Form-2 APPLICATION for PRIOR ENVIRONMENTAL CLEARANCE

Form-2 APPLICATION for PRIOR ENVIRONMENTAL CLEARANCE

9/24/2019 Report Part 1 Form-2 APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE S. Item Details No. Details of Project: (a)Name of the project(s) QUARRY UNIT OF MR. C. FIROS BABU (b)Name of the Company / Organisation QUARRY UNIT OF MR. C. FIROS BABU 1. Chirakkattil House Anamangad Post Perinthalmanna Taluk Malappuram (c)Registered Address District,Thrissur,Kerala-679357 (d)Legal Status of the Company Private Address for the correspondence: (a)Name of the Applicant Firos Babu (b)Designation (Owner/ Partner/ CEO) Proprietor Chirakkattil House Anamangad Post Perinthalmanna Taluk Malappuram (c)Address District,Kerala State,Thalapilly,Thrissur,Kerala-679357 (d)Pin code 679357 2. (e)E-mail [email protected] (f)Telephone No. 606950 (g)Fax No. (h)Copy of documents in support of the competence/authority of the person making this Annexure-Uploaded Copy of documents in support of the competence/authority application to make application on behalf of the User Agency . Category of the Project/Activity as per Schedule of EIA Notification,2006: (a)Major Project/Activity 1(a) Mining of minerals (b)Minor Project/Activity NIL (c)Category B2 3. (d)Proposal Number SIA/KL/MIN/43559/2019 (e)Master Proposal Number(Single Window) SW/119263/2019 (f)EAC concerned (for category A Projects only) Non-Coal Mining (g)Project Type Fresh EC Location of the Project: (a)Plot/Survey/Khasra No. 201, 202, 203, 214, 215, 216/1, 218 (b)Pincode 680588 (c)Bounded Latitudes (North) FROM 1187436.03 To 1187570.10 (d)Bounded Longitudes (East) FROM 659429.10 To 659667.30 (e)Survey of India Topo Sheet No. 58-B/06 4. (f)Uploaded Topo Sheet File Copy of Topo Sheet File (g)Maximum Elevation Above Means Sea Level(AMSL) 100 (h)Uploaded (kml) File Copy of Kml File (i)Distance of Nearest HFL from the project boundary 1.38 within the study area (j)Seismic Zone 3 (a)Number of States in which Project will be Executed 1 5. (b)Main State of the project Kerala Details of State(s) of the project S. State Name District Name Tehsil Name Village Name No. (1.) Kerala Thrissur Thalapilly Thiruvilwamala Details of Terms of Reference (ToR): (a)MoEF&CC / SEIAA File Number 00 6. (b)Date of Issue of TOR / Standard ToR 24 Sep 2019 (c)Previous TOR Letter Copy of Previous TOR letter Details of Public Consultation: (a)Whether the Project Exempted from Public Hearing? Yes 7. (b)Reason Below 5ha and no cluster situation (c)Supporting Document Copy of Supporting Document 8. Details of Project Configuration/Product: 8.1. Project Configuration S. Plant/Equipment/Facility Configuration Remarks environmentclearance.nic.in/state/FB_ECgeneral_report.aspx?pid=65006 1/9 9/24/2019 Report Part 1 No. Granite Building Stone 243300 tonnes per annum (1.) Applied Area: 4.3520 Ha (Non Forest Private Land) Quarry maximum 8.2. Product Other Mode of S. Product/Activity Mode of Transport / Transport / Quantity Unit Other Unit No. (Capacity/Area) Transmission of Product Transmission of Product (1.) 4.3520 ha 243300 Tons per Annum Road In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): 9. Details Not Applicable Details of Consent to Operate (i)Whether Consent to operate obtained ? NA (ii)Copies of all Consent to operate obtained since NA inception 9.1. (iii)Date of Issue 24 Sep 2019 (iv)Valid Upto 23 Sep 2021 (v)File No. Nil (vi)Application No. 00 (vii)Copy of Consent to operate valid as on date Copy of Consent to Operate Project Cost: (a)Total Cost of the Project at current price level (in 0.80 crores) (b) Funds Allocated for Environment Management 0.037 (Capital) (in crores) 10. (c) Funds Allocated Towards ESC (Entrepreneur Social 0.040 Responsibility) (in crores) (d) Funds Allocated for Environment Management Plan 0.056 (EMP) (Recurring per Annum) (in crores) (e) Funds Allocated for Environment Management NaN Capital(%) Whether project attracts the General Condition 11. No specified in the Schedule of EIA Notification ? Whether project attract the Specific Condition 12. No specified in the Schedule of EIA Notification ? Raw Material / Fuel Requirement: (a)Proposed quantity of raw material/fuel 50 13. (b)Existing quantity of raw material/fuel N/A (c)Total quantity of raw material/fuel 50 13.1. Raw Material / Fuel Profile Source Distance of (incase Source of from Import. Project Site please (in specify Kilometres) country (In case of Raw and Other Other Uploaded S. Other Mode of import, Type of Material Quantity Unit Name of Mode of Type of Copy of No. Unit Transport distance Linkage / Fuel the port Transport Linkage Linkage from the from port from which which the Raw raw Material material / / Fuel is fuel is received received) ) mining project Copy of (1.) no raw 0 Others NA NA Road 0 Others NA Linkage metiral required Baseline Data : 14. (a)Period of Base Line Data Collection FROM 22 Mar 2016 To 23 Mar 2016 (b)Season Pre-Monsoon 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 2 environmentclearance.nic.in/state/FB_ECgeneral_report.aspx?pid=65006 2/9 9/24/2019 Report Part 1 98 S. Maximum Minimum Prescribed Criteria Pollutants Other Criteria Pollutants Unit Percentile No. Value Value Standard Value Micro Gram (1.) SO2 per Meter 8.6 6.4 8 80 Cube Micro Gram (2.) NOx per Meter 26.1 14.9 24 80 Cube Micro Gram (3.) PM10 per Meter 71.4 52.7 70 100 Cube Micro Gram (4.) PM2.5 per Meter 24.8 13.7 22 60 Cube 14.2. No. of Ground Water Monitoring Locations : 1 Other Maximum S. Criteria Heavy Maximum Minimum Desirable Criteria Unit Other Unit Permissible No. Pollutants Metal Value Value Limit Pollutants Limit (1.) pH NA 7.31 7.31 6.5 8.5 (2.) TSS mg/l 349 349 500 2000 Total (3.) mg/l 185.79 185.79 200 600 Hardness (4.) Chlorides mg/l 131.72 131.72 250 1000 (5.) Fluoride mg/l 0.16 0.16 1 1.5 Heavy (6.) Fe mg/l 0.17 0.17 0.30 0.30 Metals (7.) TDS mg/l 349 349 500 2000 14.3. No. of Surface Water Monitoring Locations : 0 Classification S. Maximum Minimum Criteria Pollutants Other Criteria Pollutants Unit Other Unit of inland No. Value Value water body (1.) DO NA 0 0 A (2.) COD NA 0 0 A (3.) pH NA 0 0 A (4.) BOD NA 0 0 A 14.4. No. of Ambient Noise Monitoring Locations : 2 S. Prescribed Parameter Unit Maximum Value Minimum Value No. Standard (1.) Leq(Night) A-weighted decibels(dB(A)) 52.9 41.6 70 (2.) Leq(Day) A-weighted decibels(dB(A)) 61.4 48.3 75 14.5. No. of Soil Sample Monitored Locations : 1 S. Parameter Unit Other Unit Maximum Value Minimum Value No. (1.) pH 6.72 6.72 (2.) N(Nitrogen) Kilogram per hectare 141 141 (3.) P(Phosphorus) Kilogram per hectare 1.26 1.26 (4.) Electric Conductivity Millisiemens per Centimetre 238 238 (5.) K(Potassium) Milligram per Kilogram 72.91 72.91 Details of Ground Water Table: (a)Range of Water Table Pre-Monsoon Season (Meters From 1.57 To 14.42 Below Ground Level (m bgl)) 14.6. (b)Range of Water Table Post-Monsoon Season (Meters From 0.53 To 11.73 Below Ground Level (m bgl)) (c)Whether Ground Water Intersection will be there ? No 15. Details of Water Requirement (During Operation) S. Source Source Required Distance Copy of Mode of Other Method of Other Letter Date Permitted No. Other Quantity from Permission Transport Mode of Water Method of No. of Quantity Source from Transport Withdrawal Water Issue Withdrawal environmentclearance.nic.in/state/FB_ECgeneral_report.aspx?pid=65006 3/9 9/24/2019 Report Part 1 Competent Authority Copy of Rain Water 24 (1.) Surface 5 0.10 Permission Pipeline Others Harvesting NA Sep 5 Letter Structure 2019 15.1. (a)Whether Desalination is proposed No 16. Waste Water Management(During Operation) Quantity of Quantity of Quantity of Waste Treatment Treated Water Discharged S. Water Capacity Treatment Mode of Other Mode of Type/Source Used in Water No. Generated (Kilolitre Method Disposal Disposal Recycling/Reuse (Kilolitre per (Kilolitre per Day) (Kilolitre per Day) Day) per Day) No Waste Not (1.) 0 0 Others Not Applicable 0 0 Anticipated Applicable (a)Total Waste Water Generation 0 16.1. (b)Total Discharged Water 0 (c)Total Reused Water 0 17. Solid Waste Generation/Management Quantity Distance Other S. Name of Other Mode of Mode of Other Mode of Item per Unit from Mode of No. Waste Item Transport Disposal Disposal Annum Site(KM) Transport No Waste Quarry (1.) Others 0 Tons 0.1 Road Others Not Applicable Anticipated Waste 18. 18.1. Air Quality Impact Prediction Other S. Criteria Baseline Distance Incremental Prescribed Criteria Unit Total GLC No. Pollutants Concentration GLC Concentration Standard Pollutants (1.) PM2.5 Microgram per Meter Cube 24.8 0.5 10 34.8 60 (2.) NOx Microgram per Meter Cube 26.1 0.5 10 36.1 80 (3.) SO2 Microgram per Meter Cube 8.6 0.5 5 13.6 80 (4.) PM10 Microgram per Meter Cube 71.4 0.5 10 81.4 100 18.2. Stack Details S. Stack Source Fuel Stack Height(m) Pollutants Other Pollutants Emission (GLS) No. Diameter(m) Open Pit (1.) HSD 5 100 PM10 0.00001192 Source Power Requirement: (a)Quantity (Kilo Volt Amps (kVA)) 0 (b)Source KSEB 19.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us