Re-connecting people with the River : to Allington Lock Towpath creation

Pedro Braga MEng MSc Engineer

Flood & Coast 2017 Contents

 Scope

 Background

 Challenges

 Solutions Aylesford

Allington Lock Background • Once very busy river with the transhipment of goods Aylesford • Aylesford to Allington Lock is the Allington Lock only virtually abandoned strip

• Several previous attempts from County Council to reinstate the former towpath

• Currently part of The Kent County Council’s Countryside and Coastal Allington Access Improvement Plan

• Project delivered under the WEM Framework

• Local Enterprise Partnership (LEP) and Aylesford Parish Council local support

500m Path condition

Health and safety Accessibility Areas of concern for public safety Eventually impassable Path condition

Vegetation Width Uncontrolled and overgrown vegetation Restricted available space Retaining structures

Failure in various areas Deterioration Timber retaining structures have failed Sheet piling walls rotating Path condition

Flooding Daily tidal events flood the path Riverbank condition

Erosion Tidal has eroded the frontage Delivering together

Local ecological support

Cycle forum Providing a safe route

Finished levels above daily flood tidal level Drainage blanket to maintain floodplain connectivity Providing a safe route

12m steel - timber span bridge Flying over the main drainage pathway Providing a safe route

150m boardwalk Crossing over collapsed riverbanks Addressing river bank erosion

Willow stake bank stabilisation Current status

 Construction works started in November 2016

 CDM and technical support as Principal Designer

 Boardwalk and bridge already installed

 Embankment constructed in the majority of the route

 Construction programme scheduled to finish in April 2017 Conclusions

 Worked collaboratively with client and stakeholders to maximise budget

 New towpath provides local residents and Maidstone Cycle Forum with safe and environmentally sensitive route that enhances riverside amenity

 By summer 2017, the link between the villages of Aylesford and Allington, the River Medway and the public, will be accessible again Re-connecting people with the River Medway: Aylesford to Allington Lock Towpath creation

[email protected]