Joint Application

Total Page:16

File Type:pdf, Size:1020Kb

Joint Application Joint Application Piermont Marsh Pilot Shoreline Stabilization Project Rockland County May 2021 Applicant: NYSDEC – Hudson River National Estuarine Research Reserve Attn: Heather Gierloff P.O. Box 315 Staatsburg, NY 12580 Joint Application Piermont Marsh Pilot Shoreline Stabilization Project Table of Contents Joint Application Form Attachments: 1. Project Description and Purpose 2. Location Map 3. Site Photos 4. Project Plans 5. 401 Water Quality Certification – Supplement WQC-1 6. 401 Water Quality Certification – Pre-Filing Meeting Request 7. SEQR – Short Environmental Assessment Form 8. SHPA – Structural Archaeological Assessment Form 9. NYS DOS – Federal Consistency Assessment Form 10. Supplemental Compensatory Mitigation Plan for a Pilot Project to Evaluate Erosion Prevention Techniques at Piermont Marsh Orangetown, NY May 2021 JOINT APPLICATION FORM For Permits for activities activities affecting streams, waterways, waterbodies, wetlands, coastal areas, sources of water, and endangered and threatened species. You must separately apply for and obtain Permits from each involved agency before starting work. Please read all instructions. 1. Applications To: > NYS Department of Environmental Conservation Check here to confirm you sent this form to NYSDEC. Check all permits that apply: Dams and Impound- Tidal Wetlands Water Withdrawal Stream Disturbance ment Structures Wild, Scenic and Long Island Well Excavation and Fill in 401 Water Quality Recreational Rivers Incidental Take of Navigable Waters Certification Coastal Erosion Endangered / Docks, Moorings or Freshwater Wetlands Management Threatened Species Platforms >US Army Corps of Engineers Check here to confirm you sent this form to USACE. Check all permits that apply: Section 404 Clean Water Act Section 10 Rivers and Harbors Act Is the project Federally funded? Yes No If yes, name of Federal Agency: General Permit Type(s), if known: Preconstruction Notification: Yes No >NYS Office of General Services Check here to confirm you sent this form to NYSOGS. Check all permits that apply: State Owned Lands Under Water Utility Easement (pipelines, conduits, cables, etc.) Docks, Moorings or Platforms >NYS Department of State Check here to confirm you sent this form to NYSDOS. Check if this applies: Coastal Consistency Concurrence 2. Name of Applicant Taxpayer ID (if applicant is NOT an individual) Mailing Address Post Office / City State Zip Telephone Email Applicant Must be (check all that apply): Owner Operator Lessee 3. Name of Property Owner (if different than Applicant) Mailing Address Post Office / City State Zip Telephone Email For Agency Use Only Agency Application Number: JOINT APPLICATION FORM 04/20 Page 1 of 4 JOINT APPLICATION FORM – Continued. Submit this completed page as part of your Application. 4. Name of Contact / Agent Mailing Address Post Office / City State Zip Telephone Email 5. Project / Facility Name Property Tax Map Section / Block / Lot Number: Project Street Address, if applicable Post Office / City State Zip NY Provide directions and distances to roads, intersections, bridges and bodies of water Town Village City County Stream/Waterbody Name Project Location Coordinates: Enter Latitude and Longitude in degrees, minutes, seconds: Latitude: ° ' " Longitude: ° ' " 6. Project Description: Provide the following information about your project. Continue each response and provide any additional information on other pages. Attach plans on separate pages. a. Purpose of the proposed project: b. Description of current site conditions: c. Proposed site changes: d. Type of structures and fill materials to be installed, and quantity of materials to be used (e.g., square feet of coverage, cubic yards of fill material, structures below ordinary/mean high water, etc.): e. Area of excavation or dredging, volume of material to be removed, location of dredged material placement: f. Is tree cutting or clearing proposed? Yes If Yes, explain below. No Timing of the proposed cutting or clearing (month/year): Number of trees to be cut: Acreage of trees to be cleared: JOINT APPLICATION FORM 04/20 Page 2 of 4 JOINT APPLICATION FORM – Continued. Submit this completed page as part of your Application. g. Work methods and type of equipment to be used: h. Describe the planned sequence of activities: i. Pollution control methods and other actions proposed to mitigate environmental impacts: j. Erosion and silt control methods that will be used to prevent water quality impacts: k. Alternatives considered to avoid regulated areas. If no feasible alternatives exist, explain how the project will minimize impacts: l. Proposed use: Private Public Commercial m. Proposed Start Date: Estimated Completion Date: n. Has work begun on project? Yes If Yes, explain below. No o. Will project occupy Federal, State, or Municipal Land? Yes If Yes, explain below. No p. List any previous DEC, USACE, OGS or DOS Permit / Application numbers for activities at this location: q. Will this project require additional Federal, State, or Local authorizations, including zoning changes? Yes If Yes, list below. No JOINT APPLICATION FORM 04/20 Page 3 of 4 Joint Application Piermont Marsh Pilot Shoreline Stabilization Project Attachment 1 Project Description and Purpose Orangetown, NY May 2021 Joint Application Form Piermont Marsh Pilot Shoreline Stabilization Project Project Description and Purpose a. Purpose of the proposed project: The primary purpose of the proposed project is to stabilize a section of eroding shoreline at Piermont Marsh in order to protect the present and potential values of the tidal wetland. Undercutting, slumping, and calving have been observed along much of the marsh shoreline. A review of historical aerial imagery and maps indicates that the Piermont Marsh shoreline has eroded 0.5 – 1.5 ft per year over the past 75 years resulting in an overall loss of marsh area and native low marsh vegetation. As a pilot project, the shoreline stabilization has been designed to protect a priority section of shoreline and evaluate different treatments that could be utilized to stabilize other shoreline sites in Piermont Marsh or other areas of the Hudson River. b. Description of current site conditions: Piermont Marsh is located on the west bank of the Hudson River, downstream of the Governor Mario M. Cuomo Bridge (see attached Location Map). Piermont Pier is located at the marsh’s northern end. From the base of the pier at the mouth of Sparkill Creek, the marsh extends 1.5 miles downstream. Piermont Marsh occupies approximately 278 acres, and is the largest brackish tidal marsh in the Hudson River estuary, providing ecologically significant habitat that is uncommon in the region. Extensive shallows are located between the marsh and the Hudson River navigation channel to the east. Located between the Village of Piermont and the Hudson River, Piermont Marsh provides important ecosystem services, including protecting the Village of Piermont from waves and storm debris. Sparkill Creek runs through the northern portion of Piermont Marsh, and Crumkill Creek runs through the central area of the marsh. Piermont Marsh experiences semi-diurnal tides with an average tidal range of 3.2 ft. Mean higher high water (MHHW) is 2.13 ft NAVD88, mean high water (MHW) is 1.84 ft NAVD88, mean sea level (MSL) is 0.11 ft NAVD88, mean low water (MLW) is -1.77 ft NAVD88, and mean lower low water (MLLW) is -1.94 ft NAVD88. The marsh surface elevation is generally above MHHW, with elevations between 2 and 3 ft NAVD88, and flooding of the marsh occurs irregularly. Marsh flooding occurs during spring tides and episodic flood and storm surge events. The top soil layer of the marsh is peat, and the soil profile alternates between layers of peat and clay to a depth of at least 40 ft. The Hudson River is brackish at Piermont Marsh, with salinity ranging from 0 to 12 ppt. There is a relatively steep 1 to 2 ft decline in elevation from the marsh surface to the intertidal zone. The slope at the marsh edge is more gradual within inlets compared to more exposed shoreline. The elevation decreases from 0 to -1.5 ft NAVD88 within approximately 10 ft of the marsh edge. Offshore of the initial drop off, there is a wide, relatively flat area with a typical elevation of -1.5 ft NAVD88 and scattered depressions, near the edge of the drop off, where elevations are slightly lower at -1.75 ft NAVD88 (see attached Supplemental Compensatory Mitigation Plan for a Pilot Project to Evaluate Erosion Prevention Techniques at Piermont Marsh). The project site includes brackish tidal marsh and brackish intertidal mudflat communities. The vegetation along the marsh edge is dominated by common reed (Phragmites australis) with isolated remnant patches of native saltmarsh cordgrass (Spartina alterniflora) and three-square bulrush (Schoenoplectus pungens). Erosion has resulted in the loss of marsh vegetation and peat, undercutting and slumping of the shoreline, and exposure of rhizome and roots (see attached Site Photographs). c. Proposed site changes: Oyster castle sills, coir logs, and saltmarsh cordgrass will be installed by hand within the intertidal zone in order to stabilize the eroding shoreline. The design includes two parallel oyster castle sills positioned at MLLW and MSL to reduce wave energy over the entire tidal range and promote sediment accretion landward of the sills (see attached Project Plans). This design would reduce wave energy by 66 to 100% when the tide is at or below MSL. Under high tide conditions, the double castle sill design would reduce wave energy by 37 to 38%. Per USACE guidelines, five-foot gaps will be included for every 100 ft linear length of sill to allow for the unencumbered movement of aquatic organisms between the marsh and the river. The pilot project design also includes coir logs, placed at the unvegetated marsh toe in a single row behind the lower castle sill, adjacent to a patch of cordgrass. This treatment promotes sediment accretion and facilitates marsh expansion. Placing the coir logs at the marsh toe will protect the marsh edge, which is most vulnerable to erosion and it will offer wave protection for the shoreline when the tide is above MSL.
Recommended publications
  • THE PIONEER of INTEGRATIVE SOLUTIONS on LAND & SEA Carver Laraway Owner, Carver Companies
    THE PIONEER of INTEGRATIVE SOLUTIONS on LAND & SEA Carver Laraway Owner, Carver Companies OUR MISSION For over 30 years, Carver Companies' fundamental belief has been to provide unparalleled service all while maintaining our values of honesty and integrity both on land and sea. We pride ourselves on our unmatched logistics services and superior products to our customers, partners and tenants. We work hard to inspire our diverse, well-rounded workforce and management team to always perform at the highest levels of safety and professionalism. Carver Companies has a long-term vision of growth that will transform the way our clients respond to challenges. We become your partner in comprehensive project management. We provide resources unlike any other organization, and in turn can respond quickly to our client’s needs, no matter how unique. SAFETY AT CARVER COMPANIES Chevron-circle-right FULLY OSHA & MSHA COMPLIANT Chevron-circle-right OSHA SUBPART CC CERTIFIED RIGGERS Chevron-circle-right EXPERIENCE MODIFICATION RATE (EMR)= .74 Chevron-circle-right STATE LICENSED & NCCCO CRANE OPERATORS Chevron-circle-right U.S. COAST GUARD MARITIME ISPS SECURITY Chevron-circle-right ISNETWORLD & AVETTA COMPLIANT (MARSEC) LEVEL CARVER MARITIME Our built-to-suit warehousing and facilities with turnkey customer solutions are located only 10 miles south of Albany, NY and 4 miles south of exit 22 of the NYS Thruway. With easy access by river, truck, or rail to major access points in the Northeast, our warehousing and outside yard storage capability strengthens
    [Show full text]
  • Comprehensive Plan Update Appendices Draft
    TOWN OF COEYMANS COMPREHENSIVE PLAN UPDATE APPENDICES DRAFT DRAFT TOWN BOARD REVIEW DRAFT DECEMBER 2020 DRAFT Town of Coeymans DRAFT December 2020 Comprehensive Plan Update APPENDICES Appendix A – Existing Conditions Supplement Appendix B – Town of Coeymans Comprehensive Plan Update Preparation Report Appendix C – Potential Topic Areas for Comprehensive Plan Update Appendix D – Online Community Survey Summary Appendix E – Stakeholder Meeting Summaries Appendix F – Town Board Workshop Summaries DRAFT DRAFT Town of Coeymans DRAFT December 2020 Comprehensive Plan Update APPENDIX A EXISTING CONDITIONS SUPPLEMENT DRAFT Town of Coeymans Comprehensive Plan Update Existing Conditions Supplement Overview In July 2020, the Town of Coeymans kicked-off a targeted update to its 2006 Comprehensive Plan to reflect the current needs, opportunities, and vision for the community. Prior to the initiation of the Comprehensive Plan Update process, the Town completed an analysis of existing conditions. This included the preparation of a community profile by the Capital District Regional Planning Commission (CDRPC) and a Natural Resources Inventory (NRI) prepared by the Town of Coeymans Conservation Advisory Council. To build on these efforts, the project team (MJ Engineering) developed an existing conditions supplement which included a review of the Town and Village wastewater and drinking water systems. The purpose of this review was to gain a better understanding of the current and future needs of the Town form an infrastructure perspective. The information presented in this report was gathered through key stakeholder interviews with Town staff from the Wastewater Treatment Plan and Village of Ravena staff from the Water Department in August 2020. Following is a summary of existing conditions and maintenance needs for the water and wastewater systems in Coeymans.
    [Show full text]
  • The Workforce Opportunity of Offshore Wind in New York
    New York State Offshore Wind Master Plan The Workforce Opportunity of Offshore Wind in New York NYSERDA Report 17-25t December 2017 NYSERDA’s Promise to New Yorkers: NYSERDA provides resources, expertise, and objective information so New Yorkers can make confident, informed energy decisions. Mission Statement: Advance innovative energy solutions in ways that improve New York’s economy and environment. Vision Statement: Serve as a catalyst – advancing energy innovation, technology, and investment; transforming New York’s economy; and empowering people to choose clean and efficient energy as part of their everyday lives. Cover Image Source: LM Windpower New York State Offshore Wind Master Plan The Workforce Opportunity of Offshore Wind in New York Final Report Prepared for: New York State Energy Research and Development Authority Prepared by: BVG Associates Cricklade, United Kingdom Stantec New York, New York GLWN Cleveland, Ohio NYSERDA Report 17-25t December 2017 Notice This study was prepared by BVG Associates, Stantec, and GLWN (Contractors) in the course of performing work contracted for and sponsored by the State of New York through its agencies and public-benefit corporations (the State). The State and the Contractors make no warranties or representations, expressed or implied, as to the fitness for particular purpose or merchantability of any product, apparatus, or service, or the usefulness, completeness, or accuracy of any processes, methods, or other information contained, described, disclosed, or referred to in this study. The State and the Contractors make no representation that the use of any product, apparatus, process, method, or other information will not infringe privately owned rights and will assume no liability for any loss, injury, or damage resulting from, or occurring in connection with, the use of information contained, described, disclosed, or referred to in this study.
    [Show full text]
  • Tappan Zee Constructors, Llc
    TAPPAN ZEE CONSTRUCTORS, LLC July 18, 2014 Ref: LT-TZC-NYSDEC-00016 Mr. William Clarke, Regional Permit Administrator New York State Department of Environmental Conservation, Region 4 1130 North Westcott Road Schenectady, NY 12306 Re: New NY Bridge Project Approach Span Sub-assembly Staging Area at Port of Coeymans Town of Coeymans, Albany County, New York Subject: Response to June 24, 2014 NYSDEC Comments on Joint Permit Application Dear Mr. Clarke, Tappan Zee Constructors, LLC ("TZC"), has prepared documents and responses to address your comment letter dated June 24, 2014. To facilitate your review, the comments and responses in this letter are organized in the same order and under the same headings as in the comment letter. L Sturgeon/Part 182. Comment: The Department has determined that a taking will occur for this specific project at Coeymans and a 182 permit along with a species habitat mitigation/conservation plan covering the net conservation benefit is required. As discussed we still owe you and hope to have to you shortly a specific mitigation measure/project commensurate with this taking to incorporate into such a plan that TZC will be preparing and is needed for the complete application. Response: Please see our June 11, 2014 response letter regarding the measures taken to avoid the take of shortnose and Atlantic sturgeon in the project area. TZC maintains that the potential effects of planned in-water construction activities, specifically trestle pile installation and dredging, to sturgeon would not constitute a take and therefore a habitat mitigation/conservation plan is not required. Our assessment is based on the following: Tappan Zee Constructors, LLC Phone: (914) 789-3200 HDA, Inc.
    [Show full text]
  • PORT of COEYMANS • TROFFA LANDSCAPE SUPPLY • NEW OPTIONS Kawasaki Keeps It Simple
    4TH ISSUE 2010 PORT OF COEYMANS • TROFFA LANDSCAPE SUPPLY • NEW OPTIONS Kawasaki Keeps It Simple. Since 1962, Kawasaki has been listening to and learning from customers and dealers in the field. As a result, Kawasaki wheel loaders continue to evolve, with a constant focus on one thing — producing the most durable, most efficient, most dependable machines possible. EASY TO OPERATE. In a world of increasing demands, tighter deadlines, shrinking budgets and complicated contracts, better efficiency and greater productivity are a must. Innovative high-tech features on all Kawasaki wheel loaders allow the operator to adapt to the environment and the application right from the cab. EASY TO MAINTAIN. Diagnostic and operational modules monitor fluids and filters, and constantly provide information on everything from engine and transmission codes to location, hours, alarm sensors and machine performance data. EASY TO DO BUSINESS WITH. No run-arounds. No layers and layers of management. No distractions from competing product lines. Wheel loaders are our only business. Got a question? We’ll get you an answer. Need a part? It’s on its way. Quickly. Kawasaki offers flexible warranty programs, a state-of-the-art parts distribution system, an in-house rebuild center, and an experienced, knowledgeable support staff, focused on serving you. The independent dealers that represent and support Kawasaki loaders are experts in their markets and are dedicated to providing you with the best service available. Together, we are committed to making your investment in a Kawasaki loader a sound business decision that will pay dividends for years to come. KAWASAKI. ONE FOCUS.
    [Show full text]
  • Town of Coeymans Natural Resources Inventory
    Town of Coeymans Natural Resources Inventory Prepared by the Coeymans Conservation Advisory Council July 2019 Contents Contributors .................................................................................................................................................. 3 Acknowledgements ....................................................................................................................................... 4 Introduction ................................................................................................................................................... 5 Why inventory natural resources?............................................................................................................. 5 What is a natural resources inventory (NRI)? ........................................................................................... 5 Community Setting ................................................................................................................................... 6 Historic Setting ......................................................................................................................................... 6 Data and Methodology ............................................................................................................................ 11 How to Use This Inventory ..................................................................................................................... 12 Background Maps ......................................................................................................................................
    [Show full text]
  • MISCELLANEOUS NOTICES/HEARINGS Notice of Abandoned Property ENTITY NAME: DAZIER REALTY CORP
    MISCELLANEOUS NOTICES/HEARINGS Notice of Abandoned Property ENTITY NAME: DAZIER REALTY CORP. Received by the State Comptroller REINSTATE: 11/20/13 DIS BY PROC: 01/26/11 Pursuant to provisions of the Abandoned Property Law and related laws, the Office of the State Comptroller receives unclaimed monies ENTITY NAME: DECALS MEDIA NYC CORP. and other property deemed abandoned. A list of the names and last REINSTATE: 12/12/13 known addresses of the entitled owners of this abandoned property is DIS BY PROC: 10/26/11 maintained by the office in accordance with Section 1401 of the Abandoned Property Law. Interested parties may inquire if they ap- ENTITY NAME: DELI FARMS CORPORATION pear on the Abandoned Property Listing by contacting the Office of REINSTATE: 11/14/13 Unclaimed Funds, Monday through Friday from 8:00 a.m. to 4:30 DIS BY PROC: 10/26/11 p.m., at: 1-800-221-9311 ENTITY NAME: DULGAS' CAR CORP or visit our web site at: REINSTATE: 11/08/13 www.osc.state.ny.us DIS BY PROC: 10/26/11 Claims for abandoned property must be filed with the New York State Comptroller's Office of Unclaimed Funds as provided in Sec- ENTITY NAME: HERMANY INC. tion 1406 of the Abandoned Property Law. For further information REINSTATE: 12/04/13 contact: Office of the State Comptroller, Office of Unclaimed Funds, DIS BY PROC: 07/27/11 110 State St., Albany, NY 12236. ENTITY NAME: JUST IN TIME REALTY INC. NOTICE OF ANNULMENT REINSTATE: 11/07/13 OF DISSOLUTION OF DIS BY PROC: 04/27/11 CERTAIN BUSINESS CORPORATIONS Under the Provisions of Section 203-a of the Tax Law, As Amended ENTITY NAME: JUST LIKE MAMA'S COOKIN, INC.
    [Show full text]
  • Town of Bethlehem Local Waterfront Revitalization Program Draft
    Town of Bethlehem Local Waterfront Revitalization Program Draft Adopted: Town of Bethlehem Town Board, **, 2020 Approved: NYS Secretary of State, **, 2021 Concurred: U.S. Office of Coastal Management, **, 2021 CONTENTS SECTION I – TOWN OF BETHLEHEM WATERFRONT REVITALIZATION AREA BOUNDARY............................. 1 EXISTING NEW YORK STATE COASTAL AREA WITHIN THE TOWN OF BETHLEHEM ............................................................................. 1 TOWN OF BETHLEHEM WATERFRONT REVITALIZATION AREA BOUNDARY ......................................................................................... 3 SECTION II – INVENTORY AND ANALYSIS OF EXISTING CONDITIONS WITHIN THE WATERFRONT REVITALIZATION AREA ............................................................................................................................. 1 EXISTING LAND USE AND ZONING DISTRICTS ............................................................................................................................................. 1 Land Use ................................................................................................................................................................................................... 2 Agricultural Lands and Uses ............................................................................................................................................................ 4 Open Space .............................................................................................................................................................................................
    [Show full text]
  • 0 FULL Coeymans Briefing 26Oct16
    INDUSTRIALIZING THE HUDSON RIVER IN COEYMANS 26 October 2016 Call for an independent environmental review of current & future industrial development in Coeymans, New York. Coeymans Falls, April 2015, ½ mile downstream of the Port of Coeymans Cement dust from a ship docked at the Port of Coeymans, April 2016 This paper was written by concerned residents and property owners in Coeymans with help from the Hudson River Sloop Clearwater For more information, please contact: Barbara Heinzen Email: [email protected] Paul Lawler See the full report on the Clearwater website: Email: [email protected] http://www.clearwater.org/ea/ Coeymans Briefing - 26 October 2016 1 SUMMARY New Heavy Industry along the Hudson River in Coeymans, NY Full Environmental Impact Study Needed Twelve miles south of Albany is the Hamlet of Coeymans, one of the earliest Dutch settlements on the Hudson River. It faces Schodack Island which held the last Council fire of the Mahican Indians and is now a State Park with nesting bald eagles. The Hamlet is bracketed by two Hudson tributaries, the Coeymans and Hannacroix Creeks. Together they are a ‘significant coastal habitat’ bordering an important stretch of the Hudson River where endangered sturgeon are found. In 2006, Carver Laraway opened the Port of Coeymans just north of the Hamlet. His businesses have expanded with unseemly haste. They include staging for the Tappan Zee Bridge project, the Coeymans Recycling Company, Coeymans Industrial Park, and a number of tenant industries. To achieve this growth, local Town and Village authorities were pressured to rezone residential and agricultural land along the Coeymans Creek for heavy industrial use.
    [Show full text]
  • The New York State Solid Waste ISSUE HIGHLIGHTS
    The New York State Solid Waste EXAMINERNews From Assemblymember Alan N. Maisel Chair, Legislative Commission on Solid Waste Management 4 Empire State Plaza, 5th Floor, Albany, NY 12248 • (518) 455-3711 Summer Edition 2010 Dear Colleagues and Friends In January 2010 Speaker Sheldon Silver appointed me Chair of the NYS Assem- bly Legislative Commission on Solid Waste Management. I find this new assignment ISSUE both challenging and exciting. I am honored to follow in the footsteps of the chairs that have preceded me and set high standards for this Commission. I will continue HIGHLIGHTS to work with them on issues of mutual concern and interest. Despite the great progress that we have made in New York State on solid waste OGS Recycling Tour ...............2 issues, much remains to be accomplished. This newsletter outlines and discusses Kid-Safe Playgrounds ..............3 some of the issues that the Commission has already undertaken or will be working Marcellus Shale Drilling .........4 on in the future. These issues include: producer responsibility for take-back of drugs from hospitals and health care facilities; disposal of out-of-state drilling fluids from hydraulic fracturing in other states; Hospital Drug Take-Back ........6 potential environmental contamination and public health impacts from disposal of smoke detectors BPA-Free! ...............................8 containing americium-241; expanded recycling in state facilities; and expanded recycling opportuni- ties in the private sector. E-Waste Recycling ................10 I look forward to working with you on these and other important solid waste management issues Smoke Detectors ..................11 facing New York in the coming years. You may contact my office at any time.
    [Show full text]
  • New NY Bridge Project, 2020 Project
    APWA PROFESSIONAL AWARDS Nomination of the New NY Bridge for PUBLIC WORKS PROJECT OF THE YEAR 2020 TABLE OF CONTENTS PROJECT OVERVIEW 2 DESIGN-BUILD PROCUREMENT PROCESS 2 KEY PROJECT ELEMENTS 3 COMMITMENT TO THE ENVIRONMENT 3 ENHANCED BUS SERVICE 3 THE PATH 4 INTELLIGENT TRANSPORTATION SYSTEMS 4 EMERGENCY LANES 5 CASHLESS TOLLS 5 LIGHTING SYSTEM 6 I. USE OF GOOD CONSTRUCTION MANAGEMENT TECHNIQUES 6 i. MAIN SPAN PILE CAPS PLACEMENT CHALLENGE 6 ii. MATERIAL FABRICATION CHALLENGE 7 iii. BRIDGE GIRDER PLACEMENT CHALLENGE 7 iv. PREPARATION FOR CONSTRUCTION OPERATIONS CHALLENGE 8 v. CONCRETE SUPPLY CHALLENGE 8 II. SAFETY PERFORMANCE AND DEMONSTRATED AWARENESS OF THE NEED FOR A GOOD OVERALL SAFETY PROGRAM DURING CONSTRUCTION 9 III. COMMUNITY RELATIONS 10 IV. DEMONSTRATED AWARENESS FOR THE NEED TO PROTECT THE ENVIRONMENT DURING THE PROJECT 12 V. UNUSUAL ACCOMPLISHMENTS UNDER ADVERSE CONDITIONS 14 VI. QUALITY CONTROL AND MONEY SAVING TECHNIQUES SUCCESSFULLY UTILIZED 15 VII. SUSTAINABILITY 17 SUSTAINABLE GOALS & FEATURES 17 i. REDUCED DELAYS 17 ii. CASHLESS TOLLS 18 iii. SHARED USE PATH 18 iv. EMISSIONS REDUCING TRANSIT 18 1 | PAGE NOMINATION - PUBLIC WORKS PROJECT OF THE YEAR 2020 NY STATE THRUWAY AUTHORITY-NEW NY BRIDGE PROJECT OVERVIEW The New York State Thruway Authority has replaced the Tappan Zee Bridge with a new 3.1-mile state-of-the-art, twin-span bridge crossing over the Hudson River and traveling between Rockland and Westchester Counties. The 570-mile New York State Thruway is renowned for its safety and reliability and plays a vital role in the state’s transportation and economic infrastructure. The Thruway links the New York City metropolitan area to upstate N.Y.
    [Show full text]
  • Upstate Regulatory Field Office 1 Buffington St
    2603 Guilderland Avenue May 18, 2020 Schenectady New York 12306 t.518.393.7725 U.S. Army Corps of Engineers f.518.393.2324 Upstate Regulatory Field Office [email protected] 1 Buffington St., Building 10, 3rd Fl. North www.ingallsllp.com Watervliet, New York 12333-1750 Attn: Brad Sherwood Re: RESPONSE TO NOIA Dated 03-12-20 NAN-2019-01113-USH P&M Brick, LLC Port of Coeymans (POC), 2170 River Rd Town of Coeymans, Albany County Dear Mr. Sherwood: We offer the following responses to comments in your Notice of Incomplete Application (NOIA) letter dated March 12, 2020, regarding the above referenced project. 1. Finalize drawings of the proposed project, as the submittal referenced above only appears to provide drawings regarding alternative designs. These finalized drawings should include: Cross-section drawings that clearly and accurately identify: the location of the mean low and high tide elevation; the existing elevation of the riverbed; the proposed elevation of the riverbed; and the location and elevations of all existing and proposed structures; Response: The preferred and finalized alternative includes a bulkhead wharf, which was determined to be required considering structural design for supporting heavy loads. Other aspects such as heavy structure loading/unloading procedures and related safety concerns are being evaluated to provide safe operations on the wharf to prevent risk to human health and safety. Typically, heavy load wharf design will require vertical bulkheads to retain backfill soils, increase wharf load shear strength and overall stability. It has been determined that a new wharf as detailed in the application documents and plans will be required for safe loading and transport of the heavy wind components.
    [Show full text]