The New Gotthard Tunnel – Switzerland Through and Through

The New Gotthard Tunnel – Switzerland Through and Through

The new Gotthard Tunnel – Switzerland through and through. The centrepiece of the new north-south Gotthard corridor. 2 With 57 kilometres, the new Gotthard Tunnel is the longest railway tunnel in the world and forms the centrepiece of the New Rail Link through the Alps (NRLA). It ­embodies­Swiss­values­such­as­innovation,­precision­and­reliability­and­connects­ people­and­goods­in­the­north­and­south­more­quickly­and­more­reliably.­ AlpTransit­Gotthard­AG­(ATG),­a­subsidiary­of­SBB,­built­the­Gotthard­Base­Tunnel­on behalf­of­the­Federal­Government.­ATG­is­also­responsible­for­the­construction­of­ the 15-kilometre-long­Ceneri­Base­Tunnel,­which­is­due­to­go­into­operation­in­late­ 2020.­The­Gotthard­Base­Tunnel­will­be­put­into­operation­on­schedule­on­ 11 ­December­2016­after­17­years­of­construction.­Further­information­is­available­at­ www.gottardo2016.ch. The­Ceneri­Base­Tunnel­will­create­a­continuous­flat­rail­route­through­the­Alps­and­ customers­will­be­able­to­benefit­fully­from­the­new­north-south­Gotthard­corridor­ from­late­2020­with­the­opening­of­the­4-metre­corridor­for­freight­traffic.­Goods­will­ be­transported­more­efficiently­and­in­a­more­environment-friendly­manner and­ passengers­will­have­a­faster­and­more­comfortable­journey.­ Freight­traffic­is­becoming­more­efficient­and­more­ ­environment-friendly. When­it­comes­to­freight­traffic,­the­new­Gotthard­Tunnel­will­bring­increased­ 3 ­capacity,­faster­connections­and­greater­reliability.­SBB­Cargo­customers­will­receive­ efficient,­congestion-free­and­environment-friendly­solutions­for­their­logistics­ ­requirements.­With­up­to­750-metre-long­trains,­SBB­Cargo­will­be­able­to­operate­ even­more­efficiently.­As­of­the­2016/2017­timetable­change,­four­freight­trains­ will be­able­to­travel­in­each­direction­every­hour­during­the­day.­Up­to­three­deliveries­ and­collections­will­thus­be­made­every­day­at­busy­operating­points­in­Ticino. For­international­transit­traffic,­the­new­Gotthard­Base­Tunnel­marks­a­first­major­step­ towards­the­flat­rail­route­through­the­Alps.­With­the­Ceneri­Base­Tunnel­and­the­ 4-metre­corridor­(for­transporting­4-metre-high­semi-trailers­by­train),­rail­will­become­ significantly­more­competitive­on­the­north-south­corridor.­From­the­end­of­2020,­ freight­trains­will­be­able­to­transport­up­to­2,000­tonnes­instead­of­the­1,600­or­so­ tonnes that they do today. Passengers­will­have­a­faster­and­more­comfortable­ journey. 4 Faster,­more­frequent­and­more­convenient­connections­as­well­as­new­and­modern- ised­rolling­stock­will­considerably­increase­the­transport­quality­on­the­north- south corridor.­Customers­will­also­benefit­from­more­seats.­The­improvements­will­ take­effect­gradually­from­2016­onwards­and­provide­their­full­benefit­from­late­2020. From­late­2016,­for­example,­the­journey­from­Zurich­to­Lugano­will­take­up­to­ 30 minutes­less­than­it­does­today.­When­the­Ceneri­Base­Tunnel­is­in­operation­too, you­will­be­able­to­reach­Lugano­from­Zurich­in­less­than­two­hours.­From­late­ 2020,­the­journeys­between­German-speaking­Switzerland­and­Ticino­will­be­around 45­minutes­shorter.­In­addition­to­long-distance­traffic,­regional­traffic­in­Ticino­ will also­be­significantly­increased,­the­connections­between­Lugano,­Bellinzona­and­ Locarno­will­be­upgraded­from­late­2020­and­travel­times­will­be­considerably­ shorter. SBB­will­continue­to­operate­the­historic­mountain­route,­which­is­popular­with­ ­tourists,­and­help­to­boost­and­develop­the­tourism­industry­in­the­Gotthard­region. Late 2016 Faster through the Gotthard region Start of operations for the Gotthard Base Tunnel (SOO GBT) Basel Zurich–Milan: 3,5 hours, service every two hours Olten Zurich New EC service: Zurich–Venice Zug Zurich–Lugano in 2 hours 10 minutes Lucerne New kind of services on the mountain line Arth-Goldau Integration in TILO New stops in Ambri-Piotta and Lavorgo Erstfeld Late 2019 More comfortable journeys with Late 2016 SOO GBT new rolling stock Giruno-trains for EC Zurich–Milan Late 2020 Faster and more frequently through the Ceneri Bellinzona Start of operations for the Late 2020 Ceneri Base Tunnel (SOO CBT) Lugano SOO CBT Zurich–Milan: 3 hours, hourly service 2021 target between Zurich and Milan in peak hours half-hourly Half-hourly service between hourly German-speaking Switzerland and Ticino some services Milan to Venice Giruno trains for IC services too Double-deck trains possible; more seats at peak times New line Locarno–Lugano and more relations in the regional traffic Development­of­the­access­routes­for­customers­to­ ­benefit­fully. In­order­for­customers­to­benefit­fully­from­the­Gotthard­corridor,­SBB­is­improving­ 5 access­routes­to­the­base­tunnels­and,­by­2020,­will­complete­a­continuous­ ­4-metre­corridor­from­Basel­to­the­Italian­border.­Therefore,­once­the­Gotthard­Base­ Tunnel­comes­into­operation,­construction­activity­will­intensify­on­the­Gotthard­ ­corridor.­To­the­north,­the­priorities­are­at­Lake­Zug­and­Axen,­while­in­the­south,­they lie­in­the­Bellinzona­area.­A­number­of­tunnels­will­also­be­renovated­or­con- structed. This concentration of construction sites in terms of time and space repre- sents­a­major­challenge­for­timetable­stability­and­carries­the­risk­of­delays­and­ connection­problems.­The­timetable­is­operating­despite­these­construction­sites,­but it­is­more­­vulnerable.­With­a­range­of­measures­relating­to­rolling­stock,­construc- tion and­operations,­SBB­will­limit­the­impact­on­customers­as­much­as­possible­until­ the­25 construction­projects­are­completed. New Bözberg tunnel 1 1 2 2 3 1 1 Immensee–Steinen, 1 Lake Zug: maintenance and 1 Axensee track renovation various upgrades double tracking 2 Bellinzona tracks 750 m 2 Arth-Goldau station 2 Arth-Goldau station 3 Dragonato tunnel 3 Crocetto/Giustizia tunnel 3 Axensee track renovation 4 Giubiasco track 36 4 Bellinzona station, northern 4 Bellinzona tracks 750 m 5 Locarno line approach and platforms 5 Svitto tunnel and Bellinzona, 6 Paradiso and San Martino 5 southern approach Giubiasco track 36 tunnel 6 Luino line 6 Coldrerio tunnel 7 Chiasso tracks 750 m 7 Giubiasco signal box, 8 southern approach, track 36 Chiasso signal box 3 8 Lugano-Paradiso, various upgrades 9 Maroggia tunnel 4 4 2 5 5 3 6 7 5 4 8 6 9 6 7 8 2016 2017/2018 2019/2020 Start of operations Start of operations Gotthard Base Tunnel Ceneri Base Tunnel and 4-metre corridor New standards, including in terms of safety. 6 The­Gotthard­Base­Tunnel­(GBT)­has­cutting-edge­safety­equipment: • Various­systems­on­the­access­routes­detect­any­defects­on­the­trains­before­ they enter the tunnel. • The sophisticated operating concept and cutting-edge automatic train safety ensure that the trains run safely at high speeds, three minutes apart from each other. • The­two­emergency­stop­stations­at­Sedrun­and­Faido­form­the­basis­for­rapid­ evacuations. • Every­325­metres,­passages­to­the­parallel­tube­provide­quick­access­to­a­safe­ space. • Emergency lighting, handrails and signs help train passengers to get out of ­danger­themselves.­ Biasca­and­Erstfeld­have­maintenance­and­intervention­centres,­from­where fire-fighting­and­rescue­trains­can­enter­the­tunnel. 57 kilometres – two entrances. Maintaining­the­longest­railway­tunnel­in­the­world­is­a­major­challenge.­The­ 7 ­57-kilometre-long­tunnel­tubes­are­only­accessible­via­two­entrances.­A­tunnel­tube­ is­closed­for­three­nights­each­time­maintenance­work­is­carried­out.­During­this­ time,­up­to­eleven­workplaces­are­transferred­from­the­new­maintenance­and­inter- vention­centres­(MIC)­in­Biasca­and­Erstfeld­to­the­GBT,­where­they­are­set­up,­ put into­operation­and­then­vacated­and­transferred­back­again.­SBB­has­prepared­ around­3,900­people­for­the­particular­challenges­in­the­Gotthard­Base­Tunnel­–­ and not­just­those­in­maintenance­work:­locomotive­drivers,­train­staff­and­employees­ involved­in­the­train­services­and­tunnel­management­have­also­been­prepared­ for these­challenges. A “control tower” for the Gotthard Base Tunnel. Since­mid-2014,­SBB­has­controlled­and­monitored­the­entire­rail­operations­in­Ticino as­well­as­to­and­from­Arth-Goldau­from­the­south­operations­centre­(OC­south)­ in Pollegio.­OC­south­also­provides­the­passenger­information­in­the­event­of­disrup- tions.­The­160­or­so­employees­in­Pollegio­also­control­and­monitor­the­operation­ of passenger­and­freight­traffic­as­well­as­the­safety­systems­and­the­traction­power supply in the longest railway tunnel in the world. www.sbb.ch 3000 Bern 65,Switzerland 1 Hilfikerstrasse Communications SBB AG June­2016­en­I-PJ-PONS.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us