Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. FORM-1 (I) Basic Information Sr. Item Details No. 1 Name of the Project Mulund Shanti Nagar, Ram Manohar Dube Chawl CHS (prop.) 2 S. No. in the Schedule 8 (a) 3 Proposed capacity/area Plot Area: 10,618.27sq.m. /length/tonnage to be Total Built up Area : 81,856.98 sq. m. handled/command area/lease area/ number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. Nil 6 Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7 Does it attract the general No condition? If Yes, Please specify 8 Does it attract the specific No condition? If yes, Please specify 9 Location Plot/Survey/Hissa No. Land bearing C.T.S. No. 589(part), 589/1 to 95 of Village Nahur, Mulund (West). Mumbai – 400 080. Village Village Nahur, Tehsil Kurla District Mumbai State Maharashtra 10 Nearest railway station/airport Mulund Railway Station (km) by Road Distance =1.2 along with distance in kms. km CST International Airport (km) by Road Distance=23.7 km 11 Nearest Town, City, District Mumbai. Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, Municipal Corporation of Greater Mumbai (MCGM) Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/S Rajguru Developers Pvt. Ltd. 14 Registered Address R.B. House , M.I.D.C. Cross Road “B”, Off Andheri Kurla Road, J.B. Nagar, Andheri (E) Mumbai – 400 059. 15 Address for correspondence: Name Priyal K Patel Designation(Owner/Partner/CEO) Owner Address R.B. House , M.I.D.C. Cross Road “B”, Off Andheri Kurla Road, J.B. Nagar, Andheri (E) Mumbai – 400 1 Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. 059. Pin Code 400 059 E-mail [email protected] Telephone No. +91 22 6735 9900 Fax No. - 16 Details of Alternative Sites Not Applicable examined, If any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects None 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) None 24 Whether there is any litigation Not Applicable pending against the project and/or land in which the project is propose to be set up? Name of the Court Case No. Orders/directions of the Court, if any and its Relevance with the proposed project. * Capacity corresponding to sartorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc. 2 Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No It is new residential project under SRA scheme. land use, land cover or Land use will remain same as earlier reserved in topography including increase in DP as Residential. intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No NA vegetation and building? 1.3 Creation of new land uses No 1.4 Pre-construction investigations Yes Pre–Feasibility studies, Geo-Technical e.g. bore houses, soil testing? investigations had already being carried during previous Environmental Clearance. 1.5 Construction Works? Yes Total constructed area (FSI + Non FSI area) is 81,856.98 sq. m. 1.6 Démolition Works? No Not Applicable. 1.7 Temporary sites used for Yes Labour camps of 75-100 no’s already being construction works or housing of provided with sanitation facility. construction workers? The site is having temporary store rooms and site office during construction phase, which will be demolished. The demolition waste will be used within the site to the best possible extent. 1.8 Above ground buildings, Yes The above ground structures shall comprise of structures or earthworks including 3 Res. Bldgs. linear structures, cut and fill or Rehab Building No. 1 = Stilt + 22 Upper Floors excavations. Sale Building No. 2 = 2 Basement + Stilt + 2 podium + 50 Upper Floors + Service Floor + Fire Check Floor Rehab Building No. 3= Stilt + 12 upper Floors The maximum height of the proposed project will be 169.30 m. Thus, there will be a visual impact on the surroundings. This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped will be provided which will enhance the aesthetic beauty of the area. 1.9 Underground works including No No underground works including mining / 3 Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data mining or tunneling? Tunneling is required except excavation work for lower ground level, for foundation, lay down of pipes, underground storage tank, electric cables, soak pits, septic tanks etc. 1.10 Reclamation works? No - 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and manufacturing No - Process? 1.14 Facilities for storage of goods or Yes Separate raw material storage yard is being made, materials? which is temporary. Construction Phase: Construction Phase: During the construction phase soak pits and septic tanks is being provided for disposal of waste water. Temporary sanitary toilets will be provided. Operation Phase: # Type Of Rehab Sale Total Waste 1 Biodegr 345 579 924 adable Waste (kg/day) 2 Non- 261 386 647 biodegrad able Waste (kg/day) 3 STP 7 20 27 Sludge (Kg) Treatment & Disposal : The biodegradable waste will be processed in OWC & Non biodegradable waste will be managed through recyclers. 4 Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.15 Facilities for treatment or disposal Yes Biodegradable waste will be processed in organic of solid waste or liquid effluents? waste convertor and manure shall be used for landscaping within the premises and nearby gardens if required. Non- Biodegradable waste will be managed through recyclers. Dried sewage sludge 27Kg/Day (Rehab = 7kg/day, Sale = 20 Kg/day) will be used as manure for gardening. sewage will be treated in STP of capacity which is mentioned in the table. Rehab Sale Total Sewage 148 391 539 generation STP Capacity 155 400 555 Treated water will be utilized for greenbelt development and flushing. Rehab Sale Total Flushing 55KLD 87 KLD 142 KLD Landscaping 03KLD 04KLD 7KLD 1.16 Facilities for long term housing of No Apart from residents, there will be maintenance operational workers? team along with security. The impact due to this will be negligible. 1.17 New road, rail or sea traffic No No new road is required as project site is during construction of operation? abutting the 18.30 mt. wide Goshala road, 18.30m wide Jawaharlal Nehru Road & 13.40 m wide Sevaram Lalawani Road. Project is located within highly urban area having well established connectivity through rail road. During construction phase, traffic will increase due to inward movement of trucks carrying raw materials. 1.18 New road, rail, air, waterborne or No No new Rail/road is required. The entire essential other transport infrastructure infrastructure is already available. including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing No There will be no diversion or closure of the transport routes or infrastructure existing transport routes and infrastructure. This is leading to changes in traffic applicable for large projects only. movements? 5 Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd. Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.20 New or diverted transmission No There will be no shifting of electrical transmission lines or pipelines? line. But the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, internal power distribution lines. 1.21 Impoundment, damming, No No change in hydrology. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream passing through the site. 1.23 Abstraction or transfers of water No Water requirement in the construction phase will from ground or surface waters? be supplied depending upon construction activity through tanker (25 KLD). During operation phase, total water requirement of 426 KLD (Rehab = 165 KLD, Sale =261 KLD) will be met from MCGM and recycled water from STP. 1.24 Changes in water bodies or the No There will be no change in the drainage pattern. land surface affecting drainage or The project will not materially affect the drainage run-off. or run-off in the area which will be improved by well planned development. 1.25 Transport of personnel or Yes Construction: materials for construction, There will be movement of personnel’s, materials operation or decommissioning? and machineries during the construction phase.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages16 Page
-
File Size-