MAG Regional Commuter Rail System Study Update Final Report

MAG Regional Commuter Rail System Study Update Final Report

2018 REGIONAL COMMUTER RAIL SYSTEM STUDY UPDATE Maricopa Association of Governments | May 2018 MARICOPA ASSOCIATION OF GOVERNMENTS REGIONAL COMMUTER RAIL SYSTEM STUDY UPDATE May 2018 Page intentionally left blank. Table of Contents ES Executive Summary ................................................................................................ ES-1 1.0 Study Overview ......................................................................................................... 1-1 1.1 Introduction ............................................................................................................ 1-1 1.2 Background ........................................................................................................... 1-1 1.3 Purpose of the System Study ................................................................................ 1-2 1.4 Need for a Commuter Rail System ........................................................................ 1-2 1.5 Potential Benefits and Goals of Commuter Rail ..................................................... 1-5 1.6 System Study Update Process .............................................................................. 1-6 1.7 Organization of the System Study Update ............................................................. 1-6 2.0 Existing and Future Conditions ................................................................................ 2-1 2.1 Introduction and Methodology ................................................................................ 2-1 2.2 New Information Included in Update ...................................................................... 2-5 2.3 Major Changes Since the 2010 Study .................................................................... 2-8 2.4 Summary of Findings ........................................................................................... 2-11 2.5 Grand Line Corridor ............................................................................................. 2-13 2.6 Estrella Line Corridor ........................................................................................... 2-37 2.7 San Tan Line Corridor ......................................................................................... 2-61 2.8 Kyrene Line Corridor ............................................................................................ 2-87 2.9 Future Extensions .............................................................................................. 2-110 3.0 Development of the Commuter Rail Program .......................................................... 3-1 3.1 Introduction ............................................................................................................ 3-1 3.2 Development of Commuter Rail Corridors ............................................................. 3-1 3.3 Description of Proposed Commuter Rail System ................................................. 3-13 3.4 Commuter Rail Operations .................................................................................. 3-13 3.5 Summary of Commuter Rail System Assumptions ............................................... 3-14 3.6 Ridership Forecasting Results ............................................................................. 3-15 3.7 Cost Estimates .................................................................................................... 3-20 4.0 Recommendations and Implementation Strategy ................................................... 4-1 4.1 Introduction ............................................................................................................ 4-1 4.2 Peer City Comparison ............................................................................................ 4-1 4.3 Phasing Recommendations ................................................................................... 4-5 4.4 Integration with other Transit Modes ...................................................................... 4-5 i 4.5 Siting of Layover and Maintenance Facilities ......................................................... 4-8 4.6 Operations Models ............................................................................................... 4-12 4.7 Governance Options ............................................................................................ 4-16 4.8 Funding Options .................................................................................................. 4-22 4.9 Liability, Insurance, and Indemnification .............................................................. 4-35 4.10 Implementation Steps .......................................................................................... 4-43 5.0 References ................................................................................................................. 5-1 Appendix A: Methodology for Cost Estimating Appendix B: Evaluation of Potential Commuter Rail Corridor Extensions Appendix C: System Study Station Target Area Evaluation Appendix D: Commuter Rail Design Concepts Appendix E: Railroad Conditions and Issues Appendix F: Commuter Rail Vehicle Technology Appendix G: Commuter Rail Operations Plan Appendix H: Commuter Rail Maintenance Facility Description and Evaluation Appendix I: Commuter Rail Governance and Operating Structures Appendix J: Conceptual Memorandum of Understanding Appendix K: Insurance and Indemnity Language Appendix L: Potential Grade Separation Locations Appendix M: One-on-One Meetings with Participating Jurisdictions Appendix N: BNSF Operations Report (Included Separately) ii List of Figures Figure 1-1: MAG Regional Commuter Rail System Corridors _________________________ 1-4 Figure 1-2: Commuter Rail Train Examples _______________________________________ 1-5 Figure 2-1: Arizona Passenger Rail Corridor Study Preferred Alterative ________________ 2-10 Figure 2-2: Grand Line Corridor – Land Use _____________________________________ 2-17 Figure 2-3: Grand Line Corridor – Railroad Facilities ______________________________ 2-23 Figure 2-4: Grand Line Corridor – Peak Period Travel Characteristics _________________ 2-29 Figure 2-5: Grand Line Corridor – Transit Services ________________________________ 2-33 Figure 2-6: Estrella Line Corridor – Land Use ____________________________________ 2-41 Figure 2-7: Estrella Line Corridor – Railroad Facilities _____________________________ 2-47 Figure 2-8: Estrella Line Corridor – Peak Period Travel Characteristics ________________ 2-53 Figure 2-9: Estrella Line Corridor – Transit Services _______________________________ 2-57 Figure 2-10: San Tan Line Corridor – Land Use __________________________________ 2-65 Figure 2-11: San Tan Line Corridor – Railroad Facilities ____________________________ 2-73 Figure 2-12: San Tan Line Corridor – Peak Period Travel Characteristics ______________ 2-79 Figure 2-13: San Tan Line Corridor – Transit Services _____________________________ 2-83 Figure 2-14: Kyrene Line Corridor – Land Use ___________________________________ 2-91 Figure 2-15: Kyrene Line Corridor – Railroad Facilities _____________________________ 2-97 Figure 2-16: Kyrene Line Corridor – Peak Period Travel Characteristics ______________ 2-103 Figure 2-17: Kyrene Line Corridor – Transit Services _____________________________ 2-107 Figure 2-18: Future Commuter Rail Extensions and Conceptual Station Area Locations __ 2-111 Figure 3-1: MAG Regional Commuter Rail System Corridors _________________________ 3-2 Figure 3-2: MAG Commuter Rail System Study Update Station Areas __________________ 3-7 Figure 3-3: MAG Commuter Rail System 2040 Daily Boardings by Station _____________ 3-17 Figure 3-4: MAG Commuter Rail System Potential Ridership to Extension Areas of Wickenburg and San Tan Valley _______________________________________ 3-18 Figure 3-5: Tempe Elevated Bypass and Trench Options ___________________________ 3-21 Figure 3-6: Gilbert Trench Option _____________________________________________ 3-22 Figure 3-7: Phoenix Union Station Track Layout from 2010 Study ____________________ 3-27 Figure 4-1: Capital Cost per Mile (in 2017 Dollars) _________________________________ 4-3 Figure 4-2: Boardings per Revenue Mile Comparison _______________________________ 4-4 Figure 4-3: Annual O&M Cost per Passenger Trip _________________________________ 4-4 Figure 4-4: Existing and Planned Transit Modes in Downtown Phoenix _________________ 4-6 Figure 4-5: Typical Layover/Trail Track Facility ___________________________________ 4-10 Figure 4-6: Typical CRMF Site Layout __________________________________________ 4-10 Figure 4-7: Potential Commuter Rail Maintenance and/or Layover Facility Locations _____ 4-11 Figure 4-8: Limitations on Passenger Transportation Liability ________________________ 4-39 iii List of Tables Table 2-1: Grand Line Corridor Population Change (2015 – 2040) ____________________ 2-14 Table 2-2: Grand Line Corridor Employment Change (2015 – 2040) __________________ 2-14 Table 2-3: Grand Line Corridor Existing and Future Land Use _______________________ 2-15 Table 2-4: Grand Line Corridor Recent and Future Roadway Improvements ____________ 2-25 Table 2-5: Grand Line AM Peak Period Travel Characteristics (2015 – 2040) ___________ 2-26 Table 2-6: Grand Line PM Peak Period Travel Characteristics (2015 – 2040) ___________ 2-27 Table 2-7: Home-Based Work Trips Originating within the Grand Line Corridor __________ 2-35 Table 2-8: Estrella Line Corridor Population Change (2015 – 2040) ___________________ 2-37 Table 2-9: Estrella Line Corridor Employment Change (2015 – 2040) _________________

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    230 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us