Information of Major and Medium irrigation projects Report : Yearly District : Reporting Year : 2011-12

Aurad Shahajani Devarjan Gharani Girakchal Manjara Prakalp, Ta. Masalga Nimna Terana Tawarja Tiru Vati LABEL OF FORMER VARIABLE Prakalp Prakalp Prakalp Prakalp Kaij Prakalp Prakalp Prakalp Prakalp Prakalp Prakalp Prakalp Name Of Taluka In Whoch Project Is Located Chakur Nilanga Latur Nilanga Ausa Renapur Nilanga Latur Udgir Renapur A) Year Of Complition Of Work 1983 2002 1969 1982 1984 2002 1989 1998 1983 1976 1982 B) If Work Is Not Completed Then The Year In Which Work 2013 Completed C) Estimated Cost Of Project (In Lac) 78 1282.54 102 234.5 48661 2022 16333 6972 1591 544 122.7 241 Height Of Dam Sanctioned (Meter) 6 15.2 15 6.5 25.5 12.39 26.3 17.5 14.56 21 19.8 Height Of Dam Completed (Meter) 6 15.2 15 6.5 25.5 12.39 26.3 17.5 14.56 21 19.8 Canol Sanctioned Length (Km) 0 27 54 0 168 31 154 28 49 50 20 Canol Completed Length (Km) 0 27 54 0 168 31 154 0 49 50 20 Maximum Capacity (Million Cube Meter) 3.67 12.41 25.08 9.78 224.093 14.68 121.188 20.82 27.72 23.32 9.51 Actual Storage As On 31 /200 (Million Cube Meter) 0 5.88 7.04 0 104.776 7.113 23.223 2.51 5.222 5.799 9.29 1.942 Total Command Area (Hector) 883 3170 4888 2146 26526 1664 15600 3270 3050 4173 2654 2413 Cultivable Area Under Command Area 883 2853 3542 2146 23690 1450 14513 3053 2275 4173 2625 1810 Expected Irrigated Area After Complition Of Project 883 1882 2834 2146 18223 1364 11610 2445 2064 4040 2348 1760 (Hectare) Irrigated Area In The Year (Hectare) 245 6.35 913 1255 22799 188.09 7096 604.6 833 1526 701 932 Usage Of Water For Drinking Prpose ( Million Cube Meter) 0 0.01 0.844 0 31.957 0.083 1.151 1.654 0.267 0.54 2.38 0.278 Usage Of Water For Agricultural ( Million Cube Meter) 0.511 4.012 7.038 5.499 130.67 3.098 0 6.706 6.334 11.23 7.01 8.359 Usage Of Water For Industry ( Million Cube Meter) 0 0 0 0 1.324 0 0 0.018 0 0.194 0 0 Usage Of Water For Energy Generation ( Million Cube Meter) 0 0 0 0 0 0 0 0 0 0 0 0 Usage Of Water For Other Purpose ( Million Cube Meter) 0 0 0 0 0 0 0 0 0 0 0 0 Recovery Of Water Tax ( Rs. Lac) 3.11 2.55 8.95 0.91 270.21 0.21 42.15 3.73 2.82 16.46 10.45 2.12 Balanced Water Tax ( Rs. Lac) 31.55 11.43 135.3 19.9 2506.61 12.76 211.11 25.05 14.46 86.06 34.5 5.97 No. Of Water Usages / Distribution Co-Operative Socities 0 0 8 1 19 0 0 0 0 1 2 0

Source : 'Executive Engineer, Irrigation Department Local Sectors,Superitendent Engineer, Irrigation Department, Zilla Parishad'

Navigation Path : www.mahasdb..gov.in > Home > Latur > Irrigation And Flood Control > Reports

This report should be updated within 2 months after completion of Reporting period Data as on July 16, 2013 on SDB PAGE 1 / 1