Twelfth Five Year Plan Document (Volume III)

© Copyright Gross National Happiness Commission (2019) Published by: Gross National Happiness Commission, Royal Government of . “Looking ahead, we have a new five-year plan, and a great number of responsibilities of national importance before us. We must work together in order to build an extraordinary, strong, secure, and peaceful future for Bhutan.” ISBN: 978-99936-55-04-6 His Majesty The ISBN: 978-99936-55-05-3 111th National Day, Samtse, 17th December, 2018

TWELVE FIVE YEAR PLAN_BINU_12.indd 3 5/24/2019 10:52:20 AM “Looking ahead, we have a new five-year plan, and a great number of responsibilities of national importance before us. We must work together in order to build an extraordinary, strong, secure, and peaceful future for Bhutan.”

His Majesty The Druk Gyalpo 111th National Day, Samtse, 17th December, 2018

TWELVE FIVE YEAR PLAN_BINU_12.indd 3 5/24/2019 10:52:20 AM

Twelfth Five Year Plan (2018-2023),

PRIME MINISTER 2nd February, 2019 FOREWORD

e 12th Five Year Plan (FYP) commences amid numerous auspicious occasions that hold special signi cance for all Bhutanese. Our Nation celebrated the 12th year of glorious reign of His Majesty e Druk Gyalpo and 111 years of the institution of Monarchy and nation building. e nation continues to enjoy the blessings of Yabjey-Damba, His Majesty e Fourth Druk Gyalpo. It witnessed the 22nd year of tireless service by His Holiness the 70th Je for the wellbeing of the country and its people. e Nation’s Son, His Royal Highness e Gyalsey continues to be a source of unbounded joy for all Bhutanese citizens. e ird Parliamentary election was successfully held with increased people’s participation in the electoral process. at the Election Commission of Bhutan and Bhutan Broadcasting Service were conferred well-deserved high awards by His Majesty e Druk Gyalpo re ects their eminent role in the success of the elections.

In addition, Bhutan will be graduating from the list of Least Developed Countries (LDC) by 2023. Meeting the eligibility criteria for graduation is a testament of the hard work of the people of Bhutan with the support of key development partners. Even though Bhutan has ful lled the two required indicators for graduation, the fact that we are yet to cross the threshold for economic vulnerability is a source of concern. It is a reminder of the work that remains to address the last mile challenge of development and ensure continued progress towards creating an inclusive and prosperous Gross National Happiness (GNH) state. e 12th FYP will be Bhutan’s last  ve year plan as an LDC. At this critical stage in our development history, Bhutan looks to the continued support of all its development partners to implement the 12th FYP. It is also a call to all public servants, the private sector, civil society organisations and citizens to work together to achieve the noble aspirations of the 12th FYP and live up to the trust bestowed on each one of us by His Majesty e Druk Gyalpo.

With the objective of Just, Harmonious and Sustainable Society through enhanced Decentralisation, the 12th FYP and its 17 national key result areas are drawn from the timeless vision and wisdom emanating from the Golden rone. Re ecting Bhutan’s status as an active member of the global

xii-i-

TWELVE FIVE YEAR PLAN_BINU_12.indd 12 5/24/2019 10:52:21 AM Twelfth Five Year Plan (2018-2023), Thimphu Thromde

community, it also takes into consideration the Sustainable Development Goals and other regional and international commitments. e Plan has been shaped by extensive consultations held over a period of two years with wide ranging groups of stakeholders. e outcome is a 12th FYP that is a National Development Plan re ecting the aspirations and concerns of the people of Bhutan. Pledges of elected Government as well as selected pledges of the other three political parties have been incorporated into the Plan following rigorous assessment. Lessons learnt from 11 FYP have also proved useful in changing how we plan and implement better.

e 12 FYP formulation, execution and implementation are underpinned by the principles of coordination, consolidation and collaboration to achieve greater gains. True to the objective of enhancing decentralisation, resources have been doubled for LGs in the 12th FYP compared to 11th FYP resulting in an equal share of capital resources as the Central Agencies. e Division of Responsibilities Framework has also been revised to provide greater decentralisation of roles, functions and authority to the local governments. Another new feature of the 12th FYP is the Government’s  agship programmes that aims to address issues of national priority. e programme areas have been chosen to ensure that critical issues such as youth unemployment, water security and poverty reduction are addressed in a coherent manner within a  ve year period.

Unlike past plan periods, the 12th FYP period commences from 1st November, 2018 and will end on 31st October, 2023 in order to align with the Government’s tenure. Implementation will be rigorously monitored through the government performance management system to ensure that results are achieved. Progress will be reviewed during the annual and mid-term reviews to ensure that corrective measures and mid-course corrections are made in a timely manner.

e 12th FYP is unprecedented both in size and scope and will demand utmost dedication on the part of the over 54,000 public servants across the country. It sets out an ambitious agenda and will be the biggest plan implemented thus far with an outlay of Nu. 310 billion, an increase of nearly 38 percent over the 11th FYP. An inclusive plan has been formulated, adequate resources mobilised with quali ed public servants to implement the activities. All required causes and conditions are in place to ensure that what has been planned can be delivered. I take this opportunity to call upon all Bhutanese as well as our development partners, civil society organisations, political parties, private sector and other stakeholders to work together to build a strong, secure and peaceful future for our nation.

TASHI DELEK.

(DR. ) CHAIRPERSON OF THE GNH COMMISSION

-ii- xiii

TWELVE FIVE YEAR PLAN_BINU_12.indd 13 5/24/2019 10:52:21 AM Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Table of Contents

1. Background...... 1 2. Thromde Map...... 1 3. Thromde at a glance ...... 2 4. Key Strategies ...... 7 5. Resource Allocation formula (RAF) ...... 8 6. Rationale and expenditure objectives of capital grants allocated under each criteria and sub-criteria of RAF ...... 9 7. Resource Allocation (Capital Grants share) of Thromde...... 13 8. Local Government Key Result Areas (LGKRAs) at a Glance...... 13

9. LGKRA 1: Gainful employment created and local economy enhanced (2 KPIs)...... 14 9.1 Programme Summary and Strategies...... 15 9.2 Programme Output Matrix...... 17

10. LGKRA 2: Livability, Safety and Sustainability of Human Settlements Improved (18 KPIs)...... 19 10.1 Programme Summary and Strategies...... 24 10.2 Programme Output Matrix...... 26

11. LGKRA 3: Transparent, effective and efficient public service delivery enhanced (3 KPIs)...... 32 11.1 Programme Summary and Strategies...... 33 11.2 Programme Output Matrix...... 35

12. LGKRA 4: Quality of Education & Skills improved (8 KPIs)...... 37 12.1 Programme Summary and Strategies...... 39

-iii- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

12.2 Programme Output Matrix...... 41

13. LGKRA 5: Health and nutrition of Thromde residents enhanced (6KPIs) 45 13.1 Programme Summary and Strategies...... 46 13.2 Programme Output Matrix...... 48

14. LGKRA 6: Culture & Traditions preserved and promoted (6 KPIs)...... 51 14.1 Programme Summary and Strategies ...... 53 14.2 Programme Output Matrix...... 54

15. LGKRA 7: Carbon neutral, climate and disaster resilient development enhanced (4 KPIs)...... 56 15.1 Programme Summary and Strategies ...... 57 15.2 Programme Output Matrix...... 59

16. LGKRA 8: Gender equality promoted, women and girls empowered (6KPIs)...... 61 16.1 Programme Summary and Strategies...... 63 16.2 Program Output Matrix...... 65

17. LGKRA 9: Democracy & Decentralization strengthened (4 KPIs)...... 67 17.1 Programme Summary and Strategies...... 69 17.2 Programme Output Matrix...... 71

18. Programme Monitoring and Evaluation Plan...... 73 19. Collaborating Agencies and Requirements ...... 75 20. Common Minimum Infrastructures...... 77

-iv- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

1. Background

Thimphu Thromde is the capital City of Bhutan. It has seven Demkhongs with a total area of 26 square kilometers. As per the Population and Housing Census of Bhutan 2017 (PHCB 2017) the total population of Thimphu Thromde is 114,551 which is about 15.6 percent of the total national population. This number excludes the 2535 numbers of non-Bhutanese/tourists recorded on the census day in Thimphu. The total urban population of Bhutan is 274,316 (PHCB 2017) and Thimphu Thromde alone contributes 41.8% to the total national urban population. Thimphu City is spread in the valley on either side of the Wangchu River.

2. Thromde Map

-1- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

3. Thromde at a glance

Indicators Status Source of Data/Remarks Mean Annual 100000-150000 Household Income Poverty Rate 0.4% PAR 2017 93.6% (i.e. unemployment rate for urban Employment rate PHCB 2017 Thimphu is 6.4%) 94.9% (i.e. unemployment rate for Thimphu Male PHCB 2017 urban area is Male – 5.1%) 91.4% (i.e. unemployment rate for Thimphu Female PHCB 2017 urban area is Female – 8.6%) Total resident 114551 (Excluding 2535 Non-Bhutanese/ PHCB 2017 (Average HH population Tourists size is 4.2) Male 58996 Female 55555 Total number of Revenue Management 6190 (Updated in the system as of Dec. 2018) buildings System, ICT Area (sq. km) 26 Sq.Km TSP 30% Greens areas (This include E1, E2, E3, E4, Forest Cover (%) SEA for TSP G1 and G2 precincts) JDWNRH, Lungtenphu RBA, Number of Hospital IBF Hospital Ministry of Health NITM DANTAK Health Post (Babesa) Number of Basic Dechencholing BHU I Health Units Grade I Number of Basic RBP Health Dispensary Health Units Grade II CHD-JDWNRH (1. Babesa Zero point, 2. Number of Out Reach Babesa Primary School, 3. Serbithang, 4. Ministry of Health Clinics DANTAK Canteen, Babesa) Changjiji Number of Satellite Hejo Ministry of Health clinics Motithang 472 in JDWNRH and 4 in Thimphu Dzongkhag Number of nurses Ministry of Health (excluded Gidakom Hospital) 34 in JDWNRH and 25 in Thimphu Dzongkhag Number of HA (Excluded Gidakom Hospital) 171 including 72 specialists in JDWNRH and Number of Doctors one Doctor in Dechencholing BHU I (Excluded Gidakom Hospital)

-2- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Indicators Status Source of Data/Remarks Number of buildings/ houses with safe & 4529 metered buildings/houses Administrative Data/ID 24X7 drinking water supply Motithang WTP Junghzhina WTP Dechencholing WTP Number of functional Megaypang WTP Thromde Administrative Water Supply Schemes Ground water scheme in Changbangdu Data Dodeyna Central Water Supply Scheme (DCWSS) – Will be commissioned February 23 2019 24226 HHs (Out of 25408 HHs surveyed, Number of households 24226 HHs have toilets with some kind of flush PHCB, 2017 with PF toilets system) 96.9 % (Percentage of children aged 6-12 Enrolment rate PHCB 2017 currently attending School/Institute) Extended Classrooms Nil TEO Office Community ECCD – 3 ECCD Centre Workplace ECCD – 2 TEO Office Private ECCD - 21 11th MTR Document, TEO Primary schools 5 (Govt.) + 8 (Pvt.) = 13 Office Lower secondary 5 (Govt.) + (No Pvt.) = 5 schools Middle secondary 6 (Govt.) + 2 (Pvt.) = 8 schools Higher secondary 3 (Govt.) + 5 (Pvt.) = 8 schools 9 (YHS, Lungtenzampa MSS, Jigme Losel PS, Jigme Namgyal LSS, Motithang HSS, Autonomous School Dechencholing HSS, Babesa MSS, Changangkha MSS and Rinchen Kuenphen PS) Number of Students 18413 (Govt.) + 5392 (Pvt.) = 23805 TEO Office Male 8956 (Govt.) + 2629 (Pvt.) = 11585 Female 9457 (Govt.) + 2763 (Pvt.) = 12220 Number of Non- Annual Education Formal Education 21 (PLC, BLC) + 2 (CLC) = 23 Statistics, 2018, TEO Office (NFE)Centers Number of teachers 892 (Govt.) + 363 (Pvt.) = 1255 TEO Office Male 243 (Govt.) + 156 (Pvt.) = 399 Female 649 (Govt.) + 207 (Pvt.) = 856

-3- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Indicators Status Source of Data/Remarks Number of students 97% (calculated as Number of Schools with STR Annual Education Statistics per teacher (Student less than or equal to 24) 2018, Teo Office Teacher Ratio) Number of NFE 287 (BLC Learners-200 + PLC Learners-65 = Learners CLC - 22) Male 2 Female 285 No of NFE instructors 25 Male 3 Female 22 Number of 7 Administrative Data Constituency Number of female TT 2 members 20 (Dechencholing, Dechen Zam, Heydrong bridge, Near EoI, Lungtenzampa, Fly over bridge, Changjiji bridge, 3 in Olakha, Babesa Thromde administrative Number of Bridges Zero, Bridge leading Debsi and 2 Shhing data Zams, 1 at Jungzhina, 1 at Semtokha, 1 at RTC junction, 1 at NITM) Kilometers of footpath 47 Kilometers of urban 270 roads Kilometers of cycling 1Km along Doebum Lam lanes Express way – 6.2 KM Langjuphakha – 237m Sunday market – 327 m Number of Common Changzamtog – 936 m Road & Bridge Section, ID service ducts Jangchub Lam – 343 m Changangkha – 347 m RICB Colony – 379 m DPH (Changzamtog) till Motithang – 3.8 KM Number of parking Thromde administrative 4 wheelers – 2479, 2 wheelers - 139 spaces Data Number of Local Area 14 UPD Plan 8 (Changangkha, Norzin temple, Dolma Number of Lhakhang, Changjiji, Bab Lhakhang, Tandin Thromde administrative government owned Nye, Dechenphodrang, Mitrhup Lhakhang at Data lhakhangs/temples Hejo, Number of community Thromde administrative owned lhakhangs / Samarzingkha Lhakhang, Jungzhina Lhakhang Data temples

-4- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Indicators Status Source of Data/Remarks Number of privately 2 (Near CFM Zangdopelri and 1 at Thromde administrative owned lhakhangs / Changzamtog) Data temples Number of chortens 40 11th FYP MTR report Sports facilities by types 15 (2 in Changlingmethang, above YHS School, Motithang, 2 in Hejo, 2 in Dechencholing, Thromde administrative Archery Range 3in Changbangdu, RTC, Olakha, Near Truck Data Parking (Debsi bridge), Semtokha) 10 (Dechencholing, Taba, 2 in Sangaygang, YDF, Thromde administrative Open Gym Area Chubachu, 2 on way to Kuenselphodrang, YHS Data synthetic ground), Babesa, Coronation park MP Halls YDF hall and Babena Sports Centre Administrative Data 3 (Changlingmethang, Chagjiji and Serbithang Thromde administrative Football grounds (pvt.), futsal in Changlingmethang and Babesa Data (Pvt) Swimming Pool Complex, Changlingmethang Stadium, Olakha Children Park, Dechencholing Thromde administrative Basketball Courts Park, IMTRAT, Lungtenphu (Pvt), Thimphu Data Primary School (pvt.) Clock Tower Motithang Ozone Park Centenary Park Thai Pavilion Park Eco Park at YDF Tarayana Park Olakha Park Thromde administrative Children’s Parks Dechencholing Park Data Babena Park Ludrong Park Taba park Botanical Garden Changjiji Park BCCI park Motithang Opposite to Jojo’s Building 2 Near Chubachu School Annual Information Number of Bus stops Babesa below IT park Bulletin 2018, MoWHS Changjiji 4 along express way Number of city buses Fleet Size -48 (2017) Kuensel Online Number of Bus/ Taxi Thromde administrative 4 terminal Data 1+1 (Lungtenzampa bus terminal and City Bus Thromde administrative Bus Terminal Terminal) Data

-5- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Indicators Status Source of Data/Remarks Thromde administrative Taxi Terminal 2 (Changlingmethang and Near Bus Terminal) Data Statistical Yearbook of Number of EV vehicles 19 (Registered as of June 2018 for Thimphu) Bhutan 2018 Number of EV 1 (Near JDWNRH) charging stations Number of Public 2 (National Library and JDW Public Library) libraries Number of vegetable 3 (CFM, Hejo and Changbangdu) markets

-6- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

4. key Strategies

In the 12th FYP, key strategies are

1. Develop and improve critical infrastructures and ensure standards and quality; 2. Strengthen human resource capacity and ensure its effective and efficient management; 3. Promote and strengthen entrepreneurship and enterprises of all types; 4. Identify and strengthen critical capacity and skills and ensure its effective and efficient management and utilization; 5. Identify land in collaboration with National Land Commission during the plan preparation phase to develop/facilitate development of infrastructure for business/enterprises/industries/service centers and for other social development; 6. Identify issues, opportunities and mitigating interventions related to cross- cutting issues and themes such as gender, climate change, environment, disaster, poverty, population and vulnerable and disabled people etc. during plan and strategy formulation; 7. Tap incentives and various sectoral support available in various policies such as EDP, Fiscal Incentives Policy, Thromde Finance Policy, CSMI Policy etc. for local development and economic/business growth; 8. Increase contracting and outsourcing of works and services and ensure quality and value for money; 9. Explore different revenue sources to become self-sustaining; 10. Ensure that the mandatory indicators related to corruption reduction namely, work integrity & leadership culture index, corruption, transparency & accountability index, and administrative sanction against public officials as KPIs in the Annual Performance Agreement in addition to ensuring that the measures to reduce corruption are strengthened and implemented.

-7- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

5. resource Allocation formula (RAF) Thromdes

Criteria Sub-criteria Description/Indicator Number of resident populations of the Thromde 1. Population (15%) Population (10%) (PHCB, 2017) Population density (5%) Number of resident populations per area (sq.km) of Inverse Thromde (PHCB, 2017 & Thromde Administrations) Level of happiness and general wellbeing of the GNH Index (10%) 2. GNH Index (10%) population in the Thromde (GNH Survey Report, Inverse 2015) Number of households without access to reliable water (unavailability of water at least during the critical time Unreliable water supply 3. Health (30%) 5AM-8AM, 11AM-2 PM and 5PM-9PM and adequate (20%) for washing and cooking) in the Thromde (PHCB 2017) Number of households without access to improved Unhygienic sanitation sanitation facilities (households without pour flush, (10%) ventilated improved pit, pit latrine with slab and composting toilet) in the Thromde (PHCB 2017) Students performance Pass percentage (40%) of students in class X in 4. Education (15%) (15%) BCSE (Pupil Performance Report, 2018, BCSEA) in Inverse Thromde Cultural participation Average number of days of participation in socio- 5. Culture (5%) (5%) cultural activities in the Thromde (GNH Survey Inverse Report, 2015) 6. Environment Number of people discontented with air pollution in Air pollution (5%) (15%) the Thromde (PHCB, 2017) Number of people affected by inadequate waste Waste disposal and litter disposal sites or littering in the Thromde (PHCB, (10%) 2017) Number of people discontented with crime and 7. Safety (10%) Crime and violence (3%) violence in the Thromde (PHCB, 2017) Number of cars per population in the Thromde Traffic congestion (5%) leading to traffic congestion (PHCB, 2017 & RSTA Administrative Data)

-8- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

6. rationale and expenditure objectives of capital grants allocated under each criteria and sub-criteria of RAF

Sl. No. Criteria Weightage (%) Amount (Nu. in million) 1. Population 15 962.59 2. GNH Index 10 209.57 3. Health 30 1991.47 4. Education 15 370.52 5. Culture 5 153.11 6. Environment 15 595.90 7. Safety 10 353.28 4636.44

Figure 1: Allocation based on RAF criteria and weightage for Thromde

1. Population is the first criteria used for resource allocation for Thromde ‘A’s, and is measured by two sub-criteria; 1. Number of resident populations, and 2. Population density. The grant allocated under sub-criteria 1 and 2 for Thimphu Thromde are Nu.720.04 million and Nu.242.55 respectively. Under sub-criteria 1, larger the number of resident populations in the Thromde, more resource is allocated. Allocation of grant under this sub- criterion offers the best possible equal per capita resource allocation, in an objective and transparent manner, which correlates to developmental issues and needs faced by the resident population. The grant is allocated to

-9- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

encourage and direct Thromdes to invest in priority interventions to develop and improve urban infrastructure, amenities and facilities, which are also disaster-resilient. It is also to improve quality, speed and effectiveness of public service delivery and addressing citizens’ grievances, encourage industries, reduce urban poverty, create urban employment, and make urban settlements clean, beautiful and livable. Sub-criteria 2 is unique and is calculated as ‘inverse of population density’, whereby Thromdes with higher population density receive lesser resource. The rationale behind this being that, generally the cost of providing utility services declines as population density increases due to economies of scale. For example, denser settlements which is due to human settlement in every available space in the Thromde, has the potential for large scale production and low-cost distribution thereby bringing about greater economies of scale. Infrastructure is spread over shorter distances per unit of output, thereby requiring lower maintenance costs and preventing loss of resources (such as water and electricity) as well as lowering both unit production and distribution costs. Grant allocation under this sub-criterion is to encourage and direct the Thromdes to invest in achieving inclusivity, connectedness and cost-effective provision of infrastructure, facilities and utility services benefiting majority of the urban population.

2. GNH index which reflects the level of happiness and general wellbeing of the urban population from the lens of nine domain is the second criteria used for resource allocation for Thromde ‘A’s. The grant allocation under GNH Index for Thimphu Thromde is Nu.209.57 million. Inverse of GNH Index is used for resource allocation, whereby less happier Thromdes receive more resource. The grant is allocated to encourage and direct Thromde to invest in priority interventions to enhance conducive conditions and provide holistic development support to improve well-being and happiness of the people. Focus will particularly be on less happy people such as women, widowed, divorced or separated people, less educated, unemployed people especially youth and disabled, and in improving psychological well-being (anger, frustration, spirituality), community vitality (belonging), and cultural diversity (Driglam Namzha), which have suffered significant reduction in sufficiency in the Thromde. Provision of awareness, education, innovative activities and other urban support like child-care creches, ECCDs, non-

-10- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

formal education, etc. are priorities requiring attention.

3. Health is the third criteria for resource allocation and is measured by two sub-criteria namely; 1. Number of households without access to reliable water for drinking, washing and cooking, and 2. Number of households without access to improved sanitation facilities, in the Thromde area. The grant allocation under sub-criteria 1 for Thimphu Thromde is Nu. 1332.36 million, which is the highest allocation compared to other sub- criteria, reflecting severity of drinking water issues in Thromde. Grant allocation under sub-criteria 2 is Nu. 659.11 million, which is to encourage and direct Thromde to invest in priority interventions to provide 24x7 safe drinking water for all within 12 FYP, reliable water for washing and sanitation, and quality drainage, sewerage and waste management system. Thromdes experiencing more unreliable water supply and more unhygienic sanitation will receive more resource.

4. Education is the fourth criteria for Thromde resource allocation and is measured by sub-criteria, Students’ Performance in class X in BCSE’. The grants allocation under this sub-criterion for Thimphu Thromde is Nu.370.52 million. The inverse of education criteria is used, which means more resource is allocated to Thromdes with lower students’ performance. The grant is allocated to encourage and direct Thromde to invest in priority interventions to enhance and achieve education access and quality, professional development of teachers, improve school infrastructure and services particularly required toilet ratio for boys and girls, promote school agriculture, enhance student’s performance, learning outcomes, and prepare students for job market. Focus will also be given to support out-of-school children in the Thromde to ensure their school attendance and completion.

5. Culture is the fifth criteria used for resource allocation and is measured by sub-criteria: Average number of days of participation in socio-cultural activities in the Thromde, and grant allocation for Thimphu Thromde under this criterion is Nu. 153.11 million. The inverse of criteria is used, which means more resource is allocated to Thromdes with lower average number of days of participation in social-cultural activities.

-11- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

6. Cultural preservation, promotion and participation by people in cultural activities are important aspects of our unique identity and social fabric influencing community vitality. The grant is allocated to encourage and direct Thromde to invest in priority interventions, especially preservation and promotion of any intangible culture and tradition in the Thromde. Cultural practices, traditions and values that may get diluted or lost need to be preserved and promoted through documentation, awareness and education on folk songs and stories, dances and local festivals, our unique identity and features of settlements, and social, family and neighbor cohesion. Important interventions would also be to improve psychological well- being (spirituality), community vitality (belonging) and cultural diversity (Driglam Namzha), which have suffered significant reduction in sufficiency so far in the Thromdes. Volunteerism, participation in socio-environment, cultural activities and programs will also be promoted to foster a healthy, responsible and vibrant community.

7. Environment is the sixth criteria used for resource allocation, and is measured by two sub-criteria, namely: 1. Number of people affected by inadequate waste disposal sites or littering in the Thromde, and 2. Number of people discontented with air pollution in the Thromde. The grant allocation under sub-criteria 1 and 2 for Thimphu Thromde is Nu. 198.73 million and Nu.397.17 million respectively. Higher the number of people affected by waste and litter and higher the number of people discontented with air pollution, higher the resource allocation to Thromdes. An increase in population and urbanization in Thromde brings about increase in construction activities, number of vehicles, waste generation and pollution of air, land and water. The grant is allocated to encourage and direct Thromde to invest in priority interventions to institute proper waste disposal and management system. In particular it will promote waste segregation, reduction, reusing, recycling, eco-friendly construction and make towns and settlements green, clean and beautiful through awareness and education.

8. Safety is the seventh and last criteria for Thromdes’ resource allocation, and is measured by two sub-criteria, namely: 1. Number of people discontented with crime and violence in Thromde; and 2. Congestion (Number of cars per population) in Thromde. The grants allocation under sub-criteria 1 and 2 for

-12- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

Thimphu Thromde is Nu.198.47 million and Nu.154.81 million respectively. Thromdes receive more resource allocation for more urban crime and violence, and more numbers of cars per population. As the population grows and modernizes, and urbanization sets in the Thromdes, there are increasing social, economic and livability problems. The grant is allocated to encourage and direct Thromde to invest in priority interventions to develop and improve community infrastructure, recreational and entertainment facilities, and conduct educational activities and volunteerism to reduce and deter crime and violence. Focus will also be need to place on promoting and developing efficient and good public transport system, managing traffic and car congestion, designating appropriate vehicle parking spaces, and roads, pedestrian and bi-cycling trails.

7. resource Allocation (Capital Grants share) of Thromde

Capital Grant Share (Nu. in Million) Sl. No Thromde Total RAF CMI 1 Thimphu 4,636.44 30 4,666.44

8. local Government Key Result Areas (LGKRAs) at a Glance

1. LGKRA 1: Gainful employment created and local economy enhanced 2. LGKRA 2: Livability, safety and sustainability of human settlements improved 3. LGKRA 3: Transparent, effective and efficient public service delivery enhanced 4. LGKRA 4: Quality of education & skills improved 5. LGKRA 5: Health and nutrition of Thromde residents enhanced 6. LGKRA 6: Culture and traditions preserved and promoted 7. LGKRA 7: Carbon neutral, climate and disaster resilient development enhanced 8. LGKRA 8: Democracy and decentralization strengthened 9. LGKRA 9: Gender equality promoted, women and girls empowered

-13- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

emarks R 90 new CSMIs, 18 new Enterprises and Businesses 450 and Businesses and Enterprises supported y onom methodology Data collectionData Administrative Administrative record/Record by maintained Trade Regional Office LFS Report/ Annual Statistical Handbook/ Administrative data al e c c al lo Data source Data Administrative Administrative Thromde Data, Administrative Thromde Data, an d Target 558 950 t e d B aseline NA NA U nit Nos Nos c rea men t y lo Description This indicator measures creation of creation measures indicator This and PSL through CSMIs non-farm manufacturing to related others serviceand & clothing like firms furniture, textiles, handicrafts, IT restaurants, hotels, minerals, dry & salon, cobbler & electronic, number The etc. tourism, cleaning, be to distinguished created CSMIs of by 1) solely created CSMIs by 2) interventions, plan Thromde’s and Thromde of partnership through entities private and agencies central created jobs measures indicator This is defined A job the Thromde. within earning a work or a profession as of number The payment. or cash by be to distinguished jobs created Thromde’s by solely 1) jobs created created 2) jobs interventions, plan & Thromde of partnership through created 3) jobs and agencies central support/ with entities private by Thromde. from facilitation (2 K PIs) (2 PI K CSMIs CSMIs and established supported (non- farm) created Jobs farm) (non- c e d ul em p G a i n f ul 1: NKRA enhan lgkra 1. Macroeconomic 1. Macroeconomic ensured stability 2. Economic and diversity productivity enhanced 3. Poverty and eradicated reduced inequality 10. Gender equality promoted and girls and women empowered and 11. Productive gainful employment created 9.

-14- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

9.1 Programme Summary and Strategies

Programme Title: Employment generation and Local Economy enhancement program,

Objective: To enhance local economy and create gainful employment

Collaborating Agency/ies: MoEA/MoLHR/MoAF/MoF/MoIC/TCB

Programmme Strategies:

The Labour Force Survey 2016 recorded urban areas in Bhutan with higher proportion of the population (aged 15-64 years) as compared to rural areas. Thimphu Thromde has 41.8 percent of the total national urban population. Unemployment is one of the most important cross-cutting issues faced by the Thromde currently, with 3,229 (PHCB-2017) unemployed people residing in Thimphu Thromde alone. Thromde has a big and shared-responsibility in facilitating jobs creation, in order to enhance local economy and resolving the issue of unemployment.

Given the issues, potential and opportunities of economic growth, job creation and income generation, Thromde will: 1. Form Thromde Business/Economic Development Committee with representatives from Thromde, Bhutan Chamber of Commerce and Industry (BCCI), Ministry of Labor and Human Resources (MoLHR), Regional Immigration office, Regional Trade office, Regional Revenue and Customs office and business community and other relevant stakeholders. The committee shall: a. Prepare local economic growth and job creation strategy and plan. b. Facilitate and collaborate with relevant stakeholders to seek information on number of new job seekers in addition to the current number of unemployed. c. Study background information of job seekers such as skills and qualification that they possess, age, gender, their area of interests and any business ideas and plans that they may have.

-15- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

d. Accordingly, job seekers will be trained in relevant entrepreneurship skills in the 12FYP in collaboration with MoLHR and BCCI. Furthermore, job seekers with viable business ideas will be mentored and supported and facilitated for funds. Trainings on self-employment through entrepreneurship will be provided. 2. Prepare Local Area Plans (LAP) for development by providing basic municipal services and facilities such as road, water, waste management services, waste water management to encourage landowners and investors in developing CSMIs: manufacturing and service sectors. 3. Thromde will generate revenue once the CSMIs are functional and help in achieving Thromde self-sustainability. 4. Explore new revenue sources and outsource municipal services (waste, parking fee, public toilet maintenance) in order to create jobs for Bhutanese workers. 5. Initiate development of tourism infrastructure and other facilities within the thromde jurisdiction.

-16- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 90 18 450 2019 2020 180 950 FY 2022-2023 20 4 100 40 200 B aseline NA NA NA NA NA (2017) NA (2017) NA FY 2021-2022 20 4 100 40 200 Weight 15 15 15 10 15 15 15 U nit Nos Nos Nos Date Date Nos Nos FY 2020-2021 20 4 100 40 200 FY 2019-2020 15 4 100 40 Formed 200 nnual Target utput Indicator utput Projected A Projected FY 2018-2019 15 2 50 20 2019 (initiate) 2019 150 O Number of new CSMIs (non-farm) new CSMIs of Number and supported businesses and new enterprises of No. strengthened and supported businesses and enterprises existing of No. strengthened formed Business Council/Committee Thromde in place plan and strategy Local job creation market on trained job seekers new entrepreneurs/ of No. skills relevant jobs created of Number Weight Weight 45 55 atrix utput O utput M utput Functional and and Functional CSMIs Productive established Gainful Jobs created utcome O Gainful employment local and created economy enhanced Programme O Programme Indicators Indicators Number of new CSMIs (non-farm) new CSMIs of Number No. of new enterprises and businesses supported and strengthened and supported businesses and new enterprises of No. No. of existing enterprises and businesses supported and and supported businesses and enterprises existing of No. strengthened relevant market on trained job seekers new entrepreneurs/ of No. skills Local job creation strategy and plan in place plan and strategy Local job creation Thromde Business Council/Committee formed Business Council/Committee Thromde jobs created of Number o. S l. N 1. S l. N o 1 2 3 6 5 4 7 9.2 targets and indicators output Programme Target Annual Projected

-17- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R u in million) utlay ( N utlay Indicative Plan O Plan Indicative 0.2 15.44 15.64 15.44 15.44 ocation rand Total rand Total ctivity L A G Within Thromde Within Total ctivity A programs awareness and Training Development Infrastructure utput Major sub activities under LGKRAs includes activities costing Nu 5 million and above per activity in the Thromde. In Thromde. the in activity per above and million 5 Nu costing activities includes LGKRAs under activities sub Major Functional and Productive CSMIs CSMIs Productive and Functional created Gainful Jobs established O Construction of vegetable sheds vegetable Construction of ajor sub-activities ajor 1 S l. N o M 1 Program Activity and Outlay Outlay and Activity Program Note: themselves. LGs respective the with maintained are 5 million than less costing activities those addition,

-18- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R ) 2 Bus terminal in Bus Semtokha Standard parking 5*2.5 (12.5 size is m Procurement of of Procurement marking road also machines under included this methodology Data collectionData Administrative Administrative records Administrative Administrative records Administrative Administrative records Administrative Administrative records uman H uman f o Data source Data Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, i l ity Target C-20 C-0.17 C-90 NT-40 a i nab t B aseline 6 (2017) 0.12 (2017) 60(2017) NA us S U nit Nos % % Nos an d ty (18 K PIs) (18 Description v e d , S a f e , ro This indicator measures taxis measures indicator This proper with bays bus and without or with blacktopped, size/shape standard and sheds terminal bus one including This indicator measures measures indicator This as developed area of percentage area total space to parking public It will be calculated Thromde. of size of based the standard on space multiplied each parking spaces parking of number by and street on MLCPS, including street parking off This indicator measures measures indicator This of length of proportion without roads urban blacktopped running without and potholes it over water This indicator measures the measures indicator This traffic/ new proper of number types by facilities signage safety signs, speed traffic as, such passes/overheard under breakers, barrier crash within bridges, out carried are These Thromde. and RSTA with in coordination traffic RBP i l ity s Im p s ab PI K Proper taxi and bus bus taxi and Proper in place bays Area of vehicle vehicle of Area to [public] parking area Thromde total Roads without Roads without without and potholes running water Proper traffic/safety traffic/safety Proper facilities and signage and road urban for pedestrian footpath 2: Liv 2: tt lemen t e NKRA S LGKRA 2. Economic diversity diversity 2. Economic and productivity enhanced eradicated 3. Poverty inequality and reduced 9. Infrastructure, communication services public and improved 10.Gender equality promoted, women empowered girls and safety 15. Livability, of sustainability and settlements human improved water 17. Sustainable ensured 10.

-19- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R

5 Km CS Duct 5 Km

0.0065MT/Day/ 0.0065MT/Day/ Building methodology Data collectionData Administrative Administrative Record Administrative Administrative records Administrative Administrative records Administrative Administrative records Administrative Administrative records Administrative Administrative records Data source Data Administrative Administrative Record Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Target NT-4 C-6500 C-67 C-57 C-6 25 B aseline 14 parks, 14 parks, Environment (E1, precincts E2, E3, E4, G1, G2)- >30% 2017) (SEA-TSP, 4476 47 KM (2017) 47(2017) 4 (2017) 40.3 (2017- Based on of 6190 No. buildings) U nit Nos Nos Nos Km Km Nos MT/ day.

Description This indicator measures the measures indicator This taken to initiatives of number through areas the green maintain landscaping, urban plantation, micro and zone buffer developing recreational and parks gardening, urban maintaining areas, etc. precincts, environmental This indicator measures the measures indicator This lamps lights street of number installed This indicator measures length length measures indicator This the including footpath proper of common and footpath off-street service footpath duct This indicator measures length length measures indicator This maintained. footpath proper of usable) meaning (Maintained This indicator measures the measures indicator This Thromde by initiatives of number crimes. annual reduce to of Installation as such Initiatives CCTVs, awareness lights, Street facilities, recreational programs, drayangs, and bars managing working closely with law law with closely working regulatory and enforcement etc. agencies This indicator measures total measures indicator This disposed to waste of amount source reduced through landfill recycling and segregation plazas/ waste as such initiatives other and in center drop waste will This initiatives. related HHs of the number depend on composting/ more and increased taken under initiatives recycling PI K Initiatives taken to taken to Initiatives areas green maintain Street light coverage to to coverage light Street area Thromde total Length of Length of footpath proper (construction) Length of footpath footpath Length of maintained Initiatives to reduce reduce to Initiatives crimes annual Solid waste disposedSolid waste landfill to NKRA

-20- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Fecal sludge sludge Fecal treatment plant construction under included this KPI Thromde to direct to direct Thromde service bus the city provider methodology Data collectionData Administrative Administrative records Administrative Administrative records Administrative Administrative Record. Data source Data Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Record. Target 10 C= 80 50 B aseline 5 28 (2017) 15 U nit MT/ day Nos % Description This indicator measures measures indicator This recycled waste of proportion [household, waste total from waste] hazardous clinical and modern use of through produced environmental natural/ as well as as methods such technology and composting/ /home composting Greener initiatives/ road Green etc. initiatives, way This indicator measures measures indicator This buildings of percentage points connections or connected and waste integrated to provided infrastructure sewer management peras technical feasibility. connection provide also Thromde which plots vacant to provisions well. as considered to will have alsomeasure can indicator This sewer raw of nos. of reduction going water waste household and the river, into directly spilling or water other any and streams bodies This indicator measures measures indicator This transport public of proportion reserved seats with buses for children women, citizens, senior abled people. differently and PI K Waste Recycled per Waste day Buildings connected connected Buildings waste/ integrated to sewer management infrastructure and collection system Public transport transport Public services facilities with citizens, senior for children women, differently-abled and people. NKRA

-21- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Daily users over over users Daily total population CCTVs, BRTS, AMR, Street Smart pilot lighting, light, Pedestrian etc. City Hall and 2 and Hall City toilets public

methodology Data collectionData Administrative Administrative records Administrative Administrative records Administrative Administrative records Administrative Administrative records Data source Data Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Administrative Administrative Thromde data, Target C- >50 NT=3 C=6 NT - 3 100 B aseline 12 3 (2017) 1 (ramp) 1 (ramp) 80(2016) U nit % Nos Nos % Description This indicator measures the measures indicator This population urban of percentage (bus) transport public using to carry out Thromde and the increase to the initiatives of construction through ridership links, missing stops, bus proper city of procurement and bays bus etc. buses, This indicator measures smart smart measures indicator This as such taken up initiatives city other and tourism promoting promoting attractions, living energy, and water of use efficient services side of demand reducing waste energy and resources, and guaranteed sharing, disposal, car transport public by home ride to CCTV free Wi-Fi, (BRTS), information online coverage, services, bus city on using efficient provide technology to equal servicesand etc. This indicator measures number number measures indicator This types with infrastructures by of as friendlydisabled such facilities toilet separate blocks, SEN ramp, footpath, proper disabled, for not is if lift affordable), lift (if service can be centers affordable etc. floor the ground on The indicator measures measures indicator The current of the proportion internal from met expenditure annual increasing by revenue through generated revenue initiatives various PI K Ridership in public in public Ridership (Bus) transport Number of smart city city smart of Number initiatives New public public New infrastructure with friendlydisabled facilities Thromde current current Thromde met expenditure Internal through revenue NKRA

-22- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Lungten Zampa Zampa Lungten & Bridge road/ Ring Lam Norzin Pedestrianization/ redevelopment methodology Data collectionData Administrative Administrative records Data source Data Administrative Administrative Thromde data, Target NT-2 B aseline 5 (2017) U nit Nos Description This indicator measures number number measures indicator This types as such by initiatives of proper pricing, decongestion roads/ alternate regulation, traffic signs, traffic diversions/bridges, (BRTS), transport intelligent etc. pedestrianization PI K Initiatives to reduce reduce to Initiatives congestion vehicle NKRA

-23- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

10.1 Programme Summary and Strategies

Programme Title: Programme for enhancing livability, safety and sustainability of human settlements.

Objective: To improve livability, safety and sustainability of human settlements

Collaborating Agency/ies: MoWHS/Private/Business Community/Bhutan Post

Programme Strategies:

Thromde is facing a lot of challenges in keeping the city clean and green. Currently, Thromde generates solid waste of 40 MT (2017) per day, witnessing an increase of 4 MT from 2010 to 2017. Increasing number of improper dumping of waste is a major challenge faced by the Thromde. This will be addressed through the following: 1. Introducing waste segregation at source (Bio-degradable and Non- degradable) through awareness programmes. 2. Outsourcing waste management and upgrading and activating scrap dealers and initiating various composting mechanisms and waste drop off centers. 3. Instituting a system of cleaning one’s own surrounding once a week, through close collaboration and monitoring by respective Demkhong Tshogpas and Building Inspectors (Private and Government Buildings). 4. Monitoring of illegal dumping of waste by installing CCTV cameras.

Thimphu region alone has 31,218 vehicles (2017), a growth from 24,578 vehicles in 2013 (RSTA). This has resulted in emerging issues of traffic congestion, while at the same time public transport ridership is only 12 percent. In order to address this, the Thromde will: 1. In collaboration with Bhutan Post and City Bus Service providers train city- bus drivers and conductors on improving professionalism/right attitude and monitor their performance. 2. Collaborate with Bhutan Postal Corporation and make public transport (city bus) service attractive and reliable and carry out initiatives to increase public transport ridership and discourage private vehicle usage. 3. Develop maps, signs and information boards on the public transport systems.

-24- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

4. Construct additional multi-storied parking to ease traffic congestion. 5. Install traffic signage and zebra crossing and introduce pothole policing and reporting mechanisms in every constituency

Thromde has met 57 percent of their recurrent expenditure from internal revenue. In order to increase annual revenue, Thromde will: 1. Develop service centers and encourage setting up of CSMIs. Institute minimum fees collection from these CSMIs and businesses once these are functional and fully operational. 2. Provide hand holding support (fast-track clearances and approvals) and facilitate training to aspiring and potential entrepreneurs. 3. Identify parking spaces and introduce parking fees in extended Thromde areas

-25- Twelfth Five Year Plan (2018-2023), Thimphu Thromde NT-1000 NT - 14 NT=2 NT – 7 C-14 NT-1 node 1 Neighborhood 1 Community and Hall NT-12 C-90 2020 NT - 40 4 initiatives parks, C-22 including & water landscaping development front cinemas and C-6500 NT 20 C - 67 NT – 57 Plan Target Target Plan 2479 (4 wheelers) 6 5 7 0 NA 270 60 NA NA NT-4 14 parks/ recreational 4 space and cinemas 4476 (2017) 47 KM 47 (2017) B aseline 3 2.5 3 4 2.5 2.5 3 3 3 3 3 4 4 4 4 Weight Nos Nos Nos Nos Nos Nos KM % Date % % Nos Nos Km Km U nit utput Indicator utput Number of vehicle parking [public] spaces created created spaces [public] parking vehicle of Number MLCPs including area in Thromde in place bays bus taxi and Proper congestion vehicle reduce to Initiatives proper with Local Plans Area Approved drainage and roads blacktopped image ortho (satellite) of Purchase including implemented Nodes Neighborhood hall community library and roads new urban Construction of running water without and potholes Roads without mechanisms reporting and policing Pothole developed onthe and facilities signage traffic/safety Proper road space area/public green maintain to Initiatives amenities Recreational areas installed Thromde within light street Total Lamps) (Total constructed footpath new proper Length of street off including maintained footpath Length of O atrix 90 Weight Weight utput M utput utput Functional Functional infrastructure/ facilities developed O Programme O Programme utcome Livability, Livability, safety and sustainability human of settlements improved O 1 S l. N o 10.2 targets and indicators output Programme

-26- Twelfth Five Year Plan (2018-2023), Thimphu Thromde 200 100 Plan Target Target Plan NT-5 C- 6 25 24 + (2 weigh NT- bridges) 10 NT-3 C-80 1 50 >50 2 0 NT – 3 C - 6 90 80 12.5 4 40.3 23 5 1 (Ramp) 28 0 15 12 NA NA 3 B aseline 5 4 3 4 4 3 4 4.5 3.5 2.5 2.5 3 3.5 3 2 Weight In Million % Km Nos MT Nos MT Nos % Nos % % Nos Nos Nos U nit utput Indicator utput Annual Revenue Generated Revenue Annual Internal met through expenditure current Thromde revenue Common serviceCommon constructed duct crimes annual reduce to Initiatives disposed landfill solid to waste per day of Amount bridges weighing trucks and garbage of Purchase Recycled per day Waste of Amount friendly disabled facilities with Infrastructure to points connection with provided Buildings infrastructure management waste/sewer integrated collection system and constructed plant treatment sludge Fecal seats with buses transport public of Proportion and children women, citizens, senior reserved for abled people. differently Bus) (City transport in public Ridership Transport in Public ridership increase to Initiatives dwelling proper without living HHs. initiatives city smart of Number O 9 Weight Weight utput Internal Internal of revenue Thromde increased O utcome O 2 S l. N o

-27- Twelfth Five Year Plan (2018-2023), Thimphu Thromde FY 2022-2023 1 57 4 404 (C-6500) 1 recreational 1 recreational park 1 NT-10 C-90 1 - 4 2 200 Phase nd FY 2021-2022 1 55 4 405 1 recreational 1 recreational park 1 NT-10 - C -85 1 - 4 2 150 (Lungtenzampa (Lungtenzampa Bridge-2 and completion) and Phase) nd nnual Target FY 2020-2021 1 52 4 405 1 recreational park 1 recreational 1 NT-10 2020 C -80 3 - 3 2 150 1 (Ring road road 1 (Ring Lam Nrozin or pedestrianization & (Lungtenzampa Bridge-2 Projected A Projected Phase) st FY 2019-2020 2 49 4 405 1 recreational park 1 recreational 1 NT-10 - C-70 4 1 (Lungtenzampa 1 (Lungtenzampa -1 Bridge 1 3 1 500 FY 2018-2019 - 47 4 405 - - - C-60 3 - - 0 Indicators Indicators Common ServiceCommon constructed duct Length of footpath maintained footpath Length of Length of new proper footpath constructed including including constructed footpath new proper Length of street off Street light coverage to total Thromde area (Total (Total area Thromde total to coverage light Street Lamps) Number of recreational amenities (Baseline includes (Baseline includes amenities recreational of Number 4 cinemas) and 14 parks Number of initiatives to maintain Green area/public area/public Green maintain to initiatives of Number space Proper traffic/safety signage and facilities on the road onthe and facilities signage traffic/safety Proper Pothole policing and reporting mechanisms mechanisms reporting and policing Pothole developed Roads without potholes and without running water without and potholes Roads without Construction of new urban roads roads new urban Construction of Initiatives to reduce vehicle congestion vehicle reduce to Initiatives Purchase of ortho (satellite) image ortho (satellite) of Purchase Proper taxi and bus bays in place bays bus taxi and Proper Approved Local Area Plans with proper blacktopped blacktopped proper with Local Plans Area Approved of implementation including drainage and roads nodes community with Neighborhood AAP and library halls and Number of vehicle parking [public] spaces created in created spaces [public] parking vehicle of Number area Thromde S l. N o 15 14 13 12 11 10 9 8 7 6 3 5 2 4 1 Projected Annual Target Annual Projected

-28- Twelfth Five Year Plan (2018-2023), Thimphu Thromde FY 2022-2023 100 200 1 Phase II Phase completion C-50 C-50 - C-80 10 6 25 C-6 FY 2021-2022 100 200 1 Phase I and completion phase II C-40 C_45 - C-70 1 8 6 28 C-6 nnual Target FY 2020-2021 100 200 - Phase I & II Phase 1 C-30 C-35 1 C-60 1 7 6 30 C-5 Projected A Projected FY 2019-2020 100 200 1 Phase I 1 C-15 C-25 - C-50 1 6 6+2 weighing 6+2 weighing bridge 35 C-5 FY 2018-2019 100 150 - - - C-12 C-20 - C-35 5 - 40.3 C-4 Indicators Indicators Thromde current expenditure met through Internal Internal met through expenditure current Thromde revenue Annual Revenue Generated Revenue Annual Number of smart city initiatives city smart of Number HHs living without proper dwelling dwelling proper without living HHs Initiatives to increase ridership in city bus in city ridership increase to Initiatives Ridership in public transport (Bus) transport in public Ridership Proportion of public transport buses with seats seats with buses transport public of Proportion and children women, citizens, senior reserved for abled people. differently Fecal sludge treatment plant constructed constructed plant treatment sludge Fecal Buildings provided with connection points to to points connection with provided Buildings infrastructure management waste/sewer integrated collection system and Infrastructure with disabled friendly disabled facilities with Infrastructure Amount of Waste Recycled per day Waste of Amount Purchase of garbage trucks and weighing bridge bridge weighing trucks and garbage of Purchase Amount of solid waste disposed landfill solid to waste per day of Amount Initiatives to reduce annual crimes annual reduce to Initiatives S l. N o 29 28 27 26 25 24 23 22 21 20 19 18 17 16

-29- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R Phase - Construction Phase Phase – Drawing and Design and other other Design and and – Drawing Phase st nd 1 (plus, 30M from CMI) 30M from (plus, For taxi/bus base taxi/bus also be this to used from For 2 Nos weighing bridge and 24 Nos garbage garbage 24 Nos and bridge weighing 2 Nos trucks 5 Nos Nu 207M for Land compensation 207M for Nu ground works ground 2 utlay utlay u in million) ( N Indicative Plan O Plan Indicative 3175.90 3175.33 0.57 592 400 70 45 60 30 20 16 170 75 100 70 200 50 50 207 5 ocation and other other and ctivity L A rand Total rand Total Within Thromde Within G Lungtenzampa North Norzin Lam Norzin areas Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within - Within Thromde Within Within Thromde Within Norzin Lam Norzin Dechencholing Within Thromde Within Semtokha Within Thromde Within ctivity A Infrastructure Development Infrastructure Training & Awareness programs & Awareness Training utput O Reconstruction of Lungtenzampa bridge (200 meters) bridge Lungtenzampa of Reconstruction Functional Functional Infrastructure/ facilities developed Hejo-Samtenling LAP and Jungzhina -Pamtsho LAP -Pamtsho Jungzhina LAP and Hejo-Samtenling Construction of common service common Construction ducts of Construction of footpath Construction of Street lights lights Street New sewerage lines sewerage New Fecal Sludge Treatment Plant Treatment Sludge Fecal Construction of bus stops bus Construction of BRTS infrastructure BRTS Purchase of garbage trucks and weighing bridge bridge weighing trucks and garbage of Purchase Improvement and resurfacing of urban roads urban of resurfacing and Improvement Construction of new urban roads new urban Construction of Redevelopment of Norzin Lam Norzin of Redevelopment Implementation of Dechencholing Area Action Plan Plan Action Area Dechencholing of Implementation (AAP) Construction of underpasses and overhead bridges overhead underpassesConstruction and of Construction of Inter-Bus Terminal at Semtokha at Terminal Inter-Bus Construction of Purchase of Road Marking Machine Road Marking of Purchase ajor sub-activities ajor S l. N o M 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Program Activity and Outlay Outlay and Activity Program

-30- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R Phase I (Drawing & design) II Phase I (Drawing Phase (Construction) RGoB Contribution 15% RGoB Contribution December 2018 Balances of as Fund utlay utlay u in million) ( N Indicative Plan O Plan Indicative 50 6 65 12 45 20 10 10 21 300.109 (@69.4) 96.200 81.748 65.945 36.986 123.256 67.488 3158.00 ocation ctivity L A Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within Within Thromde Within Memelhakha Within Thromde Within Within Thromde Within Babesa, Thim-Throm Thim-Throm Taba, Thromde Thimphu Taba Thim-Throm Taba, Hejo-Samtenling Pamtsho Jungzhina Total Total ctivity A utput ank Project B ank Project P II – World O ank Project B ank Project Development sian Implementation of Neighborhood Nodes including including Nodes Neighborhood of Implementation hall community library and Water-front Development/landscaping Plan Development/landscaping Water-front Comprehensive Property Inventory (CPI) Inventory Property Comprehensive Construction of parks Construction of Plantation and beautification and Plantation Waste management Waste Landfill site management Landfill site Installation of CCTVs of Installation Construction of Low-income housing Low-income Construction of A 12 MLD WTTPConstruction of BUB S l. N o 18 19 20 21 22 23 24 25 26 27 Infrastructure Development works at Taba LAP under Taba at works Development Infrastructure Financing Additional 28 (AF) Dodeyna-Taba from supply Central water (AF) Taba at Plant treatment 10 MLD water (AF) Taba at plant 1MLD sewer treatment Hejo-Samtenling for works development Infrastructure X Package Pamtsho Jungzhina- for works development Infrastructure XI Package

-31- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks e e vic R Infrastructure Infrastructure Hall City include construction, TSP, review of servicesJDWPL developing and systems online Urban Planner, Planner, Urban Legal Officer, Officer (1 ICT shortage than approved) ser methodology Data collectionData Administrative Administrative records Administrative Administrative record Administrative Administrative records ic p ubl Data source Data Administrative Administrative Thromde data, Administrative Administrative Thromde Data, Administrative Administrative Thromde data, en t e ffici Target 100 2019-2020 (SOP) 0 B aseline 90 (2017) 3 (2017) U nit % Date Nos e an d e ff ctiv , (3 K PIs) (3 Description c e d aren t This indicator measures measures indicator This commonly of percentage servicesavailed G2C and services per as delivered TAT/SOP This indicator measures the measures indicator This infrastructure development which by the timeline and Service Delivery Standards Operating Standard with Thromde for Procedures servicespublic developed operationalized and This indicator measures measures indicator This staff positions of number filled not but approved nurses doctors, excluding Thromde teachers. and meet this target to regular through either or Contract recruitments. tied recruitments project p PI K enhan y Proportion of services delivered peras TAT Infrastructures and and Infrastructures Service Delivery Standards with Thromde for SOPs servicespublic and developed operationalized Civil servant filled not positions 3: Trans 3: el iv er NKRA d LGKRA 2. Economic 2. Economic and diversity productivity enhanced 9. Infrastructure, communication services public and improved 13. Democracy &decentralization strengthened 14. Corruption reduced services16. Justice institution and strengthened 11.

-32- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

11.1 Programme Summary and Strategies

Program title: Transparent, effective and efficient public service delivery

Objective: To provide transparent, effective and efficient public services

Collaborating Agency/ies: Gewogs/MoHCA, DLG

Programme Strategies:

• The GNH Survey 2015 pointed out that people’s perception on government’s performance has declined significantly, mainly in terms of reducing the gap between rich and poor, creating jobs and fighting corruption • While government has come up with over 200 G2C services, people still resort to traditional practice of filling up papers and formalities due to limited awareness on the availability of services through online platforms. Furthermore, there are just over 10-15 G2C services available at Thromde level, thus calling forth to increase the number of services delivered through online avenues. This will not only reduce turn-around-time but will also benefit citizens availing the public services. • Against this back drop, Government Performance Management System (GPMS) is initiated by government to hold agencies accountable. The whole-of-government approach system is being implemented to strengthen planning, implementation, monitoring and evaluation at various levels of government. In the 12th FYP, focus will be on strengthening initiatives that will enhance decentralization; taking efficient and effective public services delivery closer to the people. There will also be an increased focus on reducing corruption, and increasing responsibility and accountability in the local governments. Collaborative strategies will also be adopted to enhance electricity and mobile coverage and its reliability.

The Thromde in the 12FYP will focus on: a. Periodic renewal of ISO90021:2015 certification for Quality Management System (QMS). The scope of QMS will be increased by adding all municipal services for certification and certification in turn will take care of service delivery standards, standard operating procedure and turn-around-time for most commonly availed municipal services.

-33- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

b. Construct City Hall and deliver all public services from one location efficiently c. Develop and mainstream grievance redressal mechanism through increased involvement and engagement of residents. The redressal systems will use both office based and technology based systems for complaint registration and follow up (IT or mobile technology). d. Focus will be given to improve and strengthen capacity and professionalism of the front line service provider in the customer service division and other staffs under the administrations. e. Conduct awareness and advocacy on availability of online public services through G2C and other municipal services which can be availed manually. Priority shall be given to making all manual services available through online platforms. f. Explore and develop mobile apps to deliver basic municipal services like paying of water bills, sewerage charges, and etc. Encourage the use of mobile apps and mobile phones in discharging and sharing real time information such as getting directions on parking availability, waste disposal, road blocks and traffic diversion, city social/entertainment events, free wi-fi locations, etc. for transparent, efficient and effective service delivery.

-34- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 100 2019 >95 5 0 1 2020 2020 2021 - - - - 0 2 >95 C-100 Completion FY 2022-2023 B aseline 90 NA 92.87 (2017) NA 3 (2017) 0 NA NA NA - - - 0 2 Phase >95 2021 C-100 nd 2 Weight 10 10 10 10 10 20 10 10 10 FY 2021-2022 U nit % Date % Nos Nos Nos Date Date Date - - nnual Target 1 1 Phase >95 2020 2020 C-97 nd 2 FY 2020-2021 Projected A Projected - - - - 2 >95 Phase C-95 st 1 2019-2020 FY 2019-2020 utput Indicator utput O ------>95 C-90 FY 2018-2019 Proportion of services per of as TAT delivered Proportion public Thromde for Service SOPs with Delivery Standards services operationalized and developed Score Agreement Performance Annual ISO certified services filled not Civil Positions Hall City Construction of Review TSP of MIS of Development system approval building online of Development Weight Weight 100 atrix utput O utput M utput Indicators Indicators Public servicePublic delivery improved utcome O Programme O Programme Transparent, effective effective Transparent, public efficient and service delivery enhanced Construction of City Hall City Construction of Civil Servant Positions not filled not Civil Servant Positions ISO certified certificates Annual Performance Agreement Score Agreement Performance Annual Service Delivery Standards with SOPs for Thromde public public Thromde for Service SOPs with Delivery Standards services operationalized and developed Development of online building approval system system approval building online of Development Proportion of services per of as TAT delivered Proportion Development of MIS of Development Review TSP of o. S l. S l. N o N 6 5 4 3 2 9 1 8 7 2 3 4 5 6 7 8 9 1 11.2 targets and indicators output Programme Target Annual Projected

-35- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Phase - Construction Phase Phase – Drawing and Design and other other Design and and – Drawing Phase st nd 1 ground works and initiate construction initiate and works ground 2 utlay utlay 5 6 8 6.00 0.20 10.00 30.00 300.00 365.00 365.20 365.00 u in million) ( N Indicative Plan O Plan Indicative ocation ctivity L A Changangkha Chubachu For Thromde Office Thromde For ctivity A Total rand Total rand Total Infrastructure development Infrastructure G Training & Skills development Training utput O Construction of City Hall City Construction of Service Delivery enhanced Corruption reduced JDWPL Development of online municipal services municipal online of Development Review TSP of equipment office furniture, computers, of Purchase Development if MIS Development system approval building online of Development ajor sub-activities ajor S l. N o 2 M 1 1 7 6 2 5 3 4 Programme Activity and Outlay Outlay and Activity Programme

-36- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R At least 2 least At community beECCDs to in 5 constructed years Construction additional of academic blocks, up-gradation specialof needs education (8 K PIs) (8 methodology Data collectionData Records Records by maintained TEO Office/ Schools Records Records by maintained TEO Office/ Schools Records Records by maintained TEO Office/ Schools Annual Education Education Annual Stats/Records by maintained TEO Office Annual Education Education Annual Stats/Records by maintained TEO Office v e d ro Data source Data Administrative Administrative data Administrative Administrative data Administrative Administrative data, Administrative Administrative data Administrative Administrative Data Target 95 95 95 0 NT-4 lls i m p k i lls (Year) B aseline 90 90 90 64 3 U nit % % % Nos Nos Nos on & S & on ti u c a Description Ed f o The indicator measures the measures indicator The old 3-5 years of participation total of in ECCD out children The old. 3-5 years resident expected is to rate enrolment construction through increase new ECCDs of The indicator measures the measures indicator The who students of percentage in 60 percent least at score and Math Dzongkha, English, Science This indicator measures measures indicator This 60% above scoring students [Science, subjects IT in STEM Dzongkha Mathematics], and in BCSE English and examination. This indicator measures measures indicator This specificsubject of number in STEM, shortages teachers’ in the Dzongkha and English Thromde This indicator measures measures indicator This school of Out of numbers 6-12 including aged students initiates This Special Needs. of construction includes academic blocks additional in Schools, awareness programme PI K Enrolment Rate for for Rate Enrolment gender ECCD by Students scoring at at scoring Students 60 % in English, least and math Dzongkha, gender Science in VI by Students scoring at at scoring Students 60% in each least subjects, STEM English and Dzongkha in BCSE examination gender by Specific subject Specific teachers Out of school students students school of Out 6-12 including aged Needs Special ity Qual 4: NKRA LGKRA 3. Poverty 3. Poverty and eradicated reduced inequality 7. Quality of skills and education improved 10.Gender equality promoted, girls and women empowered and 11. Productive gainful employment created 12.

-37- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Sport facilities facilities Sport include development football, of site MPH, field, development etc. works methodology Data collectionData Records Records by maintained TEO Office/ Schools Records Records by maintained TEO Office/ Schools Records Records by maintained TEO Office/ Schools Data source Data Annual Annual Education Stats/Thromde Stats Education Administrative Administrative data Administrative Administrative data Target 100 19 M/F 100 (Year) B aseline 53 (2017) 10 M/F 100 U nit % Nos % Description The indicator measures measures indicator The with schools of percentage 24 in primary size of class 30 in secondaryand schools. is expected This to achieve various construction through academic, administrative in blocks relevant other and Schools This indicator measures measures indicator This schools of percentage such clubs vocational with agriculture, cultural, as crafts, arts and horticulture, science democracy, literary, culinary technology, and the also measures It etc. sport facilities of development development site other and in Schools works The indicator will measure willmeasure indicator The NFE of rate completion learners. PI K Schools meeting class Schools class meeting size targets Number of schools schools of Number clubs vocational with sport facilities and NFE completion rate rate NFE completion gender by NKRA

-38- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

12.1 Programme Summary and Strategies

Programme Title: Quality education and skills enhancement

Objective: To improve quality of education & skills

Collaborating Agency/ies: MoE/BCSEA/MoLHR (Technical Training Institute)/ RCSC

Programme Strategies:

In order to improve learning outcomes, quality of education, develop behavioural and life skills, prepare for jobs, Thromde will 1. Equip libraries with relevant books and online resource materials for references, self-learning and online education. 2. Regularly assess student’s strengths, weaknesses, performance and individual student’s learning needs for feedback and all round improvement especially focusing on improving those who are poor performers and slow learners. 3. Provide life skills through social interactions, creative activities and educational trips for peer learning to adapt to and to manage real life complexities and challenges. For that strengthen existing club activities and introduce additional extracurricular clubs such as health, fine arts, music, culinary, technology etc in the schools to make education more fun, and to learn additional life and social skills. 4. Create awareness to parents on their responsibility for child’s development and avoid putting undue pressure on the child to excel academically. Awareness programme to also target parents and encourage them to contribute in school activities such as minor maintenance, greening of schools etc. 5. Strengthen parents and teachers collaboration to discuss and agree on some of the pertinent issues and wellbeing of the students through regular review meetings and discuss best way forward. 6. Initiate programmes to improve competencies such as effective communication, problem solving, cognition, critical thinking, creativity, value education complemented by life guidance and career mentorship to prepare students for the future life and jobs.

-39- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

7. Strengthen professional development (PD) programmes for teachers by preparing and implementing PD plan for teachers in schools for execution, monitoring and review for enhancing teacher’s competency and each child’s development.

Thromde will implement WASH and Menstrual Hygiene Management facilitates in schools by 1. Conducting survey to assess the current status of water quality and quantity. If water source is a problem, explore alternate solutions for water supply such as rainwater harvesting; 2. Providing assistance for design of water supply schemes and support construction of water supply systems or seek assistance for technical design from Department of Public Health 3. Constructing water treatment units/plants to ensure quality water supply. 4. Building capacity of health coordinators and water caretakers on how to operate and maintain water and sanitation facilities and equip them with minor tools 5. Constructing toilets as per national standards for secondary schools which is 1 for every 25 girls and 1 for every 40 boys. 6. Ensuring availability of sanitary pads to girl students on a regular basis and proper sanitary pad disposal facilities

-40- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 100 100 100 10 100 100 19 100 95 100 At least 2 least At 95 95 0 NT-4 B aseline NA NA NA NA NA 53 10 53 90 NA 3 (Com. ECCD) 90 90 64 3 Weight 10 5 5 5 5 15 5.5 15 5 5 4 5 5.5 5 5 U nit % % % Nos % % Nos % % Nos Nos Nos % Nos Nos Nos utput Indicator utput O Schools with sanitarySchools with pad disposal facilities Schools with national standards (1 toilet for every for 25 (1 toilet standards national Schools with every facilities for toilet 40 boys) 1 toilet girls, Schools (100%) with sufficient water supply for supply water sufficient Schools (100%) with drinking No. of schools with ideal student computer ratio (1:30 ratio computer ideal with schools student of No. secondary schools) 1:10 for primary and for Schools with access to safely managed WASH (Water, (Water, WASH managed safely to access Schools with facilities Hygiene) and Sanitation Secondary size targets class meeting schools Number of schools with vocational clubs and sport and clubs vocational with schools of Number facilities size targets Primary class meeting schools Students performance in Class VI by gender VI by in Class performance Students NFE completion rate by gender by rate NFE completion Number of ECCD constructed of Number Enrolment Rate for ECCD by gender ECCD by for Rate Enrolment Students scoring above 60% in STEM subjects, subjects, 60% in STEM above scoring Students by in BCSE examination English and Dzongkha gender Shortage of specific subject teachers specificsubject of Shortage Out of school students aged 6-12 including Special 6-12 including aged students school of Out Needs atrix Weight Weight 60 40 utput M utput utput O Functional Functional infrastructure/ facilities developed Quality of Quality of primary and secondary education improved utcome O Programme O Programme Quality of Quality of & education improved skills Quality of Quality of & education improved skills o. S l. N 2 1 12.2 targets and indicators output Programme

-41- Twelfth Five Year Plan (2018-2023), Thimphu Thromde 0 19 95 95 95 100 100 100 100 100 100 100 C-10 NT-1 FY 2022-2023 97 97 97 97 80 80 15 93 93 93 20 100 C-8 NT-1 FY 2021-2022 nnual Target 1 95 95 95 95 70 70 14 92 92 92 30 100 C-7 NT-1 FY 2020-2021 Projected A Projected 1 93 93 93 93 60 60 13 91 91 91 40 100 C-6 NT-1 FY 2019-2020 - 90 90 90 90 53 53 12 90 90 90 50 100 C-4 FY 2018-2019 Indicators Indicators Schools with sanitarySchools with pad disposal facilities Schools with national standards (1 toilet for every 25 girls, 1 toilet for every for for 1 toilet 25 girls, (1 toilet standards national Schools with every facilities toilet 40 boys) Schools (100%) with sufficient water supply for drinking supply water sufficient Schools (100%) with No. of schools with ideal student computer ratio (1:30 for primary and primary and (1:30 for ratio computer ideal with schools student of No. secondary schools) 1:10 for Schools with access to safely managed WASH (Water, Sanitation and and Sanitation (Water, WASH managed safely to access Schools with facilities Hygiene) Secondary size targets class meeting schools Primary schools meeting class size targets Primary class meeting schools Proportion of schools with vocational clubs and sport facilities sport facilities and clubs vocational with schools of Proportion Students performance in Class VI by gender VI by in Class performance Students NFE completion rate by gender by rate NFE completion Number of ECCD constructed of Number Enrolment Rate for ECCD by gender ECCD by for Rate Enrolment Students scoring above 60% in STEM subjects, Dzongkha and English English and Dzongkha subjects, 60% in STEM above scoring Students gender by in BCSE examination Shortage of specific subject teachers specificsubject of Shortage Out of school students aged 6-12 including Special Needs Special Needs 6-12 including aged students school of Out S l. N o 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Projected Annual Target Annual Projected

-42- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R utlay utlay u in million) ( N Indicative Plan O Plan Indicative 787.00 6.00 793.00 60.00 7.00 5.00 20.00 7.00 48.00 15.00 20.00 6.00 7.00 48.00 25.00 7.00 25.00 15.00 6.00 25.00 7.00 6.00 6.00 25.00 ocation ctivity L A All Schools G rant total MSS Changzamtog Loselling MSS MSS Lungtenzampa Zilukha MSS LSS Changrigphel PS Namgyal Jigme LSS Lungtenphu LSS Taba LSS Zilnon Namgyeling Babesa PS Losel PS Jigme ctivity A Development of Thromde Education Education Thromde of Development System Management Infrastructure Development Infrastructure utput O ub-activities ajor S ajor M of construction and furnishes complete with block Classroom Integrated Construction of blocks classroom temporary works development site with MPH Day Construction of works development Site Football ground of Turfing works development site with MPH Day Construction of furnishes complete with block Classroom Integrated Construction of hall furnishes complete MPH with Construction of Football ground of Turfing Quarter Principals Construction of works development site with MPH Day Construction of furnishes complete with block Classroom Integrated Construction of furnishes complete with block 12 classroom Construction of works development site with MPH Day Construction of furnishes complete with block 12 classroom Construction of hall furnishes complete MPH with Construction of Quarter Principals Construction of furnishes complete with block 12 classroom Construction of works development site with MPH Day Construction of works development site and network drainage Construction of Quarter Principals Construction of furnishes complete with block 12 classroom Construction of Quality primary and secondary education Quality secondary primary and education improved developed infrastructure/facilities Functional Program Activity and Outlay Outlay and Activity Program

-43- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R utlay utlay u in million) ( N Indicative Plan O Plan Indicative 7.00 7.00 7.00 25.00 48.00 6.00 48.00 25.00 15.00 25.00 20.00 6.00 20.00 20.00 18.00 24.50 6.00 717.5 ocation ctivity L A Jungzhina PS Jungzhina PS Phodrang Kuensel PS Kuenphen Rinchen new Dechencholing School (Dangrina) HSS Yangchenphu Babesa HSS HSS Motithang MSS Changangkha Thromde Within ctivity A Total utput O Construction of Day MPH with site development works development site with MPH Day Construction of works development site with MPH Day Construction of furnishes complete with block 12 classroom Construction of furnishes complete with block Classroom Integrated Construction of Quarter Principals Construction of furnishes complete with block Classroom Integrated Construction of furnishes complete with block 12 classroom Construction of hall furnishes complete MPH with Construction of furnishes complete with block 12 classroom Construction of Football ground of Turfing Quarter Principals Construction of Football ground of Turfing Football ground of Turfing schools walls in various Construction of schools Thromde in Thimphu works development Site ECCDs 2 Nos Construction of Construction of Day MPH with site development works development site with MPH Day Construction of

-44- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R 2 initiatives per 2 initiatives year Out of 15, 2 of Out will be disable friendly Workshop Workshop Core areas, areas and Hotels s s methodology Data collectionData Administrative Administrative record Administrative Administrative record Administrative Administrative record Administrative Administrative Thromde data, Administrative Administrative records Administrative Administrative records en t id ource Data S Data Administrative Administrative Thromde Data, Administrative Administrative Thromde Data, Administrative Administrative Thromde Data, Administrative Administrative records Administrative Administrative Thromde data, Administrative Administrative Thromde data, e res e Target 100 100 10 C-15 100 100 (Year) B aseline NA NA NA 10 80 (2017) 30 (2017) d Throm f U nit % % Nos Nos % % on o on t r iti Description nu This indicator measures implementation implementation measures indicator This responsibilities the Thromde’s of Plan the Action by mandated This indicator measures implementation implementation measures indicator This responsibilities the Thromde’s of the policy by mandated This indicator measures initiatives initiatives measures indicator This programs awareness education/ as such in Schools), meeting teachers (parent inspection in entertainment frequent maintaining and creating centers, jogging/ developing areas, recreational gym, open track, cycling sport of incidences reduce to etc. complexes, cases abuse substance drug and This indicator measures the number of number the measures indicator This toilets friendly public disable/gender constructed This indicator measures percentage of percentage measures indicator This industries, as such entities commercial restaurants, workshops, automobile & Clean (Treated Safe with etc. hotels, supply 24X7 drinking water and water) LPCD) (i.e.135 This indicator measures percentage of percentage measures indicator This and water) (Treated safe with households LPCD) till (i.e.135 the supply 24X7 water point meter h an d t h PI (6 K PIs) K c e d 5: H eal 5: Implement Suicide Suicide Implement Plan Action Prevention Implement National policy National Implement framework strategic and of Use Harmful Reduce to (2015-2020) Alcohol Initiatives to reduce reduce to Initiatives drug and of incidence cases abuse substance Disable/Gender friendlyDisable/Gender toilets public Commercial entities with with entities Commercial supply water 24*7 safe Households with access to to access with Households drinking water 24*7 safe supply NKRA enhan LGKRA 3. Poverty 3. Poverty and eradicated reduced inequality and 8. Food Nutrition security ensured 10.Gender equality promoted, girls and women empowered and 14. Healthy societycaring enhanced 17. Sustainable ensured water 13.

-45- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

13.1 Programme Summary and Strategies

Programme Title: Quality Health enhancement

Objective: To improve community health and water security

Collaborating Agency/ies: MoH/MoWHS

Programme Strategies

According to GNH Survey 2015, 2.46 percent of the population suffer from severe psychological distress and about 8.99 percent of population suffer from some form of distress which mainly leads to suicides and alcoholism. The Thromde will plan and implement the Suicide Prevention Action Plan, particularly responsibilities assigned to the Thromde. The Thromde’s Suicide Prevention Response Team (DSPRT), with technical support from relevant central agencies, will plan and implement suicide prevention awareness and interventions action plan in the Thromde, as well as identify causes driving people to commit suicide.

Similarly, Thromde with support from health committee will address the issue of incidences of alcohol deaths through implementation of the National Policy and Strategic Framework to Reduce Harmful Use of Alcohol (2015-2020), particularly responsibilities assigned to the Thromde, such as formation of Alcohol Harm Reduction Committee at Thromde level. Accordingly, public education and awareness on alcohol policies and harmful use of alcohol will be taken up in collaboration with community health workers and religious figures, targeting both sellers and consumers.

Currently, only 80 percent of commercial entities and 30 percent of households have access to safe, clean and reliable drinking water (24x7). With increase in housing construction in the thromde area, more people are expected to reside within the Thromde, thus there will be increased demand for provision of safe and clean drinking water to every household within the Thromde vicinity. In order to provide 24x7, clean and safe drinking water, Thromde will: • Construct additional reservoirs and ensure that every building is provided with municipal water connections ensuring reliable water supply and wherever necessary storage tanks are installed by all households. • Ensure strict monitoring on water breakdowns, leakages, illegal tapping, and initiate digitization of water networks to monitor water supply

-46- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

• Promote user responsibility on water management through awareness and formation of Water User Association in every constituency. • Procure adequate water tankers to supply water during emergencies, should there be problem with the main supply line.

-47- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 100 100 100 C-15 NT -2 10 10 10 100 100 B aseline 30 40 80 10 0 NA NA 1 Doebum Lam) NA NA Weight 12 10 12 10 12 10 8 8 9 9 U nit % % % Nos Nos Nos Nos KMs % % utput Indicator utput O Households with access to 24*7 clean, safe drinking safe 24*7 clean, to access with Households 135 LPCD) (i.e. till point the meter supply water clean, 10 hours least at to access with Households 56.25 LPCD) (i.e. supply drinking water safe water safe 24*7 clean with entities Commercial 135 LPCD) (i.e. supply toilets friendly public gender of Number toilets public abled differently- of Number drug and of incidences reduce to Initiatives cases abuse substance Sporting events Thromde Intra/Inter jogging tracks and Bicycle framework policy strategic and National Implement (2015-2020) Alcohol of Use Harmful Reduce to Plan Action Prevention Suicide National Implement (2015-2018) Weight Weight 34 22 26 18 atrix utput utput M utput O Clean and Safe Drinking water Drinking water Safe Clean and ensured supply friendlyGender/ public disable constructed toilets incidence reduce taken to Initiatives cases abuse substance drug and of Alcohol of Use Harmful for Strategy Prevention Suicide National and implemented Plan Action Programme O Programme utcome O Health of Thromde residents enhanced o. S l. N 1 2 3 4 5 6 7 8 9 10 13.2 targets and indicators output Programme

-48- Twelfth Five Year Plan (2018-2023), Thimphu Thromde - 1 2 2 2 100 100 C-100 C-100 C - 100 FY 2022-2023 2 1 2 2 2 90 100 C-90 C-80 C - 97 FY 2021-2022 nnual Target 1 0 2 2 3 80 100 C-70 C-70 C - 95 FY 2020-2021 Projected A Projected 1 1 2 2 3 70 100 C- 90 C- 60 C -55 FY 2019-2020 - -

2 2 50 50 C-85 C-45 C-45 FY 2018-2019 Indicators Implement National Suicide Prevention Action Plan (2015- Plan Action Prevention Suicide National Implement 2018) Commercial entities with 24*7 clean safe water supply (i.e. 135 (i.e. supply water safe 24*7 clean with entities Commercial LPCD) toilets friendly public gender of Number toilets public abled differently- of Number abuse substance drug and of incidences reduce to Initiatives cases Sporting events Thromde Intra/Inter jogging tracks and bicycle Construction of Reduce to framework policy strategic and National Implement (2015-2020) Alcohol of Use Harmful Households with access to at least 10 hours clean, safe drinking safe clean, 10 hours least at to access with Households 56.25 LPCD) (i.e. supply water Households with access to 24*7 clean, safe drinking water drinking water safe 24*7 clean, to access with Households 135 LPCD) (i.e. supply S l. N o 10 3 4 5 6 7 8 9 2 1

Projected Annual Target Annual Projected

-49- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R utlay utlay u in million) ( N Indicative Plan O Plan Indicative 11.00 97.00 15.00 123.00 123.00 0.30 123.30 ocation ctivity L A Within Thromde Thromde Within Thromde Within Within Thromde and Periphery and Thromde Within Within Thromde and Periphery and Thromde Within ajor sub-activities ajor ctivity M A Functional Infrastructure Infrastructure Functional development capacity and Awareness development Total Total rand Total G utput O Water supply system, network and WTP and (3 Nos) network system, supply Water toilets public Construction of 1- Clean and Safe Drinking water supply ensured supply Drinking water Safe 1- Clean and toilets friendly2-Gender/ public disable constructed National and Alcohol of Use Harmful for Strategy implemented Plan Action Prevention Suicide jogging tracks and bicycle Construction of S l. N o 2 1 2 1 Program Activity and Outlay Outlay and Activity Program

-50- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks (6 (6 R Among Constituency, 2 least at in 5 competitions years 5-time cleaning 1 per campaign, year includes It namzha Driglam for training staffs, Thromde t e d Collection Collection methodology Administrative Administrative record Administrative record Administrative record Administrative record romo p an d Data source Data Administrative Administrative Thromde Data, Administrative Administrative Thromde Data, Administrative Thromde Data, Administrative Thromde Data, v e d Target 30 5 3 2 reser B aseline NA NA NA NA U nit Nos Nos Nos Nos ons p ons and Boedra Description This indicator measures measures indicator This participants of number in Zhungdra organized Competition excluding Thromde by in schools competition The indicator describes the indicator The activities volunteer of number waste as such taken up Midey engaging management community and Tshogpas measures indicator This such initiatives of number speaking and writing as sign drama, competition, in minutes Tshogde boards, and memo Office Dzongkha, in Dzongkha presentations etc. The indicator measures measures indicator The training of the number events, awareness, programs, to media, etc. TV Programs, promote Namzha Driglam ure & Tra & diti t ure PI K Competition 6: Cul 6: Zhungdra and Boedra level in Thromde Activities Activities undertaken through community (Without volunteers kind) and cash to Initiatives promote Dzongkha Initiatives to to Initiatives promote Driglam Namzha K PIs) NKRA LGKRA 2. Economic 2. Economic and diversity productivity enhanced & 4. Culture Traditions preserved and promoted 11. Productive gainful and employment created 15. Livability, safety and sustainability human of settlements improved 14.

-51- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Changangkha/ Dolma Lhakhang/ Memorial and Chorten Chortens Support for the promotion of sports indigenous Collection Collection methodology Administrative Administrative record Data source Data Administrative Administrative Thromde Data, Administrative Administrative Thromde Data, Target 2 5 B aseline NA 1 U nit Nos Nos etc. etc. Description or supported/sponsored by promotion its for Thromde This indicator measures measures indicator This heritage tangible of number maintained/renovated/ Constructed measures indicator This programs of the number in established clubs and and promote Schools to sports preserve indigenous Khuru, Archery and like PI K Promote Tangible Tangible Promote heritage Cultural to Initiatives safeguard and indigenous promote sport NKRA

-52- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

14.1 Programme Summary and Strategies

Programme Title: Programme to develop culture and tradition

Objective: To promote and preserve culture and traditions

Collaborating Agency/ies: MoHCA/DDC/

Programme Strategies:

As per the GNH Survey Report, 2015, the proportion of urban people who consider themselves ‘very’ spiritual has declined substantially from 50.4 percent to 44.5 percent. People only spent an average number of 9.7 days on social and cultural activities. The percentage of people who opined that Driglam Namzha is ‘getting weaker’ increased from 19.7% in 2010 to 38.9% in 2015. People’s perception on the decline in government performance in preserving and promoting intangible culture had also worsened considerably in 2015 as compared to 2010. The GNH Survey 2015 also reported a very low score of 7.12 in historical knowledge. Against this backdrop, the programme on culture and tradition is aimed to explore means and ways to preserve, promote and document our culture and tradition, indigenous knowledge, arts and crafts, and etc.

In addition to the conventional strategies to preserve and promote culture, Thromde will particularly promote intangible culture through the following: 1. Conduct constituency wise Boedra and Zhungdra competition to promote traditional songs and dances 2. Conduct and promote community cleaning campaigns to foster community vitality Thromde will promote Driglam Namzha and Dzongkha by; 1. Creating community training of trainers on Driglam Namzha for mass community sensitization. 2. Providing mass education and awareness on Driglam Namzha to the community especially during public and community meetings and gatherings 3. Training all Thromde staff in Driglam Namzha. 4. Training relevant Thromde staff on Dzongkha Unicode 5. Installing sign-boards written in Dzongkha. -53- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 2 2 2 30 5 3 2 FY 2022-2023 B aseline C-30 1

1 1 NA NA NA NA NA NA NA Weight 15 20 15 13 10 15 12 U nit Nos Nos Nos Nos Nos Nos Nos FY 2021-2022 - 1 1 1

1

nnual Target FY 2020-2021 C-15 1 1 1 2 1 Projected A Projected Competition in Thromde in Thromde Competition FY 2019-2020 - 1 1

1 1

utput Indicator utput and Boedra O FY 2018-2019 - 1

No. of new religious infrastructure developed new religious of No. infrastructure renovated religious of No. sport indigenous promote and safeguard to Initiatives Participants in Zhungdra Participants competition level (Without volunteers community undertaken through Activities kind) and cash Dzongkha promote to Initiatives Namzha Driglam promote to Initiatives atrix Weight Weight 50 50 utput M utput utput O Indicators Tangible Cultural Cultural Tangible preserved Heritage and promoted Intangible Cultural Cultural Intangible preserved and promoted utcome Programme O Programme O Culture & Culture Traditions preserved and promoted Participants in Zhungdra and BoedraParticipants in Competition competition level Thromde Activities undertaken through community volunteers volunteers community undertaken through Activities kind) and cash (Without Initiatives to promote Dzongkha promote to Initiatives Driglam Namzha Driglam promote to Initiatives No. of new religious infrastructure developed new religious of No. No. of religious infrastructure renovated religious of No. Initiatives to safeguard and promote indigenous sport indigenous promote and safeguard to Initiatives o. S l. S l. N o N 2 1 1 2 3 4 5 6 7 14.2 targets and indicators output Programme Target Annual Projected

-54- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R New construction New Renovations utlay u in million) ( N Indicative Plan O Plan Indicative 40.00 20.00 0.50 40.00 40.50 20.00 ctivity ocation A L ctivity A rand total rand total Total Total Conduct awareness and competition program competition and awareness Conduct Development Infrastructure G utput O at Thai Pavilion Thai at Lhakhang Dolma Construction of Intangible Cultural preserved and promoted preserved and Cultural Intangible preserved and Heritage Cultural Tangible promoted Development of Changangkha Lhakhang Changangkha of Development ajor sub-activities ajor S l. N o 2 1 2 M 1 Programme Activity and Outlay Outlay and Activity Programme

-55- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

emarks emarks R All Thromde All Thromde infrastructure and safe open No burning, of procurement sprinkler water LED Hall, City lighting/ street Solar street lighting i l en t Collection Collection methodology Administrative Administrative record Administrative record Administrative record Administrative record er res t er Data source source Data Administrative Administrative Thromde Data, Administrative Thromde Data, Administrative Thromde Data, Administrative Thromde Data, sas di Target Target 30 NT-5 2 2 B aseline NA 10 NA NA e an d t e nit nit U Nos Km Nos Nos (4 K PIs) (4 c e d t ral, c l i ma Description The indicator measures all criticalmeasures indicator The infrastructures (schools, public are roads) and hospitals/BHUs by proofed disaster and climate disaster and all climate ensuring components, engineering resilient quality standards, and safeguards also the safe and strength and wastes. hazardous disposal of disaster the This alsomeasures through Thromde of preparedness EOC like system established proper in place hydrants SAR and and of length measures indicator This maintained/ drainage water storm floodingand reduce to constructed the also measures logging. It water walls floodprotection of length constructed of number measures indicator This pollution air reduce to initiatives number measures indicator This energy promote to initiatives of buildings efficient/green enhan PI K PI p men t Critical public Critical public infrastructure (schools, and hospitals climate/ roads) resilient disaster disaster and of preparedness Thromde proper Length of water storm flood and drainage walls protection to Initiatives air reduce pollution energy Promote efficient/green buildings 7: Carbon neu Carbon 7:

e v elo NKRA d LGKRA 5. Healthy 5. Healthy servicesecosystem maintained neutral, 6. Carbon and climate resilient disaster development enhanced 9. Infrastructure, communication services public and improved 3. Poverty and eradicated reduced inequality 15.

-56- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

15.1 Programme Summary and Strategies

Programme Title: Carbon neutral, climate and disaster resilient development

Objective: To strengthen Carbon neutral, climate and disaster resilient development

Collaborating Agency/ies: Gewogs/NEC/MoAF

Programme Strategies

Climate change and disaster has been a cross cutting issue in all aspects of development. Efforts and measures are put in place to mainstream the issue into development agenda. Our development agenda is guided by our own philosophy of Gross National Happiness and Vision 2020, the international sustainable development goals, and other regional goals, which emphasizes on environmental conservation, combating climate change and its effect, developing disaster resilient infrastructure, and reducing carbon footprints.

Primary environmental pressures on urban environment arise from: • Pollution- land, air, water and noise • Increasing solid waste production and safe and sustainable disposal challenges • Safe and sustainable waste water management and treatment • Lack of good drainage systems to address increasing flooding incidents especially during monsoons

The Thromde experiences one of the heaviest rains in the country often resulting in flooding and water logging in the town areas. This calls for need of proper storm-water drains, flood mitigation structures and river training. The need for disaster resilient infrastructure, especially from earth quake is high considering Bhutan’s location in the seismically active zone. Therefore, this programme is aimed at fostering a culture of community social responsibility among individuals and communities in the preservation and conservation of our environment and in contributing towards the nation’s commitment to remain carbon neutral.

-57- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

The Thromde will focus on the following strategies: 1. Assess and explore mitigation measures pertaining to low emission in priority sectors like waste management, transport, residential building, industries and etc. Measures like energy efficient transport system, energy efficient buildings and appliances, use of renewable energy and waste and waste water management will be explored and implemented accordingly. 2. Energy efficiency will be promoted by installing energy efficient street lights (LED), replacing inefficient lights with efficient ones, encouraging households to use LEDs and exploring solar energy as a power alternative. 3. Initiate and support green transportation by encouraging residents to buy electric and hybrid vehicles (EV/HV)for which supporting services like EV charging station will be installed in the Thromde. 4. Enhance engineering capacity as well as collaboration with relevant central agencies to improve technology and quality of climate-proof and disaster- resilient drawings, design and construction of related infrastructures. Institute systems to monitor and enforce compliance to safety features in construction of structures for human occupancy. 5. Solar Water Heating may be mandated for typologies such as hotels; for others may be incentivized with various means in collaboration with relevant central agencies such as Ministry of Works and Human Settlement (MoWHS), Department of Renewable Energy (DRE), etc. 6. Thromde disaster-contingency plan with robust mechanism for information sourcing and sharing will be developed and capacity built for disaster preparedness, response and rehabilitation. 7. Awareness, monitoring and enforcement systems will be strengthened to ensure that disaster resilient and adaptation standards and quality is incorporated and adhered to in any development works and infrastructure constructions by both private and government entities.

-58- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 30 5 1 2 2 2022 2019-2020 FY 2022-2023 10 1 0.5 B aseline NA NA NA NA NA NA NA FY 2021-2022 Weight 15 15 15 15 10 15 15 Phase II – Laying of of II – Laying Phase over) (spill pipes 1 0.5 10 U nit Nos Km Km Nos Nos Date Date nnual Target FY 2020-2021 Phase II – Laying II – Laying Phase of pipes 1 1.94 5 Projected A Projected FY 2019-2020 1 I - Feasibility Phase study/design/ etc. drawing, 1 1 - 1 5 utput Indicator utput O FY 2018-2019 - - 0.05 - 1 No. of climate/disaster resilient infrastructure resilient climate/disaster of No. Length of proper storm water drainage constructed/maintained drainage water storm proper Length of walls floodprotection Construction of pollution air reduce to Initiatives buildings energy efficient/green promote to Initiatives tanksand pipe line) water (fire hydrant fire Construction of training including EOC SAR equipment of and Procurement atrix Weight Weight 100 utput M utput utput Indicators O Disaster Disaster management adaptive and capacity improved utcome Programme O Programme O Carbon Carbon neutral, and climate disaster resilient development enhanced Procurement of EOC and SAR equipment including including EOC SAR equipment of and Procurement training pipe line) water (fire hydrants fire Construction of and tanks Length of proper storm water drainage constructed/ drainage water storm proper Length of maintained walls floodprotection Construction of pollution air reduce to Initiatives buildings energy efficient/green promote to Initiatives No. of climate/disaster proofed infrastructure proofed climate/disaster of No. S l. S l. N o 6 7 2 3 4 5 N o 1 2 3 4 5 6 7 1 15.2 targets and indicators Output Programme Target Annual Projected

-59- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R utlay utlay u in M illion) ( N Indicative Plan O Plan Indicative 0.00 122.00 30.00 10.00 65.00 17.00 122.00 122.00 ocation ctivity L A Within Thromde Within Thromde Within office Thromde Within Within Thromde Within ctivity A Total Total rand Total rand Total Training & Skills development Training G Infrastructure development development Infrastructure utput O Disaster management and adaptive adaptive and management Disaster improved capacity Construction/maintenance of storm water drainage water storm of Construction/maintenance pipeline) water of fire (Laying and tanks hydrant fire Construction of Project) walls (UNEP floodprotection Construction of SAR and equipment (TEO) Operating Centre Emergency Thromde of Establishment ajor sub activities sub ajor S l. N o 1 2 M 1 1 2 3 Program Activity and Outlay Outlay and Activity Program

-60- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R Midey City Tshogpas/ Council Data by maintained MoLHR Collection Collection methodology Record Record by maintained Schools Record maintained Thromde Record maintained Thromde Record maintained Thromde Record by maintained MoLHR rls g i rls Data source source Data Administrative Administrative Data Administrative Data Administrative Data Administrative Data Administrative Administrative Data omen an d omen Target Target 50 100 400 20 80 , w , B aseline NA NA 340 (2017) NA 74 (2016) t e d nit nit U % % Nos % % romo p Description ity ual This indicator measures measures indicator This women of percentage in user representatives and groups self-help groups, local committees/groups measures indicator This eligible of proportion employees Thromde to access with (parents) crèches care functional day measures indicator This in leadership girls of number in various in schools position extra-co-curricular activities, etc. groups, clubs, measures indicator This availing female of percentage skills/entrepreneurship productive for trainings and economic livelihood, enhancement income This indicator measures measures indicator This NFE female of percentage NFE total against learners learners er e q er (6 K PIs) PI K PI Women representatives representatives Women self- in user groups, local groups, help and committees cooperative employees Government access with (parents) care functional day to crèches in girls of Number in position leadership schools skills/ availing Women entrepreneurship trainings NFE learners by gender gender by NFE learners 8: G en d 8: w ere d NKRA em p o LGKRA 1. Macroeconomic 1. Macroeconomic ensured stability eradicated 3. Poverty inequality and reduced ecosystem 5. Healthy services maintained neutral, 6. Carbon and climate resilient disaster development enhanced 9. Infrastructure, communication services public and improved 16.

-61- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R Data Data maintained NCWC/ by RENEW Collection Collection methodology Record Record maintained NCWC/ at RENEW Data source source Data Administrative Administrative Data Target Target 60 B aseline NA nit nit U % Description This indicator measures measures indicator This men women, of percentage (Thromde children and by covered population) awareness sensitization/ elimination on programs VAC and VAM VAW, of women, by disaggregated covered children and men PI K PI Women, men and and men Women, covered children sensitization/ by on programs awareness Violence of elimination VAM Women, Against and VAC NKRA

-62- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

16.1 Programme Summary and Strategies

Programme Title: Programme to promote gender equality and empowering women and girls.

Objective: To promote gender equality and empower women and girls

Collaborating Agency/ies: NCWC/MoE

Programme Strategies:

• The GNH Survey 2015 observes that in Bhutan, women are less happy than men. However, it was also noted that women’s GNH increased faster than men from 2010-2015 reducing gender inequality. Disparity is the largest in the education and good governance domains and overall, but people in rural areas enjoy higher sufficiency in political participation, donation, community relationships, ecological issues and safety indicators as compared to those in urban areas. • Women are poorly represented in decision-making positions both in the parliament and civil service. Only 8.5 percent of women were elected in the National Assembly elections in 2008 and 2013. However, for the National Council election in 2013, there were no women elected. In 2012, women only accounted for 36 percent of the entire civil service workforce out of which only 6 percent held executive positions. • While notable success has been made in terms of ending all types of discrimination against women and girls, there is still poor representation of women in decision-making and other development agenda. On the positive note, Thimphu Thromde has two women representative members (council members) in Thromde’s highest decision making body; Thromde Tshogde which is at par with the male counterpart. The programme shall explore ways and means to incentivize women and girls to participate in local forums. The school going girls shall be the priority for advocacy, awareness and campaigns pertaining to the same. • At the national level, unemployment rate is higher for women than their male counterparts (F-3.1% & M-1.8%, LFS 2015) and for Thimphu Thromde it is 6.4 percent (male-5.1% and Female-8.6%). Employment opportunities for women in the country have largely been in the agriculture sector, where

-63- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

productivity and earnings are low. However, in the Thromdes, employment opportunities with higher returns for labor exist outside agriculture sector for both men and women such as CSMIs.

Considering the importance placed on promoting gender equality and empowering women and girls, the Thromde shall focus on the following key strategies: 1. Focus on periodic sensitization and media advocacy program on the importance of gender equality and rights so as to empower women which will also encourage women participation in all kind of electoral/election programs. 2. Collaborate with relevant agencies to conduct gender related research particularly on participation in the decision making, entrepreneurship and violence against women (VAW), gender related aspects of health, teenage pregnancy, etc. 3. Thromde will make available information on employment opportunities or any form of skills development training (entrepreneurships, leadership training and public speaking). 4. Thromde will also promote ideas such as women cooperatives, self-help groups, etc. among women as a means of uplifting women out of poverty and easing their financial difficulties.

-64- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 60 20 400 100 50 80 FY 2022-2023 80 C-50 100 400 C-20 C-60 B aseline NA NA 340 (2017) NA NA 74 (2016) Weight 15 15 25 15 15 15 FY 2021-2022 U nit % % Nos % % % 78 C-40 100 380 C-15 C-50 nnual Target FY 2020-2021 76 C-30 100 360 C-10 C-40 Projected A Projected FY 2019-2020 75 C-20 100 350 C-5 C-30 utput Indicator utput O FY 2018-2019 74 - 100 340

C-20 Women, men and children covered by sensitization/ by covered children and men Women, Against Violence of elimination on programs awareness VAC and VAM Women, Women availing skills/entrepreneurship trainings skills/entrepreneurship availing Women Number of girls in leadership position in schools position in leadership girls of Number Eligible Thromde employees with access to functional day to functional day access with employees Thromde Eligible crèches care Women representatives in user groups, self-help groups, local groups, self-help in user groups, representatives Women cooperative and committees Women NFE learners Women Weight Weight 100 atrix utput O Indicators utput M utput Mechanisms for for Mechanisms of participation women/children making in decision improved process utcome O Program O Program Gender equality Gender equality promoted, girls and women empowered NFE learners by gender gender by NFE learners Women representatives in user groups, self-help groups, groups, self-help in user groups, representatives Women cooperative and local committees Eligible Thromde employees with access to functional access with employees Thromde Eligible crèches care day Number of girls in leadership position in schools position in leadership girls of Number Women availing skills/entrepreneurship trainings skills/entrepreneurship availing Women Women, men and children covered by sensitization/ by covered children and men Women, Against Violence of elimination on programs awareness VAC and VAM Women, o. S l. S l. N 6 5 4 3 2 1 N o 1 2 3 4 5 6 16.2 targets and indicators output Programme Target Annual Projected

-65- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R Training of Midey Tshogpas Midey Tshogpas of Training VAW and VAM VAC, on utlay utlay u in million) ( N Indicative Plan O Plan Indicative 0.40 0.40 ctivity ocation A L Thromde area Thromde G rant Total ctivity A Awareness and and Awareness programs training utput O Mechanisms for participation of women/children in women/children of participation for Mechanisms improved process making decision S l. 1 N o Program Activity and Outlay Outlay and Activity Program

-66- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R (4 (4 Constituency Constituency wise 1 in each constituency Road/Waste/ Sewer/Tenancy/ Land Collection Collection methodology Administrative Administrative record Administrative Administrative record Administrative record t hene d t reng Data source source Data Administrative Administrative Data Administrative Administrative Data Administrative Data on s on Target Target 30 7 100 ti B aseline NA NA (2016) NA NA nit nit U % Nos % c en t ral i za De & Description cy c ra This indicator measures measures indicator This people resident of percentage attending gender by age) (voting meetings in formal (annually) namely Thromde by conducted for setting 1) Agenda for Tshogde Thromde to submission 2) Consultation & Parliament & annual budget plans, on Thromde for targets performance & Local development Plan Area bye- Thromde on 3) Consultation policies & national laws This indicator measures number number measures indicator This as such committees and groups of Tshogpas Midey measures indicator This grievances total of percentage or resolved recorded received/ to attended PI K PI 9: Demo 9: Zomdu by attendance gender Number of of Number functional local self- user groups, & groups help local committees Grievances registered Thromde with resolved NKRA K PIs) LGKRA 2. Economic 2. Economic and diversity productivity enhanced 10. Gender equality promoted, girls and women empowered 12. Corruption reduced 13. Democracy and decentralization strengthened services16. Justice institution and strengthened 17.

-67- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks emarks R Score card card Score technique tool 4 times conducted Collection Collection methodology Survey Data source source Data Administrative Administrative Data Target Target 4 B aseline NA nit nit U Nos Nos Description This indicator measures measures indicator This on satisfaction community’s service deliveryusing Thromde’s at Tool Report Card Community the which assess a year once least public of effectiveness and quality services transport, public as such sanitation, and water roads, aspects other and etc. education (people’s) the user’s from perspectives. PI K PI Community Community tool card score implemented NKRA

-68- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

17.1 Programme Summary and Strategies

Programme Title: Democracy & decentralization

Objective: To strengthen democracy & decentralization

Collaborating Agency/ies: Gewogs/MoHCA, DLG/ECB

Programme strategies

During the local government elections held in 2016 in the four thromdes (Thimphu, Phuentsholing, Samdrup Jongkhar and Gelephu) and 205 Gewogs, a total of 3,391 candidates contested for various Local Government offices. Out of this, a total of 1,439 candidates were elected; comprising 164 women and 1,275 men.

Seven women and 13 men were elected to the 20 Thromde Tshogpa posts, and two women and ten men were elected to the Thromde Ngotshabs posts. Female representation and participation in the Thromde election have been considerably low. In the 12th FYP, LG’s share of resources has doubled and therefore strengthening implementation capacity at the LG level is critical.

Thus, to address these issues, Thromde will undertake the following strategies; 1. Framework for interactions at the community level will be developed to make the process more inclusive (especially women and youth groups) and people-centric. Local communities will be mobilized and organized and opportunities created for meaningful dialogue between community representatives and the executives on Thromde development, to develop local action plans, share experiences and feedback, and problems. 2. Collaborate with Department of Local Governance to enforce and implement Community Engagement Guideline to conduct transparent, inclusive, accountable and effective zomdues and effectively implement the resolutions of the zomdues. 3. Ensure timely update and information sharing on Thromde plans and budget, annual expenditure and progress, bye-laws, policy formulation, and any other critical public information on the public notice board, Thromde website and portals.

-69- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

4. Collaborate with central agencies to ensure adequate and rational deployment of human resources in Thromde and strengthen their capacity in planning and management of increasing development and expenditure responsibilities at the local level 5. Promote awareness and understanding of the local communities and citizens on LG Act, other rules, guidelines and manuals in place. Also ensure faster and effective redressal of developmental and social issues and attend the grievances faced by the citizens and inform citizens on the actions taken. 6. Ensure enforcement and compliance to provisions of LG Act and other rules, guidelines and manuals to enhance citizen’s participation and ownership in Thromde development. 7. Form more community user groups, committees and cooperatives (similar to community monitoring and assessment committee-CMAC, currently being piloted in dzongkhags) to strengthen local democracy, community monitoring, enhance citizen’s participation and engagement in planning, decision-making and management of Thromde development and economic growth. Women and disabled-people participation and representation in these groups and zomdues will also be ensured to be able to fully capture the development needs of the community.

-70- Twelfth Five Year Plan (2018-2023), Thimphu Thromde Plan Target Target 4 100 7 10 30 FY 2022-2023 30 2 3 C-90 1 B aseline NA NA NA (2016) NA 3 (2016) Weight 25 25 15 20 15 FY 2021-2022

2 2 C-70 1 U nit Annual Annual Score % Nos Nos % nnual Target FY 2020-2021 25 2 2 C-50 1 Projected A Projected FY 2019-2020

2 - - 1 FY 2018-2019

2 - - - utput Indicator utput O /public forum on local development plan in a plan local on development forum /public Community score card tool implemented implemented tool card score Community Grievances registered with Thromde resolved or attended attended or resolved Thromde with registered Grievances Number of functional local user groups, self-help groups, local groups, self-help functional local of user groups, Number cooperative and committees year Number of zomdues of Number attendance by gender by Zomdu attendance atrix Weight Weight 100 Indicators utput M utput utput O Create Create enabling environment attendance by gender by attendance utcome Programme O Programme O Democracy & decentralization strengthened Zomdu Number of zomdues/public forum on local development plan in a year plan local on development forum zomdues/public of Number Number of functional local user groups, self-help groups, local groups, self-help functional local of user groups, Number cooperative and committees Grievances registered with Thromde resolved or attended to attended or resolved Thromde with registered Grievances Community score card tool implemented implemented tool card score Community o. S l. S l. N 5 4 3 N o 2 1 1 2 3 4 5 17.2 targets and indicators output Programme Target Annual Projected

-71- Twelfth Five Year Plan (2018-2023), Thimphu Thromde emarks R u in million) utlay ( N utlay Indicative Plan O Plan Indicative 0.00 0.50 0.50 ocation ctivity L A Within Thromde Within Within Thromde Within ctivity A G rant Total Training & Capacity development development & Capacity Training Awareness & Education programs & Education Awareness utput O Create enabling environment enabling Create l. N o S 2 1 Program Activity and Outlay Outlay and Activity Program

-72- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

18. Programme Monitoring and Evaluation Plan

Keeping in mind the importance of institutional efficiency and good governance, the 12th Five Year Plan shall be monitored using the Government Performance Management System (GPMS) with an objective to enhance accountability, transparency, and efficient utilization of resources. Particularly, through the Annual Performance Agreements (APA); a record of understanding signed between the Prime Minister and the Thrompon that provide a summary of the most important objectives, actions and activities that the Thromde expect to achieve in a financial year. It entails performance indicators and targets that will be reviewed quarterly, bi-annually and annually by the National Technical Committee (NTC) to measure the degree of progress made in implementing the annual activities. This will ensure that any issues affecting the implementation of annual planned activities are identified and addressed within the approved timeline.

Additionally, the 12th Plan will also be monitored using the Multi Year Rolling Budget System (MYRB) of Department of National Budget, and the Public Expenditure Management System (PEMS) of Department of Public Accounts, Ministry of Finance. These systems have been integrated with the GPMS to enhance/ strengthen sharing of planning, budgeting and expenditure information for planning and monitoring purposes.

The Gross National Happiness Commission shall also conduct Quarterly and Mid-Term Review (MTR) of the 12th FYP and mid-course correction of the plan will be undertaken as necessary. The results of the 12th FYP will be evaluated by GNHC at the end of the plan. Evaluation of specific programmes/projects can be evaluated by agencies concerned, local governments and GNHC as guided by the National Evaluation Policy.

The LGs shall also be responsible for monitoring the activities within the scope of their mandate; it shall be the responsibility of the Thromde to undertake overall monitoring of the activities within its jurisdiction and compile and provide annual update on the plan activities and KPIs related to the Thromdes. Similarly, Thromdes will be responsible for monitoring the plans and programmes of the respective Thromdes and subsequent reporting to the GNHC.

-73- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

The 12th FYP shall actively promote social accountability and therefore, encourage citizen monitoring of the development plans happening within their community to ensure greater accountability and results of development programmes. The Thromdes will also form Community user’s groups, and Community Monitoring and Assessment Committees (CMAC) in a democratic manner to ensure citizen’s participation and engagement in planning, decision-making and management of local development and economic growth.

-74- Twelfth Five Year Plan (2018-2023), Thimphu Thromde s s u i remen t pecific support and interventions required from central agencies central requiredpecific from and interventions support S a) Support provision of ideas & technology to recover waste & valuable & valuable waste ideas recover & technology to of provision a) Support d) what waste, residual manage to c) how recycle, to b) how materials, raw construct to & e) how waste, recycled of sell to products do & where to disposal sites proof friendly & leachate environment a) Support provision of subject-specific teachers as per approved staffing staffing approved as per teachers subject-specific of provision a) Support highly specialized critical and on skills teachers of b) training and pattern, a) Support to provide design, technology & products for safe drinking safe for design, technology & products provide to a) Support technical expertise b) support bigger, construct/install to and water, c) system distribution reservoir and networks, integrated modern and through to come fund program flagship Water a) support provision of helpline services, b) provide psychotherapist & services, psychotherapist helpline b) provide of provision a) support in issues address health sector to Dzongkhag through counsellors trained need in when area Thromde a) Support upgradation of local hotels through provision of standards, standards, of provision through local of hotels upgradation a) Support and products local Marketing b) fiscal and incentives, certification destinations a) Access to finance, b) Pitching business ideas for sourcing support, c) support, sourcing for ideas business Pitching b) finance, to a) Access and job seekers localfor entrepreneurs in specific training Support a) Support to start-ups & CSMIs establishment in order to expedite expedite to in order establishment & CSMIs start-ups to a) Support enterprises industries/ of operationalization finance to b) Access & chain value entrepreneurship, on in skills development c) Support supply chain services and products of Marketing and d) Branding R e q gencies A es an d ci es NEC, MoWHS, Thimphu Thimphu NEC, MoWHS, MoF Dzongkhag, MoE MoWHS, MoH, GNHC MoH, MoWHS, MoH, BNCA, DoT, RBP RBP DoT, BNCA, MoH, & CSOs TCB MoEA, MoLHR MoEA, MoEA, RMA MoEA, gen ng A ti ng Collabora

PI whichK PI need support central strong/critical Waste recycled & waste disposal & waste recycled Waste a) Students scoring at least 60% in each STEM STEM 60% in each least at scoring a) Students in BCSE English and Dzongkha including subject gender, (X) by in English, 60% each least at scoring b) Students gender Science VI by in Class and math Dzongkha, Households with access to 24*7 safe drinking water drinking water 24*7 safe to access with Households Incidence of drugs, substance abuse, suicides, suicides, abuse, drugs, substance of Incidence deaths alcohol Tourist arrival by bed nights arrival by Tourist Jobs created (non-farm) created Jobs CSMIs established (non-farm) established CSMIs 19.

-75- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

pecific support and interventions required from central agencies central requiredpecific from and interventions support S a) Provide trainers and expertise for entrepreneurship training, business business training, expertise entrepreneurship and trainers for a) Provide ancillary and support) land (finance, resources to access idea development, their of operationalization expedite to in order clearances regulatory and enterprises business a) Support training of engineers on climate/disaster proofing engineering engineering proofing climate/disaster on engineers of training a) Support climate/ promote to technology & products b) provide and & designing, with c) Collaboration houses and infrastructures, buildings proofed other service and (BPC providers) Thromde Support to a) train planning officers, and b) provide oversight and oversight provide and b) officers, planning a) train to Support on up & follow implementation card score Community of monitoring service delivery per LGs’ as results the report of improvement Support to a) train LGs, and b) provide oversight and enforcement of LG LG of enforcement and oversight b) provide and LGs, a) train to Support in participation periodically people’s ensuring to rules regulations and Act, the Zomdu on up follow and grievances submitted, and decision-making & implementation actions of in terms resolutions Support to provide civil servants as per the approved staffing pattern pattern staffing civil servants per as the approved provide to Support a) Support to simplify and enhance service delivery, and bring on board board on bring and service enhance and simplify to delivery, a) Support and platforms, online through manually services provided more currently services window one manage to mandated personnel b) train a) Support provision of technical expertise to implement Bus Rapid Rapid Bus technical expertise of implement to provision a) Support support b) Thimphu, for infrastructures/facilities and system Transport Intelligent implement technical expertise and of plan to provision and to develop technicalsupport provide c) Thimphu for system Transport system transport public proper introduce gencies A MoEA, MoLHR, NGOs MoLHR, MoEA, MoWHS, DDM DDM MoWHS, and BT BPC, (MoHCA), serviceother providers GNHC DLG, MoHCA MoHCA DLG, RCSC & respective & respective RCSC Central agencies PSGRD, Office of PM & Office PSGRD, Cabinet MoIC/Bhutan Post MoIC/Bhutan gender, by attendance PI whichK PI need support central strong/critical Women entrepreneurship skills development entrepreneurship Women Critical public infrastructure (schools, hospitals and and hospitals infrastructure (schools, Critical public proofed climate/disaster roads) Community score card tool implemented tool card score Community a) Zomdu b) Grievances registered with Thromde resolved Civil servant position not filled not Civil servant position Commonly availed services per as availed TAT Commonly delivered congestion vehicle reduce to a) Initiatives (Bus transport in public b) Ridership

-76- Twelfth Five Year Plan (2018-2023), Thimphu Thromde

20. Common Minimum Infrastructures

Sl. No. Activity Plan Outlay (Nu. in Million) 1 Common Service Duct 30.00 Total 30.00

-77-