STATE OF RELEASE: IMMEDIATE 5/31/2019 DEPARTMENT OF TRANSPORTATION CONTACT: Thomas G. Bayer (718)482-4002 REGION 11 ***** T R A F F I C A D V I S O R Y *****

All lane closures listed are expected to be in place, WEATHER PERMITTING:

Bronx Arthur Sheridan Expressway 6/1/2019 • Left lane closed N/B from Westchester Avenue to 174th Street 7:00 a.m. to 3:00 p.m. 6/3/2019 – 6/8/2019 • One lane closed S/B from 174th Street to Westchester Avenue 10:00 a.m. to 3:00 p.m. • Left lane closed N/B from Westchester Avenue to 174th Street 9:00 a.m. to 2:00 p.m 6/8/2019 • Left lane closed N/B from Westchester Avenue to 174th Street 7:00 a.m. to 3:00 p.m

Bronx River Parkway 5/31/2019 - 6/1/2019 • One or two lanes closed N/B between Morris Park Avenue and Allerton Avenue from 10:00 p.m. to 5:00 a.m. • One or two lanes closed S/B between Allerton Avenue and Morris Park Avenue from 10:00 p.m. to 5:00 a.m. 6/3/2019 - 6/7/2019 • One lane closed N/B between Morris Park Avenue and Allerton Avenue from 9:30 a.m. to 3:00 p.m. • One lane closed S/B between Allerton Avenue and Morris Park Avenue from 10:00 a.m. to 3:00 p.m. 6/3/2019 - 6/8/2019 • One or two lanes closed N/B between Morris Park Avenue and Allerton Avenue from 10:00 p.m. to 5:00 a.m. • One or two lanes closed S/B between Allerton Avenue and Morris Park Avenue from 10:00 p.m. to 5:00 a.m. 6/4/2019 – 6/5/2019 • One lane closed Both Directions at Service Road from 10:00 p.m. to 5:00 a.m. (Bridge Washing) 6/5/2019 – 6/6/2019 • One lane closed Both Directions at Warning Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing)

Bruckner Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists of a change in traffic pattern on a section of the ramp from the westbound Bruckner Expressway (I-278) to the northbound Major Deegan Expressway (I-87) in . Only the left travel lane is open, the right travel lane is closed. This closure will be in place through approximately June 15th, 2019 (weather permitting). • The New York State Department of Transportation (NYSDOT) is advising motorists of a lane shift on the westbound Bruckner Expressway from approaching 138th Street Exit ramp to the Major Deegan Expressway. Motorists should proceed with caution. • The New York State Department of Transportation (NYSDOT) is advising motorists of a lane shift on the eastbound Bruckner Expressway from 138th Street to 142nd Street. Motorists should proceed with caution. 5/31/2019 – 6/1/2019 • One or two lanes closed Both Directions from Throgs Neck Expressway merge to Balcom Avenue from 10:00 p.m. to 5:00 a.m. 6/3/2019 – 6/8/2019 • One or two lanes closed Both Directions from Throgs Neck Expressway merge to Balcom Avenue from 10:00 p.m. to 5:00 a.m. Note: Paving and Striping Operations. 6/3/2019 – 6/8/2019 • Right lane closed W/B from East 141st Street to Jackson Avenue from 10:00 a.m. to 3:00 p.m. • One lane closed W/B ramp to Robert F. Kennedy Bridge from 10:00 p.m. to 6:30 a.m.

Bronx (continued) Cross Bronx Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane is open on the southbound Cross Bronx Expressway ramp to Major Deegan Expressway in the Bronx through July 2019. 6/3/2019 – 6/4/2019 • One lane closed Both Directions at Undercliff Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at ramp from Washington Bridge from 10:00 p.m. to 5:00 a.m. (Bridge Washing) 6/6/2019 – 6/7/2019 • Right lane closed N/B at Olmstead Avenue from 10:00 a.m. to 3:00 p.m. 6/7/2019 – 6/8/2019 • One lane closed Both Directions at Macombs Road from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at Jerome Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at East 174th Street from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at Walton Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at Grand Concourse from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at Morris Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing)

Cross Bronx Expressway Extension 6/6/2019 – 6/7/2019 • One lane closed Both Directions at Pennyfield Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at Lafayette Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing) • One lane closed Both Directions at East Tremont Avenue from 10:00 p.m. to 5:00 a.m. (Bridge Washing)

Major Deegan Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that the left lane is closed on the southbound Major Deegan Expressway from Brooke Avenue to the merge onto the Bruckner Expressway through the end of June 2019. Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that only one lane will be open on the southbound Major Deegan Expressway ramp to Exit 7 in the Bronx through July 2019. 6/3/2019 – 6/7/2019 • Left lane closed S/B at West Fordham Road from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/7/2019 • One lane closed S/B between Fordham Road and Depot Place from 10:00 a.m. to 3:00 p.m. • One lane closed N/B between Depot Place and West 179th Street Exit from 10:00 a.m. to 3:00 p.m. 6/3/2019 – 6/8/2019 • One lane closed N/B ramp from Robert F. Kennedy Bridge from 10:00 p.m. to 6:30 a.m. 6/4/2019 – 6/5/2019 • All lanes closed S/B ramp to N/B Cross Bronx Expressway and S/B Cross Bronx Expressway from 1:00 a.m. to 5:00 a.m. 6/4/2019 – 6/7/2019 • One lane closed Both Directions between Fordham Road and Depot Place from 10:00 p.m. to 5:00 a.m. (One direction at a time) 6/7/2019 – 6/8/2019 • One lane closed Both Directions between Fordham Road and Depot Place from 10:00 p.m. to 6:30 a.m. (One direction at a time)

Bruckner Boulevard 6/3/2019 – 6/8/2019 • One lane closed E/B between Cypress Avenue and 145th Street from 8:30 a.m. to 2:30 p.m. • One lane closed W/B between 145th Street and Cypress Avenue from 10:00 a.m. to 4:00 p.m.

2 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 2 of 23 5/31/2019 Page 2 of 23 5/31/2019 Page 2 of 23 5/31/2019 Page 2 of 23 5/31/2019 Page 2 Page 2

Brooklyn Brooklyn Queens Expressway TRAVEL ADVISORY: OPENING OF NEW ► EASTBOUND AND WESTBOUND BQE TRAFFIC SHIFTED ONTO NEW BRIDGE • Motorists are advised that the New York State Department of Transportation has shifted the eastbound and westbound Brooklyn- Queens Expressway (BQE) traffic onto the New Kosciuszko Bridge. • Traffic entering the westbound BQE via ramps from the LIE and 43rd Street is also shifted onto the New Kosciuszko Bridge. • Motorists are reminded that fines are doubled for speeding in a work zone. In accordance with the Work Zone Safety Act of 2005, convictions of two or more speeding violations in a work zone could result in the suspension of an individual’s driver license. It is imperative that motorists drive carefully through construction work zones, for their own safety and the safety of workers. • For up-to-date travel information, call 511 or visit www.511NY.org. • Follow New York State DOT on Twitter: @NYSDOT_NYC. Find us on Facebook at facebook.com/NYSDOT. 5/31/2019 – 6/1/2019 • Right lane closed Both Direction between Morgan Avenue and Grand Street from 10:30 p.m. to 5:00 a.m. Note: Drill and Grout Anchor Rods. 6/3/2019 – 6/8/2019 • Right lane closed Both Direction between Morgan Avenue and Grand Street from 10:30 p.m. to 5:00 a.m. Note: Drill and Grout Anchor Rods. 6/7/2019 • Right lane and shoulder cloure E/B between Wythe Avenue and Bedford Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure E/B between Lee Avenue and Marcy Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure W/B between Meteropolitan Avenue and Grand Street from 7:00 a.m. to 3:30 p.m.

Gowanus Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that the exit ramp to 86th Street from the W/B Gowanus Expressway is narrowed until the end of October, 2019. The on ramp from 86th Street to the E/B Gowanus Expressway is also narrowed until the end of October, 2019. For long term construction. Motorists should proceed with caution. 6/3/2019 • Right lane closed E/B at 54th Street from 10:00 a.m. to 3:00 p.m. 6/3/2019 • Right lane closed W/B between Bay Ridge Parkway and 86th Street from 10:00 a.m. to 2:00 p.m. 6/6/2019 – 6/7/2019 • Right lane closed W/B between Bay Ridge Parkway and 86th Street from 10:00 p.m. to 1:00 a.m. • Right and center lanes closed W/B between Bay Ridge Parkway and 86th Street from 1:00 a.m. to 5:00 a.m. Note: Working on temporary WZTC. 6/7/2019 – 6/8/2019 • Right lane closed W/B between Bay Ridge Parkway and 86th Street from 10:00 p.m. to 1:00 a.m. • Right and center lanes closed W/B between Bay Ridge Parkway and 86th Street from 1:00 a.m. to 6:30 a.m. Note: Working on temporary WZTC.

Prospect Expressway 6/6/2019 • Right lane and shoulder cloure E/B between 3rd Avenue and 4th Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure E/B between 8th Avenue and Prospect Park West from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure W/B between Seeley Street and 10th Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure W/B between Church Avenue and Caton Avenue from 7:00 a.m. to 3:30 p.m.

York Street 6/3/2019 • Left lane closed W/B between Washington Street and Front Street from 8:00 a.m. to 3:00 p.m.

3rd Avenue 6/3/2019 • One lane closed E/B between 64th Street and 60th Street from 8:00 a.m. to 3:00 p.m. 6/3/2019 - 6/7/2019 • Left lane closed E/B between 67th Street and 64th Street from 7:00 a.m. to 3:30 p.m.

3 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 3 of 23 5/31/2019 Page 3 of 23 5/31/2019 Page 3 of 23 5/31/2019 Page 3 of 23 5/31/2019 Page 3 Page 3

Brooklyn (continued) 6th Avenue 6/3/2019 - 6/7/2019 • One lane closed Both Directions at Gowanus Expressway from 10:00 a.m. to 3:30 p.m.

64th Street 6/5/2019 • One lane closed E/B between 2nd Avenue and 3rd Avenue from 8:00 a.m. to 3:00 p.m.

65th Street 6/5/2019 • One lane closed E/B between 2nd Avenue and 3rd Avenue from 8:00 a.m. to 3:00 p.m.

Manhattan Franklin D. Roosevelt Drive 6/1/2019 • Left lane closed N/B from East 14th Street to East 18th Street from 12:01 a.m. to 6:00 a.m. Note: Concrete Median Barrier Repairs. 6/3/2019 - 6/4/2019 • Left lane closed Both Directions from East 34th Street to East 36th Street from 10:00 p.m. to 4:00 a.m. (One direction at a time) Note: Local Street under Franklin D. Roosevelt Drive. 6/3/2019 – 6/7/2019 • Left lane closed N/B from East 14th Street to East 18th Street from 11:00 p.m. to 5:00 a.m. Note: Concrete Median Barrier Repairs. 6/5/2019 - 6/6/2019 • One lane closed Both Directions from East 30th Street to East 38th Street from 11:00 p.m. to 4:00 a.m. (One direction at a time) 6/6/2019 - 6/7/2019 • One lane closed Both Directions from East 63rd Street to East 62nd Street from 11:00 p.m. to 4:00 a.m. (One direction at a time) 6/8/2019 • Left lane closed N/B from East 14th Street to East 18th Street from 12:01 a.m. to 6:00 a.m. Note: Concrete Median Barrier Repairs.

4 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 4 of 23 5/31/2019 Page 4 of 23 5/31/2019 Page 4 of 23 5/31/2019 Page 4 of 23 5/31/2019 Page 4 Page 4

Queens Brooklyn Queens Expressway 6/3/2019 • One lane closed E/B ramp to E/B Grand Central Parkway from 9:00 a.m. to 3:00 p.m.

Clearview Expressway 6/3/2019 – 6/7/2019 • Shoulder closure S/B ramp from 73rd Avenue to Union Turnpike from 9:00 a.m. to 3:00 p.m. 6/4/2019 – 6/7/2019 • One lane closed Both Directions near Long Island Expressway from 10:00 a.m. to 3:00 p.m. Note: No lane closure Thursday, June 6th, 2019.

Cross Island Parkway 6/3/2019 – 6/7/2019 (NEW THIS WEEK) • One lane closed N/B ramp to W/B Grand Central Parkway from 10:00 a.m. to 3:00 p.m. • One lane closed N/B ramp to E/B Grand Central Parkway from 10:00 a.m. to 3:00 p.m.

Grand Central Parkway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists a lane shift that is in place on the E/B Grand Central Parkway to S/B Van Wyck Expressway, 2 lanes are be shifted to the East. 5/31/2019 – 6/1/2019 • One lane closed W/B from Union Turnpike to Transit Authority Bridge from 11:00 p.m. to 5:00 a.m. • One lane closed E/B from S/B Van Wyck Expressway to Union Turnpike/Main Street from 11:00 p.m. to 5:00 a.m. 5/31/2019 – 6/1/2019 • One lane closed Both Directions from Long Island Expressway to Northern Boulevard from 10:00 p.m. to 12:01 a.m. • Two lanes closed Both Directions from Long Island Expressway to Northern Boulevard from 12:01 a.m. to 5:00 a.m. 6/3/2019 – 6/7/2019 (NEW THIS WEEK) • One lane closed E/B Service Road from Union Turnpike to E/B Grand Central Parkway entrance from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/7/2019 • Right lane closed Both Directions from Transit Authority Bridge (MTA) to Main Street from 10:00 a.m. to 2:00 p.m. Note: No lane closure Thursday, June 6th, 2019. 6/3/2019 – 6/7/2019 • One lane closed W/B from Union Turnpike to Transit Authority Bridge from 10:00 a.m. to 2:00 p.m. • One lane closed E/B from S/B Van Wyck Expressway to Union Turnpike/Main Street from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/8/2019 • One lane closed W/B from Union Turnpike to Transit Authority Bridge from 11:00 p.m. to 5:00 a.m. • One lane closed E/B from S/B Van Wyck Expressway to Union Turnpike/Main Street from 11:00 p.m. to 5:00 a.m. 6/3/2019 – 6/8/2019 (NEW THIS WEEK) • One lane closed Both Directions from Long Island Expressway to Northern Boulevard from 10:00 p.m. to 12:01 a.m. • One lane closed Both Directions from 31st Street to Astoria Boulevard from 10:00 p.m. to 12:01 a.m. • One lane closed Both Directions from Long Island Expressway to Union Turnpike from 10:00 p.m. to 12:01 a.m. 6/4/2019 – 6/8/2019 (NEW THIS WEEK) • Two lanes closed Both Directions from Long Island Expressway to Northern Boulevard from 12:01 a.m. to 5:00 a.m. • Two lanes closed Both Directions from 31st Street to Astoria Boulevard from 12:01 a.m. to 5:00 a.m. • Two lanes closed Both Directions from Long Island Expressway to Union Turnpike from 12:01 a.m. to 5:00 a.m.

Long Island Expressway 6/3/2019 - 6/7/2019 • Right lane closed W/B between Queens Midtown Tunnel and Maurice Avenue from 10:00 a.m. to 3:00 p.m. • Right lane closed W/B Maurice Avenue to College Point from 10:00 a.m. to 3:00 p.m. 6/5/2019 • One lane closed Both Directions near Little Neck Parkway from 10:00 a.m. to 3:00 p.m. 6/7/2019 • One lane closed Both Directions between Clearview Expressway and Oceania Street from 10:00 a.m. to 3:00 p.m.

5 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 5 of 23 5/31/2019 Page 5 of 23 5/31/2019 Page 5 of 23 5/31/2019 Page 5 of 23 5/31/2019 Page 5 Page 5

Queens (continued) Nassau Expressway 6/5/2019 • Right lane and shoulder cloure W/B between Belt Parkway and South Conduit Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure E/B between Hangar Road and Farmers Boulevard from 7:00 a.m. to 3:30 p.m.

Van Wyck Expressway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that the S/B Van Wyck Expressway ramp to W/B Jackie Robinson Parkway (Exit 7) right lane only. Motorists should proceed with caution and drive safely. Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists that the S/B Van Wyck Expressway ramp to W/B Union Turnpike (Exit 8) is closed through September 30th, 2019 for contruction. All other lanes will have access to the Jackie Robinson Parkway and Van Wyck Expressway. Motorists should proceed with caution and drive safely. 5/31/2019 – 6/1/2019 • One lane closed Both Directions from Hoover Avenue (Pedestrian Bridge) to Jewel Avenue from 11:00 p.m. to 5:00 a.m. • One lane closed N/B ramp to W/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between 82nd Avenue (Pedestrian Bridge) and Union Turnpike. • One lane closed S/B ramp from E/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between Union Turnpike and Hoover Avenue. 6/3/2019 – 6/6/2019 (NEW THIS WEEK) • One lane closed Both Directions at Jewel Avenue from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/7/2019 (NEW THIS WEEK) • One lane closed Both Directions at Jewel Avenue from 11:00 p.m. to 1:00 a.m. 6/3/2019 – 6/7/2019 • One lane closed Both Directions from Hoover Avenue (Pedestrian Bridge) to Jewel Avenue from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/8/2019 • One lane closed Both Directions from Hoover Avenue (Pedestrian Bridge) to Jewel Avenue from 11:00 p.m. to 5:00 a.m. • One lane closed N/B ramp to W/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between 82nd Avenue (Pedestrian Bridge) and Union Turnpike. • One lane closed S/B ramp from E/B Grand Central Parkway from 11:59 p.m. to 5:00 a.m. Note: Between Union Turnpike and Hoover Avenue. 6/4/2019 – 6/7/2019 (NEW THIS WEEK) • Two lanes closed Both Directions at Jewel Avenue from 1:00 a.m. to 5:00 a.m.

Astoria Boulevard 5/31/2019 - 6/1/2019 • One lane closed E/B between 112th Street and Northern Boulevard/114th Street from 10:00 p.m. to 5:00 a.m. 6/3/2019 - 6/7/2019 • One lane closed E/B between 112th Street and Northern Boulevard/114th Street from 7:00 a.m. to 3:30 p.m. • One lane closed E/B ramp to Whitestone Expressway near 111th Street from 7:00 a.m. to 3:30 p.m. 6/3/2019 - 6/8/2019 • One lane closed E/B between 112th Street and Northern Boulevard/114th Street from 10:00 p.m. to 5:00 a.m.

Beach Channel Drive 6/4/2019 • One lane closed W/B over E/B Beach Channel Drive from 10:00 a.m. to 3:00 p.m.

Horace Harding Expressway 6/3/2019 • One lane closed E/B near Clearview Expressway from 10:00 a.m. to 3:00 p.m.

Laurel Hill Boulevard Traffic Pattern: • All lanes closed Both Directions from 54th Road to 56th Road (24 hour lane closure) Note: Approach Construction.

6 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 6 of 23 5/31/2019 Page 6 of 23 5/31/2019 Page 6 of 23 5/31/2019 Page 6 of 23 5/31/2019 Page 6 Page 6

Queens (continued) Union Turnpike 5/31/2019 - 6/1/2019 • Left lane closed Both Directions between 132nd Street and Grand Central Parkway from 10:00 p.m. to 5:00 a.m. 6/3/2019 – 6/7/2019 • One lane closed W/B between 138th Street and Queens Boulevard from 10:00 a.m. to 2:00 p.m. • One lane closed E/B between Queens Boulevard and 134th Street from 10:00 a.m. to 2:00 p.m. 6/3/2019 – 6/7/2019 • One lane closed W/B between Clearview Expressway S/B exit ramp and Francis Lewis Boulevard from 9:00 a.m. to 3:00 p.m. • One lane closed E/B between Francis Lewis Boulevard and Clearview Expressway S/B on ramp from 9:00 a.m. to 3:00 p.m. 6/3/2019 – 6/7/2019 • Left lane closed W/B from Main Street to Queens Boulevard from 10:00 a.m. to 3:00 p.m. Note: No lane closure Thursday, June 6th, 2019.

54th Road Traffic Pattern: • All lanes closed Both Directions from 43rd Street to Laurel Hill Boulevard (24 hour lane closure) Note: Construction of phase 2 bridge.

7 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 7 of 23 5/31/2019 Page 7 of 23 5/31/2019 Page 7 of 23 5/31/2019 Page 7 of 23 5/31/2019 Page 7 Page 7

Staten Island. Korean War Veterans Memorial Parkway Traffic Pattern: • The New York State Department of Transportation (NYSDOT) is advising motorists of a permanent change in traffic pattern at the Korean War Veterans Parkway (KWVP)/West Shore Expressway (WSE) Interchange approaching the on Staten Island. • To increase mobility and improve safety, a concrete barrier has been installed to channel westbound traffic heading to the Outerbridge Crossing to appropriate lanes, separating KWVP traffic from merging WSE traffic. Traffic on the KWVP wanting to access Arthur Kill Road will continue to use the Maguire Avenue/Bloomingdale Road /Arthur Kill Road exit, eliminating vehicles crossing two lanes of traffic to access Exit 1 (Arthur Kill Road). • This work is part of a $5.4 million safety and mobility improvement project at the Interchange, which also included construction of a new 3,000-foot sidewalk along the Korean War Veterans Parkway service road (Drumgoole West) between Bloomingdale Road and Lenevar Avenue, which opened in October. The new sidewalk complies with the Americans with Disabilities Act and improves safety and access to Bloomingdale Park and the surrounding community. The sidewalk also provides direct access to express bus stops at Bloomingdale Road. • For up-to-date travel information, call 511 or visit www.511NY.org. Follow New York State DOT on Twitter: @NYSDOT_NYC. Find us on Facebook at facebook.com/NYSDOT. • The New York State Department of Transportation (NYSDOT) is advising motorists that the exit ramp to 86th Street the lane will be narrowed on Thursday, February 28th until the end of October, 2019. The on ramp from 86th Street to the E/B Gowanus Expressway will also be narrowed on Thursday, February 28th until the end of October, 2019. For long term construction. Motorists should proceed with caution. 6/3/2019 – 6/7/2019 • Left lane closed S/B from Annadale Road to Arden Avenue from 6:00 a.m. to 2:30 p.m. Note: Mark out, Saw cutting and excavation. • All lanes closed S/B ramp to Arden Avenue from 6:00 a.m. to 2:30 p.m. • All lanes closed S/B ramp from Arden Avenue from 6:00 a.m. to 2:30 p.m. • All lanes closed S/B ramp to Huguenot Avenue from 6:00 a.m. to 2:30 p.m. • All lanes closed S/B ramp to Maguire Avenue from 6:00 a.m. to 2:30 p.m. • All lanes closed S/B ramp from Maguire Avenue from 6:00 a.m. to 2:30 p.m. Note: Not all ramps will closed at the same time, one ramp at a time. 6/4/2019 • Right lane and shoulder cloure N/B between Bloomingdale Road and Foster Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure S/B between Annadale Road and Arden Avenue from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure N/B between Arthur Kill Road and Richmond Avenue from 7:00 a.m. to 3:30 p.m.

Staten Island Expressway 6/1/2019 • HOV lane closed W/B from Hylan Boulevard to Targee Street from 1:00 a.m. to 10:00 a.m. Note: Prep work on median 6/3/2019 - 6/5/2019 • One lane closed Both Directions at Bradley Avenue from 7:00 a.m. to 3:30 p.m. Note: Install wooden planking. 6/3/2019 – 6/4/2019 • HOV lane closed E/B from Targee Street to Hylan Boulevard from 10:00 p.m. to 5:00 a.m. 6/4/2019 – 6/6/2019 • HOV lane closed W/B from Hylan Boulevard to Targee Street from 10:00 p.m. to 5:00 a.m. Note: Prep work on median. 6/6/2019 - 6/8/2019 • One lane closed Both Directions at Bradley Avenue from 10:00 p.m. to 5:00 a.m. Note: Install wooden planking.

West Shore Expressway 6/3/2019 • Right lane and shoulder cloure S/B between Rossville Avenue and Bloomingdale Road from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure N/B between Rossville Avenue and Arthur Kill Road from 7:00 a.m. to 3:30 p.m. • Right lane and shoulder cloure S/B between Sharrots Avenue and Englewood Avenue from 7:00 a.m. to 3:30 p.m.

8 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 8 of 23 5/31/2019 Page 8 of 23 5/31/2019 Page 8 of 23 5/31/2019 Page 8 of 23 5/31/2019 Page 8 Page 8

NYCDOT Weekend Construction PRELIMINARY WEEKEND TRAFFIC ADVISORY Friday May 31, 2019 to Sunday June 2, 2019

As part of its citywide traffic improvement program, the Department of Transportation has compiled a list of areas where Street construction or Street events will impede the normal flow of traffic this weekend.

MANHATTAN

East 16th Street between 3rd Avenue and Rutherford Place: This street will be closed Saturday from 8am to 6pm through 6/2/19 for hoisting building materials.

West 16th Street between 7th Avenue and Avenue of the Americas: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/9/19 to facilitate crane operation.

West 18th Street between 6th Avenue and 7th Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/2/19 to facilitate crane operation.

East 19th Street between Broadway and Park Avenue South: This street will be closed Saturday and Sunday from 7am to 10pm through 6/2/19 to facilitate crane operation.

East 22nd Street between Lexington Avenue and 3rd Avenue: This street will be closed Saturday from 7am to 7pm through 6/9/19 to facilitate crane operation.

East 28th Street between 3rd Avenue and 2nd Avenue: This street will be closed from 5an to 3pm Saturday and Sunday through 6/2/19 for hoisting HVAC.

East 30th Street between Madison Avenue and Park Avenue South: This street will be closed from 5am to 3pm Saturday and Sunday through 6/2/19 for hoisting replacement windows.

West 30th Street between 6th Avenue and Broadway: This street will be fully closed from 4an Saturday to 9pm Sunday through 6/9/19 to dismantle a tower crane.

West 33rd Street between Dyer Avenue and 9th Avenue: This street will be fully closed from 12:01am Saturday to 11:59pm Sunday through 6/8/19 to assemble a tower crane

West 35th Street between 9th Avenue and 8th Avenue: This street will be closed from 5am to 3pm Saturday and Sunday through 6/2/19 to facilitate crane operation.

West 35th Street between Hudson Boulevard and 10th Avenue: This street will be closed from 8pm to 6am Sunday through 6/14/19 for installation of electric service conduit.

West 39th Street between 8th Avenue and 9th Avenue: This street will he closed Saturday and Sunday from 12:01am to 9am through 6/2/19 to facilitate crane operation.

East 46th Street between 1st Avenue and 2nd Avenue: This street will be closed from 10am to 6pm Saturday and Sunday through 6/30/19 for installation of electric structure and conduit.

East 48th Street between Madison Avenue and Park Avenue: This street will be closed Sunday from 9am to 6pm through 6/22/19 for installing steel plating.

East 52nd Street between 3rd Avenue and Lexington Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/16/19 for major gas installation/safeway.

West 54th Street between 6th Avenue and 5th Avenue: This street will be closed from 8am to 8pm Saturday to facilitate crane operation.

West 55th Street between 7th Avenue and 6th Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/2/19 for hoisting HVAC equipment.

9 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 9 of 23 5/31/2019 Page 9 of 23 5/31/2019 Page 9 of 23 5/31/2019 Page 9 of 23 5/31/2019 Page 9 Page 9

NYCDOT Weekend Construction (continued) MANHATTAN (continued)

West 56th Street between Lexington Avenue and 3rd Avenue: This street will be closed from 6am to 9pm Saturday and Sunday through 6/9/19 to facilitate crane operation.

East 66th Street between 5th Avenue and Madison Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/9/19 for hoisting stairs.

East 67th Street between 1st Avenue and York Avenue: This street will be closed from 8am to 8pm Saturday and Sunday through 6/2/19 to facilitate crane operation.

East 69th Street between 2nd Avenue and 1st Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/9/19 for knuckle boom delivery.

West 75th Street between Amsterdam Avenue and Columbus Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/23/19 for major gas installation/Danella.

West 95th Avenue between Broadway and Amsterdam Avenue: This street will be closed Sunday 8am to 8pm through 6/30/19 to facilitate crane operation.

West 126th Street between Frederick Douglas Boulevard and Adam Clayton Powell Jr. Boulevard: This street will be closed from 10pm Friday to 5am Monday through 6/10/19

West 130th Street between 12th Avenue and Broadway: This street will be closed from 7am to 7pm Saturday and Sunday through 6/30/19 for water main and sewer installation.

West 131st Street between Amsterdam Avenue and Convent Avenue: This street will be closed Saturday from 8am to 4pm through 6/16/19 to enlarge structure and install electric conduit.

West 155th Street between Bradhurst Avenue and Drive Service Road: These streets will be fully closed Monday to Friday from 9pm to 5am next morning and from Friday 10pm to Saturday 7am to facilitate long term NYCDOT Bridges structural steel repairs of the West 155th Street viaduct of the Bridge.

Barrow Street between Bedford Street and Commerce Street: This street will be closed Friday from 7am to 4pm through 6/9/19 to facilitate park and plaza reconstruction.

Bradhurst Avenue between West 154th Street and West 155th Street: This street will be closed Friday from 7am to 6pm through 7/23/19 to facilitate viaduct rehabilitation.

Hamilton Place between West 136th Street and West 138th Street: This street will be closed Saturday from 8am to 4pm and Friday from 7:30am to 3:30pm while school is in session and 7am to 6pm during school recess through 6/24/19 to facilitate crane operation.

Harlem River Drive Service Road between 8th Avenue and West 155th Street: This street will be closed Friday from 7am to 6pm through 7/23/19 to facilitate viaduct rehabilitation.

FDR Service Road between East 30th Street and East 34th Street: This street will be closed from 10pm to 6am nightly except Friday and Saturday nights through 6/16/19 to facilitate roadway paving.

FDR Drive (southbound) near East 14th Street: The southbound FDR Drive will be fully closed Sunday, June, 2019, from 2am to 6am to facilitate Con Edison work. One of three southbound lanes will be maintained from 1am to 2am (prior to the full southbound) closure, and again from 5am to 6am (following the full southbound closure). Additionally, the entrance ramp to the southbound FDR Drive at Avenue C will be fully closed from 2am to 6am. Motorists wishing to continue southbound should follow the posted detour from the 23rd Street exit to 2nd Avenue southbound to East Houston Street, where they can re-enter the southbound FDR Drive.

Rutherford Place between East 15th Street and East 16th Street: This street will be closed Saturday from 8am to 6pm through 6/2/19 for associated closure.

Rutherford Place between East 16th Street and East 17th Street: This street will be closed Saturday from 8am to 6pm through 6/2/19 for associated closure.

10 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 10 of 23 5/31/2019 Page 10 of 23 5/31/2019 Page 10 of 23 5/31/2019 Page 10 of 23 5/31/2019 Page 10 Page 10

NYCDOT Weekend Construction (continued) MANHATTAN (continued)

Duane Street between West Broadway and Church Street: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/2/19 to facilitate crane operation.

Rector Street between Greenwich Street and Trinity Place: This street will be fully closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/2/19 to enlarge manhole.

Leonard Street between Hudson Street and West Broadway: This street will be fully closed Friday from 7am to 3pm through 6/18/19 to facilitate deliveries and booming and pumping operations.

Park Place between Church Street and Broadway: This street will be fully closed Friday from 7am to 3pm through 6/16/19 due to building collapse.

Platt Street between Gold Street and Pearl Street: This street will be closed Friday, Saturday, and Sunday from 7pm to 6am through 6/1/19 to facilitate installation of water and sewer service.

Avenue of the Americas between Dominick Street and Spring Street: This street will be closed from 6am to 6pm Saturday and Sunday through 6/2/19 to facilitate crane operation.

Dominick Street between Hudson Street and Varick Street: This street will be closed from 10pm Friday to 5am Monday through 6/10/19 to facilitate crane operation.

Broome Street between Essex Street and Norfolk Street: This street will be closed Friday from 11pm to Sunday 11:59pm through 6/9/19 for tower crane erection.

Broome Street between Suffolk Street and Clinton Street: This street will be closed Friday from 10pm to Monday 5am through 6/1/19 for crane placement for dismantle of tower crane operation.

Broome Street between Norfolk Street and Suffolk Street: This street will be closed Friday from 11pm to Sunday 11:59pm through 6/9/19 for tower crane erection.

Norfolk Street between Broome Street and Grand Street: This street will be closed Friday from 11pm to Sunday 11:59pm through 6/9/19 for tower crane erection.

Norfolk Street between Delancey Street and Broome Street: This street will be closed Friday from 11pm to Sunday 11:59pm through 6/9/19 for tower crane erection.

Murray Street between River Terrace and North End Avenue: This street will be closed from 6sam to 10pm Saturday and from 9am to 10pm Sunday through 6/2/19 to facilitate crane operation.

West Thames Street between South End Avenue and Battery Park Place: This street will be closed from 12:01am to 8am Saturday and from 8pm to 11:59pm Saturday and 12am to 10am Sunday through 6/2/19 for crane set up and erection.

West Thames Street between Battery Park Place and Intersection: This street will be closed Friday from 6pm to 8am Saturday and from 8pm to 11:59pm Saturday and 12am to 10am Sunday through 6/9/19 for crane set up and erection.

MANHATTAN/BRONX

Broadway Bridge over the Harlem River: There will be intermittent 15-minute closure of the bridge on Sunday starting at 10am to facilitate routine monthly testing.

11 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 11 of 23 5/31/2019 Page 11 of 23 5/31/2019 Page 11 of 23 5/31/2019 Page 11 of 23 5/31/2019 Page 11 Page 11

NYCDOT Weekend Construction (continued) BRONX

Park Avenue between East 168th Street and East 167th Street: This street will be closed Friday from 9am to 6pm through 6/27/19 to facilitate crane operation.

East 150th Street between Prospect Avenue and Union Avenue: This street will be closed Sunday from 9am to 6pm through 7/3/19 to facilitate crane operation.

Cassanova Street between Oak Point Avenue and Randall Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/9/19 for hoisting condenser.

St. George Crescent between Bend and East 206th Street: This street will be closed Friday from 9am to 6pm through 8/28/19 to facilitate crane operation.

MANHATTAN/BROOKLYN

Manhattan Bridge: Lower Roadway (Manhattan-bound) left lane will be closed 24/7 to facilitate structural and component rehabilitation under contract BRC-156F Contract #15.

Manhattan Bridge: A single lane at a time will be closed on the upper roadways on weeknights from Monday, May 27 to Friday, May 31 between the hours of 11:00 p.m. and 5:00 a.m. Manhattan-bound North Upper Roadway single-lane closures will occur between the hours of 11:00 p.m. and 5:00 a.m. Brooklyn-bound South Upper Roadway closures will occur between the hours of 1:00 a.m. and 5:00 a.m. The ongoing single-lane closure on the lower roadway will continue throughout this work. At least one lane of traffic in each direction will be maintained at all times as permitted by NYCDOT Bridges.

Williamsburg Bridge: A single Brooklyn-bound lane will be closed on four Saturdays June 1, 8, 15, and 29 between the hours of 6am to 2pm for cleaning and lubrication work as permitted by NYCDOT Bridges. At least one lane of traffic in each direction will be maintained at all times.

BROOKLYN

Willoughby Avenue between Knickerbocker Avenue and Wilson Avenue: This street will be closed Friday from 7am to 4pm through 6/29/19 to facilitate crane operation.

Clinton Street between Pierrepont Street and Bend/Tillary Street: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/9/19 for electrical installation upgrade.

East 12 Street between Avenue J and Avenue I: This street will be closed Friday from 9am to 4pm through 6/3/19 to facilitate crane operation.

Schermerhorn Street between Lafayette Street and Flatbush Avenue: This street will be closed Saturday from 8am to 6pm and Sunday from 9am to 6pm through 6/19/19 for gas main installation and gas service upgrade.

Granite Street between Broadway and Bushwick Avenue: This street will be closed Friday from 7am to 4pm through 6/3/19 for deliveries and reduction of traffic motion.

Debevoise Street between Humboldt Avenue and Graham Avenue: This street will be closed Sunday from 9am to 6pm through 7/1/19 to facilitate crane operation.

Bay 19th Street between Benson Avenue and 86th Street: This street will be closed Saturday from 8am to 6pm through 6/30/19 to facilitate crane operation.

Rutland Road between New York Avenue and Nostrand Avenue: This street will be closed Friday from 9am to 4pm through 6/10/19 to facilitate crane operation.

Adams Street between York Street and Front Street: This street will be fully closed Saturday from 7am to 4pm through 8/16/19 to facilitate deliveries.

12 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 12 of 23 5/31/2019 Page 12 of 23 5/31/2019 Page 12 of 23 5/31/2019 Page 12 of 23 5/31/2019 Page 12 Page 12

NYCDOT Weekend Construction (continued) BROOKLYN (continued)

10th Street between 40th Avenue and 38th Avenue: This street will be closed Sunday from 9am to 6pm through 6/4/19 for knuckle boom placement for delivery of materials.

Henry Street between Degraw Street and Sackett Street: This street will be closed Saturday from 8am to 8pm and Sunday from 9am to 6pm through 6/2/19 to facilitate crane operation.

President Street between Van Brunt Street and Columbia Street: This street will be closed Friday from 7am to 3pm through 6/2/19 to facilitate crane operation.

Front Street between Jay Street and Bridge Street: This street will be closed Friday from 10pm to 5am Monday through 6/3/19 to facilitate crane operation.

MANHATTAN/QUEENS

Ed Koch : A single lane will be closed on the Lower Roadway and the North Inner Roadway (Manhattan-bound) on Saturday from 12:01am to 7am and from 1am to 7am the South Inner Roadway (Queens-bound will be closed to facilitate replacement of Upper Roadway.

QUEENS

31st Street between Astoria Boulevard North and Grand Central Parkway (Hoyt Avenue South): This street will be closed from 11pm Friday to 5am Monday through 6/29/19 for mainline track repairs.

107th Street between 34th Avenue and 37th Avenue: This street will be closed Friday from 9am to 4pm through 7/24/19 to facilitate crane operation.

113th Street between Jamaica Avenue and 89th Avenue: This street will be closed Saturday from 7am to 7pm through 6/1/19 to facilitate MTA work.

Hoyt Avenue South between 31st Street and 33rd Street: This street will be closed from 11pm Friday to 5am Monday through 6/29/19 for mainline track repairs.

Hoyt Avenue South between 31st Street and Grand Central Parkway Eastbound Exit 3: This street will be closed from 11pm Friday to 5am Monday through 6/29/19 for mainline track repairs.

Woodhaven Boulevard between 101st Avenue and 103rd Avenue: This street will be closed Saturday from 8am to 4pm and Sunday from 9am to 4p through 5/26/19 to facilitate crane operation.

Crescent Street between Queens Plaza South and 42nd Road: This street will be closed 6pm Saturday to 11:59pm Sunday through 6/9/19 to facilitate crane operation.

STATEN ISLAND

Richmond Terrace between and Newark Avenue: This street will be closed Friday from 9pm to 5am through 6/23/19 for Bayonne Bridge replacement of main span roadway and approach.

Richmond Terrace between Morningstar Road and Bayonne Bridge: This street will be closed Friday from 9pm to 5am through 6/23/19 for Bayonne Bridge replacement of main span roadway and approach.

Richmond Terrace between Pedestrian and Bike Path and Bayonne Bridge: This street will be closed Friday from 9pm to 5am through 6/23/19 for Bayonne Bridge replacement of main span roadway and approach.

13 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 13 of 23 5/31/2019 Page 13 of 23 5/31/2019 Page 13 of 23 5/31/2019 Page 13 of 23 5/31/2019 Page 13 Page 13

NYCDOT Weekly Construction WEEKLY TRAFFIC ADVISORY Saturday June 1, 2019 to Friday June 7, 2019

The City of New York’s Department of Transportation issued a traffic alert for this week providing the locations of road construction and events where lane and street closings will affect the flow of traffic. Lane closings may also occur due to circumstances beyond our control. Major road, lane and street closings for the coming week are as follows:

EAST RIVER BRIDGE CROSSINGS

Ed Koch/Queensboro Bridge: A single-lane will be closed Manhattan-bound north inner roadway on Saturday from 12:01am to 7am and Monday to Thursday from 10pm to 5am. Single-lane will be closed Queens-bound south inner roadway on Saturday from 1am to 7am and Monday to Thursday from 11pm to 5:30am. These lane closures are necessary to facilitate replacement of upper roadway under Contract BRC-231F and will be coordinated with the bridge maintenance operation. To facilitate the bridge maintenance, single-lane will be closed Monday to Friday from 10pm to 5am for north roadways and from 11pm to 5:30am for South roadways.

Manhattan Bridge: A single-lane Manhattan-bound Lower Roadway will be closed 24/7 on Saturday and Sunday, and single-lane on the South Upper Roadway will be closed Monday to Friday from 10am to 3pm to facilitate bridge rehabilitation under Contract BRC-156F. During the Manhattan-bound North Upper Roadway closure, two lanes on the Lower Roadway will operate in the Brooklyn-bound direction. Also, single-lane at a time on the upper roadways will be closed Monday to Friday from 11pm to 5am for Manhattan-bound and from 1am to 5am for Brooklyn-bound to facilitate bridge maintenance.

Williamsburg Bridge: Brooklyn-bound single-lane will be closed Saturday from 6am to 2pm to facilitate bridge cleaning and lubrication.

MANHATTAN

West 33rd Street between 10th Avenue and 11th Avenue: This street is fully closed closed to facilitate long term roadway reconstruction work.

Battery Park Underpass: North Tube will be fully closed from Friday 10pm to Saturday 10am to facilitate EDC's bridge span erection operation at West Thames Street.

JP Ward Street between Washington Street and West Street: This street will be fully closed from Friday 10pm to Saturday 10am to facilitate EDC's bridge span erection operation at West Thames Street.

West Thames Street between Route 9A/West Street and Battery Place: This street will be fully closed from Friday 6pm to Sunday 3pm to facilitate EDC's bridge span erection operation at West Thames Street.

West Thames Street between Battery Place and South End Avenue: This street will be fully closed from Friday 6pm to Saturday 10am to facilitate EDC's bridge span erection operation at West Thames Street.

Route 9A/West Street between Morris Street and Rector Street: Northbound single-lane will be closed Friday and Saturday from 9pm to 10am next morning and double-lane will be closed Saturday and Sunday from 1am to 5am to facilitate EDC's bridge span erection operation at West Thames Street.

Route 9A/West Street between Albany Street and Morris Street: Southbound single-lane will be closed Friday and Saturday from 9pm to 10am next morning and double-lane will be closed Saturday from 1am to 5am and from 11pm to 5am next morning to facilitate EDC's bridge span erection operation at West Thames Street.

Route 9A/West Street (northbound/southbound) between Battery Place and Vesey Street: One northbound lane will be closed from 10pm to 5am Monday to Friday, 8:30pm Friday to 8am Saturday and 8:30pm Saturday to 10:30am Sunday. Two northbound lanes will be closed from 1am to 5am Monday to Friday, 2am to 7am Saturday and 12:01am to 8am Sunday. One southbound lane will be closed from 11pm to 5am nightly. Two southbound lanes will be closed from 1am to 5am Monday to Friday, 3am to 8am Saturday and 3am to 9am Sunday. These lane closures are necessary through June 2019 to facilitate NYSDOT roadway rehabilitation work.

14 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 14 of 23 5/31/2019 Page 14 of 23 5/31/2019 Page 14 of 23 5/31/2019 Page 14 of 23 5/31/2019 Page 14 Page 14

NYCDOT Weekly Construction (continued) MANHATTAN (continued)

Route 9A/West Street (northbound/southbound) between Vesey Street and Canal Street: One northbound lane will be closed from 10am to 3pm and 10pm to 5am Monday to Friday, 10pm Friday to 9am Saturday and 10pm Saturday to 9am Sunday. Two northbound lanes will be closed from 10pm to 5am Monday to Friday, 11pm Friday to 8am Saturday and 11pm Saturday to 8am Sunday. One southbound lane will be closed from 9pm to 5am Monday to Friday, 10pm Friday to 10am Saturday and 10pm Saturday to 10am Sunday. Two southbound lanes will be closed from 12:01am to 5am Monday to Friday, 1am to 9am Saturday and 2am to 10am Sunday. These lane closures are necessary through June 2019 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between Canal Street and 14 Street: One northbound lane will be closed from 9pm to 6am Monday to Friday, 8pm Friday to 11:59am Saturday and 9pm Saturday to 1pm Sunday. Two northbound lanes will be closed from 11pm to 6am Monday to Friday, 1am to 8am Saturday and 1am to 10am Sunday. One southbound lane will be closed from 10pm to 6am Monday to Friday, 12:01am to 11:59am Saturday and Sunday. Two southbound lanes will be closed from 1am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. These lane closures are necessary through June 2019 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between 14 Street and 24 Street: One northbound lane will be closed from 11pm to 6am Monday to Friday, 12:01am to 9am Saturday and 1am to 10am Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 7am Saturday and 3am to 8am Sunday. One southbound lane will be closed from 9pm to 6am Monday to Friday, 12:01am to 9am Saturday and 12:01am to 10am Sunday. Two southbound lanes will be closed from 12:01am to 6am Monday to Friday, 1am to 6am Saturday and 2am to 8am Sunday. These lane closures are necessary through June 2019 to facilitate NYSDOT roadway rehabilitation work.

Route 9A/West Street (northbound/southbound) between 42 Street and 50 Street: One northbound lane will be closed from 9am to 2pm and 11pm to 7am Monday to Friday, 12:01am to 10am Saturday and 12:01am to 1pm Sunday. Two northbound lanes will be closed from 12:01am to 6am Monday to Friday, 2am to 8am Saturday and 2am to 10am Sunday. One southbound lane will be closed from 8pm to 6am Monday to Friday, 8pm Friday to 9am Saturday and 8pm Saturday to 11am Sunday. Two southbound lanes will be closed from 11pm to 6am Monday to Friday, 12:01am to 8am Saturday and 1am to 9am Sunday. These lane closures are necessary through June 2019 to facilitate NYSDOT roadway rehabilitation work.

Henry Hudson Parkway northbound on-ramp at 79 Street between and Edgecombe Avenue: The ramp will be reduced to 12-foot lane until November as part of Henry Hudson Parkway Viaduct Rehabilitation between West 72 and West 82 Streets.

Henry Hudson Parkway southbound off-ramp at 95th Street: The ramp will be closed weeknights from 11pm to 5am beginning May 21, 2019 for approximately two weeks as part of Henry Hudson Parkway Viaduct Rehabilitation between West 94 and West 98 Streets.

Macombs Dam Viaduct between Harlem River Drive and Edgecombe Avenue: The viaduct will be fully closed Monday to Friday from 11pm to 5am next morning and from Friday 11:59pm to Saturday 7am to facilitate long term NYCDOT Bridges structural steel repairs of the West 155th Street viaduct of the . During Yankee's home games, full closure will take place 3 hours after the end of game.

West 155 Street between Bradhurst Avenue and Harlem River Drive Service Road: These streets will be fully closed Monday to Friday from 9pm to 5am next morning and from Friday 10pm to Saturday 7am to facilitate long term NYCDOT Bridges structural steel repairs of the West 155th Street viaduct of the Macombs Dam Bridge.

BROOKLYN

Brooklyn Queens Expressway between Old Fulton Street and Joralemon Street: On the westbound Brooklyn Queens Expressway, single-lane will be closed from 12:01am to 1am. A double-lane will be closed from 1am to 5am to facilitate repairs on the expressway. This closure will occur one night a week on either Tuesday or Thursday.

Brooklyn Queens Expressway by Union Street and Sacket Street Bridges: Single-lane at a time in either direction of the expressway will be closed weeknights from 12:01am to 1am and double-lane in one direction will be closed from 1am to 5am to facilitate maintenance of both bridges.

Gowanus Expressway/Belt Parkway Interchange between 86th Street and 45th Street: One of three lanes in each direction may be closed Monday to Friday from 10am to 3pm to facilitate NYSDOT long term roadway rehabilitation work.

Third Avenue between 54th Street and 5th Avenue/65th Street: One lane westbound is closed around-the clock on the inner roadway, and an additional lane may be closed from 8pm to 2pm Monday to Friday to facilitate NYSDOT long term work.

15 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 15 of 23 5/31/2019 Page 15 of 23 5/31/2019 Page 15 of 23 5/31/2019 Page 15 of 23 5/31/2019 Page 15 Page 15

NYCDOT Weekly Construction (continued) MANHATTAN/BRONX

Henry Hudson Bridge southbound between Kappock Street and Dyckman Street: Southbound will be fully closed Monday to Saturday from 12:01am to 5am to facilitate replacement of structural steel.

BRONX

East 174 Street underneath Grand Concourse overpass: Parking lane of approximately 15 parking spaces along the north curb of East 174 Street underneath Grand Concourse overpass will be closed Monday to Friday from 7am to 4pm and Saturday and Sunday from 8am to 6pm to facilitate bridge component rehabilitation project (HBCR03A).

Grand Concourse Parkway Bridge over East 174 Street: Right lane of southbound mainline and left lane and right parking lane of the southbound service road will be closed Monday to Friday from 9am to 4pm and Saturday and Sunday from 8am to 6pm as part of the Component Rehabilitation of Ten Bridges Citywide Project (HBCR03A).

Bruckner Expressway between RFK Bridge and Sheridan Expressway: Northbound single-lane will be closed Monday to Friday from 9 am to 2 pm and from 10 pm to 5 am next morning, Friday from 11 pm to Saturday 3 pm, Saturday 11 pm to Sunday 3 pm, and Sunday 10 pm to Monday 5 am; Southbound single-lane will be closed Monday to Saturday from 10 am to 3 pm and from 10 pm to 5 am, Friday from 10 pm to Saturday 6:30 am, and Saturday from 10 pm to Sunday 2 pm; Double-lane will be closed in either direction Tuesday 1 am to Friday 5 am, Saturday from 1 am to 6:30 am, and Sunday 2 am to 9 am. These closures are necessary to facilitate deck replacement.

Major Deegan Expressway under the Cross Bronx Expressway: Close single-lane northbound Monday to Friday from 10 pm to 5 am next morning, Friday 11 pm to Saturday 6:30 am, and Saturday 11 pm to Sunday 3 pm. Close single-lane southbound Monday to Saturday from 10 am to 3 pm, Monday to Friday from 10 pm to 5 am next morning, Friday 10 pm to Saturday 6:30 am, and Saturday 10 pm to Sunday 2 pm. These closures are necessary to facilitate rehabilitation of the Major Deegan Expressway and Cross Bronx Expressway interchange.

Hutchinson River Parkway Bridge: Southbound will be fully closed for one night between Monday to Saturday from 11pm to 5am next morning to facilitate urgent bridge repair.

Third Avenue Bridge: South roadway and south sidewalk will be closed and two-way traffic and pedestrian will be shifted to north side Monday to Friday from 7am to 4:30pm as part of Filling Five Bridges Over Abandoned CSX Line.

Unionport Road Bridge over and CSX: Northbound of Unionport Bridge between White Plains Road and East Tremont Avenue will be closed 24/7 for approximately 6 weeks, beginning May 13, 2019, to facilitate bridge rehabilitation.

QUEENS

Van Wyck Expressway under the Roosevelt Avenue Bridge: [Northbound] Single-lane will be closed Monday to Friday from 9:30 am to 2 pm and from 11 pm to 5 am next morning, Friday from 9 pm to Saturday 12 pm, and Sat from 8 pm to Sunday 12 pm, double-lane will be closed Monday to Friday from 12:01 am to 5:30 am, Sat from 1 am to 6 am, and Sun from 1 am to 7:30 am; [Southbound] Single-lane will be closed Monday to Friday from 9:30 am to 2 pm and from 11 pm to 5 am next morning, Friday from 9 pm to Saturday 3 pm, and Saturday from 8 pm to Sunday 3 pm, double-lane will be closed Monday to Friday from 12:01 am to 6 am, Saturday from 1 am to 5 am, and Sunday from 1 am to 9 am. These closures are necessary to facilitate reconstruction of the Roosevelt Avenue Bridge under contract HBQ1203.

16 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 16 of 23 5/31/2019 Page 16 of 23 5/31/2019 Page 16 of 23 5/31/2019 Page 16 of 23 5/31/2019 Page 16 Page 16

MTA TBTA WEEKLY TRAFFIC ADVISORY

BRONX WHITESTONE BRIDGE (MTA)

Daytime: • Monday to Friday: Intermittent single lane closures to be implemented in northbound and southbound directions from 9:00 AM to 2:00 PM

Weekend (5/31/19 PM – 6/3/19 AM): No closures

CROSS BAY BRIDGE (MTA):

24/7 continuous closures: • Northbound and Southbound - one lane closures

Day-time – Monday through Friday • Northbound – In addition to the 24/7 lane closure, an adjacent lane, a total of 2 out of 3 lanes will be closed from 8:00 am to 5:30 pm – all closures will be coordinated where necessary

• Southbound – In addition to the 24/7 lane closure, an adjacent lane, a total of 2 out of 3 lanes will be closed from 7:00 am to 3:00 pm – all closures will be coordinated where necessary

Ramp Closures (From May 9th through May 23th): • Full Northbound Ramp Closure from Eastbound Beach Channel Drive (9 AM to 4 PM) • Full Southbound Ramp Closure to Beach Channel Drive WB (7AM to 3 PM)

Weekend (5/31/19 PM – 6/3/19 AM): • Refer to the 24/7 continuous closures as noted above.

HENRY HUDSON BRIDGE (MTA)

Daytime: • Single lane 24/7 closure with traffic pattern change on the Lower Level Roadway (Manhattan-bound). The pedestrian walkway is also closed.

• Monday – Sunday: single lane closure Upper Level Roadway (Bronx-bound) (7:00 AM – 3:00 PM).

• Monday – Friday: double lane closure Upper Level Roadway (Bronx Bound) (9:00 AM until 3:00 PM)

Nighttime: • Monday – Sunday: two of three lanes closed Upper and Lower Level Roadways (9:00 PM – 5:00 AM)

• Throughout the month of May, the Lower Level Roadway (Manhattan Bound) will be fully closed at Exit 18, Kappock St. between 12 a.m. and 5 a.m. for approximately 12 nights. Full closure to happen on all nights of the week except Sunday night into Monday. The roadway closures are weather-permitting.

Note: Full nighttime closures of the south bound direction is planned in June for approximately 11 nights.

Weekend (5/31/19 PM – 6/3/19 AM):

• The outer lane and shoulder lane on the Lower Level Roadway (Manhattan-bound) will be closed continuously.

17 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 17 of 23 5/31/2019 Page 17 of 23 5/31/2019 Page 17 of 23 5/31/2019 Page 17 of 23 5/31/2019 Page 17 Page 17

MTA (continued) HUGH L. CAREY TUNNEL (MTA)

Daily Night-time single tube closures

• Sunday to Thursday, 9:00 PM to 5:30 AM • Friday 9:00 PM to Saturday 10:00 AM

Weekend (5/31/19 PM – 6/3/19 AM):

• A full tube closure will be switched between the East Tube (Manhattan Bound) and West Tube (Brooklyn Bound) from Friday 9:00 PM to Saturday 10:00 AM. Only one tube will be closed at a time. • East Tube (Manhattan Bound) Full Closure from Sunday 11:00 PM to Monday 5:30 AM.

MARINE PARKWAY BRIDGE (MTA)

Day-time – Monday through Friday: Southbound – right lane closed: 7 AM to 3:00 PM Northbound – right lane closed: 8 AM to 4:00 PM

Weekend (5/31/19 PM – 6/3/19 AM): No closures

QUEENS MIDTOWN TUNNEL (MTA)

Daily Night-time/Single Lane Closures (one lane in each tube):

• Sunday 9:00 PM to Monday 5:30 AM • Monday to Thursday 10:00 PM to 5:30 AM • Friday 11:00 PM through Saturday 5:30 AM

Weekend (5/31/19 PM – 6/3/19 AM): South Tube (Queens Bound) Full Closure from Friday 11:00 PM to Saturday 10:00AM

ROBERT F. KENNEDY BRIDGE (MTA)

Ramp to/from FDR • Monday–Sunday (10 AM to 3 PM): as needed soft closure of shoulder for (Manhattan bound) off ramp to the FDR.

• Monday–Sunday (7 AM to 3 PM): as needed soft closure of shoulder for on ramp from the FDR to bridge.

• Weekend as needed double lane soft closure (9 PM to 5 AM) for off bound ramp to the FDR.

Queens Approach Monday-Friday (9 PM-5 AM) as needed Queens Approach to Bronx- right lane closure Queens Approach to Queens- right lane closure

Harlem River Lift Span: Monday–Friday (7 AM to 3 PM): as needed right lane closure onbound from Manhattan

Bronx Span: Monday–Friday (10 AM to 3 PM): as needed right lane closure

18 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 18 of 23 5/31/2019 Page 18 of 23 5/31/2019 Page 18 of 23 5/31/2019 Page 18 of 23 5/31/2019 Page 18 Page 18

MTA (continued) ROBERT F. KENNEDY BRIDGE (MTA) (continued)

Queens Span: Monday-Friday (10 AM to 3 PM) as needed Queens Span to Bronx- right lane closure Queens Span to Queens- right lane closure

Suspension Span (to/from Queens) Monday- Friday (9 PM to 5 AM) On-bound (from Queens) and Off-bound (to Queens) - Single soft lane closure

Manhattan Plaza No lane closures

Weekend (5/31/19 PM – 6/3/19 AM): A single lane closure on on-bound FDR Ramp (to Queens) from Friday 9:00 PM to Saturday 5:00 AM.

THROGS NECK BRIDGE (MTA)

Daytime: • Monday through Friday, a single lane will be closed southbound from 8:00 AM to 2:00 PM and northbound from 10:00 AM to 3:00 PM

Nighttime: • Monday through Friday, two lanes will be closed on select nights southbound from 10:00 PM to 5:00 AM and northbound from 10:00 PM to 5:00 AM.

Notes: ▪ Stage 1 reconstruction of the former toll plaza is scheduled to begin on June 10th for approximately a 7 to 9 weeks duration with three lanes maintained in each direction.

▪ Weekends June through October: On select weekends June through October, a single lane will be closed northbound direction from 10:00 PM Friday to 5:00 AM Monday.

▪ An additional lane northbound will also be closed at night: 10:00 PM Friday to 7:00 AM Saturday, 10:00 PM Saturday to 7:00 AM Sunday, and 11:00 PM Sunday to 5:00 AM Monday. The work will be weather dependent.

Weekend (5/31/19 PM – 6/3/19 AM):

▪ A single lane closure in north and south bound directions from Friday 10:00 PM to Saturday 5:00 AM.

19 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 19 of 23 5/31/2019 Page 19 of 23 5/31/2019 Page 19 of 23 5/31/2019 Page 19 of 23 5/31/2019 Page 19 Page 19

MTA (continued) VERRAZZANO NARROWS BRIDGE (MTA)

Daytime: • Mon-Friday 10:00 AM-7:00 PM. Upper and Lower Level Eastbound – Single Lane Closures

• Mon-Thursday 7:00 AM-3:00 PM; Fri (7:00 AM-1:00 PM) Upper and Lower Level Westbound – Single Lane Closures

Nighttime:

• Mon-Thursday 9:00 PM-5:00 AM; Fri (11:59 PM-8:00 AM); Sat (11:59 PM-8:00 AM) Lower or Upper Level Eastbound – Single Lane/Full Level Closure

• Mon-Thursday 10:00 PM-6:00 AM; Fri (11:59 PM-8:00 AM); Sat (11:59 PM-8:00 AM) Lower or Upper Level Westbound – Single Lane/Full Level Closure.

Weekend (5/31/19 PM – 6/3/19 AM): No closures

20 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 20 of 23 5/31/2019 Page 20 of 23 5/31/2019 Page 20 of 23 5/31/2019 Page 20 of 23 5/31/2019 Page 20 Page 20

Port Authority NY/NJ BAYONNE BRIDGE (PA)

Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions Side (Bayonne) to New York Side (Staten Island), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 06:00 AM thru 03:00 PM, 1 lane closed.

Port Authority NY/NJ: bridge construction on Bayonne Bridge southbound New Jersey Side (Bayonne) to New York Side (Staten Island), Saturday June 1st, 2019 thru Sunday June 2nd, 2019, Saturday/Sunday, 06:00 AM thru 03:00 PM, right lane closed.

Port Authority NY/NJ: bridge construction on Bayonne Bridge both directions New Jersey Side (Bayonne) to New York Side (Staten Island), Monday June 3rd, 2019 thru Friday June 7th, 2019, Monday thru Friday, 06:00 AM thru 03:00 PM, 1 lane closed.

Port Authority NY/NJ: bridge construction on Bayonne Bridge northbound New York Side (Staten Island) to New Jersey Side (Bayonne), Wednesday June 5th, 2019 thru Thursday June 6th, 2019, 09:00 PM thru 05:00 AM, left lane closed.

GEORGE WASHINGTON BRIDGE (PA)

Port Authority NY/NJ: long-term construction on Bridge eastbound ramp to 178th Street (New York), Continuous Thursday July 26th, 2018 10:00 PM thru Saturday July 27th, 2019 11:59 PM ramp closed and detoured.

Port Authority NY/NJ: bridge construction on westbound ramp to Palisades Interstate Parkway Toll Plaza (Fort Lee), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 08:30 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Lower Level (Fort Lee) to New York Side/Lower Level (Manhattan), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 10:30 AM thru 03:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound from New York Side/Lower Level (Manhattan) to Lower Trans Manhattan Expressway (Manhattan), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 10:30 AM thru 03:30 PM, left lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 08:30 AM thru 02:30 PM, right lane closed, Saturday June 1st, 2019, 08:00 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound from Lower Trans Manhattan Expressway (Manhattan) to Henry Hudson Parkway (Manhattan), Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday/ Friday, 08:30 AM thru 02:30 PM, right lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound approaching New Jersey Side/Lower Level Toll Plaza (Fort Lee), Friday May 31st, 2019, 10:30 AM thru 03:30 PM, left lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee), Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 08:00 AM, 2 left lanes closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp to Palisades Interstate Parkway Toll Plaza (Fort Lee) two 20 minute traffic holds, Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 10:00 AM.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound New York Side/Upper Level (Manhattan) to New Jersey Side/Upper Level (Fort Lee) one 20 minute traffic hold, Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 10:00 AM.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound New Jersey Side/Upper Level (Fort Lee) to New York Side/Upper Level (Manhattan) one 20 minute traffic hold, Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 10:00 AM.

Port Authority NY/NJ: bridge construction on George Washington Bridge eastbound Lower Trans Manhattan Expressway (Manhattan), Saturday June 1st, 2019, 12:00 AM thru 08:00 AM, all lanes closed and detoured.

21 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 21 of 23 5/31/2019 Page 21 of 23 5/31/2019 Page 21 of 23 5/31/2019 Page 21 of 23 5/31/2019 Page 21 Page 21

Port Authority NY/NJ (continued) GEORGE WASHINGTON BRIDGE (PA) (continued)

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp from Palisades Interstate Parkway Toll Plaza (Fort Lee), Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 10:00 AM, all lanes closed and detoured

GOETHALS BRIDGE (PA)

Port Authority NY/NJ: bridge construction on westbound New York Side (Staten Island) to New Jersey Side (Elizabeth), Thursday May 30th, 2019 thru Saturday June 1st, 2019 Thursday/ Friday, 09:00 PM thru 05:00 AM, left lane closed.

Port Authority NY/NJ: bridge construction on George Washington Bridge westbound ramp to Palisades Interstate Parkway Toll Plaza (Fort Lee) Two 20 minute traffic holds, Friday May 31st, 2019 thru Saturday June 1st, 2019, 10:00 PM thru 10:00 AM.

Port Authority NY/NJ: bridge construction on Goethals Bridge both directions New Jersey Side (Elizabeth) to New York Side (Staten Island) four 15 minutes traffic holds, Saturday June 1st, 2019, 12:00 AM thru 08:00 AM,.

Port Authority NY/NJ: bridge construction on Goethals Bridge eastbound New Jersey Side (Elizabeth) to New York Side (Staten Island), Tuesday June 4th, 2019 thru Thursday June 6th, 2019 Tuesday/ Wednesday, 09:00 PM thru 05:00 AM, left lane closed.

HOLLAND TUNNEL (PA)

Port Authority NY/NJ: tunnel repairs on eastbound New Jersey Side - South Tube (Jersey City) to New York Side - South Tube (Manhattan), Sunday June 2nd, 2019 thru Friday June 7th, 2019 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, 1 lane closed.

Port Authority NY/NJ: tunnel repairs on Holland Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Jersey City), Monday June 3rd, 2019 thru Friday June 7th, 2019 Monday/ Tuesday/ Wednesday/ Friday, 12:00 AM thru 05:30 AM, 1 lane closed.

LINCOLN TUNNEL (PA)

Port Authority NY/NJ: Repair Helix Guiderail & Relocate Manhole Recover on NJ 495 at both directions New Jersey Side Wednesday May 30th, 2018 thru Saturday November 30th, 2019, Monday thru Friday, 09:00 PM thru 05:00 AM, one lane closed on 495 and one to two lanes closed on JFK Boulevard East.

Port Authority NY/NJ: Remove & Replace Existing Above Ground Storage Tanks & Install 2" Electric Conduits at Lincoln Tunnel on 10th Avenue between 39th and 40th Streets (Manhattan) up to 3 lanes closed Weeknights from 10 p.m. - 6 a.m. the next morning, July 31st, 2018 thru July 31st, 2020.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel eastbound New Jersey Side - South Tube (Weehawken Twp) to New York Side - South Tube (Manhattan) , Friday May 31st, 2019 thru Saturday June 1st, 2019, 11:00 PM thru 07:00 AM, all lanes closed and detoured, Sunday June 2nd, 2019, 12:00 AM thru 09:00 AM, all lanes closed and detoured, Thursday June 6th, 2019 thru Friday June 7th, 2019, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel westbound New York Side - North Tube (Manhattan) to New Jersey Side - North Tube (Weehawken Twp), Sunday June 2nd, 2019 thru Tuesday June 4th, 2019 Sunday/ Monday, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

Port Authority NY/NJ: tunnel repairs on Lincoln Tunnel both directions New Jersey Side - Center Tube (Weehawken Twp) to New York Side - Center Tube (Manhattan), Tuesday June 4th, 2019 thru Thursday June 6th, 2019 Tuesday/ Wednesday, 11:00 PM thru 05:00 AM, all lanes closed and detoured.

22 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 22 of 23 5/31/2019 Page 22 of 23 5/31/2019 Page 22 of 23 5/31/2019 Page 22 of 23 5/31/2019 Page 22 Page 22

Port Authority NY/NJ (continued) OUTERBRIDGE CROSSING (PA)

Port Authority NY/NJ: bridge construction on Outerbridge Crossing eastbound, Tuesday May 28th, 2019 thru Friday May 31st, 2019 Tuesday/ Wednesday/ Thursday, 10:00 PM thru 05:00 AM, right lane closed, Saturday June 1st, 2019, 12:00 AM thru 08:00 AM, right lane closed.

Port Authority NY/NJ: bridge construction on Outerbridge Crossing both directions New Jersey Side (Perth Amboy) to New York Side (Staten Island), Friday May 31st, 2019 thru Saturday June 1st, 2019, 11:00 PM thru 07:00 AM, right lane closed.

Port Authority NY/NJ: bridge construction on Outerbridge Crossing both directions New Jersey Side (Perth Amboy) to New York Side (Staten Island), Monday June 3rd, 2019 thru Friday June 7th, 2019 Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, right lane closed, Friday June 7th, 2019 thru Saturday June 8th, 2019, 10:30 PM thru 07:00 AM, right lane closed, Sunday June 2nd, 2019 thru Monday June 3rd, 2019, 10:30 PM thru 05:00 AM, right lane closed.

23 5/31/2019 1 5/31/20199/12/2008 Page of 23 5/31/2019 Page 23 of 23 5/31/2019 Page 23 of 23 5/31/2019 Page 23 of 23 5/31/2019 Page 23 of 23 5/31/2019 Page 23 Page 23