use of Fly Ash 4 - 7 4.4.1.2 Borrow Area Soil 4 - 7 4.4.1.3 Coarse aggregates (stone) and Fine Aggregate (Sand) 4 - 7 Materials Enviro Infra Solutions Pvt. Ltd . 2 Development of Economic Corridors, Inter - corridors and feeder routes and Coastal road primarily to improve the efficiency of freight movement in India (Lot - 3/Odisha & Jharkhand/Package - 2) Raipur - Visakhapatnam (Ch 0.000 – Ch 124.661) (Length = 124.661 km) in the state of Chhattisgarh under Bharatmala Pariyojana NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 4.4.1.4 Bitumen 4 - 7 4.4.1.5 Cement 4 - 7 4.4.1.6 Steel 4 - 7 4.4.2 Impacts During Operation Phase 4 - 9 4.4.2.1 Prediction of Impact on Ambient Air Quality 4 - 9 4.4.2.2 Change in Ambient air and GLC 4 - 1 2 4.5 Impact On Noise Levels 4 - 1 6 4.5.1 Prediction of Noise Impact on Noise Level 4 - 1 7 4.5.2 Mitigation measures to reduce Noise levels 4 - 21 4.6 Impact on Flora, Fauna and Ecosystem 4 - 21 4.6.1 Removal of trees 4 - 22 4.6.2 Removal of Herbal Cover 4 - 2 2 4.6.3 Conservation and Mitigation Measures 4 - 2 2 4.6.3.1 Integrated Eco - friendly designs 4 - 2 4 4.6.3.2 Impact of Noise, Light and Power lines on Wild animals 4 - 2 7 4.7 Impact on Protected Monuments and Cultural Heritage 4 - 2 7 Sites 4.8 Impacts on Social Environment 4 - 2 7 4.9 Impacts on Road Safety and Public Health 4 - 2 7 4.10 Mitigation Measures 4 - 2 8 4.10.1 Soil 4 - 2 8 4.10.2 Water Resources 4 - 2 8 4.10.3 Ambient Air Quality 4 - 2 9 4.10.4 Noise Levels 4 - 29 4.10.5 Human Health and Safety 4 - 3 0 4.10.6 Measures Taken For Pedestrian Safety 4 - 3 1 4.11 Biological Characteristics 4 - 3 1 4.12 Summary of Environmental Impact Assessment 4 - 3 4 CHAPTER - 5: ANALYSIS OF ALTERNATIVES 1 - 1 9 5. 1 Introduction 5 - 1 5. 2 Selection of Alternative 5 - 1 5. 3 With and Without Project Scenario 5 - 1 8 CHAPTER - 6: ENVIRONMENTAL MONITORING PROGRAMME 6 1 - 5 6. 1 Environment Monitoring Programme 6 - 1 6. 2 Environmental Monitoring Cost 6 - 4 CHAPTER - 7: ADDITIONAL STUDIES 1 - 62 7.1 Introduction 7 - 1 7.2 Preparation Of Site Specific Wildlife Management Plan For 7 - 1 The Proposed Project Highway 7. 3 Public Consultation 7 - 1 7.3 .1 Introduction 7 - 1 Enviro Infra Solutions Pvt. Ltd . 3 Development of Economic Corridors, Inter - corridors and feeder routes and Coastal road primarily to improve the efficiency of freight movement in India (Lot - 3/Odisha & Jharkhand/Package - 2) Raipur - Visakhapatnam (Ch 0.000 – Ch 124.661) (Length = 124.661 km) in the state of Chhattisgarh under Bharatmala Pariyojana NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Road Transport & Highways Government of India) 7.3 .2 Methodology Followed For Public Consultation 7 - 2 7.3 .3 Public Consultation Process 7 - 2 7.3 .4 Key Issues 7 - 4 7.3 .5 Consultation during design 7 - 4 7.3 .6 Consultation Session 7 - 4 7.3 .7 Continued Consultation 7 - 7 7. 4 Public Hearing 7 - 8 7. 5 Social Impact Assessment (SIA) Study in the Project 7 - 26 7.5 .1 Methodology 7 - 26 7.5 . 2 Policy, Legal and Administrative Framework 7 - 27 7.5 .3 Project Profile 7 - 27 7.5 .4 Project Affected Households (PAHs) & Project 7 - 28 Affected Population(PAPs) 7.5 .5 Land Acquisition 7 - 28 7.5 .6 Public Consultation 7 - 28 7.5 .7 Potential Impacts 7 - 29 7.5 .8 Mitigation and Enhancement Measures 7 - 30 7.5 .9 R&R Budget 7 - 30 7.5 .10 Project Impact Zone 7 - 30 7.4.11 Conclusions 7 - 31 7.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    345 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us