Us Customs and Border Protection

Us Customs and Border Protection

Update on State of Border San Diego Field Office July 15, 2020 Pete Flores Director Field Operations San Diego Field Office Week of March 2 compared to week of July 13 at all the land ports of entry on the California border with Mexico has seen a decrease in passenger traffic. o an average decrease of 42% in vehicles crossing o an average decrease of 57% in pedestrians crossing o 92-94% of travelers entering in vehicles and on foot were U.S. citizens or lawful permanent residents San Ysidro port of entry: o 38% decrease in vehicle traffic o 32% decrease in pedestrians Otay Mesa port of entry: o 11% decrease in vehicle traffic o 39% decrease in pedestrians Tecate port of entry: o 57% decrease in vehicle traffic o 44% decrease in pedestrians Calexico West port of entry: o 37% decrease in vehicle traffic o 61% decrease in pedestrians Calexico East port of entry: o 64% decrease in vehicle traffic o 83% decrease in pedestrians Andrade port of entry: o 60% decrease in vehicle traffic o 85% decrease in pedestrians We continue to maintain a strong and secure economic supply chain across our border. We have also experienced the following changes in cargo entering the U.S. during the week of March 2 compared to last week. o +4% at the Otay Mesa cargo facility, (+14% laden, -23% empties) o +6% at the Tecate cargo facility, (+10% laden, +1% empties) o -11% at the Calexico cargo facility, (-20% laden, +3% empties) Current Port of Entry Hours of Operation • San Ysidro port of entry: Open 24 hours a day, seven days a week for pedestrian and vehicle processing northbound/southbound. Processing is suspended at the newer Pedestrian West facility. • Cross Border Express: Open 24 hours a day, seven days a week. • Otay Mesa port of entry: Open 24 hours a day, seven days a week for pedestrian and vehicle processing northbound/southbound. • Tecate port of entry: For both vehicle and pedestrian northbound crossings, from 5 a.m. – 2 p.m. (daily). • Calexico ports of entry: The Calexico West crossing remains open 24 hours a day, seven days a week for pedestrian and vehicle processing northbound and southbound. The Calexico East crossing is open for both pedestrian and vehicle northbound/southbound crossings, from 6 a.m. – 2 p.m. (daily). • Andrade port of entry: Hours of operation for both pedestrian and vehicle northbound and southbound crossings, from 6 a.m. – 2 p.m. (daily). Joseph Misenhelter Officer in Charge Otay Mesa Port of Entry Modernization Project Cost: $134 Million Modernization & Expansion: o Site Acquisition $ 12 Million o Expansion of pedestrian-processing facilities; o Construction $122 Million doubling the processing facilities from 6 to 12 lanes. FULLY FUNDED! o Construction of a commercial-annex building (CAB). o Relocation of Secure Electronic Network for Travelers Impact to Community: Rapid Inspection (SENTRI) enrollment facilities. o Public should expect changes to traffic o Relocation of hazardous material commercial import patterns processing. o Travelers will be informed of changes by o Construction of surface and structured parking for traffic advisories distributed to news outlets, employees and visitors. posted on social media sites. o Commercial import lot improvements; an increase o Drivers are advised to monitor posted from 10 to 16 primary inspection booths. roadway signage when transiting the port. o Improvements to commercial vehicle circulation. o Improve pedestrian-processing capacity. Joseph Misenhelter Officer in Charge Joseph Misenhelter Officer in Charge Otay Mesa Port of Entry Modernization Current Status Project is currently at 100% Design and Development Interior and exterior construction fencing complete Demolition of northwest area of the port has begun Saro Oliveri Section Chief – Trusted Traveler Program • The Enrollment Centers at both Otay Mesa and Calexico are closed • There are NO interviews being conducted • This has been extended until August 10th • CBP continues to field phone calls from the public • Current wait times (approx.) to get conditionally approved from by Vetting Center • Global Entry: 8 months • SENTRI: 12 months • SENTRI lanes at all locations, are still operational Q&A Session Email: [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us