POSITION OF SURVEYS IN PROGRESS (25 nos)

"on 26th,Sept"

S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2011-12 1 1 RECT survey for New BG bye HR& RJ Done Work Santioned in year Length - 6.0 km, Cost - Dy.CE pass line at Rewari from 2013-14.Appearing in PB Rs.33.608 cr, ROR = /III/JP Alwar-Sadulpur (8 km). 2014-15,vide item 26. (+) 18.23%. 2 2 Updating survey between RJ Done Survey report sent to Rly. Length - 92.00 km, Dy.CE /I/AII Devli-Tonk-Sakatpura New Bd. on 08.01.13. Cost - Rs. 705.42 cr, BG line (62 km). ROR = (-) 17.76%. 3 3 New line between Barmer- RJ March,15 Estimate Prepared on dt: Length - 92.00 km, DY CE/JU . , ROR calculated on dt: Cost - Rs. 705.42 cr, & under Finance vetting since ROR = ( -) 17.76%. 4 4 RECT survey for New BG line HR& RJ March,15 Estimate Prepared on dt: Length - 92.00 km, Dy CE/ between Alwar-Charkhi Dadri. , ROR calculated on dt: Cost - Rs. 705.42 cr, III/JP & under Finance vetting since ROR = (-) 17.76%. 5 5 New Line between Taranga- GJ& RJ Dec,14 Estimate prepared & DY CE/ via . submitted for approval of Survey /JP CSTE/C & CE/C/III on 15th,Sept. 6 7 RECT survey for a New line GJ & RJ March,15 Work of fixing of alignment DY CE/ between Palanpur-Ambaji-Abu is under progress. Survey /JP Road (76 km) 7 8 Up dating for NL between RAJ, Punj Details not available DY CE/HMH Abohar-Tohana via Ftehabad & DLI (207 Km). Sanction Year 2012-13 16 15 RECT survey for New line RJ & HR Dec,14 Field work completed and Dy.CE/BKN between Sardarsahar-Sirsa (94 estimate under preparation. km)

S BB Survey State Target Status Remarks Unit N NO Sanction Year 2013-14 23 Not Updating New BG line RECT RJ Updated survey estimate This survey was done by Dy.CE/HMH Ap Anoopgarh to Bikaner returned by Finance on Northern Railway in prd conducted by NR year 2005 3/04/2014. year 2005. Revision (155 km). "Now case is under done as per Rly.Bd. Vetting". Letter No. 2004/W- 2/SY/NWR/1 dt 13.06.Length - 151.56 km, Cost - Rs. 707.38 cr, ROR =(-) 7.24%.

Sanction Year : 2012-13 9 9 RECT survey for a New line GJ & RJ Dec,14 Under finance vetting since Survey for only DY CE/JU between --Vav- April,2013. Dhanera- Tharad section (75 km) is being done. Tharad- Vav-Suigam section is covered in new line survey of border area of (BB No. 15). Sanction Year : 2012-13 10 11 RECT survey for new BG line RJ Done Survey report sent to Rly. Bd. Rly. Bd's observations Dy.CE/JU between Didwana-Ringus via on 30.07.09 replied on 01.02.10. Khatushyam ji (105.50 km) Report shelved vide Rly. Bd’s letter No. 2009/WL/NWR/NL/15/5 dt. 20.07.10. Length - 105.50 km, Cost - Rs. 330.23 cr, ROR = (-) 5.81%. 11 10 Updating of Jalore-Falna New RJ Oct,14 Finance vetted the proposal Dy.CE/JU line (72 km) now case is under appr of GM in order to send to Rly Bd.

S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2012-13 13 12 RECT survey for New line RJ Dec,14 Under Finance vetting since Survey for Sikar-Neem Dy.CE/GC/ between Neem Ka Thana and 04/07/2013 Ka Thana to be done. JP Sujangarh via Sikar, Salasar Sikar-Sujangarh section and Udaipurwati (150 km) already covered in Nokha-Sikar survey for which report already sent to Rly. Bd. 14 13 RECT survey for New line RJ Done Survey report sent to Rly. Bd. Length - 110.60 km, Dy.CE/UDZ Nathdawara-Kankroli- on 30.05.13.Rly Bd asked Cost - Rs. 916.87 cr, Gangapur-Bhilwara (115 km) approval of CSTE on ROR = (-) 6.56%. proposed Signalling Scheme,vide letter dt :04/11/2013. Now Revise survey report has been submitted to Rly Bd on 5th,May. Rly Bd shelved the projet vide letter 2013/WI/NWR/NL/15/Survey dt 17/06/2014. 15 14 Badmer- via RJ & HR Details not available Pali,Marwar,Luni & 17 Not RECT survey for aNew GJ Dec,15 Place "Goradu" could not be Dy.CE/JU Ap linebetween Dhanera-Goradu traced out. Rly. Bd. vide prd HQ letter dated 20.11.12 has been requested for rechecking. 18 Not RETS survey of By Pass line RJ Sept,14 Updating in progress. This survey sanctioned DY CE/ Ap between Salawas and Banad vide Rly. Bd’s letter no. Survey /JP prd (35 km) 2012/W- I/Genl./Surveys/Budget dt. 19.07.12

S BB Survey State Target Status Remarks Unit N NO Sanction Year 2013-14 19 16 PETS for doubling between RJ & HR Dec,14 Survey included in current Requirement of Land is DY CE/ Bathinda - Suratgarh (150 km) year.Estimate is under Identified. Survey /JP preparation is to be started. 20 17 RETS for New line between RJ March,15 Survey included in current DY CE/ Gajsinghpur - Sadulpur via year.Estimate is under Survey /JP Padampur, Golowala, preparation is to be started. Rawatsar, Taranagar, Dadrewa (315 km) 21 18 PETS for New line between RJ Dec,14 Route selected and estimate DY CE/ Lunkaransar - Sardarshahar under preparation Survey /JP (82 km) Sanction Year : 2013-14 22 19 RET survey for New line RJ March,15 Estimate Prepared & under Dy.CE/JU between Pipar Road - scrutiny & Finance vetting Bhopalgarh - Asop - Shankwas since 27th,June. - Mundwa - Nagore (96 km) 24 Not Marwar- (167Km) RJ Revised updated RECT Sailent Feature: Dy.CE/UDZ Ap GC & Bari Sadri- survey report of proposal is Length - Marwar- prd Neemuch(48.35Km) New BG vetted by Finance on Nathdwara (167Km) GC Line. 28/01/2014 & after approwal & Bari Sadri- of GM Report submitted to Neemuch(48.35Km) New Rly Bd on 28th,April.(iii)Rly BG Line,Cost - Rs. Bd vide letter Dt: 27th , may 1687.18cr, ROR = (-) asked for consolidated 1.36%. report based on updated cost as submitted report is of 2012-13."Updation of Marwar-Nathdwara by NWR & of Bari sadri-Neemuch by WR is in process".

S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2014-15 24 20 RET Survey for NL between RJ NG DY CE/ Jaipur-Kota (200Km) Survey/JP 25 21 PET Survey for Doubling & RJ & HR NG Survey to be started. Survey to be started. DY CE/ Electrification from Rewari to Survey /JP Mahendra Garh via Loharu,Sadulpur. (140 Km)

Survey Completed

"As on 25th,Sept"

S.N BB Survey State Target Status Remarks Unit No Year 2001-02 1 6 PECT survey for Raj Survey report sent to Length - 152.99 km, Cost - Dy.CE/C/JU Doubling of Phulera Rly. Bd. on 07.06.07. Rs. 283.33 cr, ROR = (+) – Merta Road 11.43%. doubling (152.99 km) Year 2005-06 2 3 RECT survey for a NL Raj Survey report sent to Report shelved vide Rly. Bd’s Dy.CE/C/BKN from Anupgarh- Rly. Bd. on 05.02.08. letter No. Khajuwala- 2008/W1/NWR/NL/4 dt. Ramgarh-Jaisalmer 14.07.08. (431 km) Length - 431 km, Cost - Rs. 914.49 cr, ROR =(-) 5.30%. 3 4 RECT survey for a Raj Survey report sent to Rly. Bd's letter No.2008/W- Dy.CE/C/AII NLfrom to Rly. Bd. on 15.02.08. 1/NWR/NL/06 dt. 17.06.08, Kota (145 km) Reply of Rly. Bd.'s Project is financially unviable observations sent on and operationally not 05.12.11. desirable. Length - 145 km, Cost - Rs. 821.64 cr, ROR = (-) 6.61%.Work sanctioned in 2013-14 wide PB Item No 6. Year 2006-07 4 9 RECT survey for NL Raj Survey report sent to Report shelved vide Rly. Bd’s Dy.CE/C/BKN between Anupgarh to Rly. Bd. on 05.02.08. letter No. Kolayat via 2008/W1/NWR/NL/4 dt. Khajuwala (199.92 14.07.08. km) Length - 199.92 km, Cost - Rs. 441.06 cr, ROR = (-) 5.37% . S.N BB Survey State Target Status Remarks Unit No 5 10 RECT survey for NL Raj Survey report sent to Not found feasible vide Rly. Dy.CE/C/HMH between Loharu- Rly. Bd. on Bd’s letter No. Bhiwani (65 km) 03.01.07.Proposal has 2007/W2/NWR/NL/02 dt. Part of S.No No 25 not been found 29.06.07. feasible due to heavy Length - 58.83 km, Cost - Rs. through forward & 99.85 cr, ROR = (-) 6.16%. limited availability of Resources (Rly. BD's letter No. 2007/W2/NWR/NL/02 Survey dated 29/06/2007) Year 2008-09 6 1 Updating survey for Raj Survey report sent to Lenth - 27 km, Cost - Rs. Dy.CE/C/BKN NL ,Bhiwadi to Rly. Bd. on 27.01.09. 153.73 cr, ROR = (-) 13.53%. Rewari BG line (27 km) 7 2 RECT survey for of a Raj Survey report sent to Length - 50.10km, Cost - Rs. Dy.CE/C/GC NL between Rly. Bd. on 06.04.09. 162.09 cr, ROR = (-) 5.40%. Amarpura (Jorasi) to Chirawa via Tathwari and Singhana (50.10 km) 8 14 RECT survey for a NL Raj Survey report sent to Length - 17 km, Cost - Rs. Dy.CE/C/GC between Jhunjhunu- Rly. Bd. on 06.04.09. 55.01 cr, ROR = (-) 6.54%. Pilani via Chirawa (17 km) 9 Updating NL RECT Raj Updated survey This survey was done by Dy.CE/C/HMH Anoopgarh to estimate returned by Northern Railway in year Bikaner conducted Finance on 3/04/2014 2005. Revision done vide by NR year 2005 (155 & now under Rly.Bd. Letter No. 2004/W- km). compliance. 2/SY/NWR/1 dt 13.06.08. Length - 151.56 km, Cost - Rs. 707.38 cr, ROR = (-) 7.24%.

S.N BB Survey State Target Status Remarks Unit No Year of 2009-10 10 RECT survey for BG Raj Survey report sent to Length - 354.33 km, Cost - Dy.CE/C/AII Doubling between Rly. Bd. on 14.12.09. Rs. 1379.87 cr, ROR = (+) Ajmer-Palanpur 16.49%. (354.33 km) 11 Up Dating Survey Raj (i)Survey Report (i) Length - 165.00 km, Dy.CE/C/AII/I Tonk-swaimadhopur Initially Submitted on (ii) Gross Cost - Rs.709017 NL (165Km) Vide letter Cr, ROR = (-) 7.73%, CAO/C/W/401/AII- (iii) Revised Gros Cost - Rs. SWM,via 873.72 Cr, Tonk,dated:22/02/2011. (iv) Revised ROR = (-) (ii) Rly Bd Retuned the 7.25%. proposal stating rates are of 2010-11 hence Revise Cost along with Revise ROR is to submitted vide letter 2010/W- 1/NWR/NL/8/Survey dated 04/11/2013.(iii) Updated Revise surver & ROR submitted to Rly Bd vide letter CAO/C/W/401/AII- SWM,via Tonk,dated:13/12/2013. 12 5 RECT survey for NL Raj Survey report sent to Rly. Bd's observations replied Dy.CE/C/JU between Didwana- Rly. Bd. on 30.07.09 on 01.02.10. Report shelved Ringus via vide Rly. Bd’s letter No. Khatushyam ji 2009/WL/NWR/NL/15/5 dt. (105.50 km) 20.07.10. Length - 105.50 km, Cost - Rs. 330.23 cr, ROR = (-) 5.81%. S.N BB Survey State Target Status Remarks Unit No 13 18 RECT survey for NL Raj Survey report sent to Reply of Rly. Bd’s letter No. Dy.CE/C/I/BKN between Churu- Rly. Bd. on 31.01.11. 2010/W/1/NWR/NL/3/ Nohar via Tarangar Survey dated 10.03.11 was New BG Line.(Km sent on 26.07.2011. Railway 118.700 km) Board vide letter No. 2010/W/1/NWR/NL/3/ Survey dated 19.10.11 stated that "project may not be taken up for the time being as it is highly unremunerative". Length - 118.70 km, Cost - Rs. 342.20 cr, ROR = (-) 7.65%. 14 RECT survey for BG Raj Survey report sent to This survey was announced in Dy.CE/C/III/JP Doubling between Rly. Bd. on 4.10.11. Budget speech on Bandikui-Alwar Compliance of Rly. 13.02.09.Length - 60.37 km, (60.37 km) Bd.'s observation sent Cost - Rs. 247.29 cr, ROR = to Board on 11.11.11. (+) 13.86%. Work sanctioned in 2013-14 wide PB No. 28 15 RECT survey for NL Raj Survey report sent to This survey was announced in Dy.CE/C/JU between Samdari- Rly. Bd. on 13.02.12. Budget speech on 13.02.09. Phalodi (156.40 km) Length - 156.40 km, Cost - Rs. 514.944 cr, ROR = (-) 7.38%. 16 RECT survey for NL Raj Survey report sent to Survey sanctioned vide Rly. Dy.CE/C/JU between Bilara-Bar Rly. Bd. on 09.02.12. Bd’s letter No. 2009/W- (51.15 km) 1/Genl./Survey/09-10 dt 16.09.09. Length - 46.7 km, Cost - Rs. 204.83 cr, ROR = (-) 10.95%. S.N BB Survey State Target Status Remarks Unit No 17 NL survey from Raj Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/HMH Sardarshar to Rly. Bd. on 27.03.12. Bd’s letter No. Sadulpur via 2009/W/1/NWR/6/Petition dt Tarangar (104.019 05.11.09. km) Length - 102.838 km, Cost - Rs. 515.84 cr, ROR = (-) 6.95%. 18 Updating survey of Raj Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/UDZ Mavli-Bari Sadri GC Rly. Bd. on 20.02.12. Bd’s Letter No. 2009/W- (82.01 km). 1/NWR/GC/1 dt 26.05.10. Project shelved vide Rly. Bd.'s letter No. 2009/W- I/NWR/GC/1 Survey dt. 23.07.12. Length - 82.01 km, Cost - Rs.311.32 cr, ROR = (-) 5.24%.Work sanctioned in 2013-14 wide PB Item No 8. 19 RECT survey for NL Survey report sent to Survey sanctioned vide Rly. Dy.CE/C/HMH between Dabwali- Rly. Bd. on 14.05.12. Bd's letter No. 2009/W- Kalanwali via Sirsa 1/Genl./Survey/09-10 dt (33.70 km) 16.9.09. Length - 31.824 km, Cost - Rs. 187.14 cr, ROR = (-) 7.93%. 20 NL Sardarshar to Raj Survey report sent to Survey sanctioned vide Rly. Dy.CE/C/I/BKN Suratgarh & Rly. Bd. on 21.05.12. Bd's letter No. Ratangarh to 2009/W/1/NWR/6/Petition dt Sardarshara (118.840 05.11.09. km) Length - 118.84 km, Cost - Rs.392.427 cr, ROR = (-) 7.59%

S.N BB Survey State Target Status Remarks Unit No Year 2010-11 21 9 RECT survey for NL \ (i) Survey report sent to Length - 58.50 km, Cost - Rs. Dy.CE/C/JU between Jaisalmer- Rly. Bd. on 03.11.11. 236.93 cr, ROR = (+) 15.58%. Sanu-Hamira (55 (ii) Reply of Rly. Bd.'s Work sanctioned in 2013-14 km). observation sent on wide PB No. 5 27.01.12. 22 10 Updating survey report Raj Survey report sent to Length - 59 km, Cost - Rs. Dy.CE/C/I/AII -Merta NL Rly. Bd. on 04.02.11. 322.98 cr, ROR = (-)7.65%. (59 km) Work sanctioned in 2013-14 wide PB No. 7# 23 73 Updating survey report Raj Survey report sent to Length -189.083 km, Cost - Dy.CE/C/GC Nokha-Sikar NL Rly. Bd. on 12.03.12. Rs. 819.11 cr, ROR = (-) (209.615 km). 7.43. 24 100 Updating survey report Raj Survey sent to Rly. Bd. Length - 149 km, Cost - Rs. Dy.CE/C/I/BKN Sardarshar- on 04.10.11. 403.96 cr, ROR = (-) 8.09%. Hanumangarh New BG line (149 km). 25 PECT survey for Raj & Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/HMH Bhiwani-Loharu- Haryana Rly. Bd. on 29.05.12. Bd's letter Pilani-Churu,NL Survey sent to Rly. Bd. No.2009/W/1/Genl/survey/09- (136.74 km). on 04.10.11. 10 dated 24.6.2010.Length - Survey sent to Rly. Bd. 136.74 km, Cost - Rs. 617.79 on 04.10.11. cr, ROR = (-) 7.07%. "Proposal shelved due to very poor traffic potential and severe resource crunch faced by Railways (Rly. BD's letter No. 2012/W1/NWR/NL/25 Survey dated 04.09.13." S.N BB Survey State Target Status Remarks Unit No 26 Updating survey report Raj Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/UDZ to Marwar-Mavli Rly. Bd. on 14.05.12. Bd's Letter No. 2008/W- GC. 1/NWR/GC/2 dt 11.8.10. Length - 160.00 km, Cost - Rs.1287.80 cr, ROR = (-) 0.10% 27 NL - - Raj Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/JU Agolai-Shergarh- Rly. Bd. on 26.04.12. Bd's letter No. 2010/W- Phalsund. 1/Genl/Survey/10-11 dt. 04.02.11. Length - 116 km, Cost - Rs. 428.593 cr, ROR = (-) 8.04%. 28 Jodhpur-Jaisalmer Raj Survey report sent to Survey sanctioned as per Rly. Dy.CE/C/JU Doubling (290 km). Rly. Bd. on 13.12.12. Bd's letter No. 2010/W - "Rly Bd Shelved the 1/Genl/Survey/10-11 dt. Survey vide letter 04.02.11. 2012/NL/NWR/40 Length - 290.46 km, Cost - dated 28/10/2013." Rs. 1032.17 cr, ROR = (-) 0.02%. S.N BB Survey State Target Status Remarks Unit No 29 Marwar-Nathdwara Raj (i) The revised (i)The survey of Marwar - Dy.CE/C/UDZ (167Km) GC & Bari estimate duly vetting Mavli-Bari Sadri (GC) Sadri- by Finance on submitted by NWR to Rly Bd Neemuch(48.35Km) 13/02/2013 & appd by on 14/05/2012,out of which NL GM/NWR on Marwar-Mavli (GC) 13/02/2013 & santioned by Rly Bd vide submitted to Rly Bd letter No. 2008/W- on 12/02/2013. 1/NWR/GC/2 dt 11.8.10 . (ii) (ii) Revised updated The survey of Bari Sadri - RECT survey report Neemuch (NL) submitted by of proposal is vetted by WR. (iii) However Rly Bd Finance on28/01/2014 santioned only Marwar-Mavli & after approwal of (GC).(iv) Now The proposal GM Report submitted of BalanceMarwar-Nathdwara to Rly Bd on (GC) & Bari Sadri -Neemuch 28th,April. (NL) is prepared & vetted by (iii)Rly Bd vide letter finance is now being Dt:27th,may asked for processed for appr of GM for consolidated report onward submission to Rly Bd. based on updated cost (v) Sailent Feature:Length - as submitted report is Marwar-Nathdwara (167Km) of 2012-13. GC & Bari Sadri- "Updation of Marwar- Neemuch(48.35Km) New BG Nathdwara by NWR & Line,Cost - Rs. 1687.18cr, of Bari sadri-Neemuch ROR = (-) 1.36%. by WR is in process".

Year 2011-12 30 8 RECT survey for New Haryana/ Survey report sent to Length - 6.0 km, Cost - Dy.CE/C/III/JP BG bye pass line at Rajasthan Rly. Bd. on 19.01.12. Rs.33.608 cr, ROR = (+) Rewari from Alwar- 18.23%. Sadulpur ((8 km). S.N BB Survey State Target Status Remarks Unit No 31 15 NL for providing Raj (i) Survey report sent New line from Tharad road, Dy.CE/C/JU connectivity to border to Rly. Bd. on Santalpur, Suigam, Vav, areas of Raj. From 16.11.12. (ii) Revised Chhansara (existing). Santalpur, Suigam, cost sent to Rly. Bd on Length - 80.75 km, Cost - Rs. Vav, Sanchor, 11.06.13. 370.71 cr, ROR = (-) 7.59%. Radhanpur. (iii)"Rly Bd Shelved Revised Cost - Rs.374.64 the Survey vide letter cr(gross), Revised ROR = (-) 2012/WI/NWR/NL/39 7.59%. dated 31/07/2014." 32 16 NL between Rajasthan/ Survey report sent to Survey report of Jaisalmer- Dy.CE/C/JU Jaisalmer- Gujrat Rly. Bd. on 31.08.12. Barmer already sent to Rly. Kandla.(Barmer- Revised cost sent on Bd. This report only covers Bhabher) 14.03.13. Barmer - Bhabhar section. Line "Survey Shelved by Rly from Bhabhar to Kandla via Bd vide letter Radhanpur-Santalpur already 2012/Wl/Nl/NW32 exists. Survey Length - 193.94 km, Cost - Dt:25/11/2013". Rs. 798.727 cr, ROR = (-) 7.65%. 33 17 NL between Nagaur- Raj Survey report sent to Length - 148 km, Cost - Dy.CE/C/JU Phalodi. Rly. Bd. on 01.3.12. Rs.436.122 cr, ROR = (-) 7.76%. 34 21 Updating survey Raj Survey report sent to Length - 145.00 km, Cost - Dy.CE/C/JU between Jaisalmer- Rly. Bd. on 08.05.12. Rs. 516.305 cr, ROR = (-) Barmer NL (145 km). Revised cost sent to 7.74%. Rly. Bd on 11.06.13. Revised Cost - Rs. 517.70 cr(gross), Revised ROR = (-) 7.74%. 35 22 Updating survey Raj Survey report sent to Length - 92.00 km, Cost - Rs. Dy.CE/C/I/AII between Devli-Tonk- Rly. Bd. on 08.01.13. 705.42 cr, ROR = (-) 17.76%. Sakatpura NL (62 km). S.N BB Survey State Target Status Remarks Unit No 36 RECT survey for Haryana Rly Bd vide letter Survey for Manheru - Hisar Dy.CE/C/HMH Patch Doubling 2011/w- patch doubling sanctioned between Manheru - 1/NWR/WT/2012- vide Rly. Bd's letter No. Hisar (73.500 km) 13/DL/13 2011/W-I/NWR/WP 2012- DT:3/09/2012 asked 13/DL/13 dated 08.12.11. clarification regarding Length - 73.500 km, Cost - covered/not covered Rs.413.399 cr, ROR = (+) coal route for Thermal 6.35%. Survey report Plants.Revise Ror is sent to Rly. Bd. on 10.07.12 under Finance vetting since 07/04/14.