03122019Ecshrs9jaddition
Total Page:16
File Type:pdf, Size:1020Kb
STANDARD TEMPLATE, FORM-1, FORM-1A & CONCEPTUAL PLAN & EMP FOR THE PROPOSED RESIDENTIAL APARTMENTS PROJECT OF SRI. ANUHAR HOMES PVT LTD SURVEY.NO: 324/E & 325, NARSINGI VILLAGE, GANDIPET MANDAL, RANGAREDDY DISTRICT, TELANGANA STATE Category – 8 (a) SUBMITTED BY SRI. Y. HARSHAVARDAN REDDY, C/O. M/S. ANUHAR HOMES PVT LTD, H.NO.8-2-293/82/225/A, 3RD FLOOR, ROAD NO 18, JUBILEE HILLS, HYDERABAD – 500033 PREPARED BY: M/s. SPACE ENVIRO SOLUTIONS (QCI/NABET ACCREDITATION NO: NABET/EIA/1922/IA0043) H. NO: 1-4-69/7, STREET NO:8 HABSIGUDA, HYDERABAD. TELANGANA – 500007 STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES: - S.No. Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Anuhar Homes Pvt Ltd & Others Construction of Residential Apartments. 2 Name of the organization/ owner. Sri. Y. Harshavardhan Reddy 3 Address for communication Sri. Y. Harshavardan Reddy, Authorized Signatory, C/o. M/s. Anuhar Homes Pvt Ltd, H.No.8-2-293/82/225/A, 3rd Floor, Road No 18, Jubilee Hills, Hyderabad – 500033. 4 Telephone numbers 9676314744 5 Email ID of the organization or [email protected] contact person 6 Location of the Proposed project or Sy. No:324/E & 325, activity Alakapur Township, Narsingi Village, Gandipet Mandal, Rangareddy District, Telangana State. 7 Appraisal Category (B2 or B1) B (B2) 8 Nearest habitation and distance from Neknampur - 0.8 km (ENE) the project or activity 9 Installed capacity / Production Apartments Area – 73,222.19 Sqm Capacities Amenities Area – 2,262.30 Sqm Parking Area – 27,505.65 Sqm Total Built-up Area – 1,02,990.14 Sqm 10 Specify the Fuel (Coal / CNG / Not Applicable biomass/Others) and quantity required 11 Details of Land use/Land Cover The proposed project activity is construction of Residential Apartments. The site area is falling in HMDA area. The present land is waste land and is not used for any productive purpose. 12 Occupancy, ownership of the land in Private Land which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following None details shall be furnished: (Whether it is a Reserved forest / Protected forest / Demarcated forest / National Parks/ Sanctuaries / any land in possession of Forest Department.) (The village map with Sy. No. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the 112.0 Crores project/activity. a. Funds allocated for EMP (capital Capital Cost – 125.0 Lakhs cost and recurring cost per annum) Recurring Cost – 22.0 Lakhs 15 Brief description of the project with Domestic waste water is treated in sewage treatment special reference to specific pollution plant and the treated water will be used for gardening, and its control measures. flushing and washing. Adequate stack height is provided for effective dispersion pollutants from DG Set. 16 Compliance report on the following : i Status of compliance of the None conditions and environmental safeguards stipulated in the earlier clearance letters. ii Details of the court cases, if any, None pending in any Court of Law against the project as well as any directions passed by the Court relating to the project directly or indirectly. iii Details of the notices, if any, given to None the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981. 17. Whether the project attracts the No provisions laid under the OM dt.16.11.2010 issued by the MoE&F, GOI, w.r.t. violation of EIA Notification, 2006 and its amendments there of? (Yes / No) Present stage and status of the New Project and applied for EC Project : 18 Name of the Consultant: M/s. Space Enviro Solutions, Hyderabad. FORM-1 I) Basic information S.No. Item Details 1 Name of the project/s M/s. Anuhar Homes Pvt Ltd & others Construction of Residential Apartments 2 S.No. in the schedule The project is categorized under 'B-2' under item 8(a) of Schedule - Gazette Notification dated 14th September 2006 and subsequent amendments issued by MoEF&CC, New Delhi. 3 Proposed capacity /area/ length/ tonnage Net Plot Area – 16,691.92 Sqm to be handled/command area/lease area/ Apartments Area – 73,222.19 Sqm No of the well to be drilled Amenities Area – 2,262.30 Sqm Parking Area – 27,505.65 Sqm Total Built-up Area–1,02,990.14 Sqm No.of Flats - 510 4 New/Expansion /Modernization New 5 Existing capacity/Area etc. Not Applicable 6 Category of project A or B Category B ( ‘B2’) 7 Does it attract the general condition? This project does not attract general conditions. If yes please specify 8 Does it attract the specific condition? This project does not attract specific conditions. If yes please specify 9 Location Plot/ survey /Khasra no Sy. No:324/E & 325, Alakapur Township, Village Narsingi Village, Tehsil/Mandal Gandipet Mandal, District Rangareddy District, State Telangana State. 10 Nearest Railway Station/Airport along Hitech city – 9.6 Km (NE) with the distance in km Rajiv Gandhi International Airport - 17.0 km (SE) 11 Nearest Town, City, District Kokapet-1.8 km (NW) Headquarters along with distances in km. Shaikpet – 2.8 km (NE) Samshabad – 14.0 km (S) 12 Village Panchayats, Zilla Parishad, Narsingi Village Municipal Corporation, Local body Gandipet Mandal, (complete postal Address with telephone Rangareddy District no. to be given) 13 Name of the applicant Sri. Y.Harshavardan Reddy 14 Registered address Sri. Y. Harshavardan Reddy, Authorized Signatory, C/o. M/s. Anuhar Homes Pvt Ltd, H.No.8-2-293/82/225/A, 3rd Floor, Road No 18, Jubilee Hills, Hyderabad – 500033. 15 Address of the correspondence Name Sri. Y. Harshavardan Reddy, Designation /owner/partner/CEO Authorized Signatory, Address C/o. M/s. Anuhar Homes Pvt Ltd, H.No.8-2-293/82/225/A, 3rd Floor, Road No 18, Jubilee Hills, Hyderabad Pin code 500033. E-mail [email protected] Telephone no 9676314744 16 Details of Alternative Sites examined if No Alternative Sites are examined any. Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects Not Applicable 18 Whether separate application of Not Applicable interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. No (a) The Forest (conservation) Act, 1980? (b) The Wild life (protection)Act, 1972? No (c) The C.R.Z notification, 1991? No 22 Whether there is any Government No order/policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation pending No litigation is pending against the project in any court against the project and/or land in which of law to the best of knowledge. the project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project 2 (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information / Checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible ) with sources of information data 1.1 Permanent or temporary change in land Yes The proposed project activity is Residential use, land cover or topography including Apartments project. The site area is located in increase in intensity of land use (with HMDA area. The present land is waste land respect to local land use plan) and is not used for any productive purpose. The proposed project activity shall enhance the land cover. Topography: The present topography of the site is almost flat: Due to the project the topography of the project area will change. However, the drainage pattern will remain as per the existing pattern. 1.2 Clearance of existing land, vegetation and No There is 1 Tree that exists within the site. buildings? which will be removed according to the requirement and the same will be replaced by planting 1:3 ratios as per the guidelines with permission. Buildings: There are no structures, hence not applicable. 1.3 Creation of new land uses? Yes There will be a creation of new land use, which will be as per the approval of the HMDA. 1.4 Pre-construction investigations e.g. bore Yes There will be no physical impact on the locality holes, soil testing? due to soil testing or other pre-construction investigations. 1.5 Construction Works? Yes Construction of Residential Apartments 1.6 Demolition Works? No No demolition work is involved in the site. 1.7 Temporary sites used for construction No Temporary shelters for construction workers works or housing of construction works? are not required as majority of labor will be hired from the surrounding locations. 1.8 Above ground buildings, structures or Yes The project will involve construction of earthworks including linear structures, Residential Apartments. cut and fill or excavations This will add to the change in the localized 3 physical environment. In the post construction phase, tree plantation and landscaped areas will be provided which will enhance the aesthetic beauty of the area. 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation Works? No Not Envisaged. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing processes? No No manufacturing activity.