The 2021-2024 Statewide Interstate TIP – Highway and Bridge Projects with Public Narrative

The 2021-2024 Statewide Interstate TIP – Highway and Bridge Projects with Public Narrative

Date: 5/28/20 4:09PM Page 1 of 62 Interstate TIP - Highway & Bridge Projects Allegheny PennDOT Project Id: 81931 Project Administrator: PennDOT Title: I-79, Campbell's-Moon Run Improvement Type: Restoration State Route: 79 Municipality: Robinson (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 3/2/23 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Located on I-79, Campbells Run to Moon Run, just past Crafton exit in Kennedy & Robinson Townships, Allegheny County Project Description: Resurfacing, guiderail upgrades and new pavement markings on I-79 from Campbells Run to Moon Run and bridge preservation on I-79 over State Route 22, I-79 over Campbells Run Road and I-79 over State Route 60 in Kennedy and Robinson Townships, Allegheny County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $2,082 $0 $0 $0 $0 $0 Final Design NHPP $0 $3,000 $0 $0 $0 $0 Utility 581 $0 $0 $100 $0 $0 $0 Right of Way 581 $0 $0 $475 $0 $0 $0 Construction NHPP $0 $0 $5,000 $5,000 $10,539 $0 Federal: $2082 $3000 $5000 $5000 $10539 $0 State: $0 $0 $575 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,082 $3,000 $5,575 $5,000 $10,539 $0 Total FFY 2021-2032 Cost $26,196 PennDOT Project Id: 87756 Project Administrator: PennDOT Title: Neville Island Bridge Improvement Type: Bridge Preservation Activities State Route: 79 Municipality: Neville (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 6/4/20 Air Quality Exempt Reason: S19 - Widen narw. pave. or recon brdgs (No addtl lanes) Actual Construction Bid Date: Location: I-79 NB ramp to SR 0051 in Robinson Township 200 feet north of SR 4033 in Glenfield Borough, Allegheny County Project Description: Bridge preservation (paint, structural steel crack repairs) on I-79 and SR 65 bridges (Neville Island) and associated ramps in Robinson and Neville Townships, and Glenfield Borough, Allegheny County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $30,000 $0 $0 $0 $0 $0 Federal: $30000 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $30,000 $0 $0 $0 $0 $0 Total FFY 2021-2032 Cost $30,000 PennDOT Project Id: 87765 Project Administrator: PennDOT Title: I-376, 376 Business to Tonidale Improvement Type: Restoration State Route: 376 Municipality: Moon (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 5/21/20 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: 5/21/20 Location: Located on I-376, from Business 376 to SR 22 in, North Fayette, Findlay, Moon and Robinson Townships, Allegheny County. Project Description: Mill and overlay on I-376, from Business 376 to SR 22 in North Fayette, Findlay, Moon and Robinson Townships, Allegheny County. Date: 5/28/20 4:09PM Page 2 of 62 Interstate TIP - Highway & Bridge Projects Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $13,539 $0 $0 $0 $0 $0 Federal: $13539 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $13,539 $0 $0 $0 $0 $0 Total FFY 2021-2032 Cost $13,539 PennDOT Project Id: 87767 Project Administrator: PennDOT Title: I-376, Edgewood to Churchill Improvement Type: Restoration State Route: 376 Municipality: Churchill (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 2/15/24 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Located on I-376 from Edgewood to Churchill in Edgewood, Churchill and Wilkinsburg Boro's, Allegheny County Project Description: Mill and overlay and bridge work on I-376 from Edgewood to Churchill in Edgewood, Churchill and Wilkinsburg Boro's, Allegheny County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $2,000 $0 $0 $0 $0 $0 Final Design NHPP $0 $2,500 $0 $0 $0 $0 Utility NHPP $0 $0 $100 $0 $0 $0 Right of Way NHPP $0 $0 $450 $0 $0 $0 Construction NHPP $0 $0 $0 $10,000 $25,805 $0 Federal: $2000 $2500 $550 $10000 $25805 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,000 $2,500 $550 $10,000 $25,805 $0 Total FFY 2021-2032 Cost $40,855 PennDOT Project Id: 87778 Project Administrator: PennDOT Title: I-376, Churchhill to Monroeville Improvement Type: Resurface State Route: 376 Municipality: Churchill (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 3/16/23 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Located on I-376 from Churchhill to Monroeville in Churchhill Boro and Monroeville Boro, Allegheny County Project Description: Mill and overlay, bridge rehabilitation and preservation on I-376 from Churchhill to Monroeville in Churchhill Boro and Monroeville Boro, Allegheny County. Date: 5/28/20 4:09PM Page 3 of 62 Interstate TIP - Highway & Bridge Projects Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering NHPP $2,500 $0 $0 $0 $0 $0 Final Design NHPP $0 $2,500 $0 $0 $0 $0 Utility NHPP $0 $0 $250 $0 $0 $0 Right of Way NHPP $0 $0 $750 $0 $0 $0 Construction NHPP $0 $0 $10,000 $10,000 $64,920 $0 Federal: $2500 $2500 $11000 $10000 $64920 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $2,500 $2,500 $11,000 $10,000 $64,920 $0 Total FFY 2021-2032 Cost $90,920 PennDOT Project Id: 91565 Project Administrator: PennDOT Title: I-79, Moon Run - Neville Island Improvement Type: Reconstruct State Route: 79 Municipality: Kennedy (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 3/17/22 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Located on I-79 from Moon Run to Neville Island in Robinson, Kennedy & Neville Townships and Glenfield Borough, Allegheny County Project Description: Milling and overlay on I-79 from Moon Run to Neville Island in Robinson, Kennedy & Neville Townships and Glenfield Borough, Allegheny County Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Construction NHPP $0 $10,000 $10,000 $10,000 $12,070 $0 Federal: $0 $10000 $10000 $10000 $12070 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $0 $10,000 $10,000 $10,000 $12,070 $0 Total FFY 2021-2032 Cost $42,070 PennDOT Project Id: 94812 Project Administrator: PennDOT Title: I-79, Neville Island to I-279 Improvement Type: Restoration State Route: 79 Municipality: Aleppo (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 12/10/20 Air Quality Exempt Reason: S10 - Pavement resurfacing and/or rehabilitation Actual Construction Bid Date: Location: Located on I-79, from Neville Island to I-279 in Aleppo Township and Glenfield, Sewickley Hills and Franklin Park Boros, Allegheny County. Project Description: Mill and overlay, bridge rehabilitation and bridge preservation on I-79, from Neville Island to I-279 in Aleppo Township and Glenfield, Sewickley Hills and Franklin Park Boros, Allegheny County. Date: 5/28/20 4:09PM Page 4 of 62 Interstate TIP - Highway & Bridge Projects Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Final Design 581 $1,545 $0 $0 $0 $0 $0 Utility 581 $106 $0 $0 $0 $0 $0 Right of Way 581 $206 $0 $0 $0 $0 $0 Construction NHPP $10,000 $10,000 $10,000 $11,545 $0 $0 Federal: $10000 $10000 $10000 $11545 $0 $0 State: $1857 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $11,857 $10,000 $10,000 $11,545 $0 $0 Total FFY 2021-2032 Cost $43,402 PennDOT Project Id: 97027 Project Administrator: PennDOT Title: I-376/Carnegie Interchange Improvement Type: Interchange Improvement State Route: 376 Municipality: Carnegie (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 6/15/24 Air Quality Exempt Reason: R3 - Interchange reconfiguration projects Actual Construction Bid Date: Location: Located on I-376 Carnegie Interchange including SR 50 and SR 3099 in Scott, Carnegie and Greentree Borough, Allegheny County. Project Description: Interchange improvements and structure improvement on I-376 Carnegie Interchange including SR 50 and SR 3099 in Scott, Carnegie and Greentree Borough, Allegheny County. Project Costs(In Thousands) Phase Fund 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Preliminary Engineering 581 $500 $500 $0 $0 $0 $0 Final Design NHPP $0 $1,000 $1,575 $0 $0 $0 Utility 581 $0 $0 $515 $0 $0 $0 Right of Way 581 $0 $0 $0 $1,061 $0 $0 Construction NHPP $0 $0 $0 $0 $75,000 $35,300 Federal: $0 $1000 $1575 $0 $75000 $35300 State: $500 $500 $515 $1061 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 2021 2022 2023 2024 2025 - 2028 2029 - 2032 Period Totals: $500 $1,500 $2,090 $1,061 $75,000 $35,300 Total FFY 2021-2032 Cost $115,451 PennDOT Project Id: 97029 Project Administrator: PennDOT Title: I-376/Greentree Interchange Improvement Type: Interchange Improvement State Route: 376 Municipality: Greentree (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Estimated Construction Bid Date: 6/15/24 Air Quality Exempt Reason: R3 - Interchange reconfiguration projects Actual Construction Bid Date: Location: Located on I-376 (Greentree Interchange) in the City of Pittsburgh and Greentree Borough, Allegheny County.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    62 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us