Potential Impacts and Mitigation for Historic Properties and Public Parks SW Corridor Light Rail Project Draft – December 15Th, 2020

Potential Impacts and Mitigation for Historic Properties and Public Parks SW Corridor Light Rail Project Draft – December 15Th, 2020

Section 106 and 4(f) Public Documents Supplemental Information: Potential Impacts and Mitigation for Historic Properties and Public Parks SW Corridor Light Rail Project Draft – December 15th, 2020 This technical memo details the potential SW Corridor Light Rail Project impacts to protected historic properties and parks resources, as well as the proposed mitigations. This memo is intended for public review and comment. Please send any questions or comments to [email protected] 1 | P a g e Table of Contents Introduction……………………………………………………………………………………………………3 Attachment A, Public Parks…………………………………………………………….………………15 Attachment B, Historic Properties…………………………….……………………………………19 Attachment C, Draft Memorandum of Agreement………….………………..……………25 Attachment D, Baseline Table of Historic Resources….…………………………………..35 2 | P a g e Introduction The proposed Southwest Corridor Light Rail Project would provide high-capacity transit service, and enhance SW Barbur Boulevard with new sidewalks, new and improved crosswalks, protected bike lanes, and bike and stormwater infrastructure. This Project would affect several historic properties and park resources. Some of these resources are eligible for protection under the following federal laws: Section 106 of the National Historic Preservation Act (Section 106). For more information, see an overview of the Section 106 compliance process. Section 4(f) of the Department of Transportation Act (Section 4[f]). For more information, see an overview of the Section 4(f) process. The federal lead agency for the Project is the Federal Transit Administration (FTA), and TriMet and Metro are the local lead agencies. To comply with Section 106 and Section 4(f), the lead agencies must consult with the Oregon State Historic Preservation Officer (SHPO), Native American Tribes, local agencies and the public at different points in the environmental review process. As part of this process, TriMet is working with state and federal partners, including FTA, to assess these resources, determine potential impacts, and develop measures to mitigate impacts. Potential impacts were first disclosed in the Draft Environmental Impact Statement (EIS), published in 2018. Since then, TriMet has been able to avoid or reduce impacts, but some remain. FTA, TriMet, and Metro are currently working on the Final EIS, which includes the updated impact analysis and responses to agency and public input received on the Draft EIS. After the Final EIS is issued, FTA will publish the Record of Decision that will include mitigation measures to be incorporated into the Project to address potential impacts. The purpose of this supplemental material is to provide additional information on the preliminary findings of the Project and proposed mitigation. Figures 1 through 3 show the potential permanent impacts to historic properties and public parks. Table 1 presents the complete list of preliminary determinations for all of the properties that were evaluated under Section 106 and Section 4(f) (82 total properties). For more detail about the properties, potential impacts, and mitigation, where applicable, this document includes the following attachments: Attachment A, Public Parks – Potential Permanent Impacts and Proposed Mitigation: Contains more detailed description of public parks that would be permanently affected by the Project, potential impacts and proposed mitigation. Attachment B, Historic Properties – Adverse Effects and Proposed Mitigation: Contains descriptions of the historic properties where the Project would result in adverse effects and summarizes proposed mitigation. Attachment C, Draft Memorandum of Agreement: Provides additional detail on proposed mitigation for the 11 properties with adverse effects (listed in Table 1 and described in Attachment B). Attachment D, Baseline Table of Historic Resources: This table was developed for the project’s cultural resources investigation and includes all historic properties that were evaluated for the Project and the resulting recommendations for eligibility to be listed in the National Register of Historic Places (NRHP) to receive Section 106 protections. 3 | P a g e 4 | P a g e 5 | P a g e 6 | P a g e Summary of Eligible Resources and Proposed Determinations Table 1 summarizes the resources eligible for protection under Section 106 and Section 4(f) and the preliminary determinations for Project impacts. For more information on proposed mitigations, see Attachments A, B and C, referenced above. TABLE 1: KEY PRELIMINARY DETERMINATIONS Section 106 Preliminary Summary of Project Finding of Section 4(f) Preliminary Property Name and Address Property Type1 Impacts Effect Determination2 Summary of Proposed Mitigation Preferred Alternative: Segment A Terwilliger Parkway Historic public park Addition of inclined Adverse effect Permanent use, greater Historic property: Develop an elevator running through than de minimis interpretive display to install in the park property (see vicinity, develop signage to install Attachment B for details) elsewhere in the park, and use a collaborative process for future Marquam Hill Connection design efforts (see Attachments B and C for details) Public park: Replant trees, remove invasive vegetation and restore understory plantings, support protected views, minimize wildlife impacts, contribute funding for park management planning and trail improvements, and install a monument sign (see Attachment A for details) South Portland Historic Historic district (listed Removal of 6 contributing Adverse effect Permanent use, greater Complete state-level documentation District in NRHP) structures and changes to than de minimis for adversely affected contributing the district's setting (see structures, offer removed buildings Attachment B for details) for relocation, deconstruct other removed buildings to salvage materials, and survey the district and amend the NRHP nomination form (see Attachments B and C for details) 7 | P a g e Section 106 Preliminary Summary of Project Finding of Section 4(f) Preliminary Property Name and Address Property Type1 Impacts Effect Determination2 Summary of Proposed Mitigation Congregation Ahavath Achim Historic building or Removal or modification of Adverse effect Permanent use, greater Complete federal-level Synagogue structure the building (see than de minimis documentation and develop an 3225 SW Barbur Blvd., Attachment B for details) interpretive display to install in the Portland vicinity (see Attachments B and C for details) Jewish Shelter Home Historic building or Potential removal of Adverse effect Permanent use, greater Avoid if possible, otherwise remove 4133 SW Corbett Ave., structure (listed in isolation hospital addition than de minimis isolation hospital addition and Portland NRHP) to the building (see restore backside of the main building Attachment B for details) along SW Barbur Blvd. (see Attachments B and C for details) Rasmussen Village Historic building or Removal or modification of Adverse effect Permanent use, greater Complete state-level documentation 4950 SW Barbur Blvd., structure walls, signs and than de minimis and compile information about the Portland driveways/circulation (see history of SW Barbur Boulevard (see Attachment B for details) Attachments B and C for details) SW Newbury St. Viaduct, Historic building or Replacement of the bridge Adverse effect Permanent use, greater Complete federal-level Bridge #01983 structure (see Attachment B for than de minimis documentation, develop a display to details) install in the vicinity, and incorporate a historical marker into the new structure (see Attachments B and C for details) SW Vermont St. Viaduct, Historic building or Replacement of the bridge Adverse effect Permanent use, greater Complete federal-level Bridge #01984 structure (see Attachment B for than de minimis documentation, develop a display to details) install in the vicinity, and incorporate a historical marker into the new structure (see Attachments B and C for details) Duniway Park Historic public park Partial parcel acquisition No adverse Permanent use, de Replace access and parking and SW 6th Ave. and SW and reconfiguration of effect minimis restore disturbed areas (see Sheridan St., Portland existing parking spaces Attachment A for details) along SW Barbur Blvd. (see Attachment A for details) 8 | P a g e Section 106 Preliminary Summary of Project Finding of Section 4(f) Preliminary Property Name and Address Property Type1 Impacts Effect Determination2 Summary of Proposed Mitigation Lair Hill Park Historic public park Partial parcel acquisition No adverse Permanent use, de Restore landscape, replant trees, and 3037 SW 2nd Ave., Portland (see Attachment A for effect minimis coordinate with Portland Parks on details) design of replacement wall (see Attachment A for details) Duniway Plaza Historic building or Partial parcel acquisition No adverse Permanent use, de Restore disturbed areas 2400 SW 4th Ave., Portland structure effect minimis Marquam Plaza Historic building or Partial parcel acquisition No adverse Permanent use, de Restore disturbed areas 2525 SW 3rd Ave., Portland structure effect minimis 3926 SW Water Ave., Historic building or Partial parcel acquisition No adverse Permanent use, de Restore disturbed areas Portland structure effect minimis 3605 SW Condor Ave., Historic building or Partial parcel acquisition No adverse Permanent use, de Restore disturbed areas Portland structure effect minimis 218-220 SW Hamilton St., Historic building or Partial parcel acquisition No adverse Permanent

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    244 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us