Basalt/Boulder &Crusher Stone Village- Manegaon, District-, BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT

The project is “Basalt/Boulder, Crusher Stone mining project” having mining lease area of 1.74 Ha at Khasra No.- 17,24 in Village- Manegaon, Tehsil & District - Jabalpur, State-Madhya Pradesh. The applicant is Shri. Andesh Jain Director of M/s - Wagad Infraprojects Pvt. Ltd. registered address Halmukam, Danawatri Nagar, Jabalpur, Madhya Pradesh.

The proposed mining area is 1.74 ha with the Capacity of 20,729 m3/year production for 5 years.

The project comes under „category-B2‟ (cluster situation) as per EIA Notification dated 14 September 2006 and its amendments thereof. Mining plan has been approved vide letter no. 4569-70/Mining Plan/N.K./2018, Jabalpur dated 12.12.2018 of 1.74 ha for production of 20729 cum/year production for 5years. The mining lease vide letter no.3087 Dated 4.08.2018 has been granted for lease period of 10 years only in favour of Shri. Andesh Jain S/o Shri Ashok Jain for production of Basalt/Boulder, crusher stone mining only. Application is being submitted to SEIAA, MP for obtaining TOR/EC. An application with Form-I, PFR, proposed TOR and necessary Annexures

Table 1: SALIENT FEATURES OF THE PROJECT Sl. Particular Details No. 1. Name of the project “Basalt/Boulder,Crusher Stone mine” 2. Size of the Project Area 1.74 ha Proposed Capacity Proposed production will 20729 cum/Annum (as per approved Mining Plan with Progressive Mine Closure Plan ) for the production for 5 yers Lease period of mine Lease has been granted for a period of 10 years 3. Method of Mining Method Opencast Method - Manual & mechanized Blasting / Drilling Controlled Blasting/drilling will be done. 4. Project Location Village Manegaon Tehsil Jabalpur State Madhya Pradesh Toposheet no. 55 M/16

Andesh Jain (Director) M/s Wagad Infraprojects Pvt. Ltd. 1

Basalt/Boulder &Crusher Stone Village- Manegaon, District-Jabalpur, Madhya Pradesh BRIEF SUMMARY OF THE PROJECT

Lease Area Coordinates Pillar No N E 1 23° 4'48.22" 79°54'31.42" 2 23° 4'47.97" 79°54'32.51" 3 23° 4'45.30" 79°54'32.04" 4 23° 4'41.33" 79°54'31.47" 5 23° 4'39.22" 79°54'31.49" 6 23° 4'39.37" 79°54'29.80" 7 23° 4'43.30" 79°54'29.10" 8 23° 4'44.37" 79°54'29.23" 9 23° 4'46.52" 79°54'30.02" 5. Project Cost Details Rs. 1.45 Crore 6. Water Requirement & its Source Water requirement for drinking, plantation and dust suppression met from Tanker supply during operation phase. Total water requirement will be approx. 10KLD. 7. Man Power 22 8. Environmental Sensitivity Nearest Village Manegaon– Approx. 0.5 km in NE direction. Nearest Town Jabalpur, Approx 11.0 Km-WSW Nearest National / State Highway National Highway (NH-07)- 0.20 km in East direction Nearest Railway Station Gwarighat Railway Station- Approx. 3.98 km in NE direction. Nearest Airport Jabalpur Airport – Approx. 17.75 km in NE direction Ecological Sensitive Areas (National None Park, Wild Life Sanctuaries, Biosphere Reserve etc.) within 15 km radius. Reserved Protected Forest Nonewithin 15 km radius Water bodies within 15 km radius of Yes the mine site. Approx:- 3.92 km, NE Bargi Dam Reserviour:- Approx. 15 km, S Bargi left canal Approx.:- 0.97km, NE

Archaeological Important Place None Seismic Zone III

Andesh Jain (Director) M/s Wagad Infraprojects Pvt. Ltd. 2