
FORM 1 (Updated) (I) Basic Information S. No. Item Details 1. Name of the project/s “Hill View Garden” Housing Project, promoted by M/s Trehan Home Developer Pvt. Ltd. 2. S. No. in the schedule Category ‘B’ under item 8(a) of the schedule of Gazette Notification dated September 14th, 2006. 3. Proposed Details of Project capacity/area/length/tonnage Total Plot Area 73900 Sq. m. to be handled/command Total Built up 121471.50 Sq. m. area/lease area/number of Area wells to be drilled Flat & other 1400 Flats , community Details Center, temple Total water 1114.00 KLD Requirement STP Details 100.00 KLD Parking Details 1739 ECS DG set Details (320 kVA x4) 4. New/Expansion/Modernization Application for Amendment in previous issued EC. 5. Existing Capacity / Area etc. - 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general No condition? If yes, please specify 8. Does it attract the specific No condition? If yes, please specify 9. Location Bhiwadi Plot/Survey/Khasra No. - Village 8 Mile Stone Alwar bypass Road, Village Thanda Tehsil Tijara District Alwar State Rajasthan 10. Nearest railway station/airport The proposed site is well connected through a along with distance in Kms. road network from two sides. Rewari Railway Station is at a distance of about 26.0 km towards NE of proposed site. Indira Gandhi International Airport is at a distance of at about 47.0 km towards NNE of proposed site. NH-71 B is at about 4.8 Km towards North side of proposed site. NH-8 is at about 9.1 Km towards North West side of proposed site. 11. Nearest Town, city, District Nearest habitation is Bhudli at a distance of Headquarters along with 0.25 km towards NE. distance in Kms. Nearest town-Bhiwadi at a distance of 5.50 km M/s Trehan Home developer Pvt. Ltd. Authorized Signatory 1 towards NW. 12. Village Panchayats, Zila Village- Gaadpur, Tehsil, Bhiwadi, Distt. - Alwar, Parishad, Municipal Municipal Corporation, U. I. T. [Local body] Nagar Corporation, Local body Vikas Nyas (U.I.T). (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s Trehan Developer Pvt. Ltd. 14. Registered Address Block 15 Plot No-1, Spring Filed Colony, sector 31 Faridabad-121001 15. Address for correspondence: Name M/s Trehan Developer Pvt. Ltd Designation (Owner/ Partner/ Owner CEO) Address Block 15 Plot No-1, Spring Filed Colony, sector 31 Faridabad-121001 Pin Code 121001 E-mail [email protected] Telephone No. +91-124-43-777-27/28 Fax No. +91-124-45-139-77 16. Details of Alternative Sites The Government Body “U. I. T.,” Bhiwadi, allotted examined, if any. Location of the said land to "M/s Trehan Developer Pvt. Ltd these sites should be shown on Location of the proposed project is- a topo sheet. 8 Mile Stone Alwar bypass Road, Village Thanda Bhiwadi. 17. Interlinked Projects No 18. Whether separate application Not Applicable of interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any No Government Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No M/s Trehan Home developer Pvt. Ltd. Authorized Signatory 2 24. Whether there is any litigation No pending against the project and /or land in which the project is proposed to be set up? (a) Name of the court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. no. Information/ Checklist Yes/N Details thereof (with approximate confirmation o quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary No Land use change in land use, land The proposed site is in the developing area of cover or topography Tijara Tehsil which has mixed land use including increase in pattern of residential and commercial use. intensity of land use (with The proposed use of site is for residential respect to local land use purpose. Therefore, the proposed project will plan). not significantly differ from existing land use of locality and it will not bring any significant change in land use of locality. Yes Land cover Due to human activities, land cover is either directly affected from activity like construction of road-building leading to deforestation or indirectly from water diversion leading to lowering of the water table. The proposed project will not involve any deforestation; only small work of site clearance will be done in which some shrubs and grasses will be removed. It will be balanced by planed landscaping on the site. The excavated soil will be balanced within site by back filling. Therefore the changes will be localized and insignificant. Topography No The site is plane and will not involve any leveling activities. The proposed site does not M/s Trehan Home developer Pvt. Ltd. Authorized Signatory 3 involve any major natural drainage channel of locality therefore no changes in drainage pattern are envisaged. 1.2 Clearance of existing land, Yes The proposed site is not having any vegetation and buildings? structures. There are some seasonal shrubs and grasses in the proposed project site. Clearing of vegetation during the construction stage is very minimal. List of observed vegetations is enclosed as Annexure XI. This shall be compensated by planting trees in addition to shrubs. The proposed landscaping and plantation will have positive impact on the prevailing environment. Details of flora are enclosed as Annexure- XI. 1.3 Creation of new land uses? No The proposed site is located near Chowpanki Industrial Area, at a distance of about 5 km. from RIICO Chowk towards Chowpanki.The area of Tijara Tehsil has mixed land use pattern of residential and commercial use. The proposed use of site is for residential. Therefore, the proposed project will not create new land uses that significantly differ from existing land use of locality as per the master plan. 1.4 Pre-construction Yes The soil investigation was carried out. The investigations e.g. bore detailed Soil investigation report is enclosed houses, soil testing? as Annexure No XVII. 1.5 Construction works? Yes The Group Housing Project have 1400 Residential Flats, community center, & temple. 1.6 Demolition works? No The proposed site is not having any structures which will need demolition. 1.7 Temporary sites used for Yes They will be housed in temporary houses construction works or supported by flush WCs during construction housing of construction period only. workers? 1.8 Above ground buildings, Yes The proposed project maximum height of the structures or earthworks project will be 30 m (up to mumty level). including linear structures, cut and fill or excavations. 1.9 Underground works No No tunneling activity is involved. including mining or tunneling? 1.10 Reclamation works? No No reclamation works involved 1.11 Dredging? No Not involved 1.12 Offshore structures? No Not applicable 1.13 Production and No Not applicable manufacturing processes? M/s Trehan Home developer Pvt. Ltd. Authorized Signatory 4 1.14 Facilities for storage of Yes Temporary stores or sheds will be goods or materials? constructed for storage of construction materials. 1.15 Facilities for treatment or Yes STP for treatment of sewage. STP treated disposal of solid waste or effluent will be used for gardening and liquid effluents? flushing of toilets. All excess treated water will be discharged in drains maintained by UIT after taking necessary permission from UIT. All solid waste from different sections will be collected in separate bins. The non- organic waste shall be disposed off to authorized vendors. The organic waste will be converted into manure and used within premises for green belt development. 1.16 Facilities for long term Yes Cabins for watchmen, gardeners etc and housing of operational persons engaged in essential services. workers? 1.17 New road, rail or sea No The existing infrastructure is sufficient to traffic during construction catch-up for the need of such a small project, or operation? insignificant increase in traffic for transport of men & material is envisaged. 1.18 New road, rail, air, No The proposed project site has well waterborne or other connectivity through road; rail and air- transport infrastructure transport therefore will not require any including new or altered change in existing infrastructure. routes and stations, ports, airports etc? 1.19 Closure or diversion of No No public road or infrastructure is crossing existing transport routes or within the proposed site. or infrastructure leading to changes in traffic movements? 1.20 New or diverted No No pipeline or transmission line is crossing transmission lines or or within the proposed site. pipelines? 1.21 Impoundment, damming, No The proposed site does not involve any culverting, realignment or major natural drainage channel of locality other changes to the therefore no changes in drainage pattern are hydrology of watercourses envisaged. or aquifers? 1.22 Stream crossings? No The proposed plot is small in size and no natural drain is crossing the plot. 1.23 Abstraction or transfers of Yes Water will be taken from underground water water from ground or abstraction. No ground water will be surface waters? abstracted without obtaining prior NOC from CGWA.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages14 Page
-
File Size-