Draft Environmental Impact Assessment Project Number: 45904-01 March 2011 PAK: JDW Co-Gen Power Project Prepared by ECTECH Environment Consultants for JDW Power (Pvt.) Ltd. The environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and maybe preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. JDW POWER (P) LIMITED, PAKISTAN 2 X 40 MW BAGASSE BASED COGENERATION PROJECT ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Prepared by: Suite# 4,2nd Floor, Link Arcade, Model Town Link Road, Lahore, Pakistan Phone No. 042-35887517-35925693, 35841688; Fax No. 042-35855508, Email:
[email protected] March -2011 EIA – JDW Power (Pvt.) Ltd., 80 MW Bagasse Based Cogeneration Power Project C O N T E N T S EXECUTIVE SUMMARY S1-S16 SECTION – 1 INTRODUCTION 1.1 1.1 Introduction 1.2 1.2 Scope of SEIA Study 1.3 1.3 Approach and Methodology 1.4 1.4 Identification of The Project And The Proponent 1.6 1.5 Study Team 1.7 1.6 Nature and Size of the Project 1.8 1.7 Location 1.8 1.8 Importance & Background of the Project 1.9 1.9 Type of the Project 1.12 1.10 Objectives of the project 1.12 1.11 Policy, Legal & Administrative Framework 1.13 A. National Legal Requirements 1.13 A1. Pakistan Environmental Protection Act, 1997 1.14 A2. Policy and Procedures for the Filing, Review and Approval of 1.15 Environmental Assessments A3.