Half Yearly EC Complicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Limited Period : April 2015 - September 2015

UGP

(Cluster 12) Eastern Coalfields Limited

EC Ref. No: J-l1015n612011-1A-ll.(M) Dated: 9th February, 2015

Period: April, 2015 - September, 2015 s. General Condition Compliance No. 1. Grant of EC is only for non-forest area plus Dalurbandh Colliery is an Underground the forest area within the mining lease for mining project. No mining activities has been which FC is available. No mining activities will done below the forest area till the grant of be allowed in forest area for which FC is not Stage ll forest clearance by the MoEF&CC. available AS the followi table Mine is closed since September 2015 and no S. Name of Mine Forest Clearance production is taking place form the mine No not available (Ha.) thereafter.

1. UGP 99.0 Ha. (Expansion)

2. UGP 64.8 Ha (Expansion)

3. RangamatiA 91.0 Ha. UGP

4. Sonepur-Bazari 32.65 Ha ocP

Total 287.45 Ha 2. The maximum production from the mine at Production did not exceed at any point the any given time shall not exceed the limit as specified EC capacity. Mine is closed since prescribed in the EC. September 2015 and no production is taking place form the mine thereafter. Production details from Apr'15 to Sep'15 is given belVw:

wIttlllla Dy. G.M.(M) Pandaveswar Area Dalurband UGP A raa E- ^!---^- r/\:.,:lt Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 Half Yearly Production: 13015 tonnes

Peak Capacity as per EC (MTY) : 0.33

Month Production(tonnes)

3. The validity of the EC is for the life of the Mine Noted and agreed. or as specified in the EIA Notification, 2000, whichever is earlier. 4. All safety measures shall be taken as per All safety measures are taken as per CMR, CMR, 1957 & related Circulars 1957 and related Circulars 5. The production shall be within the same Being complied with. Mining Lease area.

6. Coal shall be transported by rail only. Coal Coal is transported by trucks covered by transportation from mine to siding should be tarpaulin over fully metalled roads from mine by conveyor belt. The loading to siding by pay to railway siding. loaders into railway wagons.

7. Independent network of railway sidings inside Independent railway siding for the mine cluster will be developed. Railway sidings already exists. should be constructed at the earliest and till then the proponent may use mechanically covered trucks for transportation of coal.

8. Three tier green belts shall be raised around Three tier plantation will be carried out the railway sidings and along the road sides wherever land is available along the coal to prevent dust and noise pollution. transport road and around the railway siding.

9. Stowing and depillaring shall be as per the Stowing practice and depillaring is being done recommendations of the DGMS. as per the DGMS recommendations.

10 The proponent must comply with the No cases of instability of land occurred so far. Action Plan. The unstable areas within the H6wever, it will be followed if such situation cluster will be brought under plantation after arises. the population residing over these areas is ,

@,,itt', L Noda (Environment)Fnv Dy. G.M.(M) Pandaveswar Area Dalurband UGP Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 rehabilitated under the Master plan for Raniganj Coalfield to be implemented by ADDA.

11. Trees with deep rooted system should be Dalurbandh is an Underground Coal Mining planted so as to prevent soil erosion. Project. No soil erosion has been identified in the mine leasehold area. Plantation works will be carried out within the leasehold of the mine through the State Forest Department. 12. Proponent should plant additional 10 Ha.f/ear Plantation in every year is being done at over the next 10 years at various locations in various locations. this Cluster.

13. River/nallahs shall be desilted and resorted Existing nallahs are being desilted regularly. back to functional state. No river exists within the leasehold.

14. Wildlife conservation plan be prepared and Not applicable submitted to the MOEFCC with the approval of the State Govt.

15. Proponent shall use high resolution image of Baseline land-use study was based on high all clusters for evaluating land use, plantation resolution satellite imagery of 2011. Further etc. changes in land use and plantation will be tracked by carrying out satellite imaginary at every three year' interval startinq 2015. 16. Separate drainage pattern be provided. Dalurbandh is an Underground Coal Mining Project. Currently there is no need to provide separate drainage system. However, it will be provided whenever req uired. 17. Sand stowing must be used as recommended Sand Stowing practice is stricfly followed as by CMPDI. per the recommendations of CMPDI

18. Action plan for prevention and mitigation of Action plan for prevention and mitigation of subsidence be prepared and implemented. subsidence is maintained and implemented.

19. The OC patches to be operated will be Dalurbandh is an Underground Coal Mining completely filled-up after exhaustion of Project. This condition is not applicable. reserves and reclaimed with plantation.

20. The OB shall be completely re-handled at the Dalurbandh is an Underground Coal Mining end of the mining. Project. This condition is not applicable.

21. There shall be no residual OB dump after the Dalurbandh is an Underground Coal Mining

a ^ttla v#f; l6 n Dy. G.M.(M) Pandaveswar Area Dalurband UGP A'r'; Fr":inaor l|. illill \-

Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period April 2015 - September 2015 mining. Project. This condition is not applicable.

22. After completion of mining activities, the No subsidence case registered so far subsided areas shall be graded and planted upon.

23. Coal Extraction shall also be optimized in For mining activities land acquired under CBA areas where agricultural production is Act. Compensation as per Company's R & R continuing. Some pillars shall be left below Policy is given to the land owners before taking possession their land mining the agricultural land. No depillaring & coal of for operation. No depillaring is done below extraction below should be carried out habitation, H.T. Lines, Roads etc. habitation, H.T. Lines & beneath road, water bodies.

24. Rehabilitation of the households falling within Not applicable this cluster to be carried out in two phases within 10 years.

25. The land excavated after mining must be Dalurbandh is an Underground Coal Mining brought back to original condition for Project. No surface excavation is carried out. ag ricultural/plantation pu rpose.

26. Water discharged from the mine should be as The discharged mine waters is fortnightly good as surface drinking water. tested for parameters namely pH, TSS, TDS, Oil & Grease and COD and conforms to the MoEF Schedule-Vl Standards. The domestic water supplied conforms to the lS 10400 standards. Monitoring reports are enclosed in Annexure l. 27. Final mine void 453 Ha and depth will not be Dalurbandh is an Underground Coal Mining more than 20-30m. The void area will be Project. No such void will be created within converted into water body. The mine void the leasehold. should be used for pisciculture purpose.

28. Regular monitoring of subsidence movement Regular monitoring of subsidence movement on the surface over and around the working on the surface over and around the working area and impact on natural drainage patter, area is done. water bodies, vegetation, structure, roads and surroundings shall be continued till movement ceases completely. In case of observation of any high rate of subsidence movement,

Dy. c.M.(M) A? ti's?{#FlGr''i:; Dalurband UGP Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 appropriate effective measures shall be taken to avoid loss of life and material. Cracks shall be effectively plugged with ballast and clayey soil/suitable material.

29. lf subsidence is found exceeding the Surface land already acquired under CBA Act permitted limits, then the landowners shall be and Compensation as per Company's R & R adequately compensated with mutual Policy is given to the land owners prior to subsidence. agreement of the landowners.

30. Water sprinkling system shall be provided to Regular sprinkling of water is carried out over check fugitive emissions from loading the surface through fixed and mobile operations, conveyor system, haulage roads, sprinklers to check fugitive emissions at Railway Siding, Transfer Points, Haulage transfer points, etc. Major approach roads Roads etc. All the major approach roads and properly shall be black topped and coal transportation road is black topped and maintained. fully metalled.

31. The CSR cost should be Rs. 5 per Tonnes of CSR works (with expenditure of at least two Coal produced which should be adjusted as per cent of the average net profits of the per the annual inflation. Rs 1358 Lakh/annum company made during the three immediately preceding financial years) are carried out as, shall be phased out after expiry of the current per Company's Act, 2013. mining lease and after reclamation of mined CSR expenditure occurred in Pandaveswar over area. The operating mines may be Area ECL from 01-04-2015 to 30-09-2015 is analyzed and monitored for compliance of Rs.1578631.00 conditions, bearing with movement of wildlife and until such time they are closed/phased out.

32. The mining in the existing mines should be Will be followed as per the Mine Closure Plan. phased out after expiry of the current mining lease and after reclamation of mined over area. The operating mines may be analyzed and monitored for compliance of conditions, bearing with movement of wildlife and until such time they are closed/phased out.

33. Everybody in the core area should be Protection against dust is provided as per the provided with mask for protection against Regulation 123 of CMR, 1953 fugitive dust emissions.

Pandaveswar Area Arae l'rainaar llrir.lll I I

Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 34. Dust mask to be provided to everyone Protection against dust is provided ds per the working in the mining area. Regulation 123 of CMR, 1953

35. The supervisory staff should be provided with Protection against dust is provided as per the mask for protection against fugitive dust Regulation 123of CMR, 1953 emissions.

36. People working in the core area should be Periodic health check up for the workers in periodically tested for the lung diseases and the core areas are carried out regularly for the burden of cost on account of working in Pneumoconiosis, Permanent Hearing loss the coal mine area. and other associated diseases.

37. The mining area should be surrounded by Yearly plantation will be carried out over the green belt having thick closed thick canopy of available land in future. the tree cover.

38. Besides carrying out regular periodic health After the periodic health check up in last 6 check-up of their workers, 10% of the workers months, no such cases have been found identified from workforce engaged in active during the period. mining operations shall be subjected to health check-up for occupational diseases and hearing impairment, if ?ny, through an specialized agency/institution within the DistricVState and the results reported to this Ministry and to DGMS.

39. The embankment constructed along the river This condition is not applicable as nver boundary shall be of suitable dimensions and exists within the leasehold. critical patches shall be strengthened by stone pitching on the river front side and stabilized with plantation so as to withstand the peak water flow and prevent mine inundation.

40. There shall be no overflow of OB into the river Dalurbandh is an Underground Coal Mining and into the agricultural fields and massive Project. This condition is not applicable plantation of native species shall be taken up in the area between the river and the project.

41. Catch drains and siltation ponds of Dalurbandh is an Underground Coal Mining appropriate size shall be constructed to arrest Project. This condition is not applicable

t6

Pandaveswar Area {'-i'{.. Dalurband UGP Af.o ' i ;'-"' ; Half Yearly EC complicance pandaveswar Report, Dalurbandh ucp, Area (Cluster 12), Eastern Coalfields Limited : April 2015 - September 2015 I silt and sediment flows from soil, OB and mineral dumps. The water so collected shall be utilized regularly desilted for watering the mine area, roads, green belt development, etc. The drains shall be regularly desilted and maintained properly. Garland drains (size, gradient and length) and sump capacity shall be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the mine site. Sump capacity shall also provide adequate retention period to allow proper settling of silt material.

42. Garland drains (size, graOEnt and lengtth) Itlot appticable around the safety areas such as mine shaft and low lying areas and sump capacity shall be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the mine sites. Sump capacity shall also provide adequate retention period to allow proper settling of silt material.

43. Dimension of the retaining waii atlne noe ot uaturbandh is an Underground Coal Mining the dumps and OB benches within the mine to Project. So, this condition is not applicable check run-off and siltation shall be based on the rainfall data.

44. Crushers at the CHp of aOequate capacity tor No UHp exists at Dalurbandh UGp. the expansion project shall be operated with high crushing operations, conveyor system, haulage roads, transfer points, etc. qtscnarge 45. Mtne water outside the Ml, shall be Mine discharge water is a@ monitored, particularly for TDS and treated to basis by CMPDIL and found to be within the conform to prescribed levels before discharge specified norms of CpCB. Fortnighfly into the natural environment. environmental monitoring reports are enclosed. w^u Nodal Officer (Environment) 'ffine Dy. c.M.(M) Dalurband UGP E .i

Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period April 2015 - September 2015 46. Drills shall be wet operated. Being followed.

47. The project authorities shall undertake regular The roads are regularly repaired and properly repairing and tarring of roads used for mineral tarred. Avenue plantation will be done in the transportation. A 3-tier green belt comprising available land along the coal transportation of a mix of native species shall be developed road. all along the major approach roads.

48. Controlled blasting shall be practiced with use Dalurbandh is an Underground Coal Mining of delay detonators and only during daytime. Project. This condition is not applicable. The Mitigative measures for control of ground vibrations and to arrest the fly rocks and boulders shall be implemented.

49. A Progressive afforestation plan shall bE Dalurbandh is an Underground Coal Mining implemented covering an area of 6215.5 ha at Project. Plantation work will be carried out the end of mining, which includes reclaimed wherever area is available for plantation. external OB dump area (404.74 ha), internal dump area (1856.54 ha) and Green belt land (364.57 ha) and in township located outside the lease by planting native species in consultation with the local DFO/ Agriculture Department. The density of the trees shall be around 2500 plants per ha. Massive plantation shall be carried out in open spaces in and around the mine and a 3-tier avenue plantation along the main approach roads to the mine. 50. The proponent should prepare restoration and Mine closure Plan has already been prepared reclamation plan for the degraded area. The for the purpose. Restoration and reclamation land be used in a productive and sustainable shall be done accordingly. manner.

51. Compensatory Ecological & Restoration of Compensatory ecological & restoration of waste land, other degraded land and OB waste land and other degraded land will be dumps in lieu of breaking open the land be carried out if required. Since Dalurbandh is carried out. an Underground Mine, no OB Dumps exists in the leasehold. 52. No ground water shall be used for mining No ground water is being used for mining operations. operations. 53. Quarry area is 2325 Ha. Backfilled quarry Dalurbandh is an Underground Coal Mining area of 1856 Ha shall be reclaimed with Project. This condition is not applicable. pleltation by planting native plant species in /t r'

@tttu 16 Nodal Officer (Environment) Dy. G.M.(M) Pandaveswar Area Dalurband UGP lrFu f r,1i;to+r 01.'t''r ', E {

Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 consultation with local DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha.

54. Regular monitoring of groundwater level and To be followed. quality shall be carried out by establishing a network of existing wells and construction of new peizometers. The monitoring for quantity shall be done four times a year in pre-monsoon (May), monsoon (August), post- monsoon (November) and winter (January) seasons and for quality in May. Data thus collected shall be submitted to the Ministry of Environment & Forests and to the Central Pollution Control Board quarterly within one month of monitorinq. 55 The Company shall put up artificial Proposal for Rooftop rain water harvesting groundwater recharge measures for system in Dalurbandh Area Office is under augmentation of groundwater resource if the process. No case of declining of ground water monitoring indicates a declining trend of table and drying of wells of villagers has been groundwater table. The project authorities found. shall meet water requirement of nearby village(s) in case the village wells go dry due to dewaterinq of mine. 56 Sewage treatment plant shall be installed in To be done the existing colony. ETP shall also be provided for workshop and CHP wastewater. 57 Land oustees shall be compensated as per The compensation for land oustees will be as the norms laid out R&R Policy of CIL or the per the norms laid out in R&R Policy of ClL. National R&R Policy or R&R Policy of the State Government whichever id hiqher. 58 For monitoring land use pattern and for post Baseline land-use study was based on high mining land use, a time series of land use resolution satellite imagery of 2011. Further maps, based on satellite imagery (on a scale changes in land use and plantation will be of 1: 5000) of the core zone and buffer zone, tracked by carrying out satellite imagery at from the start of the project until end of mine every three years interval starting 2015.. life shall be prepared once in 3 years (for any one particular season which is consistent in the time series), and the report submitted to MOEF and its Regional office at Bhubaneshwar. 59 A Final Mine Closure Plan along with details Final Mine Closure Plan has been prepared of Corpus Fund shall be submitted to for Dalurbandh UG Proiect bv CMPDI. -

Nodal Officer (Environment) Dy. G.M.(M)

aveswar Area . .., Dalurband UGP E-ri6ineei {Civil)-. E rt

Half Yearly ECComplicance Report, Dalurbandh UGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 the Ministry of Environment, Forests & Climate Change within 6 months of grant of Environmental Clearance. 60 The project authorities shall in consultation CSR works are being carried out time to time with the Panchayats of the local villages and in accordance with the Company's Act, 2013. administration identify socio-economic and welfare measures under CSR to be carried out over the balance life of the mine. 61 Corporate Envi ronment Responsibility: a) The company shall have a well laid "Corporate Environmental Policy 2012" of down Environment Policy approved by Coal Limited has already been the Board of Directors. formulated.

b) The Environment Policy shall prescribe "Corporate Environmental Policy 2012" of for standard operating Coal India Limited has prescribed standard process/procedures to bring into focus operating process/procedures to bring into any infringements/deviation/violation of focus any infringements/deviation/violation of the environmental or forest norms/condition. the environmental or forest norms/conditions. c) The hierarchical system or The hierarchical system or Administrative Administrative Order of the company to Order of the company to deal with deal with environmental issues and for environmental issues and for ensuring compliance with ensuring compliance with the the environmental clearance conditions has been furnished "Corporate environmental clearance conditions in Environmental Policy 2012" of Coal India shall be furnished. Limited d) To have proper checks and balances, The company is having a well laid down the company shall have a well laid system of reporting of non- down system of reporting of non- compliances/violations of environmental norms compliances/violations of to the Board of Directors of the company. environmental norms to the Board of Directors of the company and/or shareholders or stakeholders at large.

General Conditions S. General Conditions Compliance No. 1 No change in mining technology and scope of Being strictly followed. working shall be made without prior approval of the Ministry of Environment and Forests. 2 No change in the calendar plan includinq There shall be no change in the calendar plan / -6 4orlt6 ffi Dy. c.M.(M) Pandaveswar Area ,\ ri. Dalurband UGP |.eC n-ia"'"et f ', .tl

Half Yearly ECComplicance Report, Dalurbandh uGP, PandaveswarArea (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 excavation, quantum of mineral coal and of production for quantum of mineral eoal. waste shall be made. 3 Four ambient air quality monitoring stations Air quality monitoring is carried out by shall be established in the core zone as well CMPDIL on fortnightly basis and all desired as in the buffer zone for PMro, PM2.5, SO2, parameters are well within the prescribed and NOx monitoring. Location of the stations limits. Fortnightly monitoring reports are shall be decided based on the meteorological enclosed data, topographical features and environmentally and ecologically sensitive targets in consultation with the State pollution Control Board. Monitoring of heavy metals such as Hg, As, Ni, Cd, Cr, etc. carried out atleast once in six months. 4 Data on ambient pMz air quality (PMro, 5, SO2 Air quality monitoring is carried out by and NOx) and heavy metals such as Hg, As, CMPDIL fortnightly and data on ambient air Ni, Cd, Cr and other monitoring shall be quality shall be regularly submitted to the regularly submitted to the Ministry including its Ministry including its concerned Regional concerned Regional Office and to the State Officer and to the State pollution Control Pollution Control Board and the Central Board and the Central Pollution Control Board Pollution Control Board once in six months. once in six months. Random variation of samples through analysis from independent laboratories recognised under the EPA rules, 1986 shall be furnished as part of compliance report. 5 Adequate measures shall be taken for control Noise level monitoring is carried out by of noise levels below 85 dBA in the work CMPDIL on fortnightly basis. Noise level has environment. Workers engaged in blasting always been below 85 dBA. Reports are and drilling operations, operation of HEMM, enclosed etc shall be provided with ear plugs/muffs. 6 Industrial wastewater (workshop anO Mine discharge water samples are tested in wastewater from the mine) shall be properly laboratory at CMPDI on fortnighfly basis. Mine collected, treated so as to conform to the water quality conforms to the standards standards prescribed under GSR 422 (E) prescribed under GSR 422(E) dated 19th May dated l9thMay 1gg3 and 31't December 1993 and 31st December 1993. 1993 or as amended from time to time before discharge. Oil and grease trap shall be installed before discharge of workshop effluents. 7 Vehicular emissions shall be kept under Vehicular emissions are kept under control control and regularly monitored. Vehicles and regularly monitored. Coal transportation used for transporting the mineral shall be at Dalurbandh UGP from mine to railway covered with tarpaulins and optimally loaded. siding is being done by tarpaulin covered trucks. The loaded trucks are made wet at first and then covered with tarpaulins for :( frattt iLl 6 Nodal (Environment) Dy. c.M.(M) Dalurband UGP ,rl

Half Yearly ECCompricance Report, Darurbandh pandaveswarArea ucp, (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 transportation. 8 Monitoring of env@ Monttonng of environmental parameters shall parameters is be carried out through .3rlgg_gyt fortnighily by CMpDtL. Laboratory establishment of adequate number and ty[e at CMPDIL, is having all necessary of pollution monitoring and analysis facilities. equipment in consultation with the Siate Pollution Control Board and data got analysis through a laboratory recognised under EpA Rules, 1986. I Personnel working in o@ protective respiratory devices and they shall also be provided with adequate training anO information on safety and health aspects.

10 \,ruuuparronat neatln survetllance programme- Periodic Medical Examffi of the workers shall be for the workers periodically. undertaken periodically to observe any contractions due to exposure to dust and to take corrective measures, if needed and records maintained thereof. The quality of environment due to outsourcing and the health and safety issues of the outsourced manpower should be addressed by the company while outsourcinq. 11 A separate environmenta@ with suitable qualified personnel shall be set up under the control of a Senior Executive. who will report direcily to the Head of the company. 12 The funds earmarkedffi Funos tor environmental protection as kept in protection measures shall be kept in separate budget each year are not diverted for other account and shall not be diverted for other purposes. purpose. Year-wise expenditure shall be reported to this Ministry and its Regional Office at Bhubaneshwar. 13 t'etng uomptted with.

Q1'tvt ,t/ -.ronment) iro .-.. Dy. c.M.(M) Pandaveswar Area Dalurband J. rF{ o tl";i-"os ,i i UGp Half Yearly pandaveswarArea ECComplicance Report, Dalurbandh uGp, (Cluster 12), Eastern Coalfields Limited Period : April 2015 - September 2015 seen at the website of the ministry of Environment & Forests at http://envfor.nic.in. 14 A copy of the environmental clearance letter A forwarding letter for sending EC to ttre panchayaU shall be marked to concerned concerned Panchayat is being attached in the local NGO, if ?Dy, from whom any annexure. suggestion/representation has been received Website address of the company is while processing proposal. the A copy of the www. easterncoal. gov. i n clearance letter shall be displayed on the company's website. 15 A copy of the environmental clearance letter Environmental Clearance letter has been sent shall be shall also be displayed on the to the concerned State pollution Control pollution website of the concerned State Board and District Collector's Office. Control Board. The EC letter shall also be displayed at the Regional Office, District Industry Sector and Collector,s Officeffehsildar's Office for 30 days. 16 The clearance letter shall be uploaded on tfie Will be complied soon. company's website. The compliance status of the stipulated environmentat clearance conditions shall also be uploaded by the project authorities on their website and updated at least once every six months so as to bring the same in public domain. The monitoring data of environmental quality parameter (air, water, noise and soil) and critical pollutants such as PM10, pM2.5, SO2 and Nox (ambient) and critical sectoral parameters shall also be displayed at the entrance of the project premises and mine office and in corporate office and on company's website. 17 project The Proponent shall submit six The compliance reports on status of monthly compliance reports on status of compliance of the stipulated environmental compliance of the stipulated environmental clearance conditions (both in hard copy and in clearance conditions (both in hard copy and in e-mail) shall be submitted six monthly to the e-mail) to the respective Regional Office of respective Regional Office of the Ministry, the Ministry, respective Zonal Office's of respective Zonal Offices of CpCB and the CPCB and the SPCB. SPCB. 18 The Regional Office of this Ministry located in Being followed. the Region shall monitor compliance of the stipulated conditions. The Project authorities shall extend full cooperation to the office(s) of the Regional Office by furnishing the requisite data/information/monitoring reports. {ents Dy. c.M.(M) Dalurband UGP Half Yearly ECcomplicance Report, Dalurbandh ucp, pandaveswarArea (Cluster 12), Eastern Coalfields Limited : April 2015 - Septe-mber 2015 19 The Environmental Statement for each Complied with. financial year ending 31 March in For-V is mandated to be submitted by the project proponent for the concerned State pollution Control Board as prescribed under the Environment (Protection) Rules, 19g6, as amended subsequently, shall also be uploaded on the company's website along with the status of compliance of EC conditions and shall be sent to the respective Regional Offices of the MoEFCC bv e-mait.