OnOnOn-On ---goinggoing projects financed by European Bank for ReconsReconstructiontruction and Development September 202020 202020

Loan amount Year of Project Project Name Project Objective (((EUR(EUR mil.) Commencement Project objective is to repair several sections of the railroad on Corridor X at motorway sections Tabanovce - Rail Corridor X , Miravci – Smokvica, Nogaevci – Gradsko – 17.6 2010 Project Kukuricani and Krivolak-Negotino, thus reducing the costs for its maintenance and ensuring safe traffic on these sections.

Rehabilitation of Rehabilitation of this section will contribute to reducing Eastern Part of Rail the costs for its maintenance and provision of safe traffic, Corridor VIII i.e. improvement of safety during the transport of people 46.4 2012 Project, Phase I, and goods, thus saving time and providing for Kumanovo - environmental benefits. Beljakovce Section

The realization of this project will contribute to the Macedonian improvement of the existing situation of the assets that Railway Fleet 50 2012 are currently available to Macedonian Railways Transport Renewal Project Joint Stock Company.

Goal of the Project is reconstruction, extension and Construction and modernisation of the existing toll stations along Corridor Installation of X: Petrovec, Sopot and Otovica, then dislocation, electronic Toll modernisation and doubling the number of toll collection 15.88 2013 Collection System lanes at and Gradsko toll stations, as well as along Corridor X construction of two new toll stations in Demir Kapija and Gevgelija.

Macedonian Air This Project envisages modernisation of the air traffic Navigation System control equipment, i.e. improvement of the performance of Upgrading – second the overall system (safety, capacity, cost effectiveness, 11.15 2013 phase - without efficiency, flexibility, predictability, environmental impact, sovereign guarantee etc).

Rehabilitation and Implementation of this Project will increase the quality of Modernisation of delivery of electricity, safety when supplying electricity to the Transmission the users of the transmission system, and it will also lead 25 2013 Network and Power to revitalisation of 110 kV transmission lines older than 40 System – without years. sovereign guarantee Rehabilitation of Eastern Part of Rail The project envisages construction of railway Corridor VIII Corridor VIII section Beljakovce - Kriva Palanka, including 145 2014 Project, Phase 2- reconstruction of existing parts of the line, with a total Beljakovce-Kriva length of 34 km. Palanka Section

The Programme is aimed at improving the quality of road infrastructure in the Republic of Macedonia. The funds National Roads secured for realization of this Programme will be used for 181 2014 Programme financing the construction of Raec - Drenovo road section as an express road and the reconstruction of Stip – Kocani road section as an express road – semi motorway.

Project for 400 kv long -distance power line interconnection The realization of the project will build a new 400/110 Kv between TC Bitola 2 substation in Ohrid length of 90 km and part of the power (Republic of line from Bitola to the border with Albania. This project 37 2015 Macedonia) and TC will be the first connecting the power systems of Elbasan (Republic of Macedonia and Albania. Albania) - without sovereign guarantee

This project is part of the Government of the Republic of Construction of Macedonia policy for improving the road infrastructure Shtip - Radovish quality in the Republic of Macedonia. The realization of the 64 2015 Road Section project will facilitate the transportation of people, goods and services in the south-eastern part of the country.

Construction of The project covers complete rehabilitation and expansion Kriva Palanka – of the road section Kriva Palanka - Deve Bair in a total Deve Bair length of 13 km. This road section is part of the Eastern 10 2018 (Bulgarian border) Pan-European Road Corridor VIII, therefore there will be Road Section benefits on national, as well as on regional level.

This project envisages upgrading and modernization of the existing toll stations alongCorridor VIII, as well as Highway Tolling construction of three new toll stations for highway 13 2019 Project sections being built in the Republic of , installation of equipment, as well as maintenance and mandatory spare parts for toll stations.

The project includes procurement of new buses for the City of , i.e. procurement of low-floor buses that run on Skopje Bus Project compressed natural gas with high economic profitability 10 2019 and environmental advantage in relation to the characteristics of the existing buses.