Final Report March 2015
Total Page:16
File Type:pdf, Size:1020Kb
WATER MANAGEMENT GOAL INVESTMENT STRATEGY Final Report March 2015 Water Management Goal Investment Strategy Final Report March 2015 Executive Summary Executive Summary The U.S. Department of the Interior, Bureau of Reclamation (Reclamation) initiated the Investment Strategy in support of the San Joaquin River Restoration Program (SJRRP) Water Management Goal. The purpose of the Investment Strategy is to identify projects that, in conjunction with other activities, could cost-effectively reduce or avoid water supply impacts to the Friant Division long-term contractors (Friant Contractors) as a result of releasing Restoration Flows. The objective of the Investment Strategy is to develop, evaluate, and prepare a prioritized set of implementable projects that could help achieve this goal. Reclamation, in collaboration with the Friant Contractors, identified, screened, developed, evaluated, and ranked over 500 project concepts to form a list of approximately 60 projects. Of these, approximately 20 projects were further evaluated as ready-to-implement Priority Projects. The Investment Strategy Report provides the following information and tools: • A list of Priority Projects evaluated at an appraisal level that support the Water Management Goal of the SJRRP. Each project document includes implementation requirements, as well as appraisal-level cost estimates and designs, which will allow Reclamation and project proponents to quickly advance these projects when funding opportunities arise. • Detailed evaluation criteria and metrics that represent a structured, repeatable, and scalable planning framework to evaluate projects of varying types and scales at different stages of development. The criteria and metrics are used to assess a project’s cost- effectiveness, ability to reduce Friant Contractors’ Recovered Water Account balances, implementation complexity, completeness in definition, and contribution to multi- purpose benefits. When Federal or other funding opportunities become available, Reclamation will consult the Investment Strategy for projects that could be implemented in whole or in part. Sources of Federal funds could include SJRRP Part III funds, other Reclamation funds, other Federal agency funds, state funds, and other opportunistic sources. Priority Projects that best meet the specific funding objectives and requirements will be selected; therefore, the Priority Projects will not necessarily be implemented in the order of their ranking. Should a Priority Project proponent decide to apply for a Reclamation- or self-identified funding opportunity, Reclamation will assist with the preparation of funding applications, as appropriate and practicable. The Investment Strategy is a living document that Reclamation will maintain and update. As projects are completed, they will be removed from the Priority Project list. A project may be removed, added, or updated per project proponent request at any time provided it is consistent with the Investment Strategy approach and evaluation criteria. Reclamation will perform an annual, high-level review and a comprehensive update every five years to ensure the Investment Strategy continues to be relevant and consistent with the priorities and needs of the SJRRP Water Management Goal. Investment Strategy 1 – March 2015 San Joaquin River Restoration Program Page left blank intentionally. 2 – March 2015 Investment Strategy Table of Contents 1.0 Introduction and Background ............................................................................. 1-1 1.1 Purpose ........................................................................................................... 1-1 1.2 Background .................................................................................................... 1-2 1.3 Authorization ................................................................................................. 1-3 1.4 Organization of this Report ............................................................................ 1-4 2.0 Evaluation Guidelines ........................................................................................... 2-1 2.1 Initial Project Screening ................................................................................. 2-1 2.2 Preliminary Evaluation and Initial Scoring.................................................... 2-2 2.2.1 Preliminary Evaluation Criteria and Metrics ..................................... 2-2 2.2.2 Initial Scoring..................................................................................... 2-3 2.3 Appraisal Evaluation and Refined Scoring .................................................... 2-6 2.3.1 Appraisal Evaluation Criteria and Metrics ........................................ 2-6 2.3.2 Refined Scoring ................................................................................. 2-6 2.3.3 Water Supply and Conveyance Competition ..................................... 2-6 3.0 2015 Investment Strategy Findings ..................................................................... 3-1 3.1 Stakeholder Engagement ............................................................................... 3-1 3.2 2015 Investment Strategy Development Process ........................................... 3-1 3.3 Initial Project Screening ................................................................................. 3-4 3.4 Preliminary Evaluation and Initial Scoring.................................................... 3-6 3.4.1 Priority Projects ................................................................................. 3-9 3.4.2 Projects not Evaluated Further ......................................................... 3-11 3.5 Appraisal Evaluation and Refined Scoring .................................................. 3-13 3.5.1 Appraisal Evaluation ........................................................................ 3-13 3.5.2 Scoring and Ranking ........................................................................ 3-13 3.5.3 Water Supply Competition and Conveyance Analysis .................... 3-19 3.6 Findings........................................................................................................ 3-24 4.0 Next Steps for Investment Strategy Implementation ........................................ 4-1 4.1 Intended Use of the Investment Strategy ....................................................... 4-1 4.2 Maintaining and Updating the Investment Strategy ...................................... 4-2 4.2.1 Ad Hoc Addendum ............................................................................ 4-2 4.2.2 Annual Reviews ................................................................................. 4-2 Investment Strategy i – March 2015 San Joaquin River Restoration Program 4.2.3 Five-Year Updates ............................................................................. 4-2 4.2.4 Summary ............................................................................................ 4-3 4.3 Funding Investment Strategy Projects ........................................................... 4-3 5.0 References .............................................................................................................. 5-1 Tables Table 2-1. Project Evaluation Criteria and Metrics ......................................................... 2-4 Table 2-2. Relative Weights for the Evaluation Criteria and Metrics ............................. 2-5 Table 3-1. Investment Strategy Meetings ........................................................................ 3-2 Table 3-2. Priority Projects Identified for Further Evaluation ....................................... 3-10 Table 3-3. Retained Projects Not Evaluated Further in the Investment Strategy .............................................................................................................. 3-12 Table 3-4. Summary of Priority Projects and Scores ..................................................... 3-17 Table 3-5. Water Supply Sources for Priority Projects.................................................. 3-20 Table 3-6. Summary of Priority Projects Yield, Cost, and Cost- Effectiveness ...................................................................................................... 3-24 Figures Figure 2-1. Investment Strategy Evaluation Process ...................................................... 2-1 Figure 3-1. 2015 Investment Strategy Development Process .......................................... 3-3 Figure 3-2. Water Management Areas and Friant Contractor Boundaries ...................... 3-5 Figure 3-3. Geographical Distribution of Screened Initial Projects and Retained Projects ................................................................................................. 3-6 Figure 3-4. Locations of Retained Projects Evaluated During the Preliminary Evaluation Phase .............................................................................. 3-8 Figure 3-5. Process for Selecting Priority Projects .......................................................... 3-9 Figure 3-6. Location of Priority Projects with Corresponding Project Types .................................................................................................................. 3-11 Figure 3-7. Summary of Priority Project Evaluation Results, Compared to the Preliminary Evaluation Results .................................................................... 3-15 Figure 3-8. Priority Projects Rankings using the Overall Composite- Weighted Score .................................................................................................