Line Item Variance Massachusetts Bay Transportation Authority

Line Item Variance Massachusetts Bay Transportation Authority

Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5219 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: Skanska DW White JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 0130.175 LAYOVER FACILITY LS 1 $18,090,531.00 $18,090,531.00 $20,000,000.00 $20,000,000.00 $1,909,469.00 $1,909,469.00 0130.429 TRAFFIC OFFICERS SERVICES AN 1 $4,100,000.00 $4,100,000.00 $4,100,000.00 $4,100,000.00 $0.00 $0.00 0211.495 SITE UTILITIES AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00 0212.440 BRIDGE LS 1 $1,919,265.00 $1,919,265.00 $500,000.00 $500,000.00 ($1,419,265.00) ($1,419,265.00) 0213.211 PEST CONTROL AN 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0.00 $0.00 0221.331 DISPOSE OF QUALIFYING SOILS AN 1 $2,250,000.00 $2,250,000.00 $2,250,000.00 $2,250,000.00 $0.00 $0.00 0222.027 MATERIAL REMOVAL AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00 0222.029 HANDLING AND TRANSPORT OF CY 5,000 $15.00 $75,000.00 $15.00 $75,000.00 $0.00 $0.00 EXCESS EXCAVATED SOIL GENERATED BY OTHERS 0222.108 ROCK EXCAVATION CY 100 $100.00 $10,000.00 $525.00 $52,500.00 $425.00 $42,500.00 Page 1 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5219 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: Skanska DW White JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 0222.119 UNSUITABLE EXCAVATION CY 100 $35.00 $3,500.00 $125.00 $12,500.00 $90.00 $9,000.00 0222.398 REMOVE AND DISPOSE OF AN 1 $250,000.00 $250,000.00 $250,000.00 $250,000.00 $0.00 $0.00 HAZARDOUS WASTE 0222.442 TEST PITS CY 100 $900.00 $90,000.00 $255.00 $25,500.00 ($645.00) ($64,500.00) 0222.579 REMOVE AND DISPOSE OF AN 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0.00 $0.00 CONTAMINATED GROUNDWATER 0227.003 STABILIZATION FABRIC SY 20,000 $4.00 $80,000.00 $3.00 $60,000.00 ($1.00) ($20,000.00) 0250.006 OBSTRUCTION REMOVAL HR 100 $500.00 $50,000.00 $1,500.00 $150,000.00 $1,000.00 $100,000.00 0282.202 EROSION CONTROL SYSTEM LF 3,300 $6.67 $22,011.00 $15.00 $49,500.00 $8.33 $27,489.00 0290.000 RAILROAD WORK LS 1 $99,390,565.00 $99,390,565.00 $78,613,079.00 $78,613,079.00 ($20,777,486.00) ($20,777,486.00) 0291.411 GUARD RAIL ON WOOD TIES LF 8,265 $74.63 $616,816.95 $55.00 $454,575.00 ($19.63) ($162,241.95) Page 2 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5219 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: Skanska DW White JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 1685.054 FREETOWN STATION LS 1 $9,779,132.00 $9,779,132.00 $17,000,000.00 $17,000,000.00 $7,220,868.00 $7,220,868.00 1685.055 FALL RIVER DEPOT LS 1 $13,143,974.00 $13,143,974.00 $20,000,000.00 $20,000,000.00 $6,856,026.00 $6,856,026.00 6500.000 RISK ALLOWANCE RA 1 $14,232,346.00 $14,232,346.00 $14,232,346.00 $14,232,346.00 $0.00 $0.00 Total Estimate Contract Base Bid: $165,253,140.95 $158,975,000.00 ($6,278,140.95) Contract Total - Base Bid and Alternates: $165,253,140.95 $158,975,000.00 ($6,278,140.95) Page 3 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5214 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: White-Manafort, JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 0130.175 LAYOVER FACILITY LS 1 $18,090,531.00 $18,090,531.00 $18,000,000.00 $18,000,000.00 ($90,531.00) ($90,531.00) 0130.429 TRAFFIC OFFICERS SERVICES AN 1 $4,100,000.00 $4,100,000.00 $4,100,000.00 $4,100,000.00 $0.00 $0.00 0211.495 SITE UTILITIES AN 1 $750,000.00 $750,000.00 $750,000.00 $750,000.00 $0.00 $0.00 0212.440 BRIDGE LS 1 $1,919,265.00 $1,919,265.00 $1,400,000.00 $1,400,000.00 ($519,265.00) ($519,265.00) 0213.211 PEST CONTROL AN 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0.00 $0.00 0221.331 DISPOSE OF QUALIFYING SOILS AN 1 $2,250,000.00 $2,250,000.00 $2,250,000.00 $2,250,000.00 $0.00 $0.00 0222.027 MATERIAL REMOVAL AN 1 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $0.00 $0.00 0222.029 HANDLING AND TRANSPORT OF CY 5,000 $15.00 $75,000.00 $65.00 $325,000.00 $50.00 $250,000.00 EXCESS EXCAVATED SOIL GENERATED BY OTHERS 0222.108 ROCK EXCAVATION CY 100 $100.00 $10,000.00 $400.00 $40,000.00 $300.00 $30,000.00 Page 4 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5214 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: White-Manafort, JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 0222.119 UNSUITABLE EXCAVATION CY 100 $35.00 $3,500.00 $50.00 $5,000.00 $15.00 $1,500.00 0222.398 REMOVE AND DISPOSE OF AN 1 $250,000.00 $250,000.00 $250,000.00 $250,000.00 $0.00 $0.00 HAZARDOUS WASTE 0222.442 TEST PITS CY 100 $900.00 $90,000.00 $300.00 $30,000.00 ($600.00) ($60,000.00) 0222.579 REMOVE AND DISPOSE OF AN 1 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $0.00 $0.00 CONTAMINATED GROUNDWATER 0227.003 STABILIZATION FABRIC SY 20,000 $4.00 $80,000.00 $3.00 $60,000.00 ($1.00) ($20,000.00) 0250.006 OBSTRUCTION REMOVAL HR 100 $500.00 $50,000.00 $2,000.00 $200,000.00 $1,500.00 $150,000.00 0282.202 EROSION CONTROL SYSTEM LF 3,300 $6.67 $22,011.00 $10.00 $33,000.00 $3.33 $10,989.00 0290.000 RAILROAD WORK LS 1 $99,390,565.00 $99,390,565.00 $95,190,000.00 $95,190,000.00 ($4,200,565.00) ($4,200,565.00) 0291.411 GUARD RAIL ON WOOD TIES LF 8,265 $74.63 $616,816.95 $85.00 $702,525.00 $10.37 $85,708.05 Page 5 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 5214 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: White-Manafort, JV Engineer Bidder Variance Line Item Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 1685.054 FREETOWN STATION LS 1 $9,779,132.00 $9,779,132.00 $11,000,000.00 $11,000,000.00 $1,220,868.00 $1,220,868.00 1685.055 FALL RIVER DEPOT LS 1 $13,143,974.00 $13,143,974.00 $15,000,000.00 $15,000,000.00 $1,856,026.00 $1,856,026.00 6500.000 RISK ALLOWANCE RA 1 $14,232,346.00 $14,232,346.00 $14,232,346.00 $14,232,346.00 $0.00 $0.00 Total Estimate Contract Base Bid: $165,253,140.95 $163,967,871.00 ($1,285,269.95) Contract Total - Base Bid and Alternates: $165,253,140.95 $163,967,871.00 ($1,285,269.95) Page 6 of 24 Date/Time: Massachusetts Bay Transportation Authority Report ID: CMS-BM-003 Capital Management System Comparison of Bids Bid Date: 05/07/2020 Contract K78CN03 Engineer: 4249 Bidder: 2997 SCR Fall River Secondary Commuter Rail Expansion Firm Name: Vhb-Hntb, A Joint Venture Project Berkley to Fall River, Massachusetts Firm Name: The Middlesex Corp.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us