
GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR, MEDIUM IRRIGATION AND CADA) ANNUAL REPORT 2013-14 VIKASA SOUDHA JUNE 2014 1 SL. PAGE CONTENTS NO. NO. 1 INTRODUCTION PREFACE VISION AND MISSION OF THE DEPARTMENT OBJECTIVES OF THE DEPARTMENT 2 ORGANISATIONAL STRUCTURE 3 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2010-11 4 ACCELERATED IRRIGATION BENEFIT PROGRAMME (AIBP) 5 PRIME MINISTER’S SPECIAL PACKAGE 6 SPECIAL DEVELOPMENT PLAN (SDP) 7 WATER RESOURCES DEVELOPMENT ORGANISATION 8 CENTRAL MECHANICAL ORGANISATION (CMO) 9 KARNATAKA ENGINEERING RESEARCH STATION (KERS, K.R SAGAR) 10 WATER AND LAND MANAGEMENT INSTITUTE (WALMI, DHARWAD) NIGAM 11 KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL) 11.1 UPPER KRISHNA PROJECT (UKP) 11.2 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT (BTDA) 12 KARNATAKA NEERAVARI NIGAMA LIMITED (KNNL) AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 12.1 (NORTH), BELGAUM 12.1.1 GHATAPRABHA PROJECT 12.1.2 HIPPARAGI IRRIGATION PROJECT 12.1.3 MARKANDEYA PROJECT 12.1.4 DUDHGANGA IRRIGATION PROJECT 12.1.5 HIRANYAKESHI LIS 12.1.6 SRI RAMESHWARA L.I. SCHEME SL. PAGE CONTENTS NO. NO. 12.1.7 KINAYE PROJECT 12.1.8 MALIKWADI LIS 12.1.9 KALLOL-YADUR BRIDGE CUM BARRAGE 12.1.10 SANGAM BARRAGE 12.1.11 FILLING OF SHIRGAON BASAVANNA TANK 12.1.12 FILLING OF KADAPUR TANK FILLING OF 18 TANKS OF HUKKERI TALUK & 4 TANKS OF CHIKKODI TALUK 12.1.13 (TOTAL 22 TANKS) FROM HIRANYAKESHI RIVER) 12.1.14 SRI MAHALAKSHMI LIS 12.1.15 TUBACHI-BABALESHWAR LIS 12.1.16 VEERABHADRESHWARA 12.1.17 KEMPWAD LIS AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, MALAPRABHA 12.2 PROJECT ZONE, DHARWAD. 12.2.1 MALAPRABHA PROJECT 12.2.2 HARINALA IRRIGATION PROJECT 12.2.3 KALASA NALA AND BANDHURNALA PROJECT 12.2.4 JAVALUHALLA L.I. SCHEME 12.2.5 BENNIHALLA L.I. SCHEME (5 NOS.) 11.2.6 KOLACHI L.I. SCHEME 12.2.7 KONNUR L.I. SCHEME 12.2.8 SHIGGAON L.I. SCHEME (Micro irrigation project- sprinkler/drip system) AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, UPPER TUNGA 12.3 PROJECT ZONE, SHIMOGA 12.3.1 UPPER TUNGA PROJECT (UTP) 12.3.2 TUNGA LIFT IRRIGATION SCHEME 12.3.3 BASAPURA LIFT IRRIGATION SCHEME SL. PAGE CONTENTS NO. NO. 12.3.4 ITAGI-SASALWAD LIS 12.3.5 GUDDADA MALLAPURA LIS 12.3.6 SANYASIKOPPA LIS 12.3.7 DANDAVATHI RESERVOIR PROJECT 12.3.8 KALLUVADDAHALLA NEW TANK 12.3.9 THILUVALLI LIFT IRRIGATION SCHEME 12.3.10 NIDIGE-PURLE TANKS DEVELOPMENT 12.3.11 MODERNISATION OF TUNGA ANICUT PROJECT 12.3.12 KACHAVI LIFT IRRIGATION SCHEME 12.3.13 TUNGA MODERNISATION 12.3.14 BHADRA MODERNISATION 12.3.15 GONDI MODERNISATION 12.3.16 RAJANAHALLI LIS (DAVANAGERE 22 TANKS) 12.3.17 DAVANAGERE 22 TANKS (RAJANAHALLI LIS) 12.3.18 HARIHARA-BYRANPAD LIS MODERNISATION OF AMBLIGOLA CANAL SYSTEM & MODERNISATION OF 12.3.19 ANJANAPURA CANAL SYSTEM 12.3.20 DHARMA PROJECT 12.3.21 RANIKERE FEEDER CANAL 12.3.22 MADAGA-MASUR TANK 12.3.23 GAYATHRI RESERVOIR PROJECT 12.3.24 D.B.KERE PICK-UP PROJECT 12.3.25 JAMBADAHALLA RESERVOIR PROJECT 12.3.26 HODIRAYANAHALLA RESERVOIR PROJECT 12.3.27 BHEEMASAMUDRA TANK 12.3.28 CONSTRUCTION OF LINK CANAL FROM HEBBEHALLA TO MADAGADAKERE SL. PAGE CONTENTS NO. NO. SUPPLEMENTAING WATER TO 60 TANKS OF HARAPANAHALLI FROM 12.3.29 GARBHAGUDI BARRAGE OF TUNGABHADRA RESERVOIR AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 12.4 PROJECTS ZONE, GULBARGA 12.4.1 BENNITHORA PROJECT 12.4.2 BHIMA LIFT IRRIGATION SCHEME 12.4.3 GANDORINALA PROJECT. 12.4.4 LOWER MULLAMARI PROJECT. 12.4.5 AMARJA PROJECT. 12.4.6 CHAMDRAMPALLI PROJECT 12.4.7 HATHIKUNI TANK PROJECT 12.4.8 SOUDHAGAR TANK PROJECT 12.4.9 KARANJA PROJECT 12.4.10 UPPER MULLAMARI PROJECT 12.4.11 CHULKINALA PROJECT AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 12.5 CENTRAL ZONE, MUNIRABAD 12.5.1 TUNGABHADRA PROJECT 12.5.2 SINGATALUR LIFT IRRIGATION SCHEME (SLIS) 12.5.3 HIREHALLA PROJECT 12.5.4 HAGARIBOMMANAHALLI PROJECT 12.5.5 NARIHALLA PROJECT 12.5.6 RAJOLIBUNDA DIVERSION SCHEME 12.5.7 KATARKI LIS 12.5.8 BOYALMARCHARD LIS 12.5.9 ALAVANDI-BETAGERI LIS 12.5.10 WOLABELLARY LIS SL. PAGE CONTENTS NO. NO. 12.5.11 KANAKANALA DIVERSION PROJECT 12.5.12 MASKINALA PROJECT 12.5.13 HEDAGINAHAL BARRAGE PROJECT 12.5.14 KARUR LIS 12.5.15 VIJAYANAGARA CANAL MODERNISATION AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, VARAHI 12.6 PROJECT ZONE, SIDDAPURA. 12.6.1 VARAHI IRRIGATION PROJECT AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, UPPER BHADRA 12.7 PROJECT ZONE, CHITRADURGA. 12.7.1 UPPER BHADRA PROJECT (UBP) 12.7.2 YATTINAHOLE PROJECT 13 CAUVERY NEERAVARI NIGAMA LIMITED AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION (S) 13.1 ZONE, MYSORE 13.1.1 D. DEVARAJA URS CANAL 13.1.2 KABINI RESERVOIR PROJECT 13.1.3 HARANGI PROJECT 13.1.4 TARAKA PROJECT 13.1.5 ARKAVATHY PROJECT 13.1.6 CHIKLIHOLE PROJECT 13.1.7 UDUTHOREHALLA PROJECT 13.1.8 IGGALUR BARRAGE PROJECT 13.1.9 MANCHANABELE PROJECT 13.1.10 MODERNISATION OF KRISHNARAJA SAGAR 13.1.11 NANJAPURA LIFT IRRIGATION SCHEME 13.1.12 BANAHALLIHUNDI LIS SL. PAGE CONTENTS NO. NO. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY 13.2 CANAL ZONE, TUMKUR 13.2.1 HEMAVATHY CANAL ZONE, TUMKUR AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY 13.3 RESERVOIR PROJECT, GORUR 13.3.1 HEMAVATHY PROJECT 13.3.2 YAGACHI PROJECT 13.3.3 HUCHANAKOPPALU LIS 13.3.4 KAMASAMUDRA LIS 13.3.5 KACHENAHALLI LIS 13.3.6 VOTEHOLE PROJECT 14 COMMAND AREA DEVELOPMENT PROGRAMME 1. INTRODUCTION The Annual Report is a document giving details of the annual Programme, Progress and important events that have taken place during the year, in the Water Resources Department. GEOGRAPHICAL AREA The geographical area of Karnataka is 1,91,791 Sq. Km., accounting for 5.83% of the total area of the country. The cultivable command area of the State is 1,40,598 sq. Km. The net sown area is 1,07,000 sq. Km. The ultimate Irrigation Potential under Major and Medium Irrigation Projects has been estimated as 35,000 sq. Km or 35.00 Lakh Ha. PROGRESS IN BRIEF There are 211Major and Medium Irrigation Projects in the State, out of which 60 projects are completed, 151 are ongoing. The Water Resources Department has established three special purpose vehicles, namely, Krishna Bhagya Jala Nigama Limited (KBJNL), Karnataka Neeravari Nigama Limited (KNNL) and Cauvery Neeravari Nigam Limited (CNNL), under the companies Act of 1956, to mobilize financial resources for speedy completion of major and medium irrigation projects with-in the targeted period. KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL): “Krishna Bhagya Jala Nigam Limited” was formed vide G.O. No. ID/25/WBM/95, dated: 6-5-94, to expedite the works of Upper Krishna Project (UKP). This Nigam is functioning since 19th August 1994. KARNATAKA NEERAVARI NIGAM LIMITED (KNNL): ”Karnataka Neeravari Nigam Limited” was formed vide G.O. No. ID: 201: KBN: 98, dated: 26-11-98, to expedite the works in Krishna Basin, except UKP. This Nigam is functioning since 9th December 1998. CAUVERY NEERAVARI NIGAM LIMITED (CNNL): ”Cauvery Neeravari Nigam Limited” was formed vide G.O. No. WRD: 32: KBN: 2003, Dated: 12.05.2003, to expedite the works in Cauvery Basin. This Nigam is functioning since 3rd June 2003. 2. ORGANISATIONAL STRUCTURE WATER RESOURCES DEPARTMENT HON’BLE MINISTER FOR WATER RESOURCES PRINCIPAL SECRETARY SECRETARY C.E, DIRECT CADA’S KBJNL BOARD KNNL BOARD CNNL BOARD W.R.D.O FIELD OF DIRECTORS OF DIRECTORS OF OFFICES DIRECTORS CADA CE, DIRECTORATE REGISTERED REGISTERED HYDROLOGY CORPORATE CORPORATE REGISTERED CE, IRRIGATION & CMO, OFFICE CORPORATE CENTRAL ZONE, OFFICE BANGALORE OFFICE MUNIRABAD ADMINISTRATOR MALAPRABHA & FIELD OFFICES FIELD OFFICES FIELD C.E, GHATAPRABHA, OFFICES I.S.W.D, CE, IRRIGATION BELGAUM CE, O&M ZONE, BANGALORE PROJECT ZONE, CE, UTP UKP, GULBARGA ADMINISTRATOR ZONE, CE, NARAYANPURA TUNGABHADRA SHIMOGA IRRIGATION PROJECT, (SOUTH), MUNIRABAD CE, DAM ZONE, MYSORE CE, UPPER UKP, ALMATTI CE, VARAHI TUNGA ZONE, PROJECT, SIDDAPURA ADMINISTRATO CE, H.P.Z, SHIMOGA CE, CANAL ZONE- R BHADRA, GORUR SHIMOGA 1, UKP, B.GUDI CE, IPZ, GULBARGA DIRECTOR, CE, CANAL WALMI CE, H.C.Z, ADMINISTRATOR ZONE-2, UKP, CE, TUMKUR CAUVERY BASIN, KEMBHAVI IRRIGATION MYSORE (NORTH), DIRECTOR, K.E.R.S BELGAUM ADMINISTRATOR UKP, B.GUDI CE, MALAPRABHA PROJECT ZONE, DHARWAD ADMINISTRATOR IRRIGATION PROJECT ZONE, CE, UPPER GULBARGA BHADRA PROJECT, CHITRADURGA 3. ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2013-14 During 2013-14, an irrigation potential of 93851 Hectares is created from ongoing irrigation projects and Rs.6527.76 crores financial progress is achieved. Cumulative irrigation potential of 28.37 lakh Ha. has been created from Major & medium irrigation projects upto end of March 2014. An irrigated potential of 6,40,542 Ha. has been created so for under Upper Krishna Project, Such as, NLBC, JBC, NRBC, ALBC, ARBC are nearing completion. Central Assistance of Rs.199.82 Crores under Accelerated Irrigation Benefit Programme & Hon’ble Prime Minister’s Special Rehabilitation Package has been availed during 2013-14 and an expenditure of Rs. 527.58 crores is incurred. Krishna Bhagya Jala Nigam Limited has incurred an expenditure of Rs.2556.75 Crores for implementing 24 ongoing major and medium irrigation projects/Components during 2013-14. Karnataka Neeravari Nigam Limited has incurred an expenditure of Rs.2662.61Crores for implementing 78 ongoing major and medium irrigation projects/components of projects during 2013-14. Cauvery Neeravari Nigam Limited has incurred an expenditure of Rs.1224.63 Crores for implementing 49 ongoing major and medium irrigation projects/Components of projects during 2013-14.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages242 Page
-
File Size-