(To Be Published in the Gazette of India, Part-II, and Section 3, Sub

(To Be Published in the Gazette of India, Part-II, and Section 3, Sub

@Ei"nii:ru';" 't'o, Head Office : 'I'heMemberSecretary, Laxmi Building, 1st Floor, 6, Shoorji Vallabhdas Marg, State Invironmental Impact Assessment Authority (SEIAA) Ballard Estate, Mumbal - 400 001 , India. Mantralaya,Mumbai - 400032 Phone : +91 022-6614 4000 +91 Statc: Maharashtra. Fax i 022-6614 4114 CIN :U31300MH1957P1C010964 17-11-2018 Subject : Submission 'rf online Application for Amendmcnt in llnvironmontal Clearance (EC) for Residential & Commercial Dcvckrpmcnt at villago Magafhane, Dattpada road, Borivali -East, Mumbai - 400 066 Rcl'crcncc : l{cceivcd llnvironmental Clearance lettcr No. Sli'AC 2013/Clf -222/'l-<:-l datcd I ltr' June, 2013 Rcspcctcd Sir, Withreferenceloabovementionedsubj ect we are subn.ritting hercwith thc oulinc applicatior.r Ibr amendment in Envirorunental clearance (Form I & lA) with necessaly cnclosurc lbr yotrr' k irrd considcratio Plcascar:knowlcdgethesameandobligc. I hankingyou, Yoursfailhfully, l'or (lABl,It CORPOLATION OF INDIA LTD. *.kKEZrA,2-=' SIGNATOI{i/ llnclosurc: |orml&lA Cable Corporation of India Ltd. Registered Ofilce : Laxmi Building, 6, Shoorji Valiabhdas Marg, Ballard Estate, l\4umbai - 400 001. India. Website : www.cablecorporation.com Corporate Office: F2 & F10, E-1, StarZone, Building, Above Passport Office, Nashik Pune Road, Nashik Road, Nashik - 422 101. Phone r+91 02532 4O2AO0 Works : Plot No. F-3/'1, F-3/2, MIDC, Sinnar lndustrialArea, (lr/alegaon), Dist. Nashik-422 103. Phone : 02551-2301947 1230328 | a4464755U / A446475701 Omces at I N/Ulr.4BAl. KOLKATTA, GURGAON, CHENNAI. FORM – 1 EXPANSION PROJECT At Poisar village, Kandivali (East), Mumbai, State Maharashtra By M/s. S. D. CORPORATION PVT. LTD. (A Shapoorji Pallonji - Dilip Thacker Group Joint Venture) 41/44, Minoo Desai Marg, Colaba, Mumbai – 400 005 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project/s Proposed Amendment in Environment Clearance for Project at village Magathane, Borivali, Mumbai 2. S. No. in the schedule 8 (b) B1 3. Proposed capacity/ area/ Total Plot Area: 1, 51,327.90 Sq. mt. length/ tonnage to be handled/ Deduction: 4,087.07 Sq. mt. command area/ lease area/ Net Plot Area: 1, 47,240.83 Sq. mt. number of wells to be drilled Built-up Area as per FSI: 3, 04, 333.40 Sq. mt. Built-up Area as per FSI (Including fungible FSI): 2, 53, 241.04 Sq. mt. Total Construction Built-up area: 5, 57,574.44 Sq. mt. Project Proposal: Building Building Configuration Details Name & No. Completed Buildings Residential Tower: Wing A - Stilt + 21 floors Wing B - Stilt + 14 floors Samarpan Wing C - Stilt + 14 floors Wing D - Stilt + 14 floors Flats: 353 Club House - 2 Basements + Ground + 1flr Nos. Royale Residential Tower: Shops: 9 Samarpan Basement + Stilt + 19 floors Nos. Club House: Ground + 1 MH & D Reservation Maternity Home and Dispensary Offices Western W. E. I: 2 Basements + Ground + 6 floors Edge (W.E.) W. E. II: 2 Basements + Ground + 11 Upper Floors Amendment Portion W. E. III (Residential): Western Basement + Stilt + 2 Podium + 21 Floors Edge (W.E.) Club House: Ground +1 Residential Building 1A: Basement 2 + Basement 1 + 1st Podium + Podium 2 /1st to 19th Upper floors Building 1B: Flats: 6 wings – Wing A to F 2352 Nos. Basement 2 + Basement 1 + 1st Podium + Podium 2 /1st + Upper floors ranging from 7 Shops: 5 to 42 floors Nos. Building 1C: 6 wings A & D Wings and B & E Wings : Basement 2 + Basement 1+ 1st Podium + Podium 2/ 1st to 41st floors C & F Wings : B+ Lower Ground+Upper Ground + Podium/ 1st to 40th floors Existing Sale office and Temporary structure -- New/ Expansion/ Amendment in EC 1 Form 1- Residential & Commercial Development at Borivali, Mumbai Sr. Item Details 4. Modernization 5. Existing Capacity/ Area etc. The project has received Environmental Clearance from MoEF (on date 18th October, 2006) and Expansion in EC from SEIAA (on date 31st July 2009 & on 11th June 2013) As there is amendment in the Building 1B and 1C, we would like to get an amendment in the earlier EC. Total constructed work on site till date (FSI + Non FSI): 3,34,631.75 Sq.mt. 6. Category of project i.e. ‘A’ or B1 ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Borivali. Plot/Survey/Khasra No. C.T.S. No. 165 & 163-A village Magathane, Dattpada road, Borivali -East, Mumbai - 400 066 Village Magathane Tehsil Borivali District Mumbai Suburban State Maharashtra 10. Nearest railway station Kandivali Railway Station: Approx 2.00 Km (Road Distance) Nearest airport Borivali Railway Station: Approx 4.00 Km (Road Distance) Mumbai Chhatrapati Shivaji Terminals: Approx.16 km (Road Distance) 11. Nearest Town, city, District Mumbai Metropolitan Region headquarters along with distance in kms. 12. Village Panchayats, Zilla Municipal Corporation of Greater Mumbai (M.C.G.M.) Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. Cable Corporation of India Ltd. 14. Registered Address 4th, Laxmi Building, 6 Shoorji Vallabhdas Marg Ballard Estate, Mumbai. 15. Address for correspondence 4th, Laxmi Building, 6 Shoorji Vallabhdas Marg Ballard Estate, Mumbai. Name Mr. Dipendra Nath Mukherjee Designation AVP- Accounts & Finance (Owner/Partner/ CEO) Address 4th, Laxmi Building, 6 Shoorji Vallabhdas Marg Ballard Estate, Mumbai. Pin Code 400001 E-mail [email protected] Mobile number 7738095309 Telephone No. 022 - 66144100 Fax No. -- 16. Details of Alternative Sites Not applicable examined, if any. Location of these sites should be shown on a topo-sheet 17. Interlinked Projects Not applicable 18. Whether separate application Not applicable of interlinked project has been 2 Form 1- Residential & Commercial Development at Borivali, Mumbai Sr. Item Details submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation) Act, Not Applicable 1980? (b) The Wildlife (Protection) Act, NOC from Wild Life Board is Not Applicable as per final Notification reg. 1972? ESZ of SGNP published by MoEF & CC u/no. S.O.3645 (E) dated 05/12/2016 as our project site is not affected by the ESZ belt. (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Not applicable Government Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation -- pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order/ directions of the Court, if any and its relevance with the proposed project (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities /rates, No. No wherever possible) with source of information data 1.1 Permanent or temporary change in No • The site under reference is within limits of Municipal land use, land cover or topography Corporation of Greater Mumbai (M.C.G.M.). Site was including increase in intensity of land in Special Industrial zone (I3) as per the DP Remarks use (with respect to local land use received. plan) • NOC for non-industrial use from Office of the Joint Director of Industries and I to C permission from M.C.G.M. is also obtained • NOC from Office of the Joint Director of Industries and I to C permission are attached as Enclosure 1.2 Clearance of existing land, vegetation No Existing closed industry has already been demolished and building? 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out. Report is bore houses, soil testing? attached as Enclosure 1.5 Construction works? Yes Residential & Commercial development 1.6 Demolition works? No -- 1.7 Temporary sites used for construction No -- works or housing of construction workers? 1.8 Above ground building, structures or Yes • Excavated material partly reused for backfilling and earthworks including linear remaining disposed to Authorized landfill site with structures, cut and fill or excavations permission • Construction waste shall be partly reused/recycled and 3 Form 1- Residential & Commercial Development at Borivali, Mumbai Sr. Information/Checklist confirmation Yes / Details thereof (with approximate quantities /rates, No. No wherever possible) with source of information data remaining shall be disposed to Authorized landfill site with permission 1.9 Underground works including mining No Construction of only 2 basements or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the construction raw materials? material. 1.15 Facilities for treatment or disposal of Yes • STP for treatment of sewage solid waste or liquid effluents? • Segregation of solid waste into non-biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converters • Non-biodegradable waste to authorized recyclers • Dried sludge from STP: As manure • E-Waste: Stored separately and disposed through authorized recyclers • Bio-medical waste handled and disposed as per Bio- Medical Waste Management Rules, 2016 1.16 Facilities for long term housing of No Cabins for watchmen/ gardener and security guards etc. operational workers? 1.17 New road, rail, or sea traffic during No -- construction or operation? 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines or No -- pipelines? 1.21 Impoundment, damming, culverting, No Underground existing nallah is passing through the plot.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us