Willow Creek Final Project Report

Willow Creek Final Project Report

Willow Creek Final Project Report Pine Valley Coal Ltd. TABLE OF CONTENTS EXECUTIVE SUMMARY LIST OF TABLES LIST OF FIGURES LIST OF APPENDICES 1.0 INTRODUCTION ● 1.1 PROJECT BACKGROUND ● 1.2 PROPERTY LOCATION, SERVICE FEATURES AND PHYSIOGRAPHY ● 1.3 HISTORY ● 1.4 KEY PROJECT DATA ● 1.5 CONCEPTUAL DEVELOPMENT SCHEDULE ● 1.6 ENVIRONMENTAL ASSESSMENT TERMS OF REFERENCE ● 1.7 PERMIT REQUIREMENTS ● 1.8 REPORT ORGANIZATION 2.0 PROJECT RATIONALE AND DESCRIPTION ● 2.1 GEOLOGY ● 2.1.1 Introduction ● 2.1.2 Stratigraphy ● 2.1.3 Structural Geology ● 2.1.4 Geological Interpretation ● 2.1.5 Coal Quality ● 2.2 MINING ● 2.2.1 Introduction ● 2.2.2 Mining Methodology ● 2.2.3 Production Levels and Stripping Ratios ● 2.2.4 Mine Design and Layout ● 2.2.5 Mining Sequence And Development Plan ● 2.2.6 Main Access And Haul Road Options ● 2.2.7 Rock Dumping/Backfilling ● 2.2.8 Geotechnical Criteria ● 2.2.9 Recoverable And Product Reserves ● 2.2.10 Material Balance ● 2.2.11 Mine Equipment ● 2.2.12 Mine Maintenance ● 2.2.13 Drilling and Blasting ● 2.3 COAL PROCESSING ● 2.3.1 Introduction ● 2.3.2 General Approach ● 2.3.3 Raw Coal ● 2.3.4 Coal Preparation Plant ● 2.3.5 Clean Coal Handling ● 2.3.6 Train Loadout ● 2.3.7 Plant Refuse Disposal ● 2.3.8 Coal Quality Laboratory ● 2.4 SITE INFRASTRUCTURE ● 2.4.1 Introduction ● 2.4.2 Maintenance, Warehouse & Administration Facilities ● 2.4.3 Utilities ● 2.5 SURFACE WATER MANAGEMENT ● 2.6 RECLAMATION PLAN 3.0 SITE SELECTION 4.0 ENVIRONMENTAL BASELINE ● 4.1 SCOPE AND OBJECTIVES ● 4.2 CLIMATE AND AIR QUALITY ● 4.2.1 Wind ● 4.2.2 Air Quality ● 4.2.3 Temperature and Precipitation ● 4.3 SURFICIAL GEOLOGY AND SOILS ● 4.4 WATER QUALITY ● 4.4.1 Scope and Objectives of Studies ● 4.4.2 Surface Water Quality ● 4.4.2.1 Weekly Variability ● 4.4.2.2 Seasonal Variability ● 4.4.2.3 Spatial Variability of Seasonal Data ● 4.4.2.4 Summary Water Quality Characteristics of Area Streams ● 4.4.2.5 QA/QC ● 4.4.2.6 Low Level Metals ● 4.4.3 Groundwater ● 4.4.4 Stream Sediments ● 4.5 HYDROLOGY ● 4.5.1 Background ● 4.5.2 Objectives and Scope of the 1996/97 Program ● 4.5.3 NDM Methods ● 4.5.4 IEC 1982 Results ● 4.5.5 B. Guy 1994 Results ● 4.5.6 NDM 1996 Results ● 4.5.7 Groundwater ● 4.6 FISHERIES ● 4.6.1 Globaltex 1994 ● 4.6.2 NDM 1996 ● 4.6.2.1 Introduction ● 4.6.2.2 Study Methods ● 4.6.2.3 Baseline Environment ● 4.7 BENTHIC INVERTEBRATES ● 4.8 PERIPHYTON ● 4.8.1 Methods ● 4.8.2 Trophic Status ● 4.8.2.1 Sampling Sites ● 4.8.2.2 Taxonomy ● 4.8.2.3 Biomass ● 4.8.2.4 Chlorophyll a Content ● 4.9 BIOTERRAIN AND SOILS ● 4.9.1 Introduction ● 4.9.2 Methods ● 4.9.2.1 Terrain Mapping and Mapping Reliability ● 4.9.2.2Soil Classification ● 4.9.3 Results ● 4.9.3.1 Physiography ● 4.9.3.2 Surficial Materials and Associated Landforms ● 4.9.3.3Active Geomorphological Processes ● 4.9.3.4 Soil Classes and Distribution ● 4.9.4 Summary ● 4.10 TERRESTRIAL ECOSYSTEM MAPPING ● 4.10.1 Background ● 4.10.2 Objectives ● 4.10.3 Methodology ● 4.10.4 Description of Map Units ● 4.10.4.1 Ecoregions ● 4.10.4.2 Biogeoclimatic Units ● 4.10.4.3 Ecosystem Units ● 4.11 VEGETATION ● 4.11.1 Background ● 4.11.2 Methodology ● 4.11.3 Results ● 4.12 WILDLIFE ● 4.12.1 Methodology ● 4.12.3 Results ● 4.12.3.1 Birds ● 4.12.3.2 Mammals ● 4.12.3.3 Amphibians ● 4.12.3.4 Reptiles ● 4.12.3.5 Wildlife Capability Ratings ● 4.12.3.6 Valued Ecosystem Components ● 4.12.3.7 Environmentally Sensitive Areas ● 4.13 ARCHAEOLOGY/HERITAGE/TRADITIONAL USE ● 4.14 LAND USE ● 4.14.1 Agriculture ● 4.14.2 Forestry ● 4.14-3 Non-Renewable Resources ● 4.14.4 Private Land Holdings ● 4.14.5 Guiding/Hunting ● 4.14.6 Trapping ● 4.14.7 Water Licences and Wells ● 4.15 ACID ROCK DRAINAGE STUDIES ● 4.15.1 Introduction ● 4.15.2 Sampling and Analysis ● 4.15.3 Description of Results ● 4.15.3.1 Form of Sulphur ● 4.15.3.2 ABA Characteristics by Rock type ● 4.15.3.3 Seam Interburden ● 4.15.3.4 Coal ● 4.15.3.5 Coarse Plant Rejects ● 4.15.4 Interpretation of ARD Potential ● 4.15.5 Conclusions 5.0 SOCIO-ECONOMIC BASELINE ● 5.1 INTRODUCTION ● 5.2 PART A - CHETWYND PROFILE ● 5.2.1 History ● 5.2.2 Location ● 5.2.3 Area Communities ● 5.2.4 Population and Labour Force ● 5.2.5 Economic Base and Development ● 5.2.6 Community Services ● 5.3 PART B: DAWSON CREEK AREA PROFILE ● 5.3.1 History ● 5.3.2 Location ● 5.3.3 Economic Base and Development ● 5.3.4 Population and Labour Force 6.0 DIRECT AND INDIRECT ENVIRONMENTAL IMPACTS ASSESSMENT ● 6.1 INTRODUCTION ● 6.2 AIR QUALITY ● 6.2.1 Emission Sources ● 6.2.1.1 Mining ● 6.2.1.2 Coal Handling ● 6.2.1.3 Shops and Administration ● 6.2.2 Dust ● 6.2.2.1 Construction ● 6.2.2.2 Operations ● 6.2.3 Other Emissions ● 6.2.4 Distances to Nearest Residence from Mine Facilities ● 6.3 NOISE ● 6.3.1 Introduction ● 6.3.2 Mine Construction ● 6.3.3 Mine Operation ● 6.3.3.1 Excavators and Front End Loaders ● 6.3.3.2 Blasting ● 6.3.3.3 Haul Trucks ● 6.3.3.4 Private Automobiles ● 6.3.3.5 Highway Truck Traffic ● 6.3.3.6 Internal Plant Noise ● 6.3.3.7 Train Noise ● 6.4 VISUAL QUALITY ● 6.4.1 Construction ● 6.4.2 Operation ● 6.5 SURFACE WATER QUALITY ● 6.5.1 Introduction ● 6.5.2 Construction Phase ● 6.5.3 Operations Phase ● 6.5.3.1 Suspended Sediments ● 6.5.3.2 Nitrogen Compounds ● 6.5.4 Reclamation and Closure Phase ● 6.6 GROUNDWATER ● 6.7 FISH ● 6.7.1 Project Design ● 6.7.2 Project Construction ● 6.7.3 Mine Operation ● 6.7.4 Abandonment and Closure ● 6.7.5 Residual Impacts ● 6.8 ECOSYSTEM UNITS ● 6.8.1 Construction and Operational Phases ● 6.8.1.1 Loss of Ecosystem Units ● 6.8.2 Reclamation and Closure Phase ● 6.9 WILDLIFE ● 6.9.1 Habitat Alteration ● 6.9.1.1 Grizzly Bear ● 6.9.1.2 Elk ● 6.9.1.3 Moose ● 6.9.1.4 Mule Deer and White-tailed Deer ● 6.9.1.5 Marten ● 6.9.1.6 Fisher ● 6.9.1.7 Northern Goshawk ● 6.9.1.8 Broad-winged Hawk ● 6.9.1.9 Black-throated Green Warbler ● 6.9.1.10 Connecticut Warbler ● 6.9.1.11 Bay-breasted Warbler ● 6.9.1.12 Cape May Warbler ● 6.9.1.13 Canada Warbler ● 6.9.1.14 Philadelphia Vireo ● 6.9.1.15 Yellow-bellied Flycatcher ● 6.9.1.16 Woodland Caribou ● 6.9.1.17 Trumpeter Swans ● 6.9.2 Reduced Habitat Effectiveness ● 6.9.3 Blockage of Wildlife Movement ● 6.9.4 Habitat Fragmentation ● 6.9.5 Project Related Wildlife Mortalities 7.0 MITIGATION AND ENVIRONMENTAL MANAGEMENT ● 7.1 CONCEPTUAL RECLAMATION PLAN ● 7.1.1 Introduction ● 7.1.2 Land and Resource Use ● 7.1.3 Reclamation Objectives ● 7.1.4 Post-Mining Landscape Units ● 7.1.4.1 External Rock Dumps ● 7.1.4.2 Pits ● 7.1.4.3 Sedimentation Ponds ● 7.1.4.4 Roads ● 7.1.4.5 Plant Facilities ● 7.1.5 Site Preparation ● 7.1.5.1 Soil Stockpiling ● 7.1.5.2 Rock Dumps ● 7.1.5.3 Pit Preparation ● 7.1.5.4 Decommissioning of Roads, and Plant Site ● 7.1.6 Re-vegetation ● 7.1.6.2 Re-vegetation of Rock Dumps/Backfill ● 7.1.6.3 Selection of Vegetation ● 7.1.7 Monitoring and Research ● 7.2 CONCEPTUAL WASTE MANAGEMENT PLAN ● 7.2.1 Construction Phase ● 7.2.2 Operations Phase ● 7.2.2.1 Overburden and Rock ● 7.2.2.2 Tailings ● 7.2.2.3 Coarse Plant Rejects ● 7.2.2.4 Domestic Sewage ● 7.2.2.5 Refuse Management ● 7.2.3 Closure Phase ● 7.3 CONCEPTUAL WATER MANAGEMENT PLAN ● 7.3.1 Site Description and Drainage ● 7.3.2 Sediment and Water Control During Construction ● 7.3.3 Sedimentation and Diversion Requirements ● 7.3.4 Sedimentation Pond Phasing and Sizing ● 7.3.4.1 Conceptual Phasing and Design Criteria ● 7.3.4.2 Preliminary Estimate of Pond Inflows ● 7.3.4.3 Pond Sizing ● 7.3.5 Sedimentation Pond and Ditch Design ● 7.3.6 Wash Plant Water Balance ● 7.4 FISHERIES ● 7.4.1 Mitigation ● 7.4.2 Compensation ● 7.5 WILDLIFE HABITAT PROTECTION PLAN ● 7.5.1 Reduction Of Habitat Alteration ● 7.5.2 Improve Habitat Effectiveness ● 7.5.3 Minimize Blockage Of Wildlife Movement ● 7.5.4 Decrease Habitat Fragmentation ● 7.5.5 Reduce Project Related Wildlife Mortalities ● 7.6 NOISE ● 7.7 DUST ● 7.8 VISUAL QUALITY 8.0 DIRECT AND INDIRECT SOCIO-ECONOMIC IMPACTS ● 8.1 GENERAL ● 8.2 INDICATORS OF ECONOMIC BENEFITS ● 8.2.1 Assessment of Impact on Economic Variables ● 8.2.2 Summary of Economic Study Results ● 8.2.3 Aggregate Economic Impacts ● 8.2.4 Government Revenues ● 8.3 DISTRICT OF CHETWYND ● 8.4 WILLOW FLATS AND COMMUNITY ● 8.5 PROCUREMENT AND HUMAN RESOURCE POLICIES 9.0 PROJECT ALTERNATIVES ● 9.1 INTRODUCTION ● 9.2 PLANT LOCATION ALTERNATIVES ● 9.3 MAIN HAUL ROAD ALTERNATIVES ● 9.4 TAILINGS POND ● 9.5 REJECT DISPOSAL 10.0 ASSESSMENT OF ALTERNATIVES EFFECTS 11.0 POTENTIAL EFFECTS ON ABORIGINAL TRADITIONAL USE 12.0 SAFETY AND CONTINGENCY RESPONSE ● 12.1 SCOPE AND PURPOSE ● 12.1 REGULATORY FRAMEWORK ● 12.2 CHEMICAL STORAGE AND HANDLING ● 12.2.1 Chemicals List ● 12.2.2 Flocculants ● 12.2.3 Lime ● 12.2.4 Petroleum Products ● 12.2.4 Other Chemicals ● 12.3 SAFETY ● 12.4 EMERGENCY RESPONSE ● 12.5 ORGANIZATION AND RESPONSIBILITIES ● 12.5.1 Responsibilities of the Person Discovering the Spill ● 12.5.2 Responsibilities of the General Manager and Mine or Wash Plant Superintendent ● 12.5.3 Responsibilities of the On-Scene Work Crew ● 12.5.4 Responsibilities of the Site Crew ● 12.5.5 Duties of the Safety and Environment Manager Not Related to the Spill Event ● 12.6 GOVERNMENT NOTIFICATION PROCEDURE ● 12.6.1 Minesite Spills ● 12.6.2 Transport Spills ● 12.7 SUPPLIES AND RESOURCES ● 12.7.1 Explosives Manufacturers and Suppliers ● 12.7.2 Canadian Transport Emergency Centre (CANUTEC) ● 12.7.3 Chemical Waste Disposal Contractors ● 12.7.4 Suppliers and Dealers ● 12.7.5 Other 13.0 CUMULATIVE IMPACTS ASSESSMENT ● 13.1 DIRECT IMPACTS FROM THE PROJECT ● 13.2 FISHERIES ● 13.3 ECOSYSTEM UNITS/VEGETATION ● 13.4 WILDLIFE ● 13.4.1 Cumulative Effects ● 13.4.3.1 Grizzly Bear ● 13.4.3.2 Elk ● 13.4.3.3 Moose ● 13.4.3.4

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    338 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us