6.0 MITIGATION STRATEGY

385

6.0 MITIGATION STRATEGY OVERVIEW The Mitigation Strategy outlined in Section 6.0 of this plan is Monmouth County’s blueprint for reducing potential future losses from hazards. The Mitigation Strategy provides information to guide county and municipal decision making regarding the protection of critical facilities and local hazard mitigation planning. The Mitigation Strategy consists of:

 The State and County Hazard Mitigation Goals that help guide the selection of activities that will mitigate identified hazards and reduce future losses;

 Strategies lead to the identification, evaluation, and prioritization of mitigation actions; and

 Summary of the Monmouth County Hazard Mitigation Actions. The steps involved in developing a mitigation strategy were first introduced at the February 20th Kickoff Meeting and discussed in depth at each municipal meeting conducted between April – July 2019. During these meetings, the Project Team and the municipality discussed potential future risks affecting their community and developed specific mitigation actions to address those risks in the form of Mitigation Action Worksheets. This section describes the strategy in developing County and municipal mitigation actions. HAZARD MITIGATION PLAN GOALS STATE HMP GOALS As outlined in the State HMP (2019), the State's goals are:

1. Protect life 2. Protect property 3. Increase public preparedness and awareness 4. Develop and maintain and understanding of risks from hazards 5. Enhance local mitigation capabilities to reduce hazard vulnerabilities 6. Support continuity of operations pre-, during, and post- hazard events In addition to the plan goals, the 2019 plan update included a State Mitigation Strategy or specific actions to reduce the number of Repetitive Loss (RL) properties and Severe Repetitive Loss (SRL) properties throughout New Jersey. Some of the State Mitigation Strategy objectives include local jurisdictions with SRL properties take actions to reduce the number of these properties and to prioritize project grants for communities that have RL and SRL properties. Funding to mitigate Severe Repetitive Loss properties that are substantially damaged is the State’s highest priority. MONMOUTH COUNTY HMP GOALS As part of this plan update, Monmouth County revised the 2015 HMP Goals and more closely aligned their goals to the State’s goals. Below is a crosswalk table of the goals from the 2015 plan and this plan update. The value of the Hazard Mitigation Goals in the overall mitigation strategy is that every mitigation action identified by the County or its municipalities must align with one of the eight goals below.

386

Table 6.2 - 1 Monmouth County HMP Goals Crosswalk Monmouth County's 2015 HMP Goals Monmouth County's 2020 HMP Goals

1 1 Protect life. Promote disaster-resistant development. 2 Build and support local capacity to enable the public to prepare for, respond to, and recover from 2 Protect property and reduce economic impacts. disasters. 3 Reduce the possibility of damage and losses due to 3 Increase public preparedness, awareness, and drought. resiliency. 4 Reduce the possibility of damage and losses due to flooding associated with coastal and inland , 4 Develop, maintain, and monitor an understanding of hurricanes, and nor'easters. risks from hazards. 5 Reduce the possibility of damage and losses due to 5 Enhance local resilience and mitigation capabilities earthquakes. to reduce hazard vulnerabilities. 6 Promote hazard resilient development and Reduce the possibility of damage and losses due to 6 protection of natural resources from natural- and lightning strikes. human-based hazards.

7 Support continuity of operations pre-, during, and Reduce the possibility of damage and losses due to 7 post- hazard events. and wave action. 8 Support enhancement of Community Rating System Reduce the possibility of damage and losses due to 8 (CRS) program. dam failure. Reduce the possibility of damage and losses due to 9 Reduce the possibility of damage and losses due to 9 High Hazard Potential dam failure. landslides. 10 Reduce the possibility of damage and losses due to wildfires. 11 Reduce the possibility of damage and losses due to winter storms. 12 Reduce the possibility of damage and losses due to extreme temperatures. Reduce the possibility of damage and losses due to 13 high winds associated with tornados, windstorms, tropical storms, hurricanes, and nor'easters. Reduce the possibility of damages to emergency 14 and critical facilities from damage due to flooding, storm surge, wildfires, and extreme winds.

15 Promote disaster-resistance by incorporating mitigation actions into other planning mechanisms.

387

MITIGATION STRATEGIES OVERVIEW As part of the Monmouth County HMP update, each participating jurisdiction created their own mitigation strategy by identifying and analyzing a comprehensive range of specific mitigation actions unique to their community and based on their vulnerabilities and capabilities. Mitigation actions are specific actions, projects, activities, or processes taken to reduce or eliminate long-term risk to people and property from both human and natural hazards and their impacts. Implementing mitigation actions helps achieve the plan's goals and must align with one of the eight Monmouth County HMP Goals.

For the purpose of this mitigation strategy, the County is broken up into four regions: Bayshore, Central Monmouth South Monmouth, and Western Monmouth. Each municipality’s top risk reduction mitigation action is mapped by region to display potential projects that adjacent municipalities, the County, adjacent counties, the State, or regional stakeholders could collaborate on to mitigate a regional hazard. The regional maps are located in the Appendix Vol. I – Jurisdictional Information. The municipalities that comprise of each region are listed below and mapped in Figure 6.3 - 1 Monmouth County Regions Map.

Bayshore: Holmdel Township, Matawan Borough, Keyport Borough, Middletown Township, Hazlet Township, Keansburg Borough, Union Beach Borough, Aberdeen Township, Highlands Borough, and Atlantic Highlands Borough;

Central Monmouth: Allenhurst Borough, Interlaken Borough, Deal Borough, Ocean Township, West Long Branch Borough, Eatontown Borough, Long Branch City, Shrewsbury Township, Tinton Falls Borough, Shrewsbury Borough, Oceanport Borough, Monmouth Beach Borough, Little Silver Borough, Fair Haven Borough, Red Bank Borough, Rumson Borough, Sea Bright Borough, and Village of Loch Arbour;

South Monmouth: Brielle Borough, Sea Girt Borough, Spring Lake Heights Borough, Spring Lake Borough, Lake Como Borough, Belmar Borough, Avon-by-the-Sea Borough, Neptune City Borough, Asbury Park City, Bradley Beach Borough, Wall Township, Manasquan Borough, and Neptune Township;

Western Monmouth: Allentown Borough, Farmingdale Borough, Upper Freehold Township, Howell Township, Roosevelt Borough, Freehold Borough, Millstone Township, Freehold Township, Englishtown Borough, Manalapan Township, Colts Neck Township, and Marlboro Township.

388

Figure 6.3 - 1 Monmouth County Regions

As required by FEMA, Monmouth County and its 53 municipalities completed an evaluation of the mitigation strategies and actions from the 2015 plan and reported on the status of each, either as ongoing, completed, or withdrawn. In addition, the Planning Team worked with each Monmouth municipality to brainstorm potential new mitigation actions for inclusion in the HMP. Explanations of progress descriptions are listed below:

 New Mitigation Action: new actions identified for this plan update.

 Ongoing Mitigation Action: actions carried forward from the 2009 and/or 2015 plan into this plan update. Jurisdictions modified and expanded the action to promote implementation.

 Completed Mitigation Action: actions that were completed between 2015 and 2020 and now a capability.

 Withdrawn Mitigation Actions: mitigation actions found to be impractical, unfeasible, or undesirable. Jurisdictions provided a description as to why the action was withdrawn in the “Notes” section on the Mitigation Action Worksheets.

For this HMP update, Monmouth County and its municipalities have 282 New Mitigation Actions, 273 Ongoing Mitigation Actions, 85 Completed Mitigation Actions, and 11 Withdrawn Mitigation Actions, totaling 651 Mitigation Actions (as of 08-07-20).

389

New to this plan is the integration of the State Mitigation Strategy, which requires jurisdictions with RL and SRL 282 New Mitigation Actions properties to reduce the number of those properties. Each 273 Ongoing Mitigation Actions municipality that has RL and/or SRL properties must have 85 Completed Mitigation Actions a mitigation action that describes how they will mitigate the 11 Withdrawn Mitigation Actions properties. During the municipal meetings, the Project 651 Total Mitigation Actions Team discussed which properties are RL or SRL with local officials, along with the status of those properties and ideas on how to mitigate the RL and/or SRL properties. Since RL/SRL data is sensitive information and not available to the public, only the State and the County have access to the RL/SRL data.

Community Action # 30-16: Road Elevation in Manasquan, NJ. Community Action #42_4: HMGP-funded -proofed doors at Photo Courtesy of Borough of Manasquan Rumson’s DPW building, which experienced 4 feet of water during Superstorm Sandy. Photo courtesy of Borough of Rumson. MITIGATION ACTION WORKSHEETS Every mitigation action, regardless of their status, must have a Mitigation Action Worksheet to be part of a HMP. The action worksheets document each jurisdiction's analysis of actions considered to reduce the impacts of hazards identified in the risk assessment. The Mitigation Action Worksheets follow recent FEMA guidance on how an action is evaluated and implemented for future funding. For example, FEMA would like to know the category, evaluation, and priority of each action. Mitigation actions that substantially reduce risk or eliminate an identified hazard area are ranked with the highest priority and are listed first in the table below. Table 6.3 - 1 Mitigation Action Worksheet Evaluation explains the evaluation local officials considered when developing their mitigation action worksheets. Refer to Appendices V. I- Jurisdictional Information to see the completed Mitigation Action Worksheets for each action, sorted by municipality.

Table 6.3 - 1 Mitigation Action Worksheet Evaluation Describing the Action

Action Name: - What is the name of the mitigation action?

Action Category: - Does this action reduce risk, improve functional use, provide ongoing maintenance/related to response or recovery, or administrate in nature? The four categories are Mitigation - Risk Reduction, Mitigation - Improving Functions, Maintenance/Response/Recovery, and Administrative.

Action Type: - What is the category of action (Local Plans & Regulations, Structure & Infrastructure Projects, Natural Systems Protection, or Education & Awareness Programs)

390

HMA Eligible Activity: - Which FEMA HMA activity does this action fall under (if applicable)

Action Description - What does this action entail?

Evaluating the Action

Hazard (s) Addressed: - What hazard’s risk is reduced or eliminated due to this action?

Goals: - Which of the Monmouth County HMP Goals does this action satisfy?

Risk Reduction: - What is the risk that is reduced or eliminated?

Technical: - Is the mitigation action technically feasible?

Political: - Is there overall public support for the mitigation action?

- Is there the political will to support it?

Legal: - Does the community have the authority to implement the action?

Environmental: - What are the potential environmental impacts of the action?

- Will it comply with environmental regulations?

Social: - Will the proposed action affect one segment of the population?

- Will it disrupt established neighborhoods, break up voting districts or cause the relocation of lower income people?

Administrative Capability: - Does the community have the personnel and administrative capabilities to implement the action and maintain it or will outside help be necessary?

Local Champion: - Is there a strong advocate for the action among local departments and agencies that will support its implementation?

Other Community Objectives: - Does the action further other community objectives, such as capital improvements, economic development, environmental quality, or open space preservation?

STAPLEE Evaluation: - How does this action compare to the State HMP’s 14-point social, technical, administrative, political, legal, economic, and environmental (STAPLEE) criteria (which is used for project evaluation and prioritization)

Implementing the Action

Cost Estimate: - How much do you estimate it will cost to implement the action?

Priority: - How important is this action (high, medium, or low priority)? This prioritization is based on the HMA Eligible Activity category. Following Federal guidance, actions that reduce risk are the highest priority, followed by actions that improve functional use. Actions that are related to Maintenance/Response/Recovery or administrative are lower on the list of priority. High priority means the action is necessary and ready to start. Medium priority means the action will occur when funds become available. Low priority means the action is on the municipality’s wish list.

391

Scale of Ease of Implementation: - How easy is this action able to be implemented (high, medium, low)?

- Can you rely on stakeholders to accomplish this action?

- Is there funding available to implement this action quickly?

- “Low” scale of ease of implementation means the action is easier to implement than an action of “medium” or “high” scale.

Local Planning Mechanism: - What current plans support this action?

Responsible Party: - Who is responsible for overseeing and implementing this action?

Likely Funding Sources: - What are the likely funding sources available to complete this action?

Timeline: - What is the timeline for this action (1 year, 2 years, 3 years, 4 years, or 5 + years)?

Action Status: - What is the status of this action (new, ongoing, completed, or withdrawn)?

Notes: - List any details about the mitigation action here, including if the action has received any previous funding (e.g. FEMA 404 or 406 funding).

- If the action is ongoing, explain why and what has been done since the last plan

- If the action is withdrawn, explain why it is withdrawn.

HAZARD MITIGATION ACTION SUMMARY Altogether, Monmouth County and its 53 municipalities have 651 mitigation actions. Table 6.4 - 1 Mitigation Actions by Jurisdiction summaries each mitigation action by jurisdiction, listing the action number, name, status, category (Mitigation-Risk Reduction, Mitigation-Improving Functions, Maintenance/Response/Recovery, and Administrative), and priority. For the comprehensive worksheet (Table 6.3 – 1 Mitigation Action Worksheet Evaluation) for each mitigation action, refer to Appendices Vol. I – Jurisdictional Information.

Table 6.4 - 1 Mitigation Actions by Jurisdiction (updated 08-07-20) Community Action Jurisdiction Action Name Action Category Priority Action # Status Acquire, elevate, or relocate buildings and infrastructure in flood Aberdeen, Mitigation - Risk 01_03 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Conduct Creek Restoration at Aberdeen, Mitigation - Risk 01_10 Whale Creek and Beach New High Township of Reduction Stabilization at Clifford Beach Aberdeen, Conduct Wetland Restoration at Mitigation - Risk 01_11 New High Township of Happy Meadows Reduction Aberdeen, Prepare an Engineering Study for 01_07 New Administrative Medium Township of Nuisance Flooded Roads Aberdeen, Prepare an Engineering Study for 01_08 New Administrative Low Township of Beach Erosion Maintenance / Aberdeen, Install Surveillance Cameras along 01_09 New Response / Low Township of the Sea Wall Recovery

392

Community Action Jurisdiction Action Name Action Category Priority Action # Status Aberdeen, Create a Hazard Mitigation 01_01 Completed Township of Outreach Program Aberdeen, Drainage Improvement/Elevation on 01_02 Completed Township of Flood-prone Roadways Aberdeen, Elevate Pumping Stations Above 01_04 Completed Township of Current BFE or Waterproof Stations Aberdeen, Repair Recreation Facilities and 01_05 Completed Township of Sidewalks Near

Improve Communications and Aberdeen, 01_06 Create a Community Shelter for Completed Township of Extreme Temperatures

Remove Beach Structures and Allenhurst, Convert to Open Space, as detailed Mitigation - Risk 02_01 Ongoing High Borough of in the Storm Annex in OEM Basic Reduction Plan Acquire, elevate, or relocate buildings and infrastructure in flood Allenhurst, Mitigation - Risk 02_06 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Allenhurst, Structurally Retrofit Critical Mitigation - Risk 02_07 New High Borough of Facilities Reduction Structurally Retrofit Existing Mitigation - Allenhurst, Communication Tower on 02_05 Ongoing Improving Medium Borough of Municipal Building to Support Functions Emergency Response Purchase Jet/Vacuum Debris Truck Maintenance / Allenhurst, 02_02 and/or coordinate with County DPW Ongoing Response / Low Borough of to use their Equipment Recovery Maintenance / Allenhurst, Build a New Building Structure for 02_03 Ongoing Response / Low Borough of OEM Equipment Recovery Maintenance / Allenhurst, Purchase and Install Natural Gas 02_04 Ongoing Response / Low Borough of Emergency Generators Recovery

Maintenance / Allenhurst, Create a Temporary Shelter and 02_08 New Response / Low Borough of Warning Center Recovery

Allentown, Build a Flood Wall around the Mitigation - Risk 03_04 New High Borough of Wastewater Treatment Plant Reduction Acquire, elevate, or relocate buildings and infrastructure in flood Allentown, Mitigation - Risk 03_06 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Allentown, Repair, Remove, or Rehabilitate the Mitigation - Risk 03_07 New High Borough of Allentown Dam Reduction Mitigation - Allentown, Replace the Outfall Pipe and Storm 03_05 New Improving Medium Borough of Pipe on Probasco Drive Functions

393

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Allentown, Improve Drainage of Conine's 03_01 Ongoing Response / Low Borough of Millpond Dam Recovery Maintenance / Allentown, Improve Drainage of Sewer System 03_02 Ongoing Response / Low Borough of on County Roads Recovery Dredge Mill Pond to Alleviate Maintenance / Allentown, 03_03 Erosion and Provide Retention New Response / Low Borough of Solution Recovery Install Larger Outfall Pipes and an Asbury Park, Mitigation - Risk 04_03 Automatic Dredge Flume to Ongoing High City of Reduction Mitigate Flooding at Wesley Lake Elevate Residential Structures at Asbury Park, Risk to Flooding, including any Mitigation - Risk 04_04 Ongoing High City of Repetitive Loss or Severe Repetitive Reduction Loss Properties Dredge Deal Lake, Construct Asbury Park, Automatic Tide Gate, and Expand Mitigation - Risk 04_05 Ongoing High City of Capacity of Boat Ramp to Mitigate Reduction Flooding Around Deal Lake Asbury Park, Floodproof DPW & Sewer Mitigation - Risk 04_12 New High City of Treatment Plant Reduction Acquire properties in flood prone Asbury Park, areas, with a focus on Repetitive Mitigation - Risk 04_15 New High City of Loss (RL) and Severe Repetitive Reduction Loss (SRL) properties Clean and Upgrade Outfall Pipes to Maintenance / Asbury Park, Remove Sediment and Increase 04_02 Ongoing Response / Medium City of Stormwater Capabilities at Sunset Recovery Lake Mitigation - Asbury Park, Reconstruct Stormwater Lines to 04_06 Ongoing Improving Medium City of Mitigate Flooding in the City Functions Maintenance / Asbury Park, Replace and Upgrade Generators at 04_01 Ongoing Response / Low City of Critical Facilities Recovery Maintenance / Asbury Park, Relocate Fire House/EMT Services 04_07 New Response / Low City of and Add Security Measures Recovery Maintenance / Asbury Park, Initiate Quarterly Inspect Sewer 04_08 New Response / Low City of Pipes Recovery Install Temporary Signals and Maintenance / Asbury Park, 04_09 Generators for Traffic Lights for New Response / Low City of Emergency Evacuation Routes Recovery Maintenance / Asbury Park, Purchase and Install Generator for 04_10 Completed Response / Low City of Radio Dispatcher System Recovery Increase Security in Public Spaces, Maintenance / Asbury Park, 04_11 especially the Boardwalk, the CBD, New Response / Low City of and the Train Station Recovery Maintenance / Asbury Park, 04_13 Purchase Portable Light Towers New Response / Low City of Recovery

394

Community Action Jurisdiction Action Name Action Category Priority Action # Status Purchase and Install Generator and Maintenance / Asbury Park, 04_14 Provide ADA Access for the Asbury New Response / Low City of Park Library (Emergency Shelter) Recovery Construct Proper Drainage Atlantic Infrastructure to Eliminate High Mitigation - Risk Highlands, 05_01 Ongoing High Velocity Overland Flows that Cause Reduction Borough of Slope Failure Provide Slope Stabilization along Atlantic Bayside Dr. and Shoreline Mitigation - Risk Highlands, 05_03 Ongoing High Protection along the Henry Hudson Reduction Borough of Trail Acquire, elevate, or relocate Atlantic buildings and infrastructure in flood Mitigation - Risk Highlands, 05_04 prone areas, with a focus on Ongoing High Reduction Borough of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Atlantic Floodproof First Avenue Sewer Mitigation - Risk Highlands, 05_07 Ongoing High Pump Station Reduction Borough of Atlantic Extend the Existing Breakwall in the Mitigation - Risk Highlands, 05_09 New High Raritan Bay to Protect the Marina Reduction Borough of Atlantic Purchase and Install Portable 100 Maintenance / Highlands, 05_06 KW Diesel Generator at Atlantic Ongoing Response / Low Borough of Highlands Harbor Utility Recovery Atlantic Maintenance / Restore the Many Mind Creek Highlands, 05_08 New Response / Low Stream Corridor Borough of Recovery Atlantic Improve Infrastructure Flood Risk Highlands, 05_02 Withdrawn Reduction Borough of Atlantic Purchase and Install a Natural Gas Maintenance / Highlands, 05_05 Generator for Atlantic Highlands Completed Response / Borough of Water & Sewer Utility Recovery Acquire, elevate, or relocate Avon-by-the- buildings and infrastructure in flood Mitigation - Risk Sea, Borough 06_05 prone areas, with a focus on Ongoing High Reduction of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Avon-by-the- Construct a Tide Value for Sylvan Mitigation - Risk Sea, Borough 06_06 New High Lake Reduction of Avon-by-the- Construct Backflow Preventors Mitigation - Risk Sea, Borough 06_08 along Shark River and Rebuild New High Reduction of Stormwater Infrastructure Avon-by-the- Fortify Sewer Pump Station to Mitigation - Sea, Borough 06_07 Provide for Continuity of Operations New Improving Medium of During Storm Events Functions Avon-by-the- Maintenance / Dredge Sylvan Lake and Remove Sea, Borough 06_03 Ongoing Response / Low Sediment of Recovery Avon-by-the- Maintenance / Upgrade Surveillance Systems at Sea, Borough 06_09 New Response / Low Critical Facilities of Recovery

395

Community Action Jurisdiction Action Name Action Category Priority Action # Status Avon-by-the- Increase Hazard Education and Risk Sea, Borough 06_01 Completed Awareness of Avon-by-the- Protect Municipal Structures and Sea, Borough 06_02 Completed Infrastructure of Avon-by-the- Increase Number of Staff to Sea, Borough 06_04 Completed Manage Floodplain Development of Belmar, Replace and Elevate Bulkhead at L Mitigation - Risk 07_03 Ongoing High Borough of Street Beach and Maclearie Park Reduction Acquire, elevate, or relocate buildings and infrastructure in flood Belmar, Mitigation - Risk 07_04 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Belmar, Install a Steel Sheet Pile along the Mitigation - Risk 07_05 Ongoing High Borough of Beach Reduction Consolidate and Relocate Mitigation - Belmar, 07_06 Emergency Services Outside of New Improving Medium Borough of SFHA Functions Maintenance / Belmar, Purchase and Install Transfer 07_07 New Response / Low Borough of Switches for Generators Recovery Purchase and Install a Generator for Maintenance / Belmar, 07_08 Police Station to Provide Continuity New Response / Low Borough of of Operations During a Storm Recovery Belmar, 07_01 Lake Como Flooding Mitigation Completed Borough of Belmar, 07_02 Silver Lake Flooding Mitigation Completed Borough of Bradley Install New Outfall Pipes and Mitigation - Risk Beach, 08_03 Ongoing High Bulkhead at Sylvan Lake Reduction Borough of Acquire, elevate, or relocate Bradley buildings and infrastructure in flood Mitigation - Risk Beach, 08_06 prone areas, with a focus on Ongoing High Reduction Borough of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Bradley Improve the Borough's Maintenance / Beach, 08_05 Communication and Notification Ongoing Response / Low Borough of System Recovery Bradley Strengthen of Emergency Beach, 08_07 Response for Police, Fire, and First Ongoing Administrative Low Borough of Aid Bradley Maintenance / Beach, 08_08 Dredge Sylvan Lake New Response / Low Borough of Recovery Bradley Maintenance / Purchase and Install Generators for Beach, 08_09 New Response / Low Critical Facilities and Shelters Borough of Recovery Bradley Target Harden the Municipal Maintenance / Beach, 08_10 Building and Boardwalk with New Response / Low Borough of Surveillance Cameras Recovery

396

Community Action Jurisdiction Action Name Action Category Priority Action # Status Clean and Repair Outfall Pipe along Bradley Maintenance / Lareine Ave. which leads to Beach, 08_11 New Response / Low Repetitive Flooding for Nearby Borough of Recovery Properties Bradley Beach, 08_01 Sand Dune/Berm Construction Completed Borough of Bradley Fletcher Lake Drainage System Beach, 08_02 Improvements and Structural Completed Borough of Control Techniques Bradley Beach, 08_04 Floodproof Sewer Pump Station Completed Borough of Acquire, elevate, or relocate buildings and infrastructure in flood Brielle, Mitigation - Risk 09_01 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Brielle, Restore Bulkheads Along the Mitigation - Risk 09_02 Ongoing High Borough of Manasquan River Reduction Fortify Six Pump Stations to Provide Brielle, Mitigation - Risk 09_03 Continuity of Operations during a New High Borough of Reduction Storm Event Maintenance / Brielle, Purchase and Install New Generator 09_04 New Response / Low Borough of for School (Shelter) Recovery Acquire Current Flood-prone Brielle, Mitigation - Risk 09_05 Property for a New Dock to House New Low Borough of Reduction Police Rescue Boat Acquire, elevate, or relocate buildings and infrastructure in flood Colts Neck, Mitigation - Risk 10_02 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Protect Community Center from Colts Neck, Mitigation - Risk 10_03 Wind and Flood Events, and Ongoing High Township of Reduction Purchase and Install Generators Colts Neck, Develop a Safety and Public Health 10_06 Ongoing Administrative High Township of Outreach Program Colts Neck, Repair, Remove, or Rehabilitate the Mitigation - Risk 10_08 New High Township of Swimming River Reservoir Dam Reduction Create the Ability to Drill New Water Mitigation - Colts Neck, Wells at Public Buildings to 10_01 Ongoing Improving Medium Township of Maintain Operational Wells During a Functions Power Outage or Drought Maintenance / Colts Neck, Increase Cyber Security for the 10_07 New Response / Medium Township of Township Recovery Maintenance / Colts Neck, 10_04 Develop a Tree Trimming Program Ongoing Response / Low Township of Recovery Establish More Community Shelters Maintenance / Colts Neck, 10_05 to Provide Shelter and Water during Completed Response / Township of Storms Recovery Deal, Borough Acquire, elevate, or relocate Mitigation - Risk 11_03 Ongoing High of buildings and infrastructure in flood Reduction

397

Community Action Jurisdiction Action Name Action Category Priority Action # Status prone areas, with a focus on Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Widen Outfall Pipes to Mitigate Mitigation - Deal, Borough 11_01 Flooding at Norwood Ave & Alymar Ongoing Improving Medium of Ave Functions Deal, Borough Build Seawall Around Sewerage 11_02 Completed of Facility Maintenance / Eatontown, 12_01 Dredge and Clean Husky Brook Ongoing Response / High Borough of Recovery Acquire, elevate, or relocate buildings and infrastructure in flood Eatontown, Mitigation - Risk 12_03 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Eatontown, 12_06 Develop a Power Failure Plan New Administrative High Borough of Maintenance / Eatontown, Clean and De-snag the Wampum 12_04 New Response / Medium Borough of Brook Recovery Eatontown, Relocate or Floodproof (with Mitigation - Risk 12_05 New Medium Borough of ) DPW Building Reduction Maintenance / Eatontown, Purchase and Install Backup 12_02 Ongoing Response / Low Borough of Generators for Emergency Shelters Recovery Acquire, elevate, or relocate buildings and infrastructure in flood Englishtown, Mitigation - Risk 13_03 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Englishtown, Repair Dam and Bulkhead at Lake Mitigation - Risk 13_04 New High Borough of Weamaconk Reduction Maintenance / Englishtown, 13_05 Dredge Lake Weamaconk New Response / High Borough of Recovery Maintenance / Englishtown, Increase Security at Borough Hall 13_06 New Response / High Borough of and the Water Treatment Plant Recovery Maintenance / Englishtown, Clean and De-snag Weamaconk 13_01 Ongoing Response / Medium Borough of Creek and McGellairds Brook Recovery Maintenance / Englishtown, 13_07 Implement a Reverse 911 System New Response / Medium Borough of Recovery Purchase and Install Emergency Englishtown, Generators and ATS for Water 13_02 Completed Borough of Wells, Treatment Facilities, and DPW Garage Fair Haven, Acquire Two Flood-prone Properties Mitigation - Risk 14_04 Ongoing High Borough of and Convert to Open Space Reduction Fair Haven, Repair or Enlarge Outfall Pipes 14_05 New Administrative High Borough of along the Navesink River Fair Haven, Acquire, elevate, or relocate Mitigation - Risk 14_07 New High Borough of buildings and infrastructure in flood Reduction

398

Community Action Jurisdiction Action Name Action Category Priority Action # Status prone areas, with a focus on Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Construct Flood Measure (e.g. Fair Haven, Mitigation - Risk 14_08 floodwalls or berms) along Fourth New High Borough of Reduction Creek Rebuild the DPW Building and Maintenance / Fair Haven, 14_06 Upgrade Fuel Pumps for Continuity New Response / Medium Borough of of Operations Recovery Mitigation - Fair Haven, Remove Overhead Transmission 14_01 Ongoing Improving Low Borough of Lines and Place Underground Functions Maintenance / Fair Haven, Remove or Trim Trees Near Power 14_02 Ongoing Response / Low Borough of Transmission Lines Recovery Create a Plan to Manage Fair Haven, 14_09 Development in Landslide Hazard New Administrative Low Borough of Areas Purchase and Install a Natural Gas Fair Haven, 14_03 Generator Borough Hall/DPW Completed Borough of Building Acquire, elevate, or relocate buildings and infrastructure in flood Farmingdale, Mitigation - Risk 15_08 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Farmingdale, Increase Hazard Education and Risk 15_01 Ongoing Response / Medium Borough of Awareness Recovery Farmingdale, Protect Critical Facilities from Wind Mitigation - Risk 15_02 Ongoing Medium Borough of Damage and Flooding Reduction Maintenance / Farmingdale, Purchase and Install a Generator for 15_05 Ongoing Response / Medium Borough of School (Shelter) Recovery Mitigation - Farmingdale, Purchase and Install Generator for 15_06 Ongoing Improving Medium Borough of Borough Wells Functions Maintenance / Farmingdale, Purchase and Install Generator for 15_07 New Response / Medium Borough of Borough Hall Recovery Farmingdale, 15_03 Elevate Structures Withdrawn Borough of Farmingdale, Protect Critical Facilities 15_04 Withdrawn Borough of (Communication) Acquire, elevate, or relocate buildings and infrastructure in flood Freehold, Mitigation - Risk 16_10 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Freehold, Improve Emergency Notification 16_03 Ongoing Response / Medium Borough of System Recovery Maintenance / Freehold, Install Surveillance Cameras at 16_06 New Response / Medium Borough of Water Plant Recovery

399

Community Action Jurisdiction Action Name Action Category Priority Action # Status Purchase and Install Backup Maintenance / Freehold, 16_07 Generators for Lights at High- New Response / Medium Borough of volume Intersections Recovery Target Harden Critical Facilities by Maintenance / Freehold, Installing Surveillance Cameras, an 16_08 New Response / Medium Borough of Access Control System, Security Recovery Personnel, and/or Bulletproof Glass Mitigate Flooding at Veterans Park Mitigation - Freehold, 16_09 and Liberty Street Park Through New Improving Medium Borough of New Pipelines Functions Continue Tree Maintenance to Maintenance / Freehold, 16_04 Reduce Risk of Power Outages and Ongoing Response / Low Borough of Property/Human Harm Recovery Maintenance / Freehold, Purchase and Install Generator for 16_05 New Response / Low Borough of The Continental at Freehold Recovery Update Generator for Firehouse Freehold, 16_01 Emergency Operations Center Completed Borough of (EOC) Freehold, 16_02 Upgrade Generator for Shelter Completed Borough of Mitigation - Freehold, Reconstruct Culvert on Plymouth 17_02 Ongoing Improving High Township of Drive Functions Mitigation - Freehold, Reconstruct Culvert on Hampton 17_03 Ongoing Improving High Township of Drive Functions Mitigation - Freehold, Reconstruct Culvert on Medford 17_04 Ongoing Improving High Township of Boulevard Functions Acquire, elevate, or relocate buildings and infrastructure in flood Freehold, Mitigation - Risk 17_09 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Purchase and Install a Generator for Maintenance / Freehold, 17_10 Traffic Lights along the Route 9 and New Response / High Township of Route 537 Corridors Recovery Freehold, Repair, Remove, or Rehabilitate the Mitigation - Risk 17_14 New High Township of Lake Topanemus Dam Reduction Excavate and Remove Existing Storm Pipe, Stabilize Stream Banks, Mitigation - Freehold, 17_01 Replace Storm Pipe, and Install New Ongoing Improving Medium Township of Drainage Structure along Rose Functions Court Freehold, Provide Hazard Mitigation 17_06 Ongoing Administrative Medium Township of Information/Training to Residents Create a Wildfire Mitigation Plan Freehold, 17_08 and Provide Public Outreach on the Ongoing Administrative Medium Township of Hazard Maintenance / Freehold, Purchase and Install a Generator for 17_11 New Response / Medium Township of CentraState Hospital Recovery Freehold, Conduct a Microgrid Feasibility 17_12 New Administrative Medium Township of Study

400

Community Action Jurisdiction Action Name Action Category Priority Action # Status Target Harden Police Headquarters Maintenance / Freehold, 17_13 by Installing Surveillance Cameras New Response / Medium Township of and Fencing Recovery Maintenance / Freehold, Clean and De-snag Streams 17_05 Ongoing Response / Low Township of Throughout the Township Recovery Create a Plan to Manage Freehold, 17_15 Development in Landslide Hazard New Administrative Low Township of Areas Freehold, Purchase and Install Generators for 17_07 Completed Township of Pump Stations Acquire, elevate, or relocate buildings and infrastructure in flood Hazlet, Mitigation - Risk 18_04 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Hazlet, Upgrade Surveillance System 18_07 New Response / High Township of Software for the Township Recovery Maintenance / Hazlet, 18_08 Purchase Police Protective Gear New Response / High Township of Recovery Maintenance / Hazlet, Upgrade Communication System 18_09 New Response / High Township of between Fire and Police Recovery Hazlet, 18_10 Join FEMA's CRS Program New Administrative High Township of Construct Measures (e.g. floodwalls and small berms) Hazlet, Along Thornes Creek and Mitigation - Risk 18_11 New High Township of Waackaack Creek to Mitigate Reduction Flooding in the West Keansburg Neighborhood Continue to Clear Debris and Maintenance / Hazlet, 18_01 Sediment from Stream Corridors to Ongoing Response / Medium Township of Mitigate Flooding Recovery Maintenance / Hazlet, Clean, Televise, and Replace 18_02 Ongoing Response / Medium Township of Stormwater Inlets and Catch Basins Recovery Maintenance / Hazlet, Purchase and Install Generators for 18_05 New Response / Medium Township of Critical Facilities Recovery Hazlet, Develop a Natco Park Wildfire 18_06 New Administrative Medium Township of Protection Plan Hazlet, Acquire Flood-prone Property for 18_03 Withdrawn Township of Open Space Highlands, Elevate and Floodproof Downtown Mitigation - Risk 19_01 Ongoing High Borough of District Reduction Build More Stormwater Pump Mitigation - Highlands, Stations and Provide Stormwater 19_02 Ongoing Improving High Borough of Infrastructure Improvements along Functions Route 36 Protect and Restore Existing Mitigation - Highlands, Natural Protective Features (the 19_03 Ongoing Improving High Borough of coastline) and Flood Control Functions Infrastructure (i.e. bulkheads)

401

Community Action Jurisdiction Action Name Action Category Priority Action # Status Implement No-Build Ordinances Highlands, along Landslide-prone Areas and 19_04 Ongoing Administrative High Borough of Implement Soil Stabilization Measures Highlands, Install Movable Flood Gates along Mitigation - Risk 19_08 Ongoing High Borough of the Raritan Bay Reduction Reduce the Amount of Stormwater Mitigation - Highlands, 19_09 Flowing from Middletown, which New Improving High Borough of Floods Route 36 and the Borough Functions Acquire, elevate, or relocate buildings and infrastructure in flood Highlands, Mitigation - Risk 19_10 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Improve Electrical and Maintenance / Highlands, 19_05 Telecommunication Systems at Ongoing Response / Medium Borough of Critical Facilities Recovery Highlands, Implement Wind Resistant Building Mitigation - Risk 19_06 Ongoing Medium Borough of Techniques Reduction Conduct a Study on Borough Highlands, 19_07 Facilities and Seek Funding for Ongoing Administrative Medium Borough of Mitigation Projects Acquire, elevate, or relocate buildings and infrastructure in flood Holmdel, Mitigation - Risk 20_02 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Construct Flood Measure (e.g. Holmdel, Mitigation - Risk 20_09 floodwalls or small berms) along New High Township of Reduction Hop Brook Holmdel, Conduct a Flood Mitigation Study 20_03 New Administrative Medium Township of for Route 35 Target Harden Critical Facilities by Maintenance / Holmdel, 20_04 Installing Surveillance Camera and New Response / Medium Township of Fencing Recovery Maintenance / Holmdel, Purchase and Install Generators for 20_07 New Response / Medium Township of Critical Facilities Recovery Holmdel, 20_08 Conduct a Fire Analysis Study New Administrative Medium Township of Conduct Ongoing Maintenance of Maintenance / Holmdel, 20_05 the Morrhoris Brook/Waycaake New Response / Low Township of Creek Recovery Maintenance / Holmdel, Develop a Tree Trimming 20_06 New Response / Low Township of Maintenance Program Recovery Holmdel, Update Sanitary Sewer 20_01 Completed Township of Infrastructure Acquire, elevate, or relocate buildings and infrastructure in flood Howell, prone areas, with a focus on Mitigation - Risk 21_03 Ongoing High Township of Repetitive Loss (RL) and Severe Reduction Repetitive Loss (SRL) properties in the Mariners Cove Neighborhood

402

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Howell, Install Backup Batteries Capabilities 21_10 New Response / High Township of for Intersections along Route 9 Recovery Conduct Routine Debris Removal Maintenance / Howell, and Develop a Floodplain 21_11 New Response / High Township of Management Plan for Stream Recovery Corridors Repair, Remove, or Rehabilitate the Howell, Mitigation - Risk 21_12 Echo Lake Dam, Lake Louise Dam, New High Township of Reduction and Manasquan Reservoir Dam Howell, Increase Hazard Education and Risk 21_01 Ongoing Administrative Medium Township of Awareness for Residents Protect Critical Facilities Used for Howell, Mitigation - Risk 21_02 Sheltering from Wind Damage and Ongoing Medium Township of Reduction Flooding Howell, Improve Communication for Critical 21_04 Ongoing Administrative Medium Township of Facilities Purchase and Install Generators for Maintenance / Howell, 21_05 Critical Facilities to Continue Ongoing Response / Medium Township of Emergency Services During Storms Recovery Continue to Provide Safe Drinking Maintenance / Howell, 21_06 Water to Residents During Power Ongoing Response / Medium Township of Outages Recovery Develop a Study on the Need for Howell, 21_07 Transportation of Vulnerable New Administrative Medium Township of Populations during Emergencies Howell, Develop a Wildfire and Trail 21_08 New Administrative Medium Township of Maintenance Plan Maintenance / Howell, Coordinate with NWS Earle on 21_09 New Response / Medium Township of Emergency Response Protocol Recovery Create a Plan to Manage Howell, 21_13 Development in Landslide Hazard New Administrative Low Township of Areas Acquire, elevate, or relocate buildings and infrastructure in flood Interlaken, Mitigation - Risk 22_02 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Construct Flood Measure (e.g. Interlaken, Mitigation - Risk 22_03 floodwalls or small berms) along New High Borough of Reduction Deal Lake Systematically Conduct Upgrades Maintenance / Interlaken, and Improvements to Sewer 22_01 Ongoing Response / Medium Borough of Systems, Stormwater Systems, and Recovery Outflow Pipes Install Three Floodproofed Keansburg, Mitigation - Risk 23_01 Stormwater Pump Stations with Ongoing High Borough of Reduction Generators Keansburg, Extend Bulkhead and Dredge Mitigation - Risk 23_03 Ongoing High Borough of Waackaack Creek Reduction Extend Beach Width, Increase Sand Keansburg, Dune Height, Conduct Dune Mitigation - Risk 23_04 Ongoing High Borough of Maintenance with Dune Grass, and Reduction Other Beach Mitigation Projects

403

Community Action Jurisdiction Action Name Action Category Priority Action # Status Acquire, elevate, or relocate buildings and infrastructure in flood Keansburg, Mitigation - Risk 23_05 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Keansburg, Initiate a Tree Trimming/Pruning 23_06 Ongoing Response / High Borough of Program Recovery Keansburg, Acquire Vacant Properties for Open Mitigation - Risk 23_07 Ongoing High Borough of Space Reduction Keansburg, Create Flood Hazard Zoning 23_09 Ongoing Administrative High Borough of Ordinances Keansburg, Construct a Certified along Mitigation - Risk 23_13 New High Borough of the Bay Reduction Keansburg, Update Winter Storm Response 23_15 New Administrative High Borough of Plan Keansburg, Develop a Civil Unrest Response 23_16 New Administrative High Borough of Plan Maintenance / Keansburg, 23_34 Reconstruct Inlet on Steeley Avenue New Response / High Borough of Recovery Maintenance / Keansburg, Install New Inlet and Pipes at Laurel 23_38 New Response / High Borough of Avenue Recovery Maintenance / Keansburg, Construct a Two Million Gallon 23_39 New Response / High Borough of Storage Tank Recovery Maintenance / Keansburg, 23_40 Replace Aging Water Mains New Response / High Borough of Recovery Purchase and Install New Pumps Mitigation - Keansburg, 23_42 and New Comminutors at Sewer New Improving High Borough of Pump station Functions Maintenance / Keansburg, Purchase Two New Trucks for 23_46 New Response / High Borough of Water/Sewer Department Recovery Keansburg, 23_08 Develop a Backup Generator Plan Ongoing Administrative Medium Borough of Maintenance / Keansburg, Designate More Dredging Dump 23_14 New Response / Medium Borough of Sites Recovery Keansburg, Develop a Cyber Attack Response 23_17 New Administrative Medium Borough of Implementation Keansburg, Develop an Action Plan to Address 23_18 New Administrative Medium Borough of Economic Collapse Keansburg, Develop an Action Plan to Address 23_19 New Administrative Medium Borough of a Pandemic Event Keansburg, Create an Action Plan to Address 23_20 New Administrative Medium Borough of Power Failure Keansburg, 23_21 Create a Terrorism Response Plan New Administrative Medium Borough of Maintenance / Keansburg, 23_22 Reconstruct Randall Place New Response / Medium Borough of Recovery

404

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Keansburg, 23_23 Reconstruct Maple Avenue New Response / Medium Borough of Recovery Maintenance / Keansburg, 23_24 Reconstruct Grove Place New Response / Medium Borough of Recovery Maintenance / Keansburg, Reconstruct Woodside Avenue - 23_25 New Response / Medium Borough of Phase 1 Recovery Maintenance / Keansburg, Reconstruct Woodside Avenue - 23_26 New Response / Medium Borough of Phase 2 Recovery Maintenance / Keansburg, 23_27 Reconstruct Lawrence Avenue New Response / Medium Borough of Recovery Maintenance / Keansburg, 23_28 Reconstruct Myrtle Avenue New Response / Medium Borough of Recovery Maintenance / Keansburg, 23_29 Reconstruct Beachway Avenue New Response / Medium Borough of Recovery Maintenance / Keansburg, 23_30 Reconstruct Carr Avenue New Response / Medium Borough of Recovery Maintenance / Keansburg, Reconstruct Forest Avenue -Phase 23_31 New Response / Medium Borough of 1 Recovery Maintenance / Keansburg, Reconstruct Forest Avenue -Phase 23_32 New Response / Medium Borough of 2 Recovery Maintenance / Keansburg, 23_33 Reconstruct Murray Lane New Response / Medium Borough of Recovery Maintenance / Keansburg, Replace Piping at Beaconlight 23_35 New Response / Medium Borough of Avenue Recovery Maintenance / Keansburg, Replace Piping at Willis Avenue & 23_36 New Response / Medium Borough of Park Avenue Recovery Maintenance / Keansburg, Improve Drainage at Beachway 23_37 New Response / Medium Borough of Avenue Recovery Maintenance / Keansburg, Replace Pressure Filter in Water 23_41 New Response / Medium Borough of Plant Recovery Maintenance / Keansburg, 23_43 Purchase a New Jet/Vac Truck New Response / Medium Borough of Recovery Maintenance / Keansburg, Purchase a New Belt Filter Press for 23_44 New Response / Medium Borough of Sludge Disposal Recovery Maintenance / Keansburg, Purchase New Membranes for R/O 23_45 New Response / Medium Borough of Treatment Recovery

405

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Keansburg, Purchase Three New Department of 23_47 New Response / Medium Borough of Public Works Trucks Recovery Maintenance / Keansburg, 23_48 Purchase a New Sweeper Vac New Response / Medium Borough of Recovery Maintenance / Keansburg, Purchase a New Trailer to Haul 23_49 New Response / Medium Borough of Equipment Recovery Maintenance / Keansburg, 23_50 Purchase New Aerial Fire Trucks New Response / Medium Borough of Recovery Maintenance / Keansburg, Purchase New Basic Life Support 23_51 New Response / Medium Borough of Ambulances Recovery Keansburg, Develop Water Use Restriction 23_11 Ongoing Administrative Low Borough of Ordinances Maintenance / Keansburg, 23_52 Purchase New Wave Runners New Response / Low Borough of Recovery Relocate the Police Headquarters Mitigation - Keansburg, 23_02 and Emergency Operation Center Completed Improving Borough of out of Flood Area Functions Keansburg, 23_10 Develop a Variance Plan Completed Administrative Borough of Keansburg, Develop Hazard Mitigation Outreach 23_12 Completed Borough of Program Acquire, elevate, or relocate buildings and infrastructure in flood Keyport, Mitigation - Risk 24_01 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Keyport, Mitigation - Risk 24_02 Acquire Two Flood Prone Properties Ongoing High Borough of Reduction Keyport, Mitigation - Risk 24_03 Elevate and Replace Bulkheads Ongoing High Borough of Reduction Keyport, Elevate and Floodproof Maple Place Mitigation - Risk 24_04 Ongoing High Borough of Pump Station Reduction Mitigation - Keyport, Build New Culvert at Green Grove 24_06 Ongoing Improving High Borough of Ave. Functions Increase Size of Stormwater Pipes Mitigation - Keyport, 24_07 and Overall Stormwater System in Ongoing Improving High Borough of the Borough Functions Keyport, Mitigation - Risk 24_08 Elevate Firemen's Park Bulkhead Ongoing High Borough of Reduction Keyport, Mitigation - Risk 24_09 Install Tide Valves - Phase II Ongoing High Borough of Reduction Mitigation - Keyport, Extend Beach Park Pipe Past 24_10 Ongoing Improving High Borough of Division Street Functions Keyport, Acquire 44 Beer Street and Convert Mitigation - Risk 24_12 New High Borough of to Open Space Reduction Maintenance / Keyport, 24_13 Dredge Luppatatong Creek New Response / High Borough of Recovery

406

Community Action Jurisdiction Action Name Action Category Priority Action # Status Mitigation - Keyport, Restore Wetlands at Happy 24_14 New Improving High Borough of Meadows Functions Keyport, Develop Storm Debris Dumpster 24_15 New Administrative High Borough of Storage Plan Create along the Keyport, Mitigation - Risk 24_16 Raritan Bay and Install Wave New High Borough of Reduction Attenuation Devices in the Bay Implement the Beers Street Keyport, 24_17 Neighborhood Plan New Administrative High Borough of Recommendations Implement the Walnut-Oak Street Keyport, 24_18 Neighborhood Plan New Administrative High Borough of Recommendations Implement the First Street Keyport, 24_19 Neighborhood Plan New Administrative High Borough of Recommendations Implement the Division Street Keyport, 24_20 Neighborhood Plan New Administrative High Borough of Recommendations Keyport, Acquire Olsen’s Marina and Convert Mitigation - Risk 24_21 New High Borough of to Open Space Reduction Maintenance / Keyport, Purchase and Install Permanent 24_11 New Response / Medium Borough of Generators for Emergency Shelters Recovery Maintenance / Keyport, Purchase and Install Generators at 24_05 Completed Response / Borough of Pump Stations Recovery Construct a New Outfall Pipe and Lake Como, Mitigation - Risk 25_01 Pump at Lake Como to Allow Water Ongoing High Borough of Reduction to be Released to the Ocean Acquire, elevate, or relocate buildings and infrastructure in flood Lake Como, Mitigation - Risk 25_02 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Lake Como, Purchase and Install Generator for 25_04 Ongoing Response / Medium Borough of Emergency Shelter Recovery Protect the Emergency Command Lake Como, Center from Wind Damage Through Mitigation - Risk 25_08 Ongoing Medium Borough of Purchasing and Installing Hurricane Reduction Windows and Roof Straps Maintenance / Lake Como, Purchase and Install Generator for 25_09 New Response / Medium Borough of Belmar Police Recovery Maintenance / Lake Como, Purchase and Install Generator for 25_06 Ongoing Response / Low Borough of Public Works Building Recovery Lake Como, 25_03 Water System Improvements Completed Borough of Lake Como, Purchase and Install Generator for 25_05 Completed Borough of OEM Central Command Center Lake Como, Purchase and install Generator for 25_07 Completed Borough of First Aid Building

407

Community Action Jurisdiction Action Name Action Category Priority Action # Status Improve Stormwater Runoff and Maintenance / Little Silver, 26_01 Drainage by Upgrading Ongoing Response / High Borough of Infrastructure and Clean Streams Recovery Acquire, elevate, or relocate buildings and infrastructure in flood Little Silver, Mitigation - Risk 26_02 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Little Silver, Repair Outfall Drainage Pipe and Mitigation - Risk 26_03 Ongoing High Borough of Install Tide Flex Valve Reduction Little Silver, Install a Regional Dyke Structure Mitigation - Risk 26_04 Ongoing High Borough of along the Sandy Hook Inlet Reduction Mitigation - Little Silver, Elevate Seven Bridges Rd. Above 26_08 New Improving High Borough of the Flood Zone Functions Target Harden Critical Facilities by Maintenance / Little Silver, Installing Surveillance Cameras, 26_06 New Response / Medium Borough of Panic Buttons, and/or Bulletproof Recovery Glass Maintenance / Little Silver, Improve Communications between 26_07 New Response / Medium Borough of Police Officers Recovery Maintenance / Little Silver, Purchase Tree Trimming 26_09 New Response / Medium Borough of Equipment Recovery Maintenance / Little Silver, Purchase and Install Generators for 26_05 New Response / Low Borough of Critical Facilities Recovery Create a Plan to Manage Little Silver, 26_10 Development in Landslide Hazard New Administrative Low Borough of Areas Acquire the Beach Club Property Loch Arbour, Mitigation - Risk 27_04 and Protect the Shoreline with Ongoing High Village of Reduction Dunes and Living Shorelines Acquire, elevate, or relocate buildings and infrastructure in flood Loch Arbour, Mitigation - Risk 27_06 prone areas, with a focus on New High Village of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Conduct a Study on the Need for Loch Arbour, 27_03 Stormwater Basins and Construct Ongoing Administrative Medium Village of New Infrastructure (if needed) Loch Arbour, Construct an Automatic Tide Gate Mitigation - Risk 27_05 Ongoing Medium Village of at Deal Lake Reduction Loch Arbour, 27_01 Automatic Flume Gate for Deal Lake Completed Village of Loch Arbour, Deal Lake Stream Maintenance and 27_02 Completed Village of Clearing Long Branch, Install Stormwater Control Devices Mitigation - Risk 28_04 Ongoing High City of at Lake Takanassee Reduction Long Branch, Install Improved Stormwater Pipe at Mitigation - Risk 28_05 Ongoing High City of the Elberon Trestle Reduction Long Branch, Install Duckbill Check Valves along Mitigation - Risk 28_06 Ongoing High City of the Shrewsbury River Reduction Long Branch, Construct a New Bulkhead at Bay Mitigation - Risk 28_07 Ongoing High City of Ave. Reduction

408

Community Action Jurisdiction Action Name Action Category Priority Action # Status Elevate Flood-prone Residential Long Branch, Properties Below the BFE, especially Mitigation - Risk 28_08 Ongoing High City of Repetitive Loss and Severe Reduction Repetitive Loss Properties Acquire and demolish/relocate buildings and infrastructure in flood Long Branch, Mitigation - Risk 28_09 prone areas, with a focus on Ongoing High City of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Long Branch, Purchase and Install Portable Flood Mitigation - Risk 28_10 New High City of Diversions Reduction Long Branch, Replace Bulk Head at Long Branch Mitigation - Risk 28_16 New High City of Promenade Reduction Mitigation - Long Branch, Upsize the Stormwater Pipe under 28_03 Ongoing Improving Medium City of the New Jersey Transit Rail Line Functions Target Harden Critical Facilities by Maintenance / Long Branch, Installing Surveillance Cameras, an 28_11 New Response / Medium City of Access Control System, Security Recovery Personnel, and/or Bulletproof Glass Maintenance / Long Branch, Purchase and Install Back Up 28_12 New Response / Medium City of Servers at Polling Stations Recovery Maintenance / Long Branch, 28_13 Purchase Portable Traffic Lights New Response / Medium City of Recovery Mitigation - Long Branch, Relocate Police Station out of Flood 28_14 New Improving Medium City of Hazard Area Functions Maintenance / Long Branch, Purchase and Install Flood Warning 28_15 New Response / Medium City of Signs Recovery Mitigation - Long Branch, Create Water Retention Areas to 28_17 New Improving Medium City of Alleviate Flooding Functions Long Branch, Install Flood Gate within Mitigation - Risk 28_18 New Medium City of Manahassett Creek Reduction Long Branch, Continue to Enforce Flood 28_01 Ongoing Administrative Low City of Ordinances Long Branch, Continue to Implement the City- 28_02 Ongoing Administrative Low City of Wide Drainage Master Plan Manalapan, Acquire Flood-prone Properties Mitigation - Risk 29_01 Ongoing High Township of Along Birmingham Drive Reduction Acquire, elevate, or relocate buildings and infrastructure in flood Manalapan, Mitigation - Risk 29_04 prone areas, with a focus on New High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Manalapan, Repair, Remove, or Rehabilitate the Mitigation - Risk 29_05 New High Township of Millhurst Lake Dam Reduction Maintenance / Manalapan, Active Shooter Training and 29_02 New Response / Medium Township of Shelters Recovery Maintenance / Manalapan, Target Harden Critical Facilities by 29_03 New Response / Medium Township of Installing Surveillance Cameras, an Recovery

409

Community Action Jurisdiction Action Name Action Category Priority Action # Status Access Control System, Security Gates, and/or Bulletproof Glass Complete the Borough Risk Manasquan, Assessment for Structures, 30_01 Ongoing Administrative High Borough of Facilities, and Equipment in the Borough Elevate Residential and Non- Residential Structures & Equipment, Manasquan, Mitigation - Risk 30_14 especially Repetitive Loss (RL) and Ongoing High Borough of Reduction Severe Repetitive Loss (SRL) Properties Relocate Structures, Critical Facilities, and Equipment out of Manasquan, Mitigation - Risk 30_15 Flood Hazard Areas, especially Ongoing High Borough of Reduction Repetitive Loss and Severe Repetitive Loss Properties Mitigation - Manasquan, Elevate and/or Improve Drainage of 30_16 Ongoing Improving High Borough of Roadways in Flood-prone Areas Functions Manasquan, Mitigation - Risk 30_17 Construct a Seawall and Flood Gate Ongoing High Borough of Reduction Maintenance / Manasquan, Increase Public Warning 30_05 Ongoing Response / Medium Borough of Capabilities Recovery Maintenance / Manasquan, Provide Lightning Protection for 30_09 Ongoing Response / Medium Borough of Critical Facilities Recovery Manasquan, Restore Natural Buffers to Mitigate Mitigation - Risk 30_11 Ongoing Medium Borough of Flooding Borough-Wide Reduction Manasquan, Floodproof Residential and Non- Mitigation - Risk 30_13 Ongoing Medium Borough of Residential Structures Reduction Continue Monitoring the Manasquan, 30_03 Implementation of the Hazard Ongoing Administrative Low Borough of Mitigation Plan Manasquan, 30_06 Develop a Drought Emergency Plan Ongoing Administrative Low Borough of Conduct Seismic Retrofitting of Manasquan, Mitigation - Risk 30_07 Structures, Facilities, and Ongoing Low Borough of Reduction Equipment Provide Erosion and Wave Manasquan, Protection along the Oceanfront by Mitigation - Risk 30_10 Ongoing Low Borough of Constructing a Dune and Wall Reduction System along the Coastline Conduct an Inventory and Retrofit Manasquan, 30_18 Structures, Facilities, and Ongoing Administrative Low Borough of Equipment to Sustain High Winds Manasquan, Establish Funding Mechanism for 30_02 Completed Borough of HMP Implement a Program for Public Manasquan, 30_04 Information on Hazard Awareness Completed Borough of & Mitigation Manasquan, Provide Back-up Power Generation 30_08 Completed Borough of for Critical Facilities Manasquan, Enforce Compliance with NFIP's 30_12 Completed Borough of CRS Program

410

Community Action Jurisdiction Action Name Action Category Priority Action # Status Acquire, elevate, or relocate buildings and infrastructure in flood Marlboro, Mitigation - Risk 31_06 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Marlboro, Desnag and Clean Stream Corridors 31_07 New Response / High Township of within the Township Recovery Construct Flood Measure (e.g. Marlboro, Mitigation - Risk 31_08 floodwalls or small berms) along New High Township of Reduction Deep Run Purchase and Install Generator at Maintenance / Marlboro, 31_03 Tennent Rd. Water Treatment Plant Ongoing Response / Medium Township of and Pump Station Recovery Provide Awareness and Readiness Marlboro, 31_01 Information on Hazards and Completed Township of Preparedness Marlboro, Provide Public Information on 31_02 Completed Township of Emergencies Purchase and Install Generator at Marlboro, 31_04 the Harbor Rd. Water Treatment Completed Township of Plant Marlboro, Purchase and Install Generator at 31_05 Completed Township of Recreation Center Matawan, Mitigation - Risk 32_02 Replace Lake Matawan Dam Ongoing High Borough of Reduction Mitigation - Matawan, 32_03 Elevate Aberdeen Road Ongoing Improving High Borough of Functions Maintenance / Matawan, Purchase a Jet Vac Ravine Cleaning 32_05 New Response / High Borough of and Clean Outfall Pipes Recovery Acquire, elevate, or relocate buildings and infrastructure in flood Matawan, Mitigation - Risk 32_09 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Target Harden Critical Facilities by Maintenance / Matawan, Installing Surveillance Cameras, an 32_07 New Response / Medium Borough of Access Control System, and/or Recovery Bulletproof Glass Maintenance / Matawan, 32_08 Develop a Tree Trimming Program New Response / Medium Borough of Recovery Maintenance / Matawan, Upgrade Generators at Critical 32_06 New Response / Low Borough of Facilities Recovery Matawan, 32_01 Replace Lake Lefferts Dam Completed Borough of Provide Auxiliary Power to the Matawan, 32_04 Matawan Municipal Community Completed Borough of Center/Borough Hall Acquire, elevate, or relocate Middletown, buildings and infrastructure in flood Mitigation - Risk 33_01 Ongoing High Township of prone areas, with a focus on Reduction Substantially Damaged, Repetitive

411

Community Action Jurisdiction Action Name Action Category Priority Action # Status Loss (RL), and Severe Repetitive Loss (SRL) properties Maintenance / Middletown, De-snag and Desilt Streams and 33_02 Ongoing Response / High Township of Provide Wetlands Maintenance Recovery Maintenance / Middletown, Purchase Temporary/Portable 33_04 Ongoing Response / High Township of Pumps to Remove Stormwater Recovery Conduct Compton Creek Marsh Mitigation - Middletown, Restoration and Build a Maritime 33_10 New Improving High Township of Forest; Repair Bulkhead at Belford Functions Harbor Conduct Ware Creek Marsh Mitigation - Middletown, 33_11 Restoration and Build a Upland New Improving High Township of Berm Maritime Forest Functions Coordinate with NWS Earle on Protecting the Navy Base and the Middletown, Mitigation - Risk 33_12 Belford Neighborhood through New High Township of Reduction Resiliency and Risk Reduction Projects Build Upland Dune Restoration Mitigation - Middletown, Install Wave-attenuating Oyster 33_13 New Improving High Township of Reefs to Protect the Leonardo Functions Neighborhood from Flooding Maintenance / Middletown, Increase the Number of Drones and 33_09 New Response / Medium Township of Provide Drone Training Recovery Provide for Continuity of Operations Mitigation - Middletown, 33_06 by Elevating Generators and Ongoing Improving Low Township of Switches at Fire Stations Functions Middletown, Develop a Microgrid Feasibility 33_07 New Administrative Low Township of Study (2017) Maintenance / Middletown, Enhance Security at Township 33_08 New Response / Low Township of Facilities Recovery Create a Plan to Define Steep Middletown, 33_14 Slope/High-risk Areas to Manage New Administrative Low Township of Development in Landslide Areas Construct and Install an Automatic Middletown, Mitigation - Risk 33_03 Slide Gate at Wilson Avenue at Completed Township of Reduction Pews Creek Middletown, Purchase and Install Generators for 33_05 Completed Township of Critical Facilities Acquire, elevate, or relocate buildings and infrastructure in flood Millstone, Mitigation - Risk 34_06 prone areas, with a focus on New High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Millstone, Repair, Remove, or Rehabilitate the Mitigation - Risk 34_07 New High Township of Assunpink #18 Dam Reduction Mitigation - Millstone, Mitigate Flooding Behind Township 34_03 New Improving Medium Township of Fire House Functions Maintenance / Millstone, Improve Security at Parks and 34_04 New Response / Medium Township of Historic Buildings Recovery

412

Community Action Jurisdiction Action Name Action Category Priority Action # Status Improve Stormwater Management Maintenance / Millstone, 34_01 through Larger Piping and Ongoing Response / Low Township of Maintenance of Drains and Basins Recovery Maintenance / Millstone, Remove Dead and Hazardous Trees 34_02 Ongoing Response / Low Township of along Township's ROWs Recovery Improve Security by Purchasing and Maintenance / Millstone, 34_05 Installing Generators at Parks and New Response / Low Township of Historic Buildings Recovery Monmouth Elevate Existing Retaining Wall & Mitigation - Risk Beach, 35_01 Floodproof Pump Station at Ongoing High Reduction Borough of Shorelands Park Acquire, elevate, or relocate Monmouth buildings and infrastructure in flood Mitigation - Risk Beach, 35_04 prone areas, with a focus on Ongoing High Reduction Borough of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Monmouth Mitigation - Risk Beach, 35_05 Elevate Four Municipal Structures Ongoing High Reduction Borough of Monmouth Mitigation - Install Stormwater Improvements in Beach, 35_06 Ongoing Improving High Low-laying Areas Borough of Functions Monmouth Mitigation - Beach, 35_08 Elevate Evacuation Roadways New Improving High Borough of Functions Monmouth Mitigation - Conduct Improvements to Drainage Beach, 35_03 Ongoing Improving Low Infrastructure at Shorelands Park Borough of Functions Monmouth Maintenance / Beach, 35_09 Elevate DPW Generator New Response / Low Borough of Recovery Monmouth Maintenance / Purchase and Install Permanent Beach, 35_10 New Response / Low Roof for Salt Shed Borough of Recovery Monmouth Maintenance / Purchase Drones for Research & Beach, 35_11 New Response / Low Recovery Attempts Borough of Recovery Monmouth Maintenance / Install Surveillance Cameras at Beach, 35_12 New Response / Low Critical Facilities Borough of Recovery Monmouth Maintenance / Develop a Winter Storm Response Beach, 35_13 New Response / Low Plan Borough of Recovery Monmouth Maintenance / Develop a Civil Unrest Response Beach, 35_14 New Response / Low Plan and Preparation Borough of Recovery Monmouth Maintenance / Beach, 35_15 Develop a Cyber Attack Response New Response / Low Borough of Recovery Monmouth Maintenance / Develop an Action Plan to Address Beach, 35_16 New Response / Low Economic Collapse Borough of Recovery Monmouth Maintenance / Develop an Action plan to Address Beach, 35_17 New Response / Low Pandemic Event Action Borough of Recovery

413

Community Action Jurisdiction Action Name Action Category Priority Action # Status Monmouth Maintenance / Develop an Action plan to Address Beach, 35_18 New Response / Low Power Failure Borough of Recovery Monmouth Maintenance / Beach, 35_19 Develop a Terrorism Response Plan New Response / Low Borough of Recovery Monmouth Mitigation - Risk Beach, 35_02 Floodproofing Pump Station Withdrawn Reduction Borough of Monmouth Beach, 35_07 Expand the Existing Seawall Completed Borough of Acquire, elevate, or relocate buildings and infrastructure in flood Neptune City, Mitigation - Risk 36_07 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Mitigation - Neptune City, Elevate and Waterproof Sewer 36_03 Ongoing Improving Medium Borough of Pump Station Functions Maintenance / Neptune City, Create a Safe House for OEM 36_04 Ongoing Response / Medium Borough of Equipment Recovery Maintenance / Neptune City, Develop a Comprehensive Drainage 36_06 Ongoing Response / Medium Borough of Study to Mitigate Borough Flooding Recovery Purchase and Install Generators at Maintenance / Neptune City, 36_02 Borough Hall, the Fire Station, and Ongoing Response / Low Borough of the School Recovery Maintenance / Neptune City, Implement Improvements to 36_05 Ongoing Response / Low Borough of Designated Shelters Recovery Target Harden Critical Facilities by Maintenance / Neptune City, Installing Surveillance Cameras, an 36_08 New Response / Low Borough of Access Control System, and/or an Recovery Alarm System Increase Piping Capacity and Neptune City, 36_01 Reduce Sediment/Debris within Completed Borough of Watershed Construct an Elevated Bulkhead and Neptune, Mitigation - Risk 37_03 a Living Shoreline Around Wesley New High Township of Reduction Lake Construct an Elevated Bulkhead and Neptune, Mitigation - Risk 37_06 a Living Shoreline Around Fletcher New High Township of Reduction Lake Acquire and Demolish or Relocate Buildings and Infrastructure in Neptune, Mitigation - Risk 37_08 flood-prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Elevate 23 Flood-prone Properties, Neptune, Mitigation - Risk 37_11 with a focus on Repetitive Loss and Ongoing High Township of Reduction Severe Repetitive Loss Properties Neptune, 37_21 Update ArcGIS Online Withdrawn Administrative High Township of

414

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Neptune, 37_02 De-snag and Desilt Wesley Lake New Response / Medium Township of Recovery Mitigation - Neptune, Construct a Living Shoreline along 37_04 Ongoing Improving Medium Township of Shark River Functions Maintenance / Neptune, 37_05 De-snag and Desilt Fletcher Lake New Response / Medium Township of Recovery Target Harden Critical Facilities by Installing Surveillance Cameras, Maintenance / Neptune, 37_10 Barriers, Window Film, an Access New Response / Medium Township of Control System, and/or Bulletproof Recovery Glass Mitigation - Neptune, Construct a Living Shoreline along 37_12 New Improving Medium Township of Seaview Island Functions Maintenance / Neptune, 37_14 De-snag and Desilt Alberta Lake Ongoing Response / Medium Township of Recovery Reconstruct Deteriorating Mitigation - Neptune, 37_15 Bulkheads on S. Riverside Drive and Ongoing Improving Medium Township of Retrofit Stormwater Infrastructure Functions Neptune, Retrofit Pump stations with Mitigation - Risk 37_16 Ongoing Medium Township of Watertight Doors and/or Windows Reduction Maintenance / Neptune, 37_19 Desilt and Dredge Shark River Ongoing Response / Medium Township of Recovery Maintenance / Neptune, Establish and Install Warning 37_07 Ongoing Response / Low Township of System and Flood Gauges Recovery Maintenance / Neptune, 37_09 De-snag and Desilt Hollow Brook New Response / Low Township of Recovery Maintenance / Neptune, Purchase and Install Generators for 37_13 New Response / Low Township of Critical Infrastructure Recovery De-snag and Desilt the Shark River Maintenance / Neptune, 37_17 Tributary, Jumping Brook, and Ongoing Response / Low Township of Musquash Brook Recovery Create a Permanent Confined Maintenance / Neptune, 37_18 Disposal Facilities (CDF) and Ongoing Response / Low Township of Structural Earthen Berm Recovery Neptune, Create Hazard Overlay Zones and 37_20 Ongoing Administrative Low Township of Update ArcGIS Online Maintenance / Neptune, Purchase Stormwater Pumps and 37_22 New Response / Low Township of Appurtenances Recovery Neptune, Purchase and Install a Generator at 37_01 Completed Township of North Island Pump Station Acquire, elevate, or relocate buildings and infrastructure in flood Ocean, Mitigation - Risk 38_01 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties

415

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Ocean, Create a Detention Pond for 38_05 Ongoing Response / High Township of Whalepond Brook Recovery Redesign the Existing Weir to Mitigation - Ocean, 38_10 Increase Storm Attenuation Ongoing Improving High Township of Capacity at Fireman Pond Functions Replace Existing Weir and Dredge Maintenance / Ocean, 38_11 and Reconfigure Existing Ongoing Response / High Township of Impoundment at Lollipop Pond Recovery Ocean, Construct a Flood Wall along Poplar Mitigation - Risk 38_14 Ongoing High Township of Brook Reduction Ocean, Purchase Joanna Ct. Property for Mitigation - Risk 38_16 New High Township of Detention Pond Reduction Maintenance / Ocean, Clean and Desilt Poplar Brook and 38_02 Ongoing Response / Medium Township of Whalepond Brook Recovery Reconstruct Wetlands and Flood Mitigation - Ocean, 38_09 Attenuation Basins around Harvey Ongoing Improving Medium Township of Brook; Stabilize Stream Banks Functions Maintenance / Ocean, Purchase and Install Generators for 38_06 Ongoing Response / Low Township of Other Critical Facilities Recovery Maintenance / Ocean, Remove Sediment and Tree Debris 38_07 Ongoing Response / Low Township of Along the Arm of Deal Lake Recovery Enlarge Culverts under Roadway Mitigation - Ocean, 38_12 and Railroad (Intersection of New Ongoing Improving Low Township of Jersey Transit and Poplar Brook) Functions Mitigation - Ocean, Create a Detention Pond near Joe 38_13 Ongoing Improving Low Township of Palaia Park Functions Mitigation - Ocean, Enlarge Culverts under Roadway 38_15 Ongoing Improving Low Township of and Railroad (Whalepond Brook) Functions Target Harden Municipal Complex and Schools by Installing Maintenance / Ocean, 38_17 Surveillance Cameras, Panic New Response / Low Township of Buttons, Metal Detectors, and/or Recovery Bulletproof Glass Mitigation - Ocean, 38_03 Reconstruct Roseld Avenue Dam Withdrawn Improving Township of Functions Ocean, Purchase and Install Generators for 38_04 Completed Township of Town Hall Redesign the Existing Weir to Mitigation - Ocean, Increase Storm Attenuation 38_08 Withdrawn Improving Township of Capacity at the Colonial Terrace Functions Arm of Deal Lake Acquire, elevate, or relocate buildings and infrastructure in flood Oceanport, Mitigation - Risk 39_01 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Oceanport, Coordinate with Army Corp on Mitigation - Risk 39_09 Ongoing High Borough of Installing a Moveable Flood Gate Reduction

416

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Oceanport, Examine Existing Stormwater 39_05 Ongoing Response / Medium Borough of Drainage System (Phase 1 of 2) Recovery Implement Improvements to Maintenance / Oceanport, 39_06 Stormwater Drainage System Ongoing Response / Medium Borough of (Phase 2 of 2) Recovery Maintenance / Oceanport, Protect and Restore Turtle Mill 39_07 Ongoing Response / Medium Borough of Brook Recovery Maintenance / Oceanport, Purchase and Instill Emergency 39_04 Ongoing Response / Low Borough of Generators for Critical Facilities Recovery Mitigation - Oceanport, Elevate and Improve Flood-prone 39_08 Ongoing Improving Low Borough of Roadways Functions Construct Gates on Bridges to Maintenance / Oceanport, 39_11 Prevent Residents from Re-Entering New Response / Low Borough of Borough Post Storm Recovery Create a Plan to Manage Oceanport, 39_12 Development in Landslide Hazard New Administrative Low Borough of Areas Phase 1 of Borough Hall Relocation Oceanport, 39_02 Project: Acquire Land for a New Completed Borough of Building. Oceanport, Phase 2 of Borough Hall Relocation 39_03 Completed Borough of Project: Construct a New Building Oceanport, Create Easier Access to the 39_10 Completed Borough of Emergency Watercraft Launch Acquire, elevate, or relocate buildings and infrastructure in flood Red Bank, Mitigation - Risk 40_01 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Construct Flood Measure (e.g. Red Bank, Mitigation - Risk 40_10 floodwalls or bulkhead) along the New High Borough of Reduction Navesink River Maintenance / Red Bank, Implement Stormwater 40_04 Ongoing Response / Medium Borough of Management Maintenance Plan Recovery Evaluate Water and Sewer Maintenance / Red Bank, 40_05 Infrastructure and Make Ongoing Response / Medium Borough of Improvements as Needed Recovery Coordinate with Red Bank Primary Red Bank, 40_06 School on Flood Mitigation New Administrative Medium Borough of Strategies Coordinate with Chapin Hill Nursing Red Bank, Home on Mitigation Strategies to 40_07 New Administrative Medium Borough of Address Flooding, including partnering with the Salvation Army Red Bank, Implement Impervious Cover 40_08 New Administrative Medium Borough of Reduction Action Plan Maintenance / Red Bank, Establish a Tree Trimming Program 40_09 New Response / Medium Borough of and Create a Wind Shield Survey Recovery Red Bank, New Communication Tower at 40_02 Completed Borough of Tower Hill Water Plant

417

Community Action Jurisdiction Action Name Action Category Priority Action # Status Red Bank, Drainage Improvements in Marine 40_03 Completed Borough of Park Roosevelt, Install Traffic Calming Measures on Mitigation - Risk 41_09 New High Borough of Highly Traveled Roads Reduction Acquire, elevate, or relocate buildings and infrastructure in flood Roosevelt, Mitigation - Risk 41_12 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Roosevelt, Retrofit Critical Structures with Mitigation - Risk 41_13 New High Borough of Ignition-Resistant Materials Reduction Maintenance / Roosevelt, Expand the Brush Removal 41_02 Ongoing Response / Medium Borough of Program Recovery Join a New Jersey Forest Fire Maintenance / Roosevelt, 41_03 Service for Systematic Removal of Ongoing Response / Medium Borough of Accumulated Brush Recovery Maintenance / Roosevelt, Purchase Tree Trimming 41_04 New Response / Medium Borough of Equipment for Downed Trees Recovery Maintenance / Roosevelt, Update Security System for Critical 41_05 New Response / Medium Borough of Facilities Recovery Maintenance / Roosevelt, 41_06 Install a Borough-wide Alert System New Response / Medium Borough of Recovery Purchase and Install a Generator Maintenance / Roosevelt, 41_07 Synagogue and Roosevelt New Response / Medium Borough of Elementary Recovery Maintenance / Roosevelt, Continue and Enhance the Stream 41_08 New Response / Medium Borough of Maintenance Program Recovery Roosevelt, 41_10 Provide Outreach on Tick Control New Administrative Low Borough of Maintenance / Roosevelt, 41_11 John Deer “Gator” off Road vehicle New Response / Low Borough of Recovery Roosevelt, 41_01 Expansion of Fire House Withdrawn Borough of Construct Earthen Berm and Rumson, Associated Grading above the Mitigation - Risk 42_02 Ongoing High Borough of Existing Bulkhead at Grant Ave. and Reduction Waterman Ave. Rumson, Improvements to Eight Sanitary 42_03 Completed High Borough of Sewer Pump Stations Maintenance / Rumson, Improve the Borough's Warning 42_10 Ongoing Response / High Borough of System Recovery Maintenance / Rumson, Upgrade SCADA System to Control 42_14 Ongoing Response / High Borough of and Monitor Critical Facilities Recovery Rehabilitate and Upgrade the Mitigation - Rumson, 42_16 Existing Drainage System at Holly Ongoing Improving High Borough of Tree Lane & Evergreen Drive Functions

418

Community Action Jurisdiction Action Name Action Category Priority Action # Status Elevate and Reconstruct Rumson Rumson, Mitigation - Risk 42_17 Boat Launch and Install New Ongoing High Borough of Reduction Bulkhead Rumson, 42_20 Enter NFIP's CRS Program Ongoing Administrative High Borough of Rumson, Expand the GIS Database to Digitize 42_22 New Administrative High Borough of Records Acquire, elevate, or relocate buildings and infrastructure in flood Rumson, Mitigation - Risk 42_28 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Install New Elevated Bulkhead, Rehabilitate Existing Drainage Rumson, Mitigation - Risk 42_05 Pipes, and Install a New Tide Valve Ongoing Medium Borough of Reduction at Shrewsbury Dr. & Ave of Two Rivers Maintenance / Rumson, Clean and Maintain the Borough's 42_08 Ongoing Response / Medium Borough of Streams and Ponds Recovery Maintenance / Rumson, 42_09 Establish a Tree Trimming Program Ongoing Response / Medium Borough of Recovery Rumson, Continue Adopting Floodplain 42_11 Ongoing Administrative Medium Borough of Development Protection Ordinances Maintenance / Rumson, Install Quick Connection for 42_12 Ongoing Response / Medium Borough of Portable Generator Recovery Maintenance / Rumson, Upgrade Community Shelter to 42_13 Ongoing Response / Medium Borough of Provide Temporary Refuge Recovery Purchase and Install New Generator Maintenance / Rumson, 42_15 for the Oceanic Hook Ladder Fire Ongoing Response / Medium Borough of House Recovery Initiate Regional Community Rumson, 42_24 Resiliency Discussions with New Administrative Medium Borough of Neighboring Communities Mitigation - Rumson, Elevate or Floodproof Oyster Bay 42_25 New Improving Medium Borough of Drive Functions Maintenance / Rumson, Install Lightning Protection for 42_26 New Response / Medium Borough of Critical Borough Facilities Recovery Maintenance / Rumson, Install Surveillance Cameras at 42_27 New Response / Medium Borough of Critical Facilities Recovery Purchase and Install Generator for Maintenance / Rumson, 42_07 Rumson Fair Haven Regional High Ongoing Response / Low Borough of School Recovery Rumson, Obtain High Resolution Aerials of 42_23 New Administrative Low Borough of SFHAs Create a Plan to Manage Rumson, 42_29 Development in Landslide Hazard New Administrative Low Borough of Areas Rumson, 42_01 32 Home Elevations Completed Borough of

419

Community Action Jurisdiction Action Name Action Category Priority Action # Status Rumson, Install Reinforced Steel, Rubber 42_04 Completed Borough of Gasket-lined Storm Doors at DPW Remove and Replace Existing Rumson, 42_06 Underground Diesel Fuel Storage Completed Borough of Tanks Rumson, Create an Automated Zoning and 42_18 Completed Borough of Construction Permit System Rumson, Revise Rumson Emergency 42_19 Completed Borough of Operations Plan Rumson, Develop GIS Database/Inventory of 42_21 Completed Borough of Borough Owned Infrastructure Acquire, elevate, or relocate buildings and infrastructure in flood Sea Bright, Mitigation - Risk 43_01 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Elevate Bulkhead with Pump Sea Bright, Mitigation - Risk 43_02 Stations, Tide Valves to Outfalls, Ongoing High Borough of Reduction and Backflow Preventors Sea Bright, Construct Berms Along Beachfront Mitigation - Risk 43_05 Ongoing High Borough of to Absorb Storm Surge Reduction Sea Bright, Mitigation - Risk 43_04 Floodproof the Downtown District Ongoing Medium Borough of Reduction Mitigation - Sea Bright, Move the Electrical Infrastructure 43_06 Ongoing Improving Medium Borough of Underground Functions Develop a Hydrology Study to Sea Bright, 43_08 Improve Stormwater Management New Administrative Medium Borough of Borough-wide Maintenance / Sea Bright, Maintain and Retrofit Existing 43_09 New Response / Medium Borough of Outfalls Recovery Maintenance / Sea Bright, Purchase and Install New Siren for 43_12 New Response / Medium Borough of Municipal Complex Recovery Maintenance / Sea Bright, Target Harden Pump Stations with 43_07 New Response / Low Borough of Camera System and Fencing Recovery Improve Public Awareness of Sea Bright, 43_10 Severe Wind Through Outreach New Administrative Low Borough of Activities Sea Bright, Improve Public Awareness of Storm 43_11 New Administrative Low Borough of Preparedness at the Marina Sea Bright, 43_03 Rehabilitate and Complete Sea Wall Completed Borough of Sea Girt, Mitigation - Risk 44_02 Elevate Homes above the BFE Ongoing High Borough of Reduction Acquire, elevate, or relocate buildings and infrastructure in flood Sea Girt, Mitigation - Risk 44_11 prone areas, with a focus on New High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Coordinate with the National Guard Sea Girt, Training Center to Construct Flood Mitigation - Risk 44_12 New High Borough of Measure (e.g. floodwalls or berms) Reduction along Stockton Lake

420

Community Action Jurisdiction Action Name Action Category Priority Action # Status Maintenance / Sea Girt, Purchase and Install (or Upgrade) 44_03 Ongoing Response / Medium Borough of Generators at Critical Facilities Recovery Maintenance / Sea Girt, Purchase Portable and Permanent 44_05 Ongoing Response / Medium Borough of Emergency Signage Recovery Create an Emergency Recovery Sea Girt, 44_09 Plan for the National Guard Training New Administrative Medium Borough of Center Increase Security at Water Tower Maintenance / Sea Girt, 44_10 with Surveillance Camera System New Response / Medium Borough of and Secure Gates Recovery Sea Girt, 44_01 Extend Outflow Pipe Completed Borough of Sea Girt, 44_04 New Alert Horn and Siren System Completed Borough of Sea Girt, AM Radio Station for 44_06 Completed Borough of Communication Sea Girt, 44_07 Reopen Wreck Pond Completed Borough of Sea Girt, 44_08 Dredge Wreck Pond Completed Borough of Acquire, elevate, or relocate buildings and infrastructure in flood Shrewsbury, Mitigation - Risk 45_07 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Shrewsbury, Establish Public Awareness and 45_02 Ongoing Administrative Medium Borough of Education Programs Mitigation - Shrewsbury, Relocate the First Aid Squad 45_03 Ongoing Improving Low Borough of Outside Flood-prone Area Functions Upgrade Drainage System and De- Maintenance / Shrewsbury, 45_04 snag and Clean the Little Silver Ongoing Response / Low Borough of Creek Recovery Shrewsbury, Purchase and Install a Generator at 45_01 Completed Borough of Critical Facilities Shrewsbury, Blades Run and Winding Brook Run 45_05 Completed Borough of Stabilization Project Shrewsbury, Purchase and Install Emergency 45_06 Withdrawn Borough of Generator Acquire, elevate, or relocate buildings and infrastructure in flood Shrewsbury, Mitigation - Risk 46_03 prone areas, with a focus on Ongoing High Township of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Mitigation - Shrewsbury, Purchase and Install Generator for 46_06 New Improving High Township of Pump Station Functions Purchase and Install a Generator for Maintenance / Shrewsbury, the Township Municipal Building 46_01 Ongoing Response / Medium Township of and Make Necessary Improvements Recovery to EOC Shrewsbury, Implement BMPs from the 46_02 Ongoing Administrative Medium Township of Stormwater Management Plan

421

Community Action Jurisdiction Action Name Action Category Priority Action # Status Purchase and Install Surveillance Maintenance / Shrewsbury, 46_04 Cameras at DPW and Township New Response / Medium Township of Municipal Building Recovery Shrewsbury, Coordinate with State Police on 46_05 New Administrative Medium Township of Emergency Response Time Spring Lake, Reconstruct the Sand Dune at Pier Mitigation - Risk 47_03 Ongoing High Borough of Beach Reduction Mitigation - Spring Lake, Improve Water Quality of Wreck 47_04 Ongoing Improving High Borough of Pond Functions Acquire, elevate, or relocate buildings and infrastructure in flood Spring Lake, Mitigation - Risk 47_07 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Maintenance / Spring Lake, Remove of Dredge Materials from 47_08 New Response / High Borough of Wreck Pond to Another Location Recovery Mitigation - Spring Lake, Purchase and Install Generators for 47_09 New Improving Medium Borough of Critical Facilities Functions Target Harden Police Headquarters Maintenance / Spring Lake, 47_10 with Bollards and Surveillance New Response / Medium Borough of Cameras Recovery Spring Lake, 47_01 Wreck Pond-Sluice Gate Installation Completed Borough of Spring Lake, 47_02 Dredging of Wreck Pond: Phase Ill Completed Borough of Spring Lake, Bypass Culvert from the Emergency 47_05 Completed Borough of Spillway to Ocean Spring Lake, Lake Como Outflow Reconstruction 47_06 Completed Borough of Project Spring Lake Mitigation - Heights, 48_04 Elevate and Secure Pump Stations Ongoing Improving High Borough of Functions Acquire and demolish or relocate Spring Lake buildings and infrastructure in flood Mitigation - Risk Heights, 48_05 prone areas, with a focus on Ongoing High Reduction Borough of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Elevate buildings and infrastructure Spring Lake in flood prone areas, with a focus Mitigation - Risk Heights, 48_06 Ongoing High on Repetitive Loss (RL) and Severe Reduction Borough of Repetitive Loss (SRL) properties Spring Lake Mitigation - Upsize or Replace Stormwater Pipe Heights, 48_09 New Improving High under Route 71 Borough of Functions Spring Lake Maintenance / Desilt and De-snag the North Heights, 48_08 New Response / Medium Branch of Wreck Pond Borough of Recovery Spring Lake Upsize the Culvert under NJ Transit Maintenance / Heights, 48_10 and De-snag and Clean Polly Pod New Response / Medium Borough of Brook Recovery Spring Lake Maintenance / Increase Security at the Borough Heights, 48_11 New Response / Medium Water Tower Borough of Recovery

422

Community Action Jurisdiction Action Name Action Category Priority Action # Status Spring Lake Purchase and Install Generator for Maintenance / Heights, 48_12 Spring Lake Heights Elementary New Response / Medium Borough of School Recovery Spring Lake Hazard Zoning & High-Risk Hazard Heights, 48_01 Completed Land Use Ordinances Borough of Spring Lake Increase Education and Risk Heights, 48_02 Completed Awareness Borough of Spring Lake Heights, 48_03 Protection from Tidal Flooding Completed Borough of Spring Lake Elevation or Retrofit of Existing Heights, 48_07 Completed Utilities above the BFE Borough of Mitigation - Tinton Falls, Purchase and Install Generators for 49_09 Ongoing Improving High Borough of Critical Facilities Functions Acquire, elevate, or relocate buildings and infrastructure in flood Tinton Falls, prone areas, with a focus on Mitigation - Risk 49_10 Ongoing High Borough of Repetitive Loss (RL) and Severe Reduction Repetitive Loss (SRL) properties, Especially along Pine Brook Maintenance / Tinton Falls, Implement Security Upgrade 49_13 New Response / High Borough of Measures at Borough Hall Recovery Construct Flood Measure (e.g. Tinton Falls, Mitigation - Risk 49_18 floodwalls or berms) along Pine New High Borough of Reduction Brook Tinton Falls, Continue to Enforce the Borough's 49_01 Ongoing Administrative Medium Borough of Stormwater Management Plan Create a Program for Routine Maintenance / Tinton Falls, Stormwater Maintenance Program 49_03 Ongoing Response / Medium Borough of and Seek Financial Assistance to Recovery Clean Stream Segments Limit Development along Steep Tinton Falls, 49_04 Slopes Through a Steep Slope Ongoing Administrative Medium Borough of Ordinance Tinton Falls, 49_05 Create a Wildfire Risk Map Ongoing Administrative Medium Borough of Upgrade Critical Facilities to Serve Maintenance / Tinton Falls, as a Comfort Station and 49_11 New Response / Medium Borough of Temporary Area of Refuge During Recovery or After a Disaster Target Harden the Municipal Complex (Borough Hall, Police Maintenance / Tinton Falls, Headquarters, DWP Facility) by 49_12 New Response / Medium Borough of Installing Surveillance Cameras, an Recovery Access Control System, Security Personnel, and/or Bulletproof Glass Tinton Falls, Develop a Civil Unrest Response 49_14 New Administrative Medium Borough of Plan Tinton Falls, Develop a Cyber Attack Response 49_15 New Administrative Medium Borough of Implementation

423

Community Action Jurisdiction Action Name Action Category Priority Action # Status Tinton Falls, Develop an Action Plan for a 49_16 New Administrative Medium Borough of Pandemic Event Maintenance / Tinton Falls, 49_17 Construct a OEM Vehicle Garage New Response / Medium Borough of Recovery Create a Mitigation Outreach Tinton Falls, 49_02 Program and Community Response Ongoing Administrative Low Borough of Team Program Maintenance / Tinton Falls, Purchase NOAA Weather Radios for 49_06 Ongoing Response / Low Borough of Critical Facilities Recovery Tinton Falls, Develop Educational Programs on 49_07 Ongoing Administrative Low Borough of Winter Hazards Enforce Landscaping Practices that Tinton Falls, 49_08 Reduce Hazards from Winter Ongoing Administrative Low Borough of Storms Implement the Army Corps of Union Beach, Engineers Shore Protection and Mitigation - Risk 50_01 Ongoing High Borough of Flood Control Plan for Flood Reduction Reduction Projects Acquire, elevate, or relocate buildings and infrastructure in flood Union Beach, Mitigation - Risk 50_02 prone areas, with a focus on Ongoing High Borough of Reduction Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Mitigation - Union Beach, 50_04 Elevate Front Street Ongoing Improving High Borough of Functions Relocate Department of Public Mitigation - Union Beach, 50_05 Works Main Building out of Flood Ongoing Improving High Borough of Zone Functions Relocate Harris Garden Fire Mitigation - Union Beach, 50_06 Company Building (Station 65-4) Ongoing Improving High Borough of outside a Flood Zone Functions Mitigation - Union Beach, 50_07 Elevate Florence Ave. Ongoing Improving High Borough of Functions Union Beach, 50_08 Install Flood Warning Signage Ongoing Administrative High Borough of Mitigation - Union Beach, Purchase and Install Generators for 50_14 New Improving High Borough of Memorial School and Borough Hall Functions Mitigation - Union Beach, 50_15 Elevate Park Avenue New Improving High Borough of Functions Restore the Marsh Surrounding Flat Mitigation - Union Beach, 50_16 Creek and Create an Upland New Improving High Borough of Maritime Forest Berm Functions Union Beach, Mitigation - Risk 50_11 Construct a Stone Wall Ongoing Medium Borough of Reduction Union Beach, Update the Borough's Emergency 50_13 Ongoing Administrative Medium Borough of Warning System Union Beach, Elevate Spruce Street, Center Street, 50_03 Completed Borough of and Fifth Street Union Beach, Stream/Creek Cleaning and 50_09 Completed Borough of Maintenance

424

Community Action Jurisdiction Action Name Action Category Priority Action # Status Union Beach, Maintenance of Shore Protection 50_10 Completed Borough of Programs Union Beach, 50_12 Storm Drain/Inlet Maintenance Completed Borough of Acquire, elevate, or relocate Upper buildings and infrastructure in flood Mitigation - Risk Freehold, 51_03 prone areas, with a focus on Ongoing High Reduction Township of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Upper Repair, Remove, or Rehabilitate the Mitigation - Risk Freehold, 51_09 New High Assunpink #4 Dam Reduction Township of Upper Identify and Remove Hazardous Freehold, 51_04 Ongoing Administrative Medium Trees Township of Create a Wildfire Inventory of Upper Potential At Risk Properties and Freehold, 51_05 Ongoing Administrative Medium Develop an Alerting System to Township of Notify Those Residents Coordinate with the County on Upper Maintenance / Clearing Sediment and Debris at Freehold, 51_06 Ongoing Response / Medium Bridges U-15 Breza Rd. and U-52 Township of Recovery Ellisdale Rd. Upper Maintenance / Clear Sediment and Debris at Freehold, 51_07 Ongoing Response / Medium Bridges U-53, U-47, and U-48 Township of Recovery Upper Purchase and Install Generators for Mitigation - Freehold, 51_08 the Municipal Building and the First New Improving Medium Township of Aid Building Functions Upper Create a Plan to Manage Freehold, 51_10 Development in Landslide Hazard New Administrative Low Township of Areas Upper Continue to Provide Hazard Freehold, 51_01 Completed Education and Risk Awareness Township of Upper Freehold, 51_02 Improve Drainage System Capacity Completed Township of Mitigation - Wall, Purchase and Install Emergency 52_01 Ongoing Improving High Township of Power to Critical Facilities Functions Wall, Repair, Remove, or Rehabilitate the Mitigation - Risk 52_08 New High Township of Glendola Reservoir Dam Reduction Maintain the Removal of Dead and Maintenance / Wall, 52_02 Hazardous Trees along Township Ongoing Response / Medium Township of Roads Recovery Dredge or Pump Siltation from the Maintenance / Wall, 52_03 Shark River Basin to Confined Ongoing Response / Medium Township of Disposal Facility (CDF) Recovery Maintenance / Wall, Purchase a Stationary License Plate 52_06 New Response / Medium Township of Reader Recovery Wall, Develop an Active Shooter and Civil 52_07 New Administrative Medium Township of Unrest Response Plan Wall, 52_04 Reopen Wreck Pond Withdrawn Township of

425

Community Action Jurisdiction Action Name Action Category Priority Action # Status Acquire, elevate, or relocate buildings and infrastructure in flood Wall, 52_05 prone areas, with a focus on Completed Township of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties West Long Clean the Turtle Mill Brook and Mitigation - Branch, 53_01 Design a New Drainage System for Ongoing Improving High Borough of the Brook Functions Acquire, elevate, or relocate West Long buildings and infrastructure in flood Mitigation - Risk Branch, 53_03 prone areas, with a focus on Ongoing High Reduction Borough of Repetitive Loss (RL) and Severe Repetitive Loss (SRL) properties Create an Evacuation Plan and West Long Mitigation - Purchase and Install a Generator for Branch, 53_06 New Improving High the Peter Cooper Village Senior Borough of Functions Center Construct Flood Reduction West Long Measures (e.g., floodwalls or small Mitigation - Risk Branch, 53_08 New High berms) along Turtle Mill Brook and Reduction Borough of Whale Pond Brook West Long Mitigation - Coordinate a Drainage Remediation Branch, 53_02 Ongoing Improving Medium Project for Whale Pond Brook Borough of Functions West Long Target Harden Critical Facilities by Maintenance / Branch, 53_05 Installing Surveillance Cameras and New Response / Medium Borough of Backup Servers Recovery West Long Install an Emergency Maintenance / Branch, 53_07 Communications System Specific New Response / Medium Borough of to West Long Branch Recovery West Long Maintenance / Purchase DPW Equipment for Branch, 53_04 New Response / Low Borough of Recovery Provide Assistance to the National Monmouth Flood Insurance Program's (NFIP) 54_01 Ongoing Administrative High County Community Rating System (CRS) Program Mitigation - Monmouth Protect and Restore Claypit Creek 54_04 Ongoing Improving High County and Portland Place Functions Acquire Flood-prone Properties, Monmouth Mitigation - Risk 54_05 especially Repetitive Loss and Ongoing High County Reduction Severe Repetitive Loss Properties Implement Slope Stabilization Mitigation - Monmouth 54_09 Techniques Along the Henry Ongoing Improving High County Hudson Shoreline Functions Monmouth Increase Hazard Education and Risk 54_11 Ongoing Administrative High County Awareness at the County Level Create a Repetitive Loss (RL) and Monmouth Mitigation - Risk 54_13 Severe Repetitive Loss (SRL) Bundle New High County Reduction Project Monmouth Repair, Remove, or Rehabilitate the Mitigation - Risk 54_21 New High County Allentown Dam Reduction Repair, Remove, or Rehabilitate the Monmouth Mitigation - Risk 54_22 Lake Topanemus Dam in Freehold New High County Reduction Township

426

Community Action Jurisdiction Action Name Action Category Priority Action # Status Monmouth Support Municipal Floodplain 54_02 Ongoing Administrative Medium County Management Planning Monmouth 54_03 Expand Online Mapping Services Ongoing Administrative Medium County Mitigation - Monmouth Improve Coastal Dune Systems at 54_06 Ongoing Improving Medium County Four County Parks Functions Install Stream Bank Stabilization Mitigation - Monmouth Techniques for the Ramanessin 54_07 Ongoing Improving Medium County Brook, Pine Brook, and Manasquan Functions River Conduct Scheduled Burning and Maintenance / Monmouth 54_08 Mechanical Thinning at Three Ongoing Response / Medium County County Parks Recovery Maintenance / Monmouth Improve County Evacuation 54_10 Ongoing Response / Medium County Preparations Recovery Provide Wind-Resistant Building Monmouth Mitigation - Risk 54_12 Retrofits for the County Evacuation Ongoing Medium County Reduction Centers Monmouth Improve Financial Management of 54_14 New Administrative Medium County Grant Monies Create 3D digital Elevation Models Monmouth 54_15 of Structures and Infrastructure New Administrative Medium County within the 500-year Flood Zones Monmouth Strengthen Damage Assessment 54_16 New Administrative Medium County Teams Assist the NJ State Council for the Arts, NJ Cultural Alliance for Response (NJCAR), and Monmouth Monmouth 54_17 Arts in Improving Disaster New Administrative Low County Preparedness and Response for Arts, Cultural and Historic Buildings, Structures, and Institutions.

During Non-emergency Events, Continue to Support and Strengthen the Relationships between Maintenance / Monmouth Government Agencies, Non-profits 54_18 New Response / Low County Organizations, and Volunteers that Recovery are Community Partners in the County’s Long-Term Recovery Group

Work with State Agencies to Update Monmouth 54_19 Regional Risk Maps for Risks that New Administrative Low County Extend Past the County Boundary

427

Community Action Jurisdiction Action Name Action Category Priority Action # Status

Coordinate with the Monmouth Monmouth County Chamber of Commerce to 54_20 New Administrative Low County Improve Business Response Post Disaster

Monmouth Rehabilitate and Upgrade Dams to Mitigation - County Public 54_25 Meet Current NJDEP Bureau of Ongoing Improving High Works & Dam Safety Standards Functions Engineering Monmouth Mitigation - County Public Purchase and Install Generators at 54_24 Ongoing Improving Medium Works & County Highway District Facilities Functions Engineering Monmouth Mitigation - County Public Replace or Elevate County Bridges 54_27 Ongoing Improving Medium Works & and Culverts Functions Engineering Monmouth Maintenance / County Public Inspect and Maintain the Structural 54_28 Ongoing Response / Medium Works & Integrity of County Infrastructure Recovery Engineering Monmouth Install Hard-armoring on County Mitigation - County Public 54_29 Bridges that Experience Coastal Ongoing Improving Medium Works & Erosion Functions Engineering Monmouth County Public Elevate Highway District #8 Office Mitigation - Risk 54_30 Ongoing Medium Works & in Hazlet Reduction Engineering Monmouth County Public Construct a Fueling Station at 54_23 Completed Works & Highway District #6 in Eatontown Engineering Monmouth Purchase and Install Generator at County Public 54_26 Monmouth County Hall of Records Completed Works & Building and Human Services Engineering

428

[This page is left intentionally blank]