NORTH AMERICA, LTD. Trespa North American Phone: 1-800-4-TRESPA www.trespanorthamerica.com 12267 Crosthwaite Circle Poway, CA 92064 Meteon® Façade Systems Local Rep: W.H. Steele Co., Inc. Phone: 909-930-0831 San Diego - North County Area Meteon® Installations University of , San Diego, IT2 Bldg. Location: At corner of Voigt Dr & Engineers Drive, San Diego, CA Description: 22,000 sq.ft. Meteon Satin Metallic Aluminum Gray (M51.0.1/GL) Meteon Satin Metallic Graphite Gray (M21.8.1/ST) Concealed Fixing TM-400 Completed: March 2005 Architect: N.B.B.J. Architecture, General Contractor: Gilbane Construction Installer: Tower Glass, Santee, CA

University of California, San Diego, Rady School of Management Location: Scholars Drive, East of North Point Drive, San Diego, CA Description: 36,466 sq.ft. Meteon Satin Metallic Custom Colors Aluminum (PM05065/ST) Meteon Satin Metallic Custom Colors Dark Amber (PM05012/ST) Exposed and Concealed Fixing Water Barrier: WallShield by VaproShield Completed: Spring 2007 Architect: Ellerbe Becket, Minnesota & San Francisco General Contractor: PCL Construction Installer: Division Eight Glass, Lemon Grove, CA

University of California, San Diego, UCSD TeleMedicine Center Location: 200 Campus Drive, San Diego, CA Description: 18,232 sq.ft. Meteon Satin Metallic Completed: January 2011 Architect: SOM, San Francisco, CA General Contractor: Swinterton Builders Installer: K.H.S.& S., San Diego, CA

University of California, S.D., Sanford Consortium of Regenerative Medicine Location: 2880 Torrey Pines, La Jolla, CA 92037 Description: 20,097.02 sq.ft. Meteon Satin Metallic Water Barrier: WallShield by VaproShield Completed: January 2011 Architect: Davis Davis Architects, San Diego, CA General Contractor: Hensel Phelps Construction Installer: Tower Glass, San Diego, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 1 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

San Diego North County Meteon® Installations, page 2 Miramar College Classrooms Location: 10440 Black Mountain Rd, San Diego, CA Description: 40,000 sq.ft. Meteon Satin Natural Print Sierra Red (NA-08) Exposed Fixing TS-110 Water Barrier: WallShield by VaproShield Completion: Spring 2010 Architect: NTD Architecture, San Diego General Contractor: Sundt Construction Installer: La Mesa Glass, Lemon Grove, CA

Palomar College, Bldg S Location: 11990 Avenita Azul, San Marcos, CA (corner of Las Posas & Ave Azule) Description: 6,670 sq.ft. Meteon Satin Mystic Silver Metallic Satin & Urban Grey metallic rock Exposed Fixing TS-210 Water Barrier: WallShield by VaproShield Completion: Spring 2010 Architect: Carrier Johnson, San Diego General Contractor: Swinerton Management Installer: Centex Glass, Lemon Grove, CA

Palomar College, Bldg IT Location: 1140 W. Mission Road, San Marcos, CA 92069 Description: 10,814 sq. ft. Meteon, Titanic NA10 Satin, Mahogany Red Satin Exposed Fixing TS-210 Water Barrier: WallShield by VaproShield Completion: January 2011 Architect: Carrier Johnson, San Diego General Contractor: Jaynes Corporation Installer: Johnson Finch and McClure

Cal State University San Marcos, Social & Behavorial Sciences Bldg (SBSB) Location: 333 S. Twin Oaks Valley Rd, San Marcos, CA 92096 Description: 9,000 sq.ft. Meteon Satin Wood Grain Loft Brown (NW-05) Exposed Fixing TS-110 Water Barrier: Tyvek Commercial Wrap Completion: Spring 2010 Architect: AC Martin Partners, Los Angeles General Contractor: Edge Development Installer: Tower Glass, Santee, CA

Antin Residence Location: 4016 Arroyo Sorrento Place, San Diego, CA Description: 600 sq.ft. Meteon Satin Aluminum Grey Metallic (M 51.0.1/ST) *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 2 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Exposed Fasteners Façade cladding on bridge portion of building Completed: May, 2005 Water Barrier: WallShield by VaproShield Architect: Safdie Rabines Architects, San Diego G.C. / Installer: Cavanaugh Construction, Coronado, CA

Hanna Fenichel Child Development Center, Solano Beach Preschool Location: 236 Sierra, Solano Beach, CA 92075 Description: 450 sq.ft. 45 degree bevel between joints Meteon Metallic Azurite Blue #M21.3.4ST Metallic Mystic Silver Green #CM2642ST Lavender Blue #A20.5.2ST Completion: August 2007 Water Barrier: WallShield by VaproShield Architect: Steven Dalton Associates, San Diego, CA G.C.: Marcotte & Hearne Builders, San Diego Installer: Ideal Mechanical & Sheet Metal, Santee

San Diego – Downtown Area Meteon® Installations ResMed Office Building Location: 4773 Paramount Drive San Diego, CA Description: 29,400 sq.ft. Meteon NA09 Oxidation Exposed Fixing powder-coated to match panel color Water Barrier: WallShield by VaproShield Completed: Spring 2008 Architect: Davis Davis Architects & KMA Architects, San Diego General Contractor: Reno Construction Installer: Division Eight Glass, Lemon Grove, CA

San Diego City College Vocational Tech Bldg (Carreer Training Center) Location: 1010 – 16th St, San Diego, CA Description: 9,600 sq.ft. 3/8” Aluminum Grey Metallic #M51.0.1 Exposed Fixing TS-110 Water Barrier: WallShield by VaproShield Completed: December 2009 Interior & Exterior Wall Panels Architect: Carrier Johnson, San Diego Installer: Division 8, San Diego, CA (Exterior Façade) & Lozano Casework (Interior Walls)

The Legend Restaurant @ the Ballpark Boardwalk Location: 325 - 7th Ave, San Diego, CA Description: 2,123 sq.ft. 3/8” Winter Grey #A21.1.0 Concealed Fixing TM-210 and Exposed TM-110 Water Barrier: WallShield by VaproShield Completed: December 2006 Architect: Perkins, Vancouver, British Columbia Installer: Starline Windows, San Diego, CA

Alta @ 6th & Market Location: Downtown, 6th & Market, San Diego, CA Description: 1,200 sq.ft. 3/8” Aluminum Grey Metallic #M51.0.1/ST Concealed Fixing TS-210 Water Barrier: WallShield by VaproShield Completed: Spring 2007 Architect: Perkins, Vancouver, British Columbia

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 3 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: DPR Construction, San Diego, CA Installer: Sunset Glass, San Diego, CA

The Nexus Office Building Location: 875 G Street @ corner of 9th, near Market, San Diego, CA Description: 400 sq.ft. 3/8” Meteon Carmine Red Satin #A 12.3.7/ST Exposed Fixing TS-110 Water Barrier: WallShield by VaproShield Completed: November 2006 Architect: K.M.A., San Diego Installer: Johnson, Barnes & Finch, Lakeside, CA

San Diego Gas & Electric, Friars Substation Near 163 Freeway & Friars Rd. @ corner of Mission Valley Rd. & Metropolitan Rd. (in Mission Valley Heights) Location: 7550 Mission Valley Road, San Diego, CA 92108 Description: 2,288 sq.ft. 5/16” Metallic Azurite Blue #A12.3.7/ST & Carmine Red #A12.3.7/ST Concealed Fixing TM-400 Adhesive, Reclad over existing concrete -up Completed: February 2000 Architect: Hope Consulting, San Diego, CA General Contractor: Roel Construction, San Diego, CA Installer: Tierra Glass, Spring Valley, CA

Ocean Front Walk Residence Location: 3879 Ocean Front Walk, San Diego, CA Description: 1,400 sf Meteon Metallic Mystic Green #CM26.4.2 ST & Anthracite Grey #A25.8.1 ST TS-110 Exposed Fasteners & TS-210 Concealed Fasteners Completed: December, 2009 Water Barrier: WallShield by VaproShield Architect: Frontis & Young Architects, San Diego Developer: Stevens Development G.C.: Four by Four Construction Installer: Mayall Glass, San Diego, CA

Steiner Residence Location: 830 Alameda Road, Coronado, CA 92118 Description: 2,100 sq.ft. Meteon Sienna Brown, #AM06.4.1/ST Red-Orange A10.1.8 / ST Pacific Board NW-04 / ST Water Barrier: WallShield by VaproShield Completion: Summer 2009 Architect: Laurie C. Fisher, AIA, San Diego, CA General Contractor: Woodruff Construction, Coronado, CA

Georgia Street Apartments Location: 3907 Georgia St., San Diego, California 92103 Description: 2,350 sq.ft. Steel Blue #A 24.4.1 Exposed Fasteners-Privacy Screens on steel posts Completed: March 2007 Architect: A2 Studios, San Diego CA G.C.: Cantor Property Mngmt, San Diego CA Installer: McCoy Construction Services, Colton, CA

San Diego – South County Area Meteon® Installations El Cajon Public Safety Center Location: 100 Civic Center Way, El Cajon, CA Description: 2,000 sq.ft. 3/8” Meteon Satin Metallic Aluminum Gray #M51.0.1/ST Exposed Fixing TS-100 Installed over block wall Water Barrier: none needed over block wall Completed: Spring 2010 *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 4 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: K.M.A. Architecture and Engineering, San Diego, CA General Contractor: Ledcor, San Diego, CA Installer: Vision Systems, El Cajon, CA

Chula Vista Commerce Center Location: 680 “L” Street, @ Industrial Blvd., Chula Vista, CA Description: 1,022 sq.ft. 3/8” Meteon Satin Metallic Aluminum Gray (M51.0.1/ST) Exposed Fixing TM-100 Installed over wood studs Completed: November 2001 Architect: Eric Davy Architects, San Diego, CA General Contractor: Pacific General, San Diego, CA Installer: Tower Glass, Santee, CA

San Ysidro Fire Station #29 (Interstate 5 to Via de San Ysidro, Left (North) to San Ysidro Blvd., Left to fire station (L. side) Location: 198 W. San Ysidro Blvd., San Ysidro, CA Description: 1,741 sq.ft. Meteon Satin Terra Cotta (A10.3.4/ST) Exposed Fastener TS-100 Powder coated black Water Barrier: FoilSkin by Henry Co. Completed: February 2005 Architect: C.C.B.G, San Diego, CA General Contractor: Echo Pacific Construction, Escondido, CA Installer: Centex Glazing, La Mesa, CA

S.R. 125 Toll Booths & Control Operations Center Location: State Route 125, just north of Mexican Border, Chula Vista, CA Description: 5,197 sq.ft. Meteon Metallic Amber, #M06.4.1/ST on front side of panels White # A03.0.0 on back side of panels for Toll Booths 1,123 sq.ft. Meteon Metallic Amber, #M06.4.1/ST - Contr. Ops Ctr mechanical screens Water Barrier: none needed for mechanical screens Completion: December 2006 Architect: LiberStudio Architects, Los Angeles, CA G.C. on Toll Booths: Dahl / Taylor, Santa Ana, CA Toll Booths Installer: ICON Structures, Fontana CA G.C. on Cont Ops Ctr: Cox Construction, San Diego, CA Cont Ops Ctr Installer: Simmons Sheet Metal, Oceanside, CA

Orange County Meteon® Installations Biola University, School of Business Bldg. Location: 13800 Biola Ave, La Mirada, CA Description: 6,140 sq.ft. Meteon Metallic Satin Aluminum Grey (M51.0.1/ST) Exposed Fasteners TM-100, painted to match panel color Completed: Summer 2006 Water Barrier: WallShield by VaproShield Architect: Gensler, Santa Monica, CA G.C.: Cannon Builders, Placentia Installer: Custom Metal Fabricators, Orange, CA

Biola University, Studio B Renovation Location: 13800 Biola Ave, La Mirada, CA Description: 800 sq.ft. Panels curved with a 182’ radius. 5/16” Meteon A08.4.5 ST Rusty Red TS 110 Exposed Fastener with ½” spacers. Water Barrier: WallShield by VaproShield Completed: August 2008 Architect: Gensler, Santa Monica, CA *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 5 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: Cannon Builders, Placentia Installer: Custom Metal Fabricators, Orange, CA Tustin Library Location: 345 E. Main Street, Tustin, CA Description: 2,100 sq.ft. Exposed Fasteners Meteon Garnet Red Metallic (M12.4.2ST) Completed: March 2009 Water Barrier: WallShield by VaproShield Architect: Field Paoli Architects, San Francisco Constr. Mngr: GKK Works, Irvine G.C. P. H. Hagopian Installer: Eberhard Sheet Metal, Van Nuys Providence Medical Office Building, Phases 1, 2 & 3 Location: 1950 Sunnycrest Rd, Fullerton, CA Description: 5,800 sq.ft., exterior entry walls & interior 1st, thru 3rd floors Meteon English Cherry NW-10 ST Exposed Fasteners TS-110 Completed: 2007 & 2008 Water Barrier: WallShield by VaproShield Architect: Sterns Arch., Laguna Beach & Ewing Cole, Irvine G.C.: GMI Wall Panel Installer: Seeley Bros, Brea (Phase 1) Wall Panel Installer: McCoy Construction Services, Colton (Phases 2 & 3) Elevator Installer: Leading Concepts, Glendora Sun Cal Corporate Offices Corner of Morse Ave and McCabe Way, 1 block East of Von Karman, North side of I-405. Location: 2392 Morse, Irvine, CA Description: 2,600 sq.ft. Installed over existing wood siding 3/8” Meteon Metallic Satin, Azurite Blue #M21.3.4/ST TS 100 Exposed Fastener modified with some adhesive fasteners. Rivets powder-coated to match Metallic Azurite Blue. SFS # GAZ 803 Stainless Decorative Fasteners Completed: September 2003 Architect: Sherman Gabus, Long Beach, CA General Contractor: Turelk Construction, Long Beach, CA Installer: Centex Glazing, El Cajon, CA Bank & Office Bldg, Interior Lobby and Exterior Entry Location: 1666 N. Main St., Santa Ana Description: 1,100 sf interior & 900 sf exterior Meteon Metallic Amber #06.4.1 ST Concealed Fasteners TS-210 & TS-2000 Completed: July 2007 Water Barrier: W.R. Grace Ice & Water Shield Architect: Sautter Architecture, Claremont Designer: Fluri Design, Studio City G.C.: Richardson Group, Santa Ana Installer: Tahiti Cabinets, Anaheim

Orange County Meteon® Installations, page 2

Whole Foods Market, Canopies at Entry Location: 7881 Edinger Ave, Huntington Beach, CA 92647

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 6 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 300 SQ.FT Meteon 5/16” NW16 Milano Terra Completed: October 2010 Water Barrier: none needed for canopy Architect: D.L. English Design G.C.: Savant Construction Installer: McCoy Construction

Pacific City Discovery Center Sales Office and Canopy (Across street and just south of Huntington Beach Pier) Location: 120 Pacific Coast Highway, Huntington Beach, CA Description: 1,880 sq.ft. cladding / 260 sq.ft. canopy 5/16” Meteon White (A03.0.0/ST) Exposed Fasteners TM-100 Screws powder-coated to match panels Channels and joint closures powder-coated Aquamarine Completed: November 2003 Architect: DMJM/H+N, Orange, CA General Contractor: Snyder Langston, Irvine, CA Installer: Custom Metal Fabricators, Orange, CA

Collier Residence Location: 5216 River Ave. Newport Beach, CA 92626 Description: 2,100 sq.ft. Meteon Aquamarine (A28.2.1) & Spring Green (A37.2.3 ST) Exposed Fasteners Water Barrier: WallShield by VaproShield Completed: Fall, 2006 Architect: Bruce Bolander Architects, Malibu G.C. / Installer: J.T. Builders, Newport Beach

Los Angeles – West Side Meteon® Installations West Los Angeles Community College, Science & Math Building (2 bldgs, 5 stories) Location: 9000 Overland Ave, Culver City, CA 90404 Description: 42,035 sq.ft. exterior façade Meteon Rusty Red (A08.4.5/ST) Meteon Aluminum Grey Metallic (M51.0.1/ST) Exposed Fixing TS-110 Water Barrier: WallShield by VaproShield Completed: Spring, 2009 Design Architect: HOK, Culver City, CA Arch of Record: CWA, Burbank G.C.: Sinanian Development, Tarzana, CA Installer: McCoy Construction Services, Colton, CA

Ocean Avenue. Travelodge Location: 1515 Ocean Avenue, Santa Monica, CA 90401 Description: 18,082 sq. ft. Exterior façade Exposed Fixing TS-110 Meteon NW08 Italian Walnut Water Barrier: WallShield by VaproShield Completed: Spring, 2011 Architect: Gensler, Santa Monica *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 7 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

G.C.: Morley Construction Installer: Van Nuys Sheet Metal

L.A. Harbor College Library and Resource Learning Center Location: 1111 Figueroa Place, Wilmington, CA 90744 Description: 16,000 sq.ft. exterior façade & 11,000 sq. ft. Interior Meteon NW10 English Cherry & Meteon NW07 Montreaux Sunglow Exposed Fixing TS-110 Water Barrier: WallShield by VaproShield Completed: Summer 2011 Design Architect: DLR/W.W.C.O.T. Santa Monica, CA G.C.: Edge Development Installer: Custom Metal Fabricators, Orange, CA

Airport Marina Bldg #1-Corbus Video Bldg Reclad and Bldg #2 Bldg #1 - 12959 Coral Tree Pl., Marina del Rey, CA (near corner of Alla) Bldg #2 - 5340 Alla, Marina del Rey, CA (at the corner of Coral Tree Pl.) Location: Marina del Rey, CA Description: 5,000 sq.ft. Bldg #1 & 8,500 sq.ft. Bldg #2 ½” Meteon Metallic Satin Azurite Blue (M21.3.4/ST) Exposed Fixing TM-101 Reclad over existing redwood siding and concrete tilt-up Completed: Bldg #1 – July 2000 - Bldg #2 – March 2001 Architect: Gensler Associates, Santa Monica, CA General Contractor: Matt Construction, Santa Fe Springs, CA Installer: Interstate Glass, El Cajon, CA

Los Angeles – West Side Meteon® Installations (cont.) Cloverfield Service Center (Homeless Shelter) Location: Corner of 26th & Michigan St, Santa Monica (one block north of 10 fwy) Santa Monica Description: 3,809 sq.ft. Meteon Wood Grain Montreux Amber #NW-06/ST Water Barrier: WallShield by VaproShield Completion: Spring 2006 Architect: Killefer Flammang Arch, Santa Monica, CA General Contractor: Mackone Development, Culver City, CA Installer: Custom Metal Fabricators, Orange, CA

JCB Music Studio Location: 2800 1630 Euclid St. Santa Monica, CA 90404 Description: 1,700 sq.ft. exterior façade NW-09 Wenge wood grain, Exposed Fixing TS-110 6,300 sq.ft. of interior wall (3/8”) & ceiling panels (1/4”) #NW-04 Pacific Board& NW-09 Wenge 1,600 sq.ft. of casework, tops & cabinet doors #A25.8.1 Anthracite Grey & #A05.0.0 Pure White, Gloss Finish Water Barrier: WallShield by VaproShield Completed: December, 2006 Architect: Studio 440, Hollywood, CA G.C.: Race Point Construction, Studio City, CA Wall Panel Installer: McCoy Construction Services, Colton, CA Casework Installer: SMI Cabinets, Santa Ana, CA

Condo’s at Superior & Venice Blvds Location: 1107 Venice Boulevard, Venice, CA Description: 6,800 sq.ft. Exposed Fixing TS-110 3/8” Meteon Elegant Oak NW-02 *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 8 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Water Barrier: WallShield by VaproShield Completed: Spring 2009 Architect: Kanner Architects, Santa Monica G.C.: Advanced Building Group Installer: Tinco Sheet Metal, Los Angeles, CA

Magnolia Hi-Fi Stores Location: 2800 Wilshire Blvd, Santa Monica, Ca 90404 Description: 570 sq.ft. Exposed Fixing TM-101 At entry off parking lot, and small facades on 2 corners on Wilshire 3/8” Meteon Metallic Satin Copper Yellow (M53.0.2/ST) Reclad over existing redwood siding and concrete tilt-up Completed: September 2003 Architect: Callison Architects Installer: B.T. Mancini, Milpitas, CA

Office Remodel Location: 3611 Motor Ave., Los Angeles, CA 90036 Description: 1,000 sq.ft. Exposed Fixing TS-101 At entry off parking lot, and entry off Motor Ave, and interior area in courtyard 5/16” Meteon NW-04 Pacific Board Reclad over existing stucco Water Barrier: WallShield by VaproShield Completed: February 2011 Architect: Dvoretzky Bardovi Bunnell Architects Installer: R.B. Olson, Redlands, CA

Los Angeles – West Side Meteon® Installations (cont.) Geek Squad Stores Location: 2800 Wilshire Blvd, Santa Monica, Ca 90404 Description: 500 sq.ft. Exposed Fixing TM-101 At entry off parking lot 3/8” Meteon Custom Color Orange, Satin Reclad over existing stucco siding Completed: October 2005 Architect: Callison Architects G.C. / Installer: Boyd Inc., El Segundo, CA

Marina Tae Kwon Do Martial Arts Studio Location: 13203 W. Washington Blvd., Culver City, CA Description: 500 sq.ft. Exposed Fixing TS-110 3/8” Meteon Metallic Aluminum Grey Rock (M51.0.1/RT) Completed: Summer 2006 Architect: Twichell Studio, Culver City G.C. / Installer: Roger Wilson Construction, Marina Del Rey, CA

Kelly Residence Location: 660 Tiger Tail Road, Brentwood, CA Description: 4,218 sq.ft. Exposed Fixing TS-110 Meteon Wood Grain Satin Wenge (#NW-09) Completed: May, 2006 Water Barrier: WallShield by VaproShield Architect: Abramson Teiger Architects, Culver City G.C. / Installer: 44 West Construction, Topanga, CA

Bennett Residence Location: 1156 Napoli St, LA, CA 90272 (Pacific Palisades) *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 9 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 1,500 sq.ft. Exposed Fixing TS-110 Meteon Italian Walnut (NW-08 ST) Completed: Fall 2006 Water Barrier: WallShield by VaproShield Architect: Abramson Teiger, Culver City, CA G.C. / Installer: AJ Engineering & Construction, Tarzana

Gillis Residence Location: 710 N. Arden Drive, Beverly Hills, Ca 90212 Description: 3,400 sq. ft. Exposed Fastening Aluminum Gray Metallic M51.0.1 Used as Mechanical Screen over Cinderblock Wall Completed: Summer ‘07 Water Barrier None specified over block wall Architect: Ed Niles G.C / Installer: B.S.I. Construction Fabricator: SSC

Los Angeles – West Side Meteon® Installations (cont.) Lushing Residence Location: 850 Linda Flora Dr, Los Angeles, CA Description: 2,000 sq.ft. Exposed Fixing TS-110 NW-08 Italian Walnut Water Barrier: WallShield by VaproShield Completed: Spring 2009 Architects: Kovac Architects, Los Angeles, CA G.C.: BalCorp Construction, Los Angeles, CA Installer: McCoy Construction Services, Colton Shapiro Residence Location: 6000 Philip Ave, Malibu, CA Description: 9,125 sq.ft. Exposed Fixing TS-112 with stainless trim insert between panels Meteon Spring Green #A37.2.3 ST & Aluminum Grey Metallic #M51.0.1 ST Completed: July, 2007 Water Barrier: WallShield by VaproShield Architect: Levitt & Moss, Santa Monica G.C.: Leishman Construction, Los Angeles Installer: McCoy Construction Services, Colton Aret Kociglu Residence Location: 3833 Paseo Hidalgo Road, Malibu, CA Description: 150 sq.ft. Exposed Fixing TS-110 Meteon Deep Red Brown Satin (A14.7.2/ST) Façade cladding around entry Completed: Spring, 2006 Water Barrier: WallShield by VaproShield Architect: Tact Design, Malibu G.C. / Installer: Deck Doctor, Malibu Goodman Residence Location: 645 East Milwood Ave, Venice, CA 90291-3862 Description: 1,786 sq.ft. Exposed Fixing TS-110 Meteon Mustard Yellow (#M40.4.3 ST) Completed: Summer, 2009 Water Barrier: WallShield by VaproShield Architect: Abramson Teiger, Culver City G.C.: John Oliver Construction *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 10 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Installer: McCoy Construction Services, Redlands Seehoff Residence Location: 3701 Dellvale Place, Encino, CA 91434 Description: 856 sq. ft. Exposed Fixing TS-110 Meteon NW-05 Loft Brown Completed: December 2010 Water Barrier: WallShield by VaproShield Architect: Abramson Teiger, Culver City G.C.: A&J Engineering Installer: A&J Engineering Big Blue Bus Maintenance Facility Location: 1620 6th Street - Santa Monica, CA 90401 Description: 2,500 sq.ft. Site Wall / Privacy Wall in Curtain Wall Frame Meteon Aluminum Grey Metallic (#M51.0.1 ST) Completed: Summer, 2009 Architect: H.O.K., Culver City G.C.: Morley Construction Installer: Steel City, Costa Mesa

Hollywood Meteon® Installations “The Hollywood” Condo’s (54 units) Location: 6750 Yucca Blvd, Hollywood, 1 block east of Highland / 1 block north of Hollywood Blvd Description: 8,580 sq.ft. - Exposed Fixing TS-110 1/2” Meteon Italian Walnut #NW-08 Water Barrier: Double layer, WallShield by VaproShield Completed: November, 2007 Architect: Kanner Architects, Santa Monica G.C.: Hy-Max Construction, Newhall Installer: McCoy Construction Services, Colton CA Best Western, Hollywood Location: 6141 Franklin Avenue Description: 1,000 sq. ft., TS-110 Exposed Fixing Meteon Black A90.0.0 – Perforated Sun Shades Water Barrier: none needed for awnings Completed: March, 2011 Architect: Koning Eizenberg Architects, Santa Monica G.C.: City Constructors Installer: McCoy Construction Services, Colton CA Musician’s Institute, Campus Hollywood Location: Hollywood Blvd., Hollywood, CA @ McCadden Place 1 block east of Highland Description: 1,200 sq.ft. - Exposed Fixing TS-110 3/8” Meteon Metallic Aluminum Gray Satin (M51.0.1/ST) Water Barrier: WallShield by VaproShield Completed: November, 2006 Architect: Twichell Studio, Culver City, CA G.C.: Essex Construction, Torrance, CA Installer: McCoy Construction Services, Colton CA Java Detour Location: 8900 Santa Monica Blvd, West Hollywood Description: 1,500 sq.ft. Exposed Fixing TS-110 5/16” Meteon Wood Grain Satin Wenge (NW-09/ST) Water Barrier: WallShield by VaproShield Completed: November, 2007 Architect: Little Diversified, Costa Mesa, CA Installer: McCoy Construction Services, Colton Shoreham Villas Location: 8788 Shoreham Dr, West Hollywood, CA 90061 *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 11 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Description: 8,210 sq.ft. - Exposed Fixing TS-110 5/16” Meteon Wood Grain Satin Pacific Board (NW-04/ST) Completed: Summer 2006 Water Barrier: WallShield by VaproShield Architect: Design X, Hollywood, CA G.C. / Installer: CalCon Construction, Los Angeles, CA Cahuenga Universal Apartments Location: 3408 Cahuenga Blvd, Los Angeles (Corner of Universal Studios Blvd & Cahuenga Blvd) Description: 2,400 sq.ft. – Balcony Railing Panels Meteon Stone Beige #A05.1.1 / ST) Water Barrier: none needed for balcony panels Completed: Summer 2007 Architect: Nadel Architects, Santa Monica, CA G.C.: American Constructors, Huntington Beach, CA Installer: S.S.C., Newbury Park, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 12 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Downtown L.A. Area Meteon® Installations LA USD ES #6, South Region (3 Buildings) Location: 123 West 59th Street, Los Angeles, CA Description: 11,929 sq.ft. Meteon Gold Yellow A 04.1.7 ST, Graphite Grey M21.8.1 ST Completed: March 2011 Water Barrier: WallShield by VaproShield Architect: Dougherty & Dougherty, Costa Mesa, CA G.C. Suffolk Education Contractor Installer: Action Sheet Metal, Los Angeles, CA

LA USD ES #10, South Region Location: Los Angeles, CA Description: 5,000 sq.ft. Meteon Metallic Azurite Blue Completed: Summer 2011 Water Barrier: WallShield by VaproShield Architect: Dougherty & Dougherty, Costa Mesa, CA G.C. Tai-Sai Construction, Cypress, CA Installer: Aragon Sheet Metal, Pomona, CA

East LA Community College E3/E5 Replacement Building Location: 1301 Avenida Ceasar Chavez, Monterey Park, CA Description: 5,000 sq.ft. English Red #A 11.4.4, Stone Beige #A 05.1.1 Completed: Summer 2010 Water Barrier: WallShield by VaproShield Architect: W.W.C.O.T., Los Angeles, CA G.C. Diffenbaugh GC Installer: Aragon Sheet Metal, Pomona, CA

GRATTS EEC Primary Elementary School Location: 474 S. Hartford Street, Los Angeles, CA (West of Harbor Freeway, near Fifth Street) Description: 1,100 sq.ft. Dark Blue A20.7.2 Deep Red Brown A14.7.2 Moss Green A40.5.1 Ochre A06.3.5 Water Barrier: None needed for decorative screen wall Completed: Fall 2010 Architect: Jubany NAC Architecture G.C. Summit Builders Installer: Performance Contracting Group, Anaheim, CA

Fred Roberts Recreation Center Gym Location: 4700 S. Honduras Avenue, Los Angeles, CA 90011 Description: 2,900 sq. ft. Mustard Yellow M40.4.3 Water Barrier: WallShield by VaproShield Completed: September 2010 Architect: City of Los Angeles Architecture, Bureau of Engineering G.C. A.W.I. Builders Installer: Tinco Sheet Metal, East Los Angeles, CA

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 13 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Gilbert Lindsey Rec. Center Location: 429 E. 42nd Place, So. Los Angeles, CA Description: 1,886 sq.ft. M 53.0.2 Trespa Meteon Copper Yellow Metallic. Completed: Spring 2009 Water Barrier: WallShield by VaproShield Architect: City of Los Angeles, Los Angeles, CA G.C. Los Angeles Engineering Installer: McCoy Construction Services, Redlands, CA Lamp Village (from the Movie “The Soloist”) Location: 526 S. San Pedro St, Los Angeles, CA (across Street from Union Rescue Mission) Description: 1,200 sq.ft. - Gold Yellow # A 04.1.7 ST Completed: December 2009 Water Barrier: WallShield by VaproShield Architect: Killefer Flammang, Santa Monica, CA G.C. Dreyfuss Construction Installer: Allied Sheet Metal, Pomona, CA Charles R. Drew / MLK University, Research & Nursing Education Building Location: 1748 E. 118th St, Los Angeles, CA Description: 4,600 sq.ft. Garnet Red # M12.4.2/ST on exterior / White A03.0.0 ST on interior Spandrel Panels in Curtain Wall System Completed: December 2009 Water Barrier: none needed Architect: HOK, Culver City, CA G.C. GKK Works, Pasadena Installer: Romanowski Glass, CA Lexington Avenue School (F.K.A. Marshall Primary School) (1 blk. No. of Santa Monica Blvd, 2 blks. E of Vermont, 1 blk. W of Virgil, corner of Westmoreland) Location: 4564 Lexington Ave., Los Angeles, CA Description: 2,220 sq.ft. Meteon Satin Pale Yellow (#A04.0.2/ST) Stair & Balcony Rail in-Fill Panels, 3/8” thick double sided color Completion: Spring 2006 Architect: Studio Works, Los Angeles General Contractor:Woodcliff Construction, Los Angeles, CA Installer: C & H Chan Yaffe Residence Location: 1925 Avon Street, Echo Park, CA Description: 500 sq.ft. - Exposed Fixing TM-101, including channels and fasteners. ½” & 1/4” Meteon Uni-Color Black Satin (A90.0.0/ST) Completed: Summer 2003 Architect: Central Office of Architects, Los Angeles, CA G.C. / Installer: Roman Janczak Construction, Studio City

Roquebrune Residence Location: 4800 Nob Hill Drive, Los Angeles, CA 90065 Description: 1,500 sq.ft. 5/16” Meteon, Wood Grain, Satin finish (NW09 Wenge) Water Barrier: WallShield by VaproShield Completed: November, 2007 Architect: DE Architects, Santa Monica, CA G.C. / Installer: R2 Studio, Los Angeles, CA

Long Beach & South Bay Meteon® Installations GXK Properties

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 14 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Location: 1706 W. 130th Street, Gardena, Ca Description: 1,004 sq.ft. Meteon Various Colors Exposed Fasteners, painted to match Water Barrier: WallShield by VaproShield Completion: Spring 2008 Architect: Miyoshi Morioka General Contractor: Pacific National Group Installer: McCoy Construction Services, Colton, Ca Los Angeles Fire Station #36 Location: 1005 N. Gaffey St., San Pedro, CA Description: 2,945 sq.ft. Meteon Garnet Red #M12.4.2/ST Exposed Fasteners, painted to match Water Barrier: WallShield by VaproShield Completion: Spring 2007 Architect: Killefer Flammang Arch, Santa Monica, CA General Contractor: Royal Construction, Arcadia, CA Installer: Weiss Sheet Metal, Los Angeles, CA

Miller Children’s Hospital, Memorial Hospital Group Location: 2801 Atlantic Av., Long Beach, Ca 90806 Description: 2,000 sq.ft. approx. Meteon Lagoon #J24.3.3 (Meteon custom color from Virtuon) Exposed Fasteners, Parapet, Elevator Cabs, and Handrail infill Panels. Water Barrier: WallShield by VaproShield Completion: Spring 2009 Architect: Taylor & Associates, Arch, Newport Beach, Ca General Contractor: Turner Construction, Anaheim, CA Elevator Cab Dlr: Travertine Elevators Interiors VaproShield Installer:Best Waterproofing (Best Contracting Svc.), Gardena, Ca. Trespa Installer: Carmel Architectural Sales, Anaheim, CA

San Fernando Valley Meteon® Installations Florentine Condo’s Location: 5440 N Tujunga, North Hollywood (Between Cumpton and West of Lankershim) Description: 1,300 sq.ft. Meteon Montreux Amber NW-06 ST , In Lobby Area Water Barrier: WallShield by VaproShield Completed: September 2007 Architect: DE Architects, Santa Monica G.C.: JSM Companies, North Hollywood Installer: McCoy Construction Services, Colton

Magnolia Hi-Fi Stores Location: 21603 Victory Blvd, Canoga Park, CA 818-346-1703 (west of Canoga Ave.) Description: 1,248 sq.ft. 3/8” Meteon Metallic Satin Copper Yellow (M53.0.2/ST) Exposed Fixing TM-101 Reclad over existing siding and concrete tilt-up Completed: September 2003 Architect: Callison Architects Installer: B.T. Mancini, Milpitas, CA

Target Store / Westfield Location: 6600 Topanga Canyon Blvd, Topanga, CA Description: 1,455 sq.ft. 1/2” Meteon Carmine Red Satin (A12.3.7/ST) Concealed Fixing TM-210 Water Barrier: none needed as this was installed on the interior of the Mall Completed: Summer 2006 *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 15 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Westfield Shopping Centers G.C.: Whiting Turner, Irvine Installer: G.E.S. Sheet Metal, Pomona, CA

Santa Clarita Community Center / Train Station Location: 22421 Market Street, Santa Clarita Description: 750 sq.ft. Meteon Garnet Red #M12.4.2/ST Exposed Fasteners, painted to match Water Barrier: WallShield by VaproShield Completed: October 2005 Architect: R.R.M. Design Group, San Luis Obispo General Contractor: S.J. Amaroso, Orange County, CA Installer: Custom Metal Fabricators, Orange, CA

LAVC Robert Hertzberg Library Los Angeles Valley College Location: 5800 Fulton Ave, Van Nuys, CA Description: 16,500 sq.ft. Meteon (4 Colors) Mahogany Red #A09.6.4 / Dark Brown #A08.8.1 / Silver Grey # A03.4.0. / Mid Grey # A21.5.1. Exposed Fasteners, painted to match Water Barrier: WrapShield by VaproShield Completed: Summer 2011 Architect: Pfeiffer Partners, Los Angeles, CA General Contractor: Diffenbaugh General Contractors, CA Installer: F. Rodgers, CA

Ventura County Meteon® Installations Calabasas Business Park Location: 23801 Calabasas Rd, Calabasas, CA 91302 Description: 2,100 sq.ft. - Concealed Fasteners TS-210-134 Meteon #NW-03 Harmony Oak Water Barrier: WallShield by VaproShield Completed: December 2009 Architect: Harley Ellis Devereaux Architects Installer: Seeley Brothers, Brea, CA

Ventura Co Community College Dist. – Fire & Sheriff Training Academy (VCCCD) Location: 103 Durley Ave, Camarillo, CA 93010 Description: 10,600 sq.ft. - Exposed Fixing TS-110 3/8” Meteon Copper Red M53.0.1 Mustard Yellow M40.4.3 Water Barrier: WallShield by VaproShield Completed: Spring 2010 Architect: Carrier Johnson Architects G.C.: S.M.C. Construction Installer: Engineered Metal Systems

Lima Residence Location: 1055 Cold Canyon Road, Calabasas, Ca 91302 Description: 2,100 sq.ft. - Interior and Exterior - Exposed Fixing TS-110 5/16” Meteon #NW-08 Italian Walnut Water Barrier: WallShield by VaproShield Completed: Spring 2008

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 16 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Abramson Teiger Architects G.C.: A&J Engineering Installer: I.V. Construction

San Gabriel Valley Meteon® Installations Cinema Lofts, 30 Condo’s Location: 215 S. Marengo, Pasadena, CA @ Cordova, 1 block east of Arroyo Description: 9,800 sq.ft. - Exposed Fixing TS-110 5/16” Meteon #NW-06 Montreux Amber Water Barrier: WallShield by VaproShield Completed: August 2007 Architect: DE Architects, Santa Monica G.C.: Dalah Construction, Santa Monica Installer: McCoy Construction Services, Colton CA

Hudson Terrace Condos Location: 257 S. Hudson, Pasadena Water Barrier: WallShield by VaproShield Description: 8,800 sq.ft. Meteon NW-09 WENGE Exposed Fasteners, painted to match Completion: Spring 2009 General Contractor: Ballian Construction Installer: McCoy Construction Services, Colton, CA

San Gabriel Valley Meteon® Installations, page 2 Azusa Pacific University, Science Building Location: (Old Azusa Drive In Theater) Corner of Rockvale Ave & Foothill, Azusa, CA Description: 5,200 sq.ft. Meteon NW-08 Italian Walnut TS-110 Exposed Fasteners, painted to match for ceilings TS-210 Concealed Fasteners for walls Underlayment: Henry Air-Block 33 Completion: Spring 2009 Architect: AC Martin Partners, Los Angeles General Contractor: C.W. Driver Installer: Custom Metal Fabricators, Orange, CA

Puente Hills Mall & Panera Bread Location: 17427 Colima Road, Rowland Heights, CA 91748-1612 Description: 2,500 sq.ft. Meteon NW-04 Pacific Board Meteon Moss Green #A-40.5.1 ST TS-110 Exposed Fasteners, painted to match panels TS-130 for Stand-off panels for Panera Bread Water Barrier: WallShield by VaproShield Completion: Summer 2009 Architect: Perkowitz & Ruth, Long Beach General Contractor: 2H Construction

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 17 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Installer: McCoy Construction Services, Redlands, CA

Clifton Middle School, Monrovia Unified School District, Phases 1 & 2 3 Buildings with Rooftop Mechanical Screens on Canyon Ave. West of Myrtle Ave., South of Foothill Blvd Location: 226 S. Ivy Ave., Monrovia, CA Description: 1,300 sq.ft., Phase 1 Exposed Fasteners, attached to steel stud frame 1,000 sq.ft., Phase 2 3/8” Meteon Iron Grey Satin (A25.7.1/ST) Water Barrier: none needed for mechanical screens Completed: September 2003 & June 2004 Architect: Osborn Architects, Glendale, CA G.C. / Installer: Phase 1: Neil Edwards Construction, Monrovia, CA Phase 2: Harik Construction, Covina, CA.

Transportable Modular Ambulatory Care Center (TMACC) American Bio-Medical Services Corp., contact: Yale Misrahi 909-599-5800. Mobile Medical Clinic for quick response in emergencies. Location: San Dimas, CA Description: 1,170 sq.ft. Exposed Fixing Stainless screws with ½” stainless spacer. 5/16” Meteon Metallic Graphite Grey Rock (M21.8.1/RT) 5/16” Meteon Uni-Color Carmine Red Satin (A12.3.7/ST) Water Barrier: WallShield by VaproShield Completed: October 2003 Architect (In-House): American Bio-Medical, San Dimas, CA G.C. / Installer: Profile Structures, Santa Fe Springs CA

Inland Empire Meteon® Installations Upland Christian High School (Now Western Christian HS) Location: 85 N. Euclid Avenue, Upland, CA 91786 (corner of Euclid & A Street) Description: 11,000 sq.ft. Exposed Fasteners, painted to match Meteon Satin, Silver Grey (A03.4.0/ST), Winter Grey (A21.1.0/ST), Lavender Blue (A20.5.2/ST) Water Barrier: WallShield by VaproShield Completed: April 2006 Architect: Williams / Chaio Architects, Upland, CA - Bonney Architects, Redlands, CA General Contractor: KBI General Contractors, Tustin, CA Installer: All Seasons Framing, Anaheim, CA

Unical Aviation Location: 680 S. Lemon Avenue, City of Industry, CA 91789 Description: 7,100 sq. ft. TS-210 Concealed Fasteners Meteon #M21.8.1 Graphite Grey Water Barrier: WrapShield by VaproShield Completion: July 2010 Architect: Withee Malcom Architects, Torrance, CA General Contractor: Oltmans Construction Installer: Emerald Metal Products, Signal Hill, CA

Indio Corporate Yard Location: 83-101 Avenue Forty Five, Indio, CA Description: 4,000 sq.ft. TS-110 Exposed Fasteners Meteon #M51.0.2 Urban Grey Metallic Rock Water Barrier: WallShield by VaproShield Completion: November 2009 Architect: Pitassi Architects, Rancho Cucamonga, CA General Contractor: Edge Development, Temecula Installer: Progressive Roofing Services, San Diego

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 18 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Jurupa Hills High School (Fontana High #5 ) Location: 10697 Oleander Ave, Fontana, California 92337, CA Description: 4,600 sq.ft. TS-110 Exposed Fasteners Meteon White #A03.0 Gold Yellow #A04.1.7 Amethyst #M18.7.2 Water Barrier: WallShield by VaproShield Completion: January 2010 Architect: WLC Architects (Wolf, Lang, Christopher), Rancho Cucamonga, CA General Contractor: Inland Building Company, San Bernardino Installer: McCoy Construction Services, Redlands, CA

Temecula City Yard - Maintenance Facility & Corp Yard Location: City of Temecula, Maintenance Facility & Corp Yard, Temecula, CA Description: 4,900 sq.ft. Meteon Pastel Grey (A 03.1.0) & Salmon (A 08.2.3) Water Barrier: WallShield by VaproShield Completion: Summer 2007 Architect: Platt / Whitelaw, San Diego, CA General Contractor: Tovey Shulz Construction, Lake Elsinore Installer: Shultz/Gephart Construction, Poway

Palm Springs Airport Outdoor Café Location: 3400 E. Tahquitz Canyon Way, Palm Springs, CA Description: 500 sq.ft. TS-110 Exposed Fasteners Meteon #NW10 English Cherry Water Barrier: WallShield by VaproShield Completion: February 2009 Architect: Gensler, Santa Monica , CA General Contractor: Harbor Construction Installer: Atlas Sheet Metal, Irvine

Mid-California Meteon® Installations University of California, Santa Barbara, Life Sciences Bldg. Location: UCEN Rd, west of Lagoon Rd., on east side of Lot 7 Santa Barbara, CA Description: 8,000 sq.ft. 5/16” Meteon Metallic Satin Azurite Blue (M21.3.4/ST) Exposed Fasteners TM-100 with stainless steel spacers Water Barrier: Ice and Water Shield by W.R. Grace Completed: October 2004 Architect: N.B.B.J. Architecture, San Francisco G.C.: Soltek Pacific, San Diego Installer: B.T. Mancini, Milpitas, CA

California State Polytechnic University (Cal Poly) San Luis Obispo Solar Decathlon Project Location: Architecture Department, San Luis Obispo, CA Description: 1,000 sq.ft. 3/8” Meteon Wine Red Satin (#A12.6.3/ST) & Iron Grey (#A25.7.1/ST) Exposed Fasteners TS-110 with powder coated fasteners Water Barrier: WallShield by VaproShield Completed: August 2005 *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 19 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Architect: Cal Poly Architectural Department, San Luis Obispo G.C.: Maino Construction, San Luis Obispo Installer: Cal Poly Architecture Students, San Luis Obispo

Car Quest Headquarters Location: 7th Standard Rd @ Highway 65, off Hwy 99, Bakersfield, CA Description: 800 sq.ft. Concealed Fixing TM-200 3/8” Meteon Satin Metallic Azurite Blue (M21.3.1/ST) Water barrier: 5/8” dens-glass and steel studs Completed: September 2001 Architects: K.S.A. Architects, Bakersfield, CA General Contractor: Colombo Construction, Bakersfield, CA Installer: Bakersfield Glass, Bakersfield, CA

Greater Bakersfield Convention & Visitors Bureau Location: 515 Truxton Ave @ “T” Street, 93301, CA Description: 2,400 sq.ft. 5/16” Meteon Metallic Graphite Grey Rock (M21.8.1/RT) Exposed Fixing TM-100, Screws powder-coated to match panels Water Barrier: WallShield by VaproShield Completed: December 2003 Architects: Ordiz Melby Architects, Bakersfield, CA General Contractor: Wallace & Smith Construction, Bakersfield, CA Installer: Air Kool Mechanical Contractors, Bakersfield, CA

Wal-Mart Super Store #5134, Bakersfield Southwest Location: 5075 Gosford Street, 93301, CA Description: 1,000 sq.ft. Meteon Dark Brown #A08.8.1 ST Meteon Custom Metallics “Center” #PM08092 ST Exposed Fixing TM-100, Water Barrier: WallShield by VaproShield Completed: December 2009 Architects: Perkowitz & Ruth, Long Beach, CA General Contractor: Grant General Construction, Bakersfield, CA Installer: Empire Sheet Metal, Ontario, CA

Wal-Mart Super Store #1624, Bakersfield Location: 2601 Fashion Place, Bakersfield, CA 93306 Description: 5,124 sq. ft. Meteon Dark Brown #A08.8.1 ST Meteon Custom Metallics “Center” #PM08092 ST Exposed Fixing TM-100, Water Barrier: WallShield by VaproShield Completed: January 2011 Architects: Perkowitz & Ruth, Long Beach, CA General Contractor: Installer: M.G. McGrath, Inc.

Palmdale Corporate Center Location: 39115 & 39125 Trade Center Drive Description: 5,000 sq.ft. 3/8” Meteon NW-04 Pacific Board Exposed Fixing TM-100, Screws powder-coated to match panels *Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 20 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Water Barrier: WallShield by VaproShield Completed: Summer 2008 Architects: Ware Malcomb, Irvine, CA General Contractor: Oltmans Construction Installer: Aluma Wall, San Jose, CA

Northern California Meteon® Installations West Placer Middle School Spandrel Panels Location: Sacramento, CA Description: 10,000 sq.ft. Meteon Alum Grey and Pastel Grey satin A03.1.0 TJF Spandrel Panels Completed: October 2008 Architect: Perkins & Will, Los Angeles Installer: Rose Glass & Aluminum, Manteca, CA

Edenvale Community Center & Gym Location: Community Park, San Jose, CA Description: 10,000 sq.ft. Meteon NW-14 French Walnut - Facade 5,000 sq.ft. Meteon NW-12 Natural Bagenda (Interior Walls) Completed: December 2009 Architect: Carrier Johnson, SD Installer: Air Systems Inc.

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 21 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007

Notable Meteon® Projects in Other Areas Oregon State University – Reser Football Statdium Location: Corvallis, Oregon Description: 34,284 sq.ft. Meteon Satin White (A 0.3.0.0/ST) for Facade Silver Grey (A 03.4.0/ST) for escalator Virtuon Graphite Grey Metallic (J 21.8.1) for loge box dividers Exposed and Concealed Fasteners Completed: August, 2005 Architect: H.N.T.B. Sports, Los Angeles General Contractor: Hunt-Wildish Construction Installer: Crown Corr

Invesco Stadium-Denver Bronco Stadium Location: Denver, CO Description: 14,000 sq.ft. ½” Meteon Satin Iron Grey (A25.7.1/ST) ½” Meteon Satin Silver Grey (A034.0/ST) Exposed Fixing TM-100, Screening System Completed: July 2001 Architect: HNTB Sports Architecture & Fentress Bradburn Architects, Ltd., Denver, CO General Contractor: Turner/Empire/Alvarado Bronco Stadium Team Installer: Pect Metals

UNLV Student Union Location: 4673 South Maryland Parkway, Las Vegas, NV 89154 Description: 25,620 sq.ft. Exposed Fixing SS Fasteners Satin Aluminum Grey (M51.0.1/ST) Water Barrier: WrapShield by VaproShield Completed: September 2006 Architect: Tate Snyder Kimsey Architects General Contractor: Penta Building Group, Las Vegas, NV Installer: Mollerup Glass, Salt Lake City, UT

Westfield Shopping Center Location: Franklin Park, OHIO Description: 14,000 sq.ft. 1/2” Meteon Metallic Copper Red Satin (M53.0.1/ST) Exposed Fixing TM-110 Completed: Summer 2005 Architect: Westfield Corporation, Los Angeles G.C.: Westfield Construction Management Installer: Harmon Inc., Ohio

*Pricing is a result of variations in system type, project size, standard color, surface texture, panel yield, design accessories and joint options. Page 22 of 22 Updated 3/11/2011 W. H. STEELE CO. PROUDLY CELEBRATING OVER 100 YEARS OF SERVICE-1907-2007