{oe9a, A\'//+ GOVERNMENT OF ARUNACHAL PRADESH FINANCE, PLANNING & INVESTMENT DEPARTMENT (FTNANCE & !NVESTMENT DtVtStON) A.P. CIVIL SECRETARIAT:: ITANAGAR No PD (SPD)-22ISIDF&RE (18-19)t2019-20/A28 2 Dated, the 14th January 2020 ORDER Approval is hereby accorded for release of Rs. 14302.61 lakh (Rupees fourteen thousand three hundred two lakh and sixty one thousand) only being unspent amount against the projects approved under SIDF 2016-17, SIDF 2017-18, SIDF 2018-19, SIDF (State lmportance) 2018-19 and Additional (RE) 2018-19 as per details below: sl. Particulars No. of Amount Released No. Proiect (Rs. in lakh) 1 2 3 4 I stDF 2016-17 12 430.86 2 stDF 2017-18 148 11233.60 3 SIDF (State lmportance) 2018-19 10 2274.15 4 srDF 2018-19 6 224.00 6 Additional (RE) 201 8-1 I 2 140.00 Total 178 14302.61 2 Details of scheme- wise fund released is at Annexure- 'A'. 3. The utilization of fund is subject to adherence of the following conditions:- a) These allocations are purely indicative in nature and this shall be utilized by the departments only after verifying the actual requirement and observance of guidelines and all the financial rules, regulation, provision, prescribed in GFR, DFPR etc. & guidelines/circulars/ OM's/ directives missed by the CVC, MoF, tvlAH, Gol, Administrative lVinistries of Gol & GoAP from time to time in this regard in letter & spirit without fail. b) These allocations cannot be diverted for any other purpose and also amongst the sanctioned schemes. c) Concerned Commissioners/Secretaries shallmonitorthe progress of works and ensure that payments are made after making necessary verifications at ground level. Further, the amount only as actually required should be used and the balance amount, if any, should be surrendered d) Finance Department shall ensure that LOCs are issued only after ensuring that all codal formalities including proof of tenders have been observed and also proof of documents conforming the completed portion of the schemes/works are submitted. e) Since, allocations are given on the basis of the figures as certified by the concerned Departments, any excess expenditure/ duplicity made against individual schemes will be the sole responsibility of the concerned officers. 4. Out of totat release of Rs. 14302.61 lakh, Rs. 13282.75|akh earmarked for PWD shall be adjusted from the overall BE provision of the department during CFY. The balance amount of Rs. i0-1g.86 lakh earmarked for WRD, Elementary Education and Secondary Education department shall be adjusted from the provision earmarked for carry forward liabilities of previous year i'e', 2O1g-19 in the Budget Estimate 2O1g-20 of Planning & lnvestment Department and this will be regularised at the time of finalization of RE. 5. This is issued with the approval of Hon'ble Deputy Chief lttlinister (i/c Finance & Planning). (Him u Gupta), IAS Secretary (Planning & lnvestment) 2- 2020, Memo No. pD (SPD)-22ISIDF&RE (18-1s)t2O1S-ZOlTZgL Dated, the 14th Januarv Copy for information to: 1. The Secretary to Hon'ble Chief Minister, Govt. of Arunachal Pradesh, ltanagar. 2. The pS to Hon'ble Deputy Chief ltlinister, Govt. of Arunachal Pradesh, ltanagar. 3. The Under Secretary to Chief Secretary, Govt. of Arunachal Pradesh, ltanagar. 4. The principal Secretary/ Commissioner/ Secretary (WRD/ PWD/ Education), Govt. of A.P., Itanagar. 5. The Secretary (Finance), Govt. of Arunachal Pradesh, ltanagar' 6. The Director (ftementary Education/ Secondary Education), Govt. of A.P., ltanagar T. The Director (PC)/ Director (trlonitoring), Govt. of Arunachal Pradesh, ltanagar. 8. The Chief Engineer (WRD/ PWD-SID&P), Govt. of A.P', ltanagar' 9. The Deputy SLcretary, (Finance/Budget), Govt. of Arunachal Pradesh, ltanagar' 10. Office Copy (H upta), IAS Secretary (Planning & lnvestment) Page 1 I I Annexure-'A' Release of fund against the projects approved under SIDF 2016-17, SIDF 2017-18 , SIDF 2018-19, SIDF (State lmportance) 2018-19 and Additional (RE) 2018-19 ln SI Particulars RE, Expenditure Fund Remarks No. 2018-'19 already released incurred during 2019-20 1 2 3 4 5 6 I stDF 2016-17 Water Resources Department 1 C/o lB at Rho 200.00 50.00 150.00 2 lnfrastructure development of JNV School, Seppa 50.00 42.50 7.50 includinq retaininq wall Anti Erosion work at Uoper Dkhalmukh 100.00 45.54 54.46 4 Guide Wall and Check Dam at Goloso Bridge Point 150.00 75.17 74.83 to Tanki Point. t Protection wall at Power House complex, Seijosa 80.00 36.32 43.68 o C/o Protection wall at Dalrong village 25.00 10.26 14.74 7 C/o Protection wall near PWD lB office building /lB 25.00 11.30 13.70 at Seijosa. 8 C/o Land Protection work near Pakke Bazarline on 20.00 7.64 12.36 Pakke river 9 C/o 4 nos of minor irrigation at Pakke Kesang circle 20.00 10.00 10.00 10 C/o Protection wall to prevent erosion at Rilloh. s0.00 25.00 25.00 11 Guide wall and check Dam at Medical Nallah, 30.00 15.68 14.32 Seiiosa 12 FC work at lVlodiriio 6th l\4ile ltanaqar 55 00 44.73 10.27 Total: (l) 805.00 374.14 430.86 il stDF 2017-18 Water Resources Department 13 C/o Land protection work for Pi School at Likabali 25.00 25.00 0.00 14 C/o protection wall, CC drain and Site development 200.00 200.00 0.00 at Wessino Sub-Total(WRD) 225.00 0.00 225.00 PWD Roads & Bridqes Requirement of 15 lmprovement of Likabali Township road 99.58 27.75 71.83 fund of Rs. 16 Construction of Road from NH-13 Jnction to sub- 300.00 294.22 5.78 1 1008.60 lakh Station(132/33 kv) at Pakke Kessang-2.00 km for clearance of 17 lmprovement of road to Hydel (Nurang Power 196.99 151 .63 45.36 pending House) at Janq liabilities will be 18 Double laning of road from Lower Campus to Upper 577.68 334.30 243.38 adjusted from campus of JN College Pasighat in East Siang overall BE districti (3 Km) provision of the 19 C/O Yangte to Tali road 1000.00 642.02 357.98 Public Works 20 Development and improvement of approach road for 500.00 14.80 485.20 Department Daporiio Township during CFY. 21 C/o road from Silatoo Khamti Tinali to New Silatoo, 80.00 45.79 34.21 Kokoni village 1.60 km SH: WBM-Ill, Carpeting and RCC Slab Culvert 1.00 mtr sPan 22 C/o road from PMGSY road to Singibeel-l and 80.00 44.71 35.29 singibeel-ll village 1.960 km under Lekang circle SH WBI\,'I, WBM & Carpeting. 23 C/o road from Nongkhong Sathgh aria to Kumari 90.00 54.76 35.24 Adivasi 1 70 km SH: WBt\I-ll,WBM-lll, Carpeting and RCC slab 24 C/o road from Old lVohon-l to Old lVlohong-ll village 100.00 67.87 32.13 2.00 km under Lekang circle (SH: GSB, WBM & 25 Construciton of new lB at Sigi-G ushar circle Hq 90.00 41.20 48.80 26 C/o RCC brige over Chithing river in between khanu 300.00 0.00 300.00 Votnu (Span- 30 meters) Page 2 Rs. ln sl. Particulars RE, Expenditure Fund Remarks No. 201 8-1 I already released incurred during 2019-20 A 1 2 3 4 6 27 C/o of road from Nafra-Bomdila main road to old 150 00 12.61 137.39 villages Jeri Gaon under Nafra cilcle- 28 C/o Road of JNV Kombo to Nyumne Padum Hipe 100.00 14.98 85.02 area road (3.50 KmXPhase-l) 29 C/o lmprovement of approach road from BRTF road 100.00 44.26 55.74 to Biru village (1.00 Km) (SH: GSB, WB-ll,lll and BT, S/Cul-1 Mtr. Span-2 Nos, CC drain-200 mtrs. And RAlVall-15 mtrs). 30 Construciton of road from Pasighat-Ledum-Tene- 10.60 5.09 551 Koyu road to balek road (near Tani Ering's residence at pasighat (Rs 20 lakhs) and construciton of comunity burial ground road near kabang Borano.saw mill (Rs 10 lakhs) 3'l C/o widening, retaining wall, culvert at various points 50.00 0.59 49.41 on NEC road within sipak stream to Kqa 32 C/o formation cutting work at rina to Hippo village 300.00 205.77 94.23 lrom Ziro Rina point 33 C/o Approach Road to Nirma Hussu 25 km at Khuppi 30.00 21.31 8.69 34 C/o Road from Bhalukpong lt/ain road BRTF to 100 00 80 49 19.51 Koilabaty village near AE, Electrical office under west kamenq District, AP 35 C/o approach road from Kampu seba to Tanglangwa 50.00 0.00 50.00 36 C/o lnternal road at Bekhuliang village in Lohit 100.00 0.00 100.00 District 37 C/o Anganwadi centres in Tezu-sunpura Block 150.00 100.00 50.00 38 Upqradation of Tezu Township road 200.00 69 29 130.71 39 C/o approach road from PWD road to Gori village 12.31 11.10 1.21 near Kargo Basar School, Basar 40 C/O link road from BRTF road to Doi Lingdi village 500.00 324.90 175.10 41 C/O Link road from PWD Yangte road to Maching in 100.00 68.29 31 .71 Ribung lll, Kyokam under Yangte Circle, Kra Dadi district 42 C/o approach road, drain,development of new site at 48.85 42.27 6.58 proposed Kamgo village under Kamba circle.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-