Appendix A – Major Flood Control Projects Table 1.1 Major Drainage Projects in Northern NT (Completed Projects) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Regulation of 390 4 12/2001 11/2006 Training of Shenzhen Lo Wu, Yuen Leng Chai, Shenzhen River, stage 3 River upstream of Nam Hang, Man Kam To, Lo Wu to Lo Shue Leng Muk Wu, Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling Rural drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks, Kwan Tei, rehabilitation scheme, drainage channels and Wang Leng, Hung Leng, stage 1, phase 1A – box culvert Leng Tsai, rehabilitation works at (about 170 m) Wang Shan Keuk San Tsuen, Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po Rural drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau, rehabilitation scheme, drainage channel Cheung Lek, Lin Tong Mei, stage 1, phase 1B – Tsiu Keng Lo Wai, rehabilitation works at Tsiu Keng Pang Uk, Sheung Yue River Tsiu Keng San Wai, Chan Uk Po Rural drainage 197 1.7 05/2003 04/2006 Drainage Chow Tin Tsuen, rehabilitation scheme – rehabilitation works at Ta Kwu Ling Village, drainage rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu, works at Lei Uk, Tong Fong, Ping Yuen River and Shui Hau Mo Fan Heung Stream (NNT Portion) Drainage improvement 208 1.8 06/2005 09/2008 Construction of Ma Wat and north of for Ma Wat River at drainage channels in Hong Lok Yuen Kau Lung Hang Ma Wat and north of Hong Lok Yuen River training works for 756 4.6 08/1999 03/2003 Training of drainage Fu Tei Au, Sheung Shui Wa Shan, the Upper River Indus re-entered channel Ting Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Area Tsung Yuen, Ho Sheung Heung, Development Package 4, 30 Ying Kong engineering works River training works for 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, Shek Ma, the Lower drainage channel Ngam Pin, Pai Tau Lo, River Indus and Ho Sheung Heung, Tong Kok, River Beas Shek Tsai Leng, Kwu Tung, Ying Kong Appendix A – Major Flood Control Projects Table 1.2 Major Drainage Projects in Northern NT (Projects Under Construction) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Drainage improvement 332 5.2 12/2006 End 2012 Construction of Ping Kong, works in Ping Kong, drainage channels Kau Lung Hang, Yuen Leng, Kau Lung Hang, and box culverts in Nam Wa Po and Yuen Leng, Nam Wa Po and Ping Kong, Tai Hang areas Tai Hang areas Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas Drainage improvement 135 3.5 06/2007 End 2012 Construction of Lung Yeuk Tau, works in Lung Yeuk Tau, drainage channels and Kwan Tei South and Kwan Tei South and box culverts in Leng Tsai Leng Tsai, Fanling Lung Yeuk Tau, Kwan Tei South and Leng Tsai Drainage improvement 162 3.6 12/2007 Mid 2012 Construction of Tai Po Tin, Ping Che, works in Tai Po Tin and drainage channels and Man Uk Pin and Ping Che of Ta Kwu Ling, box culverts in Lin Ma Hang and Man Uk Pin and Tai Po Tin, Ping Che, Lin Ma Hang of Sha Tau Kok Man Uk Pin and Lin Ma Hang Drainage improvement 213 3.1 11/2008 End 2011 Construction of Ki Lun Tsuen, Ma Tso Lung, in Ki Lun Tsuen, Ma Tso Lung, drainage channels and Ying Pun, Shek Tsai Leng and Ying Pun, Shek Tsai Leng and stormwater drains in Sha Ling Sha Ling in New Territories Ki Lun Tsuen, Ma Tso Lung, Ying Pun, Shek Tsai Leng and Sha Ling Table 1.3 Major Drainage Projects in Northern NT (Projects Under Design/Planning) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Drainage improvement 314 1.9 Mid 2013 Mid 2016 Construction of Ping Che in Northern New Territories – drainage channels in Package C Ping Che and (remaining works) Ta Kwu Ling Appendix A – Major Flood Control Projects Table 2.1: Major Drainage Projects in Northwestern NT (Completed Projects) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Yuen Long, Kam Tin, 202 2.3 12/2007 02/2011 Construction of Yuen Kong San Tsuen, Ngau Tam Mei and secondary drainage Cheung Po, Ma On Kong Tin Shui Wai drainage channels in Kam Tin improvements, stage 1, phase 2B – remaining works Yuen Long, Kam Tin, 139 3.2 06/2004 06/2007 Construction of Cheung Kong, Tai Kong Po, Ngau Tam Mei and secondary drainage Tsat Sing Kong, Ha Che, Tin Shui Wai drainage channels in Kam Tin San Wai Tsuen improvements, stage 1, and Ngau Tam Mei phase 2A – Kam Tina nd Ngau Tam Mei Yuen Long, Kam Tin, 156 2.1 03/2007 11/2009 Construction of drainage Cheung Chun San Tsuen and Ngau Tam Mei and channels in Kam Tsin Wai Tin Shui Wai drainage Cheung Chun San Tsuen improvements, stage 1, and Kam Tsin Wai phase 2B – Cheung Chun San Tsuen and Kam Tsin Wai Main drainage channel for 125 1.5 09/2003 03/2006 Construction of Lung Tin Tsuen, Yuen Long and Kam Tin – drainage channel in Lam Hau Tsuen Shan Ha Tsuen to Lung Tin Tsuen Lam Hau Tsuen section Main drainage channels for 100 1.7 03/2000 12/2002 Construction of Yau Tam Mei Tsuen, Ngau Tam Mei, drainage channel from Yau Tam Mei San Tsuen, phase 2 – Ngau Tam Mei to Ngau Tam Mei to Wai Tsai Yau Mei San Tsuen section Yau Mei San Tsue Village flood protection for 109 0.9 12/2001 12/2004 Construction of Wang Chau and Pok Wai Yuen Long, Kam Tin and floodwater pumping Ngau Tam Mei, station in Wang Chau; North West New Territories, and construction of stage 1 – remainder Pok Wai drainage channel Yuen Long bypass floodway 432 3.8 01/2003 03/2006 Construction of Yuen Long town, drainage channels in Tung Shing Lei, Au Tau, Yuen Long South Small Traders New Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 354 2.4 10/2002 04/2006 Construction of Lok Ma Chau Drainage Channel the Eastern Main drainage channel in San Tin Main drainage channels for 220 3.4 05/2001 07/2003 Construction of Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, drainage channels near Kam Tsin Wai, Nam Hing Lei, stage 2 – remainder Ng Ka Tsuen and Chung Sum Tsuen, Shek Tau Wai Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main drainage channels 280 3.1 08/1999 03/2004 Construction of Kam Tin San Tsuen, for Yuen Long and drainage channel from Wing Lung Wai, Kiu Tau Tsuen, Kam Tin stage 2 – Kam Tin San Tsuen Pang Ka Tsuen, Kam Tin San Tsuen to to Wan Toi Shan Shek Kong San Tsuen, Wang Toi Shan section Wang Toi Shan Main drainage channels 210 3.5 07/1999 03/2002 Construction of Kat Hing Wai, Tai Hong Tsuen, for Yuen Long and drainage channel from Shek Wu Tong, Tin Sam Tsuen, Kam Tin stage 2 – Kam Tin Road to Tai Kek Tai Kek Kam Tin Road to Tai Kek section Main drainage channels 359 2.3 11/1999 03/2005 Construction of Yau Mei San Tsuen, for Ngau Tam Mei phase 1 – drainage channels from Chuk Yuen Tsuen, Yau Mei San Tsuen to Yau Mei San Tsuen to Man Yuen Chuen Tai Sang Wai section Tai Sang Wai Village flood protection 122 - 11/2000 03/2003 Construction of Chuk Yuen Tsuen and for Chuk Yuen Tsuen and floodwater pumping Ha San Wai Ha San Wai, station in Chuk Yuen Tsuen North West New Territories and Ha San Wai Village flood protection for 146 - 12/2001 08/2005 Construction of Mai Po Lo Wai, Mai Po Lo Wai, floodwater pumping Mai Po San Tsuen, Mai Po San Tsuen, stations in Mai Po Lo Wai, Ma Tin Tsuen and Ma Tin Tsuen and Shui Pin Wai, Ma Tin Tsuen and Shui Pin Wai North West New Territories Shui Pin Wai Appendix A – Major Flood Control Projects Table 2:2 Major Drainage Projects in Northwestern NT (Projects under Construction) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits - - - - - - - Table 2:3 Major Drainage Projects in Northwestern NT (Projects under Design/Planning) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Drainage improvement in 418 0.6 End 2015 End 2020 Drainage improvement Western San Tin Northern New Territories – to the western main drainage improvement in drainage channel San Tin in San Tin Appendix A – Major Flood Control Projects Table 3.1 Major Drainage Projects in West Kowloon (Completed Projects) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits West Kowloon drainage 686 23 12/1999 12/2004 Improvement of Tsim Sha Tsui, Mong Kok, improvement, stage 2 23km of Tai Kok Tsui, Lai Chi Kok, phase 1 works stormwater drains Cheung Sha Wan, Sham Shui Po West Kowloon drainage 1201 11 01/2001 08/2007 Construction of Yau Ma Tei, Mong Kok, improvement, stage 2 Tai Hang Tung flood Tai Kok Tsui, Sham Shui Po phase 2 and stage 3 stage scheme and phase 1 works Kai Tak stormwater transfer tunnel and improvement of 11km of stormwater drains Table 3.2 Major Drainage Projects in West Kowloon (Projects under Construction) Project Title Construction Length Start Date Compl.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-