Informational Display Boards

Informational Display Boards

Anoka Solution 2022-2023 Construction The U.S. Highway 10/169 Project will reduce crashes and improve traffic operations. This will result in improved mobility and reliability for all users of the project corridor. ANOKA SOLUTION • 60,600 vehicles per day The City of Anoka continues to work closely • Principal Arterial moves regional freight; 3,300 heavy 1+ mile daily backups with MnDOT, Metropolitan Council, Anoka commercial vehicles from Fairoak Avenue County, and other partners to plan, design, • 1+ mile back-ups during peak hour and implement fiscally-responsible safety • 21 mph avg. peak hour speed (60 mph posted) Issues and operation improvements to benefit all Existing • 1,128 crashes (2 fatal) from 2006-2015 • Crash Rate 1.5x state average U.S. Highway 10/169 corridor users. • Segmented local network forces local highway trips e v Evening Backups n A o 0.43 miles r t e s v r i R u h m • 75% delay reduction T ?ÒA@ u • 57% crash reduction #:Qh R • 4.0 benefit-cost ratio )y BNSF Railway M i s )m • Accomodate 90,000 vehicles/day s i s s i p #:Qh • Local trips on local network p e 1.15 miles Results i A v R k Main St i a • Safe and reliable movement of goods v o Investment e r r i a F and services W Total Investment THURSTON AVE. All funding is GREENHAVEN RD. GREENHAVEN committed! COUNTRY CLUB GREEN HAVEN PKWY. 80M $ TH 10/ TH 169 GREEN HAVEN PKWY. CALVARY CEMETERY ANOKA TECHNICAL COLLEGE OAKWOOD CEMETERY . D R E IC V R WEST MAIN ST SERVICE RD. SE VISTA WAY 0 1 OAK ST. WEST HIGHWAY MAIN ST. TH 10/TH 169 WEST MAIN ST. GREEN AVE. TH 10/ TH 169 REED AVE. FAIROAK AVE. W CHURCH ST. MAIN ST. FOREST HILL CEMETERY JOHN WARD PARK C U FOREST AVE. T T E R S G KINGS ISLAND R O V E AV EAGLE BROOK AnokaHwy10.com E CAMPUS CHURCH - ANOKA U.S. Highway 10/169 Improvement Project Overview of Project Improvements LU ND MI BL NERAL D POND VD W C E V T DUNHAM DR Thurston Avenue/Cutters S L T B M D Key Outcomes I Pedestrian and Bicycle BURG N N RUM RIVER DR E O ELECTRONIC Grove Avenue Intersection R P A L RECOVERY L A P Q R O Connections U E RIVERDALE A N DR N NW R D I R B M Y L T A V S THURSTON AVE • Remove existing traffic signal and replace V D A E E MC CA • Eliminate delay and queuing NN • Provide new grade-separated crossings with grade-separated roundabout AVE of Highway 10/169TUNGSTEN ST NW at Thurston Avenue BNSF RAILWAY LANO DIAMOND AUTO interchange associated with existing EQUIPMENT and Fairoak Avenue with dedicated non- ANOKA SIGNS BY RSG RIVLYN AVE NW TECHNICAL North Side – Local Road COLLEGE MCKINLEY CIR motorized accommodations • Thurston Avenue interchange will be PLACERAVE MCK Circulation & Connection traffic signals depressed 4 feet and Highway 10/169 will be INLEY ST • Include dedicated non-motorized elevated 17 feet above existing elevation RAINIERAVE accommodations to all new and/or improved STEP • Green Haven Parkway service road local connections • Innovative roundabout-style interchange improvements 10 ST • Substantial crash reduction design, with highway bridged over Thurston LOGAN • New roadway west of Thurston Avenue SAINTFRANCIS BLVD * * ** * 169 * * Avenue G SERVICE RD providingAVE SHASTA access to Anoka Technical College R E CREATIVE KIDS E ACADEMYREGENCY N Highway Access • Multi-useHA trail provided on the west side of and setting up potential future extension as INN & SUITES BNSF Railway KENNEDY ST T V E H N 1ST NATIONAL P U a frontage road into Ramsey Management ThurstonK Avenue V BANK OF • Enhanced functional, I R W S ELK RIVER Y TA S W T AY O N VISTA • Only access points to Highway 10/169 will be * * OUTDOORS A operational, and safety * * G V * * R at Main Street/Greenhaven Road interchange E * E * E Fairoak Avenue * * * N and Thurston Avenue interchange * H * * A characteristics for local * V Intersection * EN * PK * * W * Y XKIMOST connecting roadways due * • Remove existing traffic signal and replace ZUNI ST * W GARFIELD ST * * * * * with an underpass (highway bridged over * * * * * * City of Anoka * * to extensions, roundabouts, * Fairoak Avenue) * * * * * * CALVARY * * * KWIK TRIP * CEMETERY * * * GREENHAVEN RD * * VALVOLINE * • Fairoak Avenue underpass will be depressed * * geometric improvements, INSTANT OIL * JEROME ST FERRY ST CHANGE * 4 feet and Highway 10/169 will be elevated Main Street/Greenhaven * 15 feet above existing elevation Road Interchange and other measures CUTTERS GROVE AVE FIRST MN BANK CUTTERS GROVE EUCLIDAVE APARTMENT LIBERTY ACTION'S VERNDALEAVE HOMES TITLE FISHING • Multi-use trail with boulevard provided on MASTERERSON • Replace existing Highway 10/169 bridge AMERICAN BRIGHTON ST STAFFING FRASER SOLUTIONS FAMILY west side of Fairoak Avenue, sidewalk with INSURANCE over Main Street/Greenhaven Road BETTER VALUE boulevard provided on east side S LIQUOR T • Greatly improved non- D A V T • Improve existing non-motorized L GREEN HAVEN E B COUNTRY CLUB A V E E EAGLE N CUTTERS LN O OAK ST accommodations along Main Street/ BROOK T CHURCH S CHURCH OFWHISPERING motorized connectivity, W * O LATTERPINE ASSISTED L * AVE FAIROAK Greenhaven Road CUTTERS GROVE AVE L DAY SAINTS LIVING E BAMBOO Y * WEST MAIN ST VILLAGE HONEST-1 * AUTO CARE SITE FOR SALE CULVER'S * * • Construct a new roundabout at the access, and safety SERVICE RD South Side – Local Road * Mississippi River * KFC GREEN HAVEN PKWY CUTTERS GROVE CIR SUPER AMERICA * PAWN westbound ramp terminal for improved * MARTIN ST Circulation & Connection AMERICA JJ AUTO SERVICE operations and safety RAINBOW PLAZA McDONALD'S LOM'S * * APARTMENTS TAX INSURANCE ANOKA FLATS WINGFIELDAVE GRACELIFE CHURCH * SOLUTIONS APARTMENTS TACO BELL HEALTH P * GREENHAVEN IN PARTNERS • W. Main Street extension will provideWOODLAND a OFFICE SUITES R E * • Construct a new roundabout at the GREENHAVEN SUBURBAN GREENHAVEN RD I R PARK * V * I * MEDICAL EQUIP E MARKETING D APARTMENTS COMBAT BRANCH AVE BRANCH R * * G CORP WRIGHT TIRE S continuous roadwayE from Main Street to * SPORTS eastbound ramp terminal for improved B D * L R U * PERKINS F Thurston Avenue;F Cutters Grove Avenue will * PLEASANT ST L operations and safety, and to accommodate N THE HAVEN * TO WB HIG D H * R W ON FAIROAK A W “T” into the service road and will be the N Y B * E 1 Main Street extension to the west V H 0 A IG H H W N A controlled stop E Y E 1 FAIROAK AVE 0 R TO G G RE EN HA Legend • Addition of sidewalk with boulevard on VE ! N RD I AY 10 HIGHW TO WB W. Main Street FERRY ST Concrete Barrier Railroad CHURCH ST 10 169 E B HIGH * * WAY 10 TO Bridge Retaining Walls FER SIGN RY S THE TIRE ZOO STATION INC. T Concrete Stormwater Ponds Y PINEWSKI'S O H BOARD SHOPS O D GRAY ST Landscaping R E V E TIENDA EL A V RINCONCITO MEXICANO T A BENTON ST S THE ECIG SHOP D Pavement E E R E SWEDISH O CELLECTRONIX R F CROWN BAKERY MAIN ST CLAY ST Shoulder JELLYBEAN ANOKA E PARK ST SHOPPING V AND JULIA'S WEST MAIN ST A CENTER R Sidewalk/Trail E T W R E O S P T E R AVE GREEN 0 300 D N Feet FAIROAK CT OU ST G L CUTTER ST A S CALHO Source: Anoka County, MnDOT, Nearmap Imagery C T UN ST AnokaHwy10.com U.S. Highway 10/169 Improvement Project Anoka HWY 10/169 Improvement Project Figure 2-2 Existing Traffic Conditions Vehicle Traffic Environmental Assessment August 2019 Issues GÃWX GöWX Between 2006 and 2015, over Increasing traffic demands 12,700 325 people were injured and 2 people died in crashes on this Highway 10/169 freeway ends at 16,600 segment of highway. Two other ve fatalities occurred in 2003. Fairoak Avenue; traffic volumes A n #:Qh to s PM Peak Hour Max not adequately served by traffic )m r u )y 54,400 h % Queue Length: signals at Fairoak Avenue and T 72,100 0.43 miles Thurston Avenue ^_^_ ^_ 10,200 Lack of local roadway connections 2011-2015 16,200 forces local trips onto highway BNSF Railway Crash Rate 2.15 ?ÒA@ Times Higher than R E % V Statewide Average* I #:Qh R Anoka M M 5,100 89,700 U I S R S I F S 3,100 PM Peak Hour Max 6,500 S e I r P r Queue Length: P ^_ VerndaleAve 2011-2015 y Outcomes I S R 5,100 1.15 miles ^_ t I Crash Rate 5.37 N V ^_ E R ^_^_ % Times Higher than • Excessive delay and queuing along 2,800 #:Qh Statewide Average* project corridor ^_ 60,600 20,700 e v A Legend k % ! a I 24,700 • High crash rates, particularly at o Fai r PM Peak Hour Queues (2017) 70,400 56,400 ^_ Private Driveway M 85,600 74,000 Fairoak Avenue and Thurston a Average in S ^_ Public Access t Avenue intersections W Maximum City Boundaries 26,700 30,000 X,XXX Existing (2017) AADT * For Comparable Intersection Type 17,700 X,XXX Future (2041) AADT 0 ¼ 32,000 Source: Anoka County, MnDOT, MnGeo, Nearmap Imagery Miles AADT = Annual Average Daily Traffic Map Document: \\arcserver1\GIS\ANOK\T44119364\ESRI\Maps\OpenHouse\119364_ExistingConditionsTraffic_8x11L.mxd | AM Date Saved:8:47:55 | 9/17/2019 Document: \\arcserver1\GIS\ANOK\T44119364\ESRI\Maps\OpenHouse\119364_ExistingConditionsTraffic_8x11L.mxd Map AnokaHwy10.com U.S.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us