METRO EAST PROJECTS December 2020 ONGOING PROJECTS GODFREY 255 I-70 FROM I-55/70 TO EAST OF I-55/70/270, AND I-55/70 FROM EAST OF 159 TO A NORTH OF I-270 C Scope: Resurfacing, ultra-thin bonded paving, and bridge repair and painting. BETHALTO Project Cost: $23,516,000 94 ALTON 140 Pardon our dust Project Duration: February 2021 – late fall 2021 while we Rebuild Illinois. Traffic Impacts: Single lane closures on I-55/70, I-55, I-70 and I-270. Weekend closures 67 159 of I-70 entrance and exit ramps. UPCOMING PROJECTS 55 B POPLAR STREET BRIDGE EASTBOUND COLLECTOR - DISTRIBUTOR RAMPS 111 Scope: Concrete overlay, patching, deck and expansion joints replacement. EDWARDSVILLE Project Cost: $29,800,000 143 Project Duration: Late fall 2020 – late fall 2021 CHOUTEAU Traffic Impacts: Lane closures anticipated on eastbound I-55/64 this winter including closure 270 ISLAND of the westbound I-55/64 ramp to Tudor Avenue for up to two weeks. 70 C ILLINOIS 111/3 FROM ALBY ST. TO BROADWAY IN ALTON F GLEN CARBON Scope: Resurfacing and patching. TROY Project Cost: $5,500,000 E Project Duration: Spring 2021 – late summer 2021 GRANITE CITY 255 A Traffic Impacts: All lanes open during winter. D ILLINOIS 3 FROM NORTH OF AVE. TO SOUTH OF RUBY ST. IN Scope: Resurfacing. COLLINSVILLE 55 4 Project Cost: $6,500,000 H Project Duration: Spring 2021 – fall 2021 ST. LOUIS Traffic Impacts: All lanes open during winter. B E ILLINOIS 157 FROM NORTH OF CHAIN OF ROCKS RD. TO NORTH OF HORSESHOE LAKE RD. Scope: Resurfacing. LEBANON D O’FALLON 50 Project Cost: $4,800,000 G FAIRVIEW Project Duration: Early spring 2021 – fall 2021 HEIGHTS Traffic Impacts: All lanes open during winter. SHILOH 64 F I-270 AT ILLINOIS 111 INTERCHANGE Scope: Interchange reconstruction. 161 Project Cost: $17,000,000 BELLEVILLE Project Duration: Summer 2021 – summer 2022 255 177 Traffic Impacts: All lanes open during winter. G ILLINOIS 157 FROM STATE ST. IN EAST ST. LOUIS TO PETROFF DR. IN CASEYVILLE N 158 MASCOUTAH 15 Scope: Resurfacing. $4,100,000 Projects Key Project Cost: Project Duration: Spring 2021 – fall 2021 Ongoing 4 Traffic Impacts: All lanes open during winter. Upcoming FREEBURG COMPLETED PROJECTS Completed SMITHTON H I-255 FROM COLLINSVILLE RD. TO ILLINOIS 15 Scope: Resurfacing and bridge repairs. Project Cost: Awarded $67,000,000 FAYETTEVILLE Project Duration: December 2019 – November 2020 Traffic Impacts: All lanes open.