Report on Proposed Village Sewerage Schemes Programme

Total Page:16

File Type:pdf, Size:1020Kb

Report on Proposed Village Sewerage Schemes Programme An Roinn Seirbhisi Uisce Water Services Comhairle Contae Chiarrai, Kerry County Council, Rath Teas, ,m Rathass, rra U, Co. Chiarrai. Tralee. Co. Kerry. COMHAlRLE CONTAE CH1ARRAi KERRY COUNTY COUNC1L Guthan I Tel 0667183503 Faics I Fax 0667181639 Rphost J Email [email protected] Suiomh I Web www.kerrycoco.ie Chuigl Clr. Michael Healy-Rae, Meara Chontae Chiarrai Chuigl Gach ball de Chomhairle Chontae Chiarrai Report on proposed Village Sewerage Schemes Programme There is an urgent need to provide new or upgraded sewerage schemes for most of the villages in Kerry, both for environmental reasons and to support the sustainable development of the villages in line with the policies of the County Development Plan. Five projects are already under construction (Milltown, Firies, Barraduff, Kilcummin and Sneem) and design reports and costings are being completed for 29 more. Most of the schemes are included in the current Water Services Investment Programme (WSIP) to go to construction or to enter the planning phase, including Barraduff and Kilcummin. However, some very urgent schemes are not included in the WSIP while many of those which are included are not considered to be in the top priority category. An investment of over €70 million will be required to deliver all the required schemes with up to 50% of the cost of some schemes having to be funded by Kerry County Council. There would be huge logistical problems in attempting to deliver 29 further schemes quickly and simultaneously, as well as funding difficulties. Therefore, it is necessary to prioritise and phase the delivery programme in order to draw down Department funding effec~vely and to deliver schemes as quickly as possible. It is proposed that a submission be Formade inspectionto purposesDEHLG only. to include a reprioritised list of Consent of copyright owner required for any other use. schemes in the forthcoming revision of the WSIP. Phase 1 Schemes Nineteen villages which are most urgent for environmental and developmental reasons, and which are likely to be more economic to fund, are included in Phase 1. ._..__ ............... __ ....._...._._......_-_.... _----- --,- ...,,".- _._-------- Abbeydorney Beaufort Finuge Milltown Annascaul(WWTPl Caherdaniel Fieries Lixnaw Ardfert Castleqreqorv Glenbeiqh Sneem Ballyduff Castlemaine Kilflynn Tarbert ~y-Iongford Fenit Kilgarvan Substantial progress has been made in advancing these village schemes but it is vital that funding be secured through the WSIP and through Development Levies if they are all to be constructed in good time. • GAEILGE AGUS FAILTE EPA Export 26-07-2013:17:45:30 Progress to Date: • Construction has started on 3 schemes (Fieries, Milltown and Sneem) • Preliminary Reports are now complete for the other 16 schemes and will be sent to the Department of Environment, Heritage and Local Government by 20th July • Site Investigation contracts are complete or substantially complete for 14 schemes. • Site acquisitions for new treatment plants are completed for 2 schemes; are well advanced for 9 schemes; and are difficult for 3 schemes. • Part 8 notices will be published for 16 schemes on 18th July. • Consulting Engineers are being instructed to prepare Tender Documents for 16 schemes with a view to proceeding to tender in late 2007. Note that the actual tender date of projects is dependent on sites being acquired. The projects would be delayed if Compulsory Purchase Orders were required. Phase 2 Schemes There are 13 schemes proposed for Phase 2 of the Programme. Some of these schemes could advance rapidly to construction in partnership with suitable developers. Annascaul (pipelines) Brandon Cromane ScartaQlin Asdee Cashen Currow Spa AUQhacasla Chapeltown Glenflesk The Glen Boolteens • Preliminary Reports are being compiled and printed for all schemes and will be sent to the Department of Environment, Heritage and Local Government by 3'd August. •I Quick progress on Phase 2 schemes will depend on affordability issues and especially on the level of D.E.H.L.G. funding. For inspection purposes only. • The Preliminary ReportsConsentwill of copyrightprovide ownerscheme required for anytemplates other use. which can be used in any discussions with developers who would be willing to make realistic contributions towards funding or to provide elements of schemes. The Serviced Land Initiative (SU) scheme could be useful in this context. Other Villages As well as the 33 village schemes discussed above, a further 16 village scheme upgrades were included in the Assessment of Needs (2006) which was adopted by the Council last year. It is hoped that these schemes will be included in the forthcoming revision of the WSIP as schemes to enter planning. The villages are: Baile an Fheirtearaigh An Clochifm Knocknagoshel Baile na nGall Duagh Moyvane Baile an Sceilg An Fheothanach An Mhuirioch Brosna Gneeveguilla Portmagee Causeway Kilfenora LC=e""an"'n-'--'-T:..:ra=--- .:.:K"'n"'i.hts::;.to=.w:..::.:.n ---' EPA Export 26-07-2013:17:45:30 In any case, the Water Services Department would carry out interim upgrades for schemes where developments would warrant this. Any remaining villages and development nodes will be examined in the forthcoming Kerry Wastewater and Sludge Project Strategic Study and the most suitable and effective infrastructural solutions will be identified. ' Funding: The challenge for Kerry County Council will be to finance the shortfall which will arise after the DEHLG funding element is accounted for. The shortfall could vary from say, 40% in a small number of schemes, to 60% for Serviced Land Initiative (SLI) funded schemes., The shortfall will need to be funded almost entirely from development levies. At present, there is a countywide General Development Levy for sewerage of €3,020 per house. On top of this levy, there is an additional Special Development Contribution levy of €1 ,91 0 for the "fast-track" schemes of Milltown, Firies, Barraduff and Kilcummin and €4,000 for Tarbert. The current best estimates available indicate that the funding shortfall could be over €8,000 per new house equivalent for Phase 1 schemes and could be over €12,000 per house in Phase 2 schemes. The Council should note that these figures mean that the development levies for sewerage must be increased if the Village Sewerage Scheme programme is to be delivered in a reasonable timescale. It is intended to bring proposals to the Council for a revised sewerage Development Levy scheme for the Phase 1 villages at the September meeting. Conclusion: A new comprehensive, phased programme to deliver 32 new and improved Village Sewerage Scheme is proposed. For inspection purposes only. The support of the Council is Consentsought of copyright owner required for any other use. • for the revised Village Sewerage Scheme Programme to be submitted to DEHLG for inclusion in the Water Services Investment Programme • for a limited revision of the sewerage Development Levy scheme which would fund targeted elements of the Village SS Programme The Council's support is necessary enable the Water Services Section to progress these schemes to construction and to maximize the National Development Plan funding for the proposed Programme. o~w\o Director of Services July, 2007 EPA Export 26-07-2013:17:45:31 Comhairle Contae Chiarrai Kerry County Council Chir Infbeistiochta na Seirbhisi Uisce Water Services Investment Programme For inspection purposes only. Consent of copyright owner required for any other use. Dreacht Mheasunuchain ar Riachtanais Draft Assessment of Needs 2006 PlEA 1·1 rORGARTllA NArSllhTA NATIOt~AL DIEV[LOPt,l,[NT PLAN EPA Export 26-07-2013:17:45:31 Kerry Water Services Investment Programme Draft Assessment ofNeeds (2006) Report Background In 2003, the Department of Environment, Heritage & Local Government (DEHLG) requested Kerry County Council to prepare an Assessment ofNeeds for Water Services Investment which would identify the medium term requirements ofall the Local Authorities in one consolidated list. This was duly done and an Assessment ofNeeds was adopted by the members ofKerry County Council in November 2003. Local Authorities have been requested by DEHLG to prepare updated assessments ofwater services needs in view ofthe scale and pattern ofdemographic and economic developments in recent years, and to provide an input into the next National Development Plan. These assessments will also be used by DEHLG for project selection in future phases ofthe Water Services Investment Programme (WSIP) which is a three year rolling programme, mainly funded by DEHLG. Water Services Achievements, 2003 - 2006 Substantial works are in train as a result ofthe current and previous Water Services Investment For inspection purposes only. Programmes. The following is theConsentstatus of copyrightofprojects owner requiredwhich for anyhave other progresseduse. since the 2003 Assessment ofNeeds was adopted. Under Construction • Listowel RWSS Stage 4 • Caherciveen Water Supply Scheme • Firies - Scartaglin Regional WSS At Tender Stage • Waterville Sewerage Scheme • Waterville Water Supply Scheme • Milltown Sewerage Scheme • Ki1cummin Sewerage Scheme • Barraduff Sewerage Scheme • Firies Sewerage Scheme Assessment ofNeeds (2006) Page 1 EPA Export 26-07-2013:17:45:31 At Final Design Stage • Beaufort Sewerage Scheme • North Ardfert Source Protection • Kenmare Water Supply Scheme At Preliminary Design Stage • 28 Village Sewerage Schemes • Tralee Sewerage Scheme (Nutrient Reduction) • Listowel Sewerage Scheme (Nutrient Reduction) • Central Regional Water Supply
Recommended publications
  • Ireland Kerry & Dingle Peninsula Cycling
    IRELAND – KERRY & THE DINGLE PENINSULA 8-days / 7-nights Independent inn-to-inn cycling but within a small group Our most popular cycling holiday in Ireland, this tour offers arguably the most spectacular land and seascapes and views across to Ireland’s highest mountain range. Starting and finishing at Killarney, shadowing the magnificent and colourful MacGillicuddy Reeks and adjacent to the famous Muckross National Park, the route heads deep into the Iveragh Peninsula along quiet roads to the picturesque villages of Sneem and Glenbeigh. Gaelic culture is alive here and the Gaelic language is still spoken in the homes at the western end of the Dingle Peninsula. Our cycling route offers an interesting choice of terrain be it the hills that make up the spine of the peninsula or the coastal rides past the many bays, inlets and sandy beaches. Our tour guide does not cycle with you as a tour leader but instead follows with a support vehicle, ready to assist those looking for a break from cycling. You can travel at your own pace to explore the tranquil rural countryside with all the time in the world to stop, take a photograph, a coffee or a detour. Departs: 13th June, 25th July, 15th August, 2020 Cost from: $1695 per person, twin share Single supplement: $560 on request – limited availability Includes: 7 nights’ twin share accommodation in hotels and guesthouses with ensuite bathrooms (where available); 7 breakfasts, 1 dinner; hire of multi-geared bicycle with pannier; tour guide driving the support van; maps and route notes; luggage transfers, 24-hour telephone assistance.
    [Show full text]
  • Slí Chiarraí Thuaidh North Kerry
    SLÍ CHIARRAÍ THUAIDH NORTH KERRY WAY Your Guide Book to Walking The North Kerry Way on the Wild Atlantic Way - a walking trail from Tralee to Kerry Head in Ballyheigue. OVERVIEW GRADE: Moderate ESTIMATED TIME: 2 days FORMAT: Linear & Circular START POINT: Tralee TRAIL QUALITY: *** START POINT GRID REF: LENGTH: 48 km Q 835 141 CATEGORY: Walking/ END POINT: Ballyheigue Hiking Trail END POINT GRID REF: TYPE: National Q 751 280 Waymarked Trail ORDNANCE SURVEY MAP: WAYMARKING: OSI Discovery Series Yellow arrow on black Sheets 63 and 71 background DOGS ALLOWED: Yes CLIMB: 450m Please note: The information contained in this activity brochure, in all formats, is provided as a guide only. Whilst every effort has been made to ensure the accuracy and reliability of the information, Kerry County Council expressly disclaim any liability or responsibility for the accuracy of the information THE NORTH KERRY WAY IS contained herein. No endorsement, whether expressed or implied, is given by Kerry County Council. All information is correct at time of going to print. MARKED ON THE GROUND BY STANDARD BLACK POSTS CARRYING THE YELLOW ‘WALKING MAN’ LOGO AND AN ARROW INDICATING DIRECTION 2 5 THIS GUIDEBOOK The way has been SERVES AS A divided into five COMPANION section with an ON THE WALK – accompanying map CONFIRMING THE for each section, WAY TO GO AND detailing points IDENTIFYING of interest. PLACES OF INTEREST PLEASE KEEP TO THE MARKED PATHS ORDNANCE SURVEY MAPS should not be necessary, but for those who like to carry them, sheets numbers 63 and 71 are suitable (Discovery Series 1:50,000).
    [Show full text]
  • Killarney Outlook Sales: Des 087 659 3427 Or Email: [email protected]
    Vol. 13 Edition 33: Friday 15th August 2014 : www.killarneyoutlook.com 15.08.14 1 Killarney Outlook Sales: Des 087 659 3427 or Email: [email protected] 2 15.08.14 Sales: Des 087 659 3427 or Email: [email protected] Killarney Outlook 15.08.14 3 NEWS DESK Editor: Aisling Crosbie 086 0400 958 or Email: [email protected] NEW SPIN ON THE RING LAUNCHED WRONG WAY AND HARD WAY ROUND CYCLES PLANNED FOR SEPTEMBER On Saturday, September 27 cycling enthusiasts from all over Ireland will travel to Killarney for the inaugural Wrong Way Round Killarney Cycling Festival where they will take on the stunning Ring of Kerry but in the opposite direction to the traditional anti-clockwise route. Cyclists will view the Ring like they have never seen it before as they head off from Killarney, before taking a right at Molls Gap and heading to Sneem. From there on the ON SATURDAY, SEPTEMBER 27 CYCLING ENTHUSIASTS FROM ALL OVER IRELAND WILL TRAVEL TO KILLARNEY FOR THE INAUGURAL WRONG WAY ROUND KILLARNEY CYCLING FESTIVAL. AT THE LAUNCH WERE FROM LEFT, PATRICK O’DONOGHUE, MD GLENEAGLE HOTEL, SEAN MULCHINOCK, FESTIVAL route is familiar, all be backwards, and takes AND EVENTS OPERATIONS MANAGER GLENEAGLE HOTEL, FIONNBAR WALSH, GRAND MARSHALL AND DENIS GEANEY. PHOTO: VALERIE O’SULLIVAN in Waterville, Cahersiveen, Glenbeigh and Killorglin. Then it’s the homeward stretch Cahersiveen. registration fees will be used to finance the along the foothills of the MacGillycuddy’s The festival is open to all levels of cyclists. There running of the event and any surplus made will Reeks through Beaufort.
    [Show full text]
  • Speech and Language Therapy Service
    SPEECH AND LANGUAGE THERAPY SERVICE The Kerry Branch of Down Syndrome Ireland first began providing a speech and language therapy service in 2006 and this service continues to provide vital services to children and adults with Down syndrome across the county today. Therapy is provided on a fee for service basis but financial assistance is available for any families for whom payment is an issue. Any child or adult with Down syndrome can avail of the speech and language therapy service. Locations for SLT service provision The branch has a main office located in 28 Moyderwell, Tralee and this is where the SLT service is based. The speech and language therapists also travel to outside clinics in Killarney, Listowel, Cahersiveen and Kenmare as well as schools in Tralee, Listowel and Killorglin. While the majority of our clients are from Kerry, we do see some children and adults who are not from Kerry but live close to the border and for whom it is more convenient to travel to Kerry to obtain SLT services. Frequency and Cost Therapy is offered on a monthly, fortnightly or weekly basis depending on the needs and age of the child or adult and the parent’s wishes. Therapy sessions are currently run in half hourly slots and the cost per session is €30. Services Provided Our service provision is based mainly on direct, individual therapy sessions for the child or adult. Parents can either sit in and observe or take part in sessions or can wait outside. Parents are vital members of the team in carrying out activities at home to achieve generalisation of therapy goals.
    [Show full text]
  • File Number Kerry County Council P L a N N I N G a P P L I C a T I O N S Planning Applications Received from 16/11/20 to 20/11
    DATE : 03/12/2020 KERRY COUNTY COUNCIL TIME : 09:52:34 PAGE : 1 P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 16/11/20 TO 20/11/20 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions, or refused; The use of the personal details of planning applicants, including for marketing purposes, maybe unlawful under the Data Protection Acts 1988 - 2003 and may result in action by the Data Protection Commissioner, against the sender, including prosecution FILE APP. DATE DEVELOPMENT DESCRIPTION AND LOCATION EIS PROT. IPC WASTE NUMBER APPLICANTS NAME TYPE RECEIVED RECD. STRU LIC. LIC. 15/9987 MICHAEL O'DONOGHUE E 16/11/2020 (1) DEMOLITION OF THE CURVED GLAZED LOUNGE/DINING AREA AND PITCHED HIP ROOF, (2) CONSTRUCTION OF NEW RECTANGULAR GLAZED SECTION TO LOUNGE/DINING AREA WITH A NEW PARAPET FLAT ROOF TO DWELLING HOUSE, (3) CONSTRUCTION OF A FIRST FLOOR BEDROOM DORMER EXTENSION WITH NEW PARAPET FLAT ROOF TO DWELLING HOUSE AND (4) ALL WORKS ANCILLARY TO THE DEVELOPMENT INCLUDING HARD AND SOFT LANDSCAPING TO THE FRONT GARDEN FARRANASPIG AGHADOE KILLARNEY CO KERRY 20/1097 AMANDA AND TIM P 16/11/2020 CONSTRUCT A DWELLING HOUSE AND DOMESTIC BUCKLEY GARAGE AND WASTEWATER TREATMENT SYSTEM AND ALL ANCILLARY SITE SERVICES KILNABRACK LOWER GLENBEIGH CO KERRY DATE : 03/12/2020 KERRY COUNTY COUNCIL TIME : 09:52:34 PAGE : 2 P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 16/11/20 TO 20/11/20 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions, or refused; The use of the personal details of planning applicants, including for marketing purposes, maybe unlawful under the Data Protection Acts 1988 - 2003 and may result in action by the Data Protection Commissioner, against the sender, including prosecution FILE APP.
    [Show full text]
  • Audit Maritime Collections 2006 709Kb
    AN THE CHOMHAIRLE HERITAGE OIDHREACHTA COUNCIL A UDIT OF M ARITIME C OLLECTIONS A Report for the Heritage Council By Darina Tully All rights reserved. Published by the Heritage Council October 2006 Photographs courtesy of The National Maritime Museum, Dunlaoghaire Darina Tully ISSN 1393 – 6808 The Heritage Council of Ireland Series ISBN: 1 901137 89 9 TABLE OF CONTENTS 1. INTRODUCTION 4 1.1 Objective 4 1.2 Scope 4 1.3 Extent 4 1.4 Methodology 4 1.5 Area covered by the audit 5 2. COLLECTIONS 6 Table 1: Breakdown of collections by county 6 Table 2: Type of repository 6 Table 3: Breakdown of collections by repository type 7 Table 4: Categories of interest / activity 7 Table 5: Breakdown of collections by category 8 Table 6: Types of artefact 9 Table 7: Breakdown of collections by type of artefact 9 3. LEGISLATION ISSUES 10 4. RECOMMENDATIONS 10 4.1 A maritime museum 10 4.2 Storage for historical boats and traditional craft 11 4.3 A register of traditional boat builders 11 4.4 A shipwreck interpretative centre 11 4.5 Record of vernacular craft 11 4.6 Historic boat register 12 4.7 Floating exhibitions 12 5. ACKNOWLEDGMENTS 12 5.1 Sources for further consultation 12 6. ALPHABETICAL LIST OF RECORDED COLLECTIONS 13 7. MARITIME AUDIT – ALL ENTRIES 18 1. INTRODUCTION This Audit of Maritime Collections was commissioned by The Heritage Council in July 2005 with the aim of assisting the conservation of Ireland’s boating heritage in both the maritime and inland waterway communities. 1.1 Objective The objective of the audit was to ascertain the following:
    [Show full text]
  • The Kerry Way Self Guided | Free Download
    The Kerry Way: Self-Guided How to plan your multi-day backpacking trip around Ireland’s scenic Ring of Kerry Many are familiar with the beautiful Ring of Kerry in County Kerry, Ireland, but far fewer are aware that the entire route can be walked instead of driven. Despite The Kerry Way’s status as one of the most popular of Ireland’s National Waymarked Trails, I had more difficulty finding advice to help me prepare for it than I did for hikes in Scotland and the United Kingdom. At approximately 135 miles, it’s also the longest of Ireland’s trails, and in retrospect I’ve noticed that many companies who offer self-guided itineraries actually cut off two whole sections of the route - in my opinion, some of the prettiest sections. In honor of completing my own trek with nothing but online articles and digital apps to guide the way, I thought I’d pay it forward by creating my own budget-minded backpacker’s guide (for the WHOLE route) so that others might benefit from what I learned. If you prefer to stay in B&Bs rather than camping or budget accommodations, I’ve outlined how you can swap out some of my choices for your own. Stats: English Name: The Kerry Way Irish Name: Slí Uíbh Ráthaigh Location: Iveragh Peninsula, County Kerry, Ireland Official Length: 135 miles (217 km), but there are multiple route options Completion Time: 9 Days is the typical schedule High Point: 1,263ft (385m) at Windy Gap, between Glencar and Glenbeigh Route Style: Circular Loop Table of Contents: (Click to Jump To) Preparedness: Things to Consider Weather Gear Amenities Currency Language Wildlife Cell Service Physical Fitness Popularity Waymarking To Camp or Not to Camp? Emergencies Resources Getting There // Getting Around Route // Accommodations Preparedness: Things to Consider WEATHER According to DiscoveringIreland, “the average number of wet days (days with more than 1mm of rain) ranges from about 150 days a year along the east and south-east coasts, to about 225 days a year in parts of the west.” Our route along the Iveragh Peninsula follows the southwest coast of Ireland.
    [Show full text]
  • 283 Bus Time Schedule & Line Route
    283 bus time schedule & line map 283 Currans Community Centre →Tralee, Denny Street View In Website Mode The 283 bus line (Currans Community Centre →Tralee, Denny Street) has 3 routes. For regular weekdays, their operation hours are: (1) Currans Community Centre →Tralee, Denny Street: 7:30 AM - 9:40 AM (2) Tralee, Tralee Bus Station →Tralee, Denny Street: 2:00 PM (3) Tralee, Tralee Bus Station →Tralee, Tralee Bus Station: 5:00 PM Use the Moovit App to ƒnd the closest 283 bus station near you and ƒnd out when is the next 283 bus arriving. Direction: Currans Community Centre →Tralee, 283 bus Time Schedule Denny Street Currans Community Centre →Tralee, Denny Street 13 stops Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:30 AM - 9:40 AM Currans Community Centre Tuesday 7:30 AM - 9:40 AM Currow, Currow Church Wednesday 7:30 AM - 9:40 AM Farranfore, Kerry Airport Thursday 7:30 AM - 9:40 AM Aherns Pharmacy Friday 7:30 AM - 9:40 AM Firies (Osullivans Shop) Saturday 7:30 AM - 9:40 AM Ballyƒnane Crossroads Poulawaddra, Farmers Bridge 283 bus Info Direction: Currans Community Centre →Tralee, Tralee, Killerisk Manor Kerry Denny Street Killerisk Road, Tralee Stops: 13 Trip Duration: 75 min Tralee, Tralee General Hospital Line Summary: Currans Community Centre, Currow, Currow Church, Farranfore, Kerry Airport, Aherns Clash (It South Campus) Pharmacy, Firies (Osullivans Shop), Ballyƒnane Crossroads, Poulawaddra, Farmers Bridge, Tralee, Tralee, Institute Of Technology Tralee Killerisk Manor Kerry, Tralee, Tralee General Hospital,
    [Show full text]
  • BMH.WS1079.Pdf
    ROINN COSANTA. BUREAU OF MILITARY HISTORY, l913-21 STATEMENT BY WITNESS. DOCUMENT NO. W.S. 1,079 Witness Patrick P. Fitzgerald, Spa Road, Tralee, Co. Kerry. Identity. Captain Fenit Company Irish Volunteers, Co. Kerry; Brigade Staff Officer Kerry I Brigade. Subject. National activities Fenit-Tralee, Co. Kerry, 1913-1921. Conditions, if any, Stipulated by Witness. Nil File No. S.2394 Form BSM2 STATEMENT OF PATRICK PAUL FITZGERALD Spa Road, Tralee, Co. Kerry. I was born on 29th June 1896, in Tralee. I was sent to the local National School until I was 15 years of age. When I left school I was apprenticed to the bakery trade. On the formation of the Volunteers in Tralee in the latter end of 1913 or early 1914, I became a member. The drill instructorsat the time were John Roche and Ned Leen, both ex-British soldiers. In all, there were four companies in the town of Tralee, A, B, C and D. The total strength was about 400 men. We paraded and drilled with wooden rifles throughout the year 1914. After John Redmond's speech at Woodenbridge in Co. Wicklow calling on the Volunteers to join the British army to defend the shores of Ireland, there was a split in the local battalion. A, B and D companies were opposed to Redmond's policy, but C Company were in favour and broke away from the battalion and ceased to take any further part in the activities of the Volunteers. We continued our parades and drills during the year 1915. Among the members of the Battalion Council at this time were Austin Stack, P.J.Cahill, Dan Healy and Fr.
    [Show full text]
  • Applications Received 19/10/2020
    DATE : 03/11/2020 KERRY COUNTY COUNCIL TIME : 10:20:10 PAGE : 1 P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 19/10/20 TO 23/10/20 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions, or refused; The use of the personal details of planning applicants, including for marketing purposes, maybe unlawful under the Data Protection Acts 1988 - 2003 and may result in action by the Data Protection Commissioner, against the sender, including prosecution FILE APP. DATE DEVELOPMENT DESCRIPTION AND LOCATION EIS PROT. IPC WASTE NUMBER APPLICANTS NAME TYPE RECEIVED RECD. STRU LIC. LIC. 16/9313 TWOMEYS TAVERN E 19/10/2020 (1) RETAIN THE USE OF PART OF THE CAR PARK LIMITED AREA FOR THE OPERATION OF A MOBILE CATERING UNIT (2) FULL PLANNING PERMISSION TO DEMOLISH AN EXISTING OUTBUILDING AND (3) FULL PLANNING PERMISSION TO CONSTRUCT 2 NO. UNITS AS FOLLOWS (A) UNIT 1 FOR THE SALE OF FOOD FOR THE CONSUMPTION OFF THE PREMISES AND (B) UNIT 2 FOR RETAIL MONTANAGAY ABBEYDORNEY CO KERRY 20/983 PATRICK MOORE AND P 19/10/2020 TO ALTER, RENOVATE AND EXTEND EXISTING YUAN CHANG DWELLING . THE PROPOSED WORKS COMPRISE OF THE RENOVATION AND CHANGE OF USE OF AN EXISTING OUTBUILDING TO DOMESTIC USE, THE CONSTRUCTION OF EXTENSIONS TO THE NORTH, SOUTH AND EAST OF EXISTING DWELLING, INSTALLATION OF A MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER AND ALL ASSOCIATED ANCILLARY SITE WORKS GLANLOUGH LOWER SNEEM KILLARNEY CO KERRY DATE : 03/11/2020 KERRY COUNTY COUNCIL TIME : 10:20:10 PAGE : 2 P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 19/10/20 TO 23/10/20 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions, or refused; The use of the personal details of planning applicants, including for marketing purposes, maybe unlawful under the Data Protection Acts 1988 - 2003 and may result in action by the Data Protection Commissioner, against the sender, including prosecution FILE APP.
    [Show full text]
  • If These Walls Could Talk... a HISTORY of CAHERNANE HOUSE CAHERNANE HOUSE HOTEL
    C If These Walls Could Talk... A HISTORY OF CAHERNANE HOUSE CAHERNANE HOUSE HOTEL Cahernane House was built as the family residence of Henry Herbert in 1877 at a cost of £5,992. The work was carried out by Collen Brothers Contractors. The original plans by architect James Franklin Fuller, whose portfolio included Ballyseedy Castle, Dromquinna Manor and the Parknasilla Hotel, was for a mansion three times the present size. One generation on, the Herbert family had fallen on hard times and the property was being utilised as a hotel. THE HERBERT FAMILY OF CURRANS AND CAHERNANE In the mid seventeenth century, Thomas Herbert of Kilcow, agent for In 1841, Richard’s younger brothers, Henry, Edward and Thomas took his cousin Edward, 3rd Lord Herbert of Cherbury, had settled in Kerry. part in a Killarney - Cambridge four-oared boat race on the lower lake His two sons, Edward and Arthur, founded branches of the family in of Killarney. They won ten pounds from Henry Herbert of Muckross for Kerry: Edward at Muckross and Arthur at Currans and Cahernane. drawing such accolade on the locality. Richard Herbert died in Rome in 1875; he was unmarried. His younger brother Henry was now head of In 1720, Arthur purchased a walled-in house at Cahernane built by the family. Col Maurice Hussey (the site was known as Hussey’s garden). One of his sons, another Arthur, established a new residence nearby in 1750. It was built in Queen Anne style at a cost of £1200. Arthur and Lucy had no children and bequeathed the property to Richard Townsend Herbert (1754-1832), a grand-nephew.
    [Show full text]
  • Fenit Port & Marina
    Fenit Port & Marina For centuries the Old Port of Fenit was Barrow Harbour. The port was key in medieval times to monastic settlements in Ardfert. Blennerville Quay became the primary area port built in the middle of the 17th century until silting compromised its viability. Tralee Ship Canal, a town port was completed in 1846, superseding Blennerville, but before long silting and the increasing size of incoming ships doomed its viability. A deep-water port was established in Fenit in the late 1880’s. The modern-day Fenit Viaduct & Harbour was upgraded in the early 1950’s. The old wooden structure was replaced when it was discovered that during construction some wooden piles hadn’t been treated with creosote. The non-creosoted piles were damaged by sea worms and were rotting leaving the pier in a dangerous condition.2 The old wooden structure was replaced and opened in 1955. Fenit remains an important international port to this day, and the modern structure includes a deep sea pier of approximately 175 meters. Data Sources: Source: https://en.wikipedia.org/wiki/Fenit Keenan Desmond, ‘Post-Famine Ireland: Social Structure: Ireland as it Really Was’ (2006) 2 The Kerry Sentinal, August 19, 1893. Dangerous Condition of the Fenit Pier. From the records of Bridie Brassil, local historian & folklorist. Fenit Pier Fenit Pier is about 500 The late 19th century Today the pier connects the metres from the village. It wooden structure was mainland and Great Samphire Rock was constructed between replaced in the 1950’s around which the port and marina 1882-18891 a wooden by the current 800 are constructed.
    [Show full text]