New Project Addition Revision 1 As of NJTPA 8/4/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:N/A DBNUM: N1904 Name: Bayonne Commuter Ferry Pier and Dock Improvements Construction of Ferry Pier and Dock Improvements including upland improvements and ADA compliant walkway to Ferry Barge gangway system. Counties: Hudson Municipalities: Bayone City NJDOT CIS Category: Multimodal Programs RCIS Category: Transit Enhancement Sponsor: City of Bayonne Air Quality Code:

Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $1.643 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 CON OTHER $.986 CON SECT 5307 $.657 $1.643

Hudson Page 1 of 14 New Project Addition Revision 1 As of NJTPA 2/10/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:0.0 - 0.07 DBNUM: N1402 Name: Clay Street over the Clay Street Bridge over the Passaic River is a swing span and was built in 1908. The bridge carries two 18’-4” foot wide lanes of traffic and two 9’-2.5” wide pedestrian . The bridge is structurally deficient due to the serious condition of the superstructure. The overall condition rating of the bridge is “3 – Serious” due to the serious condition of the superstructure and low inventory ratings. It has a sufficiency rating of 33.0. The preferred alternative includes widening and replacement of the Clay Street Bridge along the existing alignment. The proposed structure would be a movable bridge on the existing profile. The movable bridge would span only one of the existing 75-foot wide waterway channels under the Clay Street Bridge. The typical section of the new bridge will be 68’-0”, which will include two 12-foot wide eastbound lanes, one 12-foot wide westbound lane, an 8-foot wide outside in each direction, and a 6-foot wide in each direction. Counties: Hudson Essex Municipalities: Newark City East Newark NJDOT CIS Category: Local System Support RCIS Category: Sponsor: Hudson County Air Quality Code: S19 (Exempt) Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $2.000 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 PE STBGP-NY/NWK $2.000 DES STBGP-NY/NWK $7.000 ROW STBGP-NY/NWK $.100 CON STBGP-NY/NWK $55.100 $2.000 $62.200

Hudson Page 2 of 14 New Project Addition Revision 1 As of NJTPA 2/10/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: CR 508 Mileposts:12.27 DBNUM: N1602 Name: CR 508 (Bridge Street), Bridge over Passaic River The historic structure was built in 1913 and rehabilitated in 1981. The structure is structurally deficient and functionally obsolete. 2 lanes with an overall roadway width of 39.5'. The bridge is eligible for placement on the National Register of Historic Places.

C C C C C C C C C

i i i Counties: i i i i i i

t t t t t t t t t

y y y y y y y y y

S S S S S S S S S CO507 u u u Essex Hudson u u u u u u

b b b b b b b b b

w w w w w w ST ORANGE w w w

a a a a a a a a a

y y y Municipalities: y y y y y y KEARNY NJ21 Newark City Harrison Twp NJ58 EAST NEWARK CO508 NJDOT CIS Category: Local System Support xx LLiiinnee oorrrriiiss & Esssseexx LL N1602 Moorrrr RCIS Category: CO510 Bridges PATTH HARRISON NEWARK U Sponsor: Essex County rrr oo iiidd rrriii rrr Air Quality Code: oo CC ttt ss S19 (Exempt) aa ee hh US1 ttthh rrr oo Est. Total Project Cost: NN NJI-9T NJ27 (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $9.000 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 PE STBGP-NY/NWK $2.000 DES STBGP-NY/NWK $7.000 ROW STBGP-NY/NWK $.100 CON STBGP-NY/NWK $77.000 $2.000 $7.000 $77.100

Hudson Page 3 of 14 New Project Addition Revision 1 As of NJTPA 2/10/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts: DBNUM: N2101 Name: Ferry Slip Reconstruction at the CRRNJ Terminal State Historic Site - Phase 1 The Ferry Slip Reconstruction – Phase 1 project includes engineering/design, mobilization; demolition and construction of Pier 5 / fender rack, access platforms; railing, lighting and electric. Through an interagency agreement, NJDOT – Office of Marine Resources will provide project management. Once the slip is completed, the daily public ferry service connecting Liberty State Park, Ellis Island and the Statue of Liberty can be relocated to this slip. The ferry slip will also provide additional ferry landing options for tourism, special events, and emergency situations. The NJDEP received approval of the FTA FY19 Ferry Passenger Grant Program in the amount of $6M to facilitate Phase 1 - Ferry Slip Reconstruction at the CRRNJ Terminal State Historic Site, Liberty State Park, Jersey City, Hudson County. The NJDEP will provide a 20% match from the NJ State Parks capital funds (Corporate Business Tax). Counties: Hudson Municipalities: Jersey City NJDOT CIS Category:

RCIS Category: Transit Enhancement Sponsor: NJDEP Air Quality Code: MT8 (Exempt) Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $7.432 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 ERC OTHER $1.532 ERC SECT 5307 $5.900 $7.432

Hudson Page 4 of 14 New Project Addition Revision 1 As of NJTPA 6/7/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:N/A DBNUM: N1603 Name: Avenue Retaining Wall The Manhattan Avenue Retaining walls were built between 1912 and 1914. The walls, located at JFK Blvd East, River Rd, Manhattan Ave and Paterson Plank Rd, were constructed to protect Manhattan Avenue and stabilize the Palisades Cliffs and range to a height of 42 feet. In 2007, after a heavy rainstorm a 200 ft. section of the wall collapsed and fell onto Manhattan Avenue closing the entire roadway for a period of 10 days. The LCD study revealed that the retaining walls are in overall poor condition. There are vertical cracks, loose stones, inadequate drainage, clogged weepholes and large hollow sounding areas. The purpose of this project will be to reinforce and modernize the walls to improve safety, stabilize the rock cliffs behind the walls to prevent rock slides and slope failures and improve drainage. CO503 CLIFFSIDE PARK Counties: 3 CO505 I-95 Hudson T RUTHERFORDRUTHERFORD Municipalities: Union City NJTP NJDOT CIS Category: NJ495 Local System Support CO501 WEST NEW YORK RCIS Category: N1603 Road Enhancement WEEHAWKEN US1 Sponsor: Hudson County Air Quality Code: NJ7 NJ139 HOBOKEN S2 (Exempt) I-78 US1T Est. Total Project Cost: 440 (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $3.500 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 PE STBGP-NY/NWK $1.200 DES STBGP-NY/NWK $2.300 ROW STBGP-NY/NWK $3.000 CON STBGP-NY/NWK $45.000 $1.200 $2.300 $48.000

Hudson Page 5 of 14 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:N/A DBNUM: 11407 Name: PANY&NJ-NJDOT Project Program Under this program, also known as the Access Program (LTAP), the Port Authority of NY & NJ provided funding support, in the amount of $1.8 billion, for improvements to three NJDOT facilities: Route 7, (Wittpenn) Bridge; Route 1&9T Extension (New Road); and Route 1&9 Pulaski Skyway including Route 139 (Hoboken and Conrail ) eastern approach to the Skyway. The State of NJ is also providing funding, from the TTF, to complete work on the projects.

The Route 7 is being replaced with a new vertical lift bridge. The total project cost is estimated at $575 to $625 million. The project is located in Kearny and Jersey City, Hudson County. The Route 1&9T Extension (New Road) project will provide a new roadway parallel to Route 1&9 along the railroad right-of-way in Jersey City. It will provide intermodal connections to the rail yards and divert trucks off of Tonnelle Circle and Route 1&9, helping to ease congestion and facilitate goods movement throughout the region. The total project cost is estimated at $400 to $450 million. The project is located in Jersey City, Hudson County.

The Route 1&9 Pulaski Skyway project is rehabilitating the 3.5 mile-long structure that carries Route 1&9 over the Hackensack and Passaic Rivers, the Turnpike, several railroads and industrial facilities. Also included in the Pulaski Skyway project is the Route 139 eastern approach to the Skyway. The Route 139 portion rehabilitated the Hoboken , as well as replaced the deck and rehabilitated the superstructure of the Conrail Viaduct. The total Pulaski Skyway project cost is estimated at $1.9 to $2.1 billion. The project is located in Jersey City, Kearny, and Newark in Hudson and Essex Counties. NJCO507CO506NJ721 NJ17 EAST RUTHERFORD Counties: NJTP NJ495 Hudson Essex CO505 Municipalities: KEARNY Jersey City Newark City Kearny US1 Town CO501 I-280 NJDOT CIS Category: CO508 Bridge Assets HARRISON 11407 RCIS Category: NJ139 Bridges US1T I-78 NEWARK Sponsor: JERSEY CITY I-95 JERSEY CITY NJDOT NJ440 Air Quality Code: 2030M (Non-Exempt) Est. Total Project Cost: (Million) $871.500

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $398.000 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 ERC STATE $98.000 $100.000 $100.000 $100.000 $473.500 $98.000 $100.000 $100.000 $100.000 $473.500

Hudson Page 6 of 14 Revision 1 As of 10/26/2020 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: CR 681 Mileposts:4.33-4.33 DBNUM: 16307 Name: Paterson Plank Road (CR 681), Bridge over Route 3 at MP 10.04 Initiated by the Bridge Management System, this project will reconstruct the structurally deficient and functionally obsolete bridge. PP nnn PP 111 lll 333 V VV CCC aa sss 22 333 VVV C CC nn nn rrr ll l nn ttt nn rrrddd aaa lll kk ttt dd ddd lll kk dd lll iii llelee iii eee kkk yyy aaa Counties: yyy aa aaa zzz mmm CC SS lalazalalazalalaza mmm PP ooo eee ttt PP rrr eee ttt P P P rrr aaa P P P C dd aaa P P P kk ee ttt rrrkk CCC ee aaa ttt l l l rrr CCC Hudson nn aaa l l l nn aaa eee l l l nn eee a a a ttt eee a a a tttee rrr a a a ttteerrr rrr R R ParkPark rrr RR z z z PaPa RR z z z PaPa z z z

a a a yyy ooo a a a ttt yyy ooo a a a sss ttt uuu oo nnn ttt oo nnn ttteee uuu Municipalities: 333 ooo 333 nn CCC hh CCC oo JJJ Secaucus Town

ss PP fffyy eetttee ffffff NJDOT CIS Category: ttteerrrss aa ssoonn DD ddooww nn eeaadd nn M Bridge Assets DDoorrriii rrrmoo rrriiiggoo HHaarrr NJ3 SECAUCUS 4433 RCIS Category: NJTP rrr Bridges ooo sss ddd nnn iiinnn 16307 WW Sponsor:

555 NORTH BERGEN 999555 ---999 NJDOT III---

55 449955 III---44 Air Quality Code: UU eee nini ddd onon kkk ddd onon kkk iii eee eee S19 (Exempt) SSS eee eee tt t rrr ttt rrr sss CCC NJ495 C C C eee eee

nnn nnn WW rrr WW rrr Est. Total Project Cost: ooo ooo lll llll hhh hhh eee nnn nnn DDD eee eee (Million) $15.900

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $2.300 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 PE STBGP-OS-BRDG $1.000 DES STBGP-OS-BRDG $1.300 CON STBGP-OS-BRDG $13.600 $2.300 $13.600

Hudson Page 7 of 14 THIS PAGE HAS BEEN REPLACED BY REVISION 1 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: CR 681 Mileposts:4.33-4.33 DBNUM: 16307 Name: Paterson Plank Road (CR 681), Bridge over Route 3 at MP 10.04 Initiated by the Bridge Management System, this project will reconstruct the structurally deficient and functionally obsolete bridge. PP nnn PP 111 lll 333 V VV CCC aa sss 22 333 VVV C CC nn nn rrr ll l nn ttt nn rrrddd aaa lll kk ttt dd ddd lll kk dd lll iii llelee iii eee kkk yyy aaa Counties: yyy aa aaa zzz mmm CC SS lalazalalazalalaza mmm PP ooo eee ttt PP rrr eee ttt P P P rrr aaa P P P C dd aaa P P P kk ee ttt rrrkk CCC ee aaa ttt l l l rrr CCC Hudson nn aaa l l l nn aaa eee l l l nn eee a a a ttt eee a a a tttee rrr a a a ttteerrr rrr R R ParkPark rrr RR z z z PaPa RR z z z PaPa z z z

a a a yyy ooo a a a ttt yyy ooo a a a sss ttt uuu oo nnn ttt oo nnn ttteee uuu Municipalities: 333 ooo 333 nn CCC hh CCC oo JJJ Secaucus Town

ss PP fffyy eetttee ffffff NJDOT CIS Category: ttteerrrss aa ssoonn DD ddooww nn eeaadd nn M Bridge Assets DDoorrriii rrrmoo rrriiiggoo HHaarrr NJ3 SECAUCUS 4433 RCIS Category: NJTP rrr Bridges ooo sss ddd nnn iiinnn 16307 WW Sponsor:

555 NORTH BERGEN 999555 ---999 NJDOT III---

55 449955 III---44 Air Quality Code: UU eee nini ddd onon kkk ddd onon kkk iii eee eee S19 (Exempt) SSS eee eee tt t rrr ttt rrr sss CCC NJ495 C C C eee eee

nnn nnn WW rrr WW rrr Est. Total Project Cost: ooo ooo lll llll hhh hhh eee nnn nnn DDD eee eee (Million) $15.900

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $2.300 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 PE STBGP-OS-BRDG $1.000 DES STBGP-OS-BRDG $1.300 CON STBGP-OS-BRDG $13.600 $1.000 $1.300 $13.600

Hudson Page 8 of 14 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: 440 Mileposts:21.2-21.3 DBNUM: 17356 Name: Pedestrian Bridge over Route 440 The purpose of this Concept Development study is to comply with federal regulations, which is to determine the purpose and need of the pedestrian crossing over Route 440; agree to a preferred alternative; and to identify the appropriate environmental document needed to advance the project through the construction work phase.

The following federal appropriation was allocated to this project: DEMO ID# NJ 272. rrr 44 ttthh 44 ttthh ttthh ttthh PP rrr nnn 44 rrrdd 4444 hh 4466 hh hh hh oo aaa 4422 44 66ttt rrrttt aaa eee 22nn ttthh ttthh ttt JJ PPP nndd JJee PPP K K dd eerrrss 999 ssee FFF 666 PP eeyy FFF 666 uu yy Counties: 111 lllaa JJJ aass eee sskk 44 ttetee kiii 1s1s NJ169ttt 33 ttt uuu 99 44 ooo CO501ttthh 4400 Hudson 33 ttt R RR 3377 3388 ttthh ttthh 88ttt eee hh ttthh ttt aaa ttt SSS RR 3366 SSS Municipalities: oooo 66ttthh ooss ttthh LL ssee iiinn vvee ccoo eelllttt Bayonne City NN oolllnn ttt ee lllnn 3355 wwaa 55ttt aarrr ttthh kk 3344 CC BBaa 44ttt CCee aayy ttthh NJDOT CIS Category: eenn 33 tttrrr 33 11ss rrree 332n2n 3333 ttt 2n2n AAA ttt 2n2 rrr AAA ttt ndd rrrdd AAA dd ccc ccc Multimodal Programs ccc ccc 33 eee 3300 eee 00 sss ttthh aaa 17356 sss hh aaa 17356 sss aaa sss nnn sss llnlnn EEE RCIS Category: 22 99ttt W ttthh iii CC 22 22 iiilllllloo HH CCrrrooss BAYONNE 77ttt 88 ooww aarrr ssss ttthh ttthh rrrrrriiiss Bike/Ped oonn 266ttt ttthh SStttaa tttaannllleeyy 2255 Sponsor: 55 NNN ttthh NNN eee EEE eee www eee www hh vvv eee NJDOT

uuu H H H ooo uuu HHH rrr nnn nnn ooo GG eee ooo ooo vvv ooo kkk AAA kkk

22 A AA 33 yyy AAA Air Quality Code: 33 aaa rrr aaa ccc dd ccc ww ccc CCC ww ccc ddd eee 22 ddd eee 2222 eee aaa 22 eee aaa sss nn uuu ooo sss O10a, AQ2 (Exempt) nn uuu ooo yyy sss dd rrr yyy sss nnn aaa eee BB aaa eee eee vvv ttteee www vvv ttt lll nnn iii AAA nnn NN iii HH ee aaa HH ooo ttt eeww aaa oo ccc RRR oo Est. Total Project Cost: MM hhh RRR oo 22 MM hhh ggg eee kk 00 ll l ccc ggg kk ttt ccc ggg ppp nnn ttthh eee rrr ggg ppp FFF rrr hh eee eee sss rrr uuu eee eee DDD rrr ooo eee eee hhh rrr GG uuu hhh (Million) $4.865

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $4.620 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 CD DEMO $.500 DES DEMO $.350 CON DEMO $3.550 CON OTHER $.220 $.245 $.500 $.350 $3.550 $.220 $.245

Hudson Page 9 of 14 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: CR 659 Mileposts:0.5-1.4 DBNUM: 97005B Name: Portway, Fish House Road/Pennsylvania Avenue, CR 659 This project provides roadway reconstruction. The project includes two 12-ft lanes, and a 12-ft shoulder, Eastbound and Westbound, along Pennsylvania Avenue/Fish House Road. Sidewalks will be provided along the Eastbound side of Central Avenue.

CO505 Counties: CO501 NJ21 NORTH BERGEN Hudson SECAUCUS Municipalities: Kearny Town

KEARNY NJDOT CIS Category: 08 I-280 97005B HOBOKEN HARRISON HOBOKEN Local System Support NJ139 RCIS Category: 0 Freight US1T

Newark I-95 Sponsor: NJTP NJDOT

NJ440 Jersey City Air Quality Code:

I-78 S4, S7 (Exempt) Est. Total Project Cost: (Million) $35.978

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $29.150 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 CON STBGP-FLEX $29.150 $29.150

Hudson Page 10 of 14 New Project Addition Revision 2 As of NJTPA 1/14/2021 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:N/A DBNUM: 08440 Name: Riverbank Park Bike Trail The purpose of the project is to improve the area of the Riverbank Park trail along Passaic Avenue from Bergen Avenue to the Belleville Turnpike. Counties: Boo nto Hudson n L BELLEVILLE ine BELLEVILLE CO507 Municipalities: NJ17 Kearny Town CO509 NJDOT CIS Category: BLOOMFIELD Multimodal Programs CO506 RCIS Category:

C i 08440 t Bike/Ped y NJ21

S NEWARK u NEWARK b Sponsor: w

a CO506SPUR y Kearny Town KEARNY NJ7 Air Quality Code: AQ2 (Exempt) N Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $1.820 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 CON * STATE-NJTPA $1.820 $1.820

Hudson Page 11 of 14 THIS PAGE HAS BEEN REPLACED BY New Project Addition Revision 1 As of REVISION 2 NJTPA 6/9/2020 Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: Mileposts:N/A DBNUM: 08440 Name: Riverbank Park Bike Trail The purpose of the project is to improve the area of the Riverbank Park trail along Passaic Avenue from Bergen Avenue to the Belleville Turnpike. Counties: Boo nto Hudson n L BELLEVILLE ine BELLEVILLE CO507 Municipalities: NJ17 Kearny Town CO509 NJDOT CIS Category: BLOOMFIELD Multimodal Programs CO506 RCIS Category:

C i 08440 t Bike/Ped y NJ21

S NEWARK u NEWARK b Sponsor: w

a CO506SPUR y Kearny Town KEARNY NJ7 Air Quality Code: AQ2 (Exempt) N Est. Total Project Cost: (Million) Not Available

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $1.820 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 CON * STATE-NJTPA $1.820 $1.820

Hudson Page 12 of 14 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: 3 / 495 Mileposts:10.33 DBNUM: 12386 Name: Route 3 & Route 495 Interchange Initiated from the Bridge Management System, this project will replace; the Route 495 Eastbound and Ramp B over Route 3 structure; and the bridge deck for the Route 3 Eastbound and South Service Road structure over Route 495 Ramp J. The project also includes safety and operational improvements within the Routes 3 and 495 interchange. eee hh eee hh eee 333 ee oo eee rrr oo eee rrr rrr CC JJJ rrr CC JJJ rrr CC lll lll 44 iiilll llll 77 GGG iii lll ttt GGG kkiii ttthh PP kk eee hh PPee aa eee Counties: eettt DDD ttteerrr mm DDD 44 rrrssoo ooww rrroo 66ttthh oonn eeaadd CCrrr ttthh DD nn Mee CC 44 DDoorrriii moonn 4455ttt Hudson iiiggoo HHaarrrm ttthh HH nnn 44 eee 44 ggg ttthh ggg hh rrr eee Municipalities: BBB rrr PP 4422 BBB ooo PPaa 22nn 44 sss aatttee dd 33rrr ddd rrrss 44 rrrdd nnn ssoo 4411 North Bergen Twp iiinnn oonn 11ssUS1 nn PP ssttt WW lllaann SECAUCUS nnkk 555 44 999 NJTP 4400 III--- NJ3 00ttthh III hh s III hh s NJDOT CIS Category: s t t t t t t t t t rr eee rr eee rr lllll eee lll eee eee eee bbb bbb nnn bbb UU ooo Bridge Assets UU ooo UU nnn ooo 555 kkk nnn 555 kkk nn 33 999 iii 33 RRR 999 eee iii oo 88 RRR 999 eee iiioo oo 88 RRR eee oonn 88ttthh eee nn TTT hh eee nn eee TTT rrr rrr

CCC C C C NJ495 RCIS Category: nnn nnn 12386 rrr 12386 rrr

ooo ooo

hhh hhh 3377 nnn 77 nnn yyy 77 nnn yyy ttytyy 33 ttthh Bridges eee ttt 33 hh eee 33 eee rrr eee rrr 44 Grand Grand Grand Grand eee ttt Grand Grand Grand Grand PPP ttt Grand PPP eee ttthh PPP ddd hh iii bbb iii SSS LLL ttt sss sss aaa Sponsor: aaa iii eee iii bbb bbb NORTH BERGEN WWW 33 mmm 33 mmm 33 mmm 22nn uuu dd uuu dd NJDOT lll yyy 2299 lll 99 ooo 99 ooo aaa ttt ooo aaa ttthh yyy CCC yyy www CCC ddd lll ddd iii 33 eee aaa 33 SS aaa 00ttt nnn iii RRR ttthh nnn iiipp Air Quality Code: R RR hh nnn eee SSS nnn SSS nnn SSS KKK rrr K KK t t t t t t eee t t t 33 eee aaa 33 eee aaa FFF 33 aaa FFF 1 hhh 22 F FF 1 hhh t t t 22 hhh t t t eee t t t eee 88 S19 (Exempt) ttt eee 88 JJJ eee JJJ eee ttt eee nnn ttthh uuu nnn hh

RRR aaa ooo RRR aaa ooo RRR aaa CO501 JJJ SSS t t t JJJ SSS t t t 22 t t t 22 AA 22 AA 66 22 AA 66 22 333 77 kkk m 333 77 kkk m 333 ttt 77 rr llklkk m ttthh kkk ttt oorr tttrrr hh rrr ttthh Est. Total Project Cost: oo ooo rrraa iii ddoo ooo aa iii ttt dd fff kk kkk iii rrriri rrr RR rr aa ww mmm oo ooo aaiii ww mmm C iiilllrrroo eee ttt NNN oo mmm CenCen ssttt NN (Million) $161.150

Unconstrained FY 2020 - 2023 TIP Cost: (Million) $0.000 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 DES NHPP $15.000 ROW NHPP $2.000 CON NHPP $144.150 $161.150

Hudson Page 13 of 14 NJTPA Transportation Improvement Program Fiscal Years 2020 - 2023 Routes: 7 Mileposts:1.7 - 3.6 DBNUM: 93186 Name: Route 7, Kearny, Drainage Improvements This section of Route 7 is generally uncurbed and frequently flooded due to low elevation and lack of sufficient highway drainage system. Roadway runoff is collected through inlets or sheet flow, discharging directly into the marshlands. During moderate and heavy storms, in addition to high tide, the runoff overflows the banks onto the roadway and adjacent properties. This causes the highway to be closed and traffic is detoured. This project will provide highway drainage system improvements including; pumping stations, raising road profile and sheet piling to prevent tidal water to flood the roadway. nnn

LL LLEVILLE NJ17 Counties: CO506 Hudson BB oo I-95 oo nn tttoo nn Municipalities: LL iiinn ee Kearny Town NJDOT CIS Category: 93186 NJTP SECAUCUS Road Assets RCIS Category: KEARNY rr iiiddoo Road Preservation rrrriiidd Coo ssttt C eeaass rrttthh Sponsor: Noo NJDOT CO508 I-280 Air Quality Code: HARRISON S4 (Exempt) ssss eexx LLiii iiinnee Est. Total Project Cost: H NEWARK US1 S1 (Million) $80.124 Unconstrained FY 2020 - 2023 TIP Cost: (Million) $28.400 Information Year PHASE SOURCE 2020 2021 2022 2023 2024-2029 ROW NHPP $3.400 CON NHPP $25.000 $46.000 $3.400 $25.000 $46.000

Hudson Page 14 of 14