
Wind energy projects JUW_11_395_wind_bilderbuch_4Aufl.indd 1 07.06.11 09:29 Caption Number of turbines Manufacturer Total capacity Annual energy yield Start of operation Anzahl der Anlagen Hersteller Gesamtleistung Jahresenergieertrag Inbetriebnahme Nombre d´éoliennes Constructeur Puissance Production annuelle Mise en service Numero de turbinas Fabricante Potencia Produccion anual Puesta en marcha Numero di turbine eoliche Costruttore Potenza Produzione annuale Messa in servizio Liczba turbin Producent Moc Roczna produkcja energii Przekazanie do eksploatacji Počet zařízení Výrobce Celkový výkon Roční energetický výnos Uvedení do provozu JUW_11_395_wind_bilderbuch_4Aufl.indd 2 07.06.11 09:29 We make it happen The juwi group designs, builds and operates wind farms all over the world. So far, juwi has built 435 wind turbines with a total capacity of more than 700 megawatts and an investment volume of around EUR 1 billion. In addition to finding a location, planning and implementing projects, we also take care of all project financing as well as technical and commercial management. Wind energy projects Megawatt 2.600 juwi group worldwide 2.400 2.200 2.000 By 2015, juwi will have installed more than 2.500 MW 1.800 of wind energy worldwide. About 40 percent of this 1.600 1.400 capacity will be installed outside of Germany. 1.200 1.000 800 600 400 Germany 200 0 International 200920082007200620052004 2010 2011 2012 2013 2014 2015 JUW_11_395_wind_bilderbuch_4Aufl.indd 3 07.06.11 09:29 04 05 Guanacaste (Costa Rica) Central America’s largest wind farm 55 Enercon 49.5 MW 240 million kWh 2009 JUW_11_395_wind_bilderbuch_4Aufl.indd 4 07.06.11 09:29 Plouguin, Kerherhal (Brittany | France) juwi’s first wind farm in France 7 Enercon 14 MW 32 million kWh 2004 / 2005 JUW_11_395_wind_bilderbuch_4Aufl.indd 5 07.06.11 09:29 06 07 Lestrade (Midi-Pyrénées | France) 5 Enercon 11.5 MW 25.6 million kWh 2008 JUW_11_395_wind_bilderbuch_4Aufl.indd 6 07.06.11 09:29 Vaux-les-Mouzon (Ardennes | France) 3 Enercon 6.9 MW 11.6 million kWh 2008 JUW_11_395_wind_bilderbuch_4Aufl.indd 7 07.06.11 09:29 08 09 Morbach (Rhineland-Palatinate | Germany) Multi-energy project with wind, solar and bioenergy 14 Vestas 28 MW 45 million kWh 2003 JUW_11_395_wind_bilderbuch_4Aufl.indd 8 07.06.11 09:29 Kisselbach (Rhineland-Palatinate | Germany) Wind farm in forested area 10 Enercon 22.4 MW 40 million kWh 2007 JUW_11_395_wind_bilderbuch_4Aufl.indd 9 07.06.11 09:29 10 11 Schneebergerhof (Rhineland-Palatinate | Germany) First repowering project and the world’s most powerful onshore wind turbine (E-126) 5 Vestas / Enercon 13.4 MW 36 million kWh 1996–2003 / 2010 JUW_11_395_wind_bilderbuch_4Aufl.indd 10 07.06.11 09:29 Mainz (Rhineland-Palatinate | Germany) Jointly owned by juwi and Stadtwerke Mainz AG (RIO Energie GmbH) 4 Enercon 8 MW 18 million kWh 2006 / 2009 JUW_11_395_wind_bilderbuch_4Aufl.indd 11 07.06.11 09:29 12 13 Gollenberg (Rhineland-Palatinate | Germany) Jointly owned by juwi and Pfalzwerke AG, Ludwigshafen (pfalzwind GmbH) GE Wind Energy 9 Fuhrländer 13.5 MW 27.5 million kWh 2003 / 2005 JUW_11_395_wind_bilderbuch_4Aufl.indd 12 07.06.11 09:29 Rheinhessen-Pfalz (Rhineland-Palatinate | Germany) Largest wind farm in South-West Germany Nordex / NEG Micon 28 GE Wind Energy / Enercon 32.9 MW 56.7 million kWh 1997 – 2004 JUW_11_395_wind_bilderbuch_4Aufl.indd 13 07.06.11 09:29 14 15 Lettweiler Höhe (Rhineland-Palatinate | Germany) Equipped with a touristic walking trail about wind energy Vestas / DeWind 11 GE Wind Energy 16.25 MW 30 million kWh 1999 – 2001 JUW_11_395_wind_bilderbuch_4Aufl.indd 14 07.06.11 09:29 Grevenbroich (North Rhine-Westphalia | Germany) New hybrid system for high towers, jointly developed by juwi, Mecal and Hurks Group BV Advanced Tower 1 Systems / Siemens 2.3 MW 6 million kWh 2009 JUW_11_395_wind_bilderbuch_4Aufl.indd 15 07.06.11 09:29 16 17 Landkern (Rhineland-Palatinate | Germany) Jointly owned by juwi and Berner Kraftwerke AG 4 Enercon 8 MW 16 million kWh 2009 JUW_11_395_wind_bilderbuch_4Aufl.indd 16 07.06.11 09:29 Walhausen (Rhineland-Palatinate | Germany) 3 Enercon 6 MW 10 million kWh 2005 JUW_11_395_wind_bilderbuch_4Aufl.indd 17 07.06.11 09:29 18 19 Wörrstadt (Rhineland-Palatinate | Germany) Technology and adventure: Wind farm combined with high rope course 10 Enercon 21.5 MW 60 million kWh 2009 / 2011 JUW_11_395_wind_bilderbuch_4Aufl.indd 18 07.06.11 09:30 Flat Water (Nebraska | USA) First juwi-developed wind farm in the United States 40 GE Wind Energy 60 MW 220 million kWh 2010 / 2011 JUW_11_395_wind_bilderbuch_4Aufl.indd 19 07.06.11 09:30 20 21 Stypułów (Poland) juwi’s first wind farm in Poland 3 Fuhrländer 4.5 MW 11 million kWh 2010 JUW_11_395_wind_bilderbuch_4Aufl.indd 20 07.06.11 09:30 Mehringer Höhe (Rhineland-Palatinate | Germany) Wind farm in forested area 16 Enercon 32.3 MW 65 million kWh 2005 / 2006 / 2010 / 2011 JUW_11_395_wind_bilderbuch_4Aufl.indd 21 07.06.11 09:30 22 23 Dannstadt (Rhineland-Palatinate | Germany) Hybrid system for high towers, jointly developed by juwi, Mecal and Hurks Group BV Advanced Tower 2 Systems / Kenersys 5 MW 12 million kWh 2010 JUW_11_395_wind_bilderbuch_4Aufl.indd 22 07.06.11 09:30 Lingerhahn (Rhineland-Palatinate | Germany) 4 REpower Systems 8 MW 16.5 million kWh 2011 JUW_11_395_wind_bilderbuch_4Aufl.indd 23 07.06.11 09:30 24 25 Raucourt (France) 12 MW Saint Cyr en Pail (France) 10 MW Pouillé-les-Coteaux (France) 9.2 MW Lanrivoaré (France) 2.6 MW Kartowice (Poland) 1.5 MW Wind energy – a clean, endless and low-cost source of power JUW_11_395_wind_bilderbuch_4Aufl.indd 24 07.06.11 09:30 Hartenfelser Kopf (Rhineland-Palatinate) 26 MW Ottweiler (Saarland) 6 MW Ober Kostenz (Rhineland-Palatinate) 6 MW Alterkülz-Spesenroth (Rhineland-Palatinate) 14 MW Diespeck (Bavaria) 4 MW JUW_11_395_wind_bilderbuch_4Aufl.indd 25 07.06.11 09:30 26 27 Offenbach a.d. Queich (Rhineland-Palatinate) 6 MW Römerberg (Rhineland-Palatinate) 6 MW Niederkirchen (Rhineland-Palatinate) 19.2 MW Hassloch (Rhineland-Palatinate) 3 MW Minfeld (Rhineland-Palatinate) 8 MW Together with juwi, you can benefit from the opportunities provided by wind energy. JUW_11_395_wind_bilderbuch_4Aufl.indd 26 07.06.11 09:30 Kerzenheim (Rhineland-Palatinate) 5.45 MW Weselberg (Rhineland-Palatinate) 9.5 MW Hohenstein (Hesse) 1.6 MW Balve (North Rhine-Westphalia) 3 MW Erdesbach (Rhineland-Palatinate) 8 MW JUW_11_395_wind_bilderbuch_4Aufl.indd 27 07.06.11 09:30 juwi group activities worldwide Wind energy Solar energy Bio energy Wind energy Solar energy carbon neutral Bio energy natureOffice.com | DE-218-206641 print production Please visit www.juwi.com for our wind experts in your region. Last updated: 06/2011 JUW_11_395_wind_bilderbuch_4Aufl.indd 28 07.06.11 09:31.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages28 Page
-
File Size-