Thursday, May 30, 2019 Approved Projects 237 Facilities Project Management Monthly Report BOIE, GREGG J 28 1.1‐ PLAN/EST 2019‐0042 FCR Leavitt Cntr Transportation Center ‐ Fire Protection Work Year Approved 5/30/19, Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0048 RR Elliott Alumni Center ‐ Building HVAC Modifications and Improvements Year Approved 5/30/19, Bid initiation form sent to procurement .Working on invitation to bid 2020 Design Firm: HARRIMAN Contractor: Name: Funding: DMA 1.1‐ PLAN/EST 2019‐0227 FCR Nesmith Hall ‐ Air Sourced Heat Pump suite 107 Year Approved 5/30/19, will meet with Michelle Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0255 FCR Barton Hall & Cole Hall ‐ Exhaust Fan ‐ Vet Clinic Year Approved 5/30/2019:: ‐ Need to review with EH&S no building codes available to design to. Design Firm: SMRT Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0307 FCR Woodside Apts Community Building ‐ Air Handler Replacement Year Approved 5/30/19, Waiting for proposal from SMRT Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0335 FCR James Hall ‐ Blackboard Replacement Rm 254 Year Approved 5/30/19. Emailed FCR to Joe Licciardi and explained that he needs to send the FCR to his BSC person, . Design Firm: Contractor: External Name: New England Int. Spec. Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0351 FCR Rudman Hall ‐ Ground Floor Hydration Station Year Approved 5/30/19, sent Information to Milestone waiting for proposal. Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC Brenda Whitmore, Director Facilities Project Management Thursday, May 30, 2019 University of New Hampshire Page 1 of 30 2‐ IN DESIGN 2016‐0453 BAR Memorial Union Building ‐ Granite State Room Chiller Replacement Year Approved 5/30/19, SMRT is working on design. 2019 Design Firm: SMRT Contractor: Name: Funding: COLLEGE / DEPT ALLOC 2‐ IN DESIGN 2018‐0306 RR New Hampshire Hall ‐ Window Replacements and Exterior Painting Year Approved 5/30/19, McHenry Architects provided design development for review and Asset Management decided to 2020 push this project to summer 2020.( GO OUT TO BID FALL 2019) Design Firm: McHenry Architecture Contractor: Name: Funding: DMA 2‐ IN DESIGN 2019‐0276 FCR Health & Wellness Building ‐ 2nd Floor Building Improvements Year Approved 5/30/19, Harriman working on design. Should have documentation by 5/31/19 2019 Design Firm: Harriman Contractor: Name: Funding: COLLEGE / DEPT ALLOC 2.5‐ IN PROCUREMENT 2018‐0079 FCR Demeritt Hall ‐ Rm 112 Carpet Repairs Year Approved 5/30/19,PO to Sprague Flooring for Repairs …...Previous Fund Number for larger project was 1XTM36 Design Firm: Contractor: External Name: Sprague Funding: COLLEGE / DEPT ALLOC 2.5‐ IN PROCUREMENT 2018‐0135 RR Dimond Library ‐ Rm 402 Flooring Replacement Year Approved 5/30/19, Met with Charters Brothers on 5/29 at the Library . 2019 Design Firm: Contractor: External Name: Charters Brrothers Funding: DMA 2.5‐ IN PROCUREMENT 2018‐0338 FCR Morse Hall ‐ Rms 159 and 160 Lab Renovation Design Services Year Approved 5/30/19 went out to bid on 5/8/19 . Information Meeting on 5/15/19. 2019 Design Firm: SMRT Contractor: Name: Funding: COLLEGE / DEPT ALLOC 2.5‐ IN PROCUREMENT 2019‐0107 RR Huddleston Hall ‐ 307, 308 Carpet Replacement Year Approved 5/30/19, I will meet with Kevin Sousa. 2019 Design Firm: Contractor: External Name: Milestone Funding: DMA 2.5‐ IN PROCUREMENT 2019‐0289 FCR Memorial Union Building ‐ Remove Mailboxes & Create Storage Area Year Approved 5/30/19, Careno has PO, scheduled for June 3, 2019. 2019 Design Firm: Contractor: External Name: Careno Construction Funding: COLLEGE / DEPT ALLOC Brenda Whitmore, Director Facilities Project Management Thursday, May 30, 2019 University of New Hampshire Page 2 of 30 3‐ IN CONSTRUCTION 2010‐0300 RR Dimond Library ‐ South Wall Masonry Repointing Year Approved 5/30/19, Careno working on repointing south side. Top band is in tough shape and waiting for proposal to 2020 repair. Design Firm: Contractor: External Name: Careno Construction Funding: DMA 3‐ IN CONSTRUCTION 2017‐0431 FCR Parsons Hall ‐ Rm S128 Ammonia Gas Control System Year Approved 5/30/19:Andy Glode to write procedure for System . 2018 Design Firm: Norris Contractor: External Name: Norris Funding: COLLEGE / DEPT ALLOC 3‐ IN CONSTRUCTION 2018‐0311 FCR 1 Leavitt Lane ‐ 1st and 2nd Floor Paint and Carpet Estimate Year Approved 5/30/19, Painting is work in progress. 2019 . Design Firm: Contractor: External Name: Careno Construction Funding: COLLEGE / DEPT ALLOC 3‐ IN CONSTRUCTION 2019‐0058 RR Paul Creative Arts Center ‐ 1st Floor Music Wing Restoration Year Approved Emergency Repair 5/30/19, Headwall is in fabrication. 2019 Design Firm: Contractor: External Name: T & S Construction Funding: INST RR 3.1‐ SUBSTANTIAL COMPLETION 2018‐0243 FCR MacFarlane Greenhouse ‐ HVAC Replacement Year Approved 5/30/19, project completed . 2019 Design Firm: Contractor: External Name: APH Funding: COLLEGE / DEPT ALLOC 3.1‐ SUBSTANTIAL COMPLETION 2018‐0261 FCR James Hall ‐ Rm 348 Eyewash/Shower Installation Year Approved 5/30/19,Installation complete. 2019 Design Firm: Contractor: External Name: Granite State Plumbing Funding: COLLEGE / DEPT ALLOC 3.1‐ SUBSTANTIAL COMPLETION 2018‐0344 FCR Kingsbury Hall ‐ Rm S315 INSTALL EYE WASH AND EMERGENCY SHOWER Year Approved 5/30/19, Installation completed. 2019 Design Firm: Contractor: External Name: Granite State Plumbing and Funding: COLLEGE / DEPT Heating ALLOC 3.1‐ SUBSTANTIAL COMPLETION 2019‐0003 RR Elliott Alumni Center ‐ HVAC Modifications and Upgrades Design Year Approved 5/30/19, Harriman completed construction documents 5/2/19 . 2019 Design Firm: Harriman Contractor: Name: Funding: DMA Brenda Whitmore, Director Facilities Project Management Thursday, May 30, 2019 University of New Hampshire Page 3 of 30 3.1‐ SUBSTANTIAL COMPLETION 2019‐0008 RR Tree Removal ‐ Oyster River Blow Down Removal Year Approved 5/30/19,Tree removed from Oyster River. 2019 Design Firm: Contractor: External Name: Crawfords Logging Funding: DMA 3.1‐ SUBSTANTIAL COMPLETION 2019‐0046 RR Morse Hall ‐ HVAC Unit Replacement and Building Envelope Repairs Year Approved Emergency Repair 5/30/19, substantial completion. 2019 Design Firm: Contractor: External Name: Careno Construction Funding: INST RR 3.1‐ SUBSTANTIAL COMPLETION 2019‐0199 RR Barton Hall & Cole Hall ‐ Magnetic Door Holder Installation Rm 102 Year Approved 5/30/19, Magnetic door holder installed. 2019 Design Firm: Contractor: External Name: Yates Electrical Funding: DMA 3.1‐ SUBSTANTIAL COMPLETION 2019‐0248 FCR Spaulding Hall ‐ Rm 132 Remove casework & suspected ACM countertop Year Approved 5/30/19,Job is substantially complete. 2019 Design Firm: Contractor: External Name: Milestone Construction Funding: COLLEGE / DEPT ALLOC 3.6‐ WEATHER RESTRICTION 2016‐0425 FCR Parsons Hall ‐ Installation of Exterior Window Film Year Approved 5/30/19 Scheduled for June. 2019 Design Firm: Contractor: External Name: Anderson Solar Films Funding: COLLEGE / DEPT ALLOC BRICKETT, ALEXANDER J 41 1.1‐ PLAN/EST 2015‐0091 RR Thompson Hall ‐ Single Bottom Elevator Cylinder Replacement NHE 1102 Year Approved 5/29/19 Work to occur Spring ʹ20. 2020 Design Firm: Contractor: Name: Funding: DMA 1.1‐ PLAN/EST 2013‐1225 RR Morse Hall ‐ Elevators NHE 1997 and 1998 Upgrades Year Approved 5/29/19 ‐ Working wth building occupants to determine best time to upgrade elevators. Right now it is looking 2020 like the work will be scheduled to occur late fall 2019. Design Firm: Contractor: Name: Funding: DMA 1.1‐ PLAN/EST 2016‐0363 RR Thompson Hall ‐ Clock Tower Repairs Year Approved 5/29/19 Work postponed until next year. This project requires a forensic RFQ/P to determine the cause and 2020 subsequent remedies. RFQ/P process to begin late summer early Fall. Design Firm: Contractor: Name: Funding: DMA Brenda Whitmore, Director Facilities Project Management Thursday, May 30, 2019 University of New Hampshire Page 4 of 30 1.1‐ PLAN/EST 2018‐0191 FCR Campus ‐ Housing Fire Alarm/CO Detection Year Approved 5/29/19 ‐ Review current and future efforts with SFMO during future meetings. Design Firm: SFC Engineering Contractor: External Name: TBD Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2018‐0200 SI Kingsbury Hall ‐ Career Services Year Approved 5/29/19 ‐ Schematic design of space in progress. Waiting for approval to move forward with full design. 2018 Design Firm: Contractor: Name: Funding: SARRC ALLOC 1.1‐ PLAN/EST 2019‐0055 RR Paul Creative Arts Center ‐ Fire Alarm Design ONLY Year Approved 5/29/19 ‐ Harriman and SFC to provide proposal for design. 2020 Design Firm: TBD Contractor: External Name: TBD Funding: DMA 1.1‐ PLAN/EST 2019‐0144 SI Murkland Hall ‐ COLA‐BSC Relocation Year Approved 5/29/19 ‐ Quotes received for furniture and contractor. Working on revising contractor scope to meet budget. 2019 Design Firm: Contractor: Name: Funding: SARRC ALLOC 1.1‐ PLAN/EST 2019‐0232 FCR Nesmith Hall ‐ New HR Suite ADA Door Actuator Installation Year Approved 5/29/19 ‐ Estimates for this work have been received. An FCR for this work will be issued once confirmed by ADA office. Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0241 RR Paul Creative Arts Center ‐ Building Life Safety Report Update Year Approved 5/29/19 ‐ Addendum to Life Safety plan to be reviewed and approved with the SFMO. 2019 Design Firm: Contractor: Name: Funding: DMA 1.1‐ PLAN/EST 2019‐0251 RR Nesmith Hall ‐ Life Safety Review Year Approved 5/29/19 Life Safety review to occur beginning late summer 2019. Design Firm: Contractor: Name: Funding: DMA 1.1‐ PLAN/EST 2019‐0305 FCR Rudman Hall ‐ Retro‐Commissioning of ARO HVAC System Year Approved 5/29/19 ‐ Work to be completed concurrently with project #2010‐0479. Design Firm: Contractor: Name: Funding: COLLEGE / DEPT ALLOC 1.1‐ PLAN/EST 2019‐0324 FCR Handler Hall ‐ replacement of PVI tanks Year Approved 5/29/19 ‐ Initial project scope established.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us