2017 – 2021 Scoping and Design Projects
Total Page:16
File Type:pdf, Size:1020Kb
Section 3 – Scoping and Design Projects 2017 – 2021 Scoping and Design Projects The purpose of this section is to identify potential future highway and bridge projects. These projects may be in the evaluation stage, which is called project scoping, or may be further along in the preliminary design process. Projects listed in this section are not commitments to construct or implement an improvement. These commitments won’t be made until the NEPA process is completed. These projects are being included in the STIP for informational purposes and subsequent phases have not yet been determined or are beyond the STIP horizon period. After needs have been identified and prioritized, the higher priority needs are included in this section. Next, a core team is formed, comprising personnel from various MoDOT departments. The core team investigates the problem or concern. The core team develops several solutions that may be either short term or long term. Some problems have no transportation or construction solution and instead may require public education or assistance through law enforcement. Once a solution is selected, additional preliminary design work occurs. Design progresses up to a point at which MoDOT is confident the solution will properly address the problem or concern and of the improvement’s cost. The potential project moves into the next stage of the planning framework, which is the prioritization and selection of projects for construction. Projects that have been prioritized and selected for construction are listed in the construction program (see Section 4.) Only the construction projects in Section 4 represent a commitment by MoDOT to build the project. Please see Section 2 for additional discussion regarding how a need becomes a project through the planning framework process of identifying and prioritizing needs, to developing solutions, to prioritizing and selecting projects for construction. The amount of time a potential project spends in the scoping and design phase varies. Some potential projects are more complex than others, and they might remain in the scoping and design phase for several years. This is especially true for projects such as Missouri and Mississippi River bridge replacements, new roadway construction, or converting a two-lane road to a four-lane road. Section 3 - 1 2017 - 2021 Scoping and Design Projects STATE FISCAL YEAR PROJECT BUDGETING (ENGINEERING) 7/2016- 7/2017- Prior Prog. 6/2017 6/2021 County: Andrew Scoping for bridge improvements over Hopkins Creek, 0.2 mile south of Rte. T near Amazonia. Project involves 3 3 1 Route: IS 29 Job No: 1I3109 twin bridges A1293 in the northbound and southbound lanes. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 1,001 - 2,000 County: Andrew Scoping for pavement improvements from Rte. T, in Savannah, to Rte. 59 in St. Joseph. 0 2 1 Route: RT DD Job No: 1S3171 Fed State Local Anticipated Federal Category: S.T.P. 3 0 0 Future Cost: 301 - 1,000 County: Atchison Scoping for bridge improvements over the Nishnabotna River, 1 mile south of the Iowa State line. Involves twin 3 3 1 Route: IS 29 Job No: 1I3110 bridges A2369 in the northbound and the southbound lanes. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 1,001 - 2,000 County: Buchanan Scoping for pavement improvements from Rte. 371 (22nd Street) to I-29 in St. Joseph. 5 2 1 Route: IS 229 Job No: 1I0904 Fed State Local Anticipated Federal Category: NHPP 3 0 0 Future Cost: 1,001 - 2,000 County: Buchanan Scoping for bridge improvements on I-229 viaduct in downtown St. Joseph. Project involves twin bridges 15 5 5 Route: IS 229 Job No: 1I3053 A2225. Anticipated Federal Category: NHPP Fed State Local 8 2 0 Future Cost: 10,001 - 15,000 Federal Oversight County: Buchanan Scoping for bridge and intersection improvements at Rte. 36 intersection in St. Joseph. Project involves bridge 12 5 5 Route: RT AC Job No: 1S3030 A2822. Anticipated Federal Category: S.T.P. Fed State Local 8 2 0 Future Cost: 2,001 - 5,000 County: Caldwell Scoping for pavement improvements from Rte. 13 to the Livingston County line, near Hamilton. Westbound 0 2 1 Route: US 36 Job No: 1P3165 lanes only. DRAFT Anticipated Federal Category: NHPP Fed State Local 3 0 0 Future Cost: 2,001 - 5,000 4/22/16 Section 3 - 1 District Northwest Dollars In Thousands 2017 - 2021 Scoping and Design Projects STATE FISCAL YEAR PROJECT BUDGETING (ENGINEERING) 7/2016- 7/2017- Prior Prog. 6/2017 6/2021 County: Carroll Scoping for bridge improvements over Tater Hill Creek, 1.1 miles north of Rte. 65. Project involves bridge 20 2 1 Route: RT Z Job No: 2S2185 T0267. Anticipated Federal Category: NHPP Fed State Local 3 0 0 Future Cost: 301 - 1,000 County: Chariton Scoping for pavement improvements from Rte. 36 to Rte. 24 in Salisbury. 0 2 1 Route: MO 129 Job No: 1S3170 Fed State Local Anticipated Federal Category: S.T.P. 3 0 0 Future Cost: 1,001 - 2,000 County: Chariton Scoping for bridge improvements over Grand River Overflow, 1.6 miles west of Rte. EE near Sumner. Project 0 3 1 Route: MO 139 Job No: 1S3157 involves bridge R0420. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 1,001 - 2,000 County: Chariton Scoping for pavement improvements from Marceline to Rte. 24 in Keytesville. 35 2 1 Route: MO 5 Job No: 1P3024 Fed State Local Anticipated Federal Category: S.T.P. 3 0 0 Future Cost: 2,001 - 5,000 County: Daviess Scoping for bridge improvements over Clear Creek, 0.3 mile east of Rte. V near Lock Springs. Project involves 0 3 1 Route: MO 190 Job No: 1S3159 bridge S0442. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 301 - 1,000 County: Dekalb Scoping for intersection improvements at I-35, and at Bob Griffin Road in Cameron. 0 5 5 Route: US 36 Job No: 1P3145 Fed State Local Anticipated Federal Category: NHPP 8 2 0 Future Cost: 5,001 - 10,000 County: Dekalb Scoping for bridge improvements over Lost Creek, 0.5 mile south of Rte. W near Maysville. Involves bridge 0 2 15 Route: RT A Job No: 1S3136 A1378. Anticipated Federal Category: NHPP Fed State Local 14 3 0 DRAFTFuture Cost: 301 - 1,000 County: Gentry Scoping for bridge improvements over Middle Fork Grand River, 0.6 mile east of Rte. YY near Gentry. Project 3 2 15 Route: US 169 Job No: 1P3106 involves bridge A0729. Anticipated Federal Category: NHPP Fed State Local 14 3 0 Future Cost: 301 - 1,000 4/22/16 Section 3 - 2 District Northwest Dollars In Thousands 2017 - 2021 Scoping and Design Projects STATE FISCAL YEAR PROJECT BUDGETING (ENGINEERING) 7/2016- 7/2017- Prior Prog. 6/2017 6/2021 County: Grundy Scoping for resurface driving lanes and improvements to pedestrian ramps in Trenton from west city limits to 0 5 5 Route: MO 6 Job No: 1P3144 Rte. 65. Anticipated Federal Category: NHPP Fed State Local 8 2 0 Future Cost: 301 - 1,000 County: Harrison Scoping for pavement improvements from Rte. 136 to Rte. C. 5 5 1 Route: IS 35 Job No: 1I0914 Fed State Local Anticipated Federal Category: NHPP 5 1 0 Future Cost: 5,001 - 10,000 County: Harrison Scoping for pavement improvements from Iowa State line to Rte. N at Eagleville. 0 5 1 Route: IS 35 Job No: 1I3169 Fed State Local Anticipated Federal Category: NHPP 5 1 0 Future Cost: 2,001 - 5,000 County: Harrison Scoping for bridge improvements over White Oak Creek, 0.4 mile west of Rte. TT near McFall. Project involves 0 3 1 Route: RT P Job No: 1S3158 bridge P0576. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 301 - 1,000 County: Holt Scoping for bridge improvements over I-29 near Oregon. Project involves bridge A1834. 6 3 1 Route: RT B Job No: 1S3061 Fed State Local Anticipated Federal Category: NHPP 3 1 0 Future Cost: 301 - 1,000 County: Holt Scoping for bridge improvements over Nichols Creek, 0.3 mile east of Rte. B, near Oregon. Project involves 0 3 1 Route: RT H Job No: 1S3162 bridge P0997. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 301 - 1,000 County: Holt Scoping for bridge improvements over Mill Creek, 1.8 miles south of Rte. 111 near Forest City. Project involves 6 3 1 Route: RT T Job No: 1S3062 bridge N0811. Anticipated Federal Category: NHPP Fed State Local 3 1 0 DRAFTFuture Cost: 301 - 1,000 County: Holt Scoping for bridge improvements over Spring Creek, 0.5 mile south of Rte. O near Oregon. Project involves 6 3 1 Route: RT T Job No: 1S3070 bridge R0223. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 301 - 1,000 4/22/16 Section 3 - 3 District Northwest Dollars In Thousands 2017 - 2021 Scoping and Design Projects STATE FISCAL YEAR PROJECT BUDGETING (ENGINEERING) 7/2016- 7/2017- Prior Prog. 6/2017 6/2021 County: Holt Scoping for bridge improvements over Easter Creek, 0.8 mile north of Rte. U near Oregon. Project involves 6 3 1 Route: RT T Job No: 1S3071 bridge R0224. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 301 - 1,000 County: Livingston Scoping for bridge improvements over the Thompson River, 0.9 mile east of Rte. Y, near Chillicothe. Project 0 3 1 Route: MO 190 Job No: 1S3156 involves bridge A1376. Anticipated Federal Category: NHPP Fed State Local 3 1 0 Future Cost: 2,001 - 5,000 County: Livingston Scoping for bridge improvements over the Grand River, 1.3 miles south of Rte.