Draft ESIA: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project

Draft ESIA: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project

Environmental and Social Impact Assessment: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project TUVALU COASTAL ADAPTATION PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT NANUMAGA AND NANUMEA Prepared by: FCG ANZDEC Ltd Prepared for: The Pacific Community 7 August 2020 Revision 1.1, August 2020 1 Environmental and Social Impact Assessment: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project Quality Information Environmental and Social Impact Assessment: Nanumaga and Nanumea, Tuvalu Document Coastal Adaptation Project Date 7 August 2020 Prepared for Pacific Community Revision History Authorised Version Version Date Details Name/Position Kate Walker/Environmental Specialist 1 3 July 2020 Initial Draft for Review Patrina Dumaru/Social Specialist 1.1 7 Aug 2020 ESIA Updated with review comments Kate Walker/Environmental Specialist Patrina Dumaru/Social Specialist Revision 1.1, August 2020 2 Environmental and Social Impact Assessment: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project TABLE OF CONTENTS 1 Executive Summary ....................................................................................................................... 10 Introduction .......................................................................................................................... 10 Project Summary ................................................................................................................... 10 Environmental and Social Management ................................................................................ 13 2 Introduction .................................................................................................................................. 17 Project Background ............................................................................................................... 17 Scope and Objectives ............................................................................................................ 17 Integration of the ESIA .......................................................................................................... 19 Disclosure .............................................................................................................................. 19 3 Project Description ........................................................................................................................ 20 Site Location and Study Area ................................................................................................. 20 Scope of Works...................................................................................................................... 21 3.2.1 Nanumaga ..................................................................................................................... 21 3.2.2 Nanumea ....................................................................................................................... 24 3.2.3 Berm Top Barriers ......................................................................................................... 28 Construction Methodology ................................................................................................... 28 Sources of Aggregate............................................................................................................. 28 4 Analysis of Alternatives ................................................................................................................. 31 Introduction .......................................................................................................................... 31 The ‘No Project’ Alternative .................................................................................................. 31 Alternative Design Approaches ............................................................................................. 31 Alternative BTB Core Options ................................................................................................ 32 Alternative Hard Revetment Options: Nanumea ................................................................... 34 Alternative Sources of Aggregate .......................................................................................... 36 5 Policy, Legislative and Regulatory Framework .............................................................................. 37 Introduction .......................................................................................................................... 37 Applicable Tuvalu Policies, Legislations, Regulations and Standards ..................................... 37 5.2.1 Environmental Protection Act 2008 .............................................................................. 37 5.2.2 Environmental Protection (Environmental Impact Assessment) Regulations 2012 ...... 37 5.2.3 Waste Operations and Services Act 2009 ...................................................................... 38 5.2.4 Conservation Areas Act 2008 ........................................................................................ 38 5.2.5 Employment Act 2008 ................................................................................................... 39 Revision 1.1, August 2020 3 Environmental and Social Impact Assessment: Nanumaga and Nanumea Tuvalu Coastal Adaptation Project 5.2.6 Falekaupule (Local Government) Act 1977.................................................................... 39 5.2.7 Laws of Tuvalu Act Cap. 1.06 ......................................................................................... 40 5.2.8 Public Health and Safety Regulations (Revised 1990) .................................................... 41 5.2.9 Foreshore and Land Reclamation Act (1969) ................................................................ 41 International Treaties and Organisations .............................................................................. 41 5.3.1 International Labour Organisation ................................................................................ 41 5.3.2 Convention on Biological Diversity (CBD) (1998) ........................................................... 41 5.3.3 Convention for the Protection of the World Cultural and Natural Heritage.................. 42 5.3.4 Waigani Convention ...................................................................................................... 42 5.3.5 Other Applicable Agreements ....................................................................................... 42 UNDP Social and Environmental Standards ........................................................................... 43 5.4.1 GCF Environmental and Social Policy ............................................................................ 44 6 Natural Environment Baseline ....................................................................................................... 44 Introduction .......................................................................................................................... 44 Location and Setting .............................................................................................................. 44 Physical Environment ............................................................................................................ 46 6.3.1 Meteorology .................................................................................................................. 46 6.3.2 Geology ......................................................................................................................... 48 6.3.3 Coastal Hydrology .......................................................................................................... 54 6.3.4 Topography ................................................................................................................... 56 6.3.5 Natural Hazard Vulnerability and Risks .......................................................................... 58 6.3.6 Climate Change ............................................................................................................. 61 Biological Environment .......................................................................................................... 63 6.4.1 Terrestrial Environment ................................................................................................ 63 6.4.2 Marine Environment ..................................................................................................... 66 6.4.3 Local Marine Managed Areas ........................................................................................ 73 6.4.4 Vulnerable and Endangered Species ............................................................................. 75 6.4.5 Invasive and Alien Species ............................................................................................. 76 7 Social & Built Environment Baseline .............................................................................................. 78 Land Use ................................................................................................................................ 78 7.1.1 Nanumaga ..................................................................................................................... 78 7.1.2 Nanumea ....................................................................................................................... 79 Demographics ....................................................................................................................... 80 7.2.1 Nanumaga ....................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    164 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us