Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

FORM-1 (I) Basic Information

Sr. Item Details No. 1 Name of the Project Shanti Nagar, Ram Manohar Dube Chawl CHS (prop.) 2 S. No. in the Schedule 8 (a) 3 Proposed capacity/area Plot Area: 10,618.27sq.m. /length/tonnage to be Total Built up Area : 81,856.98 sq. m. handled/command area/lease area/ number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. Nil 6 Category of Project i.e. ‘A’ or ‘B’ ‘B’ 7 Does it attract the general No condition? If Yes, Please specify 8 Does it attract the specific No condition? If yes, Please specify 9 Location Plot/Survey/Hissa No. Land bearing C.T.S. No. 589(part), 589/1 to 95 of Village Nahur, Mulund (West). – 400 080. Village Village Nahur, Tehsil District Mumbai State 10 Nearest railway station/airport Mulund Railway Station (km) by Road Distance =1.2 along with distance in kms. km CST International Airport (km) by Road Distance=23.7 km 11 Nearest Town, City, District Mumbai. Headquarters along with distance in kms. 12 Village Panchayats, Zilla Parishad, Municipal Corporation of Greater Mumbai (MCGM) Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13 Name of the applicant M/S Rajguru Developers Pvt. Ltd. 14 Registered Address R.B. House , M.I.D.C. Cross Road “B”, Off Kurla Road, J.B. Nagar, Andheri (E) Mumbai – 400 059. 15 Address for correspondence: Name Priyal K Patel Designation(Owner/Partner/CEO) Owner Address R.B. House , M.I.D.C. Cross Road “B”, Off Andheri Kurla Road, J.B. Nagar, Andheri (E) Mumbai – 400

1

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

059. Pin Code 400 059 E-mail [email protected] Telephone No. +91 22 6735 9900 Fax No. - 16 Details of Alternative Sites Not Applicable examined, If any. Location of these sites should be shown on a topo sheet. 17 Interlinked Projects None 18 Whether separate application of Not Applicable interlinked project has been submitted? 19 If yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? 22 Whether there is any Government No Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) None

24 Whether there is any litigation Not Applicable pending against the project and/or land in which the project is propose to be set up? Name of the Court Case No. Orders/directions of the Court, if any and its Relevance with the proposed project.

* Capacity corresponding to sartorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.

2

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or temporary change in No It is new residential project under SRA scheme. land use, land cover or Land use will remain same as earlier reserved in topography including increase in DP as Residential. intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No NA vegetation and building? 1.3 Creation of new land uses No 1.4 Pre-construction investigations Yes Pre–Feasibility studies, Geo-Technical e.g. bore houses, soil testing? investigations had already being carried during previous Environmental Clearance. 1.5 Construction Works? Yes Total constructed area (FSI + Non FSI area) is 81,856.98 sq. m.

1.6 Démolition Works? No Not Applicable. 1.7 Temporary sites used for Yes Labour camps of 75-100 no’s already being construction works or housing of provided with sanitation facility. construction workers?  The site is having temporary store rooms and site office during construction phase, which will be demolished. The demolition waste will be used within the site to the best possible extent. 1.8 Above ground buildings, Yes  The above ground structures shall comprise of structures or earthworks including 3 Res. Bldgs. linear structures, cut and fill or Rehab Building No. 1 = Stilt + 22 Upper Floors excavations. Sale Building No. 2 = 2 Basement + Stilt + 2 podium + 50 Upper Floors + Service Floor + Fire Check Floor Rehab Building No. 3= Stilt + 12 upper Floors

 The maximum height of the proposed project will be 169.30 m. Thus, there will be a visual impact on the surroundings. This will add to the change in the localized physical environment. In the post construction phase, tree plantation and landscaped will be provided which will enhance the aesthetic beauty of the area. 1.9 Underground works including No No underground works including mining /

3

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data mining or tunneling? Tunneling is required except excavation work for lower ground level, for foundation, lay down of pipes, underground storage tank, electric cables, soak pits, septic tanks etc. 1.10 Reclamation works? No - 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and manufacturing No - Process?

1.14 Facilities for storage of goods or Yes Separate raw material storage yard is being made, materials? which is temporary. Construction Phase:

Construction Phase: During the construction phase soak pits and septic tanks is being provided for disposal of waste water. Temporary sanitary toilets will be provided.

Operation Phase: # Type Of Rehab Sale Total Waste 1 Biodegr 345 579 924 adable Waste (kg/day) 2 Non- 261 386 647 biodegrad able Waste (kg/day) 3 STP 7 20 27 Sludge (Kg)

Treatment & Disposal : The biodegradable waste will be processed in OWC & Non biodegradable waste will be managed through recyclers.

4

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.15 Facilities for treatment or disposal Yes Biodegradable waste will be processed in organic of solid waste or liquid effluents? waste convertor and manure shall be used for landscaping within the premises and nearby gardens if required. Non- Biodegradable waste will be managed through recyclers.

Dried sewage sludge 27Kg/Day (Rehab = 7kg/day, Sale = 20 Kg/day) will be used as manure for gardening. sewage will be treated in STP of capacity which is mentioned in the table. Rehab Sale Total Sewage 148 391 539 generation STP Capacity 155 400 555 Treated water will be utilized for greenbelt development and flushing.

Rehab Sale Total Flushing 55KLD 87 KLD 142 KLD Landscaping 03KLD 04KLD 7KLD

1.16 Facilities for long term housing of No Apart from residents, there will be maintenance operational workers? team along with security. The impact due to this will be negligible. 1.17 New road, rail or sea traffic No  No new road is required as project site is during construction of operation? abutting the 18.30 mt. wide Goshala road, 18.30m wide Jawaharlal Nehru Road & 13.40 m wide Sevaram Lalawani Road.  Project is located within highly urban area having well established connectivity through rail road.  During construction phase, traffic will increase due to inward movement of trucks carrying raw materials.

1.18 New road, rail, air, waterborne or No No new Rail/road is required. The entire essential other transport infrastructure infrastructure is already available. including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing No There will be no diversion or closure of the transport routes or infrastructure existing transport routes and infrastructure. This is leading to changes in traffic applicable for large projects only. movements?

5

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.20 New or diverted transmission No There will be no shifting of electrical transmission lines or pipelines? line. But the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, internal power distribution lines. 1.21 Impoundment, damming, No No change in hydrology. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream passing through the site.

1.23 Abstraction or transfers of water No Water requirement in the construction phase will from ground or surface waters? be supplied depending upon construction activity through tanker (25 KLD). During operation phase, total water requirement of 426 KLD (Rehab = 165 KLD, Sale =261 KLD) will be met from MCGM and recycled water from STP. 1.24 Changes in water bodies or the No There will be no change in the drainage pattern. land surface affecting drainage or The project will not materially affect the drainage run-off. or run-off in the area which will be improved by well planned development. 1.25 Transport of personnel or Yes Construction: materials for construction, There will be movement of personnel’s, materials operation or decommissioning? and machineries during the construction phase. The impact due to the same will be negligible as local people will be deployed and the construction material and machinery required will be mobilized from the local area. Thus there will be contribution of marginal noise & vehicular emissions. Ghodbunder Road will be used for the transportation of material and personal.

Post Construction: There will be total 773 nos of 4W (Rehab = 35 Nos, Sale =738 Nos.) on road due to the project on completion of project with 100% occupancy. 1.26 Long-term dismantling or No It’s a residential project decommissioning or restoration works? 1.27 Ongoing activity during No It’s a residential project decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Construction Phase: either temporarily or During the construction phase about 75-100 Labors permanently? and other staff of 25-30 people influx which is

6

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data temporary in nature. Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total permanent population is expected to be 3263 Nos. 1.29 Introduction of alien species? No Indigenous or Native species will be planted. 1.30 Loss of native species or genetic No Not applicable. diversity? 1.31 Any other actions? No Not applicable.

2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data

2.1 Land specially No The plot land is non agricultural type. undeveloped or agricultural land (ha) 2.2 Water (expected source Yes Construction Phase: & competing users) unit It is expected to house about 70-80 labours at site. KLD Operation Phase: The water requirement 426 KLD will be met by MCGM and Recycled water. 2.3 Minerals (MT) No --- 2.4 Construction material – Yes The construction materials, which will be used in the project stone, aggregates, site, will be procured from authorized local dealer. and/soil (expected source-MT) 2.5 Forests and timber Yes Certified wood to be used as mentioned below. (source-MT) Material Dense woods (19 mm) Softwoods (19 mm) Plywood (12 mm)

7

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

2.6 Energy including Yes Construction Phase: 100 KVA electricity and fuels Source : MSEDCL (source, competing users) Unit: fuel (MT), energy Operation Phase : (KW) Residential Connected load (KW) 4092 Maximum demand (KW) 2455 DG Set capacity (KVA) 3 X 325 KVA

Low Sulphur diesel (HSD) will be used as fuel to run standby D.G. sets. 2.7 Any other natural No No other natural resources will be used. resources (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 3.1 Use of substances or Yes Each DG set shall be provided with proper acoustic materials, which are enclosure. Oil spillage from construction machinery & hazardous (as per MSIHC vehicles, discarded containers of paints solvents etc, rules) to human health or tarpaulins, etc. Detailed Debris management plan and the environment (flora, Standard Operating procedures shall be provided. fauna, and water supplies) Hazardous waste will be managed as per the rules. 3.2 Changes in occurrence of No During the entire construction phase adequate precaution disease or affect disease will be taken to avoid stagnation of water giving rise to vectors (e.g. insect or water mosquito breeding. Further, storm water network will be borne diseases) well designed to leave no stagnant water pockets, at any point of time. The storm water line will not cross wastewater line. Proper housekeeping practices will be adopted. 3.3 Affect the welfare of Yes Positive impact due to enhanced and hygienic living people e.g. by changing conditions. Aesthetic value of area will be improved. It living conditions? will provide employment opportunities to the local people in terms of skilled and unskilled labour during construction and service personnel during operational phase. 3.4 Vulnerable groups of No Noise and vibrations from the construction activities will people who could be be mitigated by adopting suitable measures. affected by the project e.g. hospital patients, children, the elderly etc.,

8

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

3.5 Any other causes No No other causes identified.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data

4.1 Spoil, overburden or mine No There is no activity which may generate spoil, wastes. overburden & mine waste. 4.2 Municipal waste (domestic Yes Operation Phase: and commercial wastes) Total solid waste: 1571 Kg /day.(Rehab= 606, Sale = 965) Bio – degradable waste: 924 Kg/day.(Rehab= 345, Sale = 579) Non–biodegradable waste: 647 Kg/day.(Rehab= 261, Sale = 386) Treatment & Disposal :  The biodegradable waste (924 Kg/Day) will be processed in OWC.  Non- Biodegradable waste (647Kg/Day) will be handed over to recyclers. Sludge Quantity: 27Kg, Dry sewage sludge will be used as manure for gardening. 4.3 Hazardous wastes (as per Yes Used oil from DG set will be stored carefully at hazardous waste separate location duly marked and will be sold to management rules) CPCB authorized recyclers. The mercury containing lamps will not be used in the post construction phase. However, the other hazardous waste such as waste tube lights, CFL’s, batteries (inverters), will be generated and will be sold to the registered actual users. 4.4 Other industrial process No Not Applicable wastes. 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other Yes Dewatered / dried sludge from STP will be used as sludge from effluent manure for gardening/landscaping. treatment plant.

9

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

4.7 Construction or demolition Yes Construction phase waste management wastes S Particulars Quantity Management r. No. 1 Scrap 132 tons Entire scrap material Material generated will be sold

2 Aggregates 2978 tons Will be used as a layer for internal roads and building boundary wall. 3 Tile/Marbles 7448sq.m. Waste tiles will be used as china mosaic water proofing for terraces. Also it will be used for skirting purpose. 4 Paint Cans 2320 no’s Will be sold to reuse. No demolition work is involved in proposed construction hence no demolition waste is expected to be generate.

4.8 Redundant machinery or No All equipment’s used for construction will be of equipment standard quality and maintained on regular basis. 4.9 Contaminated soils or other Yes During painting, spillage of oil, diesel, leakage from materials STP. 4.10 Agricultural wastes No - 4.11 Other solid wastes No -

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 5.1 Emissions from Yes  Exhaust emission generated from Auto mobiles will combustion of fossil fuels be checked by proper PUC certificate. from stationary or mobile  Emissions from DG set when it is operated in case of sources. emergency.  Emissions from Automated Construction Machinery and Heavy vehicles during Construction Phase. 5.2 Emission from production No There is no production as the proposed project is processes. Residential and commercial. 5.3 Emissions from materials Yes Fugitive emissions will be generated, while handling handling including storage and transportation of materials to site, this will be or transport temporary in nature. 5.4 Emissions from Yes The project may cause rise in dust levels during construction activities construction phase. Precautions will be taken to

10

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data including plant and reduce dust generation during construction phase. equipment.  RMC use will eliminate the handling of cement, sand and concrete thus dust emission will be minimized.  RMC use will also reduce the trucks trips.  Tarpaulins will be used to cover trucks carrying debris.  Water sprinkling will be done at regular intervals to reduce control of dust generation. 5.5 Dust or odours from Yes Construction Phase: handling of materials Dust is likely to be generated during construction, this including construction will be water sprinkled and Tarpaulin covers will be materials, sewage and provided over stored raw material to reduce dust waste emission.

Operation Phase: During Operation Phase, emissions will be generated from Operation of DG sets. Minimal emissions will be generated from movement of vehicles as dust, as the roads will be paved roads. Odour can be from STP. However, the STP will be working on appropriate technology, so as to minimize odour problems, and it will be strategically located so that no adverse impact is caused. 5.6 Emissions from No Not Applicable. incineration of waste. 5.7 Emissions from burning of No No such practices shall be entertained. waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable. sources

6. Generation of Noise and vibration, and emissions of Light and heat

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data

11

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

6.1 From operation of Yes Noise generation from construction equipment’s used equipment e.g. engines, for drilling, cutting operations. ventilation plant, crushers During Operation Phase, Noise will be generated due to operation of DG sets. For control of noise following measures shall be adopted:  Properly maintained equipment’s with mufflers will be used.  High noise generating construction activities would be carried out only during day time.  Workers working near high noise construction machinery would be provided with ear muffs/ear plugs. 6.2 From industrial or similar No Not Applicable. processes 6.3 From construction or Yes The construction noise will be localized, intermittent demolition in nature. The construction activities will include the following noise generating activities : 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. 4. Operation of D.G. sets. Following precautions shall be taken to control noise pollution : -High noise generating construction activities would be carried out only during day time. -Installation, use and maintenance of mufflers on equipment. -Workers working near high noise construction machinery would be supplied with ear plugs 6.4 From blasting or piling No Not Applicable.

6.5 From construction or Yes Construction phase : operational traffic There will be transport of materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. Local native plants will be used in plantation which will help to reduce the impact of air and noise pollution. 6.6 From lighting or cooling No Not Applicable systems. 6.7 From any other sources. No Not Applicable.

12

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 7.1 From handling, storage, No Not Applicable. use or spillage of hazardous materials. 7.2 From discharge of sewage No The Sewage generated (539 KLD) from the buildings or other effluents to water will be treated in STP 555 KLD capacity and the or the land (expected mode treated water (485KLD) will be utilized for and place of discharge) landscaping and flushing purpose. Excess treated water of 233 KLD will be send to municipal drain. Rehab Sale Total (in KLD) Sewage 148 243 391 generation STP Capacity 155 250 405

7.3 By deposition of pollutants No Dust will be generated during construction phase from emitted to air into the land earthworks and movement of vehicles. Appropriate or into water dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at stipulated height by providing adequate stack height to the DG sets. 7.4 From any other sources. No - 7.5 Is there a risk of long term No - buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the project, which could affect human health or the environment.

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, No. Confirmation wherever possible) with source of information data 8.1 From explosions, spillages, No Each DG set shall be provided with proper acoustic fires etc from storage, enclosure. Fire Fighting System will be provided. handling, use or production of hazardous substances. 8.2 From any other causes No -

8.3 Could the project be No The project falls under seismic zone-III as per IS1893 affected by natural (Part-1):2002. Hence, no risk due to natural hazards is disasters causing envisaged. environmental damage (e.g. floods, earthquakes, landslides, could burst etc)?

13

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Sr. Information/Checklist Yes/No Details there of (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data. 9.1 -Lead to development of supporting, Yes Supporting and ancillary development utilities, ancillary development or will take place. development stimulated by the project which could have impact on the environment e.g.

-Supporting infrastructure (roads, Internal Roads, Rainwater Harvesting, power supply, waste or waste water Yes STP etc. will be provided. treatment, etc) The project provides a well designed -Housing development Yes residential housing area for the occupants.

-Extractive industries No -Supply industries No -Other No 9.2 Lead to after use of the site, which No No significant impact envisaged. The could have an impact on the vehicular traffic is likely to increase. environment

9.3 Set a precedent for later Yes This project will be establishing state of developments. art system leading to set precedent in environment management. 9.4 Have cumulative effects due to No Not Envisaged. proximity to other existing or planned projects with similar effects.

(iii) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (with 15-km) Proposed No. Identi project location boundary ty 1 Areas protected under international No Nil conventions, national or local legislation for their ecological, landscape, cultural or other related value. 2 Areas which are important or Yes Nil sensitive of ecological reasons –

14

Proposed SRA Scheme FORM-1 By Rajguru Developers Pvt. Ltd.

Sr. Areas Name/ Aerial distance (with 15-km) Proposed No. Identi project location boundary ty wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or No Nil sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4 Inland, coastal, marine or No Nil underground waters 5 State, national boundaries No The project is located within Municipal limits. 6 Routes or facilities used by the public Yes The project site is having Nearest Road is for access to recreation or other Sevaram Lalvani Road, Goshala Road & tourist, pilgrim areas Jawaharlal Nehru Road (18.30 mt.) which is abutting to the project site. 7 Defense installations No No defense installation in the neighborhood. 8 Densely populated or built-up area Yes Residential, Commercial and Industrial area all around the site.

9 Areas occupied by sensitive man Yes Few school and small hospitals are nearby made land uses (hospitals, schools, area but not immediate vicinity of the places of worship, community proposed project. facilities) 10 Areas containing important, high No The project will meet water from MCGM quality or scarce resources (ground for its use after proper permissions are water resource, surface resources, obtained. forestry, agriculture, fisheries, tourism, mineral.

11 Areas already subjected to pollution No All parameters of Air, water and Noise or environmental damage. (those etc. will be maintained within the where existing legal environmental permissible limit. standards are exceeded) 12 Areas susceptible to natural hazard No This area is generally plain & come under which could cause the project to seismic zone –III according to Indian present environmental problems Standard Seismic zoning map. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

15