Table I.3 THE PHILIPPINE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROGRAM SUMMARY LIST OF AWARDED/FOR CONSTRUCTION/UNDER CONSTRUCTION PROJECTS (Projected/Indicative Status for December 2017)

Estimated Cost Project Title Site/Location Private Proponent IA/LGU Scheme Status for December 2017 (US$ Million) TRANSPORT SECTOR North Ave., EDSA 1 MRT Line 7 (NCR)/San Jose Del Monte, 1,540.00 Universal LRT Corp. (BVI) Ltd. DOTC BGTOM Ongoing Construction Bulacan (Region 3)

2 Metro Stage 3 Project (NCR) 592.44 CITRA Central Expressway Corporation (CCEC) TRB JV Ongoing Construction Baclaran (NCR) to 3 LRT Line 1 Cavite Extension Operations and Maintenance 1,442.22 Manila Corporation (LRMC) DOTC BTO Ongoing Construction (Region 4) Mactan-Cebu International Airport Passenger Terminal 4 Cebu (Region 6) 389.33 GMR-Megawide Cebu Airport Corporation (GMCAC) DOTC BOT Ongoing Construction Building Cavite and Laguna (Region 5 Cavite-Laguna Expressway Project 1,233.56 MPCALA Holdings Inc. DPWH BTO Ongoing Construction 4A)

6 Southwest Integrated Terminal System NCR 55.56 MWM Terminals DOTC BTO Ongoing Construction

7 South Integrated Terminal System NCR 88.89 Ayala Land Inc. DOTC BTO Ongoing Construction

Manila (NCR) and Rizal 8 LRT Line 2 Operations and Maintenance Project 0.00 To be determined DOTC/LRTA O&M Ongoing O&M (Region 4A) Laguna Lakeshore Expressway Dike Project-Calamba-Los (NCR) to Laguna 9 2,728.89 To be determined DPWH BTO No information available Baños Toll Expressway Project (Region 4A) Misamis Oriental (Region Ongoing O&M and 10 Laguindingan Airport Operations and Maintenance Project 324.90 To be determined DOTC OAT 10) Construction Enhanced Operation & Maintenance of the New Bohol 11 Bohol (Region 7) 52.00 To be determined DOTC DOM Ongoing O&M (Panglao) Airport On-going Construction for 12 Davao Sasa Port Davao (Region 11) 422.00 To be determined DOTC BTO Phase1 Ongoing O&M and 13 Operations and Maintenance of the Iloilo Airport Iloilo (Region 6) 675.60 To be determined DOTC OAT Construction Ongoing O&M and 14 Operations and Maintenance of the Davao Airport Davao (Region 11) 476.44 To be determined DOTC OAT Construction Negros Occidental (Region Ongoing O&M and 15 Operations and Maintenance of the Bacolod Airport 450.20 To be determined DOTC OAT 6) Construction Ongoing compliance with 16 LRT Line 6 Project Cavite (Region 4A) 1,446.44 To be determined DOTC BGTOM/BT+O&M and BT conditions precedent 17 NAIA Development NCR 1,656.89 To be determined #REF! ORAT TBD Sub-Total 13,575.36 HEALTH SECTOR 1 Modernization of the Philippine Orthopedic Center (NCR) 193.11 Megawide-World Citi Consortium DOH BOT Project Terminated Sub-Total 193.11

Prepared by: PPP Center Table I.3 THE PHILIPPINE PUBLIC-PRIVATE PARTNERSHIP (PPP) PROGRAM SUMMARY LIST OF AWARDED/FOR CONSTRUCTION/UNDER CONSTRUCTION PROJECTS (Projected/Indicative Status for December 2017)

Estimated Cost Project Title Site/Location Private Proponent IA/LGU Scheme Status for December 2017 (US$ Million) TRANSPORTENVIRONMENT SECTOR SECTOR 1 Puerto Galera Sewage Treatment Facility Project Sabang, Puerto Galera 2.22 JL Business & Technology Consultancy Municipality of Puerto Galera BT No information available Sub-Total 2.22 WATER SECTOR 1 Bulacan Bulk Water Supply Project Bulacan (Region 3) 542.22 Luzon Clean Water Corporation MWSS BOT Ongoing Construction 2 New Centennial Water Source Project - Kaliwa Dam Rizal (Region 4A) 416.09 To be determined MWSS BT Ongoing Construction Sub-Total 958.31 SOCIAL SECTOR On-going compliance with Regional Prison Facilities Project through PPP Nueva Ecija (Region 3) 1,115.11 To be determined DOJ/BuCor BTM 1 conditions precedent Sub-Total 1,115.11 INFORMATION TECHNOLOGY Ongoing System LTFRB IT Nationwide 6.62 To be determined DOTC/LTFRB BTO 1 Development Ongoing Construction and CRS-ITP 2 Nationwide 35.33 To be determined PSA BTO 2 System Development Sub-Total 41.95 PROPERTY DEVELOPMENT SECTOR Tanauan City Public Market Redevelopment Project (Region 4A) 8.89 Guru Property Development and Management Corp. City Government of Tanauan BOT Ongoing O&M 1 Sub-Total 8.89 25 Total for Awarded Projects (Under or for Construction) 15,894.95

Legend: BGTOM - Build - Gradual Transfer - Operate & Maintain BT - Build & Transfer OAT - Operate - Add & Transfer BOO - Build-Own & Operate BTO - Build - Transfer & Operate DOM - Develop, Operate & Maintain BOT - Build - Operate & Transfer BTO - Build - Transfer & Operate BTM - Build - Transfer & Maintain BROT - Build - Rehabilitate - Operate & Transfer EOM - Extend - Operate & Maintain ORAT- Operate-Rehabilitate-Add-Transfer

Prepared by: PPP Center 1027