SUBJECT TO REVISION

Wyoming Water Development Commission & Select Water Committee Meeting WWDO Conference Room 6920 Yellowtail Road, Cheyenne, WY May 16-17, 2019

Audio only links for the workshop and meeting can be found on our website: http://wwdc.state.wy.us/ Please check back for any updates to the E-Notebook materials on our website.

Workshop Agenda: Thursday May 16, 2019, 1:30 p.m.:

1. Call to Order

2. Audience Introductions

3. Savery Creek Instream Flow (N)

4. Aladdin Water District Well and Water Service Contract (see tab V)

5. Consultant Selection Procedures with Passage of SF0074 (O)

6. Colorado River Drought Contingency Plan (P)

Meeting Agenda: Friday, May 17, 2019 8:30 a.m.:

1. Call to Order

2. Recognition of Members present to establish quorum

3. Audience Introductions

4. Election of WWDC Officers and SWC Chair and Vice-Chair

5. Approval of Minutes (Q) • March 14, 2019 – Workshop Minutes • March 15, 2019 – Meeting Minutes

6. Planning Projects Consultant Selection and Contract Approval (R) • Crook County Rural Water Supply Plan

7. Planning Amendments (S) • Clear Creek Storage Study, Level II, Phase II, Amendment No. 5 • Little Snake Supplemental Storage, Level II, Amendment No. 6 (West Fork) • Powder Tongue & NE RBP Groundwater Update, Amendment No. 2

1 | Page SUBJECT TO REVISION

8. Closeout Memos (T) • Niobrara/Lower North Platte Rivers Watershed Study • Sunlight Basin Instream Flow Study

9. Construction Amendments (U) • Bluff/Upper Bluff System Improvements, Amendment No. 1 • Casper Zone 3 Improvements, Amendment No. 1 • Middle Piney Reservoir, Amendment No. 11

10. Aladdin Water District Well and Water Service Contract (V)

11. Colorado River Basin MOA Applications Update (W)

12. Colorado River Basin MOA Budget Modifications (XYZ)

13. Authorization for the Acting Director to file Instream Flow water right applications with the State Engineer’s Office (II) • Burroughs Creek Instream Flow Segment No. 1 • Middle Fork Long Creek Instream Flow Segment No. 1 • Sheridan Creek Instream Flow Segment No. 1 • Stonefly Creek Instream Flow Segment No. 1 • West Fork Long Creek Instream Flow Segment No. 1

14. 2020 Planning Level I and II Project Applications Level I Projects – New • Bridger Valley Regional Water Master Plan, Level I (JJ) • Cody Water Master Plan, Level I (KK) • LaGrange Water Master Plan, Level I (LL) • Lower Shoshone Watershed Study, Level I (MM) • Pavillion Water Master Plan, Level I (McMc) • Pinedale Water Master Plan, Level I (NN) • Shoshoni Water Master Plan, Level I (OO)

Level II Projects – New • CWRWS JPB Groundwater Disinfection, Level II (PP) • Happy Valley Water Supply, Level II (QQ) • Skyline ISD Water Supply, Level II (RR) • South End Water Users ISD Transmission Project, Level II (SS)

Level I Projects – Rehabilitation • Owl Creek Irrigation District Lucerne Master Plan, Level I (TT)

Level II Projects – Rehabilitation • Highland Hanover Irrigation District Pump Station, Level II (UU)

2 | Page

SUBJECT TO REVISION

15. Construction Project Progress Report (VV) • Buffalo Main Street Pipeline • Buffalo Tank Valve • Lusk Water System Improvements 2018 • Thayne Tank 2017

16. UW Water Research Program (WW) • Consideration of 2020 RFP for the UW Water Research Program

17. Intended Use Plan (IUP) – Drinking Water State Revolving Fund (DWSRF) – SWC (XYZ 2)

18. Discussion • Silver Lake Dam Rehabilitation/NRCS WFPO Watershed Plan • Interim Topics for Select Water Committee o Instream Flow o Beneficial Use of Water 19. Future Meetings Schedule (DD) • August 14-16, 2019 – Buffalo, WY • Hotel Reservations have been made at the Hampton Inn in Buffalo for WWDC and SWC – please let Katie know your travel/attendance plans. You will provide your credit card at check-in.

3 | Page WATER DEVELOPMENT COMMISSION COMMISSIONERS March 2019

Vacant Water Division IV

Vacant Water Division I

Gerald Geis (R) (3/1/21) Water Division III 600 Holly Avenue Worland, WY 82401 (H) 307-347-6443

Clinton W. Glick (R) (3/1/22) Wind River Indian Reservation P.O. Box 1308 Fort Washakie, WY 82514 (C) 307-349-0103

Kellen Lancaster (R) (3/1/21) Water Division IV 287 Star West Drive Afton, WY 83110 (C) 307-887-1400

Sheridan Little (R) (3/1/23) Water Division II P.O. Box 165 Leiter, WY 82837 (C) 307-620-0923

Mike Purcell (R) (3/1/21) Member-at-Large 317 Palm Springs Ave. Cheyenne, WY 82009 (H) 307-638-1118 (C) 307-630-7121

Larry Suchor (R) (3/1/21) Water Division II 21 Spruce Street Pine Haven, WY 82721 (H) 307-756-9491

Rodney K. Wagner (R) (3/1/21) Water Division I 3715 Road 86 Lingle, WY 82223 (H) 307-837-2786

Bill Yankee (I) (3/1/23) Water Division III 123 Dallas Dome Rd. Lander, WY 82520 (H) 307-332-6305 (C) 307-330-7922

WYOMING WATER DEVELOPMENT COMMISSION

COMMISSIONERS Vacant Water Division IV Vacant Water Division I Gerald Geis Water Division III Clinton W. Glick Wind River Indian Reservation Kellen Lancaster Water Division IV Sheridan Little Water Division II Mike Purcell Member-at-Large Larry Suchor Water Division II Rodney Wagner Water Division I Bill Yankee Water Division III

STAFF Jason Mead Acting Director Andrea Odell Administrative/Fiscal Manager Janet Belmonte Accountant Nancy Casner Office Support Specialist

Barry Lawrence Deputy Director – Planning Kevin Boyce Project Manager Keith Clarey Project Manager Julie Gondzar Project Manager Jodie Pavlica Project Manager Katie Talbott Outreach Coordinator Chace Tavelli Project Manager

Jodee Pring Supervisor-River Basin Planning Peter Gill Project Manager Mabel Jones Project Manager

Jason Mead Deputy Director – Dams & Reservoirs Andrew Linch Project Manager Tony Rutherford Project Manager Brian Smith High Savery Dam Technician

Bryan Clerkin Deputy Director – Construction Bill Brewer Project Manager Jason Fernandez Project Manager Keenan Hendon Project Manager Walter Kramb Project Manager Wade Verplancke Project Manager

ADVISORS Andrew Kuhlmann Attorney General’s Office Rick Deuell Acting State Engineer Greg Kerr Shawn University of Wyoming Reese Wyoming Business Council SELECT WATER COMMITTEE REVISED 05/08/19

Senator Wyatt Agar (R) Representative Hans Hunt (R) Hot Springs County Weston County 3292 Grass Creek Rd. 1347 Old Highway 85 Thermopolis, WY Newcastle, WY 82701 (H) 921-8825 (H) 746-8899 [email protected] [email protected]

Senator Liisa Anselmi-Dalton (D) Representative Stan Blake (D) Sweetwater County Sweetwater County 1735 Collins Street PO Box 774 Rock Springs, WY 82901 Green River, WY 82935 (H) 362-1189 (H) 875-3779 [email protected] [email protected]

Senator Dan Dockstader (R) Representative John Eklund (R) Lincoln/Teton/Sublette Counties Laramie County PO Box 129 2918 U.S. Highway 85 Afton, WY 83110 Cheyenne, WY 82009 (H) 886-1500 (W) 885-5727 (H) 246-3251 [email protected] [email protected]

Senator Ogden Driskill (R) Representative Dan Laursen (R) Crook/Weston/E. Campbell Counties Park County PO Box 155 478 Road 8 , WY 82714 Powell, WY 82435 (H) 467-5555 (C) 680-5555 (C) 754-9805 [email protected] [email protected]

Senator Larry Hicks (R) Representative Jerry Paxton (R) Albany/Carbon/Sweetwater Counties Carbon County PO Box 413 PO Box 692 Baggs, WY 82321 Encampment, WY 82325 (H) 383-7192 (H) 327-5373 [email protected] [email protected]

Senator Glenn Moniz (R) Representative Evan Simpson (R) Albany County Lincoln County PO Box 784 PO Box 678 Laramie, WY 82073 Afton WY 83110 (H) 745-4711 (C) 760-1116 885-5588 [email protected] [email protected]

Alternate Representative Jamie Flitner (R) Big Horn County 3541 Lane 32 Greybull, WY 82426 (H) 765-2148 [email protected]

Alternate Representative Jim Roscoe (I) Lincoln County Box 1789 Wilson, WY 83014 [email protected]

SNJJ/Select Water Committee

Bill No.: SF0074 Effective: July 1, 2019

LSO No.: 19LSO-0345

Enrolled Act No.: SEA No. 0070

Chapter No.: 185

Prime Sponsor: Case

Catch Title: Professional services procurement.

Subject: Procurement of professional architectural, engineering and land surveying services.

Summary/Major Elements:

 This act amends the Professional Architectural, Engineering and Land Surveying Services Procurement Act (Act).  The act: o Requires agencies to select resident firms for professional services unless less than three (3) firms are resident firms or if the resident firms are determined not qualified by the agency; o Specifies that the preference to resident firms shall not apply to the extent a proposed project will utilize funds, the receipt of which is conditioned to prohibit a residency preference; o Requires contracts for professional services entered into by an agency to contain a certification by the resident firm that it will comply with certain residency requirements; o Defines "resident firm" to mean a firm that: . Possesses a physical office within the State that is staffed by individuals with professional and technical expertise who are employed in the State; . Certifies that if selected for the project a specified percentage of the contract costs for professional services shall be performed by individuals or consultants employed in the State who will perform their labor or professional services provided under the contract within the boundaries of the State. o Defines "agency" for purposes of the resident preference provisions within the Act to mean those entities specified in W.S. 9-2-1028 including the University of Wyoming, community college districts, the Wyoming Business Council and the Wyoming Department of Transportation.

The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent. While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill. ORIGINAL SENATE ENGROSSED FILE NO. SF0074

ENROLLED ACT NO. 70, SENATE

SIXTY-FIFTH LEGISLATURE OF THE STATE OF WYOMING 2019 GENERAL SESSION

AN ACT relating to professional services procurement; modifying residency requirements related to the procurement of professional architectural, engineering and land surveying services as specified; providing a definition; modifying applicability of residency requirements; modifying contract requirements as specified; and providing for an effective date.

Be It Enacted by the Legislature of the State of Wyoming:

Section 1. W.S. 9-2-1028(a)(i), by creating a new paragraph (vi) and by renumbering (vi) to (vii), 9-2-1031(a) and by creating new subsections (f) and (g) and 9-2-1032 by creating a new subsection (g) are amended to read:

9-2-1028. Definitions.

(a) As used in this act:

(i) "Agency" means any state office, department, board, commission, institution or other operating entity of the state excluding, except as otherwise provided in W.S. 9-2-1031(f) and 9-2-1032(g), the University of Wyoming, community college districts, school districts, the Wyoming business council and the Wyoming department of transportation;

(vi) "Resident firm" means a firm that:

(A) Possesses a physical office within the state that is staffed by individuals with professional and technical expertise who are employed in the state; and

(B) Certifies in the firm's current statement of qualifications or application that if selected for the

1 ORIGINAL SENATE ENGROSSED FILE NO. SF0074

ENROLLED ACT NO. 70, SENATE

SIXTY-FIFTH LEGISLATURE OF THE STATE OF WYOMING 2019 GENERAL SESSION

project the percentage of the contract costs for professional services specified in this subparagraph shall be performed by individuals or consultants employed in the state who will perform their labor or professional services provided under the contract within the boundaries of the state. The individuals who will perform the professional services shall possess the professional and technical qualifications necessary to perform the work required by the contract. The following percentages shall apply to this subparagraph:

(I) For any projects with project contract costs in an amount equal to twenty million dollars ($20,000,000.00) or less - fifty percent (50%) of the contract costs;

(II) For capital construction projects with construction contract costs in an amount greater than twenty million dollars ($20,000,000.00) but less than forty million dollars ($40,000,000.00) - forty percent (40%) of the contract costs;

(III) For capital construction projects with construction contract costs in an amount equal to forty million dollars ($40,000,000.00) or more - thirty percent (30%) of the contract costs.

(vi)(vii) "This act" means W.S. 9-2-1027 through 9-2-1033.

9-2-1031. Selection procedures.

(a) For each proposed project, the principal representative of the agency for which the project is proposed shall evaluate current statements of qualifications and performance data of firms on file with the department or the

2 ORIGINAL SENATE ENGROSSED FILE NO. SF0074

ENROLLED ACT NO. 70, SENATE

SIXTY-FIFTH LEGISLATURE OF THE STATE OF WYOMING 2019 GENERAL SESSION

agency, together with any applications submitted by other qualified firms, and shall select in accordance with subsection (f) of this section not less than three (3) firms considered qualified to perform the required professional services. Consideration in each selection process by the principal representative shall be based upon the ability of professional personnel, past performance, willingness to meet time requirements, location, residency, current and projected work loads, the volume of work previously awarded to the firm by the agency, and the equitable distribution of contracts among qualified firms. The agency shall provide a complete description of the work to the firms selected. These firms shall submit an unpriced proposal to do the work. For purposes of this subsection, residency does not require satisfaction of the elements contained in W.S. 16-6-101(a)(i).

(f) Every agency shall base selection of a firm for professional services in accordance with the following:

(i) Except as provided in paragraph (ii) of this subsection, the agency shall select firms that are resident firms as defined by this act. Consideration between these firms shall be based upon:

(A) The ability of professional personnel;

(B) Past performance;

(C) Ability to meet time requirements;

(D) Location;

(E) Current and projected work loads;

3 ORIGINAL SENATE ENGROSSED FILE NO. SF0074

ENROLLED ACT NO. 70, SENATE

SIXTY-FIFTH LEGISLATURE OF THE STATE OF WYOMING 2019 GENERAL SESSION

(F) The volume of work previously awarded to the firm by the agency;

(G) The equitable distribution of contracts among the firms considered qualified.

(ii) If less than three (3) firms on file, together with any applications submitted for the project, are resident firms as defined by this act or if the resident firms are determined not qualified by the agency, consideration shall be based upon the considerations listed in subparagraphs (i)(A) through (G) of this subsection;

(iii) For purposes of this subsection, agency as defined in this act shall include the University of Wyoming, community college districts, the Wyoming business council and the Wyoming department of transportation when the proposed project is funded in whole or in part with state funds.

(g) The provisions of this section giving preference to resident firms shall not apply to the extent any proposed project will utilize funds, the receipt of which is conditioned to prohibit a residency preference.

9-2-1032. Contract procedure.

(g) Each contract for professional services entered into by an agency shall contain a certification by the resident firm providing professional services that the firm will comply with W.S. 9-2-1028(a)(vi)(B). For purposes of this subsection, agency as defined in this act shall include the University of Wyoming, community college districts, the Wyoming business council and the Wyoming department of transportation when the proposed project is funded in whole or in part with state funds.

4 ORIGINAL SENATE ENGROSSED FILE NO. SF0074

ENROLLED ACT NO. 70, SENATE

SIXTY-FIFTH LEGISLATURE OF THE STATE OF WYOMING 2019 GENERAL SESSION

Section 2. This act shall only apply to the procurement of professional services on or after July 1, 2019.

Section 3. This act is effective July 1, 2019.

(END)

Speaker of the House President of the Senate

Governor

TIME APPROVED: ______

DATE APPROVED: ______

I hereby certify that this act originated in the Senate.

Chief Clerk

5 April 25, 2019

Colorado River Upper Basin Drought Contingency Plan Wyoming’s Role

The Upper Basin Drought Contingency Plan (DCP) is part of a larger DCP developed and negotiated over the last six years by Wyoming, the other Colorado River Basin States, and the U.S. Department of the Interior. The States developed the DCP because the Colorado River Basin has experienced 19 years of drought and the river’s current operating rules cannot sufficiently address this historic drought cycle. If the drought continues or worsens, the Upper Basin DCP provides a process to address the resulting effects. It does not require Wyoming to reduce any water uses. Goals of the Upper Basin DCP The principal goal of the Upper Basin DCP is to help assure continued compliance with the 1922 Colorado River Compact. It does so by protecting the critical elevations at Lake Powell. Lake Powell acts as the Upper Basin’s savings account by storing water in wet years to ensure the Upper Basin can meet its compact obligations in dry years. Protecting Lake Powell elevations also reduces the risk that Wyoming water users will ever see mandatory compact curtailment. The Upper Basin DCP is also intended to maintain hydropower generation at Lake Powell. In addition to providing a reliable power supply for customers including those in Wyoming, revenues from hydropower fund many important purposes, including: (1) Repaying construction costs of federal projects like Flaming Gorge; (2) Continued operation and maintenance of federal reservoirs authorized under the Colorado River Storage Project Act, (“CRSPA”); (3) Continued funding and implementation of environmental and other programs—which allow continued water use and development; (4) Mitigating salinity in the Colorado River; and (5) Funding water projects in Wyoming and the other Upper Basin States. Hydropower generation helps assure that Wyoming has the ability to use and develop its 1922 Compact apportionment. To achieve these goals, the Upper Basin DCP consists of two agreements: The Drought Response Operations Agreement and the Demand Management Storage Agreement. Drought Response Operations Agreement • This Agreement establishes a process to rely on water stored in federal reservoirs as needed to reduce the risk of Lake Powell dropping below a target elevation of 3,525’. It essentially establishes a process to move water from where it is already stored to where it is needed— Lake Powell. This Agreement: o Only applies to the CRSPA Initial Units: Lake Powell, Flaming Gorge, Aspinall and Navajo reservoirs. It does not affect Fontenelle reservoir. o Guarantees Wyoming has a role in how the decision is made. Reclamation already has the authority to deliver stored water to Lake Powell if necessary. o Assures that all Initial Units are considered uniformly. o Precludes the release of any water needed to satisfy existing uses. It does not affect any existing water uses in Wyoming. o Provides for recovery of storage as soon as practicable.

April 25, 2019

• Wyoming’s role: Under the Agreement, Wyoming and the other Upper Basin States have the right to participate in all aspects of plan development and implementation which includes the recovery of any released storage. Additionally, the Agreement provides for public outreach where Wyoming can work with its interested stakeholders regarding potential drought response operations. Demand Management Storage Agreement • This Agreement makes unfilled storage capacity at the CRSPA Initial Units available for use by Wyoming and the other Upper Basin States at no charge. This storage capacity is available if the Upper Colorado River Commission (UCRC) requests its use to store water conserved as part of an Upper Basin demand management program. The Agreement does not establish an Upper Basin demand management program, but does set forth the minimum framework under which the Upper Basin can access the storage prior to 2026. o The purpose of a demand management program will be to reduce consumptive uses in a temporary, voluntary, and compensated manner if needed in times of drought, to help assure continued compact compliance without impairing existing water rights. o If, after study, Wyoming and the other Upper Basin States determine that a demand management program is feasible, they may then develop and implement a program. o A demand management program can only be implemented if approved independently by Wyoming’s Compact Commissioner.

• Wyoming’s role: Wyoming, along with the other Upper Basin States and the UCRC, will investigate the feasibility of an Upper Basin demand management program. Many outstanding issues must be investigated before a program can be established. The investigation will include outreach and input from interested Wyoming stakeholders. Any program must also work within Wyoming and the other three Upper Basin States. Current Status • Congress passed the federal legislation necessary to implement the DCP agreements on April 9, 2019, and the President signed that legislation on April 16, 2019. The Basin States and the Secretary of the Interior intend to sign all of the DCP agreements on May 20, 2019. Signing of those agreements will trigger implementation of Mexico’s Binational Water Scarcity Plan agreed to under Minute 323 to the 1944 Treaty with Mexico. Mexico has agreed to make contributions to Lake Mead in proportion to those that will be made by the Lower Basin States pursuant to the Lower Basin DCP. Higher Lake Mead elevations benefit Wyoming and the other Upper Basin States by benefitting Lake Powell. • After the DCP Agreements are signed, Wyoming, the other Upper Basin States, and the UCRC will investigate the feasibility of a demand management program. • Contributions to Lake Mead under the Lower Basin DCP will begin in 2020. • The DCPs will provide a bridge for the Basin States and the federal government to renegotiate the river’s current operating rules. That renegotiation will begin no later than 2021.

Wyoming Water Development Commission Workshop Wyoming Water Development Office 6920 Yellowtail Rd, Cheyenne, WY March 14, 2019

**Due to a winter storm, only 3 commissioners were present. Gerry Geis served as Acting Chairman. Minimal staff were present as State of Wyoming Offices were closed**

1. Acting Chairman Gerry Geis called the workshop to order at 1:34pm.

2. Roll Call Commission attendance: Gerry Geis, Acting Chairman Mike Purcell Bill Yankee Kellen Lancaster, Secretary via phone Rodney Wagner, via phone Sheridan Little, via phone Clinton Glick, via phone Larry Suchor - absent Senator Larry Hicks – Select Water Committee

3. Audience Introduction One person was in the audience.

4. Legislative Update – Director LaBonde and State Engineer Tyrrell Director LaBonde reviewed several bills pertaining to the Water Development Commission and Office. HB0081 – Omnibus Water Bill – Planning. Passed SF0059 – Omnibus Water Bill – Construction. One significant amendment to Weather Modification in the Wind River Mountains was made. Originally the bill was presented with a 50%-50% funding mix. Senator Hicks supported the program at a funding level of $175,000.00 from the State of Wyoming and additional funds from Colorado and Utah. The bill passed. SD0069 – Water Development Program. Applications received from qualified sponsors for projects not owned by the sponsor could be eligible for funding. Attorney General opinion was provided to the Commission, reiterating adequate public benefit must be shown in order to fund privately owned project. The bill was not received for introduction in the House.

Wyoming Water Development Commission Workshop Minutes March 14, 2019 Page 1

State Engineer Pat Tyrrell presented the next few items. HB0018 – Water Well Drillers. Did not pass. HB0047 – Senate Confirmation of Water Compact Commissioners. Did not pass. SF0039 – Legislative Approval of Water Compact Amendments. Did not pass. SF0042 – Water Division Superintendents. Did not pass. SF0087 – Temporary Instream Water Use. Did not pass.

Senator Larry Hicks suggested Instream Flow may be a potential interim topic subject. Looking into temporary use may be a portion of that discussion.

State Engineer Tyrrell informed the Commission the comment period was still open following the hearings for Instream Flow filings on Shoshone River Instream flow and the Savery Creek Instream Flow. The Commission served as the applicant for the Instream Flow filings. Director LaBonde attended the Savery Creek Instream Flow hearing and discussed the question regarding the need for the filing.

Item #9 Savery Creek Instream Flow Filing was moved up on the agenda to further the discussion and accommodate State Engineer Tyrrell and Senator Hicks.

Mike Purcell asked about the results of the Feasibility Study conducted by the office. Director LaBonde indicated it was deemed feasible in the study. He clarified the application was from storage, not a natural flow application.

Senator Hicks presented a packet of information and exhibits concerning current instream flow laws and issues. He referenced Instream Flow law and 41-3-1004 of Wyoming Statutes.

Director LaBonde addressed Senator Hicks’ concerns. The task of filing instream flow applications is delegated to the Office, by the Commission through Rules and Regulations. The same is true for the feasibility studies. Regarding the cost to provide storage, statutorily he believes the feasibility study can include the cost of developing new storage in the basin that could ultimately provide or meet the instream flow requirement if existing storage facilities were unavailable. Director LaBonde acknowledged the feasibility study for the Savery Creek Instream Flow was not provided to the Legislature nor included in the annual legislative report, and most likely should have been.

Wyoming Water Development Commission Workshop Minutes March 14, 2019 Page 2

Senator Hicks further discussed his concerns. Director LaBonde indicated if the application was to be abandoned and modified the original priority date of 2002 would be forfeited. At this point it is appropriate for the State Engineer’s Office to make a determination on this application. He indicated the report should have been provided to the legislature. Discussion continued. The suggestion to postpone discussion until the May 2019 meeting was made. It was stated the public comment deadline for the State Engineer’s Office is March 28, 2019. Mike Purcell suggested a letter to the State Engineer’s Office to request placing deliberations on hold until the Commission can further discuss at the May 17, 2019 meeting.

5. Project Updates Sweetwater I&S District/Cambria I&S District/City of Newcastle Projects Director LaBonde provided a brief history and update on numerous ongoing issues involving the entities.

Lower Nowood I&S District Project At the Sponsor’s request a Madison well was drilled. The Sponsor requested a deeper well. Director LaBonde informed them the additional expense would be their responsibility. At this point in the project the consulting engineer has resigned. There will be no additional funding provided by the WWDC for further well development.

Big Sandy Reservoir Enlargement The design estimate from the Bureau of Reclamation has increased from $10,200,000.00 to $16,200,000.00, an increase of more than 50%. WWDC has MOA funding to cover a portion of the shortfall as well as some WDA III funds to cover the difference.

6. Platte River Recovery Implementation Program (PRRIP) Update Director LaBonde indicated Senator Barrasso will be sponsoring federal legislation to extend the first increment by 13 years. Governor Mead supported the extension and Governor Gordon feels the same and has provided a letter of support to Senator Barrasso. Director LaBonde has offered to stay on as the Governance Committee representative for Wyoming after his retirement if the Governor’s office agrees. Discussion followed.

Wyoming Water Development Commission Workshop Minutes March 14, 2019 Page 3

7. New Level I and II Project Applications (Received March 1) Nine Level I – New Development applications were received. Two Level II – New Development applications and 2 Level II – Rehabilitation applications were received. Commissioners have been assigned to the projects. Please review for potential conflict of interest issues. The list of projects will be emailed to Commissioners not in attendance. In May, 2019 the Commission will be presented with recommendations and asked for formal approval to continue with the projects.

8. Proposed Johnson County Lake DeSmet Contract Director LaBonde presented information regarding the existing agreements and proposed a new agreement between Johnson County and Water Development for cost sharing of operation costs of Lake DeSmet. The Commission will be asked in the near future to review and approve the agreement.

9. Savery Creek Instream Flow Filing – handled previously on the agenda.

10. Location of the 2019 Summer Tour/Meeting The Commission was asked to consider locations for the annual summer tour and meeting. A decision will be made during Friday’s meeting.

The workshop adjourned at 4:06 pm

Respectfully submitted,

Mike Purcell, Acting Secretary

Wyoming Water Development Commission Workshop Minutes March 14, 2019 Page 4

Wyoming Water Development Commission Meeting Water Development Office, 6920 Yellowtail Rd. Cheyenne, Wyoming March 15, 2019

1. Acting Chairman Gerry Geis called the meeting to order at 8:32am.

2. Roll Call: Commission attendance: Gerry Geis, Acting Chairman Mike Purcell Bill Yankee Kellen Lancaster – via phone Sheridan Little – via phone Larry Suchor – via phone Rodney Wagner – via phone

3. Audience Introductions

4. Election of Officers Due to the weather, and inability of Commissioners to attend the meeting in person, Mike Purcell suggested Gerry Geis serve as Acting Chair, himself as Acting Secretary and postpone election of officers until May 17, 2019. Rodney Wagner made the motion, Sheridan Little seconded it; motion carried unanimously.

5. Approval of Minutes Mike Purcell made a motion to approve all provided minutes: o December 12, 2018 Workshop o December 13, 2018 Meeting Bill Yankee seconded the motion. The motion carried unanimously.

6. Planning Amendments • Alkali Creek Reservoir Final Design, Amendment No. 1 An interim amendment to the engineering contract with Trihydro Corporation was presented. The amendment serves to modify the Additional Geotechnical Analysis task and add tasks to complete supplemental geotechnical investigation, and assist the Commission in addressing unforeseen changes in scope during the completion of final design; increase the total Contract dollar amount by four hundred sixty-five thousand dollars ($465,000.00) to two million three hundred twelve thousand four hundred dollars ($2,312,400.00); to replace

Wyoming Water Development Commission Minutes March 15, 2019 Page 1

Attachment A with a new Attachment A2; and to replace Attachment C with a new Attachment C2.

• GVID Storage Enlargement, Level II Study, Amendment No. 2 An interim amendment to the engineering contract with AECOM Technical Services, Inc. was presented. The amendment serves to add Phase II tasks to assist the Commission in further analyzing storage enlargement for the Greybull Valley Irrigation District; increase the total Contract dollar amount by three hundred thousand dollars ($300,000.00) to one million ninety-six thousand dollars ($1,096,000.00); and replace Exhibit A with a new Exhibit A2.

• Leavitt Reservoir Expansion Final Design, Amendment No. 1 An interim amendment to the engineering contract with RJH Consultants, Inc., was presented. The amendment serves to modify the Additional Geotechnical Analysis task and add a discretionary task to assist the Commission in addressing unforeseen changes in scope during the completion of final design; increase the total Contract dollar amount by one hundred seventy-seven thousand nine hundred seventy-seven dollars and forty-five cents ($177,977.45) to two million nine hundred fifty-four thousand seven hundred seventy-seven dollars and forty-five cents ($2,954,777.45); and to replace Attachment A with a new Attachment A2.

• New Fork Lake Dam Enlargement, Level II Study, Amendment No. 2 An interim amendment to the engineering contract with RJH Consultants, Inc., was presented. The amendment serves to add Phase III permitting and design tasks; increase the total Contract dollar amount by one million five hundred thousand dollars ($1,500,000.00) to two million two hundred forty-four thousand dollars ($2,244,000.00); replace Exhibit A with a new Exhibit A2; replace Exhibit B with a new Exhibit B2; clarify Phase III assumptions and deliverables with the addition of Exhibit C; and extend the term of the Contract through June 30, 2023.

Bill Yankee made a motion to approve all four amendments. Mike Purcell seconded the motion; motion carried unanimously.

7. Planning Closeout Memos • Beaver Creek Watershed Study Jodee Pring, Project Manager, provided a brief summary of project findings and final project costs. Sheridan Little moved acceptance of the Beaver Creek

Wyoming Water Development Commission Minutes March 15, 2019 Page 2

Watershed Study project report as being complete and further, the WWDC makes the following findings relative to this project: 1. That the Commission recommend proceeding to the next Level of project development upon the submittal of an appropriate funding application by the sponsor. Bill Yankee seconded the motion. The motion carried unanimously.

• Bitter Creek / East Flaming Gorge Watershed Study Peter Gill, Project Manager, provided a brief summary of project findings and final project costs. Mike Purcell moved acceptance of the Bitter Creek / East Flaming Gorge Watershed Study, Level I project report as being complete and further, the WWDC makes the following findings relative to this project: 1. That the Commission recommends proceeding to the next Level of project development upon the submittal of an appropriate funding application by the sponsor. Bill Yankee seconded the motion. The motion carried unanimously.

• Fontenelle Dam and Outworks Infrastructure Completion Tony Rutherford, Project Manager, provided an extensive and thorough summary of project findings and final project costs. Bill Yankee moved acceptance of the Fontenelle Dam and Outworks Infrastructure Completion, Level II Study as being complete and further, the WWDC makes the following findings relative to this project: 1. That the Commission recommend: The Office continue to coordinate with the State Engineer’s Office, Attorney General’s Office, Governor’s Office, and Wyoming’s congressional delegation to pursue the most efficient means of securing additional water assets in the Green River Basin with Reclamation to provide opportunity for Wyoming’s use in mitigating involuntary curtailment in Wyoming. The Office continue to coordinate with Reclamation to perform the necessary Risk Analysis on the potential for erosion on the embankment and the acceptable frequency and duration of exposure before armoring would be necessary. The Office continue to coordinate with Reclamation to pursue and negotiate Standby Contracts for the remainder of the active capacity (139,000 acre-feet) and the 80,796 acre-feet be developed so as to define authorities, provisions of use, allowed beneficial uses and priorities, payment conditions, etc. The Office continue to coordinate with Reclamation on a path forward regarding the required NEPA to include operational changes leading into an extreme drought event, use of the inactive pool without armoring, contracting of the water, and the potential riprapping of the dam face in coordination with the drawdown. Mike Purcell seconded the motion; motion carried unanimously.

Wyoming Water Development Commission Minutes March 15, 2019 Page 3

• Glendo Reservoir Full Utilization Andrew Linch, Project Manager, provided a thorough summary of project findings and final project costs. Mike Purcell moved acceptance of the Glendo Reservoir Full Utilization Study as complete and further, the WWDC makes the following findings relative to this project: 1. That the Commission recommend: The Office coordinate with the Governor’s Office and Wyoming’s congressional delegation to pursue future project implementation actions with Reclamation and the USACE. Bill Yankee seconded the motion, motion carried unanimously.

• Goose Creek Watershed Study Jodee Pring, Project Manager, provided a brief summary of project findings and final project costs. Bill Yankee moved acceptance of the Goose Creek Watershed Study project report as being complete and further, the WWDC makes the following findings relative to this project. 1. The the Commission recommend proceeding to the next Level of project development upon the submittal of an appropriate funding application by the sponsor. Rodney Wagner seconded the motion; motion carried unanimously.

• Shell Water Master Plan Kevin Boyce, Project Manager, provided a brief summary of project findings and final project costs. Mike Purcell moved acceptance of the Shell Water Master Plan Level I Study as being complete and further, the WWDC makes the following findings relative to this project: 1. That the Commission recommend proceeding to the next Level of project development upon the submittal of an appropriate funding application by the sponsor. Bill Yankee seconded the motion; motion carried unanimously.

8. Planning Project Contracts • Evanston Water Master Plan, Level I An engineering contract with William H. Smith & Associates, Inc., of Green River, Wyoming was presented. The budget is $125,700.00.

• Salt Creek-Edgerton-Midwest Master Plan, Level I An engineering contract with Morrison-Maierle Systems Corporation of Sheridan, Wyoming was presented. The budget is $159,900.00.

• Torrington Water Master Plan, Level I

Wyoming Water Development Commission Minutes March 15, 2019 Page 4

An engineering contract with AVI, PC of Cheyenne, Wyoming was presented. The budget is $173,830.00.

• Lake DeSmet/Healy Reservoir Utilization, Level II An engineering contract with EnTech, Inc. of Sheridan, Wyoming was presented. The budget is $ 268,000.00.

• Bluff/Upper Bluff Irrigation Districts Master Plan, Level I An engineering contract with Western Heritage Consulting and Engineering of Mills, Wyoming was presented. The budget is $122,500.00.

• Boulder Irrigation District Rehabilitation, Level II An engineering contract with Sunrise Engineering, Inc. of Afton, Wyoming was presented. The budget is $171,000.00.

• LaPrele Irrigation District Rehabilitation, Level II An engineering contract with Re/Spec Inc. of Rapid City, South Dakota was presented. The budget is $290,000.00.

Rodney Wagner made a motion to approve all Level I and Level II planning contracts. Bill Yankee seconded the motion; motion carried unanimously.

9. UW Water Research Program MOU The Commission considered the UW WRP MOU. The MOU provides partial funding in the amount of $350,511.00 for two projects voted on by the Commission and Select Water in November, 2018. Mike Purcell made a motion to approve the MOU, Bill Yankee seconded the motion. The motion carried unanimously.

10. Small Water Project Program – Funding Applications Jodie Pavlica, Project Manager presented and briefly summarized the small water project program applications. Eighty (80) applications were received, 79 projects are eligible for funding. • WDA I – 55 Projects, Total Grant Amount - $1,483,617.00 • WDA II – 24 Projects, Total Grant Amount - $690,910.00 Mike Purcell made a motion to approve funding the Small Water Program projects as presented. Bill Yankee seconded the motion. The motion carried unanimously.

11. 2019 Construction Project & Well Purchase Agreements – Account I Director LaBonde, presented and summarized seven Level III, Account I project and well purchase agreements:

Wyoming Water Development Commission Minutes March 15, 2019 Page 5

• Buffalo Wells & Transmission 2019 • Clearmont Well Connection 2019 • Etna Storage Tank 2019 • GR/RS/SC JPWB Pump Station 2019 • Lander Storage Tanks and Pump Station 2019 • Northwest Rural Water System Improvements 2019 • Rolling Hills Well No. 7 Connection 2019 Sheridan Little made a motion to approve the Level III, Account I project and well purchase agreements. Bill Yankee seconded the motion; motion carried unanimously.

12. 2018 Construction Project Agreements – Account II Director LaBonde presented and summarized fifteen Level III, Account II project agreements: • Eden Valley Irrigation District System Improvements 2019 • Wind River Inter-Tribal Council Rehab 2019 • Austin-Wall Reservoir Rehabilitation 2019 • Big Horn Canal Wasteway Rehabilitation 2019 • Bluff/Upper Bluff System Improvements 2019 • Dry Creek Irrigation District Rehabilitation 2019 • Heart Mountain Irrigation District Rattlesnake Liner Replacement 2018 • Interstate Diversion Structure Rehabilitation 2019 • Lakeview Carter Creek Siphon/Spillway 2019 • Wheatland Irrigation District Tunnel Dam Rehabilitation 2019 • Cody Canal Rehabilitation 2019 • Deaver Irrigation District Rehabilitation 2019 • Lovell Moncur Lateral Rehabilitation 2019 • Midvale Irrigation District Rehabilitation 2019 • Shoshone Irrigation District Rehabilitation 2019 Bill Yankee made a motion to approve the Level III, Account II project agreements. Rod Wagner seconded the motion; the motion carried unanimously.

13. 2019 Construction Project Amendments Director LaBonde presented and summarized seven Level III, Account II and III project amendments: • Eden Valley Farson Lateral Rehabilitation - Acct II • Eden Valley Farson Lateral Rehabilitation (BSP Salinity Control) – Time Extension • Casper Zone 3 Improvements – Time Extension

Wyoming Water Development Commission Minutes March 15, 2019 Page 6

• Piney & Cruse Canal Piping – Time Extension • Cokeville Tri-Diversion Structure – Acct II • Gillette Regional Extensions 2017 – Acct I • Gillette Regional Extensions Phase IV 2018 – Acct I Larry Suchor made a motion to approve the Level III, Account I & II project amendments. Rodney Wagner seconded the motion; motion carried unanimously.

14. Leavitt Reservoir Expansion – Account III, Level III Jason Mead presented a Project Agreement for the Leavitt Reservoir Expansion Project. The Agreement is between the Shell Valley Watershed Improvement District and Wyoming Water Development Commission for the design, construction and operation of the Leavitt Reservoir Expansion Project. The total budget is forty- one million dollars ($41,000,000.00). 95.9% grant of thirty-nine million three hundred nineteen thousand dollars ($39,319,000.00) and a 4.1% loan of one million six hundred eighty-one thousand dollars ($1,681,000.00) for 50 years at 4% interest.

An additional special provision was added to this Agreement: If the Sponsor breaches any of the covenants, agreements, or stipulations of this document, the Commission, in its discretion may elect to operate the Project. If the Commission decides to operate the Project, the Sponsor shall transfer and assign all facilities, properties, easements, rights-of-way, water rights, and permits necessary to the operation and maintenance of the Project. Discussion followed. Bill Yankee made a motion to approve the Project Agreement for the Leavitt Reservoir Expansion project. Sheridan Little seconded the motion; motion carried unanimously.

15. Commission Authorization for the WWDO to Transfer Funds • Transfer $500,000.00 from WDA III to the Middle Piney Reservoir Account as Authorized in SEA 0028 (SF 0059). • Transfer $5,500,000.00 from the Buffalo Bill Dam Account to WDA II.

Mike Purcell made a motion to approve the funds transfers. Bill Yankee seconded the motion; motion carried unanimously.

16. Water Service Contract with the Nebraska Community Foundation Director LaBonde sought authorization for the Director to Execute a Water Service Contract with the Nebraska Community Foundation (PRRIP) for Water from the Pathfinder Modification Project.

Wyoming Water Development Commission Minutes March 15, 2019 Page 7

Mike Purcell made a motion for authorization on the Commission’s behalf. Bill Yankee seconded the motion; motion carried unanimously.

17. Consideration of a Water Service Contract with Genesis Alkali Wyoming, L.P. for water from Fontenelle Reservoir Director LaBonde outlined the basis of the Contract. The Contract was not ready as of meeting time. The Commission will be presented with the Contract at a later time.

18. Proposed Game and Fish Commission Contract for Healy Reservoir Director LaBonde presented and outlined a Public Access Agreement between Wyoming Game and Fish Commission and Wyoming Water Development Commission. The purpose of the Agreement is to provide public access to the reservoir commonly known as Healy Reservoir. The “South Parcel” is not included in this agreement. Paul Dey of the Wyoming Game and Fish Department spoke regarding the quality and variety of fishing available on the reservoir. Director LaBonde recommended approval of the agreement and sought authorization for the Director to execute.

Mike Purcell made a motion to approve the Contract and for authorization on the Commission’s behalf. Bill Yankee seconded the motion; motion carried unanimously.

19. 2019 Buffalo Bill Reservoir Winter Release Agreement Director LaBonde sought authorization for the Director to sign the Buffalo Bill Reservoir Enlargement Winter Release Operation Agreement 2109 on behalf of the Commission. The purpose of the Agreement is to provide winter releases below Buffalo Bill Dam for fisheries in the Shoshone River in conjunction with other water needs such as hydropower generation and flood control. Winter releases for the Agreement occur in the non-irrigation season (normally October 16 through April 14). Further, the Agreement sets forth the criteria for determining the winter releases with respect to Buffalo Bill Reservoir.

Mike Purcell made a motion granting authorization to the Director to sign on behalf of the Commission. Bill Yankee seconded the motion; motion carried unanimously.

20. Basin States Salinity Control – Application Director LaBonde indicated there were no funding applications received this cycle. As of January 31, 2019, $495,587.00 are remaining in the WY BSP Budget. Provided for information only.

Wyoming Water Development Commission Minutes March 15, 2019 Page 8

21. Update of Level III Construction Projects Bryan Clerkin provided an update on the following Level III Construction projects: • Cambria Tank • Central Wyoming Regional Elevated Tank • Douglas Box Elder Spring • Goshen Irrigation District Rehabilitation 2017 • High Meadow Ranch Well, Tank & Pipeline 2017 • Lovell Tank/Zone 2 Improvements • Midvale Irrigation District Rehabilitation 2018 • Opal Well Improvements 2017 • Wheatland Pipelines • Wheatland Wells 2017 This was provided for the Commission’s information only.

22. Future Meetings Schedule Director LaBonde indicated a request had been made to move the November meeting to the following week of November 13-15, 2019. The Commission approved the schedule change.

May 16-17, 2019 will be a joint meeting with Select Water Committee in Cheyenne.

The Commission discussed and selected Buffalo, Wyoming for the site of the August tour and meeting for 2019.

23. Discussion • Re: Director’s Position – Director LaBonde’s retirement is effective at 5:00pm today, March 15, 2019. He provided a few closing remarks for the Staff and Commission. No information from the Governor’s Office regarding the next Director has been received. Director LaBonde has provided Jason Mead’s name to the Governor’s Office for appointment as Interim Director.

The meeting adjourned at 11:45 am.

Respectfully submitted,

Mike Purcell, Acting Secretary

Wyoming Water Development Commission Minutes March 15, 2019 Page 9

‘R’ Crook County Rural Water Supply Plan

Consultant Selection and Contract Approval

WILL BE PROVIDED AT THE MEETING THE STATE OF WYOMING Water Development Office 6920 YELLOWTAIL ROAD TELEPHONE: (307) 777-7626 CHEYENNE, WY 82002

MEMORANDUM

DATE: April 25, 2019 TO: Wyoming Water Development Commission FROM: Jason Mead, P.E., Deputy Director – Dam & Reservoir Division SUBJECT: Amendment Five to Clear Creek Storage Study, Level II, Phase II

This memo is to serve as an explanation for Amendment Five to the Clear Creek Storage Study, Level II, Phase II. The amendment extends the current contract expiration date with Wenck Associates from June 30, 2019 to June 30, 2021.

A Level II Storage Feasibility Study was initiated in mid-2011 to further explore storage opportunities identified in the Clear Creek Watershed Study. Results of the Level II Storage Feasibility Study allowed WWDC to identify the Bull Creek Reservoir concept as the preferred alternative. The Project has the potential for multiple uses and benefits, in addition to supplemental irrigation. Phase II work initially focused on hydrologic model refinement and geotechnical investigations to further determine the feasibility of the preferred alternative. Results of the geotechnical investigation showed a strong foundation to safely build an embankment on, however uncontrolled seepage rates appeared to be high through the bed of the reservoir pool area and surrounding ridges because of bedrock that is predominantly uncemented sandstone, consequently driving up the cost. This lead the Phase II study to re-evaluate other potentially feasible alternatives. Shortly after funding became available, private lands came up for sale higher in the Bull Creek drainage which was previously unavailable for consideration of a reservoir site, but exhibited better geologic conditions. Through coordination and discussions with various agencies and non-governmental organizations, the Office of State Lands and Investment Board of Land Commissioners began analyzing the property and eventually made a decision to complete a land exchange to acquire the property as it fit very well with their trust land management objectives. The negotiation of the land exchange opened the door on an Upper Bull Creek reservoir alternative. A geotechnical investigation of the Upper Bull Creek site was ultimately allowed to take place in 2016. The results of the geotechnical investigation are positive and the remaining environmental analysis and associated field work has been completed, along with conceptual designs and cost estimates. Beneficiary/stakeholder meetings and entity formation would need to occur prior to moving the project forward. Furthermore, in light of recent State revenues, funding for the project may not be available. As a result, other configurations and alternatives may need to be analyzed. This amendment extends the current contract expiration date to allow for these items to be addressed.

Encl., Amendment Five to Consultant Contract for Services No. 05SC0294555 Clear Creek Storage Study, Level II, Phase II

Memorandum Wyoming Water Development Office Page 1 RN043019/F

AMENDMENT FIVE TO CONSULTANT CONTRACT FOR SERVICES NO. 05SC0294555 CLEAR CREEK STORAGE STUDY, LEVEL II, PHASE II BETWEEN WYOMING WATER DEVELOPMENT COMMISSION AND WENCK ASSOCIATES, INC.

1. Parties. This Amendment is made and entered into by and between the Wyoming Water Development Commission [Commission], whose address is: 6920 Yellowtail Road, Cheyenne, Wyoming 82002; and Wenck Associates, Inc. [Consultant], whose address is: 1800 Pioneer Creek Center, Maple Plain, MN 55359.

2. Purpose of Amendment. This Amendment shall constitute the fifth amendment to the Contract between the Commission and the Consultant. The purpose of this Amendment is to: extend the term of the Contract through June 30, 2021.

The original Contract, dated June 6, 2011 required the Consultant to render certain technical or professional services to explore storage opportunities in the Clear Creek Watershed for a total Contract amount of two hundred forty-six thousand, eight hundred ninety-two dollars ($246,892.00) with an expiration date of December 31, 2012.

Amendment One, dated June 11, 2012, extended the Contract expiration date from December 31, 2012 to March 31, 2013.

Amendment Two, dated March 8, 2013, amended the Contract to acknowledge the purchase of States West Water Resources Corporation by Wenck Associates, Inc. and to add Phase II tasks to further refine storage site feasibility, increasing the total Contract amount by three hundred fifty thousand dollars ($350,000.00) from two hundred forty-six thousand, eight hundred ninety-two dollars ($246,892.00) to five hundred ninety-six thousand, eight hundred ninety-two dollars ($596,892.00), to amend Exhibit B Hourly Rate and Reimbursable Expenses Price Schedule, and extended the Contract expiration date from March 31, 2013 to March 31, 2015.

Amendment Three, dated March 20, 2015, amended the Contract to supplement existing tasks and add additional Phase II tasks, increasing the total Contract amount by five hundred forty-six thousand, seven hundred dollars ($546,700.00), from five hundred ninety-six thousand, eight hundred ninety-two dollars $596,892.00 to one million, one hundred forty-three thousand, five hundred ninety-two dollars $1,143,592.00, to amend Exhibit B Hourly Rate and Reimbursable Expenses Price Schedule, and extended the Contract expiration date from March 31, 2015 to March 31, 2017.

Amendment Four, dated March 13, 2017, extended the Contract expiration date from March 31, 2017 to June 30, 2019.

Amendment Five to the Clear Creek Storage Study, Level II, Phase II between Wyoming Water Development Commission and Wenck Associates, Inc. Page 1 of 3

RN043019/F

3. Term of the Amendment. This Amendment shall commence immediately upon the date the last required signature is affixed hereto, and shall remain in full force and effect through the term of the Contract, as amended, unless terminated at an earlier date pursuant to the provisions of the Contract, or pursuant to federal or state statute, rule or regulation.

4. Amendments.

The second sentence of Section 3 of the original Contract is hereby amended to read as follows:

The term of this Contract is from June 6, 2011 through June 30, 2021.

5. Amended Responsibilities of the Consultant.

Responsibilities of the Consultant have not changed.

6. Amended Responsibilities of the Commission.

Responsibilities of the Commission have not changed.

7. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Contract, and any previous amendments, between the Commission and the Consultant, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the Consultant of an originally signed counterpart of this Amendment by PDF shall be followed up immediately by delivery of the originally signed counterpart to the Commission.

8. General Provisions.

A. Entirety of Contract. The Original Contract consisting of twelve (12) pages, Exhibit A consisting of fourteen (14) pages, and Exhibit B consisting of one (1) page, Amendment One, consisting of two (2) pages, Amendment Two, consisting of eleven (11) pages, Amendment Three, consisting of nine (9) pages, Amendment Four, consisting of three (3) pages, and Amendment Five, consisting of three (3) pages, represent the entire and integrated Contract between the parties and supersede all prior negotiations, representations, and agreements whether written or oral.

Amendment Five to the Clear Creek Storage Study, Level II, Phase II between Wyoming Water Development Commission and Wenck Associates, Inc. Page 2 of 3

RN043019/F

9. Signatures. The parties to this Amendment, through their duly authorized representatives, have executed this Amendment on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

This Amendment is not binding on either party until approved by A&I Procurement and the Governor of the State of Wyoming or his designee, if required by Wyo. Stat. § 9-2- 1016(b)(iv).

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

WENCK ASSOCIATES, INC.

______Victor Anderson, Principal Date Employer Identification Number: 41-1520095

ATTORNEY GENERAL’S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner Date Assistant Attorney General

Amendment Five to the Clear Creek Storage Study, Level II, Phase II between Wyoming Water Development Commission and Wenck Associates, Inc. Page 3 of 3

THE STATE OF WYOMING Water Development Office 6920 YELLOWTAIL ROAD TELEPHONE: (307) 777-7626 CHEYENNE, WY 82002

MEMORANDUM

DATE: May 6, 2019 TO: Wyoming Water Development Commission FROM: Jason Mead, P.E., Deputy Director – Dam & Reservoir Division SUBJECT: Amendment Six to Little Snake Supplemental Storage, Level II Study

This memo is to serve as an explanation for Amendment Six to the Little Snake Supplemental Storage, Level II Study. The amendment extends the current contract expiration date with Wenck Associates from June 30, 2019 to June 30, 2021.

In 2013, an appropriation was granted by the Wyoming Legislature to complete water quality analysis, update hydrologic modeling with temporary stream gauging, procure NEPA liaison services, and complete permitting and final design. Hydrologic modeling was updated and refined with additional data. A series of water quality and sediment samples were collected and analyzed, compared against historic water quality data, as well as discussed at length with WYDEQ. Results indicate that post-project conditions will be equal to or better than current water quality conditions experienced in Haggarty Creek, therefore confirming the feasibility in moving forward with permitting and design of the West Fork Reservoir site. Construction of West Fork Dam and Reservoir will provide supplemental late season irrigation water to lands within the Little Basin which includes lands in both Wyoming and Colorado. At the same time, this project will provide secondary environmental benefits to the watershed. The 10,000 acre-foot reservoir could have a 6,500 acre-foot active irrigation account, 2,000 acre-foot conservation pool, and a 1,500 acre-foot minimum streamflow bypass account. Managing the new reservoir in conjunction with the existing High Savery Reservoir would have benefits throughout the Basin.

The West Fork Reservoir site sits on both private and U.S. Forest Service property. As such, discussions have occurred with both parties. After discussions with the Forest Service, it was decided and supported in concept by the federal agency, that a legislated land exchange could be a logical next step and would require Federal legislation. In 2018, the Wyoming Legislature appropriate $4.7M to identify, investigate, and acquire suitable lands for the purpose of the land exchange. However, a special condition was placed on the appropriation that funds could not be expended until the project sponsor and the WWDC have secured additional funding commitments from project beneficiaries in both Wyoming and Colorado on a pro rata basis. The WWDC participated in a tour of the project and the Little Snake River Basin in the summer of 2018 which included the Colorado River District, the Savery-Little Snake Water Conservancy District, the Pothook Water Conservancy District, Senator Michael Bennett, and others. Furthermore, the WWDC has met with the past and current Director of the Colorado Water Conservation Board, as well as the Yampa-White-Green River Basin Roundtable. In addition, Project proponents within the Little Snake River Basin also continue to collaborate with Colorado. All entities have expressed support for additional storage in the Little Snake/Yampa River drainages and support

Memorandum Wyoming Water Development Office Page 1 for the West Fork project. However, a mechanism for cost sharing has not been identified, generated or executed at this time. It is important to note though, that both benefiting Conservancy Districts plan to re-apply for PL566 Watershed and Flood Prevention Operations Program funding this year, with the support of both Wyoming and Colorado NRCS. This amendment extends the current contract expiration date with Wenck Associates to allow the Project to progress once funding commitments can be secured.

Encl., Amendment Six to Consultant Contract for Services No. 05SC0293566 Little Snake Supplemental Storage, Level II Study

Technical Memorandum Wyoming Water Development Office Page 2 RN050119/F

AMENDMENT SIX TO CONSULTANT CONTRACT FOR SERVICES NO. 05SC0293566 LITTLE SNAKE SUPPLEMENTAL STORAGE, LEVEL II STUDY BETWEEN WYOMING WATER DEVELOPMENT COMMISSION AND WENCK ASSOCIATES, INC.

1. Parties. This Amendment is made and entered into by and between the Wyoming Water Development Commission [Commission], whose address is: 6920 Yellowtail Road, Cheyenne, Wyoming 82002; and Wenck Associates, Inc. [Consultant], whose address is: 1800 Pioneer Creek Center, Maple Plain, MN.

2. Purpose of Amendment. This Amendment shall constitute the sixth amendment to the Contract between the Commission and the Consultant. The purpose of this Amendment is to extend the term of the Contract through June 30, 2021.

The original Contract, dated June 9, 2008, required the Consultant to perform a Level II study for the Savery-Little Snake River Water Conservancy District, identifying storable flow, demand and shortages, and providing detail on identified reservoir sites for a total Contract amount of two hundred forty-eight thousand seven hundred sixty dollars ($248,760.00) with an expiration date of December 31, 2010.

Amendment One, dated March 9, 2010, amended the original Contract to: a) add an additional Phase II scope of services; b) increase the total Contract dollar amount by two hundred sixty-seven thousand, seven hundred fifty-one dollars ($267,751.00) to five hundred sixteen thousand, five hundred eleven dollars ($516,511.00); and c) extend the term of the Contract through December 31, 2011.

Amendment Two, dated November 8, 2011, amended the original Contract to extend the term of the Contract through December 31, 2012.

Amendment Three, dated December 13, 2012, amended the original Contract to extend the term of the Contract through June 30, 2013.

Amendment Four, dated June 12, 2013, amended the original Contract to: a) add additional scope of services for further hydrologic analysis, water quality analysis, fisheries work, permitting and NEPA liaison services; b) increase the total Contract dollar amount by eight hundred ten thousand dollars ($810,000.00) to one million, three hundred twenty-six thousand, five hundred eleven dollars ($1,326,511.00); and c) extend the term of the Contract through June 30, 2017.

Amendment Five, dated June 13, 2017 amended the original Contract to extend the term of the Contract through June 30, 2019.

Amendment Six to the Little Snake Supplemental Storage, Level II Study between Wyoming Water Development Commission and Wenck Associates, Inc. Page 1 of 3

RN050119/F

3. Term of the Amendment. This Amendment shall commence immediately upon the date the last required signature is affixed hereto, and shall remain in full force and effect through the term of the Contract, as amended, unless terminated at an earlier date pursuant to the provisions of the Contract, or pursuant to federal or state statute, rule or regulation.

4. Amendments.

A. The second sentence of Section 3 of the original Contract is hereby amended to read as follows:

The term of this Contract is from June 9, 2008 through June 30, 2021.

5. Amended Responsibilities of the Consultant.

Responsibilities of the Consultant have not changed.

6. Amended Responsibilities of the Commission.

Responsibilities of the Commission have not changed.

7. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Contract, and any previous amendments, between the Commission and the Consultant, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the Consultant of an originally signed counterpart of this Amendment by PDF shall be followed up immediately by delivery of the originally signed counterpart to the Commission.

8. General Provisions.

A. Entirety of Contract. The Original Contract consisting of eleven (11) pages, Exhibit A consisting of ten (10) pages, and Exhibit B consisting of one (1) page, Amendment One, consisting of fifteen (15) pages, Amendment Two, consisting of four (4) pages, Amendment Three, consisting of two (2) pages, Amendment Four, consisting of eight (8) pages and Exhibit C consisting of one (1) page, Amendment Five, consisting of three (3) pages, and this Amendment, consisting of three (3) pages, represent the entire and integrated Contract between the parties and supersede all prior negotiations, representations, and agreements whether written or oral.

Amendment Six to the Little Snake Supplemental Storage, Level II Study between Wyoming Water Development Commission and Wenck Associates, Inc. Page 2 of 3

RN050119/F

9. Signatures. The parties to this Amendment, through their duly authorized representatives, have executed this Amendment on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

This Amendment is not binding on either party until approved by A&I Procurement and the Governor of the State of Wyoming or his designee, if required by Wyo. Stat. § 9-2- 1016(b)(iv).

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

WENCK ASSOCIATES, INC.

______Victor Anderson, Principal Date Employer Identification Number: 41-1520095

ATTORNEY GENERAL’S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner Date Assistant Attorney General

Amendment Six to the Little Snake Supplemental Storage, Level II Study between Wyoming Water Development Commission and Wenck Associates, Inc. Page 3 of 3

THE STATE OF WYOMING Water Development Office 6920 YELLOWTAIL ROAD TELEPHONE: (307) 777-7626 CHEYENNE, WY 82002

MEMORANDUM

DATE: May 17, 2019 TO: Wyoming Water Development Commission FROM: Jodee Pring, Project Manager SUBJECT: Amendment Two to Interagency Agreement for Powder/Tongue and Northeast River Basin Plan Groundwater Update, Level I Study

The Water Development Office is requesting an extension of time only to the interagency agreement for the Powder/Tongue and Northeast River Basin Plan Groundwater Update, Level I Study. This interagency agreement amendment would change the contract expiration date from June 30, 2019 to December 31, 2019.

This extension is necessary to complete the last chapter of the report which includes irrigation use data. In addition the report needs to be properly vetted with the public in order to receive feedback and address the comments received. This extension will also allow time to finalize billing and complete a closeout memo.

Encl. Amendment Two to the Interagency Agreement between the Wyoming Water Development Commission and the Wyoming State Geological Survey Powder/Tongue and Northeast River Basin Plan Groundwater Update, Level I Study

Memorandum Wyoming Water Development Office Page 1 RN041819/F

AMENDMENT TWO TO INTERAGENCY AGREEMENT BETWEEN THE WYOMING WATER DEVELOPMENT COMMISSION AND THE WYOMING STATE GEOLOGICAL SURVEY POWDER/TONGUE AND NORTHEAST RIVER BASIN PLANS GROUNDWATER UPDATE

1. Parties. This Amendment is made and entered into by and between the Wyoming Water Development Commission [Commission], whose address is: 6920 Yellowtail Road, Cheyenne, Wyoming 82002; and the Wyoming State Geological Survey [WSGS], whose address is P.O. Box 1347, Laramie, WY 82073-1347.

2. Purpose of Amendment. This Amendment shall constitute the second amendment to the Agreement between the Commission and the WSGS. The purpose of this Amendment is to extend the term of the Agreement through December 31, 2019. The Agreement amount is not changed by this Amendment.

The original Agreement, dated July 6, 2015, required the WSGS to perform a study of the Powder/Tongue and Northeast River Basins groundwater resources for a total Agreement amount of two hundred seventy-five thousand dollars ($275,000.00), with an expiration date of December 31, 2018.

Amendment One, dated December 20, 2018, extended the term of the Agreement through June 30, 2019. The Contract amount was not changed by the Amendment.

3. Term of the Amendment. This Amendment shall commence immediately upon the date the last required signature is affixed hereto, (Effective Date), and shall remain in full force and effect through the term of the Agreement, as amended, unless terminated at an earlier date pursuant to the provisions of the Agreement, or pursuant to federal or state statute, rule or regulation.

4. Amendments. The second sentence of Section 3.A. of the original Agreement is hereby amended to read as follows:

The term of this Agreement is from June 4, 2015 or the Effective Date, whichever is later, through December 31, 2019.

5. Amended Responsibilities of the WSGS.

Responsibilities of the WSGS have not changed.

6. Amended Responsibilities of the Commission.

Responsibilities of the Commission have not changed.

Amendment Two to the Powder/Tongue and Northeast River Basin Plans Groundwater Update between WWDC and WSGS Page 1 of 3

RN041819/F

7. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Agreement, and any previous amendments, between the Commission and the WSGS, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the WSGS of an originally signed counterpart of this Amendment by PDF shall be followed up immediately by delivery of the originally signed counterpart to the Commission.

8. General Provisions.

A. Entirety of Agreement. The Original Agreement consisting of five (5) pages, Attachment A consisting of four (4) pages, Amendment One, consisting of three (3) pages, and Amendment Two, consisting of three (3) pages, represent the entire and integrated Agreement between the parties and supersede all prior negotiations, representations, and agreements whether written or oral.

THE REMAINDER OF THIS PAGE WAS INTENTIONALLY LEFT BLANK

Amendment Two to the Powder/Tongue and Northeast River Basin Plans Groundwater Update between WWDC and WSGS Page 2 of 3

RN041819/F

9. Signatures. The parties to this Amendment through their duly authorized representatives have executed this Amendment on the days and dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

This Amendment is not binding on either party until approved by A&I Procurement and the Governor of the State of Wyoming or his designee, if required by Wyo. Stat. § 9-2- 1016(b)(iv).

WYOMING WATER DEVELOPMENT COMMISSION

______Chairman Date

______Secretary Date

WYOMING STATE GEOLOGICAL SURVEY

______Erin Campbell Date State Geologist

ATTORNEY GENERAL'S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner Date Assistant Attorney General

______Margaret A. R. Schwartz Date Assistant Attorney General Representing: Wyoming State Geological Survey

Amendment Two to the Powder/Tongue and Northeast River Basin Plans Groundwater Update between WWDC and WSGS Page 3 of 3

FINAL PROJECT CLOSEOUT MEMO FOR LEVEL I AND II PLANNING PROJECTS

WYOMING WATER DEVELOPMENT OFFICE

PLANNING DIVISION

The Planning Project listed below is complete and scheduled for closeout. This memo serves to summarize the findings of the final report and to document the final contract amount.

PROJECT: Niobrara/Lower North Platte Rivers Watershed Study LEVEL: I SPONSOR: Niobrara Conservation District LOCATION: Goshen, Niobrara, and Platte Counties PROGRAM: New Development PROJECT MGR: Jodie Pavlica WWDC MTG DATE: May 17, 2019

AUTHORIZING LEGISLATION: Purpose Chapter Session Account Appropriation Due Date Level I 65 2017 I $1,087,500* 2020

* The 2017 Wyoming State Legislature authorized a “block appropriation” for one or more of seven watershed studies for which applications had been received and for which the Commission was instructed to establish a prioritized list. This study was one of four prioritized and approved for funding by the Commission with a project specific budget of $271,875.

CURRENT CONTRACT: Consultant Re/Spec Inc. Original Final Contract Contract Contract Savings Expiration Contract Number Executed Amount Amount Amount Date 05SC0296976 6-14-17 $267,900 $267,900 $0 6-30-19

PROJECT DESCRIPTION: The Niobrara Conservation District requested a watershed study to evaluate current watershed condition and function, in response to the 2015 severe flood episode. This study helped to identify opportunities for river bank stabilization and erosion control. Irrigation system efficiency, wetland and riparian area analyses, and a geomorphic classification were also investigated. The District also wanted to consider their options for groundwater conservation. This study provides baseline data from which the District can pursue the implementation of management practices that address the natural resource issues within the watershed. The completion of this watershed study puts the District in a position to leverage Small Water Project Program funding to address specific watershed conditions while providing benefit for wildlife, livestock and the environment.

PROJECT FINDINGS/RECOMMENDATIONS: To complete the objectives of the study as outlined above, the following items were completed: • Encouraged communication and solicited participation among all interested parties • Inventoried and evaluated the watershed condition and function

Page 1 of 2

• Performed a geomorphic classification to identify impaired reaches and improvement options • Assessed irrigation systems and generated rehabilitation alternatives for irrigators • Evaluated potential opportunities to improve water availability for livestock and wildlife • Developed alternatives for improvements in a Watershed Management and Rehabilitation Plan • Identified permits, easements, and clearances necessary for plan implementation • Estimated costs for proposed improvement alternatives and potential projects • Completed an economic analysis and identified potential sources of funding

Utilizing the information gathered in the above tasks, the consultant developed the following project recommendations:

• A total of 10 proposed irrigation projects with 16 associated components were identified during field inventories • 24 proposed livestock/wildlife water projects were identified for development. This included 13 wells, 6 solar pumps, 6 spring developments, over 50,000 feet of buried pipelines, 39 stock tanks, 7 storage tanks, and several ponds/reservoirs • 5 new small ponds were proposed for construction, 3 existing stock ponds were proposed for rehabilitation, and one reservoir (Hoblit Reservoir, 59.67 acre-feet) was proposed for rehabilitation • 3 channel stabilization projects were proposed on the North Platte River

The projects described above can be found in more detail in the study’s Rehabilitation and Management Plan in Chapter 4 of the report.

PUBLIC REPORT PRESENTATION HEARING: N Date Location City/Town 12-4-18 Platte Valley Bank, 2201 Main St Torrington 12-4-18 Niobrara County Fairgrounds, 4080 Hwy 20 Lusk

FINAL REPORT/EXECUTIVE SUMMARIES ONLINE: Final Report: http://library.wrds.uwyo.edu/wwdcrept/Niobrara/Niobrara_Lower_North_Platte_Watershed- Level_I_Management_Plan-Final_Report-2019.html Executive Summary: http://library.wrds.uwyo.edu/wwdcrept/Niobrara/Niobrara_Lower_North_Platte_Watershed- Level_I_Management_Plan-Executive_Summary-2019.html

WWDO RECOMMENDATION: Based on this study, the Office recommends supporting the funding of Small Water Program projects and conventional program projects within this watershed on a case by case basis.

WWDC PROPOSED MOTION:

I move acceptance of the Niobrara/Lower North Platte Rivers Watershed Level I Study project report as being complete and further, the WWDC makes the following findings relative to this project:

That the Commission recommends proceeding to the next Level of project development upon the submittal of an appropriate funding application by the sponsor.

Page 2 of 2

FINAL PROJECT CLOSEOUT MEMO FOR LEVEL I AND II PLANNING PROJECTS

WYOMING WATER DEVELOPMENT OFFICE

PLANNING DIVISION

The Planning Project listed below is complete and scheduled for closeout. This memo serves to summarize the findings of the final report and to document the final contract amount.

PROJECT: Sunlight Basin Instream Flows LEVEL: I SPONSOR: State of Wyoming LOCATION: Park County (Sunlight Basin north of Cody) PROGRAM: Instream Flow Studies PROJECT MGR: Chace Tavelli WWDC MTG DATE: May 17, 2019

AUTHORIZING LEGISLATION: Purpose Chapter Session Account Appropriation Due Date Level I 31 2016 I $47,460 2018

CURRENT CONTRACT: Consultant Biota Research and Consulting, Inc. Original Final Contract Contract Contract Savings Expiration Contract Number Executed Amount Amount Amount Date 05SC0296973 6-19-17 $47,460 $47,460 $ 0 6-30-19

PROJECT DESCRIPTION: Per Wyo. Stat. § 41-3-1003 the Wyoming Game and Fish Commission (WGFC) identified three stream segments where instream flows were deemed critical for instream flows. The segments for this study were Muddy Creek, Crandall Creek, and Dead Indian Creek, all located in Park County and tributaries to the Clarks Fork Yellowstone River. The WGFC, though the Wyoming Game and Fish Department (WGFD), studied and produced biological reports for each identified segment. The analyses completed in the biological reports aided the WGFC in identifying the points on the stream at which the need for instream flows begin and end, the time of year when the flows are most critical, and a detailed description of the minimum amount of water necessary to provide adequate instream flows to maintain or improve habitat for Yellowstone Cutthroat Trout. Said statute then requires the Wyoming Water Development Commission (WWDC) to file applications in the name of the State of Wyoming for permits to appropriate water for instream flows in those segments of streams recommended by the WGFC.

Per Wyo. Stat. § 41-3-1004(a), the WWDC is charged with determining the feasibility of providing instream flows for the recommended segments of streams from unappropriated direct flows, from existing storage facilities, or from new facilities. This study meets that requirement.

PROJECT FINDINGS/RECOMMENDATIONS: It was determined that the instream flows requested could not be satisfied by new storage as it is not economically viable; there is no existing storage. Two analyses were used to help determine the availability of unappropriated direct flows; a mean monthly unappropriated direct flow analysis and an exceedance

Page 1 of 2

analysis. An exceedance of 20% or more is desired to ensure the water right is exercised once every five years which is consistent with Wyo. Stat. § 41-3-401(a). Per Wyo. Stat. § 41-3-1004(b), the following summaries provide the findings from the study. The bold and underlined values indicate a threshold has been achieved. Meeting a threshold means that there is a potential for an instream flow request to be satisfied during the specified time period. The threshold for unappropriated direct flow is a value equal to or greater than the instream flow request. The threshold for the exceedance analysis is a value of 20% or greater. The % exceedance of the requested flow value is the percentage of time that the flows are equal to or greater than the instream flow request.

31

-

- 15 e Muddy Creek Jan Oct Feb Apr Dec Mar Aug Nov Sept May Jun July 1 July July 16 July

Instream Flow Request 1.3 1.3 1.3 1.3 29 29 29 3 3 3 1.3 1.3 1.3 (cfs) Unappropriated Direct 0.6 0.4 0.4 1.7 15.7 35.3 22.4 9.9 3.8 1.9 1.5 1.1 0.7 Flow (cfs) % Exceedance of 0 0 1 40 16 64 22 100 55 6 61 18 2 Requested Flow (%)

Crandall Creek Jan Oct Feb Apr Dec July Mar Aug Nov Sept May June

Instream Flow Request (cfs) 27 27 27 27 66 66 55 55 55 27 27 27 Unappropriated Direct Flow 12.5 11.1 11.9 27.3 124.3 317.7 205.5 73.7 37.2 29.7 19.3 14.1 (cfs) % Exceedance of Requested 2 0 0 22 66 100 100 64 12 42 7 1 Flow (%)

Dead Indian Creek Jan Oct Feb Apr Dec July Mar Aug Nov Sept May June

Instream Flow Request (cfs) 13.3 13.3 13.3 13.3 31 31 28 28 28 13.3 13.3 13.3 Unappropriated Direct Flow 14 13 13.6 24.1 71.7 146.6 104.8 48.7 29.8 25.5 18.9 15.3 (cfs) % Exceedance of Requested 43 24 33 90 81 100 100 96 44 100 99 67 Flow (%)

FINAL REPORT/EXECUTIVE SUMMARIES ONLINE: Final Report: http://library.wrds.uwyo.edu/instream_flow/Sunlight_Basin- Feasibility_of_Providing_Instream_Flows-Final_Report-2019.html Executive Summary: N/A

WWDO RECOMMENDATION: A WWDO recommendation is not applicable for this study. The completed study was forwarded to the Wyoming State Engineer’s Office, Wyoming Board of Control Water Division III Superintendent’s Office (Riverton), and the Wyoming Game & Fish Department.

WWDC PROPOSED MOTION: I move acceptance of the Sunlight Basin Instream Flows, Level I Study project report as being complete.

Page 2 of 2

RN050219/F

AMENDMENT ONE TO PROJECT AGREEMENT BLUFF/UPPER BLUFF SYSTEM IMPROVEMENTS 2019 PROJECT

1. Parties. This Amendment is made and entered into by and between the State of Wyoming, acting by and through the WYOMING WATER DEVELOPMENT COMMISSION [COMMISSION], whose address is: 6920 Yellowtail Road, Cheyenne, WY 82002 and BLUFF/UPPER BLUFF IRRIGATION DISTRICT, Washakie County, Wyoming, a duly organized irrigation district existing under the laws of that state [SPONSOR], whose address is: BLUFF/UPPER BLUFF IRRIGATION DISTRICT, P.O. Box 923, Worland, WY 82401.

2. Purpose of Amendment. This Amendment shall constitute the first amendment to the Project Agreement between the COMMISSION and the SPONSOR. The purpose of this Amendment is to effectuate 2019 Wyo. Sess. Laws, Ch. 55, modifying the PROJECT budget.

The original Project Agreement, dated April 10, 2019, authorized the design, construction and operation of the project, specified terms for funding the project and provided project financing.

3. Term of the Amendment. This Amendment shall commence upon the date the last required signature is affixed hereto [Effective Date], and shall remain in full force and effect through the term of this Project Agreement, as amended, unless terminated at an earlier date pursuant to the provisions of the Project Agreement, or pursuant to federal or state statute, rule or regulation.

4. Amendments.

A. PROJECT Loan and Grant. The PROJECT funding as set forth in Section 4.A. of the original Project Agreement is hereby amended to read as follows:

4.A. A. A sum not to exceed TWO HUNDRED NINETY-ONE THOUSAND DOLLARS ($291,000.00) shall be disbursed to the SPONSOR for the purpose of completing the aforementioned PROJECT. The funds are divided as follows:

(1) A grant to the SPONSOR of not more than TWO HUNDRED FORTY- FIVE THOUSAND TWO HUNDRED TWENTY DOLLARS ($245,220.00) or sixty- seven percent (67%) of the actual development costs, whichever is less.

(2) A loan to the SPONSOR of not more than FORTY-FIVE THOUSAND SEVEN HUNDRED EIGHTY DOLLARS ($45,780.00) or twelve and fifty-one hundredths percent (12.51%) of the actual development costs, whichever is less, for a term of twenty (20) years at an annual interest rate of four percent (4%).

5. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Project Agreement between the COMMISSION and the SPONSOR, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the SPONSOR of an originally signed counterpart of this Amendment by PDF shall be followed up immediately by delivery of the originally signed counterpart to the COMMISSION.

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & BLUFF/UPPER BLUFF IRRIGATION DISTRICT BLUFF/UPPER BLUFF SYSTEM IMPROVEMENTS 2019 PROJECT Page 1 of 3 RN050219/F

6. General Provisions.

A. Entirety of Agreement. The original Project Agreement, consisting of eight (8) pages; and this Amendment One, consisting of three (3) pages, represent the entire and integrated agreement between the parties and supersede all prior and contemporaneous negotiations, representations and agreements, whether written or oral.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & BLUFF/UPPER BLUFF IRRIGATION DISTRICT BLUFF/UPPER BLUFF SYSTEM IMPROVEMENTS 2019 PROJECT Page 2 of 3 RN050219/F

7. Signatures. The parties to this Amendment, through their duly authorized representatives, have executed this Amendment on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

BLUFF/UPPER BLUFF IRRIGATION DISTRICT

______President / Commissioner Date

______Clerk / Commissioner Date

______Treasurer / Commissioner Date

ATTORNEY GENERAL'S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner, Date Assistant Attorney General

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & BLUFF/UPPER BLUFF IRRIGATION DISTRICT BLUFF/UPPER BLUFF SYSTEM IMPROVEMENTS 2019 PROJECT Page 3 of 3 RN012819/F

AMENDMENT ONE TO PROJECT AGREEMENT CASPER ZONE 3 IMPROVEMENTS PROJECT

1. Parties. This Amendment is made and entered into by and between the State of Wyoming, acting by and through the WYOMING WATER DEVELOPMENT COMMISSION [COMMISSION], whose address is: 6920 Yellowtail Road, Cheyenne, WY 82002 and CITY OF CASPER, Natrona County, Wyoming, a duly organized municipality existing under the laws of that state [SPONSOR], whose address is: CITY OF CASPER, 200 N. David, Casper, 82601.

2. Purpose of Amendment. This Amendment shall constitute the first amendment to the Project Agreement between the COMMISSION and the SPONSOR. The purpose of this Amendment is to effectuate 2014 Wyo. Sess. Laws, Ch. 100, modifying the PROJECT to the extend reversion date.

The original Project Agreement, dated July 2, 2014, for the design and construction of a transmission pipeline, pumping facilities, storage tank; and appurtenances necessary to make the PROJECT function in the manner intended.

3. Term of the Amendment. This Amendment shall commence upon the date the last required signature is affixed hereto [Effective Date], and shall remain in full force and effect through the term of this Project Agreement, as amended, unless terminated at an earlier date pursuant to the provisions of the Project Agreement, or pursuant to federal or state statute, rule or regulation.

4. Amendments.

A. Reversion of Unexpended Funds. The reversion date for unexpended funds as set forth in Section 4.R. of the original Project Agreement is hereby amended to read as follows:

4.R. The SPONSOR agrees that it will complete the PROJECT and that it shall be responsible for operation and maintenance of the PROJECT in accordance with accepted engineering practices. The SPONSOR shall be responsible for all costs, including labor, for all operation, maintenance and repairs. In addition, the SPONSOR shall complete the PROJECT no later than the reversion date of July 1, 2020 and shall have settled all claims and paid all PROJECT expenses by that date. No funds will be paid by the COMMISSION after the reversion date specified and the SPONSOR shall be solely responsible for payment of any expenses incurred or claims received after said date.

B. Engineering Contract Changes. The list of conditions as described in Section 4.E. of the original Project Agreement is hereby amended to read as follows:

4.E. As conditions for disbursing funds to the SPONSOR, the SPONSOR shall:

(1) Provide to the COMMISSION for prior examination of and concurrence with all contracts to be executed by the SPONSOR for all work contemplated by this Agreement and any changes or work orders for items not covered in the contract documents.

(2) Provide to the COMMISSION for examination and concurrence with all plans and specifications prepared and any bids received prior to bidding and project award.

(3) Cause the SPONSOR’S ENGINEER to hold progress review meetings at the ten percent (10%), fifty percent (50%) and ninety percent (90%) levels of completion of the PROJECT plans.

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & CITY OF CASPER CASPER ZONE 3 IMPROVEMENTS PROJECT Page 1 of 3 RN012819/F

(4) Comply with all applicable State statutes regarding contractor retainage accounts.

(5) Cause the SPONSOR’S ENGINEER to provide to the COMMISSION a summary of bids received.

(6) Communicate to the COMMISSION all information on all aspects of the PROJECT and require that the SPONSOR'S ENGINEER submit or make available for inspection, such reports on the progress of the work and on the results of tests of materials and workmanship requested by the COMMISSION.

(7) Provide to the COMMISSION for review the qualifications of the engineering or consulting firm proposed by the SPONSOR to design, inspect and monitor construction of the PROJECT. Said examination shall include, but not be limited to, supervisory position assignments. The COMMISSION may review any changes to engineering or consulting firm personnel assigned to the PROJECT.

(8) Prior to incurring any cost increases to the PROJECT, the SPONSOR shall submit all proposed cost increases to the COMMISSION for review and written concurrence. The SPONSOR shall execute an amendment or change order for all changes to the engineer’s or contractor’s contract.

5. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Project Agreement between the COMMISSION and the SPONSOR, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the SPONSOR of an originally signed counterpart of this Amendment by facsimile or PDF shall be followed up immediately by delivery of the originally signed counterpart to the COMMISSION.

6. General Provisions.

A. Entirety of Agreement. The original Project Agreement, consisting of eight (8) pages; and this Amendment One, consisting of three (3) pages, represent the entire and integrated agreement between the parties and supersede all prior and contemporaneous negotiations, representations and agreements, whether written or oral.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & CITY OF CASPER CASPER ZONE 3 IMPROVEMENTS PROJECT Page 2 of 3 RN012819/F

7. Signatures. The parties to this Amendment, through their duly authorized representatives, have executed this Amendment on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

CITY OF CASPER

______Charles Powell, Mayor Date

______J. Carter Napier, City Manager Date

ATTORNEY GENERAL'S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner, Assistant Attorney General Date

AMENDMENT ONE TO PROJECT AGREEMENT BETWEEN WWDC & CITY OF CASPER CASPER ZONE 3 IMPROVEMENTS PROJECT Page 3 of 3 AMENDMENT ELEVEN TO CONSULTANT CONTRACT FOR SERVICES NO. 05SC0293018 MIDDLE PINEY RESERVOIR PROJECT BETWEEN WYOMING WATER DEVELOPMENT COMMISSION AND WENCK ASSOCIATES, INC.

1. Parties. This Amendment is made and entered into by and between the Wyoming Water Development Commission [WWDC], whose address is: 6920 Yellowtail Road, Cheyenne, Wyoming 82002; and Wenck Associates, Inc. [Consultant], whose address is: 7000 Yellowtail Road, Suite 230, Cheyenne, Wyoming 82009.

2. Purpose of Amendment. This Amendment shall constitute the eleventh amendment to the Contract between the WWDC and the Consultant. The purpose of this Amendment is to: a) increase the total Contract dollar amount by one hundred eighty- three thousand dollars ($183,000.00) to one million, nine hundred ninety-nine thousand, two hundred seventeen dollars ($1,999,217.00); b) extend the term of the Contract through June 30, 2023; c) replace Exhibit A, as amended, with Exhibit A-2, Revised Scope of Services; and d) replace Exhibit B, as amended, with Exhibit B-2.

The original Contract, dated June 15, 2006, required the Consultant to investigate the options for reconstructing and possibly enhancing Middle Piney Reservoir while making it safe for water storage for a total Contract amount of one hundred ninety-one thousand, seven hundred seventeen dollars ($191,717.00) with an expiration date of June 30, 2008.

Amendment One, dated June 9, 2008, extended the Contract expiration date from June 30, 2008 to October 1, 2008.

Amendment Two, dated November 17, 2008, extended the Contract expiration date from October 1, 2008 to December 31, 2009.

Amendment Three, dated March 11, 2009, documented the WWDC acceptance of the final report and released retainage.

Amendment Four, dated June 5, 2009, amended the Contract to provide assistance to WWDC in addressing permitting issues and ownership issues with the Forest Service. Furthermore, it included mitigation analysis, surveying, stream gauging, drilling and geotechnical design, and preliminary engineering design. The amendment increased the total Contract amount by five hundred thousand dollars ($500,000.00) from one hundred ninety-one thousand, seven hundred seventeen dollars ($191,717.00) to six hundred ninety-one thousand, seven hundred seventeen dollars ($691,717.00), and extended the Contract expiration date from December 31, 2009 to December 31, 2011.

Amendment Five, dated November 7, 2011, extended the Contract expiration date

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 1 of 6 from December 31, 2011 to December 31, 2012.

Amendment Six, dated November 15, 2012, extended the Contract expiration date from December 31, 2012 to December 31, 2014.

Amendment Seven, dated March 8, 2013, acknowledged the purchase of States West Water Resources Corporation by Wenck Associates, Inc. and replaced Exhibit B Hourly Rate and Reimbursable Expenses Price Schedule.

Amendment Eight, dated March 13, 2014, supplemented existing tasks to assist the WWDC in project coordination, final design and specification preparation, and permit acquisition. The amendment increased the total Contract amount by three hundred thousand dollars ($300,000.00), from six hundred ninety-one thousand, seven hundred seventeen dollars ($691,717.00) to nine hundred ninety-one thousand, seven hundred seventeen dollars ($991,717.00), and extended the Contract expiration date from December 31, 2014 to March 31, 2016.

Amendment Nine, dated March 7, 2016, extended the Contract expiration date from March 31, 2016 to March 31, 2017.

Amendment Ten, dated March 17, 2017, amended the original Contract to: a) add Level III bidding, construction management, field inspection, project closeout, and office support responsibilities for the Consultant; b) increase the total Contract dollar amount by eight hundred twenty-four thousand, five hundred dollars ($824,500.00) from nine hundred, ninety-one thousand, seven hundred seventeen dollars ($991,717.00) to one million, eight hundred sixteen thousand, two hundred seventeen dollars ($1,816,217.00); and c) extend the term of the Contract from March 31, 2017 to December 31, 2021.

3. Term of the Amendment. This Amendment shall commence immediately upon the date the last required signature is affixed hereto, and shall remain in full force and effect through the term of the Contract, as amended, unless terminated at an earlier date pursuant to the provisions of the Contract, or pursuant to federal or state statute, rule or regulation.

4. Amendments.

A. The entirety of Section 4.A of the original Contract is hereby amended to read as follows:

“A. Reimbursement of Expenses. The WWDC agrees to pay the Consultant an amount based on the approved hourly rate and reimbursable expenses price schedules depicted in Exhibit B, incorporated herein, for the services described in Exhibit A, incorporated herein. Total payment under this Contract shall not exceed one million, nine hundred-ninety nine thousand, two hundred-seventeen dollars ($1,999,217.00).”

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 2 of 6

B. The entirety of Section 4.B. of the original Contract is hereby amended to read as follows:

“B. Project Budget. The Project budget for each task included in Exhibit A is as follows:

Level II Tasks Estimated Cost

Task 1. Scoping and Project Meetings $ 12,368.76 Task 2. Access $ 1,333.75 Task 3. Surveying $ 6,466.90 Task 4. System Efficiencies and Conservation Opportunities $ 9,010.94 Task 5. Identify Areas of Need and Demand Projections $ 1,857.66 Task 6. Middle Piney Creek Hydrology $ 31,868.69 Task 7. Evaluation of the Existing Structure $ 13,375.77 Task 8. Enlargement Potential $ 1,351.02 Task 9. Geotechnical Evaluation $ 37,568.63 Task 10. Preliminary Designs $ 17,086.00 Task 11. Environmental and Permitting Issues $ 13,520.44 Task 12. Cost Estimates $ 5,671.72 Task 13. Economic Analysis and Project Financing $ 10,498.99 Task 14 Legal Entity $ 1,182.14 Task 15. Reports $ 16,100.00 Task 16. Project Presentation and Public Hearing $ 2,126.58 Task 17. Project Coordination $ 61,300.00 Task 18. Stream Gaging $ 65,880.00 Task 19. Surveying $ 31,643.68 Task 20. Permit Acquisition $ 136,250.00 Task 21. Final Geotechnical Investigation $ 245,250.00 Task 22. Final Design and Specification Preparation $ 260,056.32 Task 23. Acquisition of Access and Rights of Way $ 780.22 Task 24. Discretionary Task $ 9,168.79

Level II Subtotal $ 991,717.00

Level III Tasks Estimated Cost

Task 1. Bidding $ 10,300.00 Task 2. Construction Management $ 224,400.00 Task 3. Field Inspection $ 538,000.00 Task 4. Project Closeout $ 47,500.00 Task 5. Office Support $ 4,300.00 Task 6. Zone 6 Embankment, Riprap and Weir Augmentation Evaluation $ 33,000.00 Task 7. Discretionary Task $ 150,000.00

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 3 of 6

Level III Subtotal $ 1,007,500.00

PROJECT TOTAL COST $ 1,999,217.00

The amounts for each task are estimates only, but are not to be exceeded unless authorized in writing by the WWDC. No funds from the Level III, Task 7 – Discretionary Task shall occur without the WWDC’s written concurrence to the Consultant. The Contract total amount is controlling. Payment shall be made directly to the Consultant. The Consultant shall maintain hourly records of time worked by its personnel to support any audits the state or the WWDC may require. Billing reports shall be submitted no more often than monthly for activities and costs accrued since the last billing report and shall be made on forms provided by the WWDC. The Consultant may use alternate billing forms if approved in advance by the WWDC project manager. A brief project progress report summarizing project activities in the billing period must be submitted with each billing.”

C. The second sentence of Section 3 of the original Contract is hereby amended to read as follows:

“The term of this Contract is from June 15, 2006 through June 30, 2023.”

5. Amended Responsibilities of the Consultant.

Responsibilities of the Consultant are hereby amended as follows:

A. As of the Effective Date of this Amendment, Exhibit A, Scope of Services, as amended, which was attached to the original Contract, is superseded and replaced by Exhibit A-2, Revised Scope of Services, which is attached to this Amendment and incorporated into the original Contract by this reference. All references to “Exhibit A” in the original Contract, and in any amendments thereto, are amended to read: “Exhibit A-2”.

B. As of the Effective Date of this Amendment, Exhibit B, 2006 States West Water Resources Corp. Schedule of Rates, Fees and Charges, as amended, which was attached to the original Contract, is superseded and replaced by Exhibit B-2, Wenck West 2019 Fee Schedule, which is attached to this Amendment and incorporated into the original Contract by this reference. All references to “Exhibit A” in the original Contract, and in any amendments thereto, are amended to read: “Exhibit B-2”.

6. Amended Responsibilities of the WWDC.

Responsibilities of the WWDC have not changed.

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 4 of 6

7. Special Provisions.

A. Same Terms and Conditions. With the exception of items explicitly delineated in this Amendment, all terms and conditions of the original Contract, and any previous amendments, between the WWDC and the Consultant, including but not limited to sovereign immunity, shall remain unchanged and in full force and effect.

B. Counterparts. This Amendment may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Amendment. Delivery by the Consultant of an originally signed counterpart of this Amendment by PDF shall be followed up immediately by delivery of the originally signed counterpart to the WWDC.

8. General Provisions.

A. Entirety of Contract. The Original Contract, consisting of twelve (12) pages; Exhibit A, Scope of Services, consisting of ten (10) pages; Exhibit B, 2006 States West Water Resources Corp. Schedule of Rates, Fees and Charges, consisting one (1) page; Amendment One, consisting of two (2) pages; Amendment Two, consisting of two (2) pages; Amendment Three, consisting of three (3) pages; Amendment Four, consisting of nine (9) pages; Amendment Five, consisting of three (3) pages; Amendment Six, consisting of three (3) pages; Amendment Seven, consisting of four (4) pages; Amendment Eight, consisting of four (4) pages; Amendment Nine, consisting of three (3) pages; Amendment Ten, consisting of ten (10) pages; this Amendment Eleven, consisting of six (6) pages, Exhibit A consisting of twenty-four (24) pages and Exhibit B consisting of one (1) page represent the entire and integrated Contract between the parties and supersede all prior negotiations, representations, and agreements whether written or oral.

THE REMAINDER OF THIS PAGE WAS INTENTIONALLY LEFT BLANK

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 5 of 6

9. Signatures. The parties to this Amendment, through their duly authorized representatives, have executed this Amendment on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Amendment.

This Amendment is not binding on either party until approved by A&I Procurement and the Governor of the State of Wyoming or his designee, if required by Wyo. Stat. § 9-2- 1016(b)(iv).

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

WENCK ASSOCIATES, INC.

______Victor Anderson, Principal Date Employer Identification Number: 41-1520095

ATTORNEY GENERAL’S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner Date Assistant Attorney General

Amendment Eleven to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 6 of 6

EXHIBIT A-2 REVISED SCOPE OF SERVICES

A. AUTHORIZATION:

The Wyoming Legislature has authorized the Wyoming Water Development Commission to conduct the project study and perform design and construction engineering described herein. The Consultant will complete the tasks and require- ments outlined in Exhibit A-2, Revised Scope of Services.

B. PROJECT DESCRIPTION:

1. Location. Middle Piney Reservoir is located on the Middle Piney Creek, approximately thirty (30) miles west of Big Piney/Marbleton in Sublette County.

2. Purpose. To perform a Level II study of the Middle Piney Reservoir.

3. History. The Middle Piney Dam is an earthen structure that was constructed in 1940 to provide irrigation and domestic water. In 1979, the Army Corps of Engineers inspected the dam and gave it a high hazard potential classification for damage or loss of life in the event of failure. They also noted considerable seepage under and around the dam. Due to seepage, the dam is relatively ineffective for storage of water except in early spring when flow is high. The Forest Service has locked the gates in the open position.

C. PROJECT REQUIREMENTS:

1. Monthly Progress Reports and Billing Statements

The Consultant shall submit a brief monthly progress report outlining the study status, progress, and results to date, regardless of whether or not a billing statement is submitted, on or before the last working day of the month.

Each billing statement must include a task-by-task report and receipts for reimbursable expenses justifying the cost items contained in the billing statement. The monthly progress report may be used as the justification for the billing statement as long as all cost items covered in the billing statement are addressed in the progress report.

2. Computer Models, Statement of Assumptions, Project Work File

a. If the Consultant writes or uses a computer model or spreadsheet as a part of this project, the Consultant shall submit to the WWDC for approval

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 1 of 21 all proposed model names and data formats prior to beginning work on that task. All data shall be submitted to WWDC in written and digital formats with the final report. Digital media shall be labeled by the Consultant to provide sufficient detail to access the information on that media. User manuals shall be submitted by the Consultant to WWDC providing complete documentation of computer models developed under this project. The user manuals shall also contain the source code language and the type of computer equipment necessary to operate the model(s). All computer models, databases, and spreadsheets developed herein (written and digital formats) are due on the same date as the final report.

b. To facilitate the Commission's accurate evaluation of the Consultant's work product, computations, conclusions and recommendations, the Consultant shall:

* Include in the final report a section describing the assumptions and methodology used by the Consultant in generating the data and conclusions contained in that chapter.

* Maintain a project work file containing the materials used in project analysis. This file will be available for review by the Commission and should be organized in such a way as to allow replication of the steps and procedures used by the Consultant to reach the conclusions described in the study.

* Prepare a project notebook containing a description of the assumptions and methodologies used in the project analysis. The notebook shall be organized in such a way as to allow replication of the steps, calculations, and procedures used by the Consultant to reach the conclusions described in the draft final report. The project notebook shall be submitted with the draft final report.

3. Cost Estimates

The Consultant shall provide, as a part of project cost estimates, an estimate of:

a. The cost to prepare final plans and specifications.

b. The cost to acquire permits and to mitigate project impacts.

c. The cost of project legal expenses.

d. The cost of acquiring access and rights-of-way.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 2 of 21 4. Calculation of Engineering Costs and Contingencies

The Consultant shall use the following guidelines in calculating Level III cost es- timates. Level III Cost Estimates

Preparation of Final Designs and Specifications $______Permitting and Mitigation $______Legal Fees $______Acquisition of Access and Rights of Way $______

Cost of Project Components $______$______$______Construction Cost Subtotal #1 $______Engineering Costs = CCS#1 x 10% $______Subtotal #2 $______Contingency = Subtotal #2 x 15% $______

Construction Cost Total $______Project Cost Total $______

5. Final Report

The Consultant shall use the Contract Scope of Services as the outline for draft and final reports so that Consultant compliance with Contract provisions can be verified. IF THE FINAL REPORT CONTAINS INFORMATION OF AN ENGINEERING NATURE, THE COVER OF THE FINAL REPORT, ALL PLATES, AND THE EXECUTIVE SUMMARY MUST BE STAMPED AND SIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WYOMING. IF THE FINAL REPORT CONTAINS INFORMATION OF A GEOLOGIC NATURE, THE COVER OF THE FINAL REPORT, ALL PLATES, AND THE EXECUTIVE SUMMARY MUST BE STAMPED AND SIGNED BY A PROFESSIONAL GEOLOGIST LICENSED IN THE STATE OF WYOMING. IF THE FINAL REPORT CONTAINS INFORMATION OF BOTH AN ENGINEERING AND GEOLOGIC NATURE, THE COVER OF THE FINAL REPORT, ALL PLATES, AND THE EXECUTIVE SUMMARY MUST BE STAMPED AND SIGNED BY BOTH A PROFESSIONAL ENGINEER AND A PROFESSIONAL GEOLOGIST LICENSED IN THE STATE OF WYOMING. As allowed by the Board of Registration for Professional Geologists and the Board of Registration for Professional Engineers, the consultant may utilize an electronic seal and signature. However, the reproducible original to be submitted as part of the deliverables required herein must utilize an original seal(s) and original signature(s).

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 3 of 21 6. Final Report - Digital Format

In addition to the paper submittal described in Section C.5 above, the Consultant shall also provide the final documents and related materials in a digital format. This digital format shall contain the final documents in their entirety, including all text, tables, plates, figures, etc. The deliverables under this section shall be contained on a standard CD ROM(s) or DVD ROM(s). The document shall be in Word 2003 and Adobe Acrobat V7 format. Any plates, figures, etc. not suitable for Word 2003 shall be in AutoCAD Map 2000, ArcGIS 8.x or higher, Adobe Acrobat, or compatible format. Other formats may be used if approved in advance by the WWDC project manager. The final documents will also be provided fully assembled into one file, in a complete “internet ready” digital format to facilitate their distribution via the WWDC website.

7. Anticipated Project Funding Assistance

The Consultant shall clearly identify project components eligible for WWDC funding, both in cost estimates and in project mapping. The Consultant shall verify project component funding eligibility with the WWDC prior to commencing any economic analysis. Unless otherwise directed by the WWDC project manager, the Consultant shall assume that rehabilitation projects will be funded with a 67% grant and a 33% loan. The WWDC loan portion of the project will be financed at a 4% interest rate with a term to be specified by the WWDC project manager. New development projects will be funded with a 67% grant and 33% loan, at a 4% interest rate with a term to be specified by the WWDC project manager. If funding is anticipated from another agency, such as the Office of State Lands and Investments, Abandoned Mine Lands (AML) or Rural Utility Service (RUS), the Consultant shall prepare cost estimates for system components not eligible for WWDC assistance in a format and level of detail acceptable to the potential funding agency.

If required in the Contract Scope of Services, the Consultant shall provide the information necessary to complete applications to RUS, the Office of State Lands and Investments, and any other identified funding sources.

8. Project Access

The Consultant shall be responsible for obtaining access as required for project tasks.

9. Stand-By Time

The WWDC will not reimburse the Consultant for stand-by time charges for the Consultant's supervisory personnel.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 4 of 21 10. Well Permitting

All wells developed under this program shall list the State of Wyoming, Water Development Commission as the permittee. The Consultant shall be responsible for obtaining the permit.

11. Verification Log

After all casing has been installed in the well, the WWDC may require that a geophysical log be performed on the well to verify casing placement. A copy of this log shall be included in the final report.

D. LEVEL II SCOPE OF SERVICES:

Task 1. Scoping and Project Meetings

A scoping meeting shall be held early in the project schedule to familiarize the sponsor and interested parties with the scope of the project and to obtain input from affected parties. The Consultant will prepare a presentation, including maps and other visual aids, to explain the project studies.

The Consultant shall plan for a minimum of four additional project meetings to be held in the project area. Three meetings will be scheduled at the discretion of the WWDC project manager depending on developments during the study. A results presentation project meeting will be held at the conclusion of the study.

Project meetings will be conducted, as necessary, for the coordination of project activities and for keeping the sponsors informed of project progress. Several informal meetings with the project sponsor and steering committee may be necessary during the course of the study. In the interest of economy, meetings shall be scheduled to coincide with fieldwork, if possible. The Consultant shall notify the WWDC project manager in advance of any meetings with the project sponsor or other interested parties. Consultant will be responsible for setting and conducting these meetings in coordination with the WWDC and sponsor. The consultant will prepare all notices and needed materials for the meetings.

Task 2. Access

The Consultant shall be responsible for obtaining access as required for all project tasks.

Task 3. Surveying

The Consultant shall be responsible for the surveying necessary to prepare designs as required for project completion.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 5 of 21

Task 4. System Efficiencies and Conservation Opportunities

The Consultant shall identify system efficiencies within the Middle Piney Drainage and present opportunities for conservation. This shall include, but not be limited to, a literature review and a discussion at the scoping meeting with the project sponsor on efficiencies of existing irrigation units and conservation. The Consultant shall also review conveyance losses throughout the system.

Task 5. Identify Areas of Need and Demand Projections

The Consultant shall use the spreadsheet model developed for the Green River Basin Plan or the State Mod Model developed for the Upper Green River Storage Study, as approved by the Project Manager, to identify areas of shortage. The shortages evaluation shall include, but not be limited to, an evaluation of irrigation needs, industrial needs, municipal needs, and fishery habitat needs. The Consultant shall quantify the shortage and, using the information developed in Task 6, develop a list of storage sites to satisfy the shortages.

The Consultant shall examine the need for additional water storage within the Middle Piney Creek Basin. This effort shall include meetings with the State Engineers Office and others to gain their input. After the potential needs are identified, the Consultant shall prepare demand projections for the area to the year 2025. The Consultant shall use the demand projection data in the Green River Basin Plan to complete this task. Projections shall be based on Department of Administration and Information population projections, industrial/commercial demand projections, city/county planning office records, and others. The Consultant shall utilize this information to prepare estimates of water and reservoir usage to the year 2025, including irrigation, industrial, municipal, recreation, fisheries and wildlife, and other uses.

Task 6. Middle Piney Creek Hydrology

The Consultant shall determine the water yield of the Middle Piney Creek watershed including average flows, high flows, low flows, and the annual hydrograph for the stream. This information will be used to determine water available for storage.

The Consultant shall prepare a flood inundation map of the area immediately below the reservoir to verify the hazard classification of the dam.

Task 7. Evaluation of the Existing Structure

The Consultant shall conduct a field evaluation of the existing structure on Middle Piney Reservoir to determine if the structure could be rehabilitated or enlarged to

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 6 of 21 allow increased storage in the reservoir. Additionally, the Consultant shall determine if rehabilitation or enlargement of the facility will provide adequate water to meet the needs of the users.

The Consultant shall review the ownership of the structure on Middle Piney Reservoir and any water storage rights provided by the structure. A review of water rights on Middle Piney Creek shall also be conducted.

The Consultant will conduct an easement and right-of-way review of all adjacent property that would be affected by the rehabilitation or enlargement of the Middle Piney Dam and Reservoir. The information will be compiled and provided with descriptions of the easement or right-of-way type.

Task 8. Enlargement Potential

The Consultant shall evaluate the potential to enlarge Middle Piney Reservoir to allow storage to meet the water demands identified in Tasks 5 and 6. The Consultant shall evaluate structure types and spillway alternatives. Alternate storage sites to meet the needs of the users will also be evaluated for consideration in permitting. These alternative sites will be evaluated at a conceptual level only.

Task 9. Geotechnical Evaluation

The Consultant shall conduct initial geotechnical testing at Middle Piney Reservoir to evaluate materials present and subsurface conditions for the potential rehabilitation or enlargement. Testing will be limited to no more than three drill holes and three backhoe pits. The drilling and testing will require a special use permit from the USDA Forest Service. Some level of NEPA analysis will be necessary for the testing, and the Consultant shall begin working on acquisition of the special use permit early in the project schedule.

Only reconnaissance level geotechnical studies will be required for any alternative sites.

Task 10. Preliminary Designs

The Consultant shall prepare preliminary designs for rehabilitation of the existing structure on Middle Piney Reservoir if rehabilitation is a feasible means of supplying the needed additional water to the users. In addition, the Consultant shall prepare preliminary designs for enlargement of Middle Piney Reservoir, if this proves to be the best method for supplying the needed additional water. The Consultant shall include maps, drawings, and other items to clearly present its proposed preliminary designs.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 7 of 21

Task 11. Environmental and Permitting Issues

The Consultant shall provide an overview of potential environmental issues that will be encountered if the Middle Piney Reservoir control structure is rehabilitated, if a new structure is constructed and the reservoir is enlarged, and if an alternate storage structure were to be constructed as identified under Task 8. The overview will include, but not be limited to, issues such as threatened and endangered species, wetlands, cultural and historical resources, and water quality. Permitting issues shall also be defined and an overview of the permitting process provided.

Task 12. Cost Estimates

The Consultant shall provide construction cost estimates that include all construction components. The cost to end-user calculations shall include all identified and recommended improvements for the rehabilitation and potential enlargement of the structure.

The Consultant shall provide permitting cost estimates to include all permits, easements, and clearances necessary for the project. These cost estimates will be based on year 2009 construction and will include 10% for construction engineering and 15% for construction contingencies as outlined in Section C.4 above.

Task 13. Economic Analysis and Project Financing

Subtask A. Ability to Pay

The purpose of this analysis is to assist in determining a fair and equitable financing plan for the project and to provide information that can be used to determine conditions and level of state assistance. The Consultant shall prepare a life-cycle cost analysis for the project components of the alternatives selected in Task 7 and Task 8. Life-cycle cost estimates shall include operation and maintenance costs, administrative costs, debt retirement, WWDC “Repair and Maintenance Account” funding, costs that are not eligible for WWDC funding, etc. These cost estimates shall be itemized so the sponsor and the WWDC can understand each cost component comprising the total cost estimate. The cost estimates must be of sufficient accuracy to allow alternatives to be compared with each other. The Consultant shall generate recommendations relative to the annual financial commitments that the sponsor could make to retire the construction debt and meet operation and maintenance costs.

The Consultant shall document conversations with funding agencies to collaborate assumptions made by the Consultant based on information given by the funding agencies. The Consultant shall also develop specific information needed to make

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 8 of 21 applications to local, state (including WWDC), and Federal agencies. This information should include timelines, trigger dates, agency criteria, funding requirements, and the conditions and requirements of legal entities recognized by the State of Wyoming.

Subtask B. Benefit-Cost Analysis

The Consultant shall perform a benefit-cost analysis utilizing input and data generated during the course of this study. This information may be supplemented with material acquired from or through various state agencies and the University of Wyoming. The WWDC shall assist the Consultant in the coordination of the benefit- cost analysis.

Task 14. Legal Entity

The Consultant shall review and provide recommendations on the development of a of legal entity, recognized by the State of Wyoming, that will own, operate, maintain, and manage the facilities that have been rehabilitated or enlarged by implementation of study findings. This task shall include an analysis of the type of district (public entity) that would operate in the most effective manner for the objectives and purposes of sponsor organization(s). To provide adequate time for the sponsor to make decisions regarding the type of entity to pursue, recommendations under this task shall be provided by December 31, 2006.

Task 15. Reports

On or before July 1, 2007, the Consultant shall submit to the WWDC ten (10) copies of the draft report and one (1) project notebook as described in Subsection C.2.b., above, providing the results of all work completed in the study.

After receipt and incorporation of WWDC and the Sponsor's review comments, the Consultant shall submit the final report to the WWDC on or before September 1, 2007. The final report shall include a separate environmental report in the appendix if required for additional funding. The final report shall consist of fifteen (15) hard copies and one (1) unbound reproducible original of the final report, twenty (20) hard copies and one (1) unbound reproducible original of an executive summary, twelve (12) CD copies containing both the executive summary and the final report in both Microsoft Word and Adobe Acrobat formats, and one project notebook as described in Subsection C.2.b, above. The digital reports shall be completely assembled, contained in one Word file and one Acrobat file, and shall be the same version as the hard copies. The summary shall outline the purpose, findings, recommendations, and configuration of the project and shall include detailed cost estimates. The summary shall not exceed ten (10) pages. All reports shall be signed pursuant to Section C.5 above.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 9 of 21

Task 16. Project Presentation and Public Hearing

Upon completion of the final report, the Consultant will present its findings at a public meeting in the project area. The Consultant shall publish notice of the meeting not less than once each week for two weeks prior to the meeting. The Consultant will also meet with the WWDC in Cheyenne to present the results of the study.

The record of the project results presentation will include formal and informal notices; any written comments, statements, or exhibits received; and other pertinent data. The record will also include either recorded testimony or a memorandum summarizing the views and comments presented at the meeting.

If the sponsor chooses to request construction funding from the WWDC, a public hearing will be held in cooperation with WWDC to obtain public input. Information and materials to be presented at the hearing will be developed by the Consultant after consultation with WWDC.

Key project personnel will attend the meeting and the hearing and will participate in the presentation.

Task 17. Project Coordination

A scoping meeting shall be held in the project area with the project sponsors and the Wyoming Water Development Office to discuss the scope, foreseeable issues, possible alternatives, and desired results. The Consultant shall also conduct a site visit to verify surveys, verify existing conditions, and meet with affected parties. Additional meetings with other appropriate entities (e.g., U.S. Forest Service, U.S. Army Corps of Engineers, and Wyoming Water Development Office) shall be held on an as-needed basis.

Task 18. Stream Gaging

The Consultant shall prepare final design plans and specifications for the installation of two gaging structures. One gaging structure shall be located on the inlet to Middle Piney Reservoir; the second gaging structure shall be located on the outlet of Middle Piney Reservoir. The location of these gaging structures will be chosen with consultation from the Wyoming Water Development Office.

The Consultant shall aid the Wyoming Water Development Office in the contractor selection process. The Consultant shall obtain the services of a subcontractor as appropriate to construct the gaging structures as per final design plans and specifications. Approval and billings for the subcontractor shall be handled per

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 10 of 21 Section 5.C. of the Contract. The Consultant shall also provide construction management services during the construction of the structures.

Task 19. Surveying

The Consultant shall prepare a survey of the Middle Piney Reservoir storage area. This survey shall be of sufficient detail to obtain a Permit to Construct from the Wyoming State Engineer’s Office. This survey shall have 5-foot contours. The survey shall be integrated with previous surveys that were completed as part of previous phases.

Task 20. Permit Acquisition

The Consultant shall obtain the necessary permits in order to construct the project. The following permits shall be obtained as a part of this task:

• Section 404 Dredge and Fill Permit (U.S. Army Corps of Engineers) • Special Use Permit (U.S. Forest Service) • Permit to Construct (Wyoming State Engineer’s Office) • NPDES Permit (Wyoming Department of Environmental Quality)

It is assumed that an Environmental Assessment (EA) will be required as a part of the permitting process. The following clearances shall be obtained as a part of the EA: • Endangered Species Act • National Historic Preservation Act • Fish and Wildlife Coordination Act

Task 21. Final Geotechnical Investigation

The Consultant shall conduct a final geotechnical investigation so that the final design can be completed. It is assumed that no work shall begin on the project site until the proper permits (e.g., Special Use Permit from U.S. Forest Service) have been acquired.

Subtask 21.1 Drilling and Piezometer Installation

Additional subsurface drilling, in-situ testing, and sampling shall be performed to further explore the ground conditions in the right abutment landslide. One to two deep borings, from 100 to 250 feet deep, shall be drilled between the dam and the south slope of the valley near the campground. The drilling depth estimate is based on the observations from previous boring B-1 that the slide debris extends deeper than 77 feet. The deep boring(s) shall reach the depth required to penetrate the slide debris fully. The information gathered from these boring(s) shall support evaluation and design of any deep seepage control measures that

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 11 of 21 may or may not be required in the future, depending on the performance of the shallow cutoff trench.

At least four additional borings shall be drilled, up to 50 feet deep each, to explore the dam foundation and cutoff trench alignment.

Falling head tests shall be attempted at discrete intervals as the boreholes are advanced through the slide debris. It is understood that the success of this testing method will depend on whether or not the boreholes stand open in the test zones below the casing.

The drilling conditions and recovered materials shall be carefully logged by a qualified engineering geologist as drilling proceeds (and prior to disturbance of the core by placement in core boxes). Where intact bedrock is encountered, the lithology, bedding characteristics and orientation, texture, hardness, strength, cementation, degree of fracturing and weathering, and Rock Quality Designation (RQD) shall be recorded on the core logs. Any unusual conditions encountered during drilling, such as water loss zones, voids, or soft zones shall also be recorded on the drill logs. Core samples shall be preserved in core boxes that indicate the core hole and depth interval. Soil samples collected during drilling of unconsolidated material shall be properly labeled and preserved as possible samples for laboratory analysis.

The borings shall be completed with open standpipe piezometers to allow for monitoring of groundwater levels. The depth of well screen completion intervals shall be determined based on the stratigraphy encountered.

Subtask 21.2 Test Pits

A trackhoe shall be used to investigate the shallow subsurface conditions (generally less than 15 feet) at selected locations in the dam foundation and along the cutoff trench alignment in the right abutment. Backhoe excavations shall generally consist of shallow test pits or short trenches up to 15 feet deep. The excavations shall allow for removal of surface soils for examination of the character and competency of shallow bedrock materials. Test pits shall also allow for determination of bedrock structure (strike and dip) in areas of interest where the bedrock is covered by surficial soils. Test pits shall also be used to evaluate the general depth of alluvial, colluvial (slope deposits), and shallow margins of the landslide deposit. The material exposed in the test pits or trenches shall be logged by an engineering geologist who shall also collect representative samples for soils classification and laboratory testing. The track hoe shall also be used to help create a drilling pad and access for the drill rig as needed. It is assumed that 3 days of backhoe time shall be required.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 12 of 21 Subtask 21.3 Geotechnical Materials Testing

Soil and rock core samples recovered from the landslide deposit shall be tested for engineering index properties. If adequate intact samples can be obtained from the basal slide plane of the landslide deposit, strength testing by direct shear shall also be conducted. Additional bulk sampling and testing of soil materials from the proposed borrow area near the campground shall also be performed. Table 1 summarizes the number and types of tests that are anticipated for planning purposes.

Table 1 Laboratory Tests for Dam Foundation and Borrow Area

ASTM Number of Tests Designation Anticipated Test Description Soil Basal Slide D2216 Soil Moisture 10 D422 Grain Size Analysis 8 D4318 Atterberg Limits 8 D698 Standard Proctor 4 Compaction D5607 Direct Shear 6 D4767 Consolidated, 6 Undrained Triaxial Shear D2435 Consolidation 3

Subtask 21.4 Engineering Geologic Report

The results of the subsurface investigation will be presented in an Engineering Geologic Design Memorandum. Interpretive geologic cross-sections will be prepared. The location of any potentially problematic zones detected during drilling such potential seepage zones will be shown on the cross-sections.

The Engineering Geologic Design Memorandum will include the following:

• Updated engineering geologic map of the dam and reservoir area; • Interpretive geologic cross-sections of the dam foundation area; • Description of the geologic conditions in the dam foundation and reservoir area; • Description of available construction materials (embankment fill, filter/drain and aggregate, and riprap materials); and

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 13 of 21 • Specific recommendations for foundation treatment and use of materials for dam and cutoff construction.

Task 22. Final Design and Specification Preparation

The Consultant shall prepare final design plans and specifications for the rehabilitation of Middle Piney Reservoir. The design shall include detailed plans and specifications for all structures and systems (e.g., foundation, embankment, outlet works, spillway, gaging, and instrumentation).

Draft copies of the design shall be provided to the Wyoming Water Development Office for review at the 60 and 90 percent completion stages. A project meeting shall be held at the project site after the 60 percent comments have been incorporated into the design so that the project sponsors can review the status and direction of the project. Progress and review meetings shall be held with Wyoming Water Development Office on an as needed basis throughout this task.

The Consultant shall perform appropriate geotechnical analyses to develop the design layouts in sufficient detail to support detailed engineering cost opinions for embankment construction and associated earthwork and foundation treatment requirements. The following analyses shall be completed in support of dam safety evaluation and design:

• Evaluation of foundation treatment requirements; • Seepage and slope stability analyses; • Embankment zoning template (upstream/downstream slopes, use of on-site borrow and materials from required excavations, special filter/drain zones, etc.); and • Earthwork and foundation design plans and cost estimates.

The final design plans and specifications shall include the following components:

• Site map showing dam footprint, cutoff trench footprint, and general location of other structural elements such as spillway and outlet works; • Design drawings showing foundation and cutoff trench excavation plans; • Design drawings showing treatment requirements for the dam and cutoff trench; • Design drawings detailing typical sections of the dam and cutoff trench (including details for tie-in between the dam Zone 1 and cutoff trench backfill at the right abutment); • Design drawings detailing spillway and outlet works (including typical sections and construction details); and • Design specifications for all work to be completed.

A detailed cost estimate shall be provided at the 100 percent completion stage.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 14 of 21 The design plans shall be generated using AutoCAD 2006 or later. All design plans and specifications shall be completed by or under the direct supervision of a professional engineer (PE) licensed in the State of Wyoming.

Task 23. Acquisition of Access and Rights of Way

The Consultant shall aid the Wyoming Water Development Office and the project sponsor in identifying and acquiring access and rights of way.

Task 24. Discretionary Task

The Consultant shall place $20,000 of the proposed project budget in the discretionary task. The task is included to allow changes in the scope as the project develops or as new issues are discovered. The Office project manager and the Consultant shall agree on any work to be accomplished under this task and the cost of the work. No work will be initiated or funds spent for this task without direct written authorization from the Office project manager.

LEVEL III SCOPE OF SERVICES:

Task 1. Bidding

This task assumes that the Wyoming State Procurement Office will complete solicitation of the Bid Documents. The Consultant will assist the Wyoming Water Development Commission (WWDC) in bidding the project by performing the following, which also serve as the work products for this task.

Work Products:

A. Coordinate bid letting date, time, and place with Owner and prepare final Invitation to Bid.

B. Identify potential contractors and suppliers, and distribute copies of Invitation to Bid as appropriate. Maintain a record of prospective bidders and suppliers whom contract documents have been issued.

C. Conduct, at a date and time selected and a place provided by the Office project manager, a pre-bid conference to:

a. Instruct prospective bidders and suppliers as to the types of information required by the contract documents and the format in which bids should be presented. b. Review special project requirements and contract documents in general. c. Receive requests for interpretations and answer questions. d. Prepare minutes of the conference and issue required addendum.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 15 of 21 D. Interpret construction contract documents. Prepare and issue addenda to the construction contract documents when necessary.

E. Review the bids for accuracy and determine the acceptability of the apparent successful bidder. Review the formal bid tabulation sheets (from Procurement), evaluate bids, and make written recommendations to the WWDC concerning contract award.

F. Provide additional sets of plans, specifications, and contract documents to the successful bidder and the U.S. Forest Service (USFS), if necessary.

G. Review the Contractor’s performance bonds, payment bonds and insurance certificates for completeness, accuracy, and acceptability. Consultant’s review of the insurance certificates is only for determining if the Contractor maintains the type and amounts of insurance required by the contract documents.

Task 2. Construction Management

The Consultant shall complete the Construction Management tasks listed below. All work shall be performed by or supervised by a professional engineer licensed in the State of Wyoming.

Work Products:

A. Conduct a pre-construction conference. The Consultant shall prepare an agenda for the conference, and prepare and distribute minutes. The pre- construction conference will include, but not be limited to, a discussion of the project startup, project schedule, staffing, submittals, processing payment applications, critical work sequencing, change orders, record documents, permit compliance and project safety.

B. Review and comment on the Contractor’s initial and updated construction schedule and advise the Office project manager and USFS as to acceptability.

C. Schedule and conduct weekly progress meetings, and other meetings with the Office project manager, USFS and the Contractor when necessary, to review and discuss construction procedures and progress, scheduling, engineering management procedures, and other matters concerning the project. Prepare and distribute accurate meeting minutes. Provide weekly progress reports and photologs to the Office project manager.

D. Review drawings, submittals, and other data submitted by the Contractor as required by the construction contract documents. The Consultant’s review shall be to assure conformity to the construction contract documents.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 16 of 21 E. Serve as liaison with Contractor, working principally through Contractor’s superintendent, and assist in providing interpretation of the construction contract documents. Transmit clarifications and interpretations of construction contract documents to Contractor, Office project manager, and USFS.

F. Receive and review guarantees, tests and approvals which are to be assembled by the Contractor in accordance with construction contract documents.

G. Interpret construction contract documents when requested to do so by the Office project manager, USFS, or Contractor. Formally respond to any Requests for Information (RFI’s).

H. Give written notifications of observations regarding defects or deficiencies in the Contractor’s work relating to compliance with drawings, specifications, and contract documents.

I. Advise Contractor or its superintendent of the commencement of any work requiring shop drawing or sample submission if the drawing or submission has not been approved.

J. Investigate pertinent site conditions when Contractor maintains that differing subsurface and physical conditions have been encountered, and document actual site conditions. Review and analyze Contractor claims for differing subsurface and physical conditions.

K. Establish and furnish Contractor with necessary baselines and control points which will be used as survey datum for the work.

L. Conduct on-site compaction density testing services during construction. Review test results for compliance with the plans and specifications. Copies of testing results will be maintained.

M. Provide documentation and administer the processing of change orders, including applications for extension of construction time. Evaluate the cost and scheduling aspects of all change orders and, where necessary, negotiate with the Contractor to obtain a fair price for the work. Said negotiation shall be subject to the prior approval of the Office project manager.

N. Review and process the Contractor’s monthly payment requests, and forward to the Office project manager when appropriate. Consultant’s review shall be for making a full independent mathematical check of the Contractor’s payment request. Consultant is responsible for verifying the quantities of work and materials which are the basis of the payment requests. Consultant shall keep a record of daily quantities and have the Contractor sign off on totals before submitting payment requests to the Office project manager.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 17 of 21

O. Issue Field Orders or Work Change Directives as necessary to ensure conformance of work products with the overall design intent.

P. Maintain log of certified payrolls to be supplied from Contractor. Review payrolls for conformance with applicable 2017 and future Wyoming Wage Rate Determinations. Provide notice to Contractor, the Office project manager, and/or USFS if discrepancies are identified.

Task 3. Field Inspection

The Consultant shall complete the Field Inspection tasks listed below. All work shall be performed by or supervised by a professional engineer, or in some cases a professional geologist, licensed in the State of Wyoming. Work Products:

A. Staff the construction site full time with the necessary number of qualified engineers/inspectors to observe progress of the work and to adequately manage the project. Maintain a daily construction log of activities.

B. Conduct onsite observations of the work to determine if the work is proceeding in accordance with the construction contract documents.

C. Monitor the changes in the apparent integrity of the site (such as differing subsurface and physical conditions, existing structures, and site related utilities when such utilities are exposed) resulting from construction related activities.

D. Inspect materials, equipment, and supplies delivered to the worksite. Reject materials, equipment, and supplies which do not conform to the construction contract documents.

E. Complete materials testing as required by the Contract Documents.

F. Observe field tests of equipment, structures, pipe and appurtenances and review the resulting testing reports to assure conformity with the contract specifications, informing the Office project manager of results as appropriate.

G. Report to the Office project manager work which is known to be defective, or which fails any required inspections, tests, or approvals, or has been damaged prior to final payment; and advise whether the work should be corrected or rejected or should be uncovered for observation, or requires special and/or additional testing, inspection, or approval.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 18 of 21 H. Maintain a photograph and/or video file and a file of submittals for the project and provide same to the Office project manager and USFS upon project completion. The photo records shall include date, time, and location of the photo.

I. Provide geotechnical inspection of foundations below all bearing structures and during grouting operations.

Task 4. Project Closeout

The Consultant shall complete the Project Closeout tasks listed below. All work shall be performed by or supervised by a professional engineer, or in some cases a professional geologist, licensed in the State of Wyoming.

Work Products:

A. Upon substantial completion, inspect the construction work and prepare a punch-list of the items to be completed or corrected before final acceptance of the project. Submit results of the inspection to the Office project manager, USFS, and the Contractor.

B. Upon completion or correction of all items of work on the punch list, conduct a final inspection to determine if the work is completed. Provide written recommendations to the Office project manager concerning final payment, including a list of items, if any, to be completed prior to making such payment.

C. As-Constructed Drawings:

Maintain a marked set of drawings and specifications at the job site based on personal observations and data provided by the Contractor. Upon completion of the project, revise the construction drawings and produce an As-Constructed set of Record Drawings. Submit draft copies of the drawings to the Office project manager and USFS for review. Provide a final As-constructed drawing set of 3 mil wash-off Mylar reproducibles to both the Office project manager and the USFS, and a final electronic copy created in a USFS supported version of AUTODESK/CIVIL 3D, as well as a printable .pdf, to both the Office project manager and the USFS.

D. Coordinate project closeout with relevant permitting agencies and project stakeholders including the USFS, U.S. Army Corps of Engineers, and Wyoming State Engineer’s Office, Safety of Dams Division.

E. Complete and submit a final construction report to the Office Project Manager and USFS. Report shall detail overall construction activities, issues encountered and how issues were addressed, and any changes made during construction.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 19 of 21 F. Create and provide hard copy and printable .pdf operation and maintenance manuals/data to WWDC, USFS, and Middle Piney Watershed Improvement District staff.

G. Provide qualified staff to assist WWDC, USFS, and Middle Piney Watershed Improvement District staff with startup of the completed project.

H. Provide warranty inspection after warranty period is complete. Advise WWDC and USFS of warranty items. Provide Notice to Contractor regarding warranty items and ensure that warranty items are corrected.

Task 5. Office Support

Wenck shall provide the following services in support of the primary project tasks:

Work Products:

A. Office Support for the in-field inspection staff a. Secretarial services; b. Accounting services; c. Copying; d. Printing

Task 6. Zone 6 Embankment, Oversized Rock and Weir Augmentation Evaluation

The Consultant shall perform the following:

• Evaluate excavated material from the cutoff trench and existing embankment excavations to determine if the Zone 6 Embankment specification requirement of 15% passing the No. 200 sieve can be reduced to 5% passing the No. 200 sieve.

• Evaluate if the excavated oversize rock material from the cutoff trench and existing embankment excavations can be used as grouted riprap to replace the articulated concrete blocks (ACBs) revetments planned for road embankment protection.

• Evaluate relocating the weir downstream from the location identified in the bid documents to facilitate construction and protect the structure from rock slides/avalanches.

In addition to the indicated evaluations, this task shall also include all necessary coordination with the Contractor, USACE, USFS and the WWDO. The Consultant

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 20 of 21 shall hold a review meeting with the USACE, USFS and the WWDO to discuss their evaluation findings and recommendations.

Work Products:

A. The Consultant shall prepare a Tech Memo detailing their investigations and recommendations. The Tech Memo shall include a detailed description of the recommendation benefits and include cost estimates for each of the identified evaluations. The Consultant shall provide a draft of the Tech Memo to the USACE, USFS and the WWDO for review and comment. The Consultant shall incorporate USACE, USFS and WWDO review comments into the final Tech Memo.

B. Following written USACE, USFS and the WWDO concurrence to the Tech Memo, the Consultant shall make the necessary revisions to the plans and/or specifications to reflect the approved changes.

C. The Consultant shall prepare Contractor Work Order(s) and/or Contractor Change Order(s) and negotiate with the Contractor for a price to incorporate the approved changes into the project.

Task 7. Discretionary Task

The Consultant will place $150,000 of the proposed project budget in the discretionary task. The task is to allow the Consultant to evaluate changes to the project during the construction phase. The Consultant shall not use any of the Discretionary Task funding without prior written approval of the Commission.

Exhibit A-2 to the Middle Piney Reservoir Consultant Contract between the Wyoming Water Development Commission and Wenck Associates, Inc. Page 21 of 21 EXHIBIT B-2

WENCK WEST 2019 FEE SCHEDULE

Labor Category Hourly Rate Senior Principal Engineer/Scientist $185.00 Project Manager/Principal Engineer $175.00 Senior Engineer/Senior Scientist $155.00 Project Engineer/Scientist $140.00 Engineer II/Scientist II $120.00 Senior Designer $110.00 Construction Manager $105.00 Engineer $105.00 Administration $95.00 Clerical $90.00 CADD/Technician I $80.00

Other Direct Costs Rate Mileage ...... $0.65/mile or IRS rate as approved Airfare ...... @ Cost Per Diem ($7-Breakfast, $9-Lunch, $18-Dinner) ...... $34/day Lodging (hotel) ...... @ Cost Lodging (rental house) ...... $75/day Computer/Plotter ...... $75/day* Black and White Copies ...... $0.15/ea or @ Cost* Color Copies ...... $0.90/ea or @ Cost* Transparent and Color Bond, Blue Lines ...... $3.00/ea or @ Cost* Waterproof Plots ...... $3.00/ea or @ Cost* Mylar’s...... $15.00/ea or @ Cost* Total Station and Data Recorder ...... $100/day ATV (4-wheeler) ...... $125/day Water Quality Meters (pH/S.C./Temp, Turbidity, TDS) ...... $50/day Water Level Meter ...... $35/day 1000 Foot Depth Sounder ...... $35/day Scintillometer ...... $125/day Flow/Discharge Meter ...... $50/day DH-48 Sediment Sampler ...... $25/day Sampling Pumps (peristaltic, submersible) ...... $75/day Field Laptop/Computer ...... $75/day Micro R Meter ...... $25/day RTK Differential GPS Surveying Unit ...... $500/day Nuclear Density Testing ...... $65/day Acoustic Doppler Current Profiler ...... $75/day Consumables (lath, stakes, bailers, ice, baggies, etc.) ...... @ Cost Contract Services/Subcontractors ...... @ Cost Outside Sourced Testing, Monitoring, and Rental Equipment...... @ Cost Outside Services** ...... @ Cost

Invoices are due upon presentation. Invoice balances not paid within forty-five (45) days of invoice date are subject to 1-1/2% (18% annual) interest or finance charge. Subcontracted services will be billed at cost.

** Copies, transparencies, waterproof plots, mylars: Where a determination is made that it is cost effective to send work to outside services receipts will be provided.

Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com

RN050219/F

WATER SERVICE CONTRACT RENEWAL BETWEEN THE WYOMING WATER DEVELOPMENT COMMISSION AND THE ALADDIN WATER DISTRICT

1. Parties. This Water Service Contract (Contract) is made and entered into by and between the Wyoming Water Development Commission (Commission), whose address is 6920 Yellowtail Road, Cheyenne, Wyoming 82002, and the Aladdin Water District (District), whose address is 3983 State HWY 24, Aladdin, Wyoming 82710.

2. Purpose. The purpose of this Contract is for the Commission to sell water from the AWD-1 Well (Permit No. U.W. 131196), constructed from Water Development Program funds, to the District as authorized by Chapter 16, Session Laws of Wyoming, 1999. The original water service contract (executed October 22, 1999) has expired and the latest renewal Contract will expire July 16, 2019. The Commission intends to transfer (sell), the well to the District. While the transfer is pending, the parties wish to continue the sale and purchase of water from the AWD-1 Well.

3. Term of Contract. This Contract shall commence July 16, 2019, and shall remain in effect for two (2) years.

4. Payment. The District shall be assessed a fee of two dollars ($2.00) per one thousand (1,000) gallons and shall remit payment to the Commission on or before December 1st of each year for water used annually.

5. Responsibilities of the District

A. Installation, Construction and Operation. The District currently owns, and is responsible for all costs including labor for all operation, repair, and maintenance of, the well pump, well house, metering components and appurtenances necessary for the District to convey water to its customers and for the Wyoming Department of Transportation to access the well for state or federally funded highway projects. The Commission makes no warranty or representation concerning the quality of the water sold and the District is responsible for compliance with all state and federal water quality standards. Prior to installation of any new components the District shall submit a proposal to the Commission for approval. No construction shall commence until the Commission has approved the components proposed for installation and the method of construction.

B. Expenditures. All expenditures necessary to pump, meter and deliver water to its customers shall be borne by the District.

Water Service Contract Renewal Between Wyoming Water Development Commission and Aladdin Water District Page 1 of 5 RN050219/F

C. Meters. The District shall meter all water use and shall maintain water use records, documenting water used by the District and water used by the Wyoming Department of Transportation. The Commission may request the District to inspect and/or calibrate the metering device to insure accuracy of measurement.

6. General Provisions

A. Amendments. Any changes, modifications, revisions or amendments to this Contract which are mutually agreed upon by the parties to this Contract shall be incorporated by written instrument, executed by all parties to this Contract.

B. Applicable Law, Rules of Construction, and Venue. The construction, interpretation and enforcement of this Contract shall be governed by the laws of the State of Wyoming, without regard to conflicts of law principles. The terms “hereof,” “hereunder,” “herein,” and words of similar import, are intended to refer to this Contract as a whole and not any particular provision or part. The Courts of the State of Wyoming shall have jurisdiction over this Contract and the parties. The venue shall be the First Judicial District, Laramie County, Wyoming.

C. Audit and Access to Records. The Commission and its representative shall have access to any books, documents, papers, electronic data, and records of the District which are pertinent to this Contract. The District shall immediately, upon receiving written instruction from the Commission, provide to any independent auditor or accountant all books, documents, papers, electronic data, and records of the District which are pertinent to this Contract. The District shall cooperate fully with any such independent auditor or accountant during the entire course of any audit authorized by the Commission.

D. Compliance with Laws. The District shall keep informed of and comply with all applicable federal, state and local laws and regulations in the performance of this Contract.

E. Entirety of Contract. This Contract, consisting of five (5) pages, represents the entire and integrated Contract between the parties and supersedes all prior negotiations, representations and agreements whether written or oral. In the event of a conflict or inconsistency between the language of this Contract and the language of any attachment or document incorporated by reference, the language of this Contract shall control.

F. Indemnification. Each party to this Contract shall assume the risk of any liability arising from its own conduct. Neither party agrees to insure, defend, or indemnify the other.

Water Service Contract Renewal Between Wyoming Water Development Commission and Aladdin Water District Page 2 of 5 RN050219/F

G. Nondiscrimination. The District shall comply with the Civil Rights Act of 1964, the Wyoming Fair Employment Practices Act (Wyo. Stat. § 27-9-105, et seq.), the Americans with Disabilities Act (ADA), 42 U.S.C. § 12101, et seq., and the Age Discrimination Act of 1975 and any properly promulgated rules and regulations thereto and shall not discriminate against any individual on the grounds of age, sex, color, race, religion, national origin, or disability in connection with this Contract.

H. Prior Approval. This Contract shall not be binding upon either party until the Contract has been fully executed, approved as to form by the Office of the Attorney General, filed with and approved by A&I Procurement, and approved by the Governor of the State of Wyoming, or his designee, if required by Wyo. Stat. § 9-2- 1016(b)(iv).

I. Severability. Should any portion of this Contract be judicially determined to be illegal or unenforceable, the remainder of the Contract shall continue in full force and effect, and the parties may renegotiate the terms affected by the severance.

J. Sovereign Immunity. Pursuant to Wyo. Stat. § 1-39-104(a), the State of Wyoming and Commission expressly reserve sovereign immunity by entering into this Contract and specifically retain all immunities and defenses available to them as sovereigns. The parties acknowledge that the State of Wyoming has sovereign immunity and only the Wyoming Legislature has the power to waive sovereign immunity. Designations of venue, choice of law, enforcement actions, and similar provisions shall not be construed as a waiver of sovereign immunity. The parties agree that any ambiguity in this Contract shall not be strictly construed, either against or for either party, except that any ambiguity as to sovereign immunity shall be construed in favor of sovereign immunity.

K. Third-Party Beneficiary Rights. The parties do not intend to create in any other individual or entity the status of third-party beneficiary, and this Contract shall not be construed so as to create such status. The rights, duties, and obligations contained in this Contract shall operate only between the parties to this Contract and shall inure solely to the benefit of the parties to this Contract. The provisions of this Contract are intended only to assist the parties in determining and performing their obligations under this Contract.

L. Time is of the Essence. Time is of the essence in all provisions of this Contract.

M. Titles Not Controlling. Titles of sections and subsections are for reference only and shall not be used to construe the language in this Contract.

Water Service Contract Renewal Between Wyoming Water Development Commission and Aladdin Water District Page 3 of 5 RN050219/F

N. Waiver. The waiver of any breach of any term or condition in this Contract shall not be deemed a waiver of any prior or subsequent breach. Failure to object to a breach shall not constitute a waiver.

O. Counterparts. This Contract may be executed in counterparts. Each counterpart, when executed and delivered, shall be deemed an original and all counterparts together shall constitute one and the same Contract. Delivery by the District of an originally signed counterpart of this Contract by PDF shall be followed up immediately by delivery of the originally signed counterpart to the Commission.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK

Water Service Contract Renewal Between Wyoming Water Development Commission and Aladdin Water District Page 4 of 5 RN050219/F

7. Signatures. The parties to this Contract, either personally or through their duly authorized representatives, have executed this Contract on the dates set out below, and certify that they have read, understood, and agreed to the terms and conditions of this Contract.

The EFFECTIVE DATE of this Contract is the date of the signature last affixed to this page.

WYOMING WATER DEVELOPMENT COMMISSION

______Chair Date

______Secretary Date

ALADDIN WATER DISTRICT

______Tim Knapp Date President

ATTORNEY GENERAL'S OFFICE: APPROVAL AS TO FORM

______Tyler M. Renner Date Assistant Attorney General

Water Service Contract Renewal Between Wyoming Water Development Commission and Aladdin Water District Page 5 of 5 Mark Gordon Governor WYOMING WATER DEVELOPMENT OFFICE Commissioners Gerald E. Geis Larry Suchor 6920 Yellowtail Road Clinton W. Glick Rodney Wagner Cheyenne, WY 82002 Kellen K. Lancaster Bill Yankee Sheridan Little Phone: (307) 777-7626 Mike Purcell wwdc.state.wy.us

DATE: April 24, 2019

TO: Jason Mead, P.E., Acting Director, Wyoming Water Development Office

FROM: Keenan Hendon, Project Manager

REGARDING: Colorado River Basin 2019 MOA Applications Update

As of April 1, 2019, the Wyoming Water Development Office (WWDO) received no MOA applications to fund projects located in the Colorado River Basin. However, the U.S. Bureau of Reclamation (Reclamation) has requested additional funds for the existing Farson Lateral Phase I project and the Big Sandy Reservoir Enlargement project. Details for this funding request are provided in the April 24, 2019 WWDO letter, “MOA Budget Modification.”

In order to receive funds, potential MOA projects apply to the WWDO, applications are ranked by the WWDC, ranked applications are submitted to the Upper Colorado River Commission, and then submitted to Reclamation for final approval. A MOA project needs to be associated with an existing Reclamation Project (e.g., Eden, Big Sandy, Stateline, etc.) located in the Colorado River Basin. Approved projects are managed by Reclamation and utilize allocated funds from hydropower revenues generated from the Colorado River Storage Project1.

Currently, there are five WY MOA projects that are being managed by Reclamation. Please find the following Wyoming MOA funding information below:

• MOA Agreement executed 1/24/2011- funds first available in the 2012 federal fiscal year • MOA Agreement expires 9/30/2025 (funds available through 9/30/2030) • Total anticipated WY MOA funds per agreement: $ 24,652,285 • Previously funded WY MOA projects: $ 18,745,579 o Upper Green Remote Sensed Data Study o Flaming Gorge Aquatic Invasive Species Prevention o Big Sandy Reservoir Enlargement o Stateline Dam Spillway Improvements o Farson Lateral Phase I o Big Sandy/Green River Gauging Stations o Blacks Fork River Gauging Station • Total remaining anticipated WY MOA funds: $ 5,906,706 o Proposed Budget Increase for Big Sandy Reservoir Enlargement and Farson Lateral Phase I $ 5,820,000 • Total remaining anticipated WY MOA funds: $ 86,706

1 A Reclamation project to develop the upper Colorado River basin which includes the Glen Canyon Dam (Lake Powell), Flaming Gorge Dam, Navajo Dam, and other units along the Colorado River.

Mark Gordon

Governor WYOMING WATER DEVELOPMENT OFFICE Commissioners

Gerald E. Geis Larry Suchor 6920 Yellowtail Road Clinton W. Glick Rodney Wagner Cheyenne, WY 82002 Kellen K. Lancaster Bill Yankee Sheridan Little

Phone: (307) 777-7626 Mike Purcell wwdc.state.wy.us

DATE: April 24, 2019

TO: Jason Mead, P.E., Acting Director, Wyoming Water Development Office

FROM: Keenan Hendon, Project Manager

REGARDING: Colorado River Basin MOA Budget Modifications

The Wyoming Water Development Office (WWDO) received a request from Reclamation for additional funding for previously funded projects. Scott Winterton, Reclamation Project Manager, prepared updated cost estimates and determined additional MOA funding is necessary for the Farson Lateral Phase I and the Big Sandy Reservoir Enlargement Project (Projects). The Projects are needing additional MOA funds totaling $5,820,000 for the design and construction of the projects.

The following details the additional funds request and the impact on Wyoming’s MOA funding:

PROJECT NAME CURRENT BUDGET INCREASE TOTAL Farson Lateral Phase I1 $ 5,310,000 $ 200,000 $ 5,510,000 Big Sandy Res Enlargement2 $ 10,610,000 $ 5,620,000 $ 16,230,000 Total Costs: $ 15,920,000 $ 5,820,000 $ 21,740,000

The Bureau of Reclamation is seeking an acknowledgement of the cost increases from the Wyoming Water Development Commission.

Please find the following Wyoming MOA funding information below:

• MOA Agreement executed 1/24/2011- funds first available in the 2012 federal fiscal year • MOA Agreement expires 9/30/2025 (funds available through 9/30/2030) • Total anticipated WY MOA funds per agreement: $ 24,652,285 • Previously funded WY MOA projects: $ 18,745,579 o Upper Green Remote Sensed Data Study o Flaming Gorge Aquatic Invasive Species Prevention o Big Sandy Reservoir Enlargement o Stateline Dam Spillway Improvements o Farson Lateral Phase I o Big Sandy/Green River Gauging Stations o Blacks Fork River Gauging Station • Total remaining anticipated WY MOA funds: $ 5,906,706 o Proposed Budget Increase for Big Sandy Reservoir Enlargement and Farson Lateral Phase I $ 5,820,000 • Total remaining anticipated WY MOA funds: $ 86,706

1 Original project budget was $3,735,000 and increased by $1,575,000 in August 2017. 2 Original project budget was $7,002,000 and increased by $3,608,000 in August 2017. RECLAMATION’S UPDATED COST ESTIMATES:

Please find the following Farson Lateral Phase 1 cost increase explanation from Scott Winterton, Chief, Design and Contract Administration Group, for the Bureau of Reclamation, Provo Area Office.

On the Farson Lateral Phase 1 Piping Project, additional funds are needed to cover costs associated with changes to the design at the end of the Phase 1 pipeline. This design modification is required due to the change in time to complete the Phase 2 portion of the piping project. The Phase 2 section, funded through the Basin States Program and WWDC, was originally intended to be attached directly to the end of the Phase 1 pipeline and be completed at the same time thus allowing water to be delivered to the users through both the Phase 1 and Phase 2 pipe sections during the 2019 irrigation season. Due to inadequate funding, the Phase 2 project was unable to be awarded at the same time as Phase 1, therefore it will not be completed until 2020. Water is still required to be delivered in the Farson Lateral system during the 2019 irrigation season so dissipation structures and several other Phase 1 modifications are necessary to transition from the pipeline back to the open canal and allow the project to function in the manner intended.

A negotiated final pricing of $250K for this modification has been agreed upon between Reclamation and the Contractor. There is currently approximately $125K left in the budget to cover modifications to the contract leaving a shortfall of approximately $125K at the current stage of construction. It is proposed to allocate $200K of MOA funds to the Farson Lateral Phase 1 Piping Project to cover this current modification and also allow for any unforeseen changes through the completion of the project. Any unused funds would revert back to the State for use on other MOA projects.

Please find the following Big Sandy Reservoir Enlargement cost increase explanation from Scott Winterton, Chief, Design and Contract Administration Group, for the Bureau of Reclamation, Provo Area Office.

The design for the enlargement of Big Sandy Reservoir has been completed to the 90% design level. Project cost estimates have increased from the previous 30% design which was approximately $10.2M to the current 90% project estimate of approximately $16.2M. Additional funds are necessary to complete the design and provide funding for the construction contract.

Factors that have caused this increase are outlined as follows:

1. Design data collection at the spillway was necessary to collect concrete core samples. The information obtained necessitated design changes to incorporate an anchoring system to securely connect the new spillway concrete to the foundation. 2. Constraints identified during a constructability review necessitated design changes for the filter diaphragm around the outlet works at the dam which resulted in increased quantities. More in-depth research also resulted in an increase to unit pricing for materials for this item. 3. Additional excavation was determined to be necessary for the left abutment filter trench. Drilling information collected indicated cracking in the abutment foundation that could only be confidently addressed with the trench excavation laid back with slopes instead of a vertical trench. 4. The extents of the cement-bentonite cutoff wall in the dike were increased. Also, additional material was necessary to re-establish the dike to the original design elevation. 5. Slope protection along the dike was determined to be necessary to eliminate a potential re- alignment of the dike that was previously considered to be viable by re-grading the slopes to an 8H:1V slope. Re-alignment and grading was not possible due to environmental constraints and additional riprap was required to be added to protect the slopes. 6. The design for the replacement of the Big Sandy Feeder Canal structure was modified due to risks identified with potential seepage along the conduit. The conduit was required to be encased in concrete to mitigate these risks. 7. Additional cultural items were identified during the NEPA process which require additional trenching and mitigation. 8. Additional funding for final design to cover the various changes necessitated by the required revisions. 9. Funding for support during construction and project closeout from Reclamation’s Technical Service Center has not been included in previous estimates as those estimates only incorporated contract and inspection costs.

Reclamation has considered various alternatives and looked at ways to cut back costs to the extent practical. The proposed 90% designs are considered the most cost effective methods to address the risks associated with the reservoir enlargement.

A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@A@ A@

A@ A@

A@ A@ A@

A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@

A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@A@ A@ A@ @ A A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@A@ A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ @ A@ A@ A@ A

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ @ A@ A A@ A@ A@ A@ A@

A@ @ A@ A A@ A@ A@ A@ A@ A@ A@A@ A@

A@ A@ A@ A@ A@ A@A@ A@ A@ A@ A@ @ A@ A A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@A@

A@ A@

@ A@ A A@ A@

A@ A@

A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@

A@

A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@

A@

S t o n e f l y Area of Detail C r e e k I S F N o 1 B u r r o u g h s C r e e k A@ A@ A@ A@ We s t F o r k I S F N o 1 A@ L o n g C r e e k I S F N o 1 A@ A@ A@ M i d d l e F o r k L o n g C r e e k A@ A@ I S F N o 1 A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ @ A@ S h e r i d a n @ A@ A C r e e k I S F N o 1 A

A@ A@ A@ A@ A@ A@ A@ A@ A@

DD uu bb oo ii ss A@ A@ A@

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community Legend Land Ownership Private 0 0.5 1 1.5 2 Instream Flow Segment - Proposed Miles Bureau of Land Management State A@ USGS Stream Flow Gage Site 5 S c a l e 1 : 1 1 0 , 0 0 0 A@ Forest Service A@ @ A@ A A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@A@ A@ A@ A@ A@ @ A@ A A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ @ A@ A@A@ A A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@ A@ A@

A@ A@

A@ A@

A@ A@ A@ A@ A@ A@ A@ A@ A@A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

@ A@ A A@A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@ A@

A@ A@

A@ A@ A@ A@

A@ A@ A@ A@ A@

A@ A@ A@

A@ A@ A@ A@ A@

A@ A@ A@ A@

A@ A@ A@ A@

A@A@ A@ A@ A@ A@ A@ A@ A@ A@A@ A@ A@ A@

A@A@ A@ A@ A@

A@ A@

A@ A@

A@

A@

A@ A@ A@

A@ A@

A@ A@ A@ A@ A@ A@ A@A@

A@

A@

A@ A@

A@ A@ A@ A@ A@ A@ A@

A@

A@ A@

A@

A@

A@

A@ A@

A@ A@

A@ A@ A@

A@ Form S.W. 1 NOTE: Do not fold this form. Use typewriter Rev. 1/13/2015 or print neatly with black ink. STATE OF WYOMING

OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER

THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

This instrument was received and filed for record on the ______day of ______, 20______, at ______o’clock ______M.

______For State Engineer Recorded in Book ______of Ditch Permits, on Page______

Fee Paid $ ______Map Filed ______

WATER DIVISION NO. ______DISTRICT NO. ______COUNTY(IES) ______

TEMPORARY FILING NO. ______PERMIT NO.______

NAME OF FACILITY ______Burroughs Creek ISF No 1

1. Name(s), mailing address and phone no. of applicant(s) is/are ______Wyoming Water Development Commission ______6920 Yellowtail Rd, Cheyenne, WY 82002 ______E-mail address: ______(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ______Wyoming Game and Fish Commission, 5400 Bishop Blvd, Cheyenne, WY 82006 ______E-mail address: ______

3. (a) The use to which the water is to be applied is ______Instream flow (b) If more than one beneficial use of water is applied for, the location and ownership of the point of use must be shown in item 10 of the application and the details of the facilities used to divert and convey the appropriation must be shown on the map in sufficient detail to allow the State Engineer to establish the amount of appropriation. In multiple use applications, stock and domestic purposes are limited to 0.056 cubic feet per second.

4. The source of the proposed appropriation is ______Burroughs Creek, tributary of Horse Creek, tributary of Wind River, tributary of Big Wind River, tributary of ______Big Horn River, tributary of Yellowstone River. ______

5. The point of diversion of the proposed works is located ______SEE REMARKS SECTION feet distant from the ______corner of Section ______T. ______N., R. ______W., and is in the ______of Section ______T.______N., R. ______W. Lot ______Block _____ Subdivision Name ______Latitude ______Longitude ______

6. Are any of the lands crossed by the proposed facility owned by the State or Federal government? If so, describe lands and indicate whether State or Federally owned. ______All lands crossed are Federally owned and managed by the United States Forest Service. Lands crossed include Sections 4, 9, 10, 11, 13, 14, and 24, Township 43 North, Range 107 ______West, 6th P.M. ______

7. The carrying capacity of the ditch, canal, pipeline or other facility at the point of diversion is ______N/A cubic feet per second (c.f.s.)

8. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. The State Engineer may require the filing of detailed construction plans.

9. The estimated time required for the completion of construction is ______,30 days and to complete the application of water to the beneficial uses stated in this application is ______30 days from issue .

Permit No. ______Page No. ______(Leave Blank) 10. The land to be irrigated under this permit is described in the following tabulation. (Give irrigable acreage in each 40-acre subdi- vision. Designate ownership of land, Federal, State or private. If private, list names of owners and land owned separately.) If appli- cation is for stock, domestic, or for purposes other than irrigation, indicate point of use by 40-acre subdivision and owner.

1 1 1 1 NE /4 NW /4 SW /4 SE /4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Town- Range Sec. NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4

43N 107W 4 43N 107W 9 43N 107W 10 43N 107W 11 43N 107W 13 43N 107W 14 999 43N 107W 24

Number of acres to receive original supply ______n/a Number of acres to receive supplemental supply ______n/a Total number of acres to be irrigated ______n/a REMARKS ______Instream flow requested: ______October 1 thru April 30 (winter) - 4.0 cfs ______May 1 thru July 15 (spring) - 23.0 cfs ______July 16 thru September 30 (summer) - 4.1 cfs ______These amounts are requested throughout the reach segment during the seasons specified to maintain or ______improve habitat for Yellowstone Cutthroat Trout. ______Based on the report, "Instream flow studies on Burroughs Creek", completed in 2019 by the Wyoming Game & Fish Department ______Stream length - 4.34 miles ______Point of Beginning locate at the intersection of the Burroughs Creek and the boundary of the Washakie Wilderness Area in ______S4-T43N-R107W, 6th PM. ______POB Latitude: 43° 42' 54.83" N, Longitude: 109° 42' 04.32" W ______Point of Termination locate just upstream of Little Horse Creek Ditch Point of Diversion in the SE4NW4, S24-T43N-R107W, 6th PM. ______POT Latitude: 43° 40' 36.52" N, Longitude: 109° 38' 52.33" W ______If an additional gauge is required by the State Engineer to adminster the water right, one will be installed the Wyoming Game and Fish Department ______at a location within or near the reach segment.

I declare that I have examined this application and to the best of my knowledge and belief it is true, correct and complete.

______Printed Name and Signature of Applicant or Agent Date d x m

Amounts of Instream Flow Requested at the Downstream . F S I

T44N End Stream Segment of Burroughs Creek _ k e e r C

T44N _ R106W s h g

32 35 36 o 33 r

34 r u

R107W FLOW (cfs) B \ S

WINTER I G \ p

31 OCTOBER 1 - APRIL 30 4.0 a M

F S I

k e e SPRING r C

s

MAY 1 - JULY 15 23.0 h g u o r r u B

0 2

SUMMER . 2

T43N 7 . 8

JULY 16 - SEPTEMBER 30 4.1 \ D N I

R106W W _ N R

Based on the report, "Instream flow studies on O

3 H

G 5 F Burroughs Creek", completed in 2019, by I B 4 Instream Flow Segment Point of Beginning 2 1 the Wyoming Game and Fish Department. 2 7

Lat: 43° 42' 54.83" N . 8 \

Long: 109° 42' 4.32" W E

NAD1983 (2011) G 6 A N

Point of Beginning locate at the intersection of I A

Burroughs Creek and the boundary of R D Washakie Wilderness Area 0 TABLE OF INTERVENING PERMITS . 8

( \ OWNERSHIP LEGEND : M

: h

Adjudicated t a P

Federal Government F t n e

State of Wyoming NONE m W u c o P Private D Unadjudicated

NONE Burroughs Creek HES 245 F Instream Flow Segment NOTES Length of Stream Segment = 4.34 Miles 1) Sections shown hereon effected by this instream flow HES 245 permit without subdivision lines are unsurveyed and 8 F have not been protracted. 9 10 11 12 7

F

F

17 16 15 14 13 18 T43N CERTIFICATE OF SURVEYOR State of Wyoming F ss R107W County of Laramie / I, Darby A. Schock of Cheyenne, Wyoming hereby certify that this map was made from the U.S. Geological Survey National Hydrography Dataset, NAD83, developed at 1:24:000/1:12,000 scale, G.L.O. Plats, Bureau of Land Management ownership information and Wyoming State Engineer's water right records and that it correctly represents the location of Burroughs Creek and the lands that it flows through to the best of my knowledge, 0 1,100 2,200 4,400 Feet F F information and belief.

F

( 20 21 MAP TO ACCOMPANY APPLICATION 22 23 24 19 Instream Flow Segment Point of Termination FOR Lat: 43° 40' 36.52" N Long: 109° 38' 52.33" W BURROUGHS CREEK INSTREAM FLOW NAD1983 (2011) Point of Termination locate just upstream of APPLICANT: Little Horse Creek Ditch Point of Diversion WYOMING WATER DEVELOPMENT COMMISSION 6920 YELLOWTAIL ROAD CHEYENNE, WYOMING 82002

APPROVED: AGENT: WYOMING GAME & FISH COMMISSION 29 28 27 26 25 30 5400 BISHOP BLVD. STATE ENGINEER WGFD DWG. No. 8.72.20 CHEYENNE, WYOMING 82006 Form S.W. 1 NOTE: Do not fold this form. Use typewriter Rev. 1/13/2015 or print neatly with black ink. STATE OF WYOMING

OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER

THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

This instrument was received and filed for record on the ______day of ______, 20______, at ______o’clock ______M.

______For State Engineer Recorded in Book ______of Ditch Permits, on Page______

Fee Paid $ ______Map Filed ______

WATER DIVISION NO. ______DISTRICT NO. ______COUNTY(IES) ______

TEMPORARY FILING NO. ______PERMIT NO.______

NAME OF FACILITY ______Middle Fork Long Creek ISF No 1

1. Name(s), mailing address and phone no. of applicant(s) is/are ______Wyoming Water Development Commission ______6920 Yellowtail Rd, Cheyenne, WY 82002 ______E-mail address: ______(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ______Wyoming Game and Fish Commission, 5400 Bishop Blvd, Cheyenne, WY 82006 ______E-mail address: ______

3. (a) The use to which the water is to be applied is ______Instream flow (b) If more than one beneficial use of water is applied for, the location and ownership of the point of use must be shown in item 10 of the application and the details of the facilities used to divert and convey the appropriation must be shown on the map in sufficient detail to allow the State Engineer to establish the amount of appropriation. In multiple use applications, stock and domestic purposes are limited to 0.056 cubic feet per second.

4. The source of the proposed appropriation is ______Middle Fork Long Creek, tributary of Long Creek, tributary of Wind River, tributary of Big Wind River, tributary of ______Big Horn River, tributary of Yellowstone River. ______

5. The point of diversion of the proposed works is located ______SEE REMARKS SECTION feet distant from the ______corner of Section ______T. ______N., R. ______W., and is in the ______of Section ______T.______N., R. ______W. Lot ______Block _____ Subdivision Name ______Latitude ______Longitude ______

6. Are any of the lands crossed by the proposed facility owned by the State or Federal government? If so, describe lands and indicate whether State or Federally owned. ______All lands crossed are Federally owned and managed by the United States Forest Service. Lands crossed include Sections 13, and 24, Township 43 North, Range 109 West, 6th PM and ______Sections 19, 29 and 30, Township 43 North, Range 108 West, 6th PM ______

7. The carrying capacity of the ditch, canal, pipeline or other facility at the point of diversion is ______N/A cubic feet per second (c.f.s.)

8. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. The State Engineer may require the filing of detailed construction plans.

9. The estimated time required for the completion of construction is ______,30 days and to complete the application of water to the beneficial uses stated in this application is ______30 days from issue .

Permit No. ______Page No. ______(Leave Blank) 10. The land to be irrigated under this permit is described in the following tabulation. (Give irrigable acreage in each 40-acre subdi- vision. Designate ownership of land, Federal, State or private. If private, list names of owners and land owned separately.) If appli- cation is for stock, domestic, or for purposes other than irrigation, indicate point of use by 40-acre subdivision and owner.

1 1 1 1 NE /4 NW /4 SW /4 SE /4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Town- Range Sec. NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4

43N 108W 19 9 43N 108W 29 9 9 43N 108W 30 9 999 9 9 43N 107W 13 43N 107W 24 99 9 999

Number of acres to receive original supply ______n/a Number of acres to receive supplemental supply ______n/a Total number of acres to be irrigated ______n/a REMARKS ______Instream flow requested: ______October 1 thru April 30 (winter) - 2.4 cfs ______May 1 thru July 15 (spring) - 6.0 cfs ______July 16 thru September 30 (summer) - 2.7 cfs ______These amounts are requested throughout the reach segment during the seasons specified to maintain or ______improve habitat for Yellowstone Cutthroat Trout. ______Based on the report, "Instream flow studies on Middle Fork Long Creek", completed in 2019 by the Wyoming Game & Fish Department ______Stream length - 4.05 miles ______Point of Beginning locate at the confluence of Middle Fork Long Creek and an unnamed tributary in S13-T43N-R109W, 6th PM. ______POB Latitude: 43° 41' 23.78" N, Longitude: 109° 53' 18.98" W ______Point of Termination locate at the intersection of Middle Fork Long Creek and the north line of the S2SE4, S29-T43N-R108W, 6th PM. ______POT Latitude: 43° 39' 25.18" N, Longitude: 109° 50' 42.31" W ______If an additional gauge is required by the State Engineer to adminster the water right, one will be installed the Wyoming Game and Fish Department ______at a location within or near the reach segment.

I declare that I have examined this application and to the best of my knowledge and belief it is true, correct and complete.

______Printed Name and Signature of Applicant or Agent Date d x m .

Amounts of Instream Flow Requested at the Downstream F S I _

12 7 8 End Stream Segment of Middle Fork Long Creek k

11 e e 9 r C _ g n o L _ k r FLOW (cfs) o F _

WINTER e l d d 0 800 1,600 3,200 Feet OCTOBER 1 - APRIL 30 2.4 I M \ S

Instream Flow Segment Point of Beginning I G Lat: 43° 41' 23.78" N \ p Long: 109° 53' 18.98" W a M SPRING NAD1983 (2011) F S I

Point of Beginning locate at the confluence of MAY 1 - JULY 15 6.0 k e e

Middle Fork Long Creek and an unnamed tributary. r C

g n o L SUMMER k r o F

JULY 16 - SEPTEMBER 30 2.7

13 e l d d i M

Based on the report, "Instream flow studies on 1

( 2 Middle Fork Long Creek", completed in 2019, by . 2 7 18 . F 8 14 the Wyoming Game and Fish Department. \

17 D N

16 I W _ N R

T43N O H

Middle Fork Long Creek G OWNERSHIP LEGEND TABLE OF INTERVENING PERMITS I B

Instream Flow Segment 2 R109W 7 .

Adjudicated 8 \ Length of Stream Segment = 4.05 Miles F Federal Government E G

NONE A N W State of Wyoming I A

/ R D P Private

Unadjudicated 0 . 8 \ : M

NONE : h t a P

t n e m u c o

NOTES D F F 1) Sections shown hereon effected by this instream flow permit without subdivision lines are unsurveyed and have not been protracted.

2) The point of quantification for the Instream Flow Appropriation, Permit No. C254.0F with a priority date of June 14, 1926, is located F at the Point of Termination of the Instream Flow segment shown hereon. 19 23 T43N R108W 20 21 24 F F

F F

CERTIFICATE OF SURVEYOR F State of Wyoming F ss County of Laramie I, Darby A. Schock of Cheyenne, Wyoming hereby certify that this map was made from the U.S. Geological Survey National Hydrography Dataset, NAD83, developed at 1:24:000/1:12,000 scale, G.L.O. Plats, Bureau of Land Management ownership information F and Wyoming State Engineer's water right records and that it correctly represents the location of Middle Fork Long Creek and the lands that it flows through to the best of my knowledge, F 28 information and belief. 29 26 25 Instream Flow Segment Point of Termination Lat: 43° 39' 25.18" N 30 Long: 109° 50' 42.31" W NAD1983 (2011) F F Point of Termination locate at the intersection MAP TO ACCOMPANY APPLICATION F F of Middle Fork Long Creek and the north line of the south half of the southwest quarter of FOR S29-T43N-R108W (boundary of the Shoshone ( National Forest). MIDDLE FORK LONG CREEK INSTREAM FLOW APPLICANT: WYOMING WATER DEVELOPMENT COMMISSION 6920 YELLOWTAIL ROAD CHEYENNE, WYOMING 82002

APPROVED: AGENT: WYOMING GAME & FISH COMMISSION 35 36 31 5400 BISHOP BLVD. STATE ENGINEER 32 33 WGFD DWG. No. 8.72.21 CHEYENNE, WYOMING 82006 Form S.W. 1 NOTE: Do not fold this form. Use typewriter Rev. 1/13/2015 or print neatly with black ink. STATE OF WYOMING

OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER

THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

This instrument was received and filed for record on the ______day of ______, 20______, at ______o’clock ______M.

______For State Engineer Recorded in Book ______of Ditch Permits, on Page______

Fee Paid $ ______Map Filed ______

WATER DIVISION NO. ______DISTRICT NO. ______COUNTY(IES) ______

TEMPORARY FILING NO. ______PERMIT NO.______

NAME OF FACILITY ______Sheridan Creek ISF No 1

1. Name(s), mailing address and phone no. of applicant(s) is/are ______Wyoming Water Development Commission ______6920 Yellowtail Rd, Cheyenne, WY 82002 ______E-mail address: ______(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ______Wyoming Game and Fish Commission, 5400 Bishop Blvd, Cheyenne, WY 82006 ______E-mail address: ______

3. (a) The use to which the water is to be applied is ______Instream flow (b) If more than one beneficial use of water is applied for, the location and ownership of the point of use must be shown in item 10 of the application and the details of the facilities used to divert and convey the appropriation must be shown on the map in sufficient detail to allow the State Engineer to establish the amount of appropriation. In multiple use applications, stock and domestic purposes are limited to 0.056 cubic feet per second.

4. The source of the proposed appropriation is ______Sheridan Creek, tributary of Wind River, tributary of Big Wind River, tributary of ______Big Horn River, tributary of Yellowstone River. ______

5. The point of diversion of the proposed works is located ______SEE REMARKS SECTION feet distant from the ______corner of Section ______T. ______N., R. ______W., and is in the ______of Section ______T.______N., R. ______W. Lot ______Block _____ Subdivision Name ______Latitude ______Longitude ______

6. Are any of the lands crossed by the proposed facility owned by the State or Federal government? If so, describe lands and indicate whether State or Federally owned. ______All lands crossed are Federally owned and managed by the United States Forest Service. ______Lands crossed include Sections 1 and 12, Township 42 North, Range 110 West, 6th P.M., and Sections 2, 3, 4, 5, 6 and 7, Township 42 North, Range 109 West, 6thP.M. ______

7. The carrying capacity of the ditch, canal, pipeline or other facility at the point of diversion is ______N/A cubic feet per second (c.f.s.)

8. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. The State Engineer may require the filing of detailed construction plans.

9. The estimated time required for the completion of construction is ______,30 days and to complete the application of water to the beneficial uses stated in this application is ______30 days from issue .

Permit No. ______Page No. ______(Leave Blank) 10. The land to be irrigated under this permit is described in the following tabulation. (Give irrigable acreage in each 40-acre subdi- vision. Designate ownership of land, Federal, State or private. If private, list names of owners and land owned separately.) If appli- cation is for stock, domestic, or for purposes other than irrigation, indicate point of use by 40-acre subdivision and owner.

1 1 1 1 NE /4 NW /4 SW /4 SE /4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Town- Range Sec. NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4

42N 109W 2 9 42N 109W 3 99 99 99 42N 109W 4 99999 99 42N 109W 5 999 99 9 42N 109W 6 999 42N 109W 7 999 999 42N 110W 1 9 42N 110W 12 99 99

Number of acres to receive original supply ______n/a Number of acres to receive supplemental supply ______n/a Total number of acres to be irrigated ______n/a REMARKS ______Instream flow requested: ______October 1 thru April 30 (winter) - 6.5 cfs ______May 1 thru July 15 (spring) - 16.0 cfs ______July 16 thru September 30 (summer) - 6.8 cfs ______These amounts are requested throughout the reach segment during the seasons specified to maintain or ______improve habitat for Yellowstone Cutthroat Trout. ______Based on the report, "Instream flow studies on Sheridan Creek", completed in 2019 by the Wyoming Game & Fish Department. ______Stream length - 6.85 miles ______Point of Beginning locate at the intersection of Sheridan Creek and the west line of S1-T42N-R110W, 6th PM. ______POB Latitude: 43° 37' 31.49" N, Longitude: 110° 00' 42.64" W ______Point of Termination locate at the intersection of Sheridan Creek and the east line of the SW4NW4, S2-T42N-R109W, 6th PM. ______POT Latitude: 43° 37' 57.30" N, Longitude: 109° 54' 22.80" W ______If an additional gauge is required by the State Engineer to adminster the water right, one will be installed the Wyoming Game and Fish Department ______at a location within or near the reach segment.

I declare that I have examined this application and to the best of my knowledge and belief it is true, correct and complete.

______Printed Name and Signature of Applicant or Agent Date (

18 17 15 F F 16 14 Amounts of Instream Flow Requested at the Downstream End Stream Segment of Sheridan Creek

Lava Cre FLOW (cfs) ek d WINTER x m 23 . F S

OCTOBER 1 - APRIL 30 6.5 I _ k

24 e e 19 20 21 r C _

22 23 24 n SPRING a d i r e

MAY 1 - JULY 15 16.0 h S \ S I G \ p a M

SUMMER / F S

0 1,500 3,000 6,000 Feet I 6.8

JULY 16 - SEPTEMBER 30 k e e r

W C

L e n o s a

Based on the report, "Instream flows studies on d n t i g F r o e

Sheridan Creek", completed in 2019, by h C rk S re T43N e the Wyoming Game and Fish Department. 2 2

k . 2 7 T43N . 8 \

R109W D N 26 30 I W R110W 29 27 _ N 26 25 R O H 28 G OWNERSHIP LEGEND TABLE OF INTERVENING PERMITS I B 25 2

( 7 .

Adjudicated 8 \ F Federal Government E G A N W State of Wyoming USFS ISF - Sheridan Creek, Permit No. 270.0F I A R D W P Private 0 .

R i Unadjudicated 8 n \ iv d : M

e :

r h NONE t a P

t n e m u c o 35 36 31 32 33 NOTES D 34 35 36 1) Sections shown hereon effected by this instream flow Instream Flow Segment Point of Beginning permit without subdivision lines are unsurveyed and Lat: 43° 37' 31.49" N have not been protracted. Long: 110° 0' 42.64" W NAD1983 (2011) 2) The point of quantification for the Instream Flow Appropriation, Point of Beginning locate at the intersection Permit No. C270.0F with a priority date of February 9, 1983 is located of Sheridan Creek and the west line of S1-T42N-R110W. as shown hereon.

F Wind River Ranch Sprinkler F F 3 Irrigation Unit No. 5 POD F F F F F F F F F P 2 F !( 2 ! 1 1 6 F F 5 F F F F 4 F F

( F F F F F USFS ISF Permit Instream Flow Segment Point of Termination F Permit No. C270.0F, Sheridan Creek F F F F Sheridan Creek Lat: 43° 37' 57.30" N F Instream Flow Segment General Location Long: 109° 54' 22.80" W Length of Stream Segment = 6.85 Miles NAD1983 (2011) Point of Termination locate 7 at the intersection of Sheridan Creek and CERTIFICATE OF SURVEYOR F F 9 the east line of the SW4NW4, S2-T42N-R109W, 6th PM State of Wyoming 11 8 10 11 12 ss T42N County of Laramie 12 I, Darby A. Schock of Cheyenne, Wyoming hereby certify that this map was made from the U.S. Geological Survey National Hydrography Dataset, NAD83, developed at R109W 1:24:000/1:12,000 scale, G.L.O. Plats, Bureau of Land Management ownership information and Wyoming State Engineer's water right records and that it correctly represents the location of Sheridan Creek and the lands that it flows through to the best of my knowledge, information and belief.

T ro W u 13 a t S rm C p re C rin e r g k ee MAP TO ACCOMPANY APPLICATION 14 k 17 T42N 18 16 14 13 FOR 15 SHERIDAN CREEK INSTREAM FLOW R110W APPLICANT: WYOMING WATER DEVELOPMENT COMMISSION 6920 YELLOWTAIL ROAD CHEYENNE, WYOMING 82002

APPROVED: AGENT: 24 19 20 WYOMING GAME & FISH COMMISSION 23 21 22 23 24 5400 BISHOP BLVD. STATE ENGINEER WGFD DWG. No. 8.72.22 CHEYENNE, WYOMING 82006 Form S.W. 1 NOTE: Do not fold this form. Use typewriter Rev. 1/13/2015 or print neatly with black ink. STATE OF WYOMING

OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER

THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

This instrument was received and filed for record on the ______day of ______, 20______, at ______o’clock ______M.

______For State Engineer Recorded in Book ______of Ditch Permits, on Page______

Fee Paid $ ______Map Filed ______

WATER DIVISION NO. ______DISTRICT NO. ______COUNTY(IES) ______

TEMPORARY FILING NO. ______PERMIT NO.______

NAME OF FACILITY ______Stonefly Creek ISF No 1

1. Name(s), mailing address and phone no. of applicant(s) is/are ______Wyoming Water Development Commission ______6920 Yellowtail Rd, Cheyenne, WY 82002 ______E-mail address: ______(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ______Wyoming Game and Fish Commission, 5400 Bishop Blvd, Cheyenne, WY 82006 ______E-mail address: ______

3. (a) The use to which the water is to be applied is ______Instream flow (b) If more than one beneficial use of water is applied for, the location and ownership of the point of use must be shown in item 10 of the application and the details of the facilities used to divert and convey the appropriation must be shown on the map in sufficient detail to allow the State Engineer to establish the amount of appropriation. In multiple use applications, stock and domestic purposes are limited to 0.056 cubic feet per second.

4. The source of the proposed appropriation is ______Stonefly Creek, tributary of Wind River, tributary of Big Wind River, tributary of ______Big Horn River, tributary of Yellowstone River. ______

5. The point of diversion of the proposed works is located ______SEE REMARKS SECTION feet distant from the ______corner of Section ______T. ______N., R. ______W., and is in the ______of Section ______T.______N., R. ______W. Lot ______Block _____ Subdivision Name ______Latitude ______Longitude ______

6. Are any of the lands crossed by the proposed facility owned by the State or Federal government? If so, describe lands and indicate whether State or Federally owned. ______All lands crossed are Federally owned and managed by the United States Forest Service. Lands crossed include Section 35, Township 44 North, Range 110 West, 6th P.M. and ______Section 2, Township 43 North, Range 110 West, 6th P.M. ______

7. The carrying capacity of the ditch, canal, pipeline or other facility at the point of diversion is ______N/A cubic feet per second (c.f.s.)

8. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. The State Engineer may require the filing of detailed construction plans.

9. The estimated time required for the completion of construction is ______,30 days and to complete the application of water to the beneficial uses stated in this application is ______30 days from issue .

Permit No. ______Page No. ______(Leave Blank) 10. The land to be irrigated under this permit is described in the following tabulation. (Give irrigable acreage in each 40-acre subdi- vision. Designate ownership of land, Federal, State or private. If private, list names of owners and land owned separately.) If appli- cation is for stock, domestic, or for purposes other than irrigation, indicate point of use by 40-acre subdivision and owner.

1 1 1 1 NE /4 NW /4 SW /4 SE /4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Town- Range Sec. NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4

43N 110W 2 99999 44N 110W 35

Number of acres to receive original supply ______n/a Number of acres to receive supplemental supply ______n/a Total number of acres to be irrigated ______n/a REMARKS ______Instream flow requested: natural direct flows are required for the following amount: ______October 1 thru April 30 (winter) - 0.14 cfs ______May 1 thru July 15 (spring) - 0.14 cfs ______July 16 thru September 30 (summer) - 0.14 cfs ______These amounts are requested throughout the reach segment during the seasons specified to maintain or ______improve habitat for Yellowstone Cutthroat Trout. ______Based on the report, "Instream flow studies on Stonefly Creek", completed in 2019 by the Wyoming Game & Fish Department. ______Stream length - 0.64 miles ______Point of Beginning locate at the confluence of Stonefly Creek and an unnamed tributary in S35-T44N-R110W, 6th PM. ______POB Latitude: 43° 43' 37.64" N, Longitude: 110° 01' 21.29" W ______Point of Termination locate at the intersection of Stonefly Creek and the northerly right-of-way boundary of Highway 26 in the SW4NE4, ______S2-T43N-R110W, 6th PM. ______POT Latitude: 43° 43' 13.10" N, Longitude: 110° 00' 57.59" W ______If an additional gauge is required by the State Engineer to adminster the water right, one will be installed the Wyoming Game and Fish Department ______at a location within or near the reach segment.

I declare that I have examined this application and to the best of my knowledge and belief it is true, correct and complete.

______Printed Name and Signature of Applicant or Agent Date Amounts of Instream Flow Requested at the Downstream 27 26 25 End Stream Segment of Stonefly Creek

FLOW (cfs) d

WINTER x m . F

OCTOBER 1 - APRIL 30 0.14 S I _ k e e r C _ y l

SPRING f e n o MAY 1 - JULY 15 0.14 t S \ S I G \ p a M

SUMMER F S I

0 500 1,000 2,000 Feet JULY 16 - SEPTEMBER 30 0.14 k e e r C

y l f

Based on the report, "Instream flow studies on e n o t

Stonefly Creek", completed in 2019 by S

6

the Wyoming Game and Fish Department. 2 . 2 7 . 8 \ D N I

34 W

F _ N R O H

G OWNERSHIP LEGEND TABLE OF INTERVENING PERMITS I B 36 35 2 7

T44N .

Adjudicated 8 \ F Federal Government E G

NONE A N R110W W State of Wyoming I A R D P Private

Unadjudicated 0 . 8 \ : M

NONE : h t a P

t n e m u c o

NOTES D

S 1) Sections shown hereon effected by this instream flow ton permit without subdivision lines are unsurveyed and efl have not been protracted. y C re ek Instream Flow Segment Point of Beginning Lat: 43° 43' 37.64" N ( Long: 110° 1' 21.29" W NAD1983 (2011) Point of Beginning locate at the confluence of / Stonefly Creek and an unnamed tributary.

F Stonefly Creek F F Instream Flow Segment Length of Stream Segment = 0.64 Miles

W in Instream Flow Segment Point of Termination d Lat: 43° 43' 13.10" N R Long: 110° 0' 57.59" W NAD1983 (2011) iv e F Point of Termination locate at the intersection of r F Stonefly Creek and the northerly right-of-way CERTIFICATE OF SURVEYOR

( boundary of Highway 26. 2 State of Wyoming ss 3 County of Laramie I, Darby A. Schock of Cheyenne, Wyoming hereby certify that this map was made from the U.S. Geological Survey National Hydrography Dataset, NAD83, developed at 1:24:000/1:12,000 scale, G.L.O. Plats, Bureau of Land Management ownership information and Wyoming State Engineer's water right records and that it correctly represents the location T43N 1 of Stonefly Creek and the lands that it flows through to the best of my knowledge, R110W information and belief.

MAP TO ACCOMPANY APPLICATION FOR STONEFLY CREEK INSTREAM FLOW APPLICANT: WYOMING WATER DEVELOPMENT COMMISSION 6920 YELLOWTAIL ROAD CHEYENNE, WYOMING 82002

APPROVED: AGENT: WYOMING GAME & FISH COMMISSION 5400 BISHOP BLVD. 10 STATE ENGINEER 11 12 WGFD DWG. No. 8.72.26 CHEYENNE, WYOMING 82006 Form S.W. 1 NOTE: Do not fold this form. Use typewriter Rev. 1/13/2015 or print neatly with black ink. STATE OF WYOMING

OFFICE OF THE STATE ENGINEER APPLICATION FOR PERMIT TO APPROPRIATE SURFACE WATER

THIS SECTION IS NOT TO BE FILLED IN BY APPLICANT

Filing/Priority Date THE STATE OF WYOMING STATE ENGINEER’S OFFICE } SS.

This instrument was received and filed for record on the ______day of ______, 20______, at ______o’clock ______M.

______For State Engineer Recorded in Book ______of Ditch Permits, on Page______

Fee Paid $ ______Map Filed ______

WATER DIVISION NO. ______DISTRICT NO. ______COUNTY(IES) ______

TEMPORARY FILING NO. ______PERMIT NO.______

NAME OF FACILITY ______West Fork Long Creek ISF No 1

1. Name(s), mailing address and phone no. of applicant(s) is/are ______Wyoming Water Development Commission ______6920 Yellowtail Rd, Cheyenne, WY 82002 ______E-mail address: ______(if more than one applicant, designate one to act as Agent for the others)

2. Name & address of agent to receive correspondence and notices ______Wyoming Game and Fish Commission, 5400 Bishop Blvd, Cheyenne, WY 82006 ______E-mail address: ______

3. (a) The use to which the water is to be applied is ______Instream flow (b) If more than one beneficial use of water is applied for, the location and ownership of the point of use must be shown in item 10 of the application and the details of the facilities used to divert and convey the appropriation must be shown on the map in sufficient detail to allow the State Engineer to establish the amount of appropriation. In multiple use applications, stock and domestic purposes are limited to 0.056 cubic feet per second.

4. The source of the proposed appropriation is ______West Fork Long Creek, tributary of Long Creek, tributary of Wind River, tributary of Big Wind River, tributary of ______Big Horn River, tributary of Yellowstone River. ______

5. The point of diversion of the proposed works is located ______SEE REMARKS SECTION feet distant from the ______corner of Section ______T. ______N., R. ______W., and is in the ______of Section ______T.______N., R. ______W. Lot ______Block _____ Subdivision Name ______Latitude ______Longitude ______

6. Are any of the lands crossed by the proposed facility owned by the State or Federal government? If so, describe lands and indicate whether State or Federally owned. ______All lands crossed are Federally owned and managed by the United States Forest Service. Lands crossed include Sections 9, 16, 21, 22, 26, and 27, Township 43 North, Range 109 ______West, 6th P.M. ______

7. The carrying capacity of the ditch, canal, pipeline or other facility at the point of diversion is ______N/A cubic feet per second (c.f.s.)

8. The accompanying map is prepared in accordance with the State Engineer’s Rules and Regulations for filing applications and is hereby declared a part of this application. The State Engineer may require the filing of detailed construction plans.

9. The estimated time required for the completion of construction is ______,30 days and to complete the application of water to the beneficial uses stated in this application is ______30 days from issue .

Permit No. ______Page No. ______(Leave Blank) 10. The land to be irrigated under this permit is described in the following tabulation. (Give irrigable acreage in each 40-acre subdi- vision. Designate ownership of land, Federal, State or private. If private, list names of owners and land owned separately.) If appli- cation is for stock, domestic, or for purposes other than irrigation, indicate point of use by 40-acre subdivision and owner.

1 1 1 1 NE /4 NW /4 SW /4 SE /4

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Town- Range Sec. NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4 NE /4 NW /4 SW /4 SE /4

43N 109W 9 43N 109W 16 43N 109W 21 999 43N 109W 22 9 999 43N 109W 27 999 99 43N 109W 26 99

Number of acres to receive original supply ______n/a Number of acres to receive supplemental supply ______n/a Total number of acres to be irrigated ______n/a REMARKS ______Instream flow requested: ______October 1 thru April 30 (winter) - 1.9 cfs ______May 1 thru July 15 (spring) - 4.0 cfs ______July 16 thru September 30 (summer) - 2.7 cfs ______These amounts are requested throughout the reach segment during the seasons specified to maintain or ______improve habitat for Yellowstone Cutthroat Trout. ______Based on the report, "Instream flow studies on West Fork Long Creek", completed in 2019 by the Wyoming Game & Fish Department. ______Stream length - 4.15 miles ______Point of Beginning locate in S9-T43N-R109W, 6th PM. ______POB Latitude: 43° 42' 12.64" N, Longitude: 109° 56' 09.71" W ______Point of Termination locate just upstream of Smith Ditch Point of Diversion in the SW4SW4, S26-T43N-R109W, 6th PM. ______POT Latitude: 43° 39' 22.83" N, Longitude: 109° 54' 29.33" W ______If an additional gauge is required by the State Engineer to adminster the water right, one will be installed the Wyoming Game and Fish Department ______at a location within or near the reach segment.

I declare that I have examined this application and to the best of my knowledge and belief it is true, correct and complete.

______Printed Name and Signature of Applicant or Agent Date Amounts of Instream Flow Requested at the Downstream 6 5 4 3 2 End Stream Segment of West Fork Long Creek F FLOW (cfs) WINTER OCTOBER 1 - APRIL 30 1.9

SPRING West Fork Long Creek 4.0 7 8 MAY 1 - JULY 15 ( 10 11 SUMMER 9 JULY 16 - SEPTEMBER 30 2.7

Instream Flow Segment Point of Beginning Based on the report, "Instream flow studies Lat: 43° 42' 12.64" N Long: 109° 56' 09.71" W on West Fork Long Creek", completed in 2019, by NAD1983 (2011) the Wyoming Game and Fish Department.

16 0 1,100 2,200 4,400 Feet OWNERSHIP LEGEND TABLE OF INTERVENING PERMITS Adjudicated F Federal Government W State of Wyoming NONE P Private Unadjudicated

NONE

18 T43N ( 17 F 15 14 DocumentPath: M:\8.0 DRAINAGE\8.72 BIG HORN_WIND\8.72.23 West Fork LongCreek ISF Map\GIS\West_Fork_Long_Creek_ISF.mxd R109W NOTES

1) Sections shown hereon effected by this instream flow permit without subdivision lines are unsurveyed and / have not been protracted. F F F Wind River F 19 20 21 22 23 West Fork Long Creek Instream Flow Segment F Length of Stream Segment = 4.15 Miles

F F

CERTIFICATE OF SURVEYOR

State of Wyoming F F ss County of Laramie I, Darby A. Schock of Cheyenne, Wyoming hereby certify that this map was made from the U.S. Geological Survey National Hydrography Dataset, NAD83, developed at F 1:24:000/1:12,000 scale, G.L.O. Plats, Bureau of Land Management ownership information F and Wyoming State Engineer's water right records and that it correctly represents the location of West Fork Long Creek and the lands that it flows through to the best of my knowledge, 30 29 information and belief. 28 27 26 Instream Flow Segment Point of Termination Lat: 43° 39' 22.83" N F F Long: 109° 54' 29.33" W NAD1983 (2011) MAP TO ACCOMPANY APPLICATION Point of Termination locate just upstream of Smith Ditch Point of Diversion ( FOR WEST FORK LONG CREEK INSTREAM FLOW F APPLICANT: 25 WYOMING WATER DEVELOPMENT COMMISSION 6920 YELLOWTAIL ROAD CHEYENNE, WYOMING 82002

32 AGENT: 31 33APPROVED: 34 35 36 WYOMING GAME & FISH COMMISSION 5400 BISHOP BLVD. STATE ENGINEER WGFD DWG. No. 8.72.23 CHEYENNE, WYOMING 82006 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: Bridger Valley Regional Water Master Plan Program: New Development

Project Type: Joint Powers Water Board Water System County: Uinta

Sponsor: Bridger Valley Joint Powers Board (BVJPB)

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Keith Clarey

I. PROJECT DESCRIPTION

The Bridger Valley Joint Powers Board (BVJPB) has requested a Level I regional water master plan to identify the components of their existing system that are deficient and to provide a schedule for improvements.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Bridger Valley Water Supply I 38 1991 I $ 65,000 1994 Project Bridger Valley Pipeline III 231 1991 I $ 625,000 1996 Bridger Valley Water Supply II 43 1992 I $ 125,000 1995 Bridger Valley Water Supply II 10 1994 I $ 300,000 1997 Bridger Valley Intake Structure III 2/88 2001/02 II $ 505,000* 2006/07 Rehabilitation / Bridger Valley Reservoir Bridger Valley Intake Structure II 125 2003 I $ 125,000 2008 Rehabilitation / Bridger Valley Reservoir Bridger Valley Big Hill III 114 2005 II $ 67,600 2010 Transmission Line * 50% grant

2. Describe the location of the project:

The Bridger Valley Joint Powers Board is located in Uinta County and the Green River Basin. The regional water supply system serves a population of 6,088 people through 613 taps within the corporate limits and ~1,470 taps outside of the corporate limits in Bridger Valley (total 2,083 taps). The JPB is supplied with surface water from State Line Dam and Meek’s Cabin Dam and from the Smiths Fork and Black’s Fork Rivers. The total average surface water yield is approximately 2,100 gpm (3 million gallons per day). The surface water is treated at the water treatment plant from the intake structure on the Smiths Fork River and stored in a 1,000,000-gallon concrete tank, a 500,000-gallon welded steel tank, and a 500,000-gallon bolted steel tank; a total capacity of 2 million gallons.

3. Summarize the request:

A Level I regional water master plan is requested by the Bridger Valley Joint Powers Water Board to evaluate the current condition of their water system and to provide the tools and guidance necessary to assist in the planning,

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 8 rehabilitation, upgrading, and managing of their system. The plan would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The plan would also provide reconnaissance-level information regarding costs and scheduling. This Level I study would need to include , Lyman, Mountain View, and Urie, which are currently served by the JPB water system.

The BVJPB is requesting this Level I study to identify the system’s problems such as storage, transmission, and distribution. The specific system concerns include: water storage at the treatment plant, water treatment plant upgrades to increase treated water output, low pressure concerns in Fort Bridger, repair concerns for poor condition water lines in Fort Bridger, dead end pipelines and looping concerns in Lyman, concerns about the old iron pipeline in Main Street in Lyman, and concerns about old fire hydrants and the need to upgrade pipelines in Mountain View.

4. Summarize the reasons for the request:

The Bridger Valley Joint Powers Board is requesting a Level I regional water master plan study to identify the components of the existing system that are deficient and to provide a schedule for improvements. It will also identify system needs and develop a plan to accommodate future growth. The last WWDC study, the Level II Water Supply Study, was completed in 1995. Since 1995, the Bridger Valley JPB has regionalized the Bridger Valley and supplies water to the area residents.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 613 inside + 1,470 outside = 2,083 taps total 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they? RUS. SRF, Others 5. Is the Sponsor under any federal (EPA) mandates to improve its system? No 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Yes, the Sponsor’s existing system is the regional water supply system for Bridger Valley. 7. What is monthly water bill for 5,000 gallons? $45.00 A. 20,000 Gallons? $97.00 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $121.28 to $168.07 Town of Lyman MHI $80,673 [2017] (Calculation: 2017 MHI $80,673 x 2.5% = $2,016.83/12 = $168.07) Town of Mountain View MHI $58,214 [2017] (Calculation: 2017 MHI $58,214 x 2.5% = $1,455.35/12 = $121.28) 9. Can the project be delayed or staged? Yes A. Should it be? No 10. Basis for the Funding Recommendation:

The Bridger Valley Joint Powers Board (BVJPB) is requesting a Level I reconnaissance-level regional water master plan study to fully evaluate the infrastructure of the JPB’s public water supply system. The study would evaluate the current condition of their entire regional water system and provide the tools and guidance needed to assist in the planning, rehabilitating, upgrading, and managing of their system. It would also develop a plan to accommodate future growth of the Bridger Valley area.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 8 III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600757 B. Groundwater (1) Number of Wells: 0 (2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A C. Surface Water (1) Source Name(s): Smith Fork River & Black’s Fork River (2) Type of Diversion(s): Intake structure on the Smith Fork River (3) Total Average Diversion Yield (CFS of GPM): ~2,100 GPM [3.0 MGD] (2,290 GPM maximum) D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 4,320,000 GPD (4.32 MGD) (2) Increased Capacity Needed (If Known) (Gallons per Day): Unknown (3) Approximate Distance from Source(s) to Distribution System: 1 mile (4) Transmission Pipe Diameter(s): 16”, 14”, 12”, & 10” (5) Type of Transmission Pipe Material(s): AC, HDPE, PVC (6) Age of Transmission Pipeline(s): Present to 45 years old (7) Condition of Transmission Pipeline(s): Fair (aging concerns) (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): State Line Dam & Meek’s Cabin Dam (2) Treated (Volume and Tank Description): 2 MG (storage) (1 MG concrete tank, 0.5 MG welded steel tank, & 0.5 MG bolted steel tank) H. Treatment (1) Specify Water Treatment: Raw water enters from Smith Fork River intake structure into the conventional water treatment plant, followed by UV treatment and then disinfection.

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): Fire Protection D. Average Day Demand Water Usage (Gallons per Capita per Day): 245 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 316 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 432 gpcpd G. Distribution Pipe Diameter(s): 4”, 6”, 8”, & 10” H. Type of Distribution Pipe Material(s): PVC

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 8 I. Age of Distribution Pipeline(s): Present to 45 years old J. Condition of Distribution Pipeline(s): Fair (aging concerns) K. Estimated System Water Losses (Percentage): 10% to 15% L. Describe any fire-flow protection that the system provides: Most of the system provides adequate fire-flow protection. M. What water conservation measures are employed? Metering and rate structure N. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 6,349 B. Current Population Estimate: 6,088 C. Does the applicant have a comprehensive planning boundary? No (1) If so, what is the estimated additional population that may be served in the future? N/A D. How many taps are served within the corporate limits/JPB service area? 613 E. How many taps are served outside of the corporate limits/JPB service area? ~1,470 F. Identify names of other water system served: Town of Lyman (2,115 population; PWS WY5600033) Town of Mountain View (1,286 population; PWS WY5600847) G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: N/A

4. Financial Information A. Rates (1) Tap Fee(s) – Residential: $1,200 (2) Tap Fee(s) – Commercial: $1,200 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $45.00/month and 7,000 gallons/month (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): Wholesale = Service Fee; Town of Lyman $21,043.14; Town of Mountain View $20,314.42 Wholesale Rate = $0.074 per 1,000 gallons; Retail Service Fee = $21.00 1-10,000 gallons = $3.50; 10,001-20,000 gallons = $4.00; 20,001-20,000 gallons = $4.50; 30,001- 40,000 gallons = $5.00; 40,001+ gallons = $5.50

(5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): N/A B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 965,992 b. Annual Revenues from Tap Fees: $ 8,600 c. Annual Revenues from Other Sources: $ 18,208 d. Total Annual Revenues: $ 992,800

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 8 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 955,055 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 100,000 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 0 f. Total Annual Payments: $ 1,055,055 (3) Other a. Balance in Repair and Replacement Fund: $ 500,000 b. Balance in Emergency Fund: $ 500,000 c. Annual Cost of Water Quality Testing: $ 6,000 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 8 PROJECT AREA MAP

Bridger Valley JPB Area - Towns of Fort Bridger, Lyman, and Mountain View, Uinta County, WY

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 8 PHOTOS

Mountain View, WY

Lyman, WY

Fort Bridger, WY

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 8 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 8 OF 8 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: Cody Water Master Plan Program: New Development

Project Type: Municipal Water System County: Park

Sponsor: City of Cody

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Chace Tavelli

I. PROJECT DESCRIPTION

The City of Cody operates two water distribution systems, the first for treated water and the second for raw water. The treated water system provides domestic water, fire suppression, and a portion of the irrigation needs within the City’s corporate limits. The raw water system provides irrigation to only a portion of the City’s corporate limits estimated at fifty percent of the City’s land area. The treated water system was last analyzed with a master plan in 2009 and the raw water system had a separate analysis in 1996. Significant modifications, upgrades, and repairs have been made to both systems since that time, along with new growth and development throughout the City.

The requested master plan will analyze both the drinking and raw water systems, update hydraulic models and mapping, determine future growth and water needs, and develop a schedule for system upgrades and the corresponding rate structure necessary to accommodate those upgrades.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Cody Area Water Supply II 8 1995 I $ 75,000 1996 Cody Area Water Supply (Valley III 59 1996 I $ 785,000 1999 View) Cody Raw Water III 45 1997 II $ 850,000 2000 Cody Master Plan I 33 2008 I $ 100,000 2009 Cody West Transmission Pipeline III 14 2012 I $ 408,700 2017 Cody Tank 2017 III 75 2017 I $ 2,412,000 2022

2. Describe the location of the project:

The project is located in the City of Cody, Park County, in northwestern Wyoming, Yellowstone River Basin.

3. Summarize the request:

Identify current and future deficiencies within the treated and raw water systems based on detailed hydraulic analyses; analyze and identify the amount of annual replacement schedule and funding needed for the systems; identify a prioritized list of major capital projects to allow for long-term funding and planning; and to develop a fair and equitable rate structure for all users of the systems.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 8 4. Summarize the reasons for the request:

The city had a master plan in 2009 and a raw water system master plan in 1996. Significant modifications, upgrades, and repairs have been made to both systems since that time, along with new growth and development throughout the city. The study would evaluate the current condition of their water systems and provide the tools and guidance needed to assist in the planning, rehabilitating, upgrading, and managing those systems.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes A. If not, is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? N/A 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies (Use Attachment III of the operating criteria.) 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 4,958 4.Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? Cody is served by the Shoshone Municipal Pipeline regional supply system 7. What is monthly water bill for 5,000 gallons? ¾” meter = $37; 1” = $61 A. 20,000 Gallons? ¾” meter = $76; 1” = $100 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $56,356 X 2.5%/12 = $117.41 9. Can the project be delayed or staged? Yes A. Should it be? No 10. Basis for the Funding Recommendation:

The City has not had a master plan for their treated or raw water systems in 10 and 24 years respectively. There have been significant upgrades and the City needs a plan to identify deficiencies, future projects, and appropriate rate structures. The study would evaluate the current condition of their water systems and provide the tools and guidance needed to assist in the planning, rehabilitating, upgrading, and managing those systems.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: 5600207C B. Groundwater (1) Number of Wells: N/A (2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 8 C. Surface Water (1) Source Name(s): Shoshone Municipal Pipeline (Buffalo Bill Reservoir) (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): Reservoir intake (3) Total Average Diversion Yield (CFS of GPM): 990 GPM D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Water right is held by the Shoshone Municipal Pipeline. Raw Water system - City of Cody possesses water rights on the Cody Canal

F. Transmission Pipeline The city of Cody is served by the Shoshone Municipal Pipeline (SMP). The following information is for the SMP.

(1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 16.5 million (2) Increased Capacity Needed (If Known) (Gallons per Day): None (3) Approximate Distance from Source(s) to Distribution System: 1,540 feet (4) Transmission Pipe Diameter(s): 36 inch and 24 inch (5) Type of Transmission Pipe Material(s): Mortar lined steel (6) Age of Transmission Pipeline(s): 30 years (7) Condition of Transmission Pipeline(s): Excellent (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): 0.85MG steel - open top (2) Treated (Volume and Tank Description): 4 tanks - 0.2MG concrete, 2.0MG buried concrete, 0.59MG steel, 1.0MG buried concrete. H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): Conventional Treatment

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): Fire protection on treated water system; no metering on the raw water system D. Average Day Demand Water Usage (Gallons per Capita per Day): 1.558MGD E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 3.294MGD F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): Not available from Shoshone Municipal Pipeline G. Distribution Pipe Diameter(s): 2” to 24” H. Type of Distribution Pipe Material(s): PVC, CIP, DIP, welded steel I. Age of Distribution Pipeline(s): Varies - from new to 60+ years old J. Condition of Distribution Pipeline(s): Varies - From excellent to poor K. Estimated System Water Losses (Percentage): 5%-10%

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 8 L. Describe any fire flow protection that the system provides: The treated water system provides fire flow protection to developed areas within the city limits. M. What water conservation measures are employed? Alternate day lawn watering on both treated water and raw water systems; annual to biannual leak detection is performed on the treated water system; public outreach about water use and conservation (pamphlets) N. Is there an independent raw water irrigation system? Yes (1) Raw Water System Capacity (Gallons per Day): 9 MGD (2) Average Annual Raw Water Usage (Gallons per Year): 654.4 MG (2016)

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 9,520 B. Current Population Estimate: 9,885 C. Does the applicant have a comprehensive planning boundary? Yes (1) If so, what is the estimated additional population that may be served in the future? 1.5% per year D. How many taps are served within the corporate limits/JPB service area? 4,958 E. How many taps are served outside of the corporate limits/JPB service area? ~10 F. Identify names of other water system served: No stand-alone water systems are served; however, there are a couple of trailer courts with a single meter that are served G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: Cody Master Plan; 2014, available on the City of Cody website and at the Cody City Hall

4. Financial Information A. Rates (1) Tap Fee(s) – Residential: $1,000 (2) Tap Fee(s) – Commercial: $1,000 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: ¾” Meter = $29.20 for 2,000 gallons; 1” Meter = $53.20 for 2,000 gallons (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): The minimum monthly fees are calculated as follows: Shoshone Municipal Pipeline (SMP) charge + base charge + $2.60 per thousand gallons per month

SMP Charge Base Charge Meter Size $11 $13 ¾ inch $22 $26 1 inch $44 $52 1 ½ inch $77 $91 2 inch $176 $208 3 inch $308 $364 4 inch $1,408 $768 6 inch

(5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): None B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 3,171,877 b. Annual Revenues from Tap Fees: $ 23,214

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 8 c. Annual Revenues from Other Sources: $ 127,754 d. Total Annual Revenues: $ 3,322,845 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 3,026,738 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 12,088 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 92,753 f. Total Annual Payments: $ 3,131,579 (3 ) Other a. Balance in Repair and Replacement Fund: $ 162,088 b. Balance in Emergency Fund: $ 3,892,612 c. Annual Cost of Water Quality Testing: $ 910 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 8 PROJECT AREA MAP

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 8 PHOTOS

Raw water diversion gates and buried tank

Raw water tank

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 8 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 8 OF 8 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: LaGrange Water Master Plan Program: New Development

Project Type: Municipal Water System County: Goshen

Sponsor: Town of LaGrange

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Julie Gondzar

I. PROJECT DESCRIPTION

The Town of LaGrange has requested a Level I water master plan to identify the components of their existing system which are deficient and to provide a schedule for improvements.

1. Existing and Prior Legislation:

There is no existing or prior legislation for the Town of LaGrange.

2. Describe the location of the project:

The Town of LaGrange is located in Goshen County within the North Platte River Basin. The Town has a total area of 0.41 square miles, a population of 445 (as of the 2017 census) and serves 147 taps within the corporate limits, with two taps outside corporate limits. Groundwater for the town is supplied by the White River Formation through two wells which consist of an average yield of 450 to 500 gallons per minute (GPM). A 300,000 gallon above-ground water storage tank sits on the hill to the northeast.

3. Summarize the request:

The Town of LaGrange is requesting funding for a Level I Study to evaluate the condition of their water system and develops a prioritized list of projects that would provide solutions for the Town’s water system deficiencies. The current water system was originally constructed in the early 1980’s, and requires an update in order to accommodate the Town’s growth. The Town is also requesting methods for integrating water treatment into their system (if and when the need arises), as well as, addressing inadequacies in fire protection, providing redundancy, and improving the metering process. The Town also requests an evaluation of water transmission to residential areas that currently do not have access to water, and eliminating dead-end lines by tying them back into the current system.

This Level I Study would provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The study would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The study would also provide reconnaissance-level information regarding costs and scheduling, and provide GIS mapping and hydraulic modeling.

4. Summarize the reasons for the request:

If the Town of LaGrange were forced to treat water based on water quality results from required EPA testing, there would be no method in place to safely treat that water. Additional capacity is required in order to provide adequate fire protection for the town, especially if and when the water tower needs to be shut down temporarily. There is also insufficient fire protection for some areas due to dead-end and/or small-diameter water lines that only allow for “low flow” fire hydrants. Several fire hydrants around town are inactive due to a lack of appropriate service and parts. The current flat-rate fees for water within the Town of LaGrange are not enough to support maintenance of the

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 8 Town’s water system. Currently, the Town has no redundancy in the system, and growing developments have limited or no access to water. Pipelines for irrigation are generally in good condition, but become brittle and tend to break down when tapped.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 149 Taps 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF, and Others 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? No. The Sponsor will consider regionalization opportunities. 7. What is monthly water bill for 5,000 gallons? $17.00 for unlimited use A. 20,000 Gallons? $17.00 for unlimited use 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $58.85 (Calculation: 2017 MHI $28,250 x 2.5% = $706.25/12 = $58.85)

9. Can the project be delayed or staged? Yes A. Should it be? No 10. Basis for the Funding Recommendation:

The Town of LaGrange is requesting a Level I Study to address issues that are currently significantly affecting the Town’s water system, including developing a way to integrate water treatment, resolving dead-end lines and looping them back into the larger system, providing water to residential areas as a result of town growth, resolving the issue of inadequate fire protection, providing redundancy, and addressing the process of metering water in town.

This Level I Study would provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The study would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The study would also provide reconnaissance-level information regarding costs and scheduling, and provide GIS mapping and hydraulic modeling.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600788 B. Groundwater (1) Number of Wells: 2 (2) Primary Supply Aquifer(s) or Formation(s): White River Formation (3) Total Average Production Yield of All Wells (GPM): 1000 GPM C. Surface Water (1) Source Name(s): N/A (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 8 (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? An identification of existing water rights will be part of this Level I study. F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): Unknown (2) Increased Capacity Needed (If Known) (Gallons per Day): Yes (3) Approximate Distance from Source(s) to Distribution System: Less than 100 feet (4) Transmission Pipe Diameter(s): 12” (5) Type of Transmission Pipe Material(s): C 900, PVC (6) Age of Transmission Pipeline(s): 39 years old (7) Condition of Transmission Pipeline(s): Fair (8) Does the applicant possess clear title to transmission corridor easements? Yes, except a short stretch that has a 99-year lease. G. Water Storage (1) Raw (Volume and Tank Description): 300,000 gallon steel on ground tank (2) Treated (Volume and Tank Description): N/A H. Treatment (1) Specify Water Treatment: N/A

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? No C. Identify unmetered usage: Parks and fire protection D. Average Day Demand Water Usage (Gallons per Capita per Day): 430 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): Unknown F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 772 gpcpd G. Distribution Pipe Diameter(s): 12”, 8” & 6” Lines H. Type of Distribution Pipe Material(s): C 900, PVC I. Age of Distribution Pipeline(s): 39 years old J. Condition of Distribution Pipeline(s): Fair K. Estimated System Water Losses (Percentage): Unknown L. Describe any fire flow protection that the system provides: Fire flow is provided to the LaGrange Heritage Square, the Chapel and dorms with sprinklers. The rest is provided with fire hydrants. M. What water conservation measures are employed? None N. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 8 3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 448 B. Current Population Estimate: 435 C. Does the applicant have a comprehensive planning boundary? No (1) If so, what is the estimated additional population that may be served in the future? N/A D. How many taps are served within the corporate limits/JPB service area? 147 E. How many taps are served outside of the corporate limits/JPB service area? 2 F. Identify names of other water system served: None G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: None

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: $1,500.00 (2) Tap Fee(s) – Commercial: $1,500.00 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $17/mo unlimited (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): $17/mo for residential and $17/mo for commercial $174.10/mo for the elementary school $17/mo for seven students in the dorms for Frontier School of the Bible

(5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): N/A

B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales (FY18): $ 35,691 b. Annual Revenues from Tap Fees: $ 1,500 c. Annual Revenues from Other Sources: $ 2,279 d. Total Annual Revenues: $ 39,470 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 33,800 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 0 f. Total Annual Payments: $ 33,800 (3) Other a. Balance in Repair and Replacement Fund: $ 128,000 b. Balance in Emergency Fund: $ 150,000 c. Annual Cost of Water Quality Testing: $ 2,000 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? No a. If not, how is the difference subsidized? General funds

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 8 PROJECT AREA MAP

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 8 PHOTOS

Panoramic view of the Town of LaGrange from water tower location

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 8 PHOTOS (Cont'd)

Well #2

Well #1

Booster Station

Inside well house #2

Pump for two taps outside corporate limits

300,000 gallon water tower

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 8 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 8 OF 8 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION WATERSHED STUDIES

Project Name: Lower Shoshone Watershed Study Program: New Development

Project Type: Multipurpose County: Big Horn and Park

Sponsor: Shoshone Conservation District

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Peter Gill

Project Description: The Shoshone Conservation District is requesting a watershed study to evaluate current watershed processes and to develop water projects on the ground. The District is experiencing problems with sediment in their reservoirs as well as in irrigation diversion and conveyance systems. High flows in the Shoshone River move channels and erode irrigated lands. The District is interested in discussing water management on BLM lands and movement toward stemming the inflow of sediment into Big Horn Lake. This study will not include the Willwood area, but will use the recommendations from the ongoing Willwood dam studies to inform sediment management BMPs within the study area. In addition, irrigators would like better access to water and an understanding of irrigation efficiencies and return flows in order to explore the piping of smaller canals. A current assessment of upland water sources and invasive species is also needed.

The study will provide an inventory of physical, biological, and built systems within the watershed. Watershed studies evaluate water infrastructure and water storage systems for enlargement and rehabilitation, assess current condition of wetlands and riparian areas within the drainage, and provide geomorphic classification. This information will provide baseline information from which the District can pursue implementation of management practices that address the natural resource issues within the drainage.

The Shoshone River drains a large portion of the Big Horn Basin in NW Wyoming and includes the Buffalo Bill Reservoir. This study will focus on the Lower Shoshone River watershed, located primarily in Big Horn County, and includes the towns of Lovell, Byron, Cowley, Deaver, and Frannie. The watershed includes the primary stream system of the Lower Shoshone River downstream of Powell at Whistle Creek. The main tributaries including Big Wash, Coon Creek, Sage Creek, Dry Creek, Whistle Creek, and Crooked Creek. The portions of the study area that drains from Montana will not be included in the study.

PROJECT INFORMATION:

A. EXISTING WATER SUPPLY SYSTEM

What is the extent of the stream system? 259 named streams miles

Has DEQ classified this stream or segment as impaired? Shoshone River from confluence of Bighorn Lake 9.7 miles upstream, parts of Whistle Creek, Sage Creek, Polecat Creek, Foster Gulch, and Big Wash are all impaired for E. Coli.

Are there any DEQ Watershed based plans being conducted or in place? Yes, the Willwood Dam is being studied by various entities including Wyoming DEQ, USGS, and Wyoming Game & Fish, to control sediment.

2020 RECOMMENDATION WATERSHED STUDIES PAGE 1 OF 5 Is there a TMDL being prepared or in place? A TMDL for E. Coli was approved by EPA in 2018.

Is there a NRCS watershed assessment being prepared or in place? No

Are there any instream flow segments in this watershed? No

Any instream flow segments petitioned? No

Is there a soil survey completed for this area? It is incomplete.

B. FINANCIAL INFORMATION

If the entity is a conservation district, what is the status of their local revenue funding? Levy

C. COMPARISON WITH OPERATING CRITERIA

What is the entity status of the sponsor? Conservation District

Project Priority according to the Criteria? Priority Seven (7), Watershed Studies

If the entity is a conservation district, what is the status of a legal entity developing within the district? There are existing water districts within the watershed, and the sponsor is aware of entity requirements for WWDC conventional construction projects.

How many acres are irrigated? 81,460 acres

How many individual landowners in the watershed? 5,700 Residents in 2010, 1,695 of these are rural.

Will the project consider regional solutions? Yes

Can the project be postponed or staged? Yes, but the District has been receiving inquiries from landowners and producers with interest in water projects and needs watershed assessment information in order to adequately and efficiently address these needs.

Basis for the funding recommendation: This project meets program criteria requirements and has the potential to greatly benefit the citizens of Big Horn and Park Counties with a management and rehabilitation plan that outlines projects to improve watershed condition and function via the small water project program. This project provides benefit to people, wildlife, livestock, industry, and the environment.

2020 RECOMMENDATION WATERSHED STUDIES PAGE 2 OF 5 PROJECT AREA MAP

2020 RECOMMENDATION WATERSHED STUDIES PAGE 3 OF 5 PHOTOS

Big Horn Canyon

Left: Arid Landscape w/Pivot Irrigation Right: Lower Shoshone River

2020 RECOMMENDATION WATERSHED STUDIES PAGE 4 OF 5 RESOLUTION

2020 RECOMMENDATION WATERSHED STUDIES PAGE 5 OF 5 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: Pavillion Water Master Plan Program: New Development

Project Type: Municipal Water System County: Fremont

Sponsor: Town of Pavillion

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Keith Clarey

I. PROJECT DESCRIPTION

The Town of Pavillion has requested a Level I water master plan to identify the components of their existing system which are deficient and to provide a schedule for improvements.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Pavillion Water Supply III 28 1994 I $ 400,000 1999 Pavillion Area Water Supply/ I 48/39 2008/10 I $ 173,500 2010/12 Extension Pavillion Water Supply II 1 2011 I $ 100,000 2014 Pavillion Water System III 141 2013 I $ 214,500 2018 Improvements

2. Describe the location of the project:

The Town of Pavillion is located in Fremont County and resides within the Wind River Basin. The Town has a population of 240 people and they are served through 130 taps within the corporate limits and 4 taps outside of the corporate limits. The Town is supplied with Wind River Formation groundwater from five (5) wells and the wells have a total average yield estimated to be approximately 100 gpm. The supplied groundwater is treated by chlorination and stored in above-ground tank with a total capacity of 250,000 gallons. The Town uses approximately 7 million gallons per year.

3. Summarize the request:

A Level I water master plan is requested by the Town of Pavillion to evaluate the current condition of their water system and to provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The plan would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The plan would also provide reconnaissance-level information regarding costs and scheduling.

4. Summarize the reasons for the request:

The Town of Pavillion is requesting a Level I water master plan study to identify the components of the existing system that are deficient and to provide a schedule for improvements. It will also identify system needs and develop a plan to accommodate future growth.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 7 II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 134 active taps (130 inside and 4 outside) 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF, and Others 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? No. Regionalization opportunities for the Town of Pavillion were previously investigated during the WWDC Pavillion Area Water Supply, Level I Study, Level I Study Extension, and Level II Study (Oct. 2011, Aug. 2012, and Jan. 2013, respectively). 7. What is monthly water bill for 5,000 gallons? $69.50 A. 20,000 Gallons? $174.50 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $100.26 (Calculation: 2017 MHI $48,125 x 2.5% = $1,203.13/12 = $100.26) 9. Can the project be delayed or staged? Yes A. Should it be? No 10. Basis for the Funding Recommendation:

The Town of Pavillion is requesting a Level I reconnaissance-level water master plan study to fully evaluate the infrastructure of the Town’s public water supply system. The study would evaluate the current condition of their water system and provide the tools and guidance needed to assist in the planning, rehabilitating, upgrading, and managing of their system. It would also develop a plan to accommodate future growth of the Town.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600039 B. Groundwater (1) Number of Wells: 5 (2) Primary Supply Aquifer(s) or Formation(s): Wind River Formation (3) Total Average Production Yield of All Wells (GPM): TBD, ~100 gpm (250 gpm maximum) C. Surface Water (1) Source Name(s): N/A (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 7 E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 24,000 GPD (2) Increased Capacity Needed (If Known) (Gallons per Day): TBD (3) Approximate Distance from Source(s) to Distribution System: 500 feet (4)Transmission Pipe Diameter(s): 6” (5) Type of Transmission Pipe Material(s): PVC (6) Age of Transmission Pipeline(s): estimated 75 years (7) Condition of Transmission Pipeline(s): Unknown (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): 60,000 gallons (2) Treated (Volume and Tank Description): 250,000 gallons H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): Chlorination

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): Fire Department D. Average Day Demand Water Usage (Gallons per Capita per Day): 80 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 105 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 158 gpcpd G. Distribution Pipe Diameter(s): 6” H. Type of Distribution Pipe Material(s): PVC I. Age of Distribution Pipeline(s): 30 to 75 years J. Condition of Distribution Pipeline(s): Unknown K. Estimated System Water Losses (Percentage): 50% L. Describe any fire flow protection that the system provides: Fire hydrant on each block. M. What water conservation measures are employed? None N. Is there an independent raw water irrigation system? Yes (1) Raw Water System Capacity (Gallons per Day): Unknown (2) Average Annual Raw Water Usage (Gallons per Year): Unknown

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 231 B. Current Population Estimate: 240 C. Does the applicant have a comprehensive planning boundary? No D. How many taps are served within the corporate limits/JPB service area? 130 Taps (active) E. How many taps are served outside of the corporate limits/JPB service area? 4 Taps

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 7 F . Identify names of other water system served: N/A G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: N/A

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: $1,100 (2) Tap Fee(s) – Commercial: $1,200 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $62.50 / 4,000 gallons (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): Residential base rate $62.50 for first 4,000 gallons. Commercial base rate $69.50 for first 4,000 gallons. Out-of-Town customer base rate $93.50 for first 4,000 gallons. Additional $7.00 per 1,000 gallons used over 4,000 gallons base rate. (5) Identify any local conditions that affect water rates: N/A B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 69,159 b. Annual Revenues from Tap Fees: $ 0 c. Annual Revenues from Other Sources: $ 12,070 d. Total Annual Revenues: $ 81,229 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 81,229 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 0 f. Total Annual Payments: $ 81,229 (3) Other a. Balance in Repair and Replacement Fund: $ 0 b. Balance in Emergency Fund: $ 22,329 c. Annual Cost of Water Quality Testing: $ 2,500 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

NOTE: The above revenue and expenditures figures for the Town are numbers from the FY2017-2018 year-end report. At the beginning of FY2018-2019, Town Council approved a raise in rates and 3% of revenue to be placed in reserves.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 7 PROJECT AREA MAP

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 7 PHOTOS

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 7 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 7 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: Pinedale Water Master Plan Program: New Development

Project Type: Municipal Water System County: Sublette

Sponsor: Town of Pinedale

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Chace A. Tavelli

I. PROJECT DESCRIPTION

The Town of Pinedale provides water to a current population of approximately 2,030 people through about 1,200 service connections. The system’s source water is from Fremont Lake. In August of 2018, there was a fecal coliform spike in the raw water causing over 10% of samples during a rolling six month period to exceed fecal coliform criteria. The EPA indicated that they will likely be requiring the Town to either (1) implement filtration within the next 18 months, (2) conduct a watershed study to determine the source of fecal coliform or, if not attainable, potential sources of the fecal coliform and provide the EPA with an action plan for reducing the impact of these sources on the Town’s supply, or (3) develop an alternate source of water.

The Town is requesting a municipal water master plan to evaluate their water system, update hydraulic models and mapping, determine future growth and water needs, identify options for water treatment, identify an alternate source of water to meet EPA requirements, and evaluate water rates to accommodate the findings of the plan.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Pinedale Pipeline III 231 1991 I $ 320,000 1993 Pinedale Master Plan I 10 1994 I $ 125,000 1996 Pinedale Transmission Line III 59 1996 I $ 3,500,000 1998 Pinedale Intake Project III 88 2002 I $ 193,000 2003 Pinedale Hydropower II 7 2002 I $ 40,000 2004 Pinedale Master Plan I 85 2007 I $ 210,000 2009 Pinedale Pipelines III 38/68 2009/10 I $ 11,470,000 2014/15 Pinedale Hydropower II 74 2014 I $ 125,000 2016

2. Describe the location of the project:

The project is located in the Town of Pinedale, Sublette County, in the Green River Basin.

3. Summarize the request:

To complete a municipal water master plan including identification of an alternate source supply. This Level I Study would provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The study would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The study would also provide reconnaissance-level information regarding costs and scheduling, and provide GIS mapping and hydraulic modeling.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 8 4. Summarize the reasons for the request:

The Town’s last water master plan was completed in 2009 and several upgrades to their system resulted from that master plan. There are areas near Pinedale that may be annexed into the Town and will need to be supplied with water from the Town and those demands need to be identified along with the necessary infrastructure. The Town is also trying to be proactive in dealing with the EPA’s requirements.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes A. If not, is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? N/A 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies (Use Attachment III of the operating criteria.) 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 1,122 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? Yes, Filtration Avoidance Criteria Exceedance and Response Options submitted from EPA to the Town. This requires the town to select one of three options to respond to the event. (1) Implement filtration within the next 18 months, (2) Conduct a watershed study to determine the source of fecal coliform or, if not attainable, potential sources of the fecal coliform and provide the EPA with an action plan for reducing the impact of these sources on the Town of Pinedale’s raw water, (3) Develop an alternate source of water. 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? The sponsor currently serves customers outside of the Town limits that have requested connection and are close enough to make it practical. The Town is interested in identifying additional customers in this study. 7. What is monthly water bill for 5,000 gallons? $40.00 A. 20,000 Gallons? $40.00 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $78,194 X 2.5%/12 = $163 9. Can the project be delayed or staged? No A. Should it be? No 10. Basis for the Funding Recommendation:

A water master plan will help the Town plan for future growth, update their hydraulic models and mapping, identify an alternate source supply, and investigate water treatment options should the EPA require filtration.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY 5600041 B. Groundwater (1) Number of Wells: 0 (2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 8 C. Surface Water (1) Source Name(s): Fremont Lake (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): Dam with intake structure (3) Total Average Diversion Yield (CFS of GPM): 568 GPM D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 3.9 million (2) Increased Capacity Needed (If Known) (Gallons per Day): None (3) Approximate Distance from Source(s) to Distribution System: 12,660 feet for the East Line; 31,500 feet for the West Line (4) Transmission Pipe Diameter(s): 24 inch (5) Type of Transmission Pipe Material(s): Ductile Iron (6) Age of Transmission Pipeline(s): 20 years West Line, 10 Years East Line (7) Condition of Transmission Pipeline(s): Good (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): N/A (2) Treated (Volume and Tank Description): N/A H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): Chlorine, UV, Soda Ash

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): Fire protection D. Average Day Demand Water Usage (Gallons per Capita per Day): 404 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 899 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): Unknown G. Distribution Pipe Diameter(s): 6-14 inch H. Type of Distribution Pipe Material(s): Ductile Iron I. Age of Distribution Pipeline(s): 10-55 years J. Condition of Distribution Pipeline(s): Good K. Estimated System Water Losses (Percentage): Unknown L. Describe any fire flow protection that the system provides: Standard fire flow protection with hydrants M. What water conservation measures are employed?

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 8 Penalties for exceeding the base rate. Citations for wasting water. N. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 2030 B. Current Population Estimate: 1890 C. Does the applicant have a comprehensive planning boundary? No (1) If so, what is the estimated additional population that may be served in the future? N/A D. How many taps are served within the corporate limits/JPB service area? 1122 E. How many taps are served outside of the corporate limits/JPB service area? 31 F. Identify names of other water system served: None G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: N/A

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: $2,700 to $20,000 (2) Tap Fee(s) – Commercial: $2,700 to $20,000 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $40 - 18,439 gallons used (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): See attached water rates and tap fees (5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): Flow-through to prevent freezing. B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 685,093 b. Annual Revenues from Tap Fees: $ 5,221 c. Annual Revenues from Other Sources: $ 61,531 d. Total Annual Revenues: $ 751,845 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 579,780 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 150,000 e. Annual Payments for Other Purposes: $ 0 f. Total Annual Payments: $ 729,780 (3 ) Other a. Balance in Repair and Replacement Fund: $ 0 b. Balance in Emergency Fund: $ 626,000 c. Annual Cost of Water Quality Testing: $ 27,529

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 8 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

WATER RATES AND TAP FEES

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 8 PROJECT AREA MAPS

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 8 PHOTOS

UV Water Disinfection Vault

New Growth Subdivision

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 8 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 8 OF 8 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: Shoshoni Water Master Plan Program: New Development

Project Type: Municipal Water System County: Fremont

Sponsor: Town of Shoshoni

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Keith Clarey

I. PROJECT DESCRIPTION

The Town of Shoshoni has requested a Level I water master plan to identify the components of their existing system which are deficient and to provide a schedule for improvements.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Shoshoni Water Supply II 123 1990 II $ 75,000 1993 Shoshoni Water Supply III 231 1991 II $ 740,000 1996

2. Describe the location of the project:

The Town of Shoshoni is located in Fremont County and resides within the Wind River Basin. The Town has a population of 652 people and they are served through 364 taps within the corporate limits. The Town is supplied with Wind River Formation groundwater from four wells located west of the Town and the wells have a total average yield of 742 gpm. The supplied groundwater is treated by chlorination and stored in an above-ground welded steel tank with a capacity of 500,000 gallons also located west of the Town.

3. Summarize the request:

A Level I water master plan is requested by the Town of Shoshoni to evaluate the current condition of their water system and to provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The plan would serve as a framework to establish project priorities and to perform financial planning necessary to meet those priorities. The plan would also provide reconnaissance-level information regarding costs and scheduling.

4. Summarize the reasons for the request:

The Town of Shoshoni is requesting a Level I water master plan study to identify the components of the existing system that are deficient and to provide a schedule for improvements. It will also identify system needs and develop a plan to accommodate future growth.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes 2. Project Priority According to WWDO Criteria: Acct I - Priority 8: LI Reconnaissance Studies

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 6 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: 364 Taps 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF, and Others 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? No. The Sponsor will consider regionalization opportunities. 7. What is monthly water bill for 5,000 gallons? $26.00 for 10,000 gallons A. 20,000 Gallons? $36.00 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $72.92 (Calculation: 2017 MHI $35,000 x 2.5% = $875.00/12 = $72.92)

9. Can the project be delayed or staged? Yes A. Should it be? No 10. Basis for the Funding Recommendation:

The Town of Shoshoni has ongoing issues with transmission line breaks west of the Town and a high frequency of well pump replacements. The last WWDC Level II system rehabilitation study was completed in January, 1991. The Town is requesting a Level I water master plan study to evaluate the existing public water system and to modernize GIS mapping and hydraulic modeling of the system. The study will help identify infrastructure improvements and prioritize future projects related to supply, transmission, treatment, and storage.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600053 B. Groundwater (1) Number of Wells: 4 (2) Primary Supply Aquifer(s) or Formation(s): Wind River Formation (3) Total Average Production Yield of All Wells (GPM): 742 GPM (880 GPM maximum) C. Surface Water (1) Source Name(s): N/A (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? WSEO GW Permits for Four Wells: UW35 (1948); UW55334 (1954); UW [not listed in 1991 report] (1954); UW41152 (1977)

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 6 F . Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 881,280 GPD; 10” Line @ 5 FPS Flow. (2) Increased Capacity Needed (If Known) (Gallons per Day): Unknown (3) Approximate Distance from Source(s) to Distribution System: 5.4 miles (4) Transmission Pipe Diameter(s): 6”, 8”, & 10” Lines (5) Type of Transmission Pipe Material(s): PVC, Cast Iron, Ductile Iron (6) Age of Transmission Pipeline(s): 10” 1993 (26 years); 8” 1978 (41 years); 6” 1954 (65 years) (7) Condition of Transmission Pipeline(s): 10” Good; 8” Poor; 6” Poor (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): N/A (2) Treated (Volume and Tank Description): 500,000 gallons; Welded Steel (1978) H. Treatment (1) Specify Water Treatment: Chlorination

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage: Park, Fire Protection D. Average Day Demand Water Usage (Gallons per Capita per Day): 230 gpcpd (150,000 GPD) E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 460 gpcpd (300,000 GPD) F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 690 gpcpd (150% Maximum Day) G. Distribution Pipe Diameter(s): 6” & 8” Lines H. Type of Distribution Pipe Material(s): PVC I. Age of Distribution Pipeline(s): 1993 (26 years) J. Condition of Distribution Pipeline(s): Good K. Estimated System Water Losses (Percentage): Unknown L. Describe any fire flow protection that the system provides: All Fire Protection (ISO’s for 2008 & 2018) M. What water conservation measures are employed? Tiered water rates N. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 649 B. Current Population Estimate: 652 C. Does the applicant have a comprehensive planning boundary? No (1) If so, what is the estimated additional population that may be served in the future? 650 D. How many taps are served within the corporate limits/JPB service area? 364 Taps E. How many taps are served outside of the corporate limits/JPB service area? 0 F. Identify names of other water system served: None

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 6 G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: None exist.

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: $750.00 (2) Tap Fee(s) – Commercial: $750.00 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $26.00 for 10,000 gallons and $1.00 per 1,000 gallons after. (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): $26.00 for 10,000 gallons and $1.00 per 1,000 gallons after. (5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): Winter rates – basic rate for prevent freeze-up. B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales (FY18): $ 131,593 b. Annual Revenues from Tap Fees: $ 0 c. Annual Revenues from Other Sources: $ 0 d. Total Annual Revenues: $ 131,593 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 97,013 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 9,299 f. Total Annual Payments: $ 106,312 (3) Other a. Balance in Repair and Replacement Fund: $ 0 b. Balance in Emergency Fund: $ 296,040 c. Annual Cost of Water Quality Testing: $ 733 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 6 PROJECT AREA MAP

PHOTOS

Shoshoni Town Hall

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 6 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 6 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS

Project Name: CWRWS JPB GW Disinfection Program: New Development

Project Type: Joint Powers Water Board Water System County: Natrona

Sponsor: Central Wyoming Regional Water System Joint Powers Board (CWRWS JPB)

WWDO Recommendation: Do Not Fund Proposed Budget: $0*

Project Manager: Chace A. Tavelli

* The Interim Director’s recommendation is to not fund this Level II request as it does not comport with WWDC Operating Criteria regarding eligibility of disinfection facilities. See Section II.10.

I. PROJECT DESCRIPTION

The Central Wyoming Regional Water System (Regional) was formed in 1993 for the purpose of providing a centralized water supply/treatment and transmission system to the central Wyoming area. The Regional System obtains its water through a series of wells constructed in the North Platte River alluvium. Based on Cryptosporidium source water monitoring results obtained during the second round of the Long Term 2 Enhanced surface Water Treatment Rule Sampling, the EPA has placed a Bin 2 classification on the Central Wyoming Water Treatment System. To achieve EPA compliance, the disinfection system for the ground water treatment plant needs to be upgraded to include the installation of ultraviolet light disinfection. This project is to design the ultraviolet disinfection system and design the upgrade of the existing ozone generation process.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Casper Master Plan I 75 2005 I $ 200,000 2007 Casper Zone III III 121 2007 I $ 3,200,000 2012 Casper Zone IV Improvements III 68 2010 I $ 663,300 2015 Central Wyoming Regional-Zone III 63 2011 I $ 1,959,750 2016 IIB

2. Describe the location of the project:

The project is located in the the City of Casper, Natrona County, North Platte River Basin.

3. Summarize the request:

The request is for the design of an ultraviolet disinfection system facility and upgrade to the existing ozone generation.

4. Summarize the reasons for the request:

To achieve EPA compliance per a Bin 2 classification resulting from Cryptosporidium source water monitoring results.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 1 OF 8 II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes A. If not, is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? N/A 2. Project Priority According to WWDO Criteria: Acct I - Priority 6: LII Feasibility Studies (Use Attachment III of the operating criteria.) 3. Will the project serve at least 15 water taps? Yes A. Number of Taps: ~26,000 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? Yes; SRF, etc. 5. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? The EPA has placed a Bin 2 classification on the system and mandated compliance with 40 C.F.R. 141.711(a). 6. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? The CWRWS is a regional water purveyor. 7. What is monthly water bill for 5,000 gallons? $9,100 (CWRWS JPB provides wholesale water only $1.84/1,000 gallons) A. 20,000 Gallons? $36,800 (CWRWS JPB provides wholesale water only $1.84/1,000 gallons) 8. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $60,470 X 2.5% / 12 = $126 for the City of Casper 9. Can the project be delayed or staged? Yes A. Should it be? Yes 10. Basis for the Funding Recommendation:

The project is receiving a “Do Not Fund” recommendation per the Operating Criteria of the Wyoming Water Development Program; Chapter 5, Priorities of Projects-New Development and Rehabilitation Projects; Section B, Ineligible Projects and Associated Costs; Sub-section 9, Water Treatment Facilities:

“The program has not participated in water treatment facilities with the exception of disinfection facilities needed to connect groundwater wells to a supply system when it expedites the completion of the project. The need for improvements to treatment facilities is considered in the generation of master plans. However, project sponsors are advised that they will need to seek alternate funding for water treatment plants.”

The requested project is for water treatment facilities, is not part of a project to connect groundwater wells to a supply, and is not part of the generation of a master plan.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600009C B. Groundwater (1) Number of Wells: 29 (2) Primary Supply Aquifer(s) or Formation(s): North Platte River Alluvial (3) Total Average Production Yield of All Wells (GPM): 16,425 GPM

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 2 OF 8 C. Surface Water (1) Source Name(s): North Platte River (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): Intake Structures - Pumps (3) Total Average Diversion Yield (CFS of GPM): 42 CFS D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 46 million GPD (2) Increased Capacity Needed (If Known) (Gallons per Day): N/A (3) Approximate Distance from Source(s) to Distribution System: 2,000 ft (4) Transmission Pipe Diameter(s): 24” to 42” (5) Type of Transmission Pipe Material(s): Ductile Iron, PVC, Concrete (6) Age of Transmission Pipeline(s): 1 to 40 years (7) Condition of Transmission Pipeline(s): Good (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): N/A (2) Treated (Volume and Tank Description): ~9 MG, above ground, steel and elevated composite H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): Ground Water - Ozone, Chloramination, Corrosion Control; Surface Water - Flocculation/Sedimentation/Filtration, Ozone, Chloramination, Corrosion Control

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): N/A D. Average Day Demand Water Usage (Gallons per Capita per Day): ~140 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): ~362 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 300 gpcpd G. Distribution Pipe Diameter(s): 8” to 36” H. Type of Distribution Pipe Material(s): Steel, Ductile Iron, PVC, HDPE, AC, Permastrand I. Age of Distribution Pipeline(s): 1 to 45 years J.Condition of Distribution Pipeline(s): Good K. Estimated System Water Losses (Percentage): <1% L. Describe any fire flow protection that the system provides: Hydrants; fire flow protection for homes and businesses.

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 3 OF 8 M. What water conservation measures are employed? Watering restrictions during times of calls on the supply, and public education. N. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population (2010 Census): 68,000 B. Current Population Estimate: 71,000 C. Does the applicant have a comprehensive planning boundary? Yes (1) If so, what is the estimated additional population that may be served in the future? 25,000 D. How many taps are served within the corporate limits/JPB service area? ~26,000 E. How many taps are served outside of the corporate limits/JPB service area? 0 F. Identify names of other water system served: City of Casper, Mile-Hi I&S District, 33 Mile I&S District, Pioneer Water, Poison Spider Water, Sandy Lake Water, Wardwell Water & Sewer, Salt Creek JPB, Lakeview I&S District G. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: Casper Water Master Plan, Level I (October 2006); Generation Casper Comprehensive Land Use Plan. Copies can be provided by the CWRWS JPB.

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: ¾” = $1,869 (2) Tap Fee(s) – Commercial: ¾” = $1,869 (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: CWRWS provides wholesale water to multiple entities, these entities have varying rate structures. (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): $1.84 per 1,000 gallons (wholesale rate) (5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): N/A B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 6,132,000 b. Annual Revenues from Tap Fees: $ 110,000 c. Annual Revenues from Other Sources: $ 70,000 d. Total Annual Revenues: $ 6,312,000 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 3,422,966 b. Annual Payments for Debt Retirement: $ 2,418,168 policy c. Annual Payments to a Repair and Replacement Fund: $ dependent* policy d. Annual Payments to an Emergency Fund: $ dependent*

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 4 OF 8 policy e. Annual Payments for Other Purposes: $ dependent* f. Total Annual Payments: $ 5,841,134+ * The Regional Water System reserve policy establishes the following minimums: Capital = $1,000,000 (balance as of 6/30/18 = $1,256,475) Emergency Reserve to equal 45 days of operational expense (as of 6/30/18 this equaled $430,370) General Operating Reserve to equal 45 days of operational expense (as of 6/30/18 this equaled $430,371) Debt Service Fund in an amount based on subsequent fiscal year monthly payments (as of 6/30/18 this equaled $381,685) All reserve requirements have been fully funded for several years so no additional annual payments specific for these reserves have been made or scheduled (3) Other a. Balance in Repair and Replacement Fund: $ 6,549,497 b. Balance in Emergency Fund: $ 427,871 c. Annual Cost of Water Quality Testing: $ 62,000 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 5 OF 8 PROJECT AREA MAP

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 6 OF 8 PHOTOS

Ozone generation room

Well field

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 7 OF 8 RESOLUTION

2020 RECOMMENDATION MUNICIPAL/JOINT POWERS WATER BOARD WATER SYSTEMS PAGE 8 OF 8 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS

Project Name: Happy Valley Water Supply Program: New Development

Project Type: Rural Domestic County: Lincoln

Sponsor: Happy Valley Pipeline Co.

WWDO Recommendation: Level II* * Contingent, for this Level, the requirement that the Sponsor become a public entity. The Happy Valley Water Improvement and Service District formation election is set for May 7, 2019.

Proposed Budget: $TBD

Project Manager: Kevin J. Boyce, P.G.

I. PROJECT DESCRIPTION

Water System Planning Study for a Rural Domestic Public Water System

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Star Valley Regional Master Plan I 85 2007 I $ 600,000 2010

2. Describe the location of the project:

The Happy Valley Pipeline Company system is located in the Upper Star Valley, approximately 3 miles south of Afton on US HWY 89. The source springs are in the canyon of Dry Creek that flows westward, tributary to Salt River. (42°40’50” N, 110°55’50” W – Entrance to Happy Valley Lane off US HWY 89).

3. Summarize the request:

The Happy Valley Pipeline Company is requesting a water supply study that would include elements common to WWDC Level I/II examinations of rural-residential systems to evaluate the current condition of their water system and to provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system. The system had a reconnaissance-level evaluation in the WWDC 2009 Star Valley Regional Master Plan, Level I.

4. Summarize the reasons for the request:

“[The] 60-year old [transmission] steel pipe [is] needing more repairs than existing fund are available. Repairs have been made as needed. O&M account is dwindling [and] at present [water] rates, funding cannot keep up with repairs.” (from application received 2/11/2019). The Sponsor has been communicating with the Town of Afton regarding a possible regional connection. The Town’s southern distribution line presently terminates approximately ¾ north of Happy Valley which presents a feasible alternative to the springs in Dry Creek Canyon.

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 1 OF 9 II. WWDC ELIGIBILITY CONSIDERATIONS

1. Does an entity of local government exist? No A. If an entity of local government exists, provide the following: (1) Type of Entity (Water District, Water & Sewer District, Improvement & Service District, etc.): None presently; ISD formation election is set for May 7, 2019. (2) Date of Formation: N/A B. If no entity exists, provide the following: (1)Is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? No (2) Has district formation started? Yes (3) Has a petition been submitted to the City Council or County Commission? Yes (4) Has the district formation hearing been held? Yes, December 18, 2018. (5) Has the district formation election been held or scheduled? Election Day – May 7, 2019. 2. Is the area made up a subdivision, subdivisions, or un-platted development? Yes, sub-divided. 3. Provide the date or dates that the subdivision or subdivisions were approved by the City or County: Happy Valley Estates – 1968 Lancaster Subdivision – 1976

4. Is the project supported by the City Council or County Commission which has jurisdiction over the project area? With regards to this application they have not been consulted, however there has been a dialog with the Town of Afton regarding future municipal supply to Happy Valley. The project is supported by the Lincoln County Commission.

5. Project Priority According to WWDO Criteria: Acct I - Priority 6: LII Feasibility Studies

6. Will the project serve at least 15 water taps? Yes A. Number of Taps: 30 7. Is the Sponsor eligible for funding from other state or federal programs? No A. If so, what are they (RUS, SRF, other)? N/A 8. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No, but there have been past boil orders. 9. Is the Sponsor currently served by a regionalized water supply system (specify)? No Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? Yes, a study would consider a regional connection to Afton which could also serve the Osmond Water Company, etc. 10. What is monthly water bill for 5,000 gallons? $25.00 A. 20,000 Gallons? $25.00 11. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $63,756 (Lincoln County WY - https://factfinder.census.gov/) X 2.5%/12 = $132.83

12. Can the project be delayed or staged? Funding determination delayed until District formation. A. Should it be? Commission prerogative based on Criteria, Account I biennium expenditures, etc. 13. Basis for the Funding Recommendation: Statewide Drinking Water System Planning; the study will evaluate the current condition of their water system and provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system.

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 2 OF 9 III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY 5600153 B. Groundwater (1) Number of Wells: None (2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A C. Surface Water (1) Source Name(s): None (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): Water Cress #1; Water Cress #2 (2) Total Average Production Yield of All Springs (CFS or GPM): 100 gpm E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Water Cress No. 1 Pipeline, Permit No. 24245D, 0.361 cfs – Adjudicated Water Cress No. 1 Pipeline Enl., Permit No. 6854E, 0.361 cfs - Adjudicated

F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 500,000 GPD (2) Increased Capacity Needed (If Known) (Gallons per Day): None (3) Approximate Distance from Source(s) to Distribution System: 4,500 ft (4) Transmission Pipe Diameter(s): 6” (5) Type of Transmission Pipe Material(s): Steel (6) Age of Transmission Pipeline(s): 50 years (7) Condition of Transmission Pipeline(s): Poor (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): None (2) Treated (Volume and Tank Description): None H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): None

2. Existing Water Distribution System A. Is the water use metered? Meter pits but no meters. B. Are billings based on meter readings? N/A C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): None D. Average Day Demand Water Usage (Gallons per Capita per Day): 14,000 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 14,000 gpcpd

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 3 OF 9 F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 21,000 gpcpd G. Distribution Pipe Diameter(s): 6” and 2” H. Type of Distribution Pipe Material(s): Steel and some PVC I. Age of Distribution Pipeline(s): 60 years J. Condition of Distribution Pipeline(s): poor K. Estimated System Water Losses (Percentage): 15% L. Describe any fire flow protection that the system provides: None M. What water conservation measures are employed? Culinary use only. N. Does anyone in the service area haul water? No O. Is there an independent raw water irrigation system? Yes, Dry Creek Irrigation District. (1) Raw Water System Capacity (Gallons per Day): Ditches and laterals, unmetered (2) Average Annual Raw Water Usage (Gallons per Year): Unknown

3. Demographic Information and Existing Water Service Area A. Population Being Served: 90 estimated B. Does the applicant have a comprehensive planning boundary? Future District boundary survey (1) If so, what is the estimated additional population that may be served in the future? ≈50 C. How many taps are served within the district boundary? 30 D.How many taps are served outside the district boundary? N/A E. Identify names of other water system served: None, but “side-by-side” with the Osmond Pipeline system. F. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: 2009 WWDC Star Valley Regional Master Plan, Level I (available thru WWDC website)

4. Financial Information A.Rates (1) Tap Fee(s) – Residential: None (2) Tap Fee(s) – Commercial: None (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $25.00 unlimited (4) Water Rates (Provide rates for all tiers and categories of use): $25.00 unlimited (5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): NA

B. Financial Statement (of Water Utility): from 2018 Tax Return - Happy Valley Pipeline Inc. (1) Revenues a. Annual Revenues Generated from Water Sales: $ 9,503.00 b. Annual Revenues from Tap Fees: $ 0 c. Annual Revenues from Other Sources: $ 0 d. Total Annual Revenues: $ 9,503.00

(2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 6,021.00 b. Annual Payments for Debt Retirement: $ 0

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 4 OF 9 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 2,705.00 f. Total Annual Payments: $ 8,726.00 (3 ) Other a. Balance in Repair and Replacement Fund: $ 0 b. Balance in Emergency Fund: $ 0 c. Annual Cost of Water Quality Testing: $ 453.00 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 5 OF 9 PROJECT AREA MAP

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 6 OF 9 PHOTOS

Water Cress Spring #2 Vault

Water Cress Spring #1 Vault

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 7 OF 9 DISTRICT FORMATION DOCUMENTATION

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 8 OF 9 DISTRICT FORMATION DOCUMENTATION (Con’t)

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 9 OF 9 2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS

Project Name: Skyline ISD Water Supply Program: New Development

Project Type: Rural Domestic County: Teton

Sponsor: Skyline Improvement & Service District

WWDO Recommendation: Level II Proposed Budget: $TBD

Project Manager: Kevin J. Boyce, P.G.

I. PROJECT DESCRIPTION

Feasibility/Planning Study of Needed Improvements for a 45-year old Public Water Supply System.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Teton County Water Supply I 46 1997 I $ 250,000 2000 Master Plan

2. Describe the location of the project:

Skyline ISD/Ranch is located 2 miles west of Jackson on State HWY 22 above the east banks of the Snake River. (43° 29’ 00” N, 110°49’35” W, Mallard Road entrance)

3. Summarize the request:

The Skyline I & S District is requesting a water supply study that would include elements common to WWDC Level I/II examinations of rural-residential systems. The District has recently self-funded a reconnaissance-level system evaluation, installed fire/flushing hydrants, and commissioned a leak detection survey.

4. Summarize the reasons for the request:

“It has become increasingly clear that major improvements to the system are needed to extend the life of the systems. The ISD have completed the required improvement[s] note[ed] within their EPA [sanitary] surveys but it is clear that additional upgrades are required. The vision of this funding request is to provide a review and master plan for the ISD that includes the well water pumping capacity, an optimal storage system and enhanced delivery system, perhaps using variable frequency drives [on well pumps].”

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Does an entity of local government exist? Yes A. If an entity of local government exists, provide the following: (1) Type of Entity (Water District, Water & Sewer District, Improvement & Service District, etc.): Improvement & Service District

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 1 OF 9 (2) Date of Formation: 1989 B. If no entity exists, provide the following: (1) Is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? No (2) Has district formation started? N/A (3) Has a petition been submitted to the City Council or County Commission? N/A (4) Has the district formation hearing been held? N/A (5) Has the district formation election been held or scheduled? N/A 2. Is the area made up a subdivision, subdivisions, or un-platted development? Subdivisions 3. Provide the date or dates that the subdivision or subdivisions were approved by the County: 1967 4. Is the project supported by the City Council or County Commission which has jurisdiction over the project area? N/A A. Provide any comments from City Council or County Commission: None 5. Project Priority According to WWDO Criteria: Acct I - Priority 6: LII Feasibility Studies (Use Attachment III of the operating criteria.) 6. Will the project serve at least 15 water taps? Yes A. Number of Taps: 87 7. Is the Sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF, etc. 8. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 9. Is the Sponsor currently served by a regionalized water supply system (specify)? No Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? Yes 10. What is monthly water bill for 5,000 gallons? $46.58 A. 20,000 Gallons? $67.58 11. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $80,049 (Teton County WY - https://factfinder.census.gov/) X 2.5%/12 = $166.77 12. Can the project be delayed or staged? Yes A. Should it be? Commission prerogative based on Criteria, Account I biennium expenditures, etc. 13. Basis for the Funding Recommendation: Statewide Drinking Water System Planning; the study will evaluate the current condition of their water system and provide the tools and guidance necessary to assist in the planning, rehabilitation, upgrading, and managing of their system.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: 5600217 B. Groundwater (1) Number of Wells: 2 (2) Primary Supply Aquifer(s) or Formation(s): Alluvial Aquifer (Snake River) (3) Total Average Production Yield of All Wells (GPM): 96

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 2 OF 9 C. Surface Water (1) Source Name(s): None (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): None (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes, Skyline #3 Well, Permit No. U.W. 159621, 225 GPM Adjudicated Skyline #2 Well, Permit No. U.W. 179020, 250 GPM Adjudicated F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): 2,304,000 (2) Increased Capacity Needed (If Known) (Gallons per Day): none (3) Approximate Distance from Source(s) to Distribution System: 600 feet (4) Transmission Pipe Diameter(s): 8-inch (5) Type of Transmission Pipe Material(s): Steel (6) Age of Transmission Pipeline(s): 45+ years (7) Condition of Transmission Pipeline(s): “aging” (8) Does the applicant possess clear title to transmission corridor easements? Yes G. Water Storage (1) Raw (Volume and Tank Description): None (2) Treated (Volume and Tank Description): 5,000 Gal. Steel H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): None

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): None D. Average Day Demand Water Usage (Gallons per Capita per Day): 299 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 976 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 984 gpcpd G. Distribution Pipe Diameter(s): 8-inch H. Type of Distribution Pipe Material(s): 1/3 asbestos concrete; 2/3 PVC I. Age of Distribution Pipeline(s): 45-52 years J. Condition of Distribution Pipeline(s): “average for its age” K. Estimated System Water Losses (Percentage): ≈10% L. Describe any fire flow protection that the system provides: 4 x 1,300 gpm hydrants installed October 2018 M. What water conservation measures are employed? None

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 3 OF 9 N. Does anyone in the service area haul water? No O. Is there an independent raw water irrigation system? No (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population Being Served: ≈ 230 B. Does the applicant have a comprehensive planning boundary? Yes (1) If so, what is the estimated additional population that may be served in the future? 15-20 C. How many taps are served within the district boundary? 87 D. How many taps are served outside the district boundary? None E. Identify names of other water system served: N/A F. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: Teton County allows single affordable residential units (ARU’s) on properties. Some have been built however more ARU’s are likely in the next 10-20 years. In theory, with 90 lots in Skyline Ranch, full build- out could have 90 homes with 90 ARU’s.

4. Financial Information A. Rates (1) Tap Fee(s) – Residential: $3,622 (2) Tap Fee(s) – Commercial: N/A (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $64.49 for 16,500 gallons (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.): Annual Water Maintenance Charge - $475 + $1.40 per thousand gallons

(5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): None B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 25,000 b. Annual Revenues from Tap Fees: $ 44,650 c. Annual Revenues from Other Sources: $ 41,000 d. Total Annual Revenues: $ 110,650

(2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 26,330 b. Annual Payments for Debt Retirement: $ 0 c. Annual Payments to a Repair and Replacement Fund: $ 37,078 d. Annual Payments to an Emergency Fund: $ 6,242 e. Annual Payments for Other Purposes: $ 41,000 f. Total Annual Payments: $ 110,650

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 4 OF 9

(3 ) Other a. Balance in Repair and Replacement Fund: $ ≈285,000 b. Balance in Emergency Fund: $ See a. c. Annual Cost of Water Quality Testing: $ 1,000 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 5 OF 9 PROJECT AREA MAP

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 6 OF 9 PHOTOS

Entrance to Skyline Ranch from WY State HWY 22

New Fire Hydrant near Tank Site

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 7 OF 9 PHOTOS (Cont'd)

Buried/Covered 5,000 gallon Storage/Pressure Tank (Elev. 6,290)

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 8 OF 9 RESOLUTION

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 9 OF 9

2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS

Project Name: South End Water Users ISD Transmission Project Program: New Development

Project Type: Rural Domestic Water System County: Big Horn

Sponsor: South End Water Users Improvement and Service District

WWDO Recommendation: Level II Proposed Budget: $TBD

Project Manager: Jodee Pring

I. PROJECT DESCRIPTION

This project is to determine the feasibility of extending the South End Water Users (SEWU) water line to allow approximately 25 new users into the district who currently haul water. Also, two additional extensions to the current line would create a loop system and eliminate dead end lines for both the Town of Cowley system and the SEWU system.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Cowley Transmission Pipeline III 75 2008 I $ 1,366.800* 2013 Cowley Transmission Pipeline III 141 2013 I $ 554,023* 2018 Cowley Master Plan I 168 2015 I $ 135,000 2018 Cowley Tank 2017 III 75 2017 I $ 3,155,700* 2022 * 67% grant

2. Describe the location of the project:

The project is located in Big Horn County. The SEWU service area is south and east of the Town of Cowley.

3. Summarize the request:

To determine the feasibility of extending the South End Water Users (SEWU) water line west of the current line along Lane 8 (on map, Lane 8 extension) and along Lane 9 (on map, Lane 9 extension). The Lane 8 extension would allow SEWU to create a looped line for a dead end line and will serve approximately 8 additional users. The Lane 9 extension would extend service toward the Town of Deaver and allow approximately 25 new users into the District. These new users currently haul water for their domestic use. The Lane 9 extension would also allow the Town of Cowley to extend a line south from their west end line to tie to this line (on map, Town of Cowley extension). This will allow both the Town of Cowley and SEWU water lines to become a loop and eliminate dead end lines for both entities, increasing the quality of water that is supplied and improve water pressure. This extension could also potentially become a line for Shoshone Municipal pipeline and Northwest Rural Water to provide water to their users in case of an emergency.

4. Summarize the reasons for the request:

This project is needed to provide water to those hauling water, remedy the problem of dead end lines in the system and create a loop system. Currently, to keep water in the system fresh, lines are opened once a week and water is dumped. This results in a significant waste of water. Creating a loop system would relieve the necessity of

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 1 OF 7 opening those lines. This project would also create some emergency lines for Shoshone Municipal pipeline and Northwest Rural Water.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Does an entity of local government exist? Yes A. If an entity of local government exists, provide the following: (1) Type of Entity (Water District, Water & Sewer District, Improvement & Service District, etc.): Improvement and Service District (2) Date of Formation: July 16, 1985 B. If no entity exists, provide the following: (1) Is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? N/A (2) Has district formation started? N/A (3) Has a petition been submitted to the City Council or County Commission? N/A (4) Has the district formation hearing been held? N/A (5) Has the district formation election been held or scheduled? N/A 2. Is the area made up a subdivision, subdivisions, or un-platted development? Un-platted development 3. Provide the date or dates that the subdivision or subdivisions were approved by the City or County: N/A 4. Is the project supported by the City Council or County Commission which has jurisdiction over the project area? Yes A. Provide any comments from City Council or County Commission: See attached letter of support from the Big Horn County Commission 5. Project Priority According to WWDO Criteria: Acct I - Priority 6: LII Feasibility Studies (Use Attachment III of the operating criteria.) 6. Will the project serve at least 15 water taps? Yes A. Number of Taps: 31+ (additional) 7. Is the Sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they (RUS, SRF, other)? RUS, SRF, etc. 8. Is the Sponsor under any federal (EPA) mandates to improve its system? (e.g., Administrative Orders, violations, actions taken, etc.)? No 9. Is the Sponsor currently served by a regionalized water supply system (specify)? No, but the system does purchase water from the Town of Cowley and the District’s main water line ties to the Town of Cowley’s system on the southeast corner of Town in an underground vault. Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? Not at this time 10. What is monthly water bill for 5,000 gallons? $47.00 for 10,000 gallons, $12.00 facility fee A. 20,000 Gallons? $57.00 11. Theoretical Monthly Water Bill (Median Household Income X 2.5%/12): $145.00 (Calculation: 2017 MHI - $69,583 x 2.5% = $1740/12 = $145.00) 12. Can the project be delayed or staged? Yes A. Should it be? No 13. Basis for the Funding Recommendation:

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 2 OF 7

The South End Water Users are requesting a Level II Feasibility Study to explore extending existing lines to provide water to those who are hauling water. This study would also explore recommendations listed in the Town of Cowley’s Master Plan, completed in 2016, which includes minimizing and eliminating dead end lines to reduce water loss and avoid water quality issues. Looping the lines within the same service area would help maintain system pressures and operational compatibility. In addition, these line extensions could potentially become a source of emergency water for the Shoshone Municipal Pipeline and Northwest Rural Water.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. EPA Public Water System (PWS) Identification Number: WY5600970 B. Groundwater (1) Number of Wells: 1 (2) Primary Supply Aquifer(s) or Formation(s): Madison formation (3) Total Average Production Yield of All Wells (GPM): 850 GPM C. Surface Water (1) Source Name(s): N/A (2) Type of Diversion(s) (Headgate, Infiltration Gallery, Pumps, Etc.): N/A (3) Total Average Diversion Yield (CFS of GPM): N/A D. Springs (1) Name of Spring(s): N/A (2) Total Average Production Yield of All Springs (CFS or GPM): N/A E. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes, Permit No. U.W. 65794 F. Transmission Pipeline (1) Maximum Capacity of the Transmission Pipeline(s) (Gallons per Day): N/A (2) Increased Capacity Needed (If Known) (Gallons per Day): N/A (3) Approximate Distance from Source(s) to Distribution System: N/A (4) Transmission Pipe Diameter(s): N/A (5) Type of Transmission Pipe Material(s): N/A (6) Age of Transmission Pipeline(s): N/A (7) Condition of Transmission Pipeline(s): N/A (8) Does the applicant possess clear title to transmission corridor easements? N/A G. Water Storage (1) Raw (Volume and Tank Description): None (2) Treated (Volume and Tank Description): None H. Treatment (1) Specify Water Treatment (None, Chlorination, Filtration, Etc.): None

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 3 OF 7

2. Existing Water Distribution System A. Is the water use metered? Yes B. Are billings based on meter readings? Yes C. Identify unmetered usage (e.g., irrigation of parks, cemeteries, fire protection, etc.): None D. Average Day Demand Water Usage (Gallons per Capita per Day): 151 gpcpd E. Maximum Day Demand Water Usage (Gallons per Capita per Day): 503 gpcpd F. Peak Hourly Demand Water Usage (Gallons per Capita per Day): 876 gpcpd G. Distribution Pipe Diameter(s): 6” and 4” H. Type of Distribution Pipe Material(s): PVC I. Age of Distribution Pipeline(s): Approximately 35 years J. Condition of Distribution Pipeline(s): Good K. Estimated System Water Losses (Percentage): 10% L. Describe any fire flow protection that the system provides: None M. What water conservation measures are employed? All water is metered N. Does anyone in the service area haul water? No O. Is there an independent raw water irrigation system? Yes, Sidon Irrigation and Deaver Irrigation (1) Raw Water System Capacity (Gallons per Day): N/A (2) Average Annual Raw Water Usage (Gallons per Year): N/A

3. Demographic Information and Existing Water Service Area A. Population Being Served: 155 B. Does the applicant have a comprehensive planning boundary? No (1) If so, what is the estimated additional population that may be served in the future? N/A C. How many taps are served within the district boundary? 57 D. How many taps are served outside the district boundary? 0 E. Identify names of other water system served: N/A F. Identify any existing planning reports (municipal or county) that address growth management in the project area. Provide titles and how copies of the reports could be obtained: Town of Cowley Master Plan 2016 – WWDC; Big Horn County Land Use Plan 2010 – Big Horn County website

4. Financial Information A. Rates (1) Tap Fee(s) – Residential: $2,500.00 plus $50.00 activation fee (2) Tap Fee(s) – Commercial: $2,500.00 plus $50.00 activation fee (3) Average Residential Monthly Water Bill and Corresponding Gallons Used: $76.23/month – 36,858 gallons (4) Water Rates (Provide rates for all tiers and categories of use. Attach additional pages as needed.):

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 4 OF 7

Residential - $47.00/10,000 gallons, $12.00 facility fee, $1.00/1,000 gallons after Business - $54.00/10,000 gallons, $12.00 facility fee, $1.00/1,000 gallons after Non-use tap - $20.00/month, $12.00 facility fee (5) Identify any local conditions that affect water rates (e.g., flow-through for frost prevention, etc.): Rates are charged to the SEWU by the Town of Cowley B. Financial Statement (of Water Utility) (1) Revenues a. Annual Revenues Generated from Water Sales: $ 48,105.00 b. Annual Revenues from Tap Fees: $ 5,100.00 c. Annual Revenues from Other Sources: $ 53,594.00 d. Total Annual Revenues: $ 106,799.00

(2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 71,612.00 b. Annual Payments for Debt Retirement: $ 0.00 c. Annual Payments to a Repair and Replacement Fund: $ 0.00 d. Annual Payments to an Emergency Fund: $ 0.00 e. Annual Payments for Other Purposes: $ 53,594.00* f. Total Annual Payments: $ 125,206.00 (3) Other a. Balance in Repair and Replacement Fund: $ 84,250.00 b. Balance in Emergency Fund: $ 0.00 c. Annual Cost of Water Quality Testing: $ 500.00 (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes a. If not, how is the difference subsidized? *(e.) Annual Payments for Other Purposes due to costs associated with current construction project and additional administration costs. One fund is used as both the Repair and Replacement Fund and the Emergency Fund.

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 5 OF 7

PROJECT AREA MAP

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 6 OF 7

RESOLUTION

2020 RECOMMENDATION RURAL DOMESTIC WATER SYSTEMS PAGE 7 OF 7

2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION AGRICULTURAL WATER PROJECTS

Project Name: Owl Creek Irrigation District Lucerne Master Plan Program: Rehabilitation

Project Type: Agricultural Irrigation Supply County: Hot Springs

Sponsor: Owl Creek Irrigation District

WWDO Recommendation: Level I Proposed Budget: $TBD

Project Manager: Mabel Jones / Peter Gill

I. PROJECT DESCRIPTION

Owl Creek Irrigation District (District) is proposing to sponsor a Level I Master Plan for the Lower/Lucerne Irrigation Area (Lucerne) to investigate upgrading current irrigation facilities and infrastructure from the diversion at the Big Horn River to the end of the Lucerne area system.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Owl Creek ID Master Plan I 125 2003 II $ 150,000 2004 Owl Creek ID Conservation Study II 123 2005 II $ 100,000 2006 Owl Creek ID Storage Supply II 123 2005 III $ 200,000 2006 Owl Creek Watershed Study I 38 2016 I $ 375,000 2019

2. Describe the location of the project: This project area is within the Owl Creek Irrigation District (District) and located approximately 3.5 miles north of Thermopolis, Wyoming via State Highway 20. The District includes three areas: Upper, Middle and Lower (Lucerne). This project includes the Lower area of the District, in the Lucerne Valley, near the confluence of Owl Creek and the Big Horn River. The Lucerne area of the District includes 4,400 acres served by the Upper and Lower Canals via water conveyed from the Big Horn River.

3. Summarize the request: The Lucerne area system includes a primary pump station (84 cfs) and one re-lift pump station (33 cfs) serving three main canals: Upper, Lower, and Dempsey. Inventory of this system has been completed in previous studies and by the sponsor. This study will revisit those inventories to provide an update on the condition and needs (operational as well as rehabilitation) for conveyance structures and headgate/turnout metering.

There is an immediate need for a comprehensive evaluation of the major mechanical systems, electrical systems, and infrastructure associated with replacement of both the primary and re-lift pump stations. Additionally, the study will include an assessment of the structural integrity of spillways on the Upper Canal. Recommendations will include detailed conceptual plans, costs and phasing to allow the sponsor to immediately move forward with construction. Identification of funding assistance and the ability to pay for improvements will also be included in the study.

4. Summarize the reasons for the request: This project will address recommendations identified in the 2017 Owl Creek Watershed Level I Study for the Lucerne area of the District. The systems failing infrastructure creates high operation and maintenance costs which must be passed on to shareholders. The primary and re-lift pumps and motors, which have been rebuilt, were installed in 1956. Maintenance of the aging pumps is costly and parts are no longer available. The pump house itself is deteriorating with sheared bolts and crumbling concrete. In addition the electrical system requires upgrades to

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 1 OF 8 ensure efficient and safe operation. Spillway issues include erosion from a 45’ drop and issues with seasonal floodwaters. Finally, efficient conveyance and seepage is an issue.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes A. If not, is the recommendation for a Level I study or Level I or II study for a dam and reservoir project?

2. Project Priority According to WWDO Criteria: Acct II – Priority 8: LI Reconnaissance Studies (Use Attachment III of the operating criteria.) 3. Will the project serve at least 1,000 water righted acres? Yes A. Number of Acres: 4,409 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they? USBR, NRCS 5. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? No 6. Can the project be delayed or staged? Yes A. Should it be? It is not recommended that this project be delayed. 7. Basis for the Funding Recommendation: The project meets eligibility requirements of WWDO programs with feasibility and reconnaissance studies being completed over 10 years ago and infrastructure being more than 15 years old. This work will help the District prioritize and budget for projects based on current practices and pricing to insure efficient system operation and maintenance.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. Description of Direct Flow Supply (1) Direct Flow Diversion Right (CFS): 84 cfs (2) Direct Flow Source (Name of River, Stream, etc.): Big Horn River, Owl Creek (3) Type of Diversion (Headgate, Pump, etc.): Diversion Dam, Pump to Canal (4) Water Transmission System (Canal, Pipeline, etc.): Canal, Re-lift Pump to Upper Canal, Pipe B. Description of Stored Water Supply (1) Name(s) of Storage Facility (Reservoir): (OCID owns storage in) (2) Location: Fremont County, Wyoming (3) Amount of Stored Water Right (Acre-Feet): 802,000 (4) Is any of the stored supply obtained from a federal facility? Yes a. Percent of Total Supply from Federal Facility: 100% b. Amount of Stored Supply from Federal Facility (Acre-Feet): Unknown c. Name(s) of Federal Facility: Boysen Reservoir C. Description of Groundwater Supply (1) Number of Wells: N/A

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 2 OF 8

(2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A D. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes E. System Capacity (1) Maximum Capacity of the Water Supply System (Acre-Feet per Day or CFS): 84 CFS (2) Increased Capacity Needed (If Known) (Acre-Feet per Day or CFS): 12 CFS F. Water Usage (1) Estimate of Total Water Provided by the System Annually (Acre-Feet per Year): 21,900 Acre-Feet (2) Average Day Demand (Acre-Feet per Day or CFS): 52.7 CFS (3) Maximum Day Demand (Acre-Feet per Day or CFS): 92.8 CFS

2. Existing Service Area and On-Farm Information A. Service Area Information (1) How many total acres are in the district? District: 30,000 acres, Lucerne Area: 4,409 Acres (2) How many acres are assessed? District: 13,696 acres, Lucerne Area: 4,409 (3) How many acres are irrigated? District 17,000 (estimated) acres, Lucerne Area: 4,409 4) What is the annual water delivery assessed (acre-feet per acre)? Unknown (5) How many individual land owners receive water? District: 170, Lucerne Area: 106 B. On-Farm Information (1) What is the normal irrigation season (e.g., May 1 – Sept. 30)? April 1 to October 15 (2) What type(s) of on-farm irrigation water applications is used (e.g., center pivot, side roll, flood, etc.)? District: Side roll (43 acres), Pivot (442 acres), Big squirt (few), Flood irrigated (remainder) Lucerne Area: Side roll (17 acres), Pivot (153 acres), Flood irrigated (remainder) (3) Briefly describe the main crops and cropping patterns: Upper and Middle Areas: Grass and alfalfa hay primary crops Lucerne Area: Corn (173 acres), Barley (1,924 acres), Dry beans (502), Grass and alfalfa hay (remainder) (4) Describe the water measuring devices currently in use: Wyoming State Engineers Office owns and operates three measuring devices: one on the upper canal, one on the lower canal, and one below the re-lift pump. Two the devices are trapezoids and one is a rectangular weir. (5) Percentage of Farm Turnouts with Measuring Devices: Lucerne Area: 5% (5 of 98 turnouts) (6) Are water deliveries recorded? Wyoming State Engineers Office collects and transmits hourly measurements via satellite. The water deliveries at farm turnouts are not measured unless requested. The ditch rider knows how much each user is allowed and monitors the headgates accordingly. The ditch rider can take manual measurements if necessary. (7) Estimated System Water Losses (Percentage): Lucerne Area: 20-40% (8) What water conservation measures are employed by the Sponsor? A new diversion spillway to the river was installed by the District in 2017 at a cost of $120,000. This has helped to reduce silt and moss entering the system. Routine maintenance on the system includes weed management, canal cleaning, and moss abatement.

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 3 OF 8

3. Financial Information A. District Financing (1) Is the assessment based on acres, acre-feet delivered, acre-feet of storage, or other (specify)? Acres (2) How is voting authority delegated to water users (e.g., shares, individuals, number of acres, etc.)? Acres (3) What is the per-unit amount of the current assessment? Upper and Middle Areas: $4.58/acre, Lucerne Area: $36.31/Acre (includes the Lucerne Pumping Plant Canal Company (LPPCC) assessment) (4) Is there is a basic service charge or first acre assessment in addition to assessments? If so, specify amount: Upper and Middle Areas: No Minimum, Lucerne Area: $125 B. Financial Statement

FY 6/30/19 FY 12/31/19 (1) Revenues OCID LPPCC Combined a. Annual Revenues Generated from Assessments: $ 138,698 $ 73,000 $ 211,698 b. Annual Revenues from Other Sources: $ 9,670 $ - $ 9,670 c. Total Annual Revenues: $ 148,368 $ 73,000 $ 221,368

(2) Expenditures $ - a. Annual Budget for Operation and Maintenance Expenses: $ 143,435 $ 63,800 $ 207,235 b. Annual Payments for Debt Retirement: $ - $ - $ - c. Annual Payments to a Repair and Replacement Fund: $ - $ 9,200 $ 9,200 d. Annual Payments to an Emergency Fund: $ 4,500 $ - $ 4,500 e. Annual Payments for Other Purposes: $ - $ - $ - f. Total Annual Payments: $ 147,935 $ 73,000 $ 220,935

(3) Other a. Balance in Repair and Replacement Fund: $ - $ 13,000 $ 13,000 b. Balance in Emergency Fund: $ 62,765 $ 62,765 c. Explanation (If Needed): None needed (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes a. If not, how is the difference subsidized? N/A

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 4 OF 8

PROJECT AREA MAP

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 5 OF 8

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 6 OF 8

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 7 OF 8

RESOLUTION

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 8 OF 8

2020 WATER DEVELOPMENT PROGRAM RECOMMENDATION AGRICULTURAL WATER PROJECTS

Project Name: Highland Hanover ID Pump Station Program: Rehabilitation

Project Type: Agricultural Irrigation Supply County: Washakie

Sponsor: Highland Hanover Irrigation District

WWDO Recommendation: Level II Proposed Budget: $TBD

Project Manager: Peter Gill

I. PROJECT DESCRIPTION

This study will optimize plans to rehabilitate Highland Hanover ID Pump Station #2. This is one of the top projects coming out of the 2019 Master Plan. The condition and age of Pump Station #2 necessitate improvements. The pump station is critical to the operation of the District. It provides up to 84 cubic feet per second (c.f.s.) to Highland Hanover Canal 2 and 12 c.f.s. to the Coutis Ditch. This station services 5,663 acres or 81% of the acreage under the Highland Hanover Irrigation District. The 1950’s era facility is inefficient and ongoing repairs are expensive as parts are often not available for the obsolete equipment. Assessment rates have been raised in recent years to accommodate the increased costs to the system.

A Level II Study is recommended based on the complexity of the pump station and the degree of measurements, calculations, structural and electrical design, as well as control options that need evaluation. This study will optimize the final design and the effects of ground movement on the structural and piping components. Options to integrate SCADA controls and improved startup and shutdown procedures are also recommended for additional study.

1. Existing and Prior Legislation:

Project Level Chapter Session Account Appropriation Reversion Year Highland Hanover Canal II 79 1988 II $ 25,000 1990 Improvement Study Highland Hanover Rehabilitation III 67 1989 II $ 536,000 1994 Hanover Irrigation Master Plan, I 38/65 2016/17 II $ 295,000 2020 Phases I & II

2. Describe the location of the project:

The District is located in the Big Horn Basin near Worland, within Washakie County, Wyoming. Pump Station #2 is located approximately 13 miles down-canal from the Hanover Canal diversion, or two miles southwest of the Worland airport. See attached map.

3. Summarize the request:

The District is requesting an engineering study to assess the most effective way to rehabilitate Pump Station #2 on the Highland Hanover irrigation system. The study will assess the geotechnical, electrical, and structural components of the station to optimize the final design. Options to integrate SCADA controls and improved startup and shutdown procedures is recommended for study. Additionally, the study should evaluate the electrical design, and control options required to deliver the desired functions of the pump station to the District.

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 1 OF 7 4. Summarize the reasons for the request:

The large, centrifugal pumps are very aged, requiring replacement, along with all electrical gear and controls associated with them. The impellers for the two primary centrifugal motors are nearing the need for replacement, and the components are not readily available. The vertical turbine pumps were supplied with improper column lengths which do not provide proper submergence, allowing the pumps to create vortexes during maximum operation of all four Pump Station 2 pumps. Additionally, the anchor/thrust block at the convergence of the discharge pipes for the Coutis Ditch has been moving toward the pump station and pushing the pumps from their original mounting locations. A Level II Study is recommended based on the complexity of the pump station and the degree of measurements, calculations, structural and electrical design, and control options required to deliver the desired functions of the pump station to the District. Additional study will allow more in-depth geotechnical, electrical, and structural study to optimize the final design, and better understand the movement and its effects on the current structure and piping components.

II. WWDC ELIGIBILITY CONSIDERATIONS

1. Is the Sponsor a public entity? Yes A. If not, is the recommendation for a Level I study or Level I or II study for a dam and reservoir project? N/A 2. Project Priority According to WWDO Criteria: Acct II - Priority 7: LII Feasibility Studies (Use Attachment III of the operating criteria.) 3. Will the project serve at least 1,000 water righted acres? Yes A. Number of Acres: 6,992 Acres 4. Is the sponsor eligible for funding from other state or federal programs? Yes A. If so, what are they? WaterSmart, Bureau of Reclamation 5. Is the Sponsor currently served by a regionalized water supply system (specify)? Or will the Sponsor consider regional solutions to the purpose and needs of its water supply system? Yes, the system is co-managed with the Hanover and Bluff Irrigation Districts 6. Can the project be delayed or staged? Yes A. Should it be? No 7. Basis for the Funding Recommendation:

The current estimate for rehabilitation of the system is roughly $1,500,000. Before moving into construction more information is needed to know the best options for rehabilitation and the most cost effective solutions.

III. PERTINENT INFORMATION

1. Existing Water Supply System A. Description of Direct Flow Supply (1) Direct Flow Diversion Right (CFS): 150 (2) Direct Flow Source (Name of River, Stream, etc.): Big Horn River via Hanover Canal (3) Type of Diversion (Headgate, Pump, etc.): Weir damn and headgates, and pumps into Highland (4) Water Transmission System (Canal, Pipeline, etc.): Canal, pipelines B. Description of Stored Water Supply (1) Name(s) of Storage Facility (Reservoir): Boysen Reservoir (2) Location: Fremont County

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 2 OF 7

(3) Amount of Stored Water Right (Acre-Feet): As needed, subject to BOR storage pool. (4) Is any of the stored supply obtained from a federal facility? Yes a. Percent of Total Supply from Federal Facility: 100% b. Amount of Stored Supply from Federal Facility (Acre-Feet): as needed c. Name(s) of Federal Facility: Boysen Reservoir C. Description of Groundwater Supply (1) Number of Wells: 0 (2) Primary Supply Aquifer(s) or Formation(s): N/A (3) Total Average Production Yield of All Wells (GPM): N/A D. Water Rights (1) For the water source supply (or supplies) described above, does the Sponsor possess valid and/or adjudicated water rights? Yes E. System Capacity (1) Maximum Capacity of the Water Supply System (Acre-Feet per Day or CFS): 1000 cfs (2) Increased Capacity Needed (If Known) (Acre-Feet per Day or CFS): N/A F. Water Usage (1) Estimate of Total Water Provided by the System Annually (Acre-Feet per Year): ~25,000 acft (2) Average Day Demand (Acre-Feet per Day or CFS): 198 cfs (3) Maximum Day Demand (Acre-Feet per Day or CFS): 297 cfs

2. Existing Service Area and On-Farm Information A. Service Area Information (1) How many total acres are in the district? 7,084 (2) How many acres are assessed? 7,084 (3) How many acres are irrigated? 6,992 (4) What is the annual water delivery assessed (acre-feet per acre)? ~ 3 acft (5) How many individual land owners receive water? 117 B. On-Farm Information (1) What is the normal irrigation season (e.g., May 1 – Sept. 30)? April 10 thru October 10 (2) What type(s) of on-farm irrigation water applications is used (e.g., center pivot, side roll, flood, etc.)? Center pivots, side roll, flood: dirt ditch gated pipe (3) Briefly describe the main crops and cropping patterns: Sugar beets, malt barley, wheat, hay, beans, grass, alfalfa (4) Describe the water measuring devices currently in use: Four crest weirs with electronic monitors (5) Percentage of Farm Turnouts with Measuring Devices: 65% (6) Are water deliveries recorded? Not to farm (7) Estimated System Water Losses (Percentage): 10-15% (8) What water conservation measures are employed by the Sponsor? Closed systems on any new irrigation devices

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 3 OF 7

3. Financial Information A. District Financing (1) Is the assessment based on acres, acre-feet delivered, acre-feet of storage, or other (specify)? Acres (2) How is voting authority delegated to water users (e.g., shares, individuals, number of acres, etc.)? Number of Acres (3) What is the per-unit amount of the current assessment? $35 per acre (4) Is there is a basic service charge or first acre assessment in addition to assessments? If so, specify amount: No. B. Financial Statement (1) Revenues a. Annual Revenues Generated from Assessments: $ 225,800 b. Annual Revenues from Other Sources: $ 0 d. Total Annual Revenues: $ 225,800 (2) Expenditures a. Annual Budget for Operation and Maintenance Expenses: $ 202,973 b. Annual Payments for Debt Retirement: $ 16,727 c. Annual Payments to a Repair and Replacement Fund: $ 0 d. Annual Payments to an Emergency Fund: $ 0 e. Annual Payments for Other Purposes: $ 0 d. Total Annual Payments: $ 219,700 (3) Other a. Balance in Repair and Replacement Fund: $ 35,100 b. Balance in Emergency Fund: $ 8,000 c. Explanation (If Needed): N/A (4) Is the operation of the water system self-supporting in terms of revenues offsetting costs for operation, maintenance, debt retirement, replacement funds, emergency funds, etc.? Yes a. If not, how is the difference subsidized? N/A

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 4 OF 7

PROJECT AREA MAP (Pump Station #2 Area and Detail Map.)

Pump Station #2

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 5 OF 7

PHOTOS

Inside Pump Station #2

Overview of Pump Station #2 Improvements

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 6 OF 7 RESOLUTION

2020 RECOMMENDATION AGRICULTURAL WATER PROJECTS PAGE 7 OF 7 WYOMING WATER DEVELOPMENT COMMISSION LEVEL III CONSTRUCTION REPORT May-2019

PROJECT: Buffalo Main Street Pipeline SPONSOR: City of Buffalo

PROJECT DESCRIPTION: Design and construction of a 12-inch transmission pipeline.

WWDC MANAGER: Keenan Hendon

FUNDING WWDC Appropriation:$ 154,100.00 67.0% WWDC Account: I WWDC Grant Amount:$ 154,100.00 67.0% Session Law: 2016 WWDC Loan Amount:$ - 0.0% Reversion Date: 2021

Funding Source #2: City of Buffalo Amount:$ 75,900.00 33.0%

Total Project Budget: $ 230,000.00 100.0% ENGINEERING Engineer: WWC Engineering Agreement Date: Aug-15-2016 Design Fee:$ 20,424.00 Construction Fee: $ 17,790.00 Total Fee:$ 38,214.00 CONSTRUCTION Bid Opening Date: Dec-21-2017 Number of Bids: 8 Low Bidder: Barnum Construction Range of Bids: $236-$508k Engineer's Estimate:$ 226,978.00 Agreement Date: Jan-12-2018 Contractor Amount:$ 236,809.35 Construction Time: 45

MISCELLANEOUS COSTS (Easements, Permits, Title Of Opinion, Title Search etc.) Misc. Costs$ - PROJECT CLOSEOUT Final Project Cost:$ 276,634.00 Date: Mar-26-2019 WWDC Funding Share:$ 154,100.00 Other Funding Sources:$ 122,534.00 WWDC Reverted Funding:$ - PROJECT STATUS The project is currently completed and functioning as intended. The City provided the funding necessary for the costs in excess of the original budget for asphalt paving and sewer repairs. WYOMING WATER DEVELOPMENT COMMISSION LEVEL III CONSTRUCTION REPORT May-2019

PROJECT: Buffalo Tank Valve Project SPONSOR: City of Buffalo

PROJECT DESCRIPTION: Design and construction of a water level control valve for the City of Buffalo South Tank. WWDC MANAGER: Keenan Hendon

FUNDING WWDC Appropriation:$ 117,250.00 67.0% WWDC Account: Account I WWDC Grant Amount:$ 117,250.00 67.0% Session Law: 2016 WWDC Loan Amount: 0.0% Reversion Date: 2021

Funding Source #2:$ 57,750.00 Amount:$ 57,750.00 33.0%

Total Project Budget: $ 175,000.00 100.0% ENGINEERING Engineer: WWC Engineering Agreement Date: Aug-15-2016 Design Fee:$ 16,425.00 Construction Fee: $ 13,947.80 Total Fee:$ 30,372.80 CONSTRUCTION Bid Opening Date: Dec-21-2017 Number of Bids: 8 Low Bidder: Barnum Construction Range of Bids: $136-$243k Engineer's Estimate:$ 160,168.00 Agreement Date: Jan-12-2018 Contractor Amount:$ 151,798.50 Construction Time: 45

MISCELLANEOUS COSTS (Easements, Permits, Title Of Opinion, Title Search etc.) Misc. Costs$ 291.18 PROJECT CLOSEOUT Final Project Cost:$ 182,462.48 Date: Mar-12-2019 WWDC Funding Share:$ 117,250.00 Other Funding Sources:$ 65,212.48 WWDC Reverted Funding:$ - PROJECT STATUS The project has been completed and is functioning as intended. WYOMING WATER DEVELOPMENT COMMISSION LEVEL III CONSTRUCTION REPORT May-2019

Lusk Water System Improvements PROJECT: SPONSOR: Town of Lusk 2018 PROJECT DESCRIPTION: Design and construction of a new well to replace existing Well #1, plug and abandon Well #1, connect the well to the existing system. WWDC MANAGER: Ken Mitchell

FUNDING WWDC Appropriation: $ 546,050.00 67.0% WWDC Account: I WWDC Grant Amount: $ 546,050.00 67.0% Session Law: 2018 WWDC Loan Amount: $ - 0.0% Reversion Date: 2023

Funding Source #2: SRF Amount: $ 268,950.00 33.0%

Total Project Budget: $ 815,000.00 100.0% ENGINEERING Engineer: AVI Engineering Agreement Date: Jul-03-2018 Design Fee: $ 61,366.00 Construction Fee: $ 57,134.00 Total Fee:$ 118,500.00 CONSTRUCTION Bid Opening Date: Apr-09-2019 Number of Bids: 2 Low Bidder: DC Drilling Range of Bids: $289k - $691k Engineer's Estimate: $ 481,698.50 Agreement Date: Apr-15-2019 Contractor Amount: $ 289,122.00 Construction Time: 90 day

MISCELLANEOUS COSTS (Easements, Permits, Title Of Opinion, Title Search etc.) Misc. Costs PROJECT CLOSEOUT Final Project Cost: Date: WWDC Funding Share: Other Funding Sources: WWDC Reverted Funding: PROJECT STATUS This project is in the construction phase. WYOMING WATER DEVELOPMENT COMMISSION LEVEL III CONSTRUCTION REPORT May-2019

PROJECT: Thayne Tank 2017 SPONSOR: Town of Thayne

PROJECT DESCRIPTION: Design and construction of a 300,000 gallon storage tank and connection to the Town's water system. WWDC MANAGER: Ken Mitchell

FUNDING WWDC Appropriation:$ 589,600.00 67.0% WWDC Account: I WWDC Grant Amount:$ 589,600.00 67.0% Session Law: 2017 WWDC Loan Amount:$ - 0.0% Reversion Date: 2022

Funding Source #2: SLIB Amount:$ 290,400.00 33.0%

Total Project Budget: $ 880,000.00 100.0% ENGINEERING Engineer: Sunrise Engineering Agreement Date: Nov-17-2017 Design Fee:$ 90,400.00 Construction Fee: $ 64,200.00 Total Fee:$ 154,600.00 CONSTRUCTION Bid Opening Date: Mar-07-2019 Number of Bids: 2 Low Bidder: Western Municipal Const. Range of Bids: $918k - $945k Engineer's Estimate: $741,556.00 Agreement Date: Contractor Amount:$ 918,314.50 Construction Time:

MISCELLANEOUS COSTS (Easements, Permits, Title Of Opinion, Title Search etc.) Misc. Costs PROJECT CLOSEOUT Final Project Cost: Date: WWDC Funding Share: Other Funding Sources: WWDC Reverted Funding: PROJECT STATUS This project is in the construction phase

REQUEST FOR PROPOSALS University of Wyoming Office of Water Programs Water Research Program FY2020

The Office of Water Programs/Water Research Program welcomes proposals covering a wide range of topics involved in Wyoming’s water resources. Each proposal shall include a “Non- technical Statement of Relevance” explaining how the study could be used by governmental agencies in the management of Wyoming’s water resources, will meet the research needs of State and Federal agencies regarding Wyoming’s water resources, and support water related training and education.

Dam Operation and Sediment Management and Transport The accumulation of sediment in stream systems and behind dams presents challenges. Effective dam operations require the ability to meet water user needs while still protecting downstream uses (e.g., fisheries, aquatic life). Additional research is needed to help understand how to prevent heavy sediment releases and how to effectively respond when they occur. Areas of research include, but are not limited to: ● Additional studies describing the fate and transport of sediments in Wyoming’s erosive watersheds and what measures can assist with reducing sediment inputs. ● Further studies on using “flushing flows” to address downstream sediment deposition following releases. ● Studies on economically feasible ways to remove sediment accumulated behind dams. ● Information on ways to most effectively manage sediment at dams and reservoirs to protect and maintain downstream surface waters. ● Best management practices (BMPs) for reducing sediment transport from contributing watersheds. ● Studies evaluating the negative impacts of sediment deposition on land use and land features, such as rangelands and wetlands.

Proposals may build on the current Water Research Program Project, Sediment and Fisheries: An Assessment to Inform Sediment Management Practices at Wyoming Dams, or other existing sediment studies in the State of Wyoming. Proposals having a broad applicability to dams statewide are encouraged as well.

Enhanced Water Supply Forecasting and Water Use The Wyoming Water Strategy identified the need to better understand watershed, atmospheric, and climatic variables and their effects on streamflows and water supply, as well as the need to update, improve and/or develop water supply forecasts in river basins of Wyoming. Additionally, improvements on methods for estimating current and historic consumptive use in multiple areas of the state would be useful.

Areas of research include: ● Construction or evaluation of existing flow forecasting tools that analyze the response of various combinations of climate, water demand and land use on streamflow as well as general watershed hydrology. Particular emphasis should be placed on: 1

o Calibration of forecasting tools in hybrid plains/mountain streams with highly variable climates during low flow years. This could include an evaluation of temperature predictions in relation to water demand factors as well as research aimed at enhancing understanding of transitional zones (i.e. foothills that typically receive intermittent to seasonal snowpack) and lower-elevation (i.e. high plains) contributions to streamflow. Two examples of basins of interest in Wyoming that have large datasets that can contribute to the initiation of research are the Tongue River and Upper North Platte River Basins. o Use of geospatial models and statistical analyses to better understand the important drivers of streamflow (including drivers that determine whether a stream is intermittent or perennial in a given basin) in small stream basins (<50 square miles). o Developing and/or testing accuracy of various techniques for estimating streamflow variables, such as mean monthly flows and exceedance flows, in small, ungauged basins. ● Research in support of using remote sensed data in the evaluation of the extent of snowpack and snow water equivalent and resulting streamflow. ● Identification of areas in Wyoming where additional snow and/or climate instrumentation would benefit water supply forecasting. ● Identification of areas of consistently larger seasonal runoffs for potential siting of future water developments. ● Development of tools that would allow Wyoming to take advantage of emerging remote sensing technologies to determine current and historic consumptive use.

Groundwater Analysis/Aquifer Potential Characterization This topic seeks research that attempts to address the challenges of measuring and allocating groundwater in areas of growing population and declining groundwater resources. Research regarding the integration of recognized modeling techniques with existing hydrogeologic and geophysical measurements to understand aquifer reservoir properties and dynamics is needed. Priority is given to the application of digital/numerical/statistical tools that increase knowledge of groundwater basin aquifer systems and recharge areas of the State.

Protecting Public Health Wyoming citizens and out-of-state visitors enjoy fishing, boating, swimming, floating, and other recreational opportunities provided by Wyoming’s lakes, reservoirs, rivers and streams. However, recreational activities, particularly those that result in full-body immersion, can pose a risk to public health if individuals are exposed to pollutants in the water that cause adverse health effects. Proposals may build on the current Water Research Program Project, “Understanding the Contribution of Different Microbial Sources to Surface Water for Informed Management of Waterborne Pathogens in Wyoming”. ● Water borne pathogens (as typically measured by the indicator E. coli) cause the majority of Wyoming’s surface water quality impairments. Research addressing pathogens is of significant importance to the State of Wyoming. Additional tools are needed to better allow state and local water managers, regulators, conservation groups, and others to minimize public health risk by 1) better assessing and prioritizing public health risk, 2) identifying sources of pathogens, and 3) identifying effective management measures to reduce

2

pathogens and mitigate public health risk. In particular, the following topics are identified as priority research areas: o Studies related to evaluating the ability of indicators other than E. coli (e.g. enterococci, coliphage) to accurately assess public health risk from waterborne pathogens in Wyoming waterbodies. o Studies related to the fate and transport of pathogens (particularly E. coli as an indicator) in the environment. o Studies related to the ability of pathogens (particularly E.coli as an indicator) to survive and persist in streambed sediment and how this relates to assessing public health risk. o Epidemiological studies relating pathogen levels to incidence of water borne pathogen exposure and illness in Wyoming streams and rivers. o Studies using Microbial Source Tracking (MST) to determine various sources contributing pathogens to surface waters. o Studies that evaluate the effectiveness of conservation practices in reducing pathogen (E. coli) loading to surface waters.

● Nutrients (nitrogen and phosphorus), in appropriate amounts, are essential to healthy aquatic ecosystems. However, excessive nutrients, or nutrient pollution, can lead to harmful cyanobacteria blooms (HCBs) in lakes or reservoirs. HCBs are dense concentrations of cyanobacteria or blue-green algae that pose a risk to human, pet, and livestock health. HCBs can produce poisons called cyanotoxins and may be associated with other irritants that can cause adverse health effects such as rashes, itching, numbness, nausea, fatigue, disorientation, abdominal pain, vomiting, and diarrhea. In extreme cases, cyanotoxins may lead to pet or livestock death. HCBs can also cause fish kills and interfere with drinking water supplies. Recreational use health advisories were issued on twelve (12) Wyoming reservoirs in 2018 due to HCBs. Research on nutrient pollution and HCBs would help state and local entities better identify, assess, and respond to HCBs in order to reduce public health risk from exposure to cyanotoxins and other cyanobacteria-related irritants. In particular, the following topics are identified as priority research areas: o Studies related to the fate and transport of cyanotoxins and other compounds associated with cyanobacteria blooms. o Studies evaluating the effectiveness of conservation practices or advanced treatment septic systems in reducing nutrient loading to surface waters. o Studies on the types and levels of toxins (or other compounds causing health effects) in cyanobacteria blooms in Wyoming surface waters. o Studies to identify target nitrogen and phosphorus concentrations to prevent unsafe densities of cyanobacteria. o Studies evaluating the health risks to humans, pets, livestock and wildlife associated with cyanobacteria blooms with and without toxins. o Studies related to the presence of benthic cyanobacteria blooms and potential toxin production in streams and rivers. o Studies evaluating the use of remote sensing techniques to identify and quantify cyanobacteria blooms. o Studies evaluating the risks of using irrigation water from lakes and reservoirs where HCBs are occurring.

3

Conveyance Losses Conveyance efficiency is of considerable interest to irrigators and water resource managers since it can significantly affect the amount of water delivered to the point of use (crop) from the diversion. To better develop hydrologic models meant to determine volume, location, and timing of irrigation shortages and available water for development, water developers desire to have a better understanding of conveyance efficiencies in various settings. The project objective would be to evaluate available conveyance loss studies on river/stream systems and conveyance ditches/canals, to provide information that could be applied to hydrologic models developed throughout the State.

4

1 WYOMING DRINKING WATER STATE REVOLVING FUND (DWSRF) FY2020 INTENDED USE PLAN

The Wyoming Department of Environmental Quality (DEQ), the Office of State Lands and Investments (OSLI), and the Wyoming Water Development Office (WWDO) jointly administers the DWSRF. As required each year the Intended Use Plan (IUP) is revised and updated. The IUP identifies the proposed uses of the funds available through the DWSRF program during the upcoming funding year. The draft IUP is required to be presented to the public at a public hearing and then submitted to the Legislative Select Water Committee for their review and recommendation. A public hearing was held on May 2, 2019, to discuss the draft 2019 DWSRF IUP and to solicit public comments prior to the finalization of the IUP. One comment was received, please see Appendix 3. Public entities with unranked eligible projects that would qualify for the program were also encouraged to notify OSLI, DEQ, or WWDO in order to rank and include them in the new draft IUP, allowing the projects to become eligible for program assistance.

The draft IUP contains a priority ranked listing of the currently identified publicly owned drinking water system projects to address compliance issues and improvements to address system deficiencies. The draft IUP prioritizes and ranks potential projects based upon several factors. These factors include addressing public health issues, resolving compliance issues, and correcting system deficiencies. It is important to include projects in the draft IUP because it keeps these projects eligible for funding. Water system improvement projects that do not appear on this IUP are not eligible to receive loans or funding from the program. The draft FY2020 IUP Priority Ranking List contains 229 projects with estimated costs over $347 million. It is estimated that applicants seeking funding from the program could total nearly $81 million in requests for 2020. The list also shows an estimated $267 million in requests for 2021-2023.

The DWSRF will provide $220,000 of funding to the Wyoming Association of Rural Water Systems (WARWS) to fund two full time positions. The objectives are to provide technical assistance, operator training/assistance and source water protection assistance/guidance to smaller water systems under 10,000 populations. On-site technical assistance efforts would be directed toward unincorporated rural systems, tribal systems, and small municipal/water districts.

As required by the DWSRF State enabling legislation, the draft IUP is being made available to the Select Water Committee for its review and recommendations. A copy of the draft IUP may be viewed on the Wyoming DEQ website. Following review and input from the Select Water Committee, the draft IUP will be submitted to the State Lands and Investment Board for final approval and then to EPA for Agency approval.

Any comments/recommendations can be made to: Wade Verplancke, phone: (307) 777-7626, e-mail: [email protected], mail: Wyoming Water Development Office, 6920 Yellowtail Road, Cheyenne, Wyoming 82002

FACTS AND ACCOMPLISHMENTS OF THE DWSRF TO DATE

To date the DWSRF has provided a total of about $273 million to eligible entities throughout the state utilizing 221 loans including the 25 ARRA funded loans.

Current funds available for loans are estimated to be about $135 million, which includes the estimated FY2019 and the 20% state match. Estimated loan applications for the upcoming year total about $65 million. Please note that Wyoming is currently only accepting every other years Capitalization Grant and skipped the FY2018 grant and expects to skip to the FY2020 grant.

Please see page 5 of the Draft FY2020 Intended Use Plan for the complete DWSRF Financial Status.

May 2019

Wyoming Department of Environmental Quality Wyoming Water Development Commission Wyoming State Loan and Investment Board

Drinking Water State Revolving Fund

FY2020 Intended Use Plan

Introduction

The 1996 Safe Drinking Water Act (SDWA) amendments include requirements for each state to prepare an Intended Use Plan (IUP) for each capitalization grant application. The IUP describes how the State will use the Drinking Water State Revolving Fund (DWSRF) to meet SDWA objectives and further the protection of public health. The IUP contains the following elements:

1. Priority List of Projects 2. Criteria and Method for Distribution of Funds 3. DWSRF Financial Status 4. Additional Subsidization 5. Green Project Reserve 6. Short- and Long-term Goals of the Program 7. Description of Set-Aside Accounts and Activities

The Department of Environmental Quality (DEQ), Office of State Lands and Investments (OSLI), and Water Development Office (WDO) prepared the draft IUP and provided it to the public for review and comment. The DWSRF program held a public meeting on the draft IUP on May 2, 2019, in Cheyenne. Appendix 3 summarizes comments and responses from the public meeting. Additionally, pursuant to State law, DEQ, OSLI and WDO submitted the IUP to the Select Water Committee for review, comment and recommendations. The Wyoming State Loan and Investment Board (SLIB) authorized the Final Intended Use Plan at its meeting on June 6, 2019. The Final IUP will be submitted to EPA Region VIII.

Priority List of Projects

Appendix 1 contains the Comprehensive Priority List of public water systems in Wyoming that have expressed interest in the DWSRF, are planning capital improvement projects, have been identified as serious public health risks, have received notices of SDWA violations, or were issued administrative orders. Not all of the projects in Appendix 1 will use SRF funds. Some systems do not yet have major projects planned; the remainder expect to proceed with projects within the next several years. Cost information is not always available. Some systems have not yet completed the feasibility or financing plans for their projects.

The DWSRF program has identified projects most likely to apply for DWSRF funds during the upcoming year. Staff bases this projection on conversations and contacts made from potential

1 applicants. However, there is nothing implicit that these potential applications have preferential status to receive funding. Actual funding decisions will be made by the SLIB based on actual applications received and criteria determined by SLIB. The DWSRF program has also made conditional awards to fifteen projects. These projects with conditional awards still need to complete the remaining steps for DWSRF funding, either during the remainder of FY2019 or during FY2020. Projects with conditional awards do have preferential status to receive funding.

The Comprehensive Priority List in Appendix 1 identifies the projects that are expected to apply for DWSRF funds during FY2020 or that are expected to complete the remaining steps on conditional funding awards by the end of FY2019 or during FY2020. Their total estimated cost is $81,604,000. The DWSRF program believes these are the projects that will most likely pursue funding; however, other projects from the priority list may proceed before envisioned. The comprehensive priority list also identifies the projects expected to apply for funding during the FY2021-FY2023 timeframe. Their total estimated cost is $266,996,000. All projects on the Comprehensive Priority List are eligible to receive DWSRF loans. The State intends to fund projects in the actual application pool with both first and second round funds as needed to best meet (in the judgment of the State) the various known federal and state requirements, such as those regarding binding commitments, additional subsidization, green project reserve (GPR), and any as yet undetermined requirements.

Criteria and Method for Distribution of Funds

The Safe Drinking Water Act amendments of 1986 and 1996 imposed many new regulatory requirements upon public water suppliers. Public health and compliance problems related to these requirements are the most influential criteria in Wyoming’s project ranking system. System deficiencies, as related to public health and compliance, are also considered in the Wyoming ranking system. The financial impact of the proposed project on the system users is also considered; the communities most in need of low interest loans to fund the project are awarded points under the affordability criteria.

A summary of the ranking criteria and scoring is listed below. The complete Wyoming DWSRF Ranking System is attached to this plan as Appendix 2.

1. Public Health Issues - 200 points maximum 2. Compliance Issues - 240 points maximum 3. System Deficiencies that may affect public health or ability to comply - 85 points maximum 4. Affordability - 30 points maximum

Because public health issues may result from a variety of causes, points may be obtained from more than one of the four ranking system categories listed above. For example, any documented public health issue, such as a boil order resulting from bacteriological contamination, would be accompanied by compliance and system deficiencies points. Points are not awarded for any issue which results from operator error. Typically, project proposals that address immediate public health receive the highest overall scores, followed by proposals that address lower risk public health threats, such as chemical contaminants present at low levels, and then by proposals that address system deficiencies that may not allow compliance with existing or future regulatory requirements before noncompliance occurs.

2

The Wyoming DWSRF program is required annually to use at least 15% of all funds credited to the DWSRF account to provide loan assistance to systems serving fewer than 10,000 people. Because the majority of systems in Wyoming serve fewer than 10,000 people, this requirement has and will be achieved.

Financial planning: The State of Wyoming bases its financial planning for the DWSRF on the following factors: fund utilization, Mineral Royalty Grant funds available, and projects ready to proceed. The core loan program interest rate of 2.5% and the special terms under recent capitalization grants have increased loan applications over the last few years. In addition, the loan origination fees and the interest payments are projected to increase as projects are completed and loan repayments begin. Furthermore, the health of the fund will increase with a higher fund utilization rate to replenish the revolving fund.

Interest rates and different types of assistance: The current market rate is calculated annually in July; the current market rate is 3.80%. The market rate is calculated using the Range of Yield Curve Scales, for Bonds with a rating of BAA for a twenty year period.

Most loans will be made at a 2.5% interest rate; however, loans under the GPR will be made at a 0% interest rate. Repayment periods are up to twenty (20) years on regular loans and up to thirty (30) years on loans to disadvantaged communities. The interest rates were determined based on the following factors: Mineral Royalty Grant funds available, current market rate, and the need to ensure maximum fund utilization. In addition, each applicant will pay a 0.5% origination fee upon completion of loan documents. Some loans will also include forgiveness of a portion of the loan principal under requirements and criteria for awarding additional subsidization. Both additional subsidization and the GPR are discussed further in separate sections of this IUP.

Project funding decisions and bypass procedures: Historically, the State has been able to fund all eligible projects which actually apply for loan funding, and it expects to be able to continue to do so during FY2019, though not all applicants will likely be able to receive the full amount of principal forgiveness for which they apply. If and when the loan application amounts exceed the funding available for loans, the State will fund projects in order of priority of those that apply that are ready to proceed promptly with construction (or with design work for a design only loan). An exception may apply to projects eligible for the GPR; these projects, in priority order, may bypass higher ranked projects if needed to achieve the minimum GPR funding requirement. Only projects on the priority list will be considered eligible for funding, except in the case of emergencies as described below.

Non-emergency bypass procedures: Any projects not ready to proceed, or that do not apply, will be bypassed in favor of projects that actually apply. These determinations will be made at the time applications are received and presented to the SLIB. In addition, the State will do as much as possible to make bypassed projects ready to proceed in future years. This effort will include grant and loan seminars and video conferences to help applicants arrange funding for their projects. Only projects on the priority list will be considered eligible for funding, except in the case of emergencies as described below.

3

Emergency bypass procedures: If SLIB determines that immediate attention is required to protect public health, a project may be funded with DWSRF funds on an emergency basis, even if it is not on the IUP. Any eligible costs would be reimbursable after the project meets all other applicable DWSRF program requirements. An emergency for this purpose refers to a natural disaster or similar event that causes damage or disrupts normal public water system operations and requires immediate action to protect public health and safety.

Cash Draw Ratio: In FY2020, the DWSRF program will use the grant-specific proportionality method for cash draws. The federal and state ratios for each open grant are calculated in Table 1. Currently the DWSRF program is using the FY2016 grant to pay for project payment requests.

Table 1. Cash Draw Ratio Calculation State Set Aside Federal State Year Cap Grant Match Accounts Federal State Total Portion Portion 2014 $8,845,000 $1,769,000 $530,700 $8,314,300 $1,769,000 $10,083,300 82.46% 17.54% 2015 $8,787,000 $1,757,400 $853,060 $7,933,940 $1,757,400 $9,691,340 81.87% 18.13% 2016 $8,312,000 $1,662,400 $498,720 $7,813,280 $1,662,400 $9,475,680 82.46% 17.54% 2017 $8,241,000 $1,648,200 $494,460 $7,746,540 $1,648,200 $9,394,740 82.46% 17.54%

Data Entry: The State will perform monthly updates to the DW Projects & Benefits Reporting (PBR) database. In addition, the State will perform monthly updates to the Federal Funding Accountability and Transparency Act Subaward Reporting System (FSRS) to meet the Federal Funding Accountability and Transparency Act as required by the grant conditions of awarded grants.

(Rest of page intentionally left blank.)

4 DWSRF Financial Status

The following table summarizes the DWSRF financial status as of 3/31/19.

Table 2. DWSRF summary financial status as of 3/31/2019 Federal Grant State Match (20%) Total Capitalization grants FY1997 through FY2007 $91,793,500 $18,358,700 $110,152,200 Capitalization grants FY2008 through FY2009 $16,292,000 $3,258,400 $19,550,400 ARRA 2009 grant (state match not required) $19,500,000 $0 $19,500,000 Capitalization grants FY2010 through FY2015 $58,019,000 $11,603,800 $69,622,800 Capitalization grant FY2016 $8,312,000 $1,662,400 $9,974,400 Capitalization grant FY2017 $8,241,000 $1,648,200 $9,889,200 Capitalization grant FY2018 $0 $0 $0

Capitalization grant FY2019 (estimated) $11,004,000 $2,200,800 $13,204,800

Capitalization grant FY2020 $0 $0 $0

Total into DWSRF Accounts $213,161,500 $38,732,300 $251,893,800

Set-asides - Administration - 4.0% of FY1997 through FY2011 grants -$3,671,741 - Administration - portion of reserved amounts from FY2008 through FY2013 grants* -$1,009,800 - Administration – 4.0% for FY2014 through FY2017 -$1,693,240 - Technical Assistance (closed out) – Amount used from FY2001 grant -$23,916 - Source Water Assessment (closed out) - Amount used from FY1997 grant -$936,086 - Small Systems Technical Assistance - <=2% of FY2011 through FY2020 grants -$1,150,700

Sub-Total Set-asides -$8,485,483 Total Loan Principal Repayments $103,966,585 Total Loan Interest Payments $32,143,821 Investment Income earned $28,164,328 Loans (binding commitments) -$272,771,978 Estimated Fund Balance Available to Capital Construction Funding with estimated FY2019 $134,911,073 and FY2020 capitalization grants**

* Program administration set-aside: In previous IUPs, Wyoming reserved the authority to set aside an amount equal to four percent of each capitalization grant from FY2008 through FY2017, including ARRA 2009 (amount reserved from these grants=$5,364,980). Wyoming also reserves the authority to set aside four percent (estimated amount reserved=$440,160) of the FY2019 capitalization grant. Wyoming took administration set-aside totaling $662,120, as part of its FY2016 and FY2017 capitalization grants. Wyoming now plans to take an administrative set aside equal to four percent ($440,160) of the FY2019 capitalization grant. The remaining amount (estimated at $683,960 = $6,374,781 + $440,160 - $325,840 - $5,364,981- $440,160) remains reserved.

5

** As of 4/4/2019, $5,379,912 of the estimated fund balance has been conditionally awarded but is not yet under binding commitment. Projects involved are noted on the priority list and are expected to complete the remaining steps for DWSRF funding during the remainder of FY2019 or in FY2020.

A more detailed description of set-asides may be found later in this plan. Any unused administrative funds are placed in an account and used for administration in future years. After federal capitalization grants are no longer available the program must rely solely on loan origination fees and State funds.

The State program legislation and rules provide for the collection of a 0.5% loan origination fee which is to be set aside in a separate account to provide for future administration of the DWSRF program. All current and future fees will be placed into an administration account.

Additional Subsidization

Starting with the FY2010 federal capitalization grant, the State must use certain amounts of the capitalization grant to provide additional subsidization to eligible recipients. In addition to that requirement, the State also intends to take a 30% allowance from both the FY2019 and FY2020 capitalization grants to provide additional subsidization to disadvantaged communities, as allowed under federal DWSRF rules. The 30% allowance is estimated to be $2,472,300 for each of these fiscal years. The State provides additional subsidization in the form of loans in which a portion of the principal will be forgiven upon project completion. SLIB determines the actual amount of principal forgiveness awarded to individual projects based on criteria set forth in SLIB Rules and Regulations Chapter 16 and on the actual applications received. The rules base eligibility for principal forgiveness primarily on disadvantaged community criteria that are based on income data, unemployment data, and population trends. The rules also allow eligibility based only on income criteria in cases where principal forgiveness does not need to be linked to disadvantaged community criteria. The rules specify a maximum percentage of principal forgiveness for applicants based on the given criteria. Table 3 shows the status of the additional subsidization requirement.

Table 3. Additional Subsidization Requirement Status as of 4/4/19 Federal Grant Year Federal Grant Amount Min. Required Add. Sub. Max. Allowable Add. Sub. FY2010 $13,573,000 $4,071,900 $13,573,000 FY2011 $9,418,000 $2,825,400 $9,418,000 FY2012 $8,975,000 $1,795,000 $2,692,500 FY2013 $8,421,000 $1,684,200 $2,526,300 FY2014 $8,845,000 $1,769,000 $2,653,500 FY2015 $8,787,000 $1,757,400 $2,636,100 FY2016 $8,312,000 $1,662,400 $4,156,000 FY2017 $8,241,000 $1,648,200 $4,120,500 FY2018 $0.00 $0.00 $0.00 FY2019 (estimated) $11,004,000 $2,200,800 6,051,400 FY2020 $0.00 $0.00 $0.00 Totals $85,576,000 $19,414,300 $47,827,300 Additional subsidization under binding $40,731,722.47 commitment Additional subsidization conditionally awarded, binding commitment $347,083.00 pending (includes additional amount awarded 4/4/19)

6 Minimum additional subsidization still required $0 (for FY2019 grant) Maximum additional subsidization still available $0.00

Green Project Reserve

Starting with the FY2010 capitalization grant, to the extent there are sufficient eligible project applications, the State must use certain minimum amounts of the capitalization grants to fund projects which address green infrastructure, water or energy efficiency improvements, or other environmentally innovative activities (collectively referred to as "green" projects). This requirement is referred to as the Green Project Reserve, or GPR. Table 4 shows the status of the GPR. The priority list (Appendix 1) shows that sufficient green projects are anticipated to apply for funding or to complete remaining steps on conditional funding awards to meet the minimum required GPR amount. Other projects on the priority lists may be able to show, through a business case or other information, that they also are green projects; these projects too will be considered eligible for award under the GPR. GPR loans will have an interest rate of 0% and will be eligible for principal forgiveness under the criteria established in SLIB rules.

Table 4. Green Project Reserve Status as of 3/1/17 Federal Grant Year Federal Grant Amount Minimum GPR % Minimum GPR FY2010 $13,573,000 20% $2,714,600 FY2011 $9,418,000 20% $1,883,600 FY2012 $8,975,000 0% $0 FY2013 $8,421,000 0% $0 FY2014 $8,845,000 0% $0 FY2015 $8,787,000 0% $0 FY2016 $8,312,000 0% $0 FY2017 $8,241,000 0% $0 FY2018 $0.00 0% $0 FY2019 (estimated) $11,004,000 0% $0 FY2020 $0.00 0% $0 Totals $4,598,200 GPR amount under binding commitment $16,385,211.32 GPR amount conditionally awarded, binding commitment pending $1,900,000.00 Minimum GPR amount remaining $0

Short-term Goals

1. To administer the DWSRF program in Wyoming.

2. To ensure the technical integrity of DWSRF projects through the review of compliance records; outreach efforts including presentations and training at Wyoming Association of Rural Water and Wyoming Water Quality and Pollution Control Association events and conferences; and review of planning, designs/specifications, and construction documents and activities.

7 3. To ensure the financial integrity of the DWSRF program through the review of the financial impacts of publicly owned public water supplies’ loan applications, and the ability for loan repayment.

Long-term Goals

1. To build and maintain a permanent, self-sustaining State Revolving Fund program that will serve as a cost-effective, convenient source of financing for drinking water projects in Wyoming.

2. To provide a financing assistance program to help publicly owned public water supplies afford sustainable infrastructure and to assist them with funds to complete capital improvement projects to maintain and achieve compliance.

3. To work with other federal, state, and local assistance providers to bundle funding packages that address publicly owned public water supplies' most pressing needs.

4. To have the OSLI, the DEQ, and the WDO recommend priorities for financial assistance from the DWSRF program to the Wyoming SLIB.

Set-Asides

The DWSRF may fund certain provisions of the Federal Safe Drinking Water Act, through the use of “set-aside” accounts. The DWSRF Federal and State enabling legislation allows set- aside amounts of the federal drinking water capitalization grant for specific purposes. These set-asides each have different purposes and conditions. Wyoming currently uses an administration set-aside and a technical assistance set-aside. Other set-asides which may be established include state program management and local assistance. The State of Wyoming reserves its right to implement its option to fund allowable set-asides.

Administration Set-Aside: Wyoming uses the 4% administration set-aside to cover program development, review of water system facilities plans, construction and bid documents, assistance and oversight during planning, design and construction, loan origination work, administering repayments, costs associated with the Select Water Committee and the public comment process, staff salaries, and other associated costs to administer the program.

Wyoming set-aside 4% of the FY1997 - FY2007 capitalization grants for program administration. In previous IUPs, Wyoming reserved the authority to set aside an amount equal to 4% of each capitalization grant from FY2008 through FY2017, including ARRA 2009 (amount reserved from these grants=$5,364,981). Wyoming also reserves the authority to set-aside 4% (estimated amount reserved=$440,160) of the FY2019 capitalization grant. Wyoming took administration set-aside totaling $662,120 as part of its FY2016 and FY2017 capitalization grants. Wyoming did not take an administrative set aside from the FY2018 capitalization grant as we did apply for the 2018 Capitalization grant. The remaining amount (estimated at $683,960 = $6,374,781 + $440,160 - $325,840 - $5,364,981-$440,160) remains reserved.

8 Any funds that were set-aside for administration but not actually spent will be placed in an account and used for administration in future years. After federal capitalization grants are no longer available, the program must rely solely on origination fees and State funds. Spending such funds is subject to approval of the Wyoming Legislature, although federal restrictions will limit use of these funds to purposes related to this program.

Technical Assistance for Small Systems Set-Aside: A state may use up to 2% of its allotment to provide technical assistance to public water systems serving 10,000 people or fewer (section 1452(g)(2)). If a state does not use the entire 2% for these activities against a given allotment, it can bank the excess balance and use it for the same activities in later years. If a state chooses to use funds under this set-aside, EPA encourages states to use available funds to support small system efforts to apply for DWSRF loans. A state may use these funds to support a technical assistance team or to contract with outside organizations to provide technical assistance. Wyoming plans to continue using this set-aside to fund a contract with the Wyoming Association of Rural Water Systems to assist small systems. An updated work-plan will be submitted to USEPA Region VIII for their approval.

(Rest of page intentionally left blank.)

9

Appendix 1: FY2020 Drinking Water State Revolving Fund - Comprehensive Priority List

2020

2023 -

Population

Project Rank Rank Points Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Alta Community 1 172 40 Alta Community 5600275 E. coli positive samples resulting in boil order $200 25% $50 X Pipeline Pipeline 11/16. Upgrades to achieve compliance. Greater Smoot WSD 2 102 260 Greater Smoot W&S 5601397 TCR violations 8/13 and 9/13. EPA administrative order $220 50% $110 X District issued 11/11, and notice of violation of that order issued 2/14. Install system upgrades to resolve these issues, including disinfection facilities. Bear River Regional 3 82 1200 Bear River 5601019 TTHM violations 2014. TCR violation 10/13. EPA $200 25% $50 X Regional JPB administrative order 9/15. System upgrades to achieve compliance. Lusk Treatment or New 4 56 1567 Lusk, Town of 5600032 Gross alpha violations 2014. EPA administrative order $1,500 75% $1,125 X Source 9/14. Treatment or new source and/or other upgrades to achieve compliance. Wheatland Uranium 5 56 3627 Wheatland, Town of 5600187 Uranium violations 2015. EPA administrative order $500 50% $250 X Compliance 3/16. Upgrades to achieve compliance. Owl Creek & S. 6 52 60 Owl Creek and South OCWS - A new well, storage tank, transmission main and pump $6,000 75% $4,500 X Thermop New Source Thermopolis WD 5601673 station to provide an alternate source of water to Owl Project STWSD - Creek and South Thermopolis WD's. Owl Creek is under 5601083 EPA admin order for violation of DBP. They intend to form a new JPB called Hot Springs County JPB Kennington Springs 7 52 75 Kennington Springs 5601199 EPA administrative order 3/11 and subsequent violation $250 50% $125 X Water District notices and addenda. Construct upgrades to comply with administrative order; options include redevelop existing source, develop new source, regionalization, and possibly others. Owl Creek TTHM 8 45 60 Owl Creek Water 5601673 TTHM violation 2016. EPA administrative order 9/16. $200 75% $150 X District Upgrades to achieve compliance. Meeteetse Meters and 9 42 327 Meeteetse, Town of 5600035 Reduce accumulation of HAA5 and THHM in dead-end $1,067 75% $800 $100 X System Appurtenances lines and limited turnover area in the upper pressure zone. Install two new transmission lines to loop areas of Town, install a new PRV to serve the upper pressure zone, and replace several fire hydrants. Replacement of water meters with detector-type units. Kemmerer- 10 42 3393 Kemmerer- 5600028 TTHM violations 2015. EPA administrative order $250 0% $0 X Diamondville TTHM Diamondville JPB 3/16. Upgrades to achieve compliance.

10

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Laramie Distribution 11 40 30816 Laramie, City of 5600029 Replace old, deteriorated and undersized waterlines $4,000 25% $1,000 WC $1,000 X X Upgrades (cross contamination potential). DWSRF loans have been made for past similar projects. Manderson Tank 12 38 114 Manderson, Town 5600204 New storage tank to replace old, deteriorated, leaking $654 75% $491 X of tank (cross contamination potential).

Rawlins Treatment 13 37 9259 Rawlins, City of 5600045 Treatment plant nearing end of useful life and has $4,500 25% $1,125 X Upgrades recurring EPA sanitary survey deficiencies related to filters. Upgrades and/or replacements. Rock River DI 14 36 245 Rock River, Town 5600048 Replace DI transmission mains which are leaking to $1,500 75% $1,125 X replacement of reduce water losses and potential contamination.

Fort Laramie Main 15 33 230 Fort Laramie, 5600185 Replace old, deteriorated, and undersized water $240 75% $180 X Replacements Town of mains (cross contamination potential).

Dubois Distribution 16 33 971 Dubois, Town of 5600177 Replace old, deteriorated, and undersized water $500 75% $375 X Improvements mains and appurtenances (cross contamination potential). DWSRF loans have been made. Dubois Lead Corrosion 17 33 971 Dubois, Town of 5600177 Lead result above action level. Install corrosion control $100 75% $75 X Control system.

Afton Spring Source 18 32 1911 Afton, Town of 5600002 Upgrades are required to satisfy sanitary survey $150 50% $75 $150 X Overflow Modifications deficiency. Modification includes fabrication and installation of new overflow flapper gate system for the Afton Intermitting Spring. Green River Flaming 19 32 12515 Green River, City 5601181 Replace old cast iron and asbestos cement water lines $2,000 0% 0 $0 X Gorge Way Main of under Flaming Gorge Way. Approximately one mile of Replacement Project (I- old, deteriorated, undersized water mains with some 80 Business Route) lead fittings. There have been numerous water leaks on the lines. Strong potential for cross contamination. Clearmont Main 20 31 142 Clearmont, Town 5600013 Replace old, deteriorated water mains (cross $200 50% $100 X Replacements of contamination potential). DWSRF loan has been made.

11

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Lusk Well and 21 31 1567 Lusk, Town of 5600032 Rehabilitate or replace existing well, including raise $1,500 75% $1,125 X Distribution Upgrades wellhead above grade and eliminate underground vault. Replace and upsize undersized, corroded, and leaking mains (cross contamination potential). Loop deadend mains to improve water quality. Evansville 22 31 2544 Evansville, Town 5600018 Replace old, deteriorated waterlines and $1,500 75% $1,125 X Deteriorated Main of appurtenances (cross contamination potential). Replacements Mills Tank Rehab 23 31 3461 Mills, Town of 5600036 This project involves the rehabilitation and upgrade $750 75% $563 X of the Town's Water Storage Tank #1. This project will replace the interior and exterior tank coating including spot repair of corroded areas, installation of cathodic protection in the tank and the installation of an in-tank mixing system. Mills Distribution 24 31 3461 Mills, Town of 5600036 Replace old, deteriorated and undersized water lines $2,500 75% $1,875 X Improvements (cross contamination potential). Replace old, deteriorated service saddles, valves, hydrants, and other appurtenances. Wheatland 25 31 3,600 Wheatland, Town N/A We plan to replace old water lines which are $670 50% $335 X Undersized Water Line of undersized and break regularly Replacement Torrington Main 26 31 6501 Torrington, City 5600164 Replace old, deteriorated water mains and $1,200 50% $600 X Replacements of appurtenances (cross contamination potential). Turnerville Well 27 27 192 Turnerville W&SD 5601115 The Turnerville water source (Willow Creek Spring) $550 50% $275 X Project has been determined by EPA to be under the influence of surface water. Remove the spring from the system and drill a new well Meeteetse Lead 28 27 327 Meeteetse, Town 5600035 Lead result above action level. Install corrosion $100 75% $75 X Corrosion Control of control system. Thayne Tank 29 27 366 Thayne, Town of 5600159 Rehabilitate deteriorated tank (cross contamination $488 50% $244 X potential). Construct additional storage tank. DWSRF conditional award 2/17; expected to become binding commitment by end of FY2017 or in FY2018. Thayne Main 30 27 366 Thayne, Town of 5600159 Replace old, deteriorated, and undersized water $776 50% $388 X Replacements mains (cross contamination potential). DWSRF loans have been made.

12

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Encampment Main 31 27 450 Encampment, 5600060 Replace old, deteriorated, and undersized water $250 75% $188 X Replacements Town of mains (cross contamination potential). Hanna Water Mains 32 27 841 Hanna, Town of 5600025 Replace old, deteriorated, and undersized water lines $770 50% $385 X and appurtenances (cross contamination potential). DWSRF loan made for first of several phases. DWSRF conditional award 4/17 for next phase Hanna Disribution and 33 27 841 Hanna, Town of 5600025 Replace old, deteriorated and undersized water lines $1,624 $0 X Meter Upgrades and appurtenances (cross contamination potential) and install meters. Two phases expected.

Greybull Transmission 34 27 1847 Greybull, Town of 5600022 Upgrade old deteriorated transmission mains and $1,000 75% $750 X appurtenances (cross contamination potential). Greybull Tank 35 27 1847 Greybull, Town of 5600022 Replace old, deteriorated tank (cross contamination $1,500 75% $1,125 X potential). Powell Main 36 27 6314 Powell, City of 5600042 Replace old, deteriorated, and undersized water $3,000 50% $1,500 X Replacements mains with some lead joints and cross contamination potential. Lander Water Storage 37 27 7487 Lander, City of 5600176 Lander Water Storage Tanks repair and upgrades. $3,500 50% $1,750 $0 X Tanks repair and Failing tanks may be exposing the treated water to updrades open environmental conditions. The level of repairs possible is still being determined. Lander Transmission 38 27 7487 Lander, City of 5600176 Replace old, deteriorated, and undersized mains and $1,000 50% $500 X Upgrades appurtenances (cross contamination potential). Includes removal of no longer needed pump houses. DWSRF loans have been made (#180). Lander Tank 39 27 7487 Lander, City of 5600176 Replace or rehabilitate deteriorated tanks (cross $2,000 50% $1,000 X contamination potential). Riverton 40 27 10615 Riverton, City of 5600047 Replace old, deteriorated, and undersized mains and $442 25% $111 X Replacements appurtenances (cross contamination potential). DW loan #185 Deavor Distribution 41 25 178 Deaver, Town of 5600016 Replace/update old, inaccurate and leaking water $175 50% $88 WC $175 X Improvements meters and service lines. Hudson Transmission 42 25 458 Hudson, Town of 5600183 Replace failing secions of Transmission Main, (cross $200 75% $150 X Main Repair contamination potential) Salt Creek JPB 43 25 599 Salt Creek JPB 5600201 Replace old, deteriorated transmission main (cross $6,500 50% $3,250 X Transmission contamination potential). Improvements

13

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Guernsey 44 25 1147 Guernsey, Town 5600023 Replace/rehabilitate old, deteriorated mains, tanks, $1,130 50% $565 X Replacements/ of and appurtenances (cross contamination Rehabilitation potential). Thermopolis 45 25 3009 Thermopolis, 5600056 Replace old, deteriorated, and undersized water $1,300 50% $650 X Distribution Town of mains (cross contamination potential). DWSRF Improvements conditional award 4/17 Worland Main 46 25 5487 Worland, City of 5600197 Replace old, deteriorated water mains (cross $1,000 25% $250 X Replacements contamination potential). Sheridan Water Main 47 25 17444 Sheridan, City of 5600052 Replace old, deteriorated, and undersized water $1,790 25% $448 X Replacements mains and appurtenances (cross contamination potential). DWSRF loans have been made for several projects. Estimated $10 million total need. DWSRF conditional awards 10/16 and 4/17; expected to become bind Dixon 100,000 Gallon 48 24 100 Dixon, Town of 5600059 Rehabilitate tank, add/modernize pumps, controls $420 75% $315 $60 X Water Tank Rehab and appurtenances. Solar powered mixers to prevent Project freezing. Northwest Rural Main 49 24 5500 Northwest Rural 5601254 Replace old, deteriorated water mains and $1,000 25% $250 X Replacements Water District appurtenances (cross contamination potential). NW Rural System 50 24 7,000 Northwest Rural 5601254 Add loop lines in several service areas to increase $3,000 25% $750 $2,000 X Upgrades. Water District pressure and flow. Replace leaking and defective flushing hydrants and individual service PRVs. Sundance Meadows 51 22 60 Sundance 5601639 Lead result above action level. Install corrosion $100 50% $50 X Lead Corrosion Meadows Water control system. Control District Buffalo Valley Distrib 52 22 60 Buffalo Valley 5600435 Replace leaky piping, install SCADA for tank level and $256 25% $64 X Upgrades & Repairs WD chlorine application. (cross contamination potential) Buffalo Valley Galv. 53 22 70 Buffalo Valley 5600435 Replace leaky galvanized pipe. Add SCADA for $275 25% $69 X Pipe replacements WD operations. Manville Waterlines 54 22 95 Manville, Town of 5600110 Replace old, deteriorated and undersized water lines $750 75% $563 X (cross contamination potential) Granger Rehabilitation 55 22 139 Granger, Town of 5600020 Rehabilitate old, deteriorated tank (cross $500 50% $250 X Projects contamination potential); includes repair, coating, cathodic protection, mixing system. Reconstruct old, deteriorated raw water intake, pump station, and pipeline.

14

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Green Valley Estates 56 22 140 Green Valley 5601245 Lead result above action level. Install corrosion $100 50% $50 X Lead Corrosion Estates Imp. control system. Control District Bennor Estates Lead 57 22 174 Bennor Estates 5601596 Lead result above action level. Install corrosion $100 50% $50 X Corrosion Control ISD control system. Osage Water System 58 22 208 Osage Water 5600038 Replace cast iron distribution piping and old $2,400 50% $1,200 $300 X Improvements Project District hydrants, loop existing sections. Install new transmission line from an existing well to the existing tank for a backup water source. Upgrade existing SCADA system/controls. New meters, remote reading system, and curb stops on existing services without them. New coating on existing tank, disconnect Well No. 2 from Well No. 3 and the rest of system to mitigate cross-contamination issues, and upgrade the wellhouse. Osage Distribution 59 22 208 Osage Water 5600038 Replace old, deteriorated, and undersized water $500 50% $250 X Improvements District mains (cross contamination potential).

Kaycee Lead Corrosion 60 22 263 Kaycee, Town of 5600196 Lead result above action level. Install corrosion $100 50% $50 X Control control system. Meeteetse 61 22 327 Meeteetse, Town 5600035 Looping dead end water lines and replace asbestos $372 75% $279 X Distribution of transmission line with PVC. Improve capacity and Improvements resilience.

South Park Service 62 22 350 South Park 5600822 Replace old, deteriorated water system components. $805 25% $201 WC $200 X Center ISD Service Center Install water meters. I&S District Freedom Hills 63 22 400 Freedom Hills 5600789 Replace old, deteriorated water mains (cross $1,850 50% $925 WC $400 X Distribution I&S District contamination potential). Install meters on currently Improvements unmetered system (categorically green). DWSRF conditional award 6/15 for $1,127,830; expecting a loan increase application. Sinclair Main 64 22 433 Sinclair, Town 5600054 Replace old, deteriorated water mains, services, and $600 25% $150 X Replacements of appurtenances (cross contamination potential). Baggs Distribution 65 22 440 Baggs, Town of 5600058 Replace old, deteriorated water mains and $486 50% $243 X Improvements appurtenances (cross contamination potential).

15

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award LaBarge Transmission 66 22 551 LaBarge, Town of 5600222 Replace old, deteriorated transmission line from $750 50% $375 X water treatment plant to storage tank (cross contamination potential). LaBarge Pump House 67 22 551 LaBarge, Town of 5600222 Replace old, deteriorated building and floor which $121 50% $61 X Repair threatens to drop the feed pumps into the wet well (cross contamination potential). HMR Distribution 68 22 580 High Meadow 5601569 Replace old, deteriorated, and undersized water $3,590 25% $898 X Improvements Ranch Water mains and appurtenances (cross contamination District potential). Includes looping existing deadend lines and adding isolation valves and PRVs. DWSRF conditional award 4/17 Byron leaky hydrants 69 22 593 Byron, Town of 5600008 Replace old, deteriorated, and undersized water $415 25% $104 X and distribution lines mains and leaky appurtenances (cross contamination potential). Byron Distribution 70 22 593 Byron, Town of 5600008 Replace Water Pipes Crossing Under Main $415 25% $104 X Improvements- Street with WYDOT resurfacing project. Replace WYDOT Main St old, deteriorated, and undersized water mains Project (cross contamination potential). Byron Distribution 71 22 593 Byron, Town of 5600008 Replace old, deteriorated, and undersized water $1,050 25% $263 X Improvements mains and appurtenances (cross contamination potential). Cowley Main 72 22 655 Cowley, Town of 5600206 Replace old, deteriorated, and undersized water $3,100 25% $775 X Replacements mains (cross contamination potential). Melody Ranch Water 73 22 900 Melody Ranch 5601440 Construction of an additional water well, larger $560 25% $140 EC $200 X System Improvements I&S District diameter transmission main, and a more efficient pumping system. Melody Ranch ISD 74 22 900 Melody Ranch 5601440 Repair valves and hydrants damaged by corrosion $330 25% $83 X Valve Repairs I&S District (cross contamination potential). Moorcroft Distribution 75 22 1009 Moorcroft, Town 5600037 Replace old, deteriorated, undersized water mains $1,201 25% $300 X Improvements of and distribution appurtenances (cross contamination potential). Loop water lines. DWSRF conditional award 2/17. Upton Main 76 22 1100 Upton, Town of 5600140 Replace old, deteriorated water mains and $3,000 50% $1,500 X Replacements appurtenances (cross contamination potential). Pine Bluffs Main 77 22 1129 Pine Bluffs, Town 5600040 Replace old, deteriorated water mains (cross $1,057 50% $529 X Replacements of contamination potential).

16

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Sundance 78 22 1182 Sundance, City of 5600055 Upgrade aging transmission lines from well field $3,500 25% $875 X Transmission Improvements Sundance Storage and 79 22 1182 Sundance, City of 5600055 Replace old, deteriorated, undersized tanks, mains, $3,000 25% $750 X Distribution and services (cross contamination potential). Loop Improvements mains for water quality and reliability.

Basin Lead Corrosion 80 22 1285 Basin, Town of 5600004 Lead result above action level. Install corrosion $100 25% $25 X Control control system. Aspen Pines Waterline 81 22 1400 Aspens Pines 5600220 Replace old leaking waterlines that have lead swing $400 25% $100 X Replacement Project WSD joints. Star Valley Ranch 82 22 1503 Star Valley Ranch, 5600287 Replace old, deteriorated, and undersized water $6,136 25% $1,534 WC $2,000 X Main Replacements Town of mains (cross contamination potential). Estimated total need $12 million phased over several years. DWSRF loan made for first phase. DWSRF conditional award 12/16 for second phase Saratoga Tank 83 22 1690 Saratoga, Town 5600061 Replace deteriorating/leaking bolted steel standpipe. $2,000 25% $500 X Replacement of

Saratoga Tank Repair 84 22 1690 Saratoga, Town 5600061 Repair leaking panel interfaces of the Town's one $320 25% $80 X of million gallon bolted standpipe (storage tank) to prevent water loss. Saratoga Main 85 22 1690 Saratoga, Town 5600061 Replace old, deteriorating and undersized mains, $8,000 25% $2,000 X Replacements of looping mains/reduce dead ends, provide for adequate fire protection, valving for mainline isolation, meet current Wyoming DEQ Standards (cross contamination potential) Afton Distribution and 86 22 1911 Afton, Town of 5600002 Replace old, deteriorated, undersized mains (cross $1,300 50% $650 WB $600 X Storage contamination potential), including looping the Improvements replacements to eliminate deadends. Rehabilitate deteriorated top slab of concrete water storage tank (cross contamination potential). Pinedale Water Main 87 22 2030 Pinedale, Town of 5600041 Replace small sections of water mains in need of $100 25% $25 X and Hydrant replacement and replace old fire hydrants replacements

17

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Pinedale Main 88 22 2030 Pinedale, Town of 5600041 Replace old, deteriorated, and undersized water $390 25% $98 X Replacements mains (cross contamination potential). DWSRF loan has been made. Pinedale Shallow main 89 22 2300 Pinedale, Town of 5600041 Deepen shallow water lines to minimize freezing and $800 25% $200 WB $800 X replacements save the water used for winter bleeding.

KDJPB Main 90 22 3393 Kemmerer- 5600028 Replace old, deteriorated water mains (cross $800 0% $0 X Replacements Diamondville JPB contamination potential). Rawlins Tanks 91 22 9259 Rawlins, City of 5600045 Replace two old, deteriorated tanks (cross $2,500 25% $625 X contamination potential). Rawlins Raw Water 92 22 9259 Rawlins, City of 5600045 The City of Rawlins main water source is a series of $750 25% $188 X Transmission springs 35 miles south of town connected to the City Replacement system by a network of aging wooden stave pipelines which require replacement. Rawlins Potable Main 93 22 9259 Rawlins, City of 5600045 Replace old, deteriorated, and undersized water $750 25% $188 X Replacements mains and appurtenances (cross contamination potential). Jackson Landslide 94 22 9577 Jackson, Town of 5600213 Replace pump station, mains, and appurtenances $450 0% $0 X Water Mains damaged by landslide (cross contamination potential). Green River Cast Iron 95 22 12515 Green River, City 5601181 Replace old cast iron water lines in numerous $2,000 $0 X Water Line of locations within the City of Green River. (cross Replacement Project contamination and lead fitting potential).

Gillette Tank 96 22 29087 Gillette, City of 5600019 Rehabilitate tanks that have corrosion, foundation, $2,200 0% $0 X Rehabilitation and site drainage problems (cross contamination potential). Includes project for tank Z1-R3 Gillette Main 97 22 29087 Gillette, City of 5600019 Replace old, deteriorated, and undersized water $3,400 0% $0 X Replacements mains (cross contamination potential).

GR-RS-SWC JPWB 98 22 40000 GR/RS/SwCo- 5600050 Replace old, deteriorated and undersized $4,000 0% $0 X Transmission JPWB transmission mains (cross contamination potential). Replacement Recluse School Lead 99 22 46133 Campbell County 5601057 Lead result above action level. Install corrosion $100 0% $0 X Corrosion Control School District control system.

18

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Casper Miscellaneous 100 22 55316 Casper, City of 5601415 Replace/rehabilitate old, deteriorated, undersized $6,000 25% $1,500 X Water Main mains (cross contamination potential). Replacements Casper 10 MG Tank 101 22 55316 Casper, City of 5601415 Rehabilitate old, deteriorated, 10 million gallon $5,500 25% $1,375 X Rehabilitation finished water storage reservoir (cross contamination potential). Cheyenne Round Top 102 22 59466 Cheyenne, City of 5600011 Replace old, deteriorated Round Top 10 million $10,000 0% $0 X Tank Replacement gallon underground storage tank (cross contamination potential) with new above ground tank. Cheyenne Main 103 22 59466 Cheyenne, City of 5600011 Replace/rehabilitate old, deteriorated, and $2,000 0% $0 X Rehabilitation and undersized water mains (cross contamination Replacements potential). Various DWSRF loans have been made. $10M total need. Laramie Turner Well 104 20 30816 Laramie, City of 5600029 Improvements to Turner Well Field. $2,500 25% $625 X Field Improvements Laramie Tanks 105 20 30816 Laramie, City of 5600029 New tank in northern part of system to better serve $4,356 25% $1,089 X area. Includes transmission, pump station, pressure control stations, and other appurtenances. DWSRF conditional award 4/17; binding commitment by end of FY2017 or in FY2018. Laramie Public Works 106 20 30816 Laramie, City of 5600029 Fund the drinking water system related portions of $3,000 25% $750 EC $1,200 X Service Center new or renovated buildings for the City's public works department. Laramie Meters 107 20 30816 Laramie, City of 5600029 Implement a fixed base water meter reading $2,500 25% $625 WC $2,500 X system to replace the current drive-by reading system. Install higher accuracy meters. Water conservation. Laramie I-80 source 108 20 30816 Laramie, City of 5600029 Source water protection and monitoring of I-80 $150 25% $38 X protection and contaminants for Pope Springs and Soldier Springs monitoring municipal well fields. South Laramie WSD 109 19 550 South of Laramie 5601393 Drill new well for secondary water source. DWSRF $193 50% $97 X Well W&S District conditional award 2/17; expected to become binding commitment by end of FY2017 or in FY2018.

19

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Pine Haven Tank and 110 17 490 Pine Haven, 5600191 Construct new tank at higher elevation to correct $497 25% $124 X Wells Town of existing static pressures below 35 psi and to provide additional storage. Plug and abandon one of two existing wells, improvements to the other existing well, and drill new well near tank. LaGrange Waterline 111 16 448 LaGrange, Town 5600788 Waterline looping and extension. $450 75% $338 X Looping of LaGrange Tank 112 16 448 LaGrange, Town 5600788 New tank and transmission. Chlorination $1,100 75% $825 X of improvements. LaGrange Meters 113 16 448 LaGrange, Town 5600788 Replace existing meters and pits with new meters $350 75% $263 WC $350 X of including automated meter reading and leak detection system. Newcastle AC water 114 15 3532 Newcastle, City of 5600256 Replace aging 6" AC water line and upsize water line $350 25% $88 X line replacement to 8".

Freedom WSD Meters 115 13 214 Freedom W&S 5600158 Replace existing meters with new meters including $50 75% $38 WC $50 X District automated meter reading and leak detection system. Fort Laramie Meters 116 13 230 Fort Laramie, 5600185 Replace existing old, malfunctioning meters with new $58 75% $44 WC $58 X Town of meters, including automated meter reading and leak detection system. Dubois Radio Read 117 13 971 Dubois, Town of 5600177 Remove and replace approximately 186 remaining $175 75% $131 $175 X Meters non ECR water meters with SR2 ECR radio meters and purchase and install radios for approximately 460 meters thht have already been replaced with ECR. Pineview ISD Tank and 118 12 71 Pineview I&S 5601490 New tank and booster station for system that $265 50% $133 X Booster District currently has only pressure storage. Piping upgrades, generator, meters. HMR Interconnection, 119 12 580 High Meadow 5601569 District system currently has two parts unconnected $1,030 25% $258 X Tank, and Well Ranch Water to each other, and it lacks storage and adequate District redundancy of supply. Install new transmission main to interconnect two separate parts of system, tank and booster station, additional well, disinfection

20

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Cowley water system 120 12 655 Cowley, Town of 5600206 Install a water line that will tie the west end dead $2,200 25% $550 X improvements end line to a dead end line owned by South End Water Users ISD. The line will loop the systems, improve water quality and pressures for both systems. Replace old, undersized water lines and extend the service to cover the Town's new expansion. Cowley Tank 121 12 655 Cowley, Town of 5600206 Replace existing undersized tank and associated $1,509 25% $377 X transmission main. Chlorination system. Backflow preventers on transmission line taps. South Big Horn 122 12 1000 South Bighorn 5601454 Extend water mains to provide service to Greybull $1,900 50% $950 X Extension County River valley area and possible future service as far as Water Supply Burlington area. Existing individual wells produce JPB groundwater of poor quality; many residents haul water. Clearmont Well 123 11 142 Clearmont, Town 5600013 New well to provide adequate redundancy of supply. $250 50% $125 X of Yoder Distribution 124 11 151 Yoder, Town of 5600169 Distribution System Improvements $1,400 50% $700 X Improvements Evansville WTP Pump 125 11 2544 Evansville, Town 5600018 Replace and upgrade intake pumps at water $400 75% $300 EC $400 X Upgrades of treatment plant. Old pumps are t energy efficient. Variable speed drives will be installed on the new pumps. Evansville New Tank 126 11 2544 Evansville, Town 5600018 Construct additional storage tank. $1,500 75% $1,125 X of Evansville Main 127 11 2544 Evansville, Town 5600018 Loop and upsize water lines to improve service. $7,000 75% $5,250 X Looping and Upsizing of Evansville Connection 128 11 2544 Evansville, Town 5600018 Emergency connection to the Central Wyoming $350 75% $263 X to Central WY of Regional Water System. Regional

Evansville 129 11 2544 Evansville, Town 5600018 Replace obsolete or poorly functioning hydrants and $200 75% $150 X Appurtenances of valves. Mills Emergency 130 11 3461 Mills, Town of 5600036 Installation of an emergency generator at the Town's $1,200 75% $900 X Generator Water Treatment Plant.

21

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Wheatland 131 11 3,600 Wheatland, Town N/A Upgrade SCADA system to include the entire water $250 50% $125 X Telemetry/SCADA of system System Upgrade Wheatland Well 132 11 3627 Wheatland, Town 5600187 New wells for increased source redundancy. Most of $500 50% $250 X of town's wells are several decades old. Sheridan Main 133 10 17444 Sheridan, City of 5600052 Extend water mains to serve areas that currently $931 25% $233 X Extensions have water of inadequate quantity and/or quality. Extend and loop transmission main to eliminate deadend and provide redundancy. Extend main to serve new school. Broken Wheel Ranch 134 7 50 Broken Wheel 5601625 Tank, well, transmission, and pump improvements to $202 50% $101 X Ranch address deficiencies identified in EPA sanitary survey I&S District (including operating pressure below 20 psi), to meet demands, and to increase reliability. Install new curb stops and meters pits (currently unmetered) Squaw Creek 135 7 110 Squaw Creek 5600737 Upgrades to more efficiently use limited supply. New $100 25% $25 X Water District tanks. Replace well pumps. SCADA, controls, piping, metering, and valve upgrades. DWSRF loan has been made. Encampment 136 7 450 Encampment, 5600060 Loop existing dead end distribution mains to improve $300 75% $225 X Distribution Looping Town of system reliability and water circulation. Pine Haven Boe Drive 137 7 490 Pine Haven, 5600191 Install a main and appurtenances to improve service $903 25% $226 $0 X Waterline Town of to an area with inadequate water service by looping and adding redundancy to the system. Hog Island ISD Water 138 7 500 Hog Island I&S New New water system for area where homes are on $5,000 25% $1,250 X System District system individual wells with inadequate quality and quantity. Hanna Miscellaneous 139 7 841 Hanna, Town of 5600025 Water source, transmission, treatment, distribution, $1,500 50% $750 X Improvements and storage upgrades. Fencing improvements at storage facilities. Hanna Meters 140 7 841 Hanna, Town of 5600025 Replace existing meters with new meters including $500 50% $250 WC $500 X automated meter reading and leak detection system. Lovell Service 141 7 2,360 Lovell, Town of 5600031 Town of Lovell service extensions to property that $1,750 50% $875 na NA Extension - Armory the WYARNG is looking to build a new FMS center.

Lovell Looping and 142 7 2360 Lovell, Town of 5600031 Eliminate stagnant water by looping dead end water $675 50% $338 X Service Extension line and extend service to areas that currently do not have good source of water.

22

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Lander Telemetry 143 7 7487 Lander, City of 5600176 Install/upgrade SCADA system monitoring and $500 50% $250 X controls at various locations. Lander Pressurized 144 7 7487 Lander, City of 5600176 Provide a backup supply and pressure regulation to $1,000 50% $500 $0 X Water Supply for high elevation zones including the hospital and Hospital and High airport locations. Elevation Zones Lander Level II Water 145 7 7487 Lander, City of 5600176 Extend Level II Water Well Supply lines into the $2,000 50% $1,000 $0 X Well supply lines existing treatment plant or develop an approved alternate treatment if the 2019 WWDC Level 2 Test Well study produces a viable supplemental water source for the town of Lander. Riverton Water 146 7 10615 Riverton, City of 5600047 This project is the last phase of a WWDC project that $4,900 25% $1,225 X Supply, Pressure Zone will extend the service area of the city's water system 4 to the west. Delays obtaining permission to cross tribal lands resulted in our current funding falling short. Riverton Safety 147 7 10615 Riverton, City of 5600047 Safety and/or regulatory upgrades to the water $200 25% $50 X Improvements treatment plant, well houses, and storage tanks. Resulting from EPA Sanitary Survey Riverton Meters 148 7 10615 Riverton, City of 5600047 Replace old, deteriorated meters with automated $925 25% $231 WC $925 X read equipment including leak detection (current equipment at end of service life). South End WUD 149 5 150 South End Water 5600970 Extend district and water lines to serve additional $580 50% $290 X distribution Users I&S District rural customers in our area. The water line will be extensions extended approx. 4.8 miles and service approx. 20 new taps. South End WUD 150 5 150 South End Water 5600970 Control building to replace underground vault at $530 50% $265 X Users I&S District system's connection to Cowley system. Tie a dead end water line in the system back to the Town of Cowley's system along Lane 8. Improve quality in the line and reliability/capacity. Deavor Maintenance 151 5 178 Deaver, Town of 5600016 Construct a maintenance shop for the operations $113 50% $56 X Shop center for water portion of the town's public works department. Pavillion Meters 152 5 231 Pavillion, Town of 5600039 Replace existing meters with new meters including $500 75% $375 WC $500 X automated meter reading and leak detection system.

23

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Ten Sleep Well 153 5 260 Ten Sleep, Town 5600203 Replace inaccurate flow meters at the Town's wells in $75 50% $38 X Houses' Flow Meters of order to be able to calculate system losses by Replacement comparing to Town's distribution billing meters. Ten Sleep Well 154 5 260 Ten Sleep, Town 5600203 Redrill and replace one of two supply wells dating $1,270 50% $635 X of form 1950's to ensure continued source supply redundancy. Includes new well house and appurtenances. Well flows artesian therefore not requiring power to run well pump to pump to storage tank. Ten Sleep Storage 155 5 260 Ten Sleep, Town 5600203 Install lightening arrestor on top of water storage $24 50% $12 $24 X Tank Lightening of tank to protect tank mixer's solar array power supply Arrestor and telemetry equipment. Tank has been struck twice causing serious damage to solar powered electrical equipment and instruments. Ten Sleep Master 156 5 260 Ten Sleep, Town 5600203 Install two master meter vaults to totalize flow to $144 50% $72 X Meter Vaults of two out of town developments to compare with individual flow meters in order to be able to calculate system losses. South Thermopolis 157 5 300 South 5601083 Refinance project originally constructed to resolve $400 0% $0 X Refinance Thermopolis issues of low pressures and deteriorated and/or W&S District undersized infrastructure and to serve additional areas that had inadequate individual wells. Burns Well 158 5 301 Burns, Town of 5600188 Replacement wells for wells A2, A3, and A4. $2,400 75% $1,800 X Replacements Salt Creek JPB Pump 159 5 599 Salt Creek JPB 5600201 Upgrades to pump station and surge tank $320 50% $160 X Station and Surge constructed in 1995, involving SCADA, controls, Tank Improvements electrical, pumps, piping, valves, and various other appurtenances. Thermopolis Backup 160 5 3009 Thermopolis, 5600056 Backup generator for pump station. $160 50% $80 X Generator Town of Newcastle Well and 161 5 3532 Newcastle, City of 5600256 Purchase and connect new well to water system. $740 25% $185 X Control Upgrades Newcastle Meters 162 5 3532 Newcastle, City of 5600256 Retrofit existing meters with automated meter $500 25% $125 WC $500 X reading and leak detection system. Newcastle Distribution 163 5 3532 Newcastle, City of 5600256 Replace aging 6 inch steel water distribution line. $450 25% $113 X Line Replacement

24

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Sheridan/SAWS 164 5 17444 Sheridan, City of 5600052 Miscellaneous upgrades at the two water treatment $2,000 25% $500 X Treatment Plant plants, involving SCADA, plate settlers, backwash Miscellaneous piping, disinfection, sludge handling/drying, vehicle Upgrades storage building, road surfacing, drainage, security gates, utilidor. Sheridan water 165 5 17444 Sheridan, City of 5600052 Review and evaluate reservoirs within the overall $3,000 25% $750 X storage improvements water system to eliminate all EPA deficiencies associated with reservoirs and discharge points. Improvements include upgrades to hatches, screens, flap gates and appurtenances, replacement of aged and corroded piping, potential removal of reservoirs from the system. Sheridan Intake 166 5 17444 Sheridan, City of 5600052 Improvements to intake facilities that serve the $300 25% $75 EB $50 X Improvements Sheridan and Big Goose water treatment plants. Includes improvements to communications, SCADA, electrical, screening, piping/valves, flow measurement, security, and energy efficiency (possible green eligibility). Shoshone Municipal 167 5 24622 Shoshone 5601198 Relocate transmission pipeline out of WYDOT right- $500 25% $125 X Main Relocation Municipal Water of-way to accommodate highway project as required JPWB by WYDOT. Dixon Water 168 4 97 Dixon, Town of 5600059 Install an isolated transmission line from the water $760 75% $570 X Transmission Line treatment plant's clear well to the Town's storage from WTP to Storage tank to improve disinfection contact time, promote Tank tank turnover, improve water quality, and increase overall pressure throughout system. Dixon Meters 169 4 97 Dixon, Town of 5600059 Replace existing meters with new meters including $288 75% $216 WC $288 X automated meter reading and leak detection system. Includes dual check backflow preventers. Dixon Energy 170 4 97 Dixon, Town of 5600059 Install solar power system at water treatment plant $192 75% $144 EC $192 X Efficiency Upgrades and operations facility (categorically green eligible). Pioneer Transmission 171 4 450 Pioneer W&S 5600828 Additional transmission line from regional system to $682 50% $341 X District northern part of District to provide looping for more reliable supply. NW Rural Tanks and 172 4 5,500 Northwest Rural 5601254 Install tanks for additional storage in O'Donnell and $500 25% $125 X Pump Station Water District North End service areas. Upgrade North End pump station.

25

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award NW Rural System 173 4 5,500 Northwest Rural 5601254 Replace pumps that are more than 25 years old and $1,500 25% $375 $1,000 X pump station Water District upgrade pump station SCADA, starter motors and all upgrades. associated items. Douglas Well Project 174 4 6,120 Douglas, City of 5600137 Construction a new water well and water $2,000 25% $500 X transmission main to increase the water supply reliability to the City of Douglas water customers. We are currently working with WWDC on a Level II Study for this project. Aladdin 175 2 15 Aladdin, Town of 5601489 Purchase Well from WWDO. $50 50% $25 X

Opal Water System 176 2 96 Opal, Town of 5600835 Water system upgrades to reduce stagnation. $520 50% $260 X Upgrades Fox Ridge ISD System 177 2 100 Fox Ridge I&S 5601615 Well improvements, pump system upgrades, backup $250 50% $125 X Upgrades District generator, master meter, distribution upgrades. Granger secondary 178 2 139 Granger, Town of 5600020 Construct new transmission line from the Ham's Fork $2,500 50% $1,250 X water source River to the town's sediment pond as a secondary source of water for the town. Grover W&S District 179 2 147 Grover W&S 5600160 Replace existing meters with new meters including $120 50% $60 WC $120 X Meters District automated meter reading and leak detection system. Indian Paintbrush 180 2 150 Indian Paintbrush 5600758 New well, transmission, and storage tank. Install $475 25% $119 X Water District Water District meters on services (currently unmetered). Upgrades also include chlorination, pump station, control valves, controls, emergency generator. DWSRF loan has been made. Osage Telemetry 181 2 208 Osage Water 5600038 Update telemetry system for tank operation to $100 50% $50 X District better control levels and reduce water loss. Osage Meters 182 2 208 Osage Water 5600038 Replace existing meters with new meters including $300 50% $150 WC $300 X District automated meter reading and leak detection system. Etna Tank No. 2 183 2 269 Etna Water and 5600157C Construct an additional 500,000 gallon storage tank $1,495 50% $748 X Sewer District to meet existing and future connections as well as meet the required fire storage per Wyoming DEQ Chapter 12 design standards Spring Creek Well 184 2 400 Spring Creek I&S 5600811 New well and associated pump, controls, valves, and $440 25% $110 X District piping.

26

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Spring Creek Backup 185 2 400 Spring Creek ISD 5600811 Standby power generators for water supply pump $676 25% $169 X Power stations

Baggs/Dixon 186 2 440 Baggs, Town of 5600058 Transmission main to provide system redundancy $5,340 50% $2,670 X Transmission Main and to regionalize the Town of Baggs (5600058) and Town of Dixon (5600059) water treatment plants. Baggs Well 187 2 440 Baggs, Town of 5600058 Install horizontal collector well or on-land infiltration $500 50% $250 X gallery to provide alternate raw water supply to treatment plant. Baggs Miscellaneous 188 2 440 Baggs, Town of 5600058 Replace failing UV and membrane systems and $1,050 50% $525 X WTP Improvements related equipment, install misc. pretreatment systems and emergency power. Cokeville Meters 189 2 535 Cokeville, Town 5600015 New meters and pits in unmetered areas. Replace old $500 25% $125 WC $500 X of faulty well meters. LaBarge Emergency 190 2 551 LaBarge, Town of 5600222 Emergency generator for water treatment plant. $150 50% $75 X Generator

HMR Meters 191 2 580 High Meadow 5601569 Install meters in currently unmetered system. DWSRF $500 25% $125 WC $787 X Ranch Water conditional award 4/17; expected to become binding District commitment be end of FY2017 or in FY2018. Byron Looping 192 2 593 Byron, Town of 5600008 Waterline looping to eliminate deadends and $613 25% $153 X increase reliability. Bedford Water 193 2 800 Bedford WSD 5600006 This project will construct a new transmission line to $3,500 50% $1,750 X Transmission serve the northern portion of the District. The project Improvements will also replace undersized water transmission lines to improve service and reliability. Bedford Storage 194 2 800 Bedford WSD 5600006 This project will increase storage in the system as $1,200 50% $600 X Improvements detailed in the 2019 WWDC Bedford Water Supply Master Plan Level 1 Study. Alpine Meters 195 2 828 Alpine, Town of 5600156 Replace existing meters with new meters including $300 25% $75 WC $300 X automated meter reading and leak detection system. Upton Well 196 2 1100 Upton, Town of 5600140 New well to replace an old well. $1,500 50% $750 X

Pine Bluffs Well 197 2 1129 Pine Bluffs, Town 5600040 Replacement well and transmission. North Wells, on $800 50% $400 X Replacement of list in case of project changes.

27

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Pine Bluffs Rodeo 198 2 1129 Pine Bluffs, Town 5600040 Development of a Lance/Fox Hills Aquifer well to $770 50% $385 EB $200 X Ground Deep of mitigate its water supply nitrate levels and replace Production Well the pump and motor within problematical Well No. 5. This project would provide a redundant and reliable source of low nitrate water supply at sufficient yield to meet the current and future demands of the system. Pine Bluffs Reverse 199 2 1129 Pine Bluffs, 5600040 Add reverse osmosis to treat water from some wells $1,320 50% $660 X Osmosis Town of which are increasing in nitrate concentration. Pine Bluffs 200 2 1129 Pine Bluffs, Town 5600040 Main looping and extensions for water quality and $175 50% $88 X Miscellaneous of pressure improvement. Install hydrants. Install bulk Upgrades water fill station. Pine Bluffs Low 201 2 1129 Pine Bluffs, Town 5600040 New low-nitrate well to help manage nitrates and $783 25% $196 EC $200 X Nitrate Well of provide redundancy. Abandonment of underperforming Well 4. Partial green for reduction of waste treatment stream and higher efficiency equipment. Sundance Wells 202 2 1182 Sundance, City of 5600055 Rehabilitate/redevelop existing wells. $850 25% $213 X Sundance I-90 203 2 1182 Sundance, City of 5600055 Replace a restrictive pipe under I-90 that feeds the $1,200 25% $300 X Improvements south side of town.

Saratoga Well 204 2 1690 Saratoga, Town 5600061 Deepen and/or install additional well screens in Well $550 25% $138 X Upgrades of No. 5 to increase capacity and eliminate air problems. Install additional well for increased capacity. Update SCADA Control System, provide backup power supply. Wright Tank and 205 2 1807 Wright W&S 5600136 Replace chlorination system in new location for $1,400 25% $350 X Chlorination District better access. Remove or rehabilitate tank. Improvements Associated pipe and valve improvements. Afton Source 206 2 1911 Afton, Town of 5600002 Modify the overflow to the existing spring source so $400 50% $200 X Improvements that it meets requirements

Pinedale Town 207 2 2030 Pinedale, Town of 5600041 This project includes additional water mains and $1,000 25% $250 X Infrastructure Project service lines for an area with inadequate water service. Pinedale Water source 208 2 2300 Pinedale, Town of 5600041 This project includes a watershed study of the $5,000 25% $1,250 X and treatment project drinking water source, water source protection, and potential water treatment upgrades

28

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Glenrock Transmission 209 2 2576 Glenrock, Town 5600199 Transmission main improvements to provide more $130 50% $65 X of reliable supply to northern part of town. SAWS Control Valve 210 2 3900 Sheridan Area 5600052 Replace and/or upgrade aging control valves $837 25% $209 X Upgrades Water Supply JPB throughout system. Bridger Valley 211 2 4320 Bridger Valley 5600757 Install second transmission main to Fort Bridger area $768 50% $384 X Transmission JPB for redundancy and increased flow and pressures. Cody Tank 212 2 9520 Cody, City of 5600207 New tank and transmission. $1,200 25% $300 X Green River Water 213 2 12515 Green River, City 5601181 Rehabilitate three old, deteriorated water tanks $1,000 $0 X Tanks Rehabilitation of (cross contamination possible). Replace the interior Project and exterior coatings including spot repair of corroded areas and installation of cathodic protection. Green River Main 214 2 12515 Green River, City 5601181 Upsize and reconfigure water mains to improve $1,000 $0 X Reconfiguration of balance of flow between tanks.

Gillette Lakeway Area 215 2 29087 Gillette, City of 5600019 Transmission, storage, and pump station $12,300 0% $0 X Improvements improvements to extend Zone 2 to Lakeway area. This will allow switchover of some current Zone 3 areas to be more appropriately served by Zone 2. Probably not activate until about 2022 Gillette Disinfection 216 2 29087 Gillette, City of 5600019 Convert the existing chlorine gas disinfection system $2,500 0% $0 X to a Sodium Hypo-Chloride generation systems at Pump Station #1 GR-RS-SWC JPWB 217 2 40000 GR/RS/SwCo- 5600050 Parallel/redundant transmission mains to ensure $4,000 0% $0 X Additional JPWB continuous service in critical mains. Transmission GR-RS transmission 218 2 40000 GR/RS/SwCo- 5600050 Increase capacity and provide redundancy to the $6,600 $0 X system upgrades JPWB pumping and transmission system for the "Windriver Service Zone" in Rock Springs. This zone delivers water to all area north of I-80 including three districts and Reliance. A WWDC Level II study is scheduled for completion in spring/summer 2018. Cheyenne Water 219 2 59466 Cheyenne, City of 5600011 Install powder activated carbon system at treatment $250 0% $0 X Treatment Upgrades plant. DWSRF loan has been made.

29

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Cheyenne Treatment 220 2 59466 Cheyenne, City of 5600011 Treatment plant upgrades at Crow Creek WRF $7,000 0% $0 IG $7,000 X Upgrades (WYPDES# 0022381) and Dry Creek WRF (WYPDES# 0022934). Includes improved communications between these two plants, rehabilitation of Crow Creek oil/water separator waste evaporation beds, and installation of additional effluent UV disinfection. Waste Reuse. Cheyenne Sherard 221 2 59466 Cheyenne, City of 5600011 Install a hydropower generator unit at the Sherard $4,900 0% $0 EC $500 X Hydropower Water Treatment Plant. This will generate power to Generator operate the drinking water treatment plant using the excess head available in the raw water pipeline. DWSRF loan has been made. Cheyenne Reservoir 222 2 59466 Cheyenne, City of 5600011 Construct transmission lines to bypass Crystal and $2,300 0% $0 X Bypass Transmission Granite Reservoirs to allow water to flow directly to Mains Sherard WTP when necessary. Cheyenne Pressure 223 2 59466 Cheyenne, City of 5600011 Improvements associated with pressure $2,000 0% $0 X Management management plan phase II. This will allow City to better manage pressures within distribution system to reduce main breaks. Cheyenne Main 224 2 59466 Cheyenne, City of 5600011 Extend and upsize major water mains. DWSRF loans $5,000 0% $0 X Extensions and have been made. (Southern Transmission Main) Upgrades Central Wyo. Regional 225 2 60000 Central Wyo 5600009 Provide alternate backwash water supply to allow $500 25% $125 X Water Alternate Regional Water current supply components to be taken out of service Backwash Supply System as needed. Includes drain system improvements for existing backwash supply tank. DWSRF loan has been made. Central Wyo. Reg. 226 2 60000 Central Wyo 5600009 Install new ultraviolet light disinfection system for $12,000 25% $3,000 X WTP Disinfection Regional Water groundwater supply treatment. System Replacement System Central Wyo. Reg. 227 2 60000 Central Wyo 5600009 Transmission main along Westwind road connecting $5,500 25% $1,375 X Westwind Rd. Regional Water zones IIA and IIB. Transmission Main System Central Wyo. Reg. 228 2 60000 Central Wyo 5600009 SCADA and PLC system upgrades throughout regional $1,700 25% $425 X SCADA Upgrades Regional Water water system. System

30

2020

2023 -

Project Rank Rank Points Population Owner PWS No Description Allocation Amount $1,000 Est Max % Princ Forg Est Max Princ $1,000 Forg Green Type Green Amount $1,000 Expect Award 2021 Award Central Wyo. Reg. 229 2 60000 Central Wyo 5600009 Refinance loans that were originally made for major $6,600 0% $0 X Refinance Regional Water improvements associated with the creation of the System regional water system. The regional system was established to consolidate several independent systems to improve their technical, managerial, and financial capacity. Natrona Airport Utility 230 2 75450 Natrona County 5600079 Master planning study to determine existing $100 25% $25 X Master Plan International conditions and determine needed improvements for Airport Board water, sanitary sewer, and storm sewer utilities. To be funded jointly with CWSRF; $100k each. Total of all listed projects ($1,000) $347,584 $104,389 $26,404 Total of projects expected to submit applications in FY2019 or complete remaining steps on conditional awards by end of FY2019 or in $80,588 $22,285 $7,034 X FY2020 Total of projects expected to submit applications in FY2021-FY2023 $266,996 $82,104 $19,370 X

31

Appendix 2: Ranking Criteria for DWSRF Priority List

SYSTEM/PROJECT NAME ______PWS No. ______

Wyoming Drinking Water State Revolving Fund Ranking System

Available Points Points Received I. PUBLIC HEALTH ISSUES Points will be awarded for public health concerns that appear to be beyond the control of the water supplier and have occurred in the last four years. Items beyond the control of the water supplier do not include lab error or operator error. A. Outbreak of waterborne disease 100

B. Fecal or other pathogen detection which results in a boil order 80

C. Positive Coliform results which do not result in a violation 20

Public Health Issues Points

II. COMPLIANCE ISSUES

Points will be awarded for compliance issues that appear to be beyond the control of the water supplier and have occurred in the last four years. Multiple violations within a 12 month period will add 10 points total for categories in A- D below. For example a single microbiological violation receives 40 points. Two or more microbiological violations would result in a maximum point award of 50 points. A. Microbiological violation 40

B. Nitrate or nitrite MCL exceedance 25

C. Lead and Copper Rule action level exceedance 20

D. Turbidity exceedance 20

E. Non-compliance with SWTR, ISWTR, ESWTR, GWDR, GWUDI or currently applicable regulation 25

F. MCL exceedances of regulated contaminants (not mentioned above)

1. 1 contaminant 10

2. 2 to 4 contaminants 20

3. >4 contaminants 40

G. Facility is subject to a compliance issue, enforcement action and/or enforcement referral. 30 Compliance Issues Points

32

Available Points Points Received III. SYSTEM DEFICIENCIES

Points will be awarded for system deficiencies that may affect public health or the ability to comply with SDWA. Points will be awarded to a project from only one of the three categories below. A. Distribution system

1. Distribution system equipment is deteriorated and results in numerous or serious leaks, and/or creates 20 a cross-contamination potential.

2. Applicable disinfectant residual maintenance requirements are not met. 20 3. Project will replace unsafe materials. 10

4. Minimum normal operating pressure is not met (35 psi). 5

5. Distribution system is inadequate to meet existing demands. 5

B. Treatment System

1. Treatment system cannot consistently meet log removal requirements and/or turbidity standards. 25

2. Treatment system is subject to impending failure or has failed. 25

3. The required disinfection systems are not installed or are inadequate. 20

4. Treatment system equipment does not meet the requirements of Wyoming Water Quality Rules and 10 Regulations Chapter 12.

5. System equipment is projected to become inadequate without 5 upgrades within 5 years.

C. Storage System

1. Storage system is subject to impending failure, has failed, cannot be easily cleaned, or subject to 20 contamination.

2. Applicable contact time requirements cannot be met without an upgrade. 20

3. System suffers from low static pressures. 15

4. Storage system demand exceeds 90% of storage capacity. 10

System Deficiencies Points

33

Available Points Points Received IV. AFFORDABILITY

Points will be awarded based on a project’s affordability.

A. Relative income index: ratio of local annual median household income (AMHI) to the state AMHI.

1. < 50% 15

2. 50%-70% 10

3. 70%-90% 4

4. > 90% 1

B. Relative water rate index: ratio of expected average annual residential user charge for water services resulting from the project, including costs recovered through special assessments, to the local AMHI.

1. > 2.5% 15

2. 2.0% to 2.5% 10

3. 1.5% to 2.0% 6

4. 1.0% to 1.5% 3

5. < 1.0% 1

Affordability Points

POINTS AWARDED

Public Health Issues Points ______Compliance Issues Points ______System Deficiencies Points ______Affordability Points ______

Total Points ______

Population = ______

Note: Population will be used in cases of ties. Smaller systems will be given priority.

34

Appendix 3: Summary of Comments and Responses from Public Meeting

Announcement of Public Meeting for discussion of the Intended Use Plan (IUP). Advertised March 31 in the Casper Star-Tribune and on the DEQ and OSLI websites. e-mail comment from Bill Adsit, Sheridan, 4/18/2019: “As I look at the proposed rating system for loans to groups listed in this proposal, it seems the point system is overly aggressive. Due to the small populations and low incomes in rural areas, this system will potentially have the state funding water and wastewater systems in numbers that will severely impact the state lands budget. I would suggest either changing the number of points for each category, or dropping the 75 percent relief zone.” Comment is noted.

Public Meeting held May 2 as advertised at DEQ office (200 W. 17th St. 2nd floor),

All attendees were the team directly responsible for the administration of the SRF programs (Bill Tillman-DEQ SRF Project Manager, Beth Blackwell-OSLI Grants Manager, Keenan Hendon, representing Wade Verplancke-WWDO SRF Project Manager, Shawn King-OSLI Sr. Grants & Loans Analyst, Stan Miller-DEQ SRF Project Engineer). There were no other attendees.

Discussion was opened for comment on the draft IUP and there was no specific comment regarding the current listings, other than noting that the final numbers for the narrative had been sent over by OSLI and should be incorporated into the final reports in the next few days.

35

2019 WWDC/SWC MEETING SCHEDULE

______

MAY

May 16, 2019 Thursday WWDC/SWC Workshop (Cheyenne) May 17, 2019 Friday WWDC/SWC Joint Meeting (New Level I & II Apps Review/approval) ______

AUGUST

August 14-16, 2019 Wed-Fri WWDC/SWC Workshop/Summer Tour/ Meeting Buffalo, WY ______

OCTOBER

October 1-3, 2019 Tues-Thurs Consultant Selection Interviews (Cheyenne) October 4, 2019 Friday WWDC Meeting, Selection Approval

______

NOVEMBER

November 13, 2019 Wednesday WWDC/SWC Workshop (Casper) November 14-15, 2019 Thurs-Fri WWDC/SWC Joint Meeting (Preliminary Funding Recs prior to WyoLeg)

______