• A total of 52,435 houses were damaged (Totally – 14,883 /Partially – 37,552 ) 4. COST OF DAMAGES (TAB D) No change from previous • The estimated cost of damages to infrastructure, agriculture and school buildings amounted to PhP1,633,283,487.00 Infrastructure - PhP 1,360,335,647.00 Agriculture - PhP 272,974,840.00 II. DECLARATION OF STATE OF CALAMITY • Per Proclamation No. 303 dated December 20, 2011, the President of the Republic of the Philippines declared a State of National Calamity in Regions VII, IX, X, XI, and CARAGA III. EMERGENCY RESPONSE MANAGEMENT A. SUMMARY OF EARLY RECOVERY OPERATIONS IN REGION X (CAGAYAN DE ORO AND ILIGAN CITIES) 1. FOOD AND NON-FOOD ITEMS • A total of PhP172,065,536.29 worth of relief assistance was provided from the combined resources of NDRRMC, DSWD, DOH, NGOs and Local Government Units (LGUs) - (TAB E – Cost of Assistance) No change from previous 2. HEALTH, WASH, NUTRITION AND PSYCHOSOCIAL DEBRIEFING Summary of Logistical Support Mobilized to CHD X as of 12 Jan 2012 Sources Total Amount DOH Central Office PhP 9,972,235.61 CHDs 1,942,276.23 Hospitals 706,586.00 Donations 46,402,177.96 Grand Total 59,023,275.80 • CHD X conducts daily tri-cluster meeting (Health, WASH, and Nutrition) every 4:00 PM in the Regional Office of CHD Northern Mindanao in CDO City; regular coordination meetings with the health sector and cluster partners for health (including mental health and psychosocial support, reproductive health, nutrition and WASH activities; and continuous coordination with LGUs to strengthen the operations with partner agencies • All ECs are with regular coverage of City Health Office (CHO) teams composed of doctors and nurses: 1.) West City Central School conducts medical consultations every MWF afternoons; 2.) Macasandig Covered Court with German doctors doing medical consultations every Wednesday afternoons; 3.) Tibasak Covered Court with medical consultations every Wednesday mornings courtesy of German doctors; 4.) Upper/ Lower Balulang serviced by city health personnel; and 5.) Mobile Leptospirosis Prophylaxis Teams from the CHO conducting house-to-house DOTS for Leptospirosis prohylaxis; Health teachings on proper waste disposal were also conducted in different evacuation centers 2 • AFP, thru the Surgeon General’s Office and Chief, Dental Service, partnered with the Philippine Medical Association (PMA) for the “DOC SANTA” Project held on 27 December 2011. A total of three (3) medical teams, one (1) standby medical team, four (4) dental officers and five (5) dental technicians from the Army, Air Force, Navy and AFPMC were deployed serving 1,562 and 1,700 beneficiaries in Cagayan de Oro and Iligan, respectively. • WASH Cluster distributed Long Lasting Insecticide-Treated Net (LLIN) benefitting 3,891 families/14,885 individuals and 471 families/2,153 individuals, in CDO and in Iligan, respectively. • Nutrition Cluster provided micronutrient powder in some ECs in CDO and distributed ferrous sulphate to pregnant women in Iligan City. • Balay Mindanao (CDO) provided drinking water in Indahag Elementary School and Indahag San Miguel Chapel • CHD X conducted rapid health assessment and immunizations in cities of CDO and Iligan to wit: CDO City ( 36 evacuation centers) – 6,202 persons with tetanus toxoid; 589 with oral polio vaccine; 1,170 with measles vaccine (mv)/ Amv; and 505 for vitamin A supplementation Iligan City (13 ECs) 2,402 with tetanus toxoid; 217 with OVP; and 2,039 with MV/AMV and 1,178 Vitamin A supplementation As of 20 January 2012, different hospitals in CDO and Iligan recorded a total of 377 cases of leptospirosis, 16 of which were fatalities Acute Respiratory infections, diarrhea and fever remain the most common health concerns in ECs On January 02, 2012, an immunization program was conducted at West City Central School EC serving 583 individuals with tetanus toxoid, 33 with Oral Polio vaccine and 43 with Attenuated Measles Vaccine (AMV) 3. EMERGENCY SHELTER /LIVELIHOOD CLUSTERS (DSWD as OPR) 3.1 DECLARED TRANSITIONAL HOMES / SHELTERS: • Calaanan Tent City with 408 families / 2,115 persons • Kilometer 5 with 62 families / 354 persons • Agusan with 61 families / 248 persons • Indahag with 109 families / 540 persons • Bugo Elementary Scholl – 12 tents with 19 families • Gusa Regional Science High School - 12 tents with 8 families • Puerto Elementary School with 20 families • Buena Oro Covered Court with 26 families • Mt. Carmel Parish with 47 families 3.2 POTENTIAL TRANSITION SITES • St. Vianni, Camaman-an – an estimated 90 families will occupy the area through Social Action Committee • Old Cemetery (Near Xavier University) – an estimated 150 families will occupy the area 3.3 PERMANENT SHELTER SITES • CDO City Mayor Vicente Emano issued EO No. 007 Creating the local inter-agency Committee on Permanent housing in sustainable communities, defining its composition, functions and other attendant regulations 3 • Calaanan – 9.4 hectares permanent site is being developed and the plan is being prepared by National Housing Authority • Lumbia Permanent Site (5 hectares) – 12 bunkhouses from DSWD that can accommodate 120 families is 57% completed. Construction of 230 bunkhouses thru IOM is on-going, about 350 families can be accommodated • Taguano, Indahag Permanent Site – 9 hectares area still for inspection by MGB • Balulang (3.5 hectares) – MGB conducted inspection of the site but it still under negotiation. It will accommodate survivors from Balulang 3.4 NO BUILD ZONES • Iligan City Mayor Lawrence LL Cruz issued Executive Order no. 2 s.2012 declaring the moratorium in the construction of dwellings along areas affected by the floods • The following areas were also declared “NO BUILD ZONES”: ° Sitio Calcala ° Isla Bugnao ° Isla Delta ° Tambo, Macasandig ° Isla de Oro ° Isla Puntod ° Isla Baksan CASH FOR WORK • DSWD mobilized 1,698 IDPs from the evacuation centers for cash for work to maintain cleanliness in evacuation centers • DSWD FO X needs volunteers to help in developing the permanent shelter site with Habitat for Humanity and the City Engineers Office DSWD/IDP CAMP MANAGEMENT • As of 16 January 2012, the DSWD reported that the overall population served both outside and inside 124 evacuation centers totaled 104,530 families/559,784 persons. • For Region X alone, a total of 70,889 families/390,573 persons were served: 21,288 families/105,490 persons inside 84 ECs and 49,601 families/285,083 persons outside evacuation centers. Brokendown as follows: Lanao del Norte - 20,606 families/91,922 persons Misamis Oriental – 40,053 families/287,127 persons Bukidnon – 2,230 families with 11,524 persons • To date, only 47 ECs remain open and continuously providing temporary shelter to 4,863 families or 21,448 persons. Meanwhile, the 46,150 other family victims or 262,790 persons who opted to stay with their friends and relatives’ houses are still provided with relief assistance. • The estimated cost of assistance provided to the affected population in Region X amounted to PhP83,672,460.88 from the combined resources of DSWD (PhP54,963,908.25; LGUsPhP2,501,705.55) and NGOs/GOs (PhP26,206,847.34). This relief assistance included the augmentation coming from DSWD FOs XI, XII and CARAGA • A total of 30 out of 45 ECs (12 ECs are closed in CDO and 3 in Iligan), 11 ECs in CDO with 268 classrooms and 11 ECs in Iligan City utilized. 4 PROTECTION CLUSTER • UNHCR, with DSWD and local NGOs , distributed protection items to 13,602 families (68,563 people) in storm and conflict affected remote areas; delivered 9,080 blankets, 4,094 plastic sheets, 109 plastic rolls, 3,033 kitchen sets, 2,331 jerry cans, 3,138 hygiene kits, 1,355 garbs, 1,332 synthetic mats, 2,183 shovels, 1,718 garden hose, 694 ropes, and 734 pails. • UNICEF together with SGBV , spearheaded the distribution of advocacy materials (SAY NO, RUN and TELL) for the prevention of abuse in ECs particularly with young girls and women • To date, some 4,419 individuals (4122 in CDO and 297 in Iligan) have underwent psychosocial processing by different agencies (22 organizations) in evacuation centers; • Family Tracing Reunification (FTR) Mechanism is currently being formulated by DSWD-X to respond to families with missing family members • Gender-based Violence Campaign being conducted by DSWD-X through distribution of fans; IEC materials on the same campaign are also currently being produced • Child Spaces and Women spaces are provided in Calaanan Tent City and will also be put up in the opening of other relocation sites LOGISTICS CLUSTER • The Logistics Cluster conducted another meeting on the 18 th of January to discuss the sharing of warehouse contacts in Iligan City and of transport contacts with newly arrived agencies in addition to the meeting on January 10, 2012 to discuss, among others, the submission of additional projects from cluster members for the flash appeal which is due by the 26th of January • Philippine Navy Ship LT-501 will transport 1,500 units of corrugated GI sheets donated by Philsteel Holdings Corporation intended for core shelter is set to sail from Manila to CDO on 18 January 2012 • OCD- CO maintains close coordination with the AFP and facilitated the use of military assets for transport of relief goods • OCD X facilitated the availability of trucks to transport relief goods from Lumbia Airport to DSWD Regional Office X; coordinated with 10 RCDG, ARESCOM on the availability of fifty (50) ROTC cadets for augmentation to DSWD in assisting repacking of relief items; augmented one (1) OCD personnel to compose the ONE
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages10 Page
-
File Size-