MOHAMMED ABDEL FATTAH EL-ESSAWY ,Ph.D. Lecturer of Architecture, Faculty of Engineering, Modern Academy

-U Personal Data: Name : MOHAMMED ABDEL FATTAH AHMED EL-ESSAWY Birth Date : 14 / 11 / 1977 rd Address : 8P P district, Central Plateau, .. Tel. :Mobile: 002 0101828965 Home: 02 33440814 / 02 27272202

Email :[email protected] .U0T

-U Education: -PhD. degree in Architecture, Department of Architecture, Faculty of Engineering University in the field Of Environmental planning & design: “Economics of Environmental Design A Model for Economic Environmental Design and Its Impact on Buildings” (March 2008).

-M.Sc. degree in Architecture, Department of Architecture, Faculty of Engineering in the field Of Environmental planning & design: “An Approach for the Design of Building Envelope And Its Effect on Heat Transfer & Human Comfort in Buildings.” (March 2003). -Preparatory year for master degree, Grade very good (88 %) (May 2001).

-B.Sc. degree in Architecture, Department of Architecture, Faculty of Engineering Cairo University, Grade very good (83.03 %) with honor degree and 5th position with distinction graduation project. (July 2000).

-Graduation project (Under Supervision of Dr. Mohammed El-Baramelgy / Dr. Tarek Abdel Lattif) (A World Trade Center) at Alexandria.

-U Positions:

AU -Academic: -Lecturer in the Department of Architecture, Faculty of Engineering, Modern Academy – from August 2012 till Now. -Lecturer in the Department of Architecture, Faculty of Engineering, Modern Academy – from April 2008 till July 2012. -Assistant Lecturer in the Department of Architecture, Faculty of Engineering, Modern Academy – from October 2006 till April 2008.

-Assistant Lecturer ''As2T Student Researcher'' 2T in the Department of Architecture, Faculty of Engineering ,Cairo University – from July 2002 till March 2008.

BU -Practical:U August 2000 till Now Designer & Technical Manager MAConsultants – (Prof. Dr. Moemen Afify, Professor of Architecture at Cairo University) as Follow: Feb. 2006 till Now Technical Manager. Nov. 2002 to Feb. 2006 Project Coordinator. Aug. 2000 to Nov. 2002 Junior Architect.

Dr.: Mohammed El-Essawy, [email protected] Mob.: 002 010 1828965 1

15/6/1997 to 31/7/1997 Summer Training.

October 2000 till Feb. Part Time Architect In “Aswan Company”(Eng. 2002 Mohammed El Hanee) April 2002 till Jan. 2006 Designer & Coordinator at Architecture Department in Structural Consultant Prof. Dr. Ahmed Maher Ragab Professor of structure at Cairo University.

-U Academic Experience: Teaching courses in the Department of Architecture: nd rd -Design (2P P year –3P P year–Graduation project). rd th -Working drawings, Construction Documents (3P P year-4P P year). - Technical Installations (Illumination- Acoustics- Fire Fighting- Air condition). - Environmental Control. - Technical Specifications & BOQ in Buildings.

-U Practical Experience: Working as a Coordinator & Technical Designer with main tasks which are: -Coordination and meeting with internal team & Clients. -Project coordination with Architectural, Structural, Electromechanical drawings. -Projects Technical & Working Drawings and B.O.Q. Preparation. -Implementation drawings and Construction documents.

ThatU is For Many Projects as Follow:

AU : Architectural Design Competitions 1 FIRST PRIZE: Antoniades Gardens Plaza project, Alexandria: - the planning and design of a large residential commercial project at Antoniades gardens area in Somouha Alexandria for a 20 feddans complex 2 FIRST PRIZE : the New ECHEM Headquarters Building ( ENPPI) at City, 2005 – Joint with Space 3 FIRST PRIZE: New ISS office building competition (closed competition), Off Oroubah Street, Heliopolis, Cairo 2001. 4 THIRD PRIZE: Ministry of Justice Academy, City, , 2003. 5 KAHRMAA PROJECT – QATAR The design of an electronic services building with open office spaces in Doha – Qatar.

BU : Office Buildings Projects: 1 Atoun Travel Office Building at New Cairo City New office Building. 2 Concordia Company New Office Building at the eastern development area of 6th of October city. 3 Systems New Office Building – New Cairo City. 4 Redcon Company Office Building – site 211 – new cairo City. 5 BIC Company Office Building – – 2007. 6 Price Water House New Office Building 2007. The new EGYPTIAN COMPANY FOR PETROCHEMICALS Office Building – 7 ECHEM - new Cairo City 8 GIZA SYSTEMS NEW HEADQUARTERS BUILDING smart village, cairo 2006. 9 VODAFONE Switches Building – CAIRO 4 – City, 2005 RAYA Contact Center, 6th of October City 2005 10 The renovation and design of an existing building for the new RAYA Contact Center at 6th Of October City.

Dr.: Mohammed El-Essawy, [email protected] Mob.: 002 010 1828965 2

MISRFONE - CLICK “VODAFONE” HEADQUARTERS , “Owner’s Consultant” for 11 Cost Savings Execution Drawings, Sixth of October City, Egypt,. MISRFONE – CLICK “VODAFONE” OFFICE BUILDING 12 & SWITCHES BUILDING, Tenth of Ramadan City, Egypt. 13 DEGREMENT EGYPT HEADQUARTERS OFFICE BUILDING, El City, Egypt, 2001 ( Preliminary Drawings). 14 PEPSI COLA EGYPT Offices and Factory, 6th of October City, Egypt 2001.

CU : Industrial / Factories Buildings Projects: 1 PEPSI COLA EGYPT new bottling plant, sixth of October City, 2001. 2 Dar Publishing Plant – Cartoon Manufacturing Plant – el Obour City 2006. 3 BETS EGYPT PLANT, a beverage plant, , 2004. 4 VOLKSWAGEN EGYPT SHOWROOM AND SERVICE STATION, abu rawash, 2006. 5 ORANA EGYPT NEW PLANT – Badr city – 2006. 6 GLOBAL BEVERAGE COMPANY Plant COCA-COLA – Tripoli – Libya, 2004. 7 Master Foods Industries, 6th of October City, Cairo 2003. 8 Halayeb Kateelo Facoty, New Dameitta City, 2005. 9 ASHMAND Factory, Hummer Cars, Sixth of October City, Cairo 2003.

DU : Apartment & Complex Buildings Projects: 1 Mr Amr Salem Apartment and Office building, Mamaleek Square, Manyal el Roudah, Cairo 2005. 2 Mr Saad Ameen Appartment Building, Al Shorouk City, 2006. 3 Mr. Sayed Saleh Appartment Building, Sheraton Heliopolis area, Cairo, 2003. 4 Saray El Roudah Complex – Office, Commercial and Residential Tower, El Manyal 2002. 5 El Mamaleek Complex – Office Commerical and Residential Tower, El Manyal, 2002. 6 Appartment Building for Dr. Mahmoud El Adawy, 6th of October City 2002. 7 Dr. Mohamed El Hashmy Residential Tower, , 2001. 8 Dr. Aziz Yassin Residential Building , , Giza, 2003. Eng. Aly Yousef Office and Residential Building, Abdel Moneim Ryad 9 St.,Mohandiseen, Cairo, 2010.

EU : Villas Projects: 1 Dr. Mostafa Hodeib Villas Complex, Cairo Ismailia Road, 2006. 2 Mr. Ashraf Mousah Sabry villa, Gardenia Park, Sixth of October City, Cairo 2003. 3 Mr. Yehia Ettouney compound planning, pyramids area, Cairo Alexandria Road, Cairo 2003. 4 Dr. Mohamed Omar Askar Villa, Haraneyah Guiza, plus extension of a guest house, 2000.

FU : Hotel & Resorts Projects: 1 EL BORG HOTEL RENOVATION, Al Sharif Group, Gezirah, Cairo, 2003. 2 Ras Omran Tourstic Gulf Planning and Resort Design, Ras Omarn, Yemen, 2005. 3 El Molk Resort, Red Sea Coast, Yemen Republic, (2004), in junction with ACIS. 4 Al Lohayah Resort, Red Sea Coast, Yemen Republic, (2004) – in junction with ACIS. 5 Al Khokhah Resort, Red Sea Coast, Yemen Republic, (2004) – in junction with ACIS. 6 Raas Kotheib Resort, Red Sea Coast, Yemen Republic, (2004), in junction with ACIS.

GU : Educational Buildings Projects: 1 OCTOBER UNIVERSITY FOR MODERN SCIENCES AND ARTS Established by “Dr. NAWAL EL DEGWY” – Preliminary and Construction drawings for the New Campus of the University in Sixth of October City on 50 Feddans, Cairo 2001. 2 MSA UNIVERSITY EXTENSION – PHASE 2 – 6TH OF October City, 2006.

Dr.: Mohammed El-Essawy, [email protected] Mob.: 002 010 1828965 3

3 The American University in Cairo New Campus Project: President's House and Guest house in the new Campus project in New Cairo City. 4 Misr University for Sciences and Arts Extension – MUST UNIVERSITY, The extension of the faculty of engineering buildings in MUST university, 2006. 5 Cairo University Open Education Buidlings, Gza, 2005. The American University in Cairo new Campus Project: Environmental Optimization 6 Tasks for the Architectural Design of the Faculties – Library – Students Hostels – Sports Facilities. Cairo 2002 / 2003. CAIRO UNIVERSITY: UPGRADING AND DEVELOPMENT OF A LARGE NUMBER OF PUBLIC AND EDUCATIONAL BUILDINGS (2006 – 2007): 1- Lecture Halls at Faculty of Business (six lecture halls. 2- Lecture Halls and Theatre of School of Law. 7 3- Lecture Halls at School of Arts. 4- Theatre for School of Business, Students Hostels. 5- Theatre for School of Arts. 6- New Additions and renovations to the School of Economics and Political Sciences. 7- Renovation for the Basement Level for the Main Auditorium – Cairo University. 8 Agricultural National Genes Bank, Center for Agricutlural Research, Giza, Egypt, 2003. 9 Faculty of Medicine, Main Lecture Hall Building renovation, Mansourah , Egypt, 2002. Faculty of “Tarbeyah el Naweeyah” Faculty of Basic Sciences new building, Cairo 10 University, Cairo 2002. 11 Gene Bank for Ministry of Agriculture, Bahteem, Cairo 2002. Renovation and Extension of the OPEN EDUCATION BUILDING, Cairo University 12 2001.

HU : Miscellaneous Buildings: 1 HYPERONE – Hypermarket Al Hawary – 6th Of October City . 2 Recreational Multi-functional Project – Amr El Guindy – Heliopolis facing Terminal 2 airport – 2006. 3 Dandy Mall Extension : Phase 2, cairo Alexandria desert road, 2006. 4 Tripoli Bowling Center – Tripoli – Libya 2005.

IU : Interior Design: 1 Price Water House Office Building – Interior Design project – New Cairo City – 2007. 2 Giza Systems New Headquarters Building , Smart Village, Cairo 2006. 3 Interior design of the VODAPHONE MISRFONE “CLICK” BOARDROOM, Click Misrfone Headquarters, , Cairo, 2001. 4 Halayeb Kateelo Head Offices Interior – Cairo – 2005. El Borg Hotel Renovation, Al Sharif Group Gezirah, Cairo, 2003. Interior Design for the Grand Lecture Hall of Faculty of Medicine, El Mansourah, 2002.

-U Computer Skills: AutoCAD 2010 AutoCAD 2D & 3D Photoshop 7, 8 WinWord, Excel, PowerPoint Environmental Soft Ware Arabic, English (TOEFL test score 503).

-U Courses: -Management Course (American University) August 2009

Dr.: Mohammed El-Essawy, [email protected] Mob.: 002 010 1828965 4

-U Papers: st -Economics of Environmental Design for Admin. Buildings in Egypt, 10P P International Architectural Conference of Al- Azhar University, December 2008. th - Net Zero Energy Buildings – Double Skin Envelope, 5P P Architectural Conference of Cairo University, Dec. 2009. st -Towards an Ecological Design for Buildings, 11P P International Architectural Conference of Al- Azhar University, December 2010. st -Urban space for energy conservation, 11P P International Architectural Conference of Al- Azhar University, December 2010.

-U Articles: - Heat Transfer & Human Comfort in Buildings – Architecture & Urban Magazine – University – Architectural Department – 2002. - Contemporary Environmental Design – Architecture & Urban Magazine – Helwan University – Architectural Department – 2002.

Dr.: Mohammed El-Essawy, [email protected] Mob.: 002 010 1828965 5