Wolf Creek Foundation Remediation

Presented by Josh Bomar, P.E. Geological Engineer USACE, Nashville District

03 August 2011 Geohazards Conference – Chattanooga, TN

US Army Corps of Engineers

BUILDING STRONG® Project Location

Wolf Creek Dam

US Army Corps of Engineers

BUILDING STRONG® Control $34 million/yr

Hydropower $77 million/yr

Recreation 5 million visitors per year $129 million impact on local economy

Water Supply Between 100k and 200k Users

Water Quality Whole Cumberland River System Relies on Wolf Creek for Cool, Oxygenated Water USFWS Trout Hatchery Downstream over $1 million per year US Army Corps of Engineers

BUILDING STRONG® Site Stratigraphy

BUILDING STRONG® Foundation Treatment

SolutionUS Army Corps ofFeatures Engineers Intercepting BUILDING STRONG Cutoff Trench ® BUILDING STRONG® “Overhangs and loose rock will be removed only where they cross the lines of the trench, since the earthfill in the sides of the trench will have the function only of stability and not of an absolutely uniform tight contact with the trench walls.”

Slide 7 BUILDING STRONG® 1960’S Problem Areas

Sinkholes

Muddy Wet Areas Flow Starting in 1967 1964

BUILDING STRONG® 1968 Sinkhole

Sinkhole

Note the body language

BUILDING STRONG® BUILDING STRONG® 10 BUILDING STRONG® 11 1960’s and 70’s Remedial Features Embankment Wall

Switchyard Wall

Earth Emb Grout Lines Switchyard

SwitchyardBUILDINGWall STRONG® Post Construction Distress Indicators

BUILDING STRONG ICOS Diaphragm Walls ® Post Construction Distress Indicators

BUILDING STRONG® Post Construction Distress Indicators

Headwater

D-323A – 586.10

VWP1-1 – 596.8 VWP1-2 – 571.8

D-268A – 568.3

WA-59R – 502.8

VWP1-3 – 551.8 VWP1-4 – 536.6 Tailwater

BUILDING STRONG® Potential Failure Mode & Ongoing Foundation Remediation Piezometer Elev. 773 Elev. 750

Elev. 680

Existing Wall

TOR Elev. 570±

Elev. 495

Elev. 475 Base of New Wall Elev. 425 Bottom of Grout

BUILDING STRONG® Instrumentation – Cone Section

BUILDING STRONG® Instrumentation . 200+ Piezometers . 50 Inclinometers . 11 Extensometers . 101 Surface Monuments . 32 Crack Pins

BUILDING STRONG® Foundation Remediation Contract

. Two Phase Approach ►Phase 1: Grouting ►Phase 2: Barrier Wall Construction

BUILDING STRONG® 19 Foundation Grouting Contract

• Advanced Construction Techniques • Low Bid Contract • 1300 Holes • 900,000 gallons of grout • $70 million • Completed September 2008 Dual Line Grout Curtain

BUILDING STRONG® Overburden Drilling & Casing Installation – Rotosonic Drilling

BUILDING STRONG® Rock Drilling with a Cubex Rig

BUILDING STRONG® Wash Borehole Before Grouting

BUILDING STRONG® Optical Televiewer

BUILDING STRONG® Grout Hole Imagery

BUILDING STRONG® Grout Hole Imagery

Before Washing After Washing

BUILDING STRONG® Grout Cart Injection System Radio Tower

Packer

Grout & Return Hose

BUILDING STRONG® Schematic of Grout Injection System

Flow Meter Pressure Gauge Grout Hose

Grout Plant Ground Surface

Mixer Return Hose Agitator

Pumps Valves regulate Grout Header pressure and flow PVC Standpipe GROUT CART

Top of Rock

NOTE: Water Pressure Testing and Borehole Grouting uses the same equipment Grout Inflatable Packer

BUILDING STRONG® Grouting Results – Trend Plots

BUILDING STRONG® Grouting Results

BUILDING STRONG® Pre-Con Site Characterization . EMBANKMENT ► Mineralogy ► Gradation ► Atterberg Limits ► Hydrometer Analysis . BEDROCK ► Point Load Test ► Unconfined Compression ► Cerchar Abrasiveness Index ► Rock Structure ► Discontinuities ► Bedding Heterogeneity

BUILDING STRONG® 31 Barrier Wall Contract

• Contractor: Treviicos – Soletanche JV • Best Value - Request for Proposals Downstream • 4000-ft Barrier Wall • Approx. 210,000 cyds of Concrete Grout Line • $340 Million

Upstream Grout Line

Barrier Wall

Alignment BUILDING STRONG® 32 Barrier Wall Construction . Guidewall Construction . Pre-Excavation . Encasement Wall . Pilot / Exploratory Holes . Construction Techniques ►Combination Barrier Wall (CBW) ►Pile Barrier Wall (PBW) ►Slot Pile System (SPS) . Assessing Wall Continuity at Depth ►Instrumented Equipment

BUILDING STRONG® BUILDING STRONG® 34 BUILDING STRONG® Pre-Excavation - Clamshell 9’-2”

4 ft PLAN

PROFILE

~170-ft

BUILDING STRONG® Encasement Wall - Hydromill 9’-2” 5” min overlap

6 ft P S P PLAN

Embankment

P S P

Alluvium

Rock

PROFILE BUILDING STRONG® Encasement Wall Verticality

(2.434, 5.986) (2.151, -1.896) Biaxial Inclinometer +Y

-X +X 4.10˚

-Y

(-2.633, 6.168) (-2.916, -1.714) 0.25% Tolerance Theoretical (Vertical) Section Cut @ 120-ft Actual Deviation (4.085, 3.543) (3.902, -2.803)

3.30˚

(0.066, 3.661) (-0.177, -2.685)

BUILDING STRONG Section Cut @ 166-ft ® Encasement Wall Verticality 1.0 m Sensor: P2 1.0 m

0.96 m 0.87 m 120 FT 0.96 m + 0.87 m = 6.0 ft

Y’ Y Y’ = Upstream Y = Downstream

(+) Y

(-) X’P2 P1 X (+) Sensor Unit 25˚

(-) Y’

BUILDING STRONG® Concrete Placement

BUILDING STRONG® Pilot Hole – Wassara Water Hammer 31”

PLAN

Embankment

Alluvium

Rock

PROFILE BUILDING STRONG® Pilot Hole Verticality . PARATRACK 2 ►Tri-Axial Accelerometers & Magnetometers . Inclinometer ►Inserted Inside Drill Casing

BUILDING STRONG® Pilot Hole Verticality -10 -5 0 5 10 0 Reading (Inches) Polar Plot Upstream (-) / Downstream (+) Paratrack 10 Inclinometer 330˚ 30˚ Tolerance 8 50

6 300˚ 60˚ 4 100 2

0 -10-8-6-4-20246810 150 -2 Deviation (in.) Depth (Ft.)

-4

Upstream (-) / Downstream (+) / Downstream (-) Upstream 120˚ 240˚ -6 200

-8 150˚ 210˚ -10 250 Inclinometer Deviation (in.) Left (-) / Right (+)

Paratrack BUILDING STRONG® Pile Barrier Wall - PBW 31” Min. 2’ Wall Thickness

PPS

Embankment

Alluvium

Rock

BUILDING STRONG® BUILDING STRONG® PBW Verticality Biaxial Inclinometer . Biaxial Inclinometer ►Multiple Shots to Reduce Error . KODEN ►Dimensions of Final Excavation

+Y

-X +X 6.7-in -Y

0.25% Tolerance Theoretical (Vertical) Actual Deviation

BUILDING STRONG® PBW Verticality -10 -5 0 5 10 0 Reading (In.) 10 Wirth Center Left (-) / Right (+) 330˚ Koden 'Center' 30˚ Tolerance 8 50 6 300˚ 60˚ 4 100 2

0 -10-8-6-4-20246810 150 -2 Depth (Ft.) Deviation (in.)

-4

Upstream (-) / Downstream (+) / Downstream (-) Upstream 120˚ 200 240˚ -6

-8 150˚ 210˚ 250 Wirth -10 Deviation (in.) Left (-) / Right (+) Koden 'Center' BUILDING STRONG® Concrete Placement

BUILDING STRONG® 48 Combined Barrier Wall

10’- 6” 2’-7”

Embankment

Alluvium

Rock

BUILDING STRONG® 49 Slot Pile System - SPS 31” Completed Segment

P

Embankment

Alluvium

Rock

BUILDING STRONG® Consistency of Multiple Surveys -10 -5 0 5 10-10 -5 0 5 10 0 0 Reading (Inches) Wirth Center Reading (Inches) Left (-) / Right (+) Upstream (-) / Downstream (+) Paratrack

50 Inclinometer 50 Koden 'Center'

Tolerance

100 100

150 150 Depth (Ft.) Depth (Ft.)

200 200

250 250

BUILDING STRONG® 10

330˚ 30˚ 8

Wirth 6 Koden 'Center' 300˚ 60˚ Inclinometer 4 Paratrack

2

0 -10-8-6-4-20246810

-2 Deviation (in.)

Upstream (-) / Downstream (+) / Downstream (-) Upstream -4

120˚ 240˚ -6

-8 150˚ 210˚ -10 Deviation (in.) Left (-) / Right (+) BUILDING STRONG® Assessing Wall Continuity at Depth

150-FT

WIRTH/Secant Inclinometer Pilot Hole PARATRACK Primary Panel

Pilot Hole Inclinometer 0.25 % Tolerance / Theoretical Secondary Panel

BUILDING STRONG® Assessing Wall Continuity at Depth

250-FT

270-FT

WIRTH/Secant Inclinometer Pilot Hole PARATRACK

Pilot Hole Inclinometer 0.25 % Tolerance / Theoretical BUILDING STRONG® QUESTIONS