CHAPTER 10: Major Project Status Report

State Transportation Improvement Program (STIP) for (FY2019 - FY2022)

Federal regulations require that the STIP list major projects from the previous STIP and identify any significant delays in the planned implementation. The following is a list of major projects from the FY2019- FY2022 STIP. Table 52: Major Project Status Report - Transit

TRANSIT

MPMS# County Project Name Project Status Active and ongoing project that is being advanced in phases. 15407 SEPTA Villanova Intermodal Station Phase 1 is complete and Phase 2 will begin CON in FY23. 59966 SEPTA Capital Asset Lease Program This is an active and annual program. Utility Fleet Renewal Program - 59973 SEPTA This is an active and annual program. Non Revenue Vehicles

Program complete; however, the Positive Train Control Regional Rail Signal project is ongoing and details are included in the 60255 SEPTA Modernization Program Communications, Signals, & Technology Improvements Program (MPMS# 102571).

60275 SEPTA Debt Service This is an active and annual program.

60317 SEPTA Federal Preventive Maintenance This is an active and annual program.

Active and ongoing project that is being advanced in phases. Phase 1 (Dilworth Plaza) is complete. Phase 2 (15th Street 60335 SEPTA City Hall / 15th Street Stations Station) is complete. Phase 3 (Interlocking Reconfiguration) is in design. Phase 4 (Inter-Station Connections) is in design. Phase 5 (City Hall Station) is in design.

60540 SEPTA Parking Improvements This is an active and annual program.

Active and ongoing project that will be completed in phases. 60574 SEPTA Paoli Transportation Center Phase 1 is complete and Phase 2 will advance in outer years.

60582 SEPTA Vehicle Overhaul Program This is an active and annual program.

60599 SEPTA Paratransit Vehicle Purchase This is an active and annual program.

Active and ongoing project that will be completed in phases. Phase 1 of the project is complete and included the complete design, partial deployment and testing of the data network SEPTA Key (Fare Collection and the SEPTA Key system. Phase 2 is substantially 60611 SEPTA System/New Payment complete and included the installation of the system on Bus, Technologies) Trolley, Trackless Trolley, and High Speed Lines. Phase 3 of the project is underway and includes Key implementation on Regional Rail, Parking Operations, and CCT.

Source: DVRPC 2020

DVRPC FY2021 TIP FOR PENNSYLVANIA 469

Table 53: Major Project Status Report – Transit (cont.)

TRANSIT

MPMS# County Project Name Project Status

Elwyn to Wawa Rail 60636 SEPTA This is an active and ongoing project currently in construction. Restoration

Regional Rail Car, Locomotive, 60638 SEPTA This is an active and annual program. and Trolley Acquisition

Substations and Power 60651 SEPTA This is an active and annual program. Improvements

60655 SEPTA Levittown Station Program complete.

This is an active and ongoing project that will be completed in Ardmore Transportation 73214 SEPTA phases. Phase 1 is in construction and phase 2 will be Center implemented in the outer years.

Transit and Regional Rail 77183 SEPTA This is an active and annual program. Station Program

Infrastructure Safety and 90497 SEPTA This is an active and annual program. Renewal Program

90512 SEPTA SEPTA Bus Purchase Program This is an active and annual program.

This is an active and ongoing project that will be completed in 93588 SEPTA Exton Station phases. Phase 1 is complete and phases 2 & 3 will be implemented in the outer years.

95402 SEPTA Bridge Program This is an active and annual program.

102565 SEPTA Track Improvement Program This is an active and annual program.

102567 SEPTA Roof Program This is an active and annual program.

Maintenance & Transportation 102569 SEPTA This is an active and annual program. Facilities

Communications, Signals, & 102571 SEPTA This is an active and annual program. Technology Improvements

Safety and Security 107011 SEPTA This is an active and annual program. Improvements

Source: DVRPC 2020

470 D V RPC FY2021 TIP FOR PENNSYLVANIA Table 54: Major Project Status Report – Bucks County

BUCKS COUNTY

MPMS# Project Name Project Status 12923 Bristol Road Extension Project is currently active in Preliminary Engineering.

12931 Worthington Mill Rd Br (Bridge) Project is currently active in Final Design.

12965 Lawn Avenue SR:4033 Project is currently active in Preliminary Engineering.

Allentown Road and PA 663 Bridges 13440 Project is currently active in Final Design. (2) Over Licking Creek SR:0663

US 1 (Bridges) Design (Section 03S) 13549 Project is currently active in Final Design. SR:0001

Oxford Valley Road/Lincoln Highway 13635 Project is currently active in Final Design. Intersection Improvements SR:2029

Bristol Road Intersection 13727 Project is currently active in Final Design. Improvements SR:2025

County Line Road Restoration 50634 Project is currently active in Final Design. (M04)(3R) SR:2038

Route 313 Corridor Improvements 57619 Project is currently active in Final Design. SR:0313

64778 State Road SR:2002 Project is currently active in Final Design.

78516 Bridge Replacement Brownsville Road Project is currently active in Final Design.

PA 309, Sellersville Bypass, 86923 Project has been Let. Resurfacing (PM1)

92582 I-95 Philadelphia to Scudder Falls Project has been Let.t

93444 Route 1 Improvement-South (RC1) Project has been Let.t

93445 Route 1 Improvement-North (RC2) Project is currently active in Final Design.

Route 1 Improvement Frontage Project is currently active in Final Design. Construction funding pushed 93446 Corridor (RC3 out to Long-Range Plan.

Holland Road at Buck Road and Route 102272 Project is currently active in Final Design. 532

Woodbourne Road (SR 2033) and 107794 Langhorne-Yardley Road (SR 2049) Project is currently active in Final Design. Improvements SR:2033

I-95/US 13/PA 132 Slip Ramp 110309 In the process of preparing the advertisement for consultant selection. Operation Improvement

Source: DVRPC 2020

DVRPC FY2021 TIP FOR PENNSYLVANIA 471

Table 55: Project Status Report – Chester County

CHESTER COUNTY

MPMS# Project Name Project Status 14541 US 1, Baltimore Pike Widening Project is currently active in Final Design.

US 1 Expressway Reconstruction 14580 Project is currently active in Final Design. (South)

US 1 Expressway Reconstruction 14581 Project is currently active in Preliminary Engineering. (North)

14698 US 422, Reconstruction (M2B) Project is currently active in Final Design.

47979 North Valley Road over Project is currently active in Final Design.

59434 Schuylkill River Trail (Q20) Project has been Let.

US 422 Expressway Reconstruction 64220 Project is currently active in Final Design. (M03)

85949 SR 896 Safety Improvement Project is currently active in Final Design.

86301 LancasterAve/BrandywineCk Project is currently active in Final Design.

US 30, Coatesville Downingtown Project is currently active in Preliminary Engineering. Majority of 87781 Bypass (CER-Eastern Section) construction funding pushed out to Long-Range Plan.

Source: DVRPC 2020

Table 56: Project Status Report – Chester County (cont.)

CHESTER COUNTY

MPMS# Project Name Project Status

90612 Boot Road o/ Amtrak (Bridge) Project is currently active in Final Design.

Downingtown Pk over/E Branch 92733 Project has been Let. Brandywine (Bridge)

SR30/SR10 to Business 30 107551 Project is currently active in Preliminary Engineering. Interchange Improvement

SR30 & Airport Rd Interchange 107553 Project is currently active in Final Design. Improvement

US30 & PA82 Interchange 107554 Project is currently active in Preliminary Engineering. Improvement

Baltimore Pike/Newark Road 110312 Project is currently active in Preliminary Engineering. Intersection Improvements

Source: DVRPC 2020

472 D V RPC FY2021 TIP FOR PENNSYLVANIA Table 57: Major Project Status Report – Delaware County

DELAWARE COUNTY

MPMS# Project Name Project Status

Ardmore Avenue Bridge Over SEPTA 15225 Project has been Let. and Cobbs Creek

US 1 and PA 352 Interchange, Project is currently active in Preliminary Engineering. Construction 15251 Intersection, and Roadway funding pushed out to Long-Range Plan. Improvements

Sellers Avenue Bridge Over Amtrak 15306 and SEPTA Wilmington Newark Rail Project is currently active in Final Design. Line

I-95/322/Conchester Hwy. 15477 Project is currently active in Preliminary Engineering. Interchange/Impvts. (322)

South Creek Road Bridge Over 69665 Project is currently active in Final Design. Brandywine Creek

US 322, Featherbed Lane to I-95 69817 Project is currently active in Final Design. (Section 102)

I-476, MacDade Boulevard Ramp 70228 Project is currently active in Final Design. Improvements

79329 Bridgewater Road Extension Project is currently active in Preliminary Engineering.

US 1, Chester County Line to Pole Cat 88400 Project is currently active in Final Design. Road

PA 252 Palmers Mill Road Bridge over 90128 Project has been Let. Springton Dam Spillway

92323 Wanamaker Ave o/ Darby Ck (Bridge) Project is currently active in Final Design.

92581 I-95: Pavement Preservation NB Project has been Let.

92808 Marshall Rd o/ Cobbs Crk (Bridge) Project is currently active in Preliminary Engineering.

93105 State Rd o/Darby Creek (Bridge) Project is currently active in Final Design.

103217 Main Street Grade Crossing Project is currently active in Final Design.

103744 I-95 Pavement Preservation SB Project has been Let.

104343 US 322 over CSX (Bridge) Project is currently active in Final Design.

104821 I-476 Travel Management Project is currently active in Preliminary Engineering.

108910 I-95 Noise Abatement Project is currently active in Preliminary Engineering.

Source: DVRPC 2020

DVRPC FY2021 TIP FOR PENNSYLVANIA 473

Table 58: Major Project Status Report – Montgomery County

MONTGOMERY COUNTY

MPMS# Project Name Project Status

PA 611, Old York Road Over 16214 Project is currently active in Final Design. SEPTAWest (Bridge)

PA 73, Church Road Intersection and 16334 Project is currently active in Final Design. Signal Improvements

16408 Fruitville Rd Bridge Over Perkiomen Ck Project is currently active in Final Design.

Ridge Pike, Harmon Road to Crescent 16577 Avenue Reconstruction and Signal Project is currently active in Final Design. Upgrade

16599 PA 320 at Hanging Rock Project is currently active in Final Design.

16705 Chester Valley Trail Extension (C036) Project has been Let.

16738 US 422 Expressway Section M1B Project is currently active in Final Design.

PA 23 Moore to Allendale and Trout 48172 Project is currently active in Preliminary Engineering. Crk Rd Bridge

48174 PA 63, Welsh Rd. Project is currently active in Final Design.

48175 Ridge Pike, PA Turnpike to Butler Pike Project is currently active in Final Design.

US 202, Johnson Highway to 63486 Project is currently active in Final Design. Township Line Road (61S)

US 202, Township Line Road to Morris 63490 Project has been Let. Road (61N)

US 202, Morris Road to Swedesford 63491 Project has been Let. Road (65S)

PA 309, 5-Points Intersection Improvements (71A) (Old US 202, 5- 63493 Project is currently active in Final Design. Points Intersection Improvements (71A))

Belmont Rd/Rock Hill Rd Widening: I- Project is currently active in Right-of-Way. Construction funding pushed 64795 76 Ramps to Rock Hill Road out to Long-Range Plan.

North Narberth Avenue Bridge Over 64798 Project is currently active in Final Design. Amtrak/SEPTA (CB)

PA 23/Valley Forge Road and North 66952 Project is currently active in Final Design. Gulph Road Relocation (2NG)

PA 309 Connector: Allentown Road to 77211 Project is currently active in Final Design. Souderton Pike (HT2)

Source: DVRPC 2020

474 D V RPC FY2021 TIP FOR PENNSYLVANIA Table 59: Major Project Status Report – Montgomery County (cont.)

MONTGOMERY COUNTY

MPMS# Project Name Project Status

US 202, Markley Street Improvements 80021 Project has been Let. (Section 510)

Keim Street Bridge Over Schuylkill 83742 Project is currently active in Final Design. River

Ridge Pike o/ Norfolk Southern RR 92839 Project is currently active in Final Design. bridge

Project is currently active in Final Design. Title changed to Ridge/Germantown Intersection Re-Alignment - Phase 1, Perkiomen 102273 Second Collegeville Bridge Crossing Crossing. Scope changed to operational improvements and actual second bridge pushed out to Unfunded Vision of the Long-Range Plan.

PA 309 Connector: Souderton Pike to 105803 Project is currently active in Final Design. PA 309 (HT3)

106662 I-76 Integrated Corridor Management Project is currently active in Preliminary Engineering.

Belmont Ave Bridge over Schuylkill 110313 Preliminary Engineering expected to begin in FY21. River

Philmont Avenue/Tomlinson 110315 Road/Pine Road Improvements - 6 Project is currently active in Preliminary Engineering. Point Intersection

Ridge Pike - School Lane to Belvoir 110444 Road (CB #0 and TPK Bridge DB- Project is currently active in Preliminary Engineering. 116)/Interchange Area Bridges

111005 Conshohocken Garage (I-76 ICM) $2M CMAQ funding FLEXed to SEPTA for design. Awaiting obligation

112472 Pleasantview & Park Road Bridges Project has been Let.

Source: DVRPC 2020 Table 60: Major Project Status Report – Philadelphia County

PHILADELPHIA COUNTY

MPMS# Project Name Project Status

12886 ADA Ramps 2020 Philadelphia Project is currently active in Final Design.

17511 City Ave o/ SEPTA (Bridge) Project is currently active in Final Design.

17697 Island Avenue Signal Upgrade Project is currently active in Final Design.

I-95, Shackamaxon Street to Ann 17821 Project is currently active in Final Design. Street (GIR) - Design

Bridge Street Design (Section 47811 Project is currently active in Final Design. BSR)(IMP)

Source: DVRPC 2020

DVRPC FY2021 TIP FOR PENNSYLVANIA 475

Table 61: Major Project Status Report – Philadelphia County (cont.)

PHILADELPHIA COUNTY

MPMS# Project Name Project Status

I-95: Betsy Ross Interchange (BRI) - 47812 Project is currently active in Final Design. Design (IMP)

I-95: Ann Street to Wheatsheaf Lane 47813 Project is currently active in Final Design. (AFC)

Montgomery Avenue Bridge over 57276 Project is currently active in Final Design. Amtrak at 30th Street (CB) Project is a Line Item. Projects have been broken out to Citywide 57902 City Wide 3R Betterments Resurfacing Contracts 109, 110, and ADA Ramps 3. Market Street Bridges (2) Over 69828 Schuylkill River and CSX Railroad Project is currently active in Final Design. (MSB) 70231 Swanson Street Reconstruction Project is currently active in Final Design. 75804 University Av/CSX Rail (Bridge) Project is currently active in Final Design.

JFK Blvd @ 32nd St. o/ SEPTA (30th 78757 Project is currently active in Final Design. Street Station) (Bridge) 78764 W Girard Ave O/CSX (Bridge) Project is currently active in Final Design. I-95 Southbound: Columbia-Ann St N 79827 Project has been Let. (GR4)

I-95 Northbound: Race - 79828 Plans currently in Right-of-Way Unit. Shackamaxon (GR5)

I-95: Betsy Ross Section Ramps A&B 79904 Project has been Let. (BR2)

I-95: Betsy Ross Mainline 79905 Project is currently active in Final Design. Northbound (BR3)

I-95: Kennedy to Levick (Section 79908 Project has been Let. BS1) (IMP)

I-95: Margaret to Kennedy (Section 79910 Project is currently active in Final Design. BS2) (IMP) I-95: Allegheny Ave Interchange 79911 Project has been Let. Advance Contract (AF1) I-95: Allegheny Ave and Castor Ave 79912 Project is currently active in Final Design. Interchanges connection (AF2) I-95, Utility Relocation & Surface Sts 80014 Project is currently active in Final Design. (CP3) Henry Ave Corridor Safety 80104 Project is currently active in Final Design. Improvements, Phase 1 81292 Frankford Av/Frankford Ck (Bridge) Project is currently active in Final Design. Source: DVRPC 2020

476 D V RPC FY2021 TIP FOR PENNSYLVANIA Table 62: Major Project Status Report – Philadelphia County (cont.)

PHILADELPHIA COUNTY

MPMS# Project Name Project Status

Roosevelt Blvd over Wayne Junction 83736 Project has been Let. (WAV) (Bridge)

88085 Byberry Road Bridge Replacement Project is currently active in Final Design.

92147 Broad St over Loading dock (Bridge) Project has been Let. 92554 Ridge Ave Over Amtrak (Bridge) Project is currently active in Preliminary Engineering. 98207 I-95 Congestion Management Ongoing Congestion Management Activities.

98229 59th Street over AMTRAK (Bridge) Project is currently active in Preliminary Engineering.

I-95 Southbound: Race to 103553 Project is currently active in Final Design. Shackamaxon (GR6)

103555 I-95 Corridor ITS (GR8) Project is currently active in Final Design.

103556 I-95 ATMS (GR9) Ongoing projects for various Active Traffic Management System.

I-95 Northbound: Ann Street to 103557 Project is currently active in Preliminary Engineering. Wheatsheaf Lane (AF3)

I-95 Southbound: Ann Street to 103558 Project is currently active in Preliminary Engineering. Wheatsheaf Lane (AF4)

I-95: Betsy Ross Mainline 103559 Project is currently active in Preliminary Engineering. Southbound (BR4)

I-95: Betsy Ross Section 103560 Project is currently active in Preliminary Engineering. Bridges (BR5)

103563 I-95: Bridge Street Ramps (BS5) Project is currently active in Final Design.

105488 Citywide Resurfacing 105 Project has been Let.

I-95 Central Access Philadelphia 106264 Project is currently active in Final Design. (CAP) / Waterfront Access

107698 I-76 Bridge Repair Section SRE Project has been Let.

107709 I-95 Bridge Repairs (95/MB4) Project has been Let.

108090 Citywide Resurfacing 106 Project has been Let.

108092 Citywide Resurfacing 107 Project is currently active in Final Design. 108095 Citywide Resurfacing 108 Project is currently active in Final Design. 30th Street Viaduct over 30th Street 110314 Project is currently active in Preliminary Engineering. Lower (Bridge)

Schuylkill Banks Christian to 110415 Project is currently active in Final Design. Crescent (TIGER)

Source: DVRPC 2020

DVRPC FY2021 TIP FOR PENNSYLVANIA 477

Table 63: Major Project Status Report – Various Counties

Various Counties

MPMS# Project Name Project Status 109599 Bridge Group U Project is currently active in Final Design.

110494 Regional Traffic Management Cntr Project has been Let.

Source: DVRPC 2020