POSITION of SURVEYS in PROGRESS (25 Nos) "On 26Th,Sept
Total Page:16
File Type:pdf, Size:1020Kb
POSITION OF SURVEYS IN PROGRESS (25 nos) "on 26th,Sept" S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2011-12 1 1 RECT survey for New BG bye HR& RJ Done Work Santioned in year Length - 6.0 km, Cost - Dy.CE pass line at Rewari from 2013-14.Appearing in PB Rs.33.608 cr, ROR = /III/JP Alwar-Sadulpur (8 km). 2014-15,vide item 26. (+) 18.23%. 2 2 Updating survey between RJ Done Survey report sent to Rly. Length - 92.00 km, Dy.CE /I/AII Devli-Tonk-Sakatpura New Bd. on 08.01.13. Cost - Rs. 705.42 cr, BG line (62 km). ROR = (-) 17.76%. 3 3 New line between Barmer- RJ March,15 Estimate Prepared on dt: Length - 92.00 km, DY CE/JU Palanpur. , ROR calculated on dt: Cost - Rs. 705.42 cr, & under Finance vetting since ROR = ( -) 17.76%. 4 4 RECT survey for New BG line HR& RJ March,15 Estimate Prepared on dt: Length - 92.00 km, Dy CE/ between Alwar-Charkhi Dadri. , ROR calculated on dt: Cost - Rs. 705.42 cr, III/JP & under Finance vetting since ROR = (-) 17.76%. 5 5 New Line between Taranga- GJ& RJ Dec,14 Estimate prepared & DY CE/ Abu Road via Ambaji. submitted for approval of Survey /JP CSTE/C & CE/C/III on 15th,Sept. 6 7 RECT survey for a New line GJ & RJ March,15 Work of fixing of alignment DY CE/ between Palanpur-Ambaji-Abu is under progress. Survey /JP Road (76 km) 7 8 Up dating for NL between RAJ, Punj Details not available DY CE/HMH Abohar-Tohana via Ftehabad & DLI (207 Km). Sanction Year 2012-13 16 15 RECT survey for New line RJ & HR Dec,14 Field work completed and Dy.CE/BKN between Sardarsahar-Sirsa (94 estimate under preparation. km) S BB Survey State Target Status Remarks Unit N NO Sanction Year 2013-14 23 Not Updating New BG line RECT RJ Updated survey estimate This survey was done by Dy.CE/HMH Ap Anoopgarh to Bikaner returned by Finance on Northern Railway in prd conducted by NR year 2005 3/04/2014. year 2005. Revision (155 km). "Now case is under done as per Rly.Bd. Vetting". Letter No. 2004/W- 2/SY/NWR/1 dt 13.06.Length - 151.56 km, Cost - Rs. 707.38 cr, ROR =(-) 7.24%. Sanction Year : 2012-13 9 9 RECT survey for a New line GJ & RJ Dec,14 Under finance vetting since Survey for only DY CE/JU between Dhanera-Tharad-Vav- April,2013. Dhanera- Tharad section Suigam (75 km) is being done. Tharad- Vav-Suigam section is covered in new line survey of border area of Rajasthan (BB No. 15). Sanction Year : 2012-13 10 11 RECT survey for new BG line RJ Done Survey report sent to Rly. Bd. Rly. Bd's observations Dy.CE/JU between Didwana-Ringus via on 30.07.09 replied on 01.02.10. Khatushyam ji (105.50 km) Report shelved vide Rly. Bd’s letter No. 2009/WL/NWR/NL/15/5 dt. 20.07.10. Length - 105.50 km, Cost - Rs. 330.23 cr, ROR = (-) 5.81%. 11 10 Updating of Jalore-Falna New RJ Oct,14 Finance vetted the proposal Dy.CE/JU line (72 km) now case is under appr of GM in order to send to Rly Bd. S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2012-13 13 12 RECT survey for New line RJ Dec,14 Under Finance vetting since Survey for Sikar-Neem Dy.CE/GC/ between Neem Ka Thana and 04/07/2013 Ka Thana to be done. JP Sujangarh via Sikar, Salasar Sikar-Sujangarh section and Udaipurwati (150 km) already covered in Nokha-Sikar survey for which report already sent to Rly. Bd. 14 13 RECT survey for New line RJ Done Survey report sent to Rly. Bd. Length - 110.60 km, Dy.CE/UDZ Nathdawara-Kankroli- on 30.05.13.Rly Bd asked Cost - Rs. 916.87 cr, Gangapur-Bhilwara (115 km) approval of CSTE on ROR = (-) 6.56%. proposed Signalling Scheme,vide letter dt :04/11/2013. Now Revise survey report has been submitted to Rly Bd on 5th,May. Rly Bd shelved the projet vide letter 2013/WI/NWR/NL/15/Survey dt 17/06/2014. 15 14 Badmer- Delhi via RJ & HR Details not available Pali,Marwar,Luni & Jaipur 17 Not RECT survey for aNew GJ Dec,15 Place "Goradu" could not be Dy.CE/JU Ap linebetween Dhanera-Goradu traced out. Rly. Bd. vide prd HQ letter dated 20.11.12 has been requested for rechecking. 18 Not RETS survey of By Pass line RJ Sept,14 Updating in progress. This survey sanctioned DY CE/ Ap between Salawas and Banad vide Rly. Bd’s letter no. Survey /JP prd (35 km) 2012/W- I/Genl./Surveys/Budget dt. 19.07.12 S BB Survey State Target Status Remarks Unit N NO Sanction Year 2013-14 19 16 PETS for doubling between RJ & HR Dec,14 Survey included in current Requirement of Land is DY CE/ Bathinda - Suratgarh (150 km) year.Estimate is under Identified. Survey /JP preparation is to be started. 20 17 RETS for New line between RJ March,15 Survey included in current DY CE/ Gajsinghpur - Sadulpur via year.Estimate is under Survey /JP Padampur, Golowala, preparation is to be started. Rawatsar, Taranagar, Dadrewa (315 km) 21 18 PETS for New line between RJ Dec,14 Route selected and estimate DY CE/ Lunkaransar - Sardarshahar under preparation Survey /JP (82 km) Sanction Year : 2013-14 22 19 RET survey for New line RJ March,15 Estimate Prepared & under Dy.CE/JU between Pipar Road - scrutiny & Finance vetting Bhopalgarh - Asop - Shankwas since 27th,June. - Mundwa - Nagore (96 km) 24 Not Marwar-Nathdwara (167Km) RJ Revised updated RECT Sailent Feature: Dy.CE/UDZ Ap GC & Bari Sadri- survey report of proposal is Length - Marwar- prd Neemuch(48.35Km) New BG vetted by Finance on Nathdwara (167Km) GC Line. 28/01/2014 & after approwal & Bari Sadri- of GM Report submitted to Neemuch(48.35Km) New Rly Bd on 28th,April.(iii)Rly BG Line,Cost - Rs. Bd vide letter Dt: 27th , may 1687.18cr, ROR = (-) asked for consolidated 1.36%. report based on updated cost as submitted report is of 2012-13."Updation of Marwar-Nathdwara by NWR & of Bari sadri-Neemuch by WR is in process". S BB Survey State Target Status Remarks Unit N NO Sanction Year : 2014-15 24 20 RET Survey for NL between RJ NG DY CE/ Jaipur-Kota (200Km) Survey/JP 25 21 PET Survey for Doubling & RJ & HR NG Survey to be started. Survey to be started. DY CE/ Electrification from Rewari to Survey /JP Mahendra Garh via Loharu,Sadulpur. (140 Km) Survey Completed "As on 25th,Sept" S.N BB Survey State Target Status Remarks Unit No Year 2001-02 1 6 PECT survey for Raj Survey report sent to Length - 152.99 km, Cost - Dy.CE/C/JU Doubling of Phulera Rly. Bd. on 07.06.07. Rs. 283.33 cr, ROR = (+) – Merta Road 11.43%. doubling (152.99 km) Year 2005-06 2 3 RECT survey for a NL Raj Survey report sent to Report shelved vide Rly. Bd’s Dy.CE/C/BKN from Anupgarh- Rly. Bd. on 05.02.08. letter No. Khajuwala- 2008/W1/NWR/NL/4 dt. Ramgarh-Jaisalmer 14.07.08. (431 km) Length - 431 km, Cost - Rs. 914.49 cr, ROR =(-) 5.30%. 3 4 RECT survey for a Raj Survey report sent to Rly. Bd's letter No.2008/W- Dy.CE/C/AII NLfrom Ajmer to Rly. Bd. on 15.02.08. 1/NWR/NL/06 dt. 17.06.08, Kota (145 km) Reply of Rly. Bd.'s Project is financially unviable observations sent on and operationally not 05.12.11. desirable. Length - 145 km, Cost - Rs. 821.64 cr, ROR = (-) 6.61%.Work sanctioned in 2013-14 wide PB Item No 6. Year 2006-07 4 9 RECT survey for NL Raj Survey report sent to Report shelved vide Rly. Bd’s Dy.CE/C/BKN between Anupgarh to Rly. Bd. on 05.02.08. letter No. Kolayat via 2008/W1/NWR/NL/4 dt. Khajuwala (199.92 14.07.08. km) Length - 199.92 km, Cost - Rs. 441.06 cr, ROR = (-) 5.37% . S.N BB Survey State Target Status Remarks Unit No 5 10 RECT survey for NL Raj Survey report sent to Not found feasible vide Rly. Dy.CE/C/HMH between Loharu- Rly. Bd. on Bd’s letter No. Bhiwani (65 km) 03.01.07.Proposal has 2007/W2/NWR/NL/02 dt. Part of S.No No 25 not been found 29.06.07. feasible due to heavy Length - 58.83 km, Cost - Rs. through forward & 99.85 cr, ROR = (-) 6.16%. limited availability of Resources (Rly. BD's letter No. 2007/W2/NWR/NL/02 Survey dated 29/06/2007) Year 2008-09 6 1 Updating survey for Raj Survey report sent to Lenth - 27 km, Cost - Rs. Dy.CE/C/BKN NL ,Bhiwadi to Rly. Bd. on 27.01.09. 153.73 cr, ROR = (-) 13.53%. Rewari BG line (27 km) 7 2 RECT survey for of a Raj Survey report sent to Length - 50.10km, Cost - Rs. Dy.CE/C/GC NL between Rly. Bd. on 06.04.09. 162.09 cr, ROR = (-) 5.40%. Amarpura (Jorasi) to Chirawa via Tathwari and Singhana (50.10 km) 8 14 RECT survey for a NL Raj Survey report sent to Length - 17 km, Cost - Rs.