Appendix 10B Project Recommendations

The projects included in the BTMP recommendations are listed by BTMP region, by impact category and by anticipated timeframe for implementation. In addition to this classification, they are organized using the source from which they were collected:

Note: The data in this chapter reflects the current project database as of 11/06/20. Project information is still being updated and/or completed by stakeholders and will be included in the final analysis. Some project information may be incomplete.

10B-1

10.1 El Paso/Santa Teresa/Chihuahua Region

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA Apline City AWOS AWOS Alpine 2022 $150,000 Alpine City Multimodal Short Low Council Budget Replacement replacement/reloc Council Impact Workshop #1 ation 07/07/2020 ELP USA Apline City Lighting Project VASI to PAPI-1 Alpine 2020 - $920,000 Alpine City Multimodal Short Low Council Budget Conversion 2022 Council Impact Workshop #1 07/07/2020 ELP USA Apline City Sealcoat Project Runway sealcoat Alpine 2021 - $1,090,000 Alpine City Multimodal Short Low Council Budget and marking; 2023 Council Impact Workshop #1 Additional 07/07/2020 sealcoating ELP USA Apline City Master Plan Update Airport Alpine 2022 - $150,000 Alpine City Multimodal Short Low Council Budget Master 2023 Council Impact Workshop #1 Plan/Layout Plan 07/07/2020 ELP USA CBP 5-Year Plan El Paso-Bridge of One of CBP's Top El Paso, TX 2024 $114,000,000 CBP Mobility & Medium High (Latest) the Americas, Border Reliability Impact – Site and Crossing/POE Design Phase I Design Projects on Tx-Mx Border in latest 5-year plan ELP USA New-Added Low Cost / High Low Cost / High Impact 2025 $2,000,000 CBP Asset Medium Medium Projects Impact improvements at the Santa Teresa Preservation Impact improvements at LPOE the Santa Teresa LPOE ELP USA New-Added Expansion and Expansion and Modernization of the 2030 $15,000,000 CBP Mobility & Medium Medium Projects Modernization of Santa Teresa LPOE Reliability Impact the Santa Teresa LPOE ELP USA Bridges Steering Vehicle dividers Repair vehicle Ysleta $500,000 CBP Mobility & Short Medium Committee lane dividers on Reliability Impact bridge (US) ELP USA Bridges Steering Vehicle lane Improve vehicle Ysleta $500,000 CBP Safety Short Medium Committee striping lane striping after Impact CBP secondary inspection (NB) ELP USA Bridges Steering Additional Additional primary BOTA $5,000,000 CBP Mobility & Medium High Committee pedestrian lanes inspection lanes Reliability Impact for pedestrians (US)

10B-2

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA Bridges Steering Signage for Improved signage BOTA $500,000 CBP Mobility & Medium High Committee pedestrians and instructions Reliability Impact for primary inspection procedures for pedestrians ELP USA Bridges Steering Dedicated sentri Have a dedicated Ysleta $5,000,000 CBP Mobility & Medium Medium Committee lane exit sentri lane to exit Reliability Impact the port (US, NB) ELP USA Bridges Steering Secondary Traffic flow BOTA $25,000,000 CBP Safety Medium High Committee inspection area conflicts within Impact improvements secondary inspection areas ELP USA Bridges Steering Stacked primary Stacked booths at Ysleta, Paso $100,000,000 CBP Mobility & Long High Committee inspection CBP primary del Norte, Reliability Impact booths BOTA ELP USA Bridges Steering Redesign CBP Redesign CBP Ysleta, BOTA $150,000,000 CBP Mobility & Long High Committee facilities for facilities to add Reliability Impact additional more primary capacity inspection booths ELP USA Texas Priority El Paso Priority El Paso, TX TBD CBP Mobility & Long High LPOE Project improvements at Reliability Impact (Submitted by BOTA POE MP), CBP 5-Year Plan (Latest) ELP USA Texas Priority El Paso Priority El Paso, TX TBD CBP Mobility & Long High LPOE Project improvements at Reliability Impact (Submitted by Stanton POE MP), CBP 5-Year Plan (Latest) ELP USA Texas Priority Presidio Priority Presidio, TX TBD CBP Mobility & Long Medium LPOE Project improvements at Reliability Impact (Submitted by Presidio POE MP), CBP 5-Year Plan (Latest) ELP USA CBP 5-Year Plan El Paso - Stanton One of CBP's Top El Paso, TX TBD CBP Mobility & Long High (Latest) Border Reliability Impact Crossing/POE Design Projects on Tx-Mx Border in latest 5-year plan ELP USA New-Added Gold Avenue Signal Gold Avenue 2025 $750,000 City of Safety Medium Medium Projects Improvements Deming Impact ELP USA New-Added Gold Avenue I-10 / Local Gold Avenue 2030 not provided City of Connectivity Medium Medium Projects Access Deming Impact Improvements

10B-3

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 92406598 Missouri Street Overpass at Lee to Walnut 2025 $43,009,468 City of El Safety Medium High Railroad Crossing Paso Impact ELP USA El Paso Plans 92406599 Montana Ave. Overpass at Cotton at Palm 2025 $30,721,048 City of El Safety Medium Medium Railroad Crossing Street Paso Impact ELP USA El Paso Plans 92406532 CS Infrastructure (ON GLOBAL 2040 $66,100,752 CITY OF EL Connectivity Long Medium Improvements REACH) US PASO Impact 62/180 MONTANA to SS 601 ELP USA New-Added Intelligent Project Includes: BOTA and 2025 $32,000,000 City of El Safety Medium High Projects Transportation ITS, toll and traffic Ysleta Bridges Paso Impact Systems at management International Ysleta and BOTA systems upgrades Bridges at Ysleta and Department geometric improvements at BOTA. ELP USA 5-Yr. Upgrade Upgrade City of El PDN and 2025 $2,260,199 City of El Mobility & Medium Medium International electronic toll Paso's Stanton Paso Reliability Impact Bridges Capital collection International Bridges International Improvement system Bridge Toll (Downtown El Bridges Program Collection System Paso) Department at the Paso Del Norte and Stanton Bridges to have latest technology and offer bridge crossers multple payment options to include cash, pre-paid accounts, debit/credit, NFC, etc.

10B-4

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA 5-Yr. Redesign SB Redesign the Stanton Bridge 2025 $250,000 City of El Mobility & Medium High International POV/PED lanes existing layout of (Downtown El Paso Reliability Impact Bridges Capital to improve the physical Paso) International Improvement traffic flow at infrastructure Bridges Program Stanton currently in place Department to increase throughput, improve safety measures for both vehicle and pedestrian southbound lanes and help reduce queuing during peak hours. ELP USA 5-Yr. City Toll Booths Improved lane Stanton and 2025 $200,000 City of El Mobility & Medium High International Improvements at assignments, Ysleta Bridges Paso Reliability Impact Bridges Capital YSL and Stanton signage, DMS International Improvement Bridges Program Department ELP USA 5-Yr. Redesign SB DMS/Toll Ysleta Bridge 2025 $100,000 City of El Mobility & Medium High International POV/PED lanes Fares/Lanes Paso Reliability Impact Bridges Capital to improve Open/Exchange International Improvement traffic flow at Rate Information Bridges Program YSL Department ELP USA City of El Paso Redesign Concept layouts Ysleta Bridge 2025 $337,331 City of El Safety Medium High International pedestrian under review. Paso Impact Bridges waiting/pick-up Improve vehicular International Department area at YSL flow. Bridges Department ELP USA City of El Paso Traffic conflicts Rider 49 | I-10 BOTA 2025 $175,000 City of El Safety Medium High International between POV Connect Project Paso Impact Bridges and Cargo International Department (Paisano Dr.-US- Bridges 54) Department ELP USA City of El Paso Improve Overpass, Ysleta Bridge 2025 $150,000 City of El Safety Medium High International pedestrian crosswalks, lights, Paso Impact Bridges safety measures etc International Department along Loop 375 Bridges Department ELP USA New-Added RoadRUNNER Las Cruces, New RoadRUNNER 2025 not provided City of Las Mobility & Medium Medium Projects Transit Mexico Transit Cruces Reliability Impact ELP USA New-Added City of Presidio Parking and rest area on US 67 $1,283,000 City of Safety Long Medium Projects Parking and Presidio Impact Rest Area

10B-5

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 92406607 CS (Nuevo Construct New FM 76 (NORTH 2024 $20,000,000 City of Mobility & Short Medium Rd) Roadway LOOP ROAD) Socorro Reliability Impact TO SH 20 (ALAMEDA AVE.) ELP USA El Paso Plans 92406563 CS Construct New Arterial I 2030 $21,177,883 City of Mobility & Medium Medium Roadway (FUTURE Socorro Reliability Impact BORDER HIGHWAY EAST to IH 10) ELP USA El Paso Sunland Park Construct a new US LPOE in Sunland 2025 $79,300,000 City of Mobility & Medium Medium Stakeholders/Pr LPOE Park, New Mexico with a connection Sunland Park Reliability Impact oposed El Paso to Anapra, Chihuahua. Travel modes MPO Destino include pedestrians and privately 2050 MTP List owned vehicles. ELP USA El Paso Plans 92406599 Montana Ave Overpass at Cotton at Palm 2025 $30,721,048 COEP Safety Short High railroad crossing St Impact ELP USA El Paso Plans 92406598 Missouri St Overpass at Lee to Walnut 2025 $43,009,468 COEP Safety Short High railroad crossing Impact ELP USA Bridges Steering Ysleta Port of Ysleta Port of Ysleta $5,000,000 COEP Mobility & Short Medium Committee Entry Master Entry Master Plan Reliability Impact Plan and and Expansion Expansion Feasibility Study Feasibility Study ELP USA Bridges Steering Intelligent Intelligent Paso del $25,000,000 COEP, TxDOT Mobility & Medium High Committee Transportation Transportation Norte, Stanton Reliability Impact Systems Systems enhancements ELP USA New-Added El Camino Real Bicycle El Camino Real 2050 $15,000,000 Dona Ana Mobility & Long Medium Projects Bicycle Lanes infrastructure / scenic County Reliability Impact lanes highway, approx. 92 miles Sunland Park to Garfield ELP USA New-Added Airport Rd. Dona Ana County International 2021 $342,026 Dona Ana Multimodal Short Medium Projects Sidewalks Jetport County Impact International Jetport ELP USA New-Added Runway 3/21 Runway 3/21 Dona Ana 2026 $500,000 Dona Ana Multimodal Medium Low Projects New Crosswind Construction (new County County Impact Runway 2020- crosswind runway) International International 2026 Jetport Jetport

10B-6

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added Indistrial Ave. Over UPRR 2030 $10,000,000 Dona Ana Multimodal Medium Low Projects Grade County Impact Seperation International Jetport ELP USA New-Added Hwy 9 Pavement NM 136 to County Line 2030 $20,000,000 Dona Ana Multimodal Medium Low Projects Preservation County Impact International Jetport ELP USA New-Added T-hangar Additional hangar Dona Ana not $1,000,000 Dona Ana Multimodal Long Low Projects Construction space for storage County provided County Impact (possible of aircraft International International project) Jetport Jetport ELP USA New-Added DAC New DAC Airport DAC New 2030 not provided Dona Ana Multimodal Medium Medium Projects Runway Runway County, State Impact Aviation Division, FAA ELP USA EPIA CIP Active Realignment & Reconfigure El Paso 2020 $11,554,000 El Paso Mobility & Short Medium Status August Extension of taxiway and International International Reliability Impact 2020 TWY V connectors, add Airport Airport FBO ramp ELP USA EPIA CIP Active Sun Metro BRT Construct BRT bus El Paso 2021 $250,000 El Paso Multimodal Short Medium Status August Station shelter International International Impact 2021 Airport Airport ELP USA EPIA CIP Active Automatic Better tracking of El Paso 2021 $300,000 El Paso Multimodal Short Medium Status August Commercial commercial and International International Impact 2030 Vehicle Tracking rideshare vehicles Airport Airport - Taxis and and trip counts Shuttles ELP USA EPIA CIP Active Cargo Ramp Upgrade ramp El Paso 2022 $1,050,000 El Paso Safety Short Medium Status August Light Upgrade lighting International International Impact 2023 Airport Airport ELP USA EPIA CIP Active Repave GA Replace general El Paso 2022 $2,500,000 El Paso Mobility & Short Medium Status August Ramp aviation ramp International International Reliability Impact 2025 paving Airport Airport ELP USA EPIA CIP Active Relocation of Replace and El Paso 2022 $13,339,165 El Paso Mobility & Short Medium Status August TWY M relocate failing International International Reliability Impact 2026 and out-of-spec Airport Airport taxiway ELP USA EPIA CIP Active Reconstruct TWY Replace and El Paso 2022 $7,000,000 El Paso Mobility & Short Medium Status August "K2" & "J" North reconfigure failing International International Reliability Impact 2029 of TWY "K", and out-of-spec Airport Airport Remove K1, & taxiways New Connector from Ramp to TWY "J"

10B-7

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA EPIA CIP Active Terminal Upgrade ramp El Paso 2022 $1,000,000 El Paso Safety Short Medium Status August Renovation - lighting International International Impact 2031 Terminal Ramp Airport Airport Light Upgrade ELP USA EPIA CIP Active Mill & Replace Rehab pavement El Paso 2023 $12,320,000 El Paso Mobility & Short Medium Status August Runway 8R-26L, runway International International Reliability Impact 2022 Lighting Airport Airport Upgrades & Runway Turn- offs ELP USA EPIA CIP Active RWY 8 APCH / 5- Reconfigure multi- El Paso 2023 $17,758,000 El Paso Mobility & Short Medium Status August Node node taxiway International International Reliability Impact 2027 Intersection intersection Airport Airport Remediation ELP USA EPIA CIP Active Taxiway U from Rehab taxiway El Paso 2024 $1,170,000 El Paso Mobility & Short Medium Status August Customs Ramp pavement International International Reliability Impact 2028 to Twy V (Mill Airport Airport and Overlay) ELP USA EPIA CIP Active Terminal Ramp Rehab terminal El Paso 2025 $10,000,000 El Paso Mobility & Medium Medium Status August Pavement ramp paving International International Reliability Impact 2024 Rehabilitation Airport Airport ELP USA ELP Plans IH 35 Construct new Copia St to $632,000,000 ELP MPO Mobility & Long Medium road Airway Blvd Reliability Impact ELP USA El Paso Plans 92406615 Transit Regional Transit Countywide 2021 $1,139,859 EP County Multimodal Short Medium Assistance FY Impact 2021 ELP USA El Paso Plans 92406612 Transit Regional Transit Countywide 2022 $1,000,000 EP County Multimodal Short Medium Assistance FY Impact 2022 ELP USA El Paso Plans 92406613 Transit Regional Transit Countywide 2023 $2,000,000 EP County Multimodal Short Medium Assistance FY Impact 2023 ELP USA El Paso Plans 92406621 CS (Tierra Este) Construct New PELLICANO 2027 $30,000,000 EP County Connectivity Medium Medium Roadway DRIVE TO Impact COZY COVE AVENUE ELP USA El Paso Plans 92406565 CS Infrastructure (ON JOHN 2029 $17,318,858 EP County Connectivity Medium Medium Improvements HAYES ST) Impact PELLICANO DR to MONTWOOD

10B-8

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Tornillo- Tornillo POE can 31°25'58.3"N 2050 $125,000,000 EP County Mobility & Long Medium Stakeholders Gaudalupe be used more to 106°8'52.5"W Reliability Impact International relieve other Bridge POEs.There is no commercial traffic right now but the bridge [Tornillo] would be a good way to alleviate stress on ELP bridges by routing traffic east. ELP USA New-Added HWY 67 - N & S Truck route to Fort Stockton, not $125,000,000 Fort Stockton Mobility & Long Medium Projects this traffic route all traffic Texas provided EDC / City Reliability Impact already around Fort bypasses Fort Stockton Stockton on IH- 10 ELP USA New-Added HWY 385 - N this Truck route to Fort Stockton, not $125,000,000 Fort Stockton Mobility & Long Low Projects traffic will make route all traffic Texas provided EDC / City Reliability Impact a right turn onto around Fort Gonzales loop Stockton south of Fort Stockton and travel east to HWY 285 turning north and traveling to Business IH-10 taking the split to east bound there they will intersect the current 385 route. The same route will apply for S bound traffic in the other direction

10B-9

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added HWY 285 N Truck route to Fort Stockton, not $40,000,000 Fort Stockton Mobility & Long Medium Projects traffic will take route all traffic Texas provided EDC / City Reliability Impact the split to the around Fort east at Business Stockton IH-10 then make the turn around on onto IH-10 west traveling IH-10 to the 285 N Exit. ELP USA New-Added HWY 285 N Truck route to Fort Stockton, not $40,000,000 Fort Stockton Mobility & Long High Projects traffic will take route all traffic Texas provided EDC / City Reliability Impact the split to the around Fort east at Business Stockton IH-10 then make the turn around on onto IH-10 west traveling IH-10 to the 285 N Exit. ELP USA New-Added NM 11 Dona Ana Road to NM 11 2030 not provided Luna County Connectivity Medium Medium Projects Walnut Street Impact ELP USA Bridges Steering Signage with Signage with BOTA $500,000 Multiple gov't Mobility & Medium High Committee history/informati history/informatio agencies Reliability Impact on on Chamizal n on Chamizal treaty treaty ELP USA Bridges Steering Pedestrian Pedestrian Ysleta $50,000,000 Multiple gov't Safety Medium High Committee improvements at improvements at agencies Impact Ysleta Ysleta ELP USA Bridges Steering Shade canopy at Add a shade BOTA $20,000,000 Multiple gov't Safety Medium High Committee BOTA canopy for agencies Impact pedestrians (US/MX) ELP USA Bridges Steering Dedicated Dedicated bike Ysleta, Paso $10,000,000 Multiple gov't Safety Medium High Committee bicycle lanes lanes on the del Norte, agencies Impact bridge Stanton, BOTA ELP USA Bridges Steering New pedestrian New dedicated Ysleta $150,000,000 Multiple gov't Mobility & Long High Committee bridge at Ysleta pedestrian bridge agencies Reliability Impact (NB/SB) and expand vehicular lanes ELP USA Bridges Steering New pedestrian New dedicated Paso del Norte $150,000,000 Multiple gov't Mobility & Long High Committee bridge pedestrian bridge agencies Reliability Impact downtown (NB/SB) at PDN ELP USA Bridges Steering Reversible lanes Reversible lanes Stanton $50,000,000 Multiple gov't Mobility & Long High Committee during peak hours agencies Reliability Impact

10B-10

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA Bridges Steering Widen/connect Widen/connect BOTA $50,000,000 Multiple gov't Mobility & Long High Committee both bridges to both bridges to agencies Reliability Impact add capacity add capacity

ELP USA TX RRC Pecos Trail 468-mi pipeline to Reeves Co. to 2021 TBD NAmerico Multimodal Short Medium carry Natural Gas Agua Dulce Partners Impact to Corpus Christi Hub, TX ELP USA New-Added New Rail LPOE New Rail LPOE in 2050 $471,000,000 NMBA Multimodal Long Medium Projects in Santa Teresa Santa Teresa Impact ELP USA New-Added Interstate 10, Mile 49 Interstate 10, 2025 $6,000,000 NMDOT Asset Medium Medium Projects Hachita Bridge Hachita Bridge Preservation Impact ELP USA New-Added Strauss Road & Construct 600' WB Verde Logistics 2030 $100,000 NMDOT Safety Medium Low Projects Road 2A right-turn lane Industrial Park Impact ELP USA New-Added McNutt Road Addition of Center Racetrack to 2030 $5,285,000 NMDOT Safety Long Medium Projects Turn Lane On Courchesne Impact Mcnutt Rd (NM Bridge 273) and Widen From 2 Lanes To 4 where is not 4 Lanes today ELP USA New-Added Sunland Park Construct 4-Lane McNutt Road 2030 $21,597,000 NMDOT Connectivity Medium Medium Projects Drive Divided Principal (NM 273) to Impact Arterial with Grade Proposed Separation at Sunland Park UPRR tracks POE Site and Border Crossing ELP USA New-Added Grade Grade Separation At NM 2030 $16,423,000 NMDOT Safety Medium Medium Projects Separation At at Pete Domenici 136/NM 273 Impact NM 136/NM and McNutt 273 Intersection ELP USA New-Added Industrial Drive Widen Industrial Airport Road to 2030 $1,000,000 NMDOT Connectivity Medium Medium Projects Drive to 4 lanes Strauss Road Impact with center- turn lane through intersection and construct 150' SB right-turn lane ELP USA New-Added Airport Road & Signalization Verde Logistics 2030 $500,000 NMDOT Safety Medium Medium Projects Industrial Drive Industrial Park Impact ELP USA New-Added DAC New New 'Cross-wind' DAC Airport 2030 $35,000,000 NMDOT Multimodal Medium Medium Projects Runway Runway Impact ELP USA New-Added Sunland Park Widening of Widening to 6 2030 TBD NMDOT Connectivity Medium Medium Projects Drive between Anapra lanes Impact Road and the Texas state line

10B-11

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added NM136 at every Interchanges & 2030 TBD NMDOT Safety Medium Medium Projects intersection on Overpasses Impact NM136 from LPOE to State Line Connection with TX178 (ArtCraft) ELP USA New-Added NM136 Cargo SB lanes Reconstruction 2030 TBD NMDOT Mobility & Medium Medium Projects from NM 136 fork of road Reliability Impact to LPOE and POV's sections lanes from LPOE to Binational both NB and SB ELP USA New-Added McNutt Road Racetrack to McNutt Road 2030 $15,000,000 NMDOT Connectivity Medium Medium Projects Corishain Bridge Impact ELP USA New-Added Grade At NM 136/NM Grade 2030 $60,000,000 NMDOT Safety Medium Medium Projects Separation At 273 Separation At Impact NM 136/NM NM 136/NM 273 273 ELP USA New-Added Interstate 10 Exit 85 and Interstate 10 2030 TBD NMDOT Mobility & Medium Medium Projects Interstate 10 Reliability Impact ELP USA New-Added High Mesa Road Construct road on NM 136 near 2050 $73,000,000 NMDOT Connectivity Long Medium Projects -West Mesa West Mesa Santa Teresa Impact (Proposed) parallel to I-10 Airport to I-10 between Santa Teresa and Las Cruces ELP USA New-Added Strauss Road & Signalization and Verde Logistics 2050 $500,000 NMDOT Safety Long Medium Projects Road 2A addition of 2nd SB Industrial Park Impact left-turn lane as the 200' storage for both lanes. Construct 2nd EB through lane on Strauss through 2A ELP USA New-Added Futurity Drive Construct Racetrack to 2050 $4,000,000 NMDOT Connectivity Long Medium Projects Roadway McNutt (NM Impact 273) ELP USA New-Added El Camino Real Construct 92 Sunland Park 2050 $13,000,000 NMDOT Multimodal Long Medium Projects Miles of bike lanes to Garfield Impact (only include the 10 miles within the Focus Area)

10B-12

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added St. Francis Drive New roadway New roadway 2050 $25,000,000 NMDOT Connectivity Long Medium Projects Extension connection Impact (Border Highway between NM136 Connector) and NM273; near I-10 and TX375 ELP USA New-Added NM 404/213 Reconstruction (Borderland $44,400,000 NMDOT Connectivity Short Medium Projects Expressway) Impact ELP USA New-Added Traffic Signals at Traffic Signals NM 273 / $1,300,000 NMDOT Connectivity Medium Low Projects NM 273 / Airport Rd. Impact Airport Rd ELP USA New-Added NM 9 NM 136 to NM 81 NM 136 to NM $206,000,000 NMDOT Connectivity Medium Low Projects Reconstruction 81 Impact ELP USA New-Added Strauss Road & Verde Logistics Strauss Road 2030 TBD NMDOT, Connectivity Medium Medium Projects Road 2A Industrial Park & Road 2A Dona Ana Impact County ELP USA New-Added High Mesa Road NM 136 near High Mesa 2050 not provided NMDOT, Connectivity Long Medium Projects (Proposed) Santa Teresa Road Dona Ana Impact Airport to I-10 (Proposed) County ELP USA New-Added Strauss Road & Verde Logistics Strauss Road 2050 TBD NMDOT, Connectivity Long Medium Projects Road 2A Industrial Park & Road 2A Dona Ana Impact County ELP USA New-Added Sunland Park McNutt Road (NM Sunland Park 2030 TBD NMDOT, Connectivity Medium Medium Projects Drive 273) to Proposed Drive Sunland Park Impact Sunland Park POE Site and Border Crossing ELP USA New-Added Commuter Rail; 2050 $430,000,000 Not provided Multimodal Long Medium Projects Las Cruces, New Impact Mexico, to El Paso, Texas ELP USA New-Added La Union Road 2050 $50,000,000 Not provided Safety Long Medium Projects (A020); Impact Realignment and relocation of at-grade crossing 2.7 miles to the NW ELP USA New-Added Denver to El 2050 TBD Not provided Multimodal Long Medium Projects Paso High-Speed Impact Rail ELP USA New-Added Presidio Lely Various - Please Various - TBD Presidio Multimodal Long Low Projects Improvements provide additional Please provide County Impact information locations

10B-13

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added San Angelo Rail Rail Infrastructure See PDF 2050 $6,500,000 San Angelo Multimodal Long Low Projects Park attachment to EDC Impact email ELP USA Doña Ana Runway Land Acquisition, Santa Teresa 2021 - $4,600,000 Santa Teresa Multimodal Medium Low County Improvement Design and 2025 International Impact International Construction of Airports Jetport Master Crosswind Runway Plan 03 - 21 ELP USA El Paso Plans Transit Center Construct a new Downtown 2025 $37,672,754 Sun Metro Mobility & Medium Medium for Intercity and terminal to area Reliability Impact International consolidate local, Transit intercity and cross-border private and public transit services. ELP USA El Paso Plans Far East Provide express From Zaragoza 2025 $7,907,591 Sun Metro Mobility & Medium Medium Connector- bus services Int'l crossing Reliability Impact Express bus between Zaragoza To US62/180 service international Montana Av.). crossing to US62/180 (Montana Av.), include construction of new Park 'n Ride on FM659 (Zaragoza) @ Pellicano Blvd.) ELP USA El Paso International Construct a new From Stanton 2030 $131,794,418 Sun Metro Connectivity Medium High Stakeholders Pedestrian international St. Bridge To Impact Crossing bridge crossing to Santa Fe St. move pedestrians Bridge through downtown bridges and connect to transit service. ELP USA El Paso Streetcar Phase Extension From 2030 $136,124,473 Sun Metro Mobility & Medium High Stakeholders II - Downtown to streetcar route to Downtown Reliability Impact MCA MCA, Texas Tech, Terminal at Foster School Santa Fe St. to area. Alameda Av. / Colfax St. ELP USA New-Added Futurity Drive Racetrack to Futurity Drive 2050 not provided Sunland Park Mobility & Long Medium Projects McNutt (NM 273) Reliability Impact

10B-14

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added St. Francis Drive New roadway St. Francis 2050 not provided Sunland Park Connectivity Long Medium Projects Extension connection Drive Impact between NM 136 Extension and 404; near I- 10 ELP USA New-Added Rio Grande Sunland Park, NM Race Dr. Track FY 2021 $150,000 Sunland Park Multimodal Short Medium Projects Levee Linear to Country Impact Park Trail Club Rd., Phase I A/B ELP USA New-Added St. Francis Dr. Sunland Park, NM Phase IA, B, C, FY 2021 $3,000,000 Sunland Park Connectivity Short Medium Projects Extension D, and Phase II Impact ELP USA New-Added Sunland Park Dr. Sunland Park, NM Phase IC, D, FY 2022 $600,000 Sunland Park Connectivity Short Medium Projects Extension and II Impact ELP USA New-Added Brickland Trail Sunland Park, NM Brickland St. to FY 2022 $150,000 Sunland Park Multimodal Short Medium Projects Mount Cristo Impact Rey, Phase I A, B, C, D, II ELP USA Stakeholders Texas Pacifico Will include From 2021 $8,400,000 Texas Multimodal Short High RR Mainline various planned International Pacifico RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2022 $8,400,000 Texas Multimodal Short High RR Mainline various planned International Pacifico RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2023 $8,400,000 Texas Multimodal Short High RR Mainline various planned International Pacifico RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021

10B-15

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA Stakeholders Texas Pacifico Will include From 2024- $14,700,000 Texas Multimodal Medium High RR Mainline various planned International 2027 Pacifico RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2021 $8,400,000 Texas Pacifio Multimodal Short Medium RR Mainline various planned International RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2022 $8,400,000 Texas Pacifio Multimodal Short Medium RR Mainline various planned International RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2023 $8,400,000 Texas Pacifio Multimodal Short Medium RR Mainline various planned International RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021

10B-16

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA Stakeholders Texas Pacifico Will include 2023 $9,200,000 Texas Pacifio Multimodal Short Medium RR Mainline various planned RR Impact Improvements in improvements to Mexico the RR once the new rail crossing at the Presidio International Bridge has opened for business in early 2021 ELP USA Stakeholders Texas Pacifico Will include From 2024- $14,700,000 Texas Pacifio Multimodal Medium Medium RR Mainline various planned International 2027 RR Impact Improvements in improvements to Border at Texas from new the RR once the Presidio; North Presidio Rail new rail crossing in parallel to Crossing at the Presidio US 67 (Privately funded International improvements) Bridge has opened for business in early 2021 ELP USA El Paso Plans 92406587 CS (DARRNGTON Rehabilitation of Eastlake Blvd. 2022 $13,078,643 Town of Mobility & Short Medium ROAD) Existing Roadway to Oxbow Drive Horizon City Reliability Impact ELP USA El Paso Plans 255202028 SL 375 Construct New SPUR 601 to 2021 $54,034,215 TxDOT Mobility & Short High Road MONTANA AVE Reliability Impact (US 62/180) ELP USA El Paso Plans 255202035 SL 375 Interchange at 1.0 Mi N. of 2021 $5,000,000 TxDOT Connectivity Short Medium Sargent Major Sargent Majr Impact Blvd. Blvd ELP USA El Paso Plans 245102013 RM 652 Roadway Intersection 2021 $51,748,892 TxDOT Asset Short Medium Rehabilitation with FM 1165 Preservation Impact to .91 Mi. W of FM 3541 ELP USA El Paso Plans 212101094 IH 10 Widening 0.22 MI W OF 2021 $170,058,472 TxDOT Safety Short High FM 1905 Impact (ANTONIO ST) to SH 20 (MESA ST) ELP USA El Paso Plans 345101040 FM 1281 Intersection at 2022 $6,000,000 TxDOT Safety Short Low Improvements Darrington/FM Impact 1281 Intersection ELP USA El Paso Plans 212101097 IH 10 Construct frontage roads 2024 $6,000,000 TxDOT Connectivity Short High Impact ELP USA El Paso Plans 41503020 SH 166 Construct frontage roads 2024 $2,402,439 TxDOT Connectivity Short Medium Impact

10B-17

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 41502026 SH 166 Construct frontage roads 2024 $2,755,000 TxDOT Connectivity Short Low Impact ELP USA El Paso Plans 359201009 SH 178 Construct intersection improvements 2025 $193,500,000 TxDOT Safety Medium High Impact ELP USA El Paso Plans 104601021 FM 659 Widening Zaragoza Rd 2025 $36,000,000 TxDOT Safety Medium Medium Segment 3 (LP Impact 375 TO US 62/180) ELP USA El Paso Plans 212102167 IH 10 Frontage Roads Sunland Park 2025 $39,500,000 TxDOT Connectivity Medium High Drive to Impact Executive Center Blvd ELP USA El Paso Plans 212102168 IH 10 Widening SL 478 (Copia) 2025 $355,500,000 TxDOT Mobility & Medium High (Segment 3A) to US 62 Reliability Impact (Paisano Drive) ELP USA El Paso Plans 115805002 FM 2185 New Location END OF STATE 2025 $100,000,000 TxDOT Connectivity Medium Medium MAINTENANCE Impact ON FM 2185 to JUNCTION WITH RM 3541 ELP USA El Paso Plans 92406591 CS Border Hwy East Border 2025 $241,845,760 TxDOT Connectivity Medium Medium (BHE) Phase I Highway East Impact Phase I Loop 375(Americas) to Eastlake / Nuevo Hueco Tanks Extension ELP USA El Paso Plans 10410901 US 67 Infrastructure Safety Core 2025 $1,123,000 TxDOT Safety Short Medium Improvements Improvements Impact Short Term ELP USA El Paso Plans 10410903 US 67 Infrastructure Pavement 2025 $5,829,712 TxDOT Asset Medium Medium Improvements Rehab Short Preservation Impact Term ELP USA El Paso Plans 212102160 IH 10 Construct New SH 20 (MESA 2029 $23,980,000 TxDOT Mobility & Medium High Road STREET) to I- Reliability Impact 10/US 85/SUNLAND PARK INTERCHANGE ELP USA El Paso Plans 104603004 SS601 Infrastructure AIRPORT ROAD 2030 $22,607,708 TxDOT Connectivity Medium Medium improvements to SL 375 Impact (PURPLE HEART HIGHWAY)

10B-18

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 104601020 FM 659 Widening Zaragoza Rd 2030 $50,992,356 TxDOT Safety Medium High segment 2 (I- Impact 10 to LP 375) ELP USA El Paso Plans 212103159 IH 10 Widening Paisano to 2030 $276,500,000 TxDOT Mobility & Medium High (Segment 3B) Airway Reliability Impact ELP USA El Paso Plans 212101102 IH 10 Widening Thorn to 2030 $59,250,000 TxDOT Mobility & Medium High (Segment 1G) Executive Reliability Impact (adaptive lanes) ELP USA El Paso Plans 212103162 IH 10 Widening Airway to 2030 $355,500,000 TxDOT Mobility & Medium High (Segment 3C) Yarbrough Reliability Impact ELP USA El Paso Plans 92406592 CS Border Hwy East Border 2030 $113,987,672 TxDOT Connectivity Medium Medium (BHE) Phase 2 Highway East Impact Phase 2 Eastlake/Nuev o Hueco Tanks Extension to FM 1110 (Clint Rd.) ELP USA El Paso Plans 92406590 CS Construct New Mesa Park 2030 $12,787,435 TxDOT Connectivity Medium Medium Roadway Extension from Impact I-10 to Doniphan Drive ELP USA El Paso Plans 37402116 US 62 Direct Connectors Direct 2030 $128,170,618 TxDOT Connectivity Medium High Connectors at Impact Loop 375 and Global Reach ELP USA El Paso Plans 201103 SH 20 Widening SH 20 2030 $1,400,000 TxDOT Safety Medium Medium Roadway & Impact Interchanges Improvement (Old Pueblo to Candelaria) ELP USA El Paso Plans 201104 SH 20 Widening SH 20 2030 $32,900,000 TxDOT Safety Medium High Roadway & Impact interchanges Improvements (Texas to Delta) ELP USA El Paso Plans 101105 SH 20 Widening SH 20 2030 $45,100,000 TxDOT Connectivity Medium High Roadway & Impact interchanges Improvements (Delta to Prado)

10B-19

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 202058 SH 20 Widening Loop 375 2030 $81,508,485 TxDOT Connectivity Medium High (Americas Impact Ave.) to FM 1110 (Clint Rd.) ELP USA El Paso Plans 16701129 US 54 Construct FM 2529 2030 $265,173,347 TxDOT Mobility & Medium Medium Mainlanes (McCombs) to Reliability Impact TX/NM Stateline ELP USA El Paso Plans 345101045 FM 1281 Widen Roadway FM 76 (NORTH 2030 $2,602,783 TxDOT Safety Medium High LOOP) to I-10 Impact ELP USA El Paso Plans 10410900 US 67 Infrastructure ITS Core 2030 $29,000,000 TxDOT Safety Medium Medium Improvements Improvements Impact ELP USA El Paso Plans 10410904 US 67 Infrastructure Bike and Ped 2030 $6,500,000 TxDOT Multimodal Medium Medium Improvements Facilites Impact ELP USA Texas Freight 104603005 Spur 601 at LP Construction of El Paso 2031 $33,931,000 TxDOT Mobility & Medium Medium Mobility Plan 375 NB-WB, and EB-SB Reliability Impact 2018, Appendix Direct Connectors F on Spur 601 @ Loop 375 ELP USA El Paso Plans 10410901 US 67 Infrastructure Safety Core 2035 $79,555,550 TxDOT Safety Long Medium Improvements Improvements Impact Mid Term ELP USA El Paso Plans 10410903 US 67 Infrastructure Pavement 2035 $226,270,288 TxDOT Asset Long Medium Improvements Rehab Long Preservation Impact term ELP USA El Paso Plans 104603005 SS 601 Construct Direct SPUR 601 @ 2040 $23,931,284 TxDOT Safety Long Low Connectors LP 375 Impact ELP USA El Paso Plans 104601022 FM 659 Widening Zaragoza Rd 2040 $8,635,803 TxDOT Safety Long High Segment 1 (NL Impact to I-10) ELP USA El Paso Plans 212103163 IH 10 Widening Yarbrough to 2040 $276,500,000 TxDOT Safety Long High (Segment 3D1) FM 659 Impact ELP USA El Paso Plans 212104119 IH 10 Widening FM 659 to 2040 $276,500,000 TxDOT Mobility & Long High (Segment 3D2) Eastlake Reliability Impact ELP USA El Paso Plans 255204051 SL 375 Construct SL 375 at US 2040 $21,652,025 TxDOT Safety Long Medium Eastbound Ramps 62 Impact ELP USA El Paso Plans 37402102 US 62 Widening FM 659 2040 $26,647,619 TxDOT Connectivity Long Medium (ZARAGOZA Impact ROAD) to DESERT STORM ROAD

10B-20

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 212104113 IH 10 Widening IH10 Widening 2040 $102,700,000 TxDOT Mobility & Long High (FM1281 to Reliability Impact FM1110) ELP USA El Paso Plans 212104115 IH 10 Build Frontage FM 1110 to 2040 $118,500,000 TxDOT Connectivity Long High Roads FM 3380 Impact ELP USA El Paso Plans 212104116 IH 10 Widening FM 1110 to 2040 $189,600,000 TxDOT Mobility & Long High FM 3380 Reliability Impact ELP USA El Paso Plans 212104117 IH 10 Infrastructure I-10 2040 $141,100,000 TxDOT Mobility & Long High Improvements Reconstruction Reliability Impact (EASTLAKE BLVD to FM 1281 (HORIZON BLVD)) ELP USA El Paso Plans 212103146 IH 10 Pendale LEE TREVINO 2040 $16,820,000 TxDOT Safety Long High Interchange @ I- to EAST OF FM Impact 10 659 (ZARAGOZA RD) ELP USA El Paso Plans 128101019 FM 1110 New Road FM 1110 Clint 2040 $53,871,454 TxDOT Connectivity Long Medium Road Build Impact ELP USA El Paso Plans 101067 SH 20 Widening Widen to 6 2040 $23,600,000 TxDOT Connectivity Long Medium lanes divided, Impact SH 20 Roadway & interchanges Improvements (Redd to Mesa) ELP USA El Paso Plans 102073 SH 20 Widening Widen to 6 2040 $46,810,000 TxDOT Connectivity Long Medium lanes divided, Impact SH 20 Roadway & interchanges Improvements (Mesa to Sunland Park) ELP USA El Paso Plans 345101037 FM 1281 Widen Roadway I-10 to 2040 $31,356,046 TxDOT Safety Long High Ascencion Impact ELP USA El Paso Plans 66501012 FM 3255 Infrastructure TX/NM 2040 $27,687,712 TxDOT Connectivity Long Low Improvements Stateline to Impact Loma Real Ave. ELP USA El Paso Plans 10410901 US 67 Infrastructure Safety Core 2040 $231,358,000 TxDOT Safety Long Medium Improvements Improvements Impact Long Term

10B-21

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 10410902 US 67 Infrastructure Intersection 2040 $65,000,000 TxDOT Safety Long Medium Improvements Improvements Impact ELP USA El Paso Plans 10410905 US 67 Infrastructure Alternative 2040 $13,600,000 TxDOT Safety Long Medium Improvements intersection Impact concept ELP USA El Paso Plans 345101046 FM 1281 Widen Roadway FM 1281 at I- 2050 $13,608,118 TxDOT Safety Short High 10 Impact ELP USA El Paso Plans 16701117 US 54 Construct Ramps FM 3255 2050+ $5,000,000 TxDOT Safety Long Medium (MARTIN Impact LUTHER KING BLVD) to SEAN HAGGERTY ELP USA El Paso Plans 37402102 US 62 Construct New FM 659 2050+ $21,060,000 TxDOT Mobility & Long Medium Road (ZARAGOZA Reliability Impact ROAD) to DESERT STORM ROAD ELP USA Bridges Steering Redesign Redesign BOTA $10,000,000 TxDOT Safety Medium High Committee pedestrian pedestrian Impact waiting/pick-up waiting/pick-up area area to improve vehicular flow (US) ELP USA El Paso Plans 37407027 US 62 Construct New 3.715 MI W OF 2021 $34,996,200 TxDOT Design Mobility & Short Medium Road FM 1437 to Reliability Impact HUDSPETH/CU LBERSON CO LINE ELP USA El Paso Plans 37406022 US 62 Construct New 2.04 MI E OF 2022 $27,203,400 TxDOT Design Mobility & Short Medium Road FM 2317 to Reliability Impact 6.17 MI E OF RM 1111 ELP USA El Paso Plans 37405026 US 62 Construct New 13.608 MI E 2022 $25,141,300 TxDOT Design Mobility & Short Medium Road OF EL Reliability Impact PASO/HUDSPE TH CL to 2.04 MI E OF FM 2317 ELP USA El Paso Plans 212104114 IH 10 Widen Road - Add EASTLAKE 2022 $8,500,000 TxDOT Design Mobility & Short High Lanes BLVD to FM Reliability Impact 1281 (HORIZON BLVD)

10B-22

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 37402100 US 62 Construct New GLOBAL 2026 $146,583,777 TxDOT Design Mobility & Medium High Road REACH DR to Reliability Impact FM 659 (ZARAGOZA RD) ELP USA El Paso Plans 255202029 SL 375 Construct New SPUR 601 to 2026 $33,885,000 TxDOT Design Mobility & Medium Medium Road DYER (BU 54A) Reliability Impact ELP USA El Paso Plans 212102166 IH 10 Construct New EXECUTIVE 2029 $750,500,000 TxDOT Design Mobility & Medium High Road CENTER BLVD Reliability Impact to SL 478 (COPIA ST) ELP USA El Paso Plans 128101017 FM 1110 Infrastructure SH 20 2029 $29,500,000 TxDOT Design Safety Medium Medium Improvements (ALAMEDA Impact AVE) to FM 76 (NORTH LOOP) ELP USA El Paso Plans 128102007 FM 1110 Infrastructure FM 76 (NORTH 2029 $5,500,000 TxDOT Design Safety Medium Medium Improvements LOOP) to I-10 Impact ELP USA El Paso Plans 212103146 IH 10 Infrastructure LEE TREVINO 2040 $16,820,000 TxDOT Design Safety Medium High Improvements, to EAST OF FM Impact Pendale 659 Interchange at IH- (ZARAGOZA 10 RD) ELP USA El Paso Plans 92406136 VA Infrastructure 1.8 MI EAST 2050+ $296,189,217 TxDOT Design Safety Long Medium Improvements OF RAILROAD Impact DR OVRPASS@ TEX/NM STATE LINE ON FM 3255 ELP USA El Paso Plans 37404032 US 62 Construct New 0.5 MI W OF 2050+ $23,983,600 TxDOT Design Mobility & Long Low Road EL Reliability Impact PASO/HUDSPE TH CL to 13.608 MI E OF EL PASO/HUDSPE TH CL ELP USA El Paso Plans 23302028 US 62 Construct New 0.11 MI W OF 2050+ $14,875,000 TxDOT Design Mobility & Long Low Road RM 54 Reliability Impact INTERSECTION to 8.64 MI E OF RM 54 INTERSECTION

10B-23

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA El Paso Plans 37408022 US 62 Construct New 0.15 MI W OF 2050+ $8,173,600 TxDOT Design Mobility & Long Low Road HUDSPETH/CU Reliability Impact LBERSON CL to 0.11 MI W OF RM 54 INTERSECTION ELP USA El Paso Plans 23301047 US 62 Construct New 8.64 MI E OF 2050+ $36,500,000 TxDOT Design Mobility & Long Low Road RM 54 Reliability Impact INTERSECTION to NEW MEXICO STATE LINE ELP USA CBP El Paso STA Expansion STA Expansion of Stanton $2,319,109 U.S. Customs Mobility & Long High Field Office of passenger passenger and Border Reliability Impact secondary area secondary area for Protection for processing processing Adverse Actions Adverse Actions ELP USA CBP El Paso STA Upgrade STA Upgrade Stanton $115,000 U.S. Customs Safety Long High Field Office lighting pre- lighting pre- and Border Impact primary/second primary/secondar Protection ary cargo area y cargo area ELP USA CBP El Paso BOTA Port BOTA Port BOTA $700,000,000 U.S. Customs Mobility & Long High Field Office Modernization Modernization and Border Reliability Impact Expansion Expansion Protection ELP USA CBP El Paso Presidio POE - Presidio POE - Presidio $100,000 U.S. Customs Mobility & Long Medium Field Office Cargo Exit Booth Cargo Exit Booth and Border Reliability Impact Protection ELP USA CBP El Paso LED signage for LED signage for Santa Teresa $300,000 U.S. Customs Safety Long Low Field Office Santa Teresa Santa Teresa and Border Impact Protection ELP USA CBP El Paso Marcelino Serna Marcelino Serna Tornillo $300,000 U.S. Customs Safety Long High Field Office (Tornillo) (Tornillo) Replace and Border Impact Replace LED LED Signage at Protection Signage at Primary Lanes Primary Lanes ELP USA CBP El Paso Ft. Hancock - Ft. Hancock - Ft. Hancock $600,000 U.S. Customs Mobility & Long Medium Field Office Request for Request for and Border Reliability Impact Outbound Outbound Protection Infrastructure Infrastructure ELP USA CBP El Paso Presidio Cargo Presidio Cargo Presidio $2,000,000 U.S. Customs Mobility & Long Medium Field Office expansion. expansion. and Border Reliability Impact Protection ELP USA CBP El Paso Santa Teresa Santa Teresa Santa Teresa $2,100,000 U.S. Customs Mobility & Long Low Field Office expansion of expansion of and Border Reliability Impact cargo area. cargo area. Protection

10B-24

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA CBP El Paso Santa Teresa Santa Teresa Santa Teresa $2,100,000 U.S. Customs Mobility & Long Low Field Office expansion of expansion of and Border Reliability Impact passenger passenger Protection processing area. processing area. PVP PVP ELP USA CBP El Paso Santa Teresa Santa Teresa POE Santa Teresa $115,696 U.S. Customs Safety Long Medium Field Office POE - Stadium - Stadium Lighting and Border Impact Lighting in in Entry/Exit Protection Entry/Exit through out the through out the port to brighten port to brighten poorly lit areas in poorly lit areas PVP and Cargo as in PVP and well as Export Cargo as well as facility Export facility ELP USA CBP El Paso YSL Cargo - Add YSL Cargo - Add Ysleta $156,047 U.S. Customs Safety Long Medium Field Office lighting to the lighting to the Exit and Border Impact Exit Canopy Canopy facing the Protection facing the commercial traffic, commercial add light poles at traffic, add light the same location, poles at the up to the exit gate. same location, up to the exit gate. ELP USA CBP El Paso Presidio POE - Presidio POE - Presidio $1,000,000 U.S. Customs Mobility & Long Medium Field Office Change Change Approach and Border Reliability Impact Approach to to Inbound Lanes Protection Inbound Lanes and widen turn, and widen turn, create Off-Loading create Off- Zone and Parking Loading Zone Area for and Parking Commercial Area for passenger busses Commercial and SENTRI passenger inbound traffic busses and applicants. SENTRI inbound traffic applicants. ELP USA CBP El Paso Santa Teresa - Santa Teresa - Santa Teresa $120,000 U.S. Customs Mobility & Long Low Field Office Correct the turn Correct the turn and Border Reliability Impact radius at the radius at the Protection entrance of the entrance of the import cargo import cargo dock. dock.

10B-25

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA CBP El Paso Ysleta POE Ysleta POE Ysleta $300,000 U.S. Customs Safety Long High Field Office Additional high Additional high and Border Impact mast lighting mast lighting Protection through out the through out the Port Port ELP USA CBP El Paso Presidio - Presidio - Presidio $300,000 U.S. Customs Mobility & Long Medium Field Office additional additional parking and Border Reliability Impact parking to to address Protection address pending pending bi- bi-national national programs. East programs. East side of Port and side of Port and relocation of relocation of present public present public parking area. parking area. ELP USA CBP El Paso Presidio Presidio Presidio $340,000 U.S. Customs Safety Long Medium Field Office Relocation of Relocation of and Border Impact fence line next fence line next to Protection to highway, highway, additional additional concrete to concrete to roadway and roadway and addition of addition of sidewalks. Area sidewalks. Area for commercial for commercial buses to unload. buses to unload. ELP USA CBP El Paso Paso Del Nort Paso Del Norte Paso del $500,000 U.S. Customs Safety Long High Field Office and BOTA and BOTA Norte, BOTA and Border Impact permanent permanent Protection lighting at top of lighting at top of bridge bridge

ELP USA TX Tornillo Sidewalk Construct Tornillo 0 $2,209,580 US DOT Mobility & Long Medium Transportation sidewalks in Reliability Impact Commission Tornillo North, and Minute Order South 01.30.2020 ELP USA El Paso Plans 92406606 CS Valley Chile Infrastructure SH 20 2023 $7,000,000 Village of Mobility & Short High Road Improvements (Doniphan Vinton Reliability Impact Drive) to IH-10 ELP USA TX RRC Agua Blanca allows for Culberson, projected TBD White Water Multimodal Short Medium Expansion increased volumes Loving, Pecos, completio Midstream Impact Project with state Reeves, n 2021 expansion Winkler, Ward Counties

10B-26

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP USA New-Added City Street Various Locations Various - 2030+ $5,836,916 Connectivity Long Medium Projects Improvements Please provide Impact street locations ELP USA New-Added Presidio Port of Presidio LPOE Presidio LPOE $140,000,000 Mobility & Long Medium Projects Entry Reliability Impact Improvements ELP USA New-Added Presidio Rail Presidio Rail Presidio Rail $33,000,000 Multimodal Short Medium Projects Port of Entry Bridge Bridge Impact Improvements ELP USA New-Added Unified Cargo Presidio LPOE Presidio LPOE $30,000,000 Mobility & Long Medium Projects Processing Reliability Impact Infrastructure ELP USA New-Added Utopia Relief Utopia Relief Route $11,300,000 Mobility & Long Low Projects Route Reliability Impact ELP USA New-Added Ranch Rd. Relief Ranch Rd. Relief Route TBD Mobility & Long Medium Projects Route Reliability Impact ELP USA New-Added Port of Entry Port of Entry Congestion Relief $6,800,000 Mobility & Long Medium Projects Congestion Reliability Impact Relief ELP USA New-Added Port of Entry Port of Entry Parking Area $1,900,000 Safety Long Medium Projects Parking Area Impact (Smart Parking) ELP USA New-Added FM 170 At Utopia St and At Utopia St $850,000 Safety Long Low Projects Intersection US 67 intersection and US 67 Impact Improvements intersection ELP USA New-Added City Street Sidewalks, Various - TBD Safety Long Medium Projects Improvements lighting, and Please provide Impact crosswalks at locations various locations ELP Mexico El Paso El Paso - Stanton Priority El Paso TBD City of El Mobility & Long High Stakeholders Street LPOE improvements at Stanton Street Paso Reliability Impact Stanton Street POE ELP Mexico Stakeholders Ferromex Will include From 2023 $9,200,000 Ferromex Multimodal Short High Mainline (Q Line) various planned International Impact Improvements in improvements to border in Mexico (Privately the RR once the Ojinaga; South funded new rail crossing towards improvements) at the Presidio Chihuahua International Bridge has opened for business in early 2021

10B-27

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP Mexico Bridges Steering Toll collection Add automated Ysleta $5,000,000 Fideicomiso Mobility & Short High Committee system upgrade payment for cars Reliability Impact (MX) in the Mexican side (not only for Sentri lane) ELP Mexico Bridges Steering Intelligent Include ITS for the Ysleta $5,000,000 Fideicomiso Mobility & Short High Committee Transportation Mexican side to be Reliability Impact Systems (MX) aware of waiting crossing times and traffic ELP Mexico Bridges Steering Third pedestrian Add a third Ysleta $1,000,000 Fideicomiso Mobility & Medium High Committee NB booth pedestrian NB Reliability Impact booth (MX) ELP Mexico Bridges Steering Ave. Universidad Traffic conflicts at BOTA $5,000,000 Juarez Safety Medium High Committee safety intersection of Impact improvements Ave. Universidad (POV/Cargo) ELP Mexico Bridges Steering K-9 inspection Reconfiguration of BOTA $10,000,000 Juarez Mobility & Medium High Committee area redesign K-9 inspection Reliability Impact areas in Juarez, Mexico ELP Mexico Bridges Steering Extend Ready Extend Ready Ysleta, Paso $20,000,000 Juarez Mobility & Medium High Committee Lane Lane segregation del Norte, Reliability Impact segregation further into BOTA Juarez, Mexico ELP Mexico Bridges Steering Redesigned SB Redesigned SB Stanton, BOTA $50,000,000 SAT Mobility & Long High Committee POV inspection POV inspection Reliability Impact area and traffic area and traffic flow (MX) flow (MX) ELP Mexico SCT NA Eastern Highway Construction of a Eastern part of 2024 $154,468,000 SCT Mobility & Medium High Bypass in Cd. Highway Bypass in city to link to Reliability Impact Juarez Cd. Juarez Guadalupe- Tornillo border crossing ELP Mexico SCT NA Anapra-Sunland New border crossing (medium term) 2025 TBD SCT Mobility & Medium High Park border Reliability Impact crossing ELP Mexico El Paso Ciudad Juarez Ciudad Juarez Airport investment 2021- $16,284,000 SCT Multimodal Short High Stakeholders Airport program. Part of the National 2022 Impact investment Infrastructure Investment Agreement program ELP Mexico SCT Modernization of Modernization of the San Jeronimo 2023- $73,600,000 SCT Multimodal Short High the San Border Port and Ciudad Juarez 2024 Impact Jeronimo Border railway. Part of the National Port and Ciudad Infrastructure Investment Agreement Juarez railway

10B-28

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP Mexico El Paso Topolobampo Topolobampo multimodal Corridor $ SCT Mobility & Long High Stakeholders multimodal (improvements in the states of 1,024,512,000 Reliability Impact Corridor Sinaloa and Chihuahua)

ELP Mexico SCT NA Samalayuca-San Ciudad Juárez railway bypass TBD SCT Mobility & Medium High Jerónimo railway (medium term) Reliability Impact bypass ELP Mexico El Paso Bike Mobility Bike Mobility Strategy TBD State Govt of Multimodal Long High Stakeholders Strategy Chihuahua Impact ELP Mexico El Paso Trunk Route 2 – Trunk Route 2 – International Airport TBD State Govt of Connectivity Long High Stakeholders International to Helio Street (Length 20.1 km) Chihuahua Impact Airport to Helio Street ELP Mexico El Paso Modernization Modernization Trunk Route 1 (14 TBD State Govt of Connectivity Long High Stakeholders Trunk Route 1) Stations on Juan Gabriel Road Axis) Chihuahua Impact

ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Ejercito Nacional Ejercito Nacional Ave and Francisco Chihuahua Impact Ave and Villarreal Torres Ave East Francisco Villarreal Torres Ave East ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Ejercito Nacional Ejercito Nacional Ave and Francisco Chihuahua Impact Ave and Villarreal Torres Ave West Francisco Villarreal Torres Ave West ELP Mexico El Paso Underpass in S. Construction of an underpass in S. TBD State Govt of Safety Long High Stakeholders Troncoso Ave Troncoso Ave and De las Torres Ave Chihuahua Impact and De las East Torres Ave East ELP Mexico El Paso Underpass in S. Construction of an underpass in S. TBD State Govt of Safety Long High Stakeholders Troncoso Ave Troncoso Ave and De las Torres Ave Chihuahua Impact and De las West Torres Ave West ELP Mexico El Paso Underpass Construction of an underpass TBD State Govt of Safety Long High Stakeholders Aldabas St and Aldabas St and Francisco Villarreal Chihuahua Impact Francisco Torres Ave in Juarez East Villarreal Torres Ave in Juarez East

10B-29

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP Mexico El Paso Underpass Construction of an underpass TBD State Govt of Safety Long High Stakeholders Aldabas St and Aldabas St and Francisco Villarreal Chihuahua Impact Francisco Torres Ave in Juarez West Villarreal Torres Ave in Juarez West ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Palacio de Mitla Palacio de Mitla St and De las Torres Chihuahua Impact St and De las Ave East Torres Ave East ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Palacio de Mitla Palacio de Mitla St and De las Torres Chihuahua Impact St and De las Ave West Torres Ave West ELP Mexico El Paso Underpass in R. Construction of an underpass in R. TBD State Govt of Safety Long High Stakeholders Rayon St and De Rayon St and De las Torres Ave East Chihuahua Impact las Torres Ave East ELP Mexico El Paso Underpass in R. Construction of an underpass in R. TBD State Govt of Safety Long High Stakeholders Rayon St and De Rayon St and De las Torres Ave West Chihuahua Impact las Torres Ave West ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Sorgo St and Sorgo St and Francisco Villarreal Chihuahua Impact Francisco Torres Ave East Villarreal Torres Ave East ELP Mexico El Paso Underpass in Construction of an underpass in TBD State Govt of Safety Long High Stakeholders Sorgo St and Sorgo St and Francisco Villarreal Chihuahua Impact Francisco Torres Ave West Villarreal Torres Ave West ELP Mexico El Paso Overpass in Juan Construction of an overpass in Juan TBD State Govt of Safety Long High Stakeholders Pablo II Blvd and Pablo II Blvd and Arizona Ave Chihuahua Impact Arizona Ave ELP Mexico El Paso Overpass T. Construction of an overpass T. TBD State Govt of Safety Long High Stakeholders Borunda Blvd Borunda Blvd and De las Torres Ave Chihuahua Impact and De las in Juarez East Torres Ave in Juarez East ELP Mexico El Paso Overpass T. Construction of an overpass T. TBD State Govt of Safety Long High Stakeholders Borunda Blvd Borunda Blvd and De las Torres Ave Chihuahua Impact and De las in Juarez West Torres Ave in Juarez West

10B-30

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category ELP Mexico El Paso Overpass in Construction of an overpass in TBD State Govt of Safety Long High Stakeholders Zaragoza Blvd Zaragoza Blvd and De las Torres Ave Chihuahua Impact and De las in Juarez East Torres Ave in Juarez East ELP Mexico El Paso Overpass in Construction of an overpass in TBD State Govt of Safety Long High Stakeholders Zaragoza Blvd Zaragoza Blvd and De las Torres Ave Chihuahua Impact and De las in Juarez West Torres Ave in Juarez West ELP Mexico El Paso Overpass at Gaza 1 Overpass Construction at TBD State Govt of Safety Long High Stakeholders Juan Pablo II Juan Pablo II Blvd and Francisco Chihuahua Impact Blvd and Villarreal Torres Ave Francisco Villarreal Torrest Ave ELP Mexico El Paso Extension of Extension of Trunk Route 1 – TBD State Govt of Connectivity Long High Stakeholders Trunk Route 1 – St to Puerto Tarento St (13 Chihuahua Impact Jumanos St to Stations on Blvd. Zaragoza) Puerto Tarento St ELP Mexico El Paso Remodeling Remodeling Trunk Route Stations 1 TBD State Govt of Connectivity Long High Stakeholders Trunk Route (31 Stations along the route) Chihuahua Impact Stations 1 ELP Mexico El Paso Mobility Mobility improvements on Vialidad TBD State Govt of Connectivity Long High Stakeholders improvements Blvd Zaragoza Stage 1 - from Chihuahua Impact on Vialidad Blvd Jumanos St to Atacama Desert St ( Zaragoza Stage Length 1.6 Km) 1 ELP Mexico El Paso Mobility Mobility improvements on Vialidad TBD State Govt of Connectivity Long High Stakeholders improvements Blvd Zaragoza Stage 2 - from Chihuahua Impact on Vialidad Blvd Atacama Desert St to Puerto Tarento Zaragoza Stage St ( Length 1.24 Km) 2 ELP Mexico Bridges Steering Wayfinding signs Wayfinding signs BOTA $1,000,000 TxDOT Safety Short High Committee for pedestrians Impact ELP Mexico Bridges Steering Pedestrian Add pedestrian BOTA $5,000,000 TxDOT Safety Medium High Committee safety safety Impact improvements improvements along Paisano

10B-31

10.2 Laredo/Coahuila/Nuevo León/Tamaulipas Region

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Texas Priority Eagle Pass II Priority improvements at Eagle Pass II Not provided CBP Mobility & Medium Medium LPOE Project POE Reliability Impact (Submitted by MP) LAR USA Laredo Del Rio-Ciudad Cargo/Sentri 29°19'36.32"N 2021 $15,000,000 City of Del Connectivity Short High Stakeholders Acuna Lane Expansion: 100°55'39.05"W Rio Impact International lane expansion Bridge project (for cargo) at the current bridge. Currently working on lane expansion going from MX to Del Rio. These two expansion lanes will also be Sentri lanes for POV traffic. LAR USA New-Added Acuña II New International Crossing 2024 $131,800,000 City of Del Mobility & Short Medium Projects International Rio Reliability Impact Bridge LAR USA New-Added Loop 79 Loop 79 extension around City of Del 2025 $11,000,000 City of Del Mobility & Medium Medium Projects extension Rio including international bridge Rio / Ports to Reliability Impact around City of connections Plains Del Rio including international bridge connections LAR USA New-Added Ports to Plains Approximately 39 miles 2030 $390,000,000 City of Del Mobility & Medium Medium Projects improvements Rio / Ports to Reliability Impact Plains LAR USA New-Added US 277 from US 277 from Eagle Pass to Carrizo 2030 $270,000,000 City of Del Mobility & Medium High Projects Eagle Pass to Springs Rio / Ports to Reliability Impact Carrizo Springs Plains LAR USA New-Added Around City of Around City of Quemado 2030 Not provided City of Del Connectivity Medium Medium Projects Quemado Rio / Ports to Impact Plains

10B-32

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA New-Added SL 480 from US SL 480 from US 277 to US 57 around 2030 $30,205,338 City of Del Mobility & Medium Medium Projects 277 to US 57 Eagle Pass (400' ROW acquired - Rio / Ports to Reliability Impact around Eagle plans complete) Plains Pass (400' ROW acquired - plans complete) LAR USA New-Added US 277 from US 277 from Sutton/Edwards County 2031-35 $300,000,000 City of Del Mobility & Long High Projects Sutton/Edwards Line to Del Rio (approximately 61 Rio / Ports to Reliability Impact County Line to miles) Plains Del Rio (approximately 61 miles) LAR USA New-Added US 277 from Del US 277 from Del Rio to Eagle Pass 2031-35 $100,000,000 City of Del Mobility & Long Medium Projects Rio to Eagle Rio / Ports to Reliability Impact Pass Plains LAR USA New-Added Ports to Plains Approximately 14 miles 2031-35 $140,000,000 City of Del Mobility & Long Medium Projects improvements Rio / Ports to Reliability Impact Plains LAR USA New-Added US 83 from US 83 from Carrizo Springs to I-35 2031-35 $350,000,000 City of Del Mobility & Long High Projects Carrizo Springs (approximately 41 miles) Rio / Ports to Reliability Impact to I-35 Plains (approximately 41 miles) LAR USA New-Added Around City of Around City of Carrizo Springs 2031-35 $125,000,000 City of Del Connectivity Long Medium Projects Carrizo Springs Rio / Ports to Impact Plains LAR USA New-Added Around City of Around City of Asherton 2031-35 $125,000,000 City of Del Connectivity Long Medium Projects Asherton Rio / Ports to Impact Plains LAR USA New-Added Around City of Around City of Catarina 2031-35 $125,000,000 City of Del Connectivity Long Medium Projects Catarina Rio / Ports to Impact Plains LAR USA Stakeholder International Addition of International 2025 $200,000 City of Eagle Connectivity Short High Bridge 2 directional Bridge 2 Pass Impact Directional signage for Signage commercial truck traffic LAR USA Stakeholder International Creation of International 2025 $6,000,000 City of Eagle Mobility & Short High Bridge 2 additional Bridge 2 Pass Reliability Impact Additional commercial and Approach Lanes passanger lanes (Toll) approaching International Bridge 2

10B-33

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Stakeholder International Creation of at International 2025 $6,000,000 City of Eagle Mobility & Short High Bridge 2 least one Bridge 2 Pass Reliability Impact Additional additional lane Commercial for commercial Lanes (CBP) traffic approaching the Customs inspection booths LAR USA Stakeholder International Upgrade of the International 2025 $1,500,000 City of Eagle Mobility & Short High Bridge 2 Toll toll system to Bridge 2 Pass Reliability Impact System Upgrade include RFID card readers to increase mobility. LAR USA Stakeholder International Realignment of International 2030 $15,000,000 City of Eagle Mobility & Medium High Bridge 2 International Bridge 2 Pass Reliability Impact Realignment Bridge 2 to facilitate traffic patterns particularly for commercial vehicles LAR USA Stakeholder SL480 Widening Widening of Ward Street to 2030 TBD City of Eagle Mobility & Medium High under Freight SL480 under International Pass Reliability Impact Rail Freight Rail to Bridge 2 accommodate additional incoming lanes into International Bridge 2 LAR USA Laredo Plans 1806183 IH 35 Construct Direct 0.5 miles South 2022 $30,000,000 City of Connectivity Short High Connector #5 of US 59 to 0.5 Laredo Impact (DC#5) miles East of IH 35 LAR USA Laredo Plans 92233093 City Street - Construct 0.25 M EAST OF 2024 $16,242,001 City of Mobility & Short Medium Calton Road interchange - CALTON/SAN Laredo Reliability Impact New two lane MARIA_INT to grade 0.25 M WEST OF separation CALTON/SAN interchange MARIA INT over the UPRR tracks LAR USA Laredo Plans 92233165 City Street - Preliminary 0.1 miles East of 2024 $26,796,901 City of Connectivity Short Medium Hachar Parkway Engineering- FM 1472 Laredo Impact Construction of

10B-34

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA New-Added 92233178 World Trade Construct World Trade 2021 $10,300,000 City of Mobility & Short Medium Projects Bridge (Fast inspection Bridge Laredo Reliability Impact Lane booths Bridge Construction) Department LAR USA New-Added Northbound Northbound World Trade 2021 $4,500,000 City of Asset Short High Projects Weigh-in-Motion Weigh-in-Motion Bridge Laredo Preservation Impact Scales / Curve Scales Bridge Paving at the Department existing exit lanes at World Trade Bridge LAR USA Laredo NA Eagle Pass II Built over 19 28.698328°N $25,000,000 GSA Mobility & Medium Medium Stakeholders LPOE years ago to 100.506411°W Reliability Impact accommodate the needs of CBP predecessor agencies. Does not meet the current operational requirements or current LPOE Design Standards of CBP. Priority project at this location. LAR USA Stakeholder KCS Second KCS Second Span International TBD KCS Multimodal Long Medium Span Railroad Bridge (LNL2) in Laredo - Impact International Nuevo Laredo Railroad Bridge (LNL2) LAR USA Stakeholder Laredo-Nuevo Laredo-Nuevo Laredo Cross - Border TBD KCS Multimodal Long Medium Laredo Cross - Rail Crossing Fluidity, Security, and Impact Border Rail traffic congestion relief initiative Crossing grade separation public - private Fluidity, partnership project through Security, and Downtown Laredo, TX traffic congestion relief initiative grade separation public - private partnership project

10B-35

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Airport Runway Extension of Laredo 2021 - $19,100,000 Laredo Multimodal Medium Low Modernization Extension Runway 17L- 2025 International Impact Plan/Laredo 35R; Extend Airport International 1500ft due Airport North; Including (December ILS, Approach 2015) lighting, runway edge lighting, extending Taxiway J to full length of extended runway. LAR USA Airport Taxiway Reconstruct Laredo 2021 - $11,500,000 Laredo Multimodal Medium Medium Modernization Reconstruction Taxiway J from C 2025 International Impact Plan/Laredo to A. 28,000 sq Airport International yards of Airport pavement. (December 2015) LAR USA Airport Apron Reconstruction Laredo 2021 - $16,600,000 Laredo Multimodal Medium Medium Modernization Reconstruction of Apron. Phase 2025 International Impact Plan/Laredo 13, 14, 15. Airport International 60000 sq yards Airport of apron along (December east edge of 2015) west apron. LAR USA Airport Terminal Add 32,000 sq Laredo 2021 - $22,850,000 Laredo Multimodal Medium Medium Modernization Expansion ft to Terminal. 2025 International Impact Plan/Laredo Airport International Airport (December 2015) LAR USA Airport Terminal Add 40,000 sq Laredo 2026 - $29,000,000 Laredo Multimodal Long Low Modernization Expansion ft to Terminal. 2035 International Impact Plan/Laredo Airport International Airport (December 2015) LAR USA Stakeholder Old Mines Road- Completion of Maverick County 2040 $310,000,000 Maverick and Mobility & Long Medium Connect FM FM1021 to FM to Webb County Webb County Reliability Impact 1472 to FM 1472 Laredo via 1021 Old Mines Road

10B-36

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Stakeholder Miles Road / El An approximate FM 1472 to FM 2050 $310,000,000 Maverick and Connectivity Long Medium Indio Rd. 40 mile section 1021 (old Mines Webb County Impact of this road is Rd) unpaved roadway that needs to be paved and connected between the end of pavement in Webb County and end of pavement in Maverick County. The Mines Road (also known as the “El Indio Road”) begins at the terminus of FM 1472 in Webb County and roughly parallels the Rio Grande River and connects to FM 1021 in Maverick County. LAR USA Laredo NA Third New bridge at Between Eagle 2040 $300,000,000 Maverick Mobility & Long Medium Stakeholders international Piedras Pass, Texas and County / City Reliability Impact bridge at Negras/border Piedras Negras, of Eagle Pass Piedras Negras with Eagle Pass Coahuila, Mexico (border with Eagle Pass) LAR USA Laredo Plans 92233165 CS Construct New FM 1472 to 2024 $26,796,902 This project Connectivity Short Medium Road 0.100 MILES E is being Impact OF BELTWAY developed by PARKWAY non-TxDOT resources. Estimates have been provided to TxDOT by these resources.

10B-37

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 92233166 CS Construct New 0.1 MILE EAST OF 2024 $21,740,668 This project Connectivity Short Medium Road BELTWAY is being Impact PARKWAY to IH developed by 35 WEST non-TxDOT FRONTAGE ROAD resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 92233093 CS Interchange 0.25 M EAST OF 2024 $16,242,001 This project Connectivity Short Medium Improvement CALTON/SAN is being Impact (new Or Update) MARIA_INT to developed by 0.25 M WEST OF non-TxDOT CALTON/SAN resources. MARIA INT Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 54204035 US 59 Widen Road - MCMULLEN 2050+ $185,000,000 This project Mobility & Long Medium Add Lanes And COUNTY LINE to is being Reliability Impact Shoulders EAST developed by INTERSECTION non-TxDOT OF SH 44/ US 59 resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 54203038 US 59 Widen Road - 2.2 MILES WEST 2050+ $120,000,000 This project Mobility & Long High Add Lanes And OF SH 16 to is being Reliability Impact Shoulders WEBB COUNTY developed by LINE non-TxDOT resources. Estimates have been provided to TxDOT by these resources.

10B-38

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 29914010 SL 480 Widen Road - US 57 to US 277 2050+ $30,205,338 This project Connectivity Long Medium Add Lanes N is being Impact developed by non-TxDOT resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 1804058 IH 35 Widen Road - 1.2 MI NORTH OF 2050+ $68,000,000 This project Mobility & Long Medium Add Lanes US 83 INT to 7.0 is being Reliability Impact MI NORTH OF US developed by 83 INT non-TxDOT resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 1805102 IH 35 Interchange 0.50 MI SOUTH 2050+ $45,000,000 This project Connectivity Long Medium Improvement OF HACHAR is being Impact (new Or Update) REUTHINGER RD developed by to 0.50 MI non-TxDOT NORTH OF resources. HACHAR Estimates REUTHINGER RD have been provided to TxDOT by these resources. LAR USA Laredo Plans 1708107 IH 35 Widening Of An NUECES RIVER 2050+ $462,000,000 This project Mobility & Long Medium Existing Freeway BRIDGE to FRIO is being Reliability Impact (6-Lanes) COUNTY LINE developed by non-TxDOT resources. Estimates have been provided to TxDOT by these resources.

10B-39

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 1801099 IH 35 Widening Of An FM 133 to 2050+ $315,000,000 This project Mobility & Long Medium Existing Freeway NUECES RIVER is being Reliability Impact (6-Lanes) BRIDGE developed by non-TxDOT resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 1803060 IH 35 Widening Of An 8.3 MI S OF 2050+ $279,000,000 This project Mobility & Long Medium Existing Freeway WEBB/LASALLE is being Reliability Impact (6-Lanes) CO LINE to developed by WEBB/LA SALLE non-TxDOT COUNTY LINE resources. Estimates have been provided to TxDOT by these resources. LAR USA Laredo Plans 8614084 IH 69W Widening of World Trade 2022 $15,000,000 TxDOT Mobility & Short High existing freeway Bridge GSA Reliability Impact from four lanes Facility to IH 35 to six lanes LAR USA Laredo Plans 1806198 IH 35 Widen from 4 0.38 miles South 2024 $4,173,222 TxDOT Mobility & Short High lanes to 6 lanes of US 59/IH 59 Reliability Impact Interchange to 0.8 miles North of US 59/IH 69W interchange LAR USA Laredo Plans 1805094 IH 35- UP Railroad Grade 2.68 miles North 2024 $75,000,000 TxDOT Mobility & Short Medium Railroad Grade Separation and of Uniroyal Reliability Impact Separation Mile Widen to six Interchange to Marker 18 lane undivided 1.2 miles North of highway US 83 Interchange LAR USA Laredo Plans 1806136 IH 35- RR Interchange SHILOH DRIVE to 2024 $51,493,519 TxDOT Connectivity Short High Overpass north Improvement 0.38 MILES S. OF Impact of Shiloh Ave. (new Or Update) US 59/ IH 35 INT LAR USA Laredo Plans 1806183 IH 35- Direct Construct Direct 0.454 MILE 2024 $26,688,597 TxDOT Connectivity Short High Connect # 5 Connectors SOUTH OF IH35 / Impact US59-SL20 INT to 0.732 MILE EAST OF US59-SL20 / IH35 INT

10B-40

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 1806184 IH 35- Direct Construct Direct 0.207 MILE WEST 2024 $18,520,244 TxDOT Connectivity Short High Connect # 8 Connectors OF US59-SL20 / Impact IH35 INT to 0.197 MILE SOUTH OF IH35 / US59- SL20 INT LAR USA Texas Freight 1801096 IH 35 Widening and 1037.5 ft North 2025 $500,000 TxDOT Mobility & Long Medium Mobility Plan Improvements Rehabilitation of BI 35C Underpass Reliability Impact 2018, an Existing Interchange to Appendix F Highway 762.5 ft South BI 35C Underpass Interchange LAR USA 353202012 FM 3338 FM 3338 FM 3338 from SH 2030 $45,000,000 TxDOT Connectivity Long Medium Expansion Upgrade to an 255 to FM 1472 Impact Urban 5-Lane Roadway LAR USA US 83 Upgrade US 83 Upgrade to 4-Lane Divided 2030 TBD TxDOT Mobility & Medium Medium Roadway Reliability Impact

LAR USA Rural US 59 / Rural US 59 / Future I-69W 2030 $150,000,000 TxDOT Mobility & Medium Medium Future I-69W Reliability Impact LAR USA Plans I-27, Ports to US 83, from IH-35 to Carrizo Springs 2040 $1,005,000,000 TxDOT Mobility & Medium High Plains = 80.6 Miles Reliability Impact LAR USA Plans I-27, Ports to US 277, from Carrizo Springs to Eagle 2040 $548,000,000 TxDOT Mobility & Medium High Plains Pass = 42.1 Miles Reliability Impact LAR USA Plans I-27, Ports to US 277, from Eagle Pass to Del Rio = 2040 $717,000,000 TxDOT Mobility & Medium Medium Plains 55.1 Miles Reliability Impact LAR USA Plans I-27, Ports to US 277, from Del Rio to Val 2040 $724,000,000 TxDOT Mobility & Medium High Plains Verde/Edwards CL = 55.7 Miles Reliability Impact LAR USA Southern Loop Construct 6 Southern Loop 20 2040 $84,000,000 TxDOT Mobility & Long Medium 20 Extension mainlanes and Extension to Reliability Impact 6 frontage roads Proposed Bridge V LAR USA 92233151 Laredo Outer Construct 6 I-35 at SH 255 to 2050 $418,000,000 TxDOT Mobility & Long Medium Loop mainlanes and US 83 South Reliability Impact 6 frontage roads LAR USA Aviation Surface Surface Del Rio 2021 $1,650,000 TxDOT Multimodal Short Low Capital Treatment and Treatment and Aviation Impact Improvement Marking Marking on Division Program 2021 Aprons, Runway - 2023 (August 13-31, Taxiways 2020)

10B-41

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 92233178 World Trade Construct World Trade 2021 $10,300,000 TxDOT Asset Short Medium Bridge inspection Bridge Design Preservation Impact (Inspection booths Booths) LAR USA Laredo Plans 1806136 IH 35 Widen Shiloh Dr to 0.25 2022 $54,000,000 TxDOT Mobility & Short High mainlanes and miles North of US Design Reliability Impact construct 59/IH 69W overpass LAR USA Laredo Plans 1805089 IH 35 Replacement of 0.5 miles South 2024 $110,000,000 TxDOT Asset Short High existing bridge of Uniroyal Design Preservation Impact Interchange to 1.0 North of Uniroyal Interchange LAR USA Laredo Plans 8614075 US 59 Construct 0.5 miles South 2024 $24,100,000 TxDOT Safety Short Medium interchange - of Del Mar Blvd to Design Impact New six lane 0.5 miles North of grade Del Mar Blvd separation interchange LAR USA Laredo Plans 8614076 US 59 Construct 0.5 miles South 2024 $21,500,000 TxDOT Safety Short Medium interchange - of Shiloh Dr to Design Impact New six lane 0.5 miles North of grade Shiloh Dr separation interchange LAR USA Laredo Plans 8614078 US 59 Interchange 0.50 MI S OF 2024 $21,658,095 TxDOT Connectivity Short Medium Improvement JACAMAN to 0.50 Design Impact (new Or Update) MI N OF JACAMAN LAR USA Laredo Plans 8614079 US 59 Interchange 0.50 MI S OF 2024 $17,471,003 TxDOT Connectivity Short Medium Improvement UNIVERSITY BLVD Design Impact (new Or Update) to 0.50 MI N OF UNIVERSITY BLVD LAR USA Laredo Plans 8614086 US 59 Reconstruct US 59 to 0.4 2026 $15,600,000 TxDOT Mobility & Medium High Existing miles North of Design Reliability Impact Roadway Airport LAR USA Laredo Plans 8614087 US 59 Reconstruct 0.4 miles North of 2026 $34,100,000 TxDOT Mobility & Medium High Existing Airport to 0.14 Design Reliability Impact Roadway miles North of Del Mar Blvd LAR USA Laredo Plans 1806184 IH 35 Construct Direct 0.5 miles West of 2026 $22,000,000 TxDOT Connectivity Medium High Connector #8 IH 35 to 0.5 miles Design Impact (DC#8) South of US 59 LAR USA Laredo Plans 1806185 IH 35 Construct Direct 0.5 miles East of 2026 $35,000,000 TxDOT Connectivity Medium High Connectors IH 35 to 0.5 miles Design Impact North of US 59

10B-42

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 8614088 US 59 Reconstruct 0.36 miles South 2026 $20,000,000 TxDOT Mobility & Medium Medium Existing of University to Design Reliability Impact Roadway 0.51 miles South of Shiloh Dr LAR USA Laredo Plans 8601073 SH 359 Widen Road - 4.06 MILES E OF 2028 $18,561,615 TxDOT Connectivity Medium Medium Add Lanes SL 20 to 8.935 Design Impact MILES E OF SL 20 LAR USA Laredo Plans 1806185 IH 35 Construct Direct 0.50 MI EAST OF 2028 $13,952,923 TxDOT Connectivity Medium Medium Connectors IH35 to 0.50 MI Design Impact NORTH OF US59 LAR USA Laredo Plans 87601020 RM 693 Widen Road - US 90 to US 277 2029 $8,498,400 TxDOT Safety Medium Medium Add Shoulders Design Impact LAR USA Laredo Plans 1805098 IH 35 Add turnarounds 1.353 miles 2035 $22,000,000 TxDOT Safety Long High to Carriers Dr South of Carriers Design Impact Bridge Dr to Uniroyal interchange LAR USA Laredo Plans 1806186 IH 35 Construct Direct 0.5 miles East of 2035 $22,000,000 TxDOT Connectivity Long High Connectors IH 35 to 0.5 miles Design Impact North of US 59 LAR USA Laredo Plans 1806187 IH 35 Construct Direct 0.5 miles South 2040 $18,000,000 TxDOT Connectivity Long High Connectors of US 59 to 0.5 Design Impact miles East of IH 35 LAR USA Laredo Plans 8614077 US 59 Construct International 2040 $14,785,990 TxDOT Connectivity Long Medium interchange - Airport Design Impact New six lane grade separation interchange LAR USA Laredo Plans 8614089 US 59 Reconstruct 0.51 miles South 2040 $31,500,000 TxDOT Mobility & Long Medium Existing of Shiloh Dr to Design Reliability Impact Roadway International Blvd LAR USA Laredo Plans 1806196 IH 35 Widen United 0.25 miles North 2040 $22,000,000 TxDOT Safety Long High Ave Overpass - of US 59 Design Impact Add one Interchange to additional lane 1.353 miles with South of Carriers turnarounds Dr LAR USA Laredo Plans 8616009 SL 20 Construct 0.1 miles South 2040 $22,000,000 TxDOT Connectivity Long Medium interchange - of Cielito Lindo Design Impact New four lane Rd to 0.1 miles grade North of Cielito separation Lindo Rd interchange

10B-43

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 8616010 SL 20 Construct 0.1 miles South 2040 $22,000,000 TxDOT Connectivity Long Medium interchange - of Sierra Vista Rd Design Impact New four lane to 0.1 miles North grade of Sierra Vista Rd separation interchange LAR USA Laredo Plans 8616008 SL 20 Construct 2.77 miles South 2040 $22,000,000 TxDOT Connectivity Long Medium interchange - of SH 359 to 2.39 Design Impact New four lane miles South of SH grade 359 separation interchange LAR USA Laredo Plans 1806203 IH 35 Interchange Shiloh Dr 0.25 2040 $25,000,000 TxDOT Connectivity Long High Improvement - miles Design Impact LAR USA Laredo Plans 54202043 US 59 Widen Road - DUVAL COUNTY 2050+ $260,000,000 TxDOT Mobility & Long Medium Add Lanes And LINE to 7.49 Design Reliability Impact Shoulders MILES WEST OF FM 2895 LAR USA Laredo Plans 54201094 US 59 Widen Road - 7.49 MILES WEST 2050+ $205,000,000 TxDOT Mobility & Long Medium Add Lanes And OF FM 2895 to Design Reliability Impact Shoulders 3.00 MI EAST OF ARKANSAS STREET LAR USA Laredo Plans 92233182 VA Construct New US 59 to SH 255 2050+ $70,000,000 TxDOT Mobility & Long Medium Road Design Reliability Impact LAR USA Laredo Plans 3710040 US 83 Widen Road - 1 MI NORTH OF 2050+ $65,000,000 TxDOT Mobility & Long High Add Lanes And SH 255 to US Design Reliability Impact Shoulders 83/IH 35 UNDERPASS LAR USA Laredo Plans 353202012 FM 3338 Widen Road - FM_1472 to 2050+ $41,762,521 TxDOT Connectivity Long Medium Add Lanes SH_255 Design Impact LAR USA Laredo Plans 54202042 US 59 Widen Road - 7.590 MI WEST 2050+ $37,022,655 TxDOT Mobility & Long Medium Add Lanes OF FM 2895 to Design Reliability Impact 3.770 MI EAST OF FM 2895 LAR USA Laredo Plans 8616008 SL 20 Interchange 0.1 MILES SOUTH 2050+ $22,000,000 TxDOT Connectivity Long Medium Improvement OF LOMAS DEL Design Impact (new Or Update) SUR BLVD to 0.1 MILES NORTH OF LOMAS DEL SUR BLVD LAR USA Laredo Plans 54202041 US 59 Widen Road - 9.070 MILES 2050+ $21,316,205 TxDOT Mobility & Long Medium Add Lanes WEST OF FM Design Reliability Impact 2050 to DUVAL COUNTY LINE

10B-44

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA Laredo Plans 8614077 US 59 Interchange 0.50 MI S OF 2050+ $19,906,890 TxDOT Connectivity Long Medium Improvement INTERNATIONAL Design Impact (new Or Update) AIRPORT to 0.50 MI N OF INTERNATIONAL AIRPORT LAR USA Laredo Plans 1804061 IH 35 Widen Road - 7.0 MI NORTH OF 2050+ $19,740,000 TxDOT Mobility & Long High Add Lanes US 83 INT to 9.8 Design Reliability Impact MI SOUTH OF LASALLE CL LAR USA Laredo Plans 92233066 VA Construct New MANGANA-HEIN 2050+ $14,116,960 TxDOT Connectivity Long Medium Road ROAD to US83 AT Design Impact RIO BRAVO LAR USA Laredo Plans 8602026 SH 359 Widen Rdwy To 8.935 MILES 2050+ $12,000,000 TxDOT Safety Long Medium Provide Passing EAST OF SL 20 to Design Impact Lanes (super 2) 1.515 MILES WEST OF FM 2895 LAR USA Laredo Plans 8604024 SH 359 Widen Rdwy To 1.363 MI EAST 2050+ $12,000,000 TxDOT Safety Long Medium Provide Passing OF FM 649 to Design Impact Lanes (super 2) DUVAL COUNTY LINE LAR USA Laredo Plans 1803057 IH 35 Widen Road - 9.8 MI SOUTH OF 2050+ $8,000,000 TxDOT Mobility & Long Medium Add Lanes LASALLE CL to Design Reliability Impact 8.3 MI SOUTH OF LASALLE CL LAR USA Laredo Plans 8603031 SH 359 Widen Rdwy To 1.5 MI WEST OF 2050+ $7,200,000 TxDOT Safety Long Medium Provide Passing FM 2895 to Design Impact Lanes (super 2) 1.363 MI EAST OF FM 649 LAR USA 2020 - 2045 Proposed International Laredo 2035 $1,255,781 Various Mobility & Long High Laredo International Bridge #5 to SH Sponsors Reliability Impact Metropolitan Bridge 255 Transportation Plan Rev. 2 LAR USA Vallecillo Road Construct From FM 1472 to 2035 $32,000,000 WC-CL RMA Mobility & Long High Vallecillo Road 2 IH 35 Reliability Impact lanes each direction with a turn lane LAR USA Laredo Plans 92233166 City Street - Construction of 0.1 miles East of 2024 $21,740,668 Webb County Connectivity Short Medium Hachar Parkway 5 lane rural road Beltway Pkwy to Impact IH 35

10B-45

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR USA New-Added Laredo IV/V new Proposed 27°20'41.33"N, 2030 $303,003,100 Webb County Connectivity Medium Low Projects border crossing bridge, project is 99°30'22.82"W Impact in Webb County pending. As of May 2008, (feasibility Proposed there are three studies project would be potential underway) located between locations being the cities of Rio considered for Bravo and El the bridge, all Cenizo in Webb several miles County. south of the existing bridges in Laredo: Webb County officials favor a site on Mangana-Hein Road in southern Laredo. LAR USA Stakeholder Hachar- Extension of the Hachar Rd @ I35 2050 $6,000,000 Webb County Connectivity Long Medium Reuthinger Hachar Proejct east to outer loop Impact Extension East east to of I35 propposed Laredo Outer Loop LAR USA TX RRC Whistler Pipeline 450 miles, Maverick, Dimmit, 6/1/2021 $350,000,000 White Water Multimodal Short Medium transporting Kinney Counties Midstream Impact natural gas from to the Gulf Coast (Agua Dolce) LAR USA Laredo Plans 92123005 VA Construct New EAST 2050+ $90,000,000 Mobility & Long Medium Road INTERSECTION Reliability Impact OF SH 44/ US 59 to 2.2 MILES WEST OF SH 16 LAR USA SL 480 SL 480 New 2 SH 580 from US 2050 $48,000,000 Connectivity Long Medium Lane Highway 277 to US 57 Impact from US 57 to US 277 North LAR USA Santa Maria Av Bicycle lane Laredo $351,250 Multimodal Long Medium Bike Lane from Chicago St Impact to Del Mar Blvd LAR Mexico Laredo NA KCMS’s new KCS's new KCS RR $150,000,000 KCS Multimodal Long High Stakeholders double-track at double-track at Impact Laredo Laredo

10B-46

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR Mexico Laredo NA KCSM’s KCSM’s KCM RR 2019- $5,980,000 Mexico Connectivity Short High Stakeholders Sanchez Master Sanchez Master 2025 Railroads Impact Plan Plan. Expanded the Sanchez Yard, located 16 kilometers from Nuevo Laredo, extending its facilities before the increase of merchandise movement, mainly in the exports to the . LAR Mexico Laredo NA KCSM’s KCSM’s KCM RR TBD Mexico Mobility & Long High Stakeholders Universal Universal Railroads Reliability Impact Crossover at Crossover at Nuevo Laredo Nuevo Laredo LAR Mexico Multiple Ferromex’s Ferromex’s Monterrey Rail Bypass TBD Mexico Multimodal Long High Regions Monterrey Rail improvements Railroads Impact Bypass LAR Mexico Multiple Ferromex’s Ferromex’s Reconfiguration of the TBD Mexico Multimodal Long High Regions Reconfiguration Monterrey railyard Railroads Impact of the Monterrey railyard LAR Mexico Multiple KCSM’s FXE KCSM’s FXE Celaya by-pass TBD Mexico Mobility & Long High Regions Bypass Bypass project in place Railroads Reliability Impact improvements alleviate near Celaya, congested area. Guanajuato. Celaya by-pass project in place alleviate congested area. LAR Mexico Multiple KCSM’s other KCSM’s other improvements on their TBD Mexico Mobility & Long High Regions improvements B and F lines linking Monterrey to the Railroads Reliability Impact on their B and F U.S. border lines linking Monterrey to the U.S. border LAR Mexico Multiple KCSM’s Salinas KCSM’s Salinas Victoria Terminal, TBD Mexico Asset Long High Regions Victoria Nuevo Leon Railroads Preservation Impact Terminal

10B-47

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR Mexico Mexico's Highway La Construction of a tolled highway 2024 $20,700,000 SCT Mobility & Short High Economic Gloria-San between La Gloria and San Fernando, Reliability Impact Recovery Fernando Tamps Agreement LAR Mexico Multiple Garcia- Garcia-Monterrey Airport railway 2021- $911,306,000 SCT Multimodal Short High Regions Monterrey corridor construction for passengers 2022 Impact Airport railway corridor LAR Mexico Multiple Libramiento Construction of Apodaca-Pesquería- 2023- $73,048,000 SCT Connectivity Short High Regions Apodaca- Cadereyta bypass 2024 Impact Pesquería- Cadereyta LAR Mexico Multiple Santa Maria Santa Maria Port (supporting the TBD SCT Connectivity Long High Regions Port (supporting Topolobampo Corridor) Impact the Topolobampo Corridor) LAR Mexico SCT Railroad Railroad investments in Nuevo TBD SCT Mobility & Long High investments in Laredo-Laredo (long term) Reliability Impact Nuevo Laredo - Laredo LAR Mexico Laredo NA Nuevo Laredo Development of Nuevo Laredo, the 2023- $368,000,000 SCT Mobility & Short High Stakeholders 4/5 construction of a new international 2024 /Binational Reliability Impact International bridge for the cargo crossing Group Laredo Bridge and Nuevo Laredo LAR Mexico Laredo NA La Gloria- 102-kilometer stretch from La Gloria 2023- $138,000,000 SCT / Mobility & Short High Stakeholders Colombia to Colombia. It will have a vehicular 2024 Corporation Reliability Impact highway capacity of 5,000 cargo and light for the vehicles. This project would Development strengthen the operations of Puente of the Nuevo Colombia, Anahuac, and Nuevo León. León Border Zone LAR Mexico Laredo NA Second Planned improvements at Second 2024- $15,000,000 State Govt of Mobility & Medium High Stakeholders international International bridge at Acuna 2025 Coahuila Reliability Impact bridge at Acuña (border with Del Rio) LAR Mexico Laredo NA International rail Planned improvements at $25,000,000 State Govt of Multimodal Long High Stakeholders bridge at Acuña International rail bridge at Acuna Coahuila Impact (border with Del Rio) LAR Mexico Laredo NA Acuña bridge Finish modernization of Customs at $15,000,000 State Govt of Asset Long High Stakeholders the Acuña bridge Coahuila Preservation Impact

10B-48

Region Country Source CSJ Project Name Project Description Project Project Cost Project BTMP Timeframe Impact Schedule Sponsor / Project Source Category LAR Mexico Laredo NA Bypasses along Planned improvements on Federal $46,000,000 State Govt of Mobility & Long High Stakeholders Federal Roads 57 and 29 by Coahuila Coahuila Reliability Impact Highways 57 and 29 LAR Mexico Laredo NA Sabinas Bypass Bypass in Nueva Rosita, on the $1,311,000 State Govt of Connectivity Long High Stakeholders stretch from Avenida López Mateos to Coahuila / Impact Calle Saltillo. A total length of 5.8 SCT kilometers will allow to connect Highway 57 with 20, at the exit to Múzquiz. Road width of 22.5 meters, with 4 lanes of circulation, 2 per direction

LAR Mexico Laredo NA Reinforcement Reinforcement of walls on grade $1,000,000 State Govt of Safety Long High Stakeholders of walls on crossing on km. 30+880 Nuevo Leon Impact grade crossing on km. 30+880 LAR Mexico Laredo NA Nuevo Laredo to Finish rail bypass from railway to $250,000,000 State Govt of Multimodal Long High Stakeholders railway to Nuevo Laredo to railway to Nuevo Leon Impact Matamoros Matamoros

LAR Mexico Laredo NA Modernization Modernization of the Coastal Highway $32,200,000 State Govt of Mobility & Long High Stakeholders of the Coastal Altamira - Nuevo Progreso Tamaulipas Reliability Impact Highway Altamira - Nuevo Progreso LAR Mexico Laredo NA Modernization Modernization of Bypass Mex II Nuevo TBD State Govt of Asset Long High Stakeholders of Bypass Mex II Laredo, planned improvements Tamaulipas Preservation Impact Nuevo Laredo LAR Mexico Laredo NA Road Reynosa - Planned improvements Road Reynosa TBD State Govt of Connectivity Long High Stakeholders Nuevo Laredo - Nuevo Laredo section Cd. Mier - Tamaulipas Impact section Cd. Mier Nuevo Laredo - Nuevo Laredo

10B-49

10.3 Rio Grande Valley/Tamaulipas Region

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 52801112 SH 107 (Conway) Construct 6 lane FM 676 to FM 2022 $15,000,000 Alton / HC 3 Connectivity Short High divided urban 681/FM Impact 2993. RGV USA RGV Plans 92102379 Anzalduas Int'l Inbound commercial Anzalduas 2021 $4,668,185 Analduas Int'l Mobility & Short Medium Port of Entry (NB) inspection pre- Land Port of Bridge Board Reliability Impact primary inspection Entry NB pre-cleared cargo Empties RGV USA RGV Plans 92102303 Anzalduas Int'l Construction of Anzalduas Int'l 2022 $7,241,012 Analduas Int'l Mobility & Short Medium Port of Entry Southbound Port of Entry Bridge Board Reliability Impact Inspection Station RGV USA New-Added Anzalduas Int'l Infrastructure for Anzalduas 2033 $65,000,000 Anzalduas Asset Long Medium Projects POE Cold Storage Bridge Board Preservation Impact Addition RGV USA New-Added Anzalduas Int'l Infrastructure to Anzalduas 2035 $5,000,000 Anzalduas Multimodal Long Medium Projects POE support Rail Bridge Board Impact RGV USA New-Added Anzalduas Int'l Roadway Network Anzalduas 2035 $7,500,000 Anzalduas Asset Long Medium Projects POE and Modernization Bridge Board Preservation Impact Improvement RGV USA New-Added Anzalduas Int'l Transit Anzalduas 2040 $15,000,000 Anzalduas Multimodal Long Medium Projects POE Infrastructure Bridge Board Impact RGV USA New-Added Anzalduas Int'l Bridge Expansion Anzalduas 2040 $50,000,000 Anzalduas Mobility & Long Medium Projects POE for Additional Bridge Board Reliability Impact SB/NB Lane Expansion to Bridge (US) RGV USA New-Added Anzalduas Int'l Inbound Anzalduas 2045 $10,000,000 Anzalduas Asset Long Medium Projects POE Commercial Dock Bridge Board Preservation Impact Expansion RGV USA RGV Plans Anzalduas Int'l Construction of two @Anzalduas 2050+ $5,300,000 Anzalduas Int'l Mobility & Long Medium POE additional Int'l POE Bridge Reliability Impact northbound RGV USA Brownsville Brownsville Redesigning and Brownsville 2023 $55,639,609 Brownsville Multimodal Short Medium South Padre Terminal Constructing a new International Impact Island Terminal building at Airport International Brownsville Airport Master International Plan

10B-50

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA Brownsville Runway Design, Rehabilitate Brownsville 2023 $31,482,267 Brownsville Multimodal Short Medium South Padre Extension and Extend Runway International Impact Island 18-36 Airport International Airport Master Plan RGV USA Brownsville Runway Pavement Brownsville 2024 - $79,388,888 Brownsville Multimodal Medium Medium South Padre Extension Maintenance, 2028 International Impact Island Extension of Airport International Runway 13-31 Airport Master Plan RGV USA Brownsville Cargo Area Development of Brownsville 2024 - $4,203,836 Brownsville Multimodal Medium Medium South Padre Development cargo buildings, 2028 International Impact Island Phase I hangars, and new Airport International shed. Airport Master Plan RGV USA Brownsville Cargo Area Development of Brownsville 2029 - $16,619,686 Brownsville Multimodal Long Low South Padre Development cargo buildings, 2038 International Impact Island Phase II hangars, and new Airport International shed. Airport Master Plan RGV USA RGV Plans 92106252 US 77/83 SOUTH New Location - 2 S. Parallel 2021 $8,500,000 Cameron Connectivity Short Medium PARALLEL Lane Rural Roadway Corridor FM County Impact CORRIDOR - PH II in a proposed 120 509 to FM Foot ROW - Phase II 2520 RGV USA RGV Plans 92106290 Old Alice Rd Construct 4 lane SH 100 to 2022 $21,000,000 Cameron Connectivity Short Medium urban roadway Sports Park County Impact Blvd RGV USA RGV Plans 92106257 US 77/83 SOUTH New Location - 2 S. Parallel 2024 $9,000,000 Cameron Connectivity Short Medium PARALLEL lane Rural roadway Corridor, FM County Impact CORRIDOR - PH III in a proposed 120 2520 to FM Foot ROW 1577 RGV USA RGV Plans 32703048 US 77/83 South Widen to 4 lanes FM 1479 to 2040 $36,790,733 Cameron Connectivity Long High Parallel Corridor FM 1577 County Impact

RGV USA Lower Rio Upgrade of Reconfigure and Brownsville 2023 $60,000,000 CBP Mobility & Short High Grande Valley - International POE rebuild POE by Reliability Impact Tamaulipas Facilities adding capacity and Border Master increasing Plan processing efficiency, and security.

10B-51

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA CBP 5-Year Brownsville- One of CBP's Top Brownsville, TX 2024 $13,000,000 CBP Mobility & Medium High Plan (Latest) Gateway, Texas – Border Reliability Impact Site and Design Crossing/POE Phase I Design Projects on Tx-Mx Border in latest 5-year plan RGV USA CBP 5-Year Brownsville- One of CBP's Top Brownsville, TX 2030 $132,113,300 CBP Mobility & Medium High Plan (Latest) Gateway, Texas – Border Reliability Impact Construction Crossing/POE Phase II Design Projects on Tx-Mx Border in latest 5-year plan RGV USA Texas Priority Brownsville Priority improvements at Brownsville TBD CBP Mobility & Long High LPOE Project Gateway Gateway Reliability Impact (Submitted by MP) RGV USA Texas Priority Hidalgo Priority improvements at Hidalgo TBD CBP Mobility & Long Medium LPOE Project Reliability Impact (Submitted by MP) RGV USA Texas Priority Progreso Priority improvements at Progreso TBD CBP Mobility & Long Medium LPOE Project Reliability Impact (Submitted by MP) RGV USA Texas Priority Rio Grande City Priority improvements at Rio Grande TBD CBP Mobility & Long Medium LPOE Project City Reliability Impact (Submitted by MP) RGV USA Texas Priority Roma Priority improvements at Roma TBD CBP Mobility & Long High LPOE Project Reliability Impact (Submitted by MP) RGV USA RGV Plans 92106313 Veterans Expansion of CBP Primary 2021 $13,134,449 CCRMA Mobility & Short High International primary lanes for Inspection Reliability Impact Bridge at Los passenger vehicles. Lanes CBP Tomates Primary Inspection Lanes RGV USA RGV Plans 68401068 SH 550 Construct controlled .203 MI S OF 2022 $14,868,497 CCRMA Connectivity Short High access facility FM 1847 to Impact 1.13 MI SE OF UPRR OVERPASS @ FM 3248 RGV USA RGV Plans 92106254 FM 509 New Location 2 lane FM 508 to FM 2022 $7,000,000 CCRMA Connectivity Short Medium Rural Roadway 1599 Impact

10B-52

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 92106293 West Blvd. Construct West Blvd on 2024 $10,000,000 CCRMA Multimodal Short High Multimodal Facility Palm Blvd @ Impact Rail Line to I- 69E SB Frontage Road, W. of Old Alice Road RGV USA RGV Plans 92106315 East Loop Construction of 4 to IH- 69E to SH4 2026 $100,000,000 CCRMA Connectivity Medium Medium 6 lane roadway Impact partially on new location of 10.1 miles RGV USA RGV Plans 92106339 US 281 Construction of a 4- I69 @ approx. 2030 $140,000,000 CCRMA Mobility & Medium Medium Connector lane divided SH 100 to US Reliability Impact highway 281 Military Highway RGV USA RGV Plans 92106291 CS Construct 4 lane On Morrison 2031 $16,400,000 CCRMA Connectivity Long Medium urban roadway Rd, from FM to Impact 1847 FM 511 RGV USA RGV Plans 92106163 CR Constructing new FM 106 N of 2035 $554,700,000 CCRMA Connectivity Long Low causeway at new Laguna Vista Impact location to SH 100 @ South Padre Island RGV USA RGV Plans 92106283 Outer Parkway New Location - IH 69E to FM 2040 $120,000,000 CCRMA Connectivity Long Medium Controlled Access 4 106/General Impact lane Toll Facility Brant Rd RGV USA RGV Plans Flor de Mayo Construct FM 3248 to 2040 $20,000,000 CCRMA Mobility & Long Medium Bridge International Bridge US 281 Reliability Impact RGV USA RGV Plans Old Port Isabel Rd Construct two lane SH 550 to SH 2040 $20,000,000 CCRMA Connectivity Long Medium rural 100 Impact RGV USA New-Added 92106163 2nd Access to SPI 2nd Causeway Mainland to Jan-35 $385,000,000 CCRMA Connectivity Long Low Projects South Padre Impact Island RGV USA FY 2021 - 0 Southmost Engineering and Brownsville 2022 $7,852,042 City of Multimodal Short Medium 2024 Nature Trail Construction of a Brownsville Impact Transportation 10' wide concrete Improvement hike and bike trail Program RGV USA FY 2021 - 0 Los Fresnos Construct 10' Hike Brownsville, 2022 $2,131,832 City of Multimodal Short Medium 2024 Connect & Bike Bike trail and Los Brownsville Impact Transportation between Brownsville Fresnos Improvement and Los Fresnos Program (Phase I/II)

10B-53

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV 92102394 Donna FY16-17 North Bound From:Vicinity 2022 $47,971,615 City of Donna Multimodal Short Low Stakeholders DAP - Northbound inspection facility of GSA facility. Impact & Southbound improvements will To: Alliance Commercial include Non- International Improvements Intrusive Inspection Bridge Donna Technology (NII), Rio Bravo Command Center, Inspection Secondary Facilities Inspection Loading Hidalgo County Docks with 15 bays and Canopy Cargo Processing Offices, Truck Staging Area, Exit Control Booths, Training Center, Conc. Roadway, Site illumination and Drainage Improvements. Southbound upgrade will consist of adding the following: a secondary Inspection Loading Dock with 10 bays, Southbound Cargo Processing Offices and Exit Booth.

10B-54

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV 92102394 Donna FY16-17 North Bound From: Vicinity 2022 $47,971,615 City of Donna Multimodal Short Medium Stakeholders DAP - Northbound inspection facility of GSA facility. Impact & Southbound improvements will To: Alliance Commercial include Non- International Improvements Intrusive Inspection Bridge Donna Technology (NII), Rio Bravo Command Center, Inspection Secondary Facilities Inspection Loading Hidalgo County Docks with 15 bays and Canopy Cargo Processing Offices, Truck Staging Area, Exit Control Booths, Training Center, Conc. Roadway, Site illumination and Drainage Improvements. Southbound upgrade will consist of adding the following: a secondary Inspection Loading Dock with 10 bays, Southbound Cargo Processing Offices and Exit Booth.

RGV USA FY 2021 - Jackson Rd Hike Hike and Bike Rd McAllen 2022 $3,123,775 City of McAllen Multimodal Short High 2024 and Bike Project between Canton Rd Impact Transportation @ Jackson Rd to Improvement Bicentennial Hike Program and Bike Trail RGV USA RGV Plans Mission Citrus Improved access to reliable, safe & 2021 $850,000 City of Mission Multimodal Short Medium Bus Urban affordable transportation for Impact System communities in rural areas.

RGV USA RGV Plans Taylor Rd Construct 4 lane From: Bus 83 2022 $11,910,020 City of Mission Connectivity Short Medium divided urban to Mile 2N Impact RGV USA RGV Plans Los Ebanos Rd. Construct 4 lane From: SH495 2023 $8,209,820 City of Mission Connectivity Short Medium divided urban To: Mile 2 Rd Impact RGV USA RGV Plans Los Ebanos Rd. Construct 4 lane From: I2 To: 2023 $17,521,404 City of Mission Connectivity Short Medium divided urban FM1016 Impact RGV USA RGV Plans Holland Rd. Construct 4 lane From: SH495 2023 $8,014,220 City of Mission Connectivity Short Medium divided urban To: 2 Mile Line Impact

10B-55

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA New-Added Mission 18 Acquire 20 AC for 18 wheelers can 2024 $3,000,000 City of Mission Safety Medium Medium Projects wheeler Truck park overnight vs residential area Impact Parking RGV USA RGV Plans Glasscock Rd. Construct 4 lane From: Military 2024 $12,047,101 City of Mission Connectivity Short Low divided urban Hwy FM 1016 Impact To: FM494 Granjeno RGV USA RGV Plans Trinity Rd. Construct 4 lane From: FM1016 2024 $6,758,730 City of Mission Connectivity Short Medium divided urban Military Hwy Impact To: Bryan Rd. RGV USA RGV Plans Tri-County Hike & Will interconnect all hike and bike 2024 $3,000,000 City of Mission Multimodal Short Medium Bike Trail trails of the three counties. Impact

RGV USA RGV Plans Mission 18 Acquire 20 AC for 18 wheelers can 2024 $3,000,000 City of Mission Asset Short Medium wheeler Truck park overnight vs residential area Preservation Impact Parking RGV USA RGV Plans Proposed Construct Railroad City of Mission 2025 $133,000,000 City of Mission Mobility & Medium Medium Mission/ and Vehicular Reliability Impact Madero/Reynosa bridge crossing to International Mexico Border Crossing RGV USA RGV Plans Inspiration/Milita Construct 4 lane From: IH2 To: 2027 $31,436,942 City of Mission Connectivity Medium Medium ry Pkway Loop divided urban FM1016 Impact (Conway Ave.) RGV USA RGV Plans Rail Connectivity Will connect 100 From: Mission 2022 $100,000,000 City of Mission Mobility & Short Medium between City of miles of rail from To: Hebronville jointly with the Reliability Impact Mission/Hebbron Mission to Hidalgo County ville Hebbronville, Texas RMA aligned with the Mission Madero Reynosa International Multimodal Bridge. RGV USA RGV Pharr POE 2.0 New import and Land West of 2050 $55,000,000 City of Pharr Safety Long High Stakeholders export lots with all Bridge Toll Impact new infrastructure Administration and technology offices, North of levee and South of Military Hwy.

10B-56

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Pharr-Reynosa The project will at Pharr 2024 $15,000,000 City of Pharr / Mobility & Medium High Stakeholders International increase the Reynosa DAP Reliability Impact Bridge Expansion inspection capacity Bridge, Project of imports that are 26°04'N transported by 98°13'W semitrailer and truck vehicles entering the Pharr Land Port of Entry (LPOE). Project includes construction of : two new inbound commercial lanes, Superwide load bypass lane, two primary inspection booths and canopy, Selective demolition of the existing VACIS Building, repair of concrete paved areas, Construction of two new exit booths and canopy to the BSIF Exit and Site Lighting RGV USA RGV Pharr-Reynosa NB Grain Silos & at Pharr 2025 $3,000,000 City of Pharr / Asset Medium High Stakeholders International Processing Center Reynosa DAP Preservation Impact Bridge Future (2-3) Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa Export Lot Phase II at Pharr 2030 $2,500,000 City of Pharr / Mobility & Medium High Stakeholders International Expansion (In-Bond) Reynosa DAP Reliability Impact Bridge Future Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa Complete Import Lot at Pharr 2030 $30,000,000 City of Pharr / Mobility & Long High Stakeholders International Expansion Phase II Reynosa DAP Reliability Impact Bridge Future Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa IBTC at Pharr 2035 $150,000,000 City of Pharr / Mobility & Long High Stakeholders International Expansion/Overweig Reynosa DAP Reliability Impact Bridge Future ht Corridor to Bridge, Master Plan Cameron County 26°04'N Freight Connection 98°13'W

10B-57

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Pharr-Reynosa Rail Spur at Pharr 2040 $130,000,000 City of Pharr / Multimodal Long High Stakeholders International Reynosa DAP Impact Bridge Future Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa Truck at Pharr 2040 $7,000,000 City of Pharr / Asset Medium High Stakeholders International Parking/Staging Reynosa DAP Preservation Impact Bridge Future (Secure Yard #2) Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa Truck at Pharr 2040 $7,000,000 City of Pharr / Asset Medium High Stakeholders International Parking/Staging Reynosa DAP Preservation Impact Bridge Future (Secure Yard #3) Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Pharr-Reynosa IBTC/Overweight at Pharr 2040 $4,500,000 City of Pharr / Asset Medium High Stakeholders International Truck Parking Reynosa DAP Preservation Impact Bridge Future Pockets (3) Bridge, Master Plan 26°04'N 98°13'W RGV USA RGV Modernization of Upgrade and Pharr POE 2025 $15,000,000 City of Pharr / Mobility & Medium High Stakeholders Existing POE augment current DAP 2022 Reliability Impact Infrastructure & infrastructure to Technology meet public safety (LEIDOS, RPMs, standards and for LPRs) process improvements/strea mlining RGV USA RGV North-side & Extend existing Pharr POE 2026 $2,400,000 City of Pharr / Asset Medium High Stakeholders East-side Import docks to match Import Lot DAP 2023 Preservation Impact Lot Dock DAP16 dock depth Extensions from 50' to 80' RGV USA RGV FAST NB Lane & Dedicated FAST Pharr Toll 2021 $3,000,000 City of Pharr/ Mobility & Short High Stakeholders Former Import lane through former Booths to BSIF CBP Reliability Impact Lot Expansion POE/Toll Lanes (Truck Transfer, CES and/or UCP) RGV USA RGV Import Lot Control tower for Pharr POE 2024 $2,000,000 City of Pharr/ Asset Short High Stakeholders Control 360 views/line of Import Lot DAP 2021 Preservation Impact Tower/Command sight to control flow Center of traffic and expedite truck movement

10B-58

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV C-TPAT/Empties C-TPAT/Empties Pharr POE POV 2028 $3,000,000 City of Pharr/ Mobility & Medium High Stakeholders NB POV Lanes (2) exclusive lane Lanes/Booths Future DAP Reliability Impact through POV to BSIF primaries RGV USA RGV (IN PROGRESS) Twin Bridge with 4 Pharr 2025 $100,000,000 City of Pharr/ Mobility & Medium High Stakeholders Bridge Additional Lanes for International SCT/BANOBRA Reliability Impact Expansion/2nd U.S. and Mexico Bridge (3 S Span miles of bridge) RGV USA RGV Additional SB Toll Toll system upgrade Pharr Bridge, 2027 $1,700,000 City of Mobility & Medium High Stakeholders Lanes (2) & Toll and interlocal SH550 to Port Pharr/CCRMA Reliability Impact System Upgrade commercial toll of Brownsville (Regional agreement between Integrated Pharr Bridge & System) CCRMA RGV USA RGV Pre-Inspection Truck pre-inspection Mid-Point of 2025 $3,000,000 City of Safety Medium High Stakeholders Import Lot Bridge station prior to Bridge to POE Pharr/U.S. Impact Off Ramp entering import lot Import Lot Customs Brokers Association RGV USA FM 755 Extend FM 755 to Fromm FM 2021 $5,000,000 City of Rio Mobility & Short Medium Starr-Camargo 755 to Starr- Grande City Reliability Impact Bridge Camargo Bridge RGV USA RGV Plans 22001901 Military Hwy Widen to 4 Lane S Cage Blvd. to 2050+ $49,393,500 County Connectivity Long High Divided Rural 0220- Mile 3 E - Impact 01- Cameron County Line RGV USA RGV Plans 18040105 Trenton Rd Construct New 4 FM 1423 (Val 2050+ $16,092,000 County Connectivity Long Medium 7 Lane Divided Verde) to FM Impact 1015 RGV USA RGV Plans FM 492 Widen to 4 Lane US 83 to FM 2050+ $14,527,500 County Connectivity Long Medium 2221 Impact RGV USA RGV Plans Moore Field Rd Widen to 4 Lane FM 2221 to 2050+ $14,527,500 County Connectivity Long Medium US 83 Impact RGV USA RGV Plans FM 1425 Widen to 4 Lane SH 107 to 2050+ $13,410,000 County Connectivity Long Medium Divided MILE 9 N Impact RGV USA RGV Plans FM 495 Extend 2 Lane FM FM 1423 (Val 2050+ $17,509,500 County Connectivity Long High Road Verde) to FM Impact 1015 RGV USA RGV Plans FM 676 (Mile 5 Extend 2 Lane FM Jara Chinas to 2050+ $12,256,650 County Connectivity Long Medium N) Road FM 492 Impact

10B-59

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 22001902 Military Hwy Widen to 4 Lane S Cage Blvd. to 2050+ $49,393,500 County Safety Long Medium Divided Rural 0220- Mile 3 E - Impact 01- Cameron County Line RGV USA RGV Plans 14270103 FM 1423 (Val Proposed 4 lanes Roosevelt to 2050+ $24,000,000 County Connectivity Long Medium 2 Verde) curb and gutter SH 107 Impact RGV USA RGV Plans 12280304 FM 1015 Widen to 4 Lane Mile 12 N Rd 2025 $7,645,369 Edcouch Connectivity Medium Medium 1 Divided 1228-03- to SH 107 Impact 900 RGV USA RGV Plans SH 336 (10th st) Widen to 6 Lanes Trenton Rd to 2030 $7,290,000 Edinburg / Connectivity Medium High SH 107 McAllen Impact RGV USA RGV Plans 69802043 FM 88 Widen to 4 Lane SH 107 to 2040 $6,865,000 Elsa/ HC 1 Mobility & Long Medium Divided 0.2mi N of FM Reliability Impact 1925 RGV USA Lower Rio Bus Inspection Design/Build Los Indios 2030 $1,305,000 Federal Motor Multimodal Long Medium Grande Vallet - Commercial and Carrier Safety Impact Tamaulipas Bus Inspection Administration Border Master Facility Plan RGV USA FMCSA Truck Inspection Funded Veteran's TBD Federal Motor Safety Long High Facilities Plan Construction for Truck Carrier Safety Impact Renovation Administration RGV USA FMCSA Truck Inspection Funded Los Indios TBD Federal Motor Safety Long High Facilities Plan Construction for Carrier Safety Impact Renovation Administration RGV USA FMCSA Truck Inspection Funded Progreso TBD Federal Motor Safety Long Medium Facilities Plan Construction for Carrier Safety Impact Renovation Administration RGV USA FMCSA Truck Inspection New Commercial Donna TBD Federal Motor Safety Long Medium Facilities Plan LPOE / Funded Carrier Safety Impact Design Administration RGV USA FMCSA Truck Inspection New Commercial Anzalduas TBD Federal Motor Safety Long Medium Facilities Plan LPOE / Concept Carrier Safety Impact Design Administration RGV USA FMCSA Truck Inspection Renovation Not Rio Grande TBD Federal Motor Safety Long Medium Facilities Plan Funded City Carrier Safety Impact Administration RGV USA FMCSA Truck Inspection Renovation Not Roma TBD Federal Motor Safety Long High Facilities Plan Funded Carrier Safety Impact Administration

10B-60

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA 2020-2021 32703048 Brazos Island Deepen 16 miles of Brazos Island 2022 $210,500,000 Federal, Local Multimodal Long Medium Texas Port Harbor Ship the Brazos island Harbor Ship Impact Capital Channel Harbor Ship Channel Program - 86th Deepening (Port Channel from its Legislation Brownsville) previously Session authorized depth of 42 feet up to 52 feet RGV USA New-Added FM 509 - Phase 1 Widen to 5 lane BUS 77 to FM 2040 $20,580,000 Harlingen Mobility & Long Medium Projects roadway 508 Reliability Impact RGV USA New-Added FM 509 - Phase 2 Widen to 5 lane City limits near 2040 $27,000,000 Harlingen Mobility & Long High Projects roadway US HWY 281 Reliability Impact to BUS 77 RGV USA New-Added FM 506 Widen to 4 lane FM 509 to 2040 $5,250,000 Harlingen Multimodal Long Medium Projects roadway Port of Impact Harlingen RGV USA RGV Plans 92102448 Mile 6 W Rd Widen to 4 Lane SH 107 to Mile 2024 $8,207,112 HC 1 Connectivity Short High 14 1/2 Impact RGV USA RGV Plans 92102169 Nolana Loop (S3) Widen to 4 Lane FM 1423 to 2030 $3,816,526 HC 1 Connectivity Medium Medium Divided FM 493 Impact RGV USA RGV Plans 92102169 Nolana Loop (S4) Widen to 4 Lane FM 493 to FM 2030 $3,031,852 HC 1 Connectivity Medium Medium Divided 88 Impact RGV USA RGV Plans 92102169 Nolana Loop (S2) Widen to 4 Lane FM 907 to FM 2030 $2,903,952 HC 1-2 Connectivity Medium Medium Divided 1423 Impact RGV USA RGV Plans 86301048 FM 493 (La Widen to 4 Lane Mile 14 N Rd 2023 $7,405,340 HC 1-4 Connectivity Short Medium Blanca) Divided to Mile 10 N Impact Rd RGV USA RGV Plans 18030109 FM 1925 Proposed 4 lanes FM 681 to 2026 $20,515,301 HC 3 Connectivity Medium Medium 5 curb and gutter Wallace Rd Impact RGV USA RGV Plans 52801116 SH 107 Widen to 6 lane with FM 681 to FM 2026 $12,822,063 HC 3 Connectivity Medium High raised median 2220 Impact RGV USA RGV Plans 66901060 FM 681 Widen to 6 lane with FM 2221 to 2026 $6,411,031 HC 3 Connectivity Medium Medium raised median SH 107 Impact (Conway) RGV USA RGV Plans 92102322 Liberty Blvd Construct 2 lanes Mile 3 Rd to 2028 $6,795,621 HC 3 Connectivity Medium Medium (Phase II) with shoulders FM 2221 Impact RGV USA RGV Plans 34201093 Bus 281 / SH Operational Bus 281-W to 2021 $19,000,000 HC 4 Safety Short High 107 Improvements and I-69C (US 281) Impact Rehabilitation RGV USA RGV Plans 18030109 FM 1925 6 lane with raised Wallace to 2022 $20,000,000 HC 4 Connectivity Short Medium 4 median 10th St Impact RGV USA RGV Plans 18030203 FM 1925 Widen to 4 Lane FM 907 2022 $10,000,000 HC 4 Connectivity Short Medium 5 Divided (Alamo Rd) to Impact Sharp Rd

10B-61

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 92102368 365 Tollway 4 Lane Controlled 365 Tollway, 2021 $255,000,000 HCRMA Mobility & Short High Access Tolled From FM 396 Reliability Impact Facility to US 281 RGV USA RGV Plans 92102202 International New Location FM 493 to IH 2030 $180,000,000 HCRMA Mobility & Medium Medium Bridge Trade Freeway 2 Reliability Impact Corridor (IBTC) - Phase II ultimate RGV USA RGV Plans 92102142 International 4 lane divided - at 365 Tollway at 2030 $80,812,000 HCRMA Mobility & Medium High Bridge Trade grade - non toll FM 493 to IH- Reliability Impact Corridor (IBTC) - facility 2 Phase I RGV USA RGV Plans 36270100 SH 365 (Phase II) Toll improvement FM 396 2040 $37,620,524 HCRMA Mobility & Long Medium 2 being a 4 lane (Anzalduas Reliability Impact controlled access Highway) to facility FM 1016 (Conway Rd) RGV USA RGV Plans SH 365 (Ultimate Expansion from a 4- US 281 2050+ $75,371,557 HCRMA Mobility & Long Medium Construction) lane to 6 lane Military Reliability Impact controlled access Highway to FM toll facility 1016 (Conway (constructing an Rd) additional 2-lanes) RGV USA New-Added SH 495 From: FM 1423 To: Construct 5 FY 2030 $14,000,000 Hidalgo County Connectivity Medium Medium Projects Extension FM 493 lane divided Pct. #1 Impact urban RGV USA New-Added SH 495 From: FM 493 To: Construct 5 FY 2030 $22,000,000 Hidalgo County Connectivity Medium Medium Projects Extension Mile 6 Rd lane divided Pct. #1 Impact urban RGV USA New-Added FM 1925 From: FM 2221 To: Construct 2 FY 2030 $13,500,000 Hidalgo County Connectivity Medium Low Projects Extension 3.1 Miles N. lane rural Pct. #3 Impact roadway RGV USA New-Added FM 1925 From: Jara Chinas Construct 2 FY 2030 $37,000,000 Hidalgo County Connectivity Medium Medium Projects Extension Rd To: 8.6 Miles lane rural Pct. #3 Impact East roadway RGV USA New-Added La Joya Bypass On the La Joya Construct 2 FY 2030 $18,000,000 Hidalgo County Safety Medium Low Projects Two Overpasses Bypass at Overpasses Pct. #3/City of Impact Dr. & 1.9 MI W. of La Joya FM 2221 RGV USA RGV Plans - 92108360 Mile 10 N Proposed 4 lane From Mile 6 to 2024 $16,500,000 Hidalgo County Connectivity Short Medium Stakeholder added capacity FM1015 Pct.#1 Impact Email urban section 10/05/2020

10B-62

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans - Weslaco Loop Proposed 4 lane From FM 1015 2026 $35,000,000 Hidalgo County Connectivity Medium Medium Stakeholder urban section West to Bus Pct.#1 Impact Email 83 10/05/2020 RGV USA RGV Plans - 92102447 Mile 6 W Rd Proposed 4 lane From Mile 2026 $22,000,000 Hidalgo County Connectivity Medium Medium Stakeholder added capacity 14.5 to Mile Pct.#1 Impact Email urban section 11 N 10/05/2020 RGV USA RGV Plans - 92102403 Eldora Rd Proposed 4 lane FM 3362 2022 $13,700,000 Hidalgo County Connectivity Short High Stakeholder divided urban (Jackson Pct.#2 Impact Email facility corridor Road) to 10/05/2020 Veterans Blvd (I Rd) RGV USA Stakeholder Access from Expand Coyote Drive to connect to the 2021 TBD La Joya Connectivity Short Medium Email Coyote Drive to new Loop Impact 10/05/202 the new Loop RGV USA RGV Plans Jara Chinas Widen to 4 Lane FM 2221 to 2050+ $13,991,100 La Joya Connectivity Long Medium Divided Rural US 83 Impact RGV USA RGV Plans FM 491 (Base Widen to 4 Lane Mile 10 N Rd. 2050+ $14,527,500 La Villa / Connectivity Long Medium Line) Divided to SH 107 county Impact RGV USA FY 2021 - 0 San Benito Construction and San Benito 2022 - $3,375,792 LRGVDC Multimodal Short High 2024 RGVMPO Sidewalk Project rehabilitation of 2023 Impact Transit TIP sidewalks in San Benito, TX RGV USA RGV Plans 92102361 Nolana Loop (S1) Widen to 4 Lane FM 1426 2023 $10,792,787 McAllen Connectivity Short Medium Divided (Raul Impact Longoria) to FM 907 RGV USA RGV Plans FM 495 Widen to 6 lane Conway Ave. to 2050+ $12,469,500 McAllen Connectivity Long High divided FM 1926 Impact (23rd Street) RGV USA RGV Plans 20940106 FM 2220 (Ware 6 Lanes Divided FM 1925 2022 $17,000,000 McAllen / HC 3- Connectivity Short Medium 3 Rd) Urban Section (Monte Cristo) 4 Impact to SH 107 RGV USA RGV Plans 20940106 FM 2220 (Ware Proposed 6 Lane SH 107 to Mile 2024 $17,470,000 McAllen / HC 3- Connectivity Short Medium 2 Rd) Median 5 N (Auburn 4 Impact Ave) RGV USA RGV Plans 62101095 SH 336 (10th st) Widen to 6 Lanes S 2nd St. to 2050+ $11,736,000 McAllen / Connectivity Long Medium Divided 2966-01- US 281 Hidalgo / Impact 009 Military Hwy County (widening of Bridge) RGV USA RGV Plans FM 495 Widen to 6 lane 2nd St 2030 $9,535,500 McAllen / Pharr Connectivity Medium High divided (McAllen) to Impact US 281

10B-63

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA New-Added McAllen Hidalgo Passanger Car Hidlago 2025 $5,000,000 McAllen Mobility & Medium High Projects Port of Entry Expansion Project - Hidalgo Bridge Reliability Impact This Project will add Board vehicular lanes and relocate CBP command center RGV USA New-Added McAllen Hidalgo Transit Hidlago 2028 $1,800,000 McAllen Multimodal Medium High Projects Port of Entry Infrastructure Hidalgo Bridge Impact Modernization and Board Expansion RGV USA New-Added McAllen Hidalgo Roadway Network Hidlago 2030 $7,500,000 McAllen Mobility & Medium Medium Projects Port of Entry and Modernization Hidalgo Bridge Reliability Impact Improvement Board RGV USA Chapter 5 - Runway Runway 14-32 (and McAllen 2019 - $22,420,000 McAllen Multimodal Short Medium Recommended Improvement Taxiway A) Safety 2022 International Impact Master Plan Improvements Airport Concept Phases I to IV RGV USA Chapter 5 - Apron Cargo Apron McAllen 2023 - $8,600,000 McAllen Multimodal Short Low Recommended Reconstruction Reconstruction 2024 International Impact Master Plan Phases 1 and 2 Airport Concept RGV USA Chapter 5 - Runway Widen US Customs McAllen 2025 - $997,000 McAllen Multimodal Medium Medium Recommended Improvement Apron Taxiway to 50 2029 International Impact Master Plan feet Airport Concept RGV USA Chapter 5 - Runway Construct Parallel McAllen 2030 - $253,417,000 McAllen Multimodal Long Medium Recommended Improvement Runway 14R-32L 2039 International Impact Master Plan Airport Concept RGV USA Chapter 5 - Terminal Design and McAllen 2030 - $72,858,000 McAllen Multimodal Long Medium Recommended Expansion Construction of 2039 International Impact Master Plan Terminal Expansion Airport Concept RGV USA RGV Plans Military Hwy Construct 4 Lane FM 494 (Shary 2050+ $13,410,000 Mission Connectivity Long Low Rd) to FM Impact 1427 (Abram) RGV USA RGV Plans Inspiration Rd Widen to 4 Lane US 83 to 2050+ $6,928,500 Mission Connectivity Long Medium Military Hwy Impact RGV USA RGV Plans 92102395 Inspiration Rd/ Widen to 4 Lane IH-2 to FM 2024 $16,477,935 Mission / Connectivity Short Medium Military Pkwy Divided 1016 McAllen / Impact Loop Hidalgo RGV USA RGV Plans 52801118 SH 107 (Conway) Construct 6 Lane w FM 1924 (Mile 2022 $17,779,927 Mission/Palmh Connectivity Short High Raised Median 3 N) to SH 495 urst/HC 3 Impact

10B-64

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Reynosa Airport Connection to major Libramiento 2030 $32,000,000 Operadora Multimodal Medium Medium Stakeholders Expansion (Air freight corridors in Sur II to Mexicana de Impact Cargo Facility) Reynosa that have a Mexico Aeropuertos direct connection to Customs at (OMA) Pharr Bridge Reynosa-Pharr (Aduana-SAT) RGV USA RGV Plans 52801113 SH 107 (Conway) Construct 6 Lane FM 676 (Mile 2022 $9,423,361 Palmhurst/Alto Connectivity Short High Divided Rural 5 N) to FM n/HC 3 Impact 1924 (Mile 3 N) RGV USA RGV Plans 92102425 Pharr Bridge Dock Expansion @ Pharr Int'l 2022 $11,500,000 Pharr Asset Short Medium Dock Expansion Phase II Bridge Preservation Impact Phase II RGV USA RGV Plans 92102423 Pharr Bridge Pharr Commercial @ Pharr Int'l 2022 $7,500,000 Pharr Asset Short Medium Commercial Vehicle Staging Area Bridge Preservation Impact Staging RGV USA RGV Plans 92102424 Pharr Bridge Dock Expansion @ Pharr Int'l 2022 $5,500,000 Pharr Asset Short Medium Dock Expansion Phase I Bridge Preservation Impact Phase I RGV USA RGV Plans 92102943 Pharr Bridge Agricultural Lab and @ Pharr Int'l 2030 $8,000,000 Pharr Asset Medium Medium Agricultural Lab Training Center Bridge Preservation Impact RGV USA RGV Plans 92102363 I Rd Construct 2 Lane w/ Rancho Blanco 2024 $10,000,000 Pharr/San Connectivity Short Medium Shoulders to Military Hwy Juan/ HC 2 Impact RGV USA RGV Plans 92106292 CS Strengthen port Port of 2021 $4,832,000 Port of Connectivity Short Medium roadways - Harlingen Harlingen Impact Cemetery Rd., Port Rd. RGV USA Port Access Robles Road Construction of a FM 1846 to 2021 $5,262,841 Port of Asset Long Low Improvement (Port Harlingen) queuing area and Arroyo Harlingen Preservation Impact Program - expansion of Robles Colorado Authority Rider 38 Road by 2,200 linear feet RGV USA New-Added Expansion of Expand the existing Progreso 2021 $28,000,000 Progreso Asset Short Medium Projects Commercial Federal Import International Bridge Preservation Impact Facilities Inspection Dock to Bridge increase the capacity, add a refrigerated room, & FDA inspection office for processing of perishable cargo. Construct a new export dock & FMCSA inspection station.

10B-65

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA New-Added Construction of Construct second Progreso 2024 $25,000,000 Progreso Mobility & Short Medium Projects 2nd Commercial commercial span for International Bridge Reliability Impact Span 2 commercial lanes Bridge allowing the existing span to be utilized for inbound traffic and the proposed span to be utilized for outbound traffic. RGV USA Federal Energy Rio Bravo Feedstock supply to Ends at Port of projected $2,173,000,0 Rio Bravo Multimodal Short Medium Regulatory Pipeline Project Rio Grande LNG Brownsville completi 00 Pipeline/Enbrid Impact Commission project; runs from on 2023 ge area northwest of Agua Dulce hub to Brownsville RGV USA RGV Plans 92102399 Cesar Chavez Local Street Bus 83 to 2023 $5,955,000 San Juan / Connectivity Short Medium Widening Ridge Alamo / HC 1-2 Impact RGV USA RGV Plans 92102405 Cesar Chavez Rd Divided Urban Business 83 to 2023 $14,847,575 San Juan / Connectivity Short Medium Section Nolana Loop Alamo / HC 1-2 Impact RGV USA RGV Plans 36320100 SL 195 New Location Non- NEW 2024 $49,500,000 Starr County Connectivity Short Medium 1 Freeway LOCATION, FM Impact 3167 to FM 755 RGV USA RGV Plans 36320100 SL 195 New Location Non- New Location, 2025 $59,300,000 Starr County Mobility & Long Medium 1 Freeway FM 3167 to Reliability Impact FM 649 RGV USA RGV Plans 36320100 SL 195 New Location Non- New Location, 2035 $108,800,000 Starr County Mobility & Long Medium 2 Freeway FM 649 to Reliability Impact Loma Blanca Road RGV USA RGV Plans 36320100 SL 195 Alternate Option 1 US 83 2035 $90,000,000 Starr County Mobility & Long Medium 3 (Pimienta Rd) Reliability Impact to SL 195 and FM 755 RGV USA RGV Plans 36320100 SL 195 Alternate Option 2 US 83 2035 $160,000,000 Starr County Mobility & Long Medium 3 (Pimienta Rd) Reliability Impact to FM 755 RGV USA RGV Plans 3806045 US 83 Widen From 2 Lane .255 Mi North 2021 $25,557,000 TxDOT Mobility & Short High Undivided to 4 Lane of Reliability Impact Starr/Zapata CL to .31 Mi North of FM 2098 (South Leg)

10B-66

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA New-Added 3806047 US 83 Widen From 2 Lane 0.31 Mi South 2021 $22,227,000 TxDOT Mobility & Long High Projects Undivided to 4 Lane of Placido Rd. Reliability Impact to 0.09 Mi North of Loma Blanca Rd. RGV USA RGV Plans 10640102 FM 676 (Mile 5 Widen to 4 Lane SH 107 2022 $18,830,374 TXDOT Connectivity Short Medium 7 N) Divided (Conway) to Impact Taylor Rd RGV USA RGV Plans 25507140 US 281 Rural Expy Facility- 0.273 mi S SH 2022 $80,000,000 TxDOT Mobility & Short High Construct 4 lanes 186 to 0.023 Reliability Impact with overpasses & mi N FM 490 two - 2 lanes frontage roads RGV USA RGV Plans 48201036 SH 285 Super-2 Highway FM 1017 to 2022 $23,000,000 TxDOT Connectivity Short Medium JIM Impact HOGG/BROOK S CL RGV USA RGV Plans 27170102 FM 3248 Construct 6 lanes IH-69E to FM 2022 $15,120,000 TxDOT Connectivity Short High 7 with raised center 1847 Impact median. RGV USA RGV Plans 11370203 Loop 499 Construct 6 lanes Business 77 to 2022 $15,000,000 TxDOT Connectivity Short Medium 8 road with Raised SS 206 Impact Median RGV USA RGV Plans 11400203 FM 802 Proposed 6 lanes F.M. 1847 to 2022 $14,000,000 TxDOT Connectivity Short High 8 with raised center Old Port Isabel Impact median. Rd. RGV USA RGV Plans 86501108 CS - Veterans 4 Lanes divided IH-2/US 83 to 2022 $11,360,000 TxDOT Connectivity Short High Blvd (Future SH urban SH 364 (La Impact 495) Homa Rd) RGV USA RGV Plans 25506069 US 281 Convert Non- HIDALGO/BRO 2024 $267,186,465 TxDOT Mobility & Short High Freeway To Freeway OKS COUNTY Reliability Impact LINE to 0.315 MI N OF SH 186 RGV USA RGV Plans 25505043 US 281 Convert Non- 3.158 MI N. 2024 $260,167,905 TxDOT Mobility & Short Medium Freeway To Freeway OF FM 755 to Reliability Impact 0.682 MI N. OF FM 755 RGV USA RGV Plans 25504096 US 281 Convert Non- 0.906 MI S OF 2024 $191,200,000 TxDOT Mobility & Short High Freeway To Freeway FM 3066 to Reliability Impact 3.158 MI N OF FM 755

10B-67

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 25505044 US 281 Convert Non- 0.690 MI S OF 2024 $88,900,000 TxDOT Mobility & Short Medium Freeway To Freeway FM 755 to Reliability Impact HIDALGO/BRO OKS COUNTY LINE RGV USA RGV Plans 32703048 US 77 Freeway Operational 8 MI. S. OF LA 2024 $54,305,807 TxDOT Safety Short Medium Improvements PARRA AVE. to Impact 9.6 MI. N. OF NORIAS RD. RGV USA RGV Plans 48202034 SH 285 Widen Non- Freeway JIM 2024 $38,395,000 TxDOT Connectivity Short Medium HOGG/BROOK Impact to S CL FM 1329 RGV USA RGV Plans 34202052 SH 107 Widen Non- Freeway FM 1425 to 2024 $37,105,711 TxDOT Connectivity Short Medium WEST LEVEE Impact RGV USA RGV Plans 3912057 BUS 77 Proposed 6 lane FM 509 to 2024 $29,400,000 TxDOT Mobility & Short High with a raised Arroyo Reliability Impact median Colorado Bridge RGV USA RGV Plans 15860107 FM 907 Widen Non- Freeway SH 107 to 2024 $29,000,000 TxDOT Connectivity Short Medium 5 NOLANA LOOP Impact RGV USA RGV Plans 68403019 FM 1732 Widen to 4 lane US 281 to IH- 2024 $22,560,000 TxDOT Connectivity Short Medium rural 69E Impact RGV USA RGV Plans 3907049 IH 69E/US 77/83 Proposed at FM 732 2024 $17,810,000 TxDOT Connectivity Short High Northbound Continuous Intersection Impact Frontage Roads and Intersection improvement RGV USA RGV Plans 36290100 SH 68 Construct new 4 US 83 to FM 2024 $180,000,000 TxDOT Connectivity Short Medium 1 lane divided rural 1925 Impact highway facility RGV USA RGV Plans 22005076 SH 48 Proposed 6 lanes SH 4 to FM 2025 $28,043,000 TxDOT Connectivity Medium High with raised median 511 Impact RGV USA RGV Plans 22004049 US 281 Widen to 4 lane FM 1421 to 2025 $12,500,000 TxDOT Mobility & Medium Medium rural FM 1577 Reliability Impact RGV USA RGV Plans 22004050 US 281 Widen to 4 Lane FM 732 to FM 2028 $7,700,000 TxDOT Mobility & Medium Medium Rural 1577 Reliability Impact RGV USA RGV Plans 36290100 SH 68 - Phase II Divided Rural FM 1925 to IH 2030 $68,560,000 TxDOT Connectivity Medium Medium 2 Highway 69C / US 281 Impact RGV USA RGV Plans SH 48 Build a SH 48 overpass (with ramps) at 2030 $15,000,000 TxDOT Safety Medium Medium the entrance to the Next Decade LNG Impact facility.

10B-68

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA RGV Plans 92102353 I 69 Connector Widen Non- Freeway ON FM 1925 2031 $495,378,749 TxDOT Mobility & Long Medium FROM IH- Reliability Impact 69C/US 281 to IH-69E/US 77 RGV USA RGV Plans SH 48 Construct 2 lane 1/4 mile East 2036 $9,500,000 TxDOT Connectivity Long Medium frontage road and of FM 511 to Impact ramps (East bound) 1/4 mile East of entrace to the Fishing Harbor RGV USA RGV Plans SH 48 Construct 2 lane 1/4 mile East 2036 $9,900,000 TxDOT Mobility & Long Medium frontage road and of entrance to Reliability Impact ramps (West bound) the Fishing Harbor to FM 511/SH 48 overpass RGV USA RGV Plans 36290100 SH 68 - Phase III Main Lanes with IH 2 / US 83 2040 $383,730,000 TxDOT Connectivity Long Medium 3 Overpasses to IH 69C / US Impact 281 RGV USA New-Added FM 755 Super 2 US 83 to US Jan-35 $130,000,000 TxDOT Safety Long High Projects 281 Impact RGV USA New-Added SH 16 Super 2 US 83 to SH Jan-35 $110,000,000 TxDOT Connectivity Long Medium Projects 285 Impact RGV USA New-Added 3902074 FM 886 Overpass Contruct Overpass US 83 @ FM Jan-35 $30,000,000 TxDOT Connectivity Long Medium Projects 886 Impact RGV USA New-Added IH-2/SH 68 Construct @ IH-2 & SH Jan-35 $300,000,000 TxDOT Connectivity Long High Projects Interchange (Ph Interchange 68 Impact III) Intersection RGV USA New-Added 92102353 IH-69 Connector Construct Connector IH-69C to IH- Jan-35 $495,000,000 TxDOT Connectivity Long Medium Projects 69E Impact RGV USA RGV Plans US 83 Wided to 6 lanes 0.25 Mi W of 2050+ $12,714,000 TXDOT Mobility & Long Medium FM 2221 to Reliability Impact FM 1427 RGV USA RGV Plans IH-69E Grade Construct a grade .5 MI N of 2050+ $11,000,000 TxDOT Mobility & Long High Separation separation University to Reliability Impact Blvd .5 MI S of University RGV USA RGV Plans FM 493 (Salinas) Widen to 4 Lane Champion St 2050+ $12,000,000 TxDOT Connectivity Long Medium to Military Hwy Impact (US281) RGV USA Texas Freight 22005076 SH 48 (Port Widen to 6 Lane SH 4 to FM 2024 $28,043,000 Connectivity Short High Mobility Plan Brownsville) W/Raised Median 511 Impact 2018

10B-69

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV USA TxDOT Port Port Road (Port Port Road - Port Road 2024 $3,500,000 Connectivity Long Medium Connectivity Isabel) Construct New 2- Impact Report - 2020- lane Roadway 2021 Texas Port Mission Plan RGV USA Texas Freight SH 32/East Loop Construct 2 Lane SH 4 to FM 2030 $100,000,000 Connectivity Long Medium Mobility Plan (Port Brownsville) road 3551 Impact 2018 RGV USA Texas Freight SH 32/East Loop Construct 2 Lane FM 3551 to 2030 $12,000,000 Connectivity Long Low Mobility Plan (Port Brownsville) road FM 3550 Impact 2018 RGV USA Texas Freight SH 32/East Loop Construct 2 Lane FM 3550 to 2030 $24,000,000 Connectivity Long Low Mobility Plan (Port Brownsville) road FM 3068 Impact 2018 RGV USA Texas Freight SH 32/East Loop Widen to 4 Lane FM 3068 to 2030 $19,800,000 Connectivity Long Low Mobility Plan (Port Brownsville) Divided FM 1419 Impact 2018 RGV USA Texas Freight SH 32/East Loop Construct 6 Lane FM 1419 to 2030 $100,000,000 Connectivity Long High Mobility Plan (Port Brownsville) Divided urban & 4 US 77/83 Impact 2018 Lane Divided Urban near Veterans Roadways International Bridge RGV USA Texas Freight South Port Construct Direct SH 4 to Oosts 2030 $14,164,000 Connectivity Long Medium Mobility Plan Connector (Port Connector to Port - Rd. Impact 2018 Brownsville) 2 Lane Road RGV USA RGV Roma-Miguel New border crossing 26°24'13"N 2040 TBD Mobility & Long High Stakeholders Alemán International 99°01'08"W Reliability Impact International Suspension Bridge, Suspension status report from Bridge BBBXG RGV USA Lower Rio Sullivan City POE A new port of entry Sullivan City, 2040 $220,000,000 Mobility & Long Medium Grande Vallet - at Sullivan City, TX TX Reliability Impact Tamaulipas coupled with Border Master Gustavo Diaz Ordaz, Plan TM RGV Mexico RGV Rio Grande City- The City of Camargo has proposed a 2050 $35,000,000 City of Camargo Mobility & Long High Stakeholders Camargo Bridge/ new commercial access route to the / SCT Reliability Impact Starr-Camargo International Bridge. Feasibility studies are completed and financing mechanisms are under review. RGV Mexico RGV Pharr-Reynosa Expansion of Access at Pharr 2023 $6,000,000 City of Pharr / Mobility & Short High Stakeholders International to Mexico Customs Reynosa DAP Reliability Impact Bridge Future – 8 Lanes/Overpass Bridge, Master Plan 26°04'N 98°13'W

10B-70

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV Mexico RGV KCSM’s KCSM’s Matamoros New Yard 2030 TBD Mexico Multimodal Long High Stakeholders Matamoros New Mechanical Track Railroads Impact Yard Mechanical Track RGV Mexico Multiple Ferromex’s Ferromex’s Improvements to the TBD Mexico Multimodal Long High Regions Improvements to Monterrey-Altamira corridor Railroads Impact the Monterrey- Altamira corridor RGV Mexico RGV Reynosa North Multimodal logistics Orange Group 2029 $250,000,000 Orange Group Multimodal Medium High Stakeholders Park & Logistics center/trade Investments/C Investments Impact Center zone/industrial park ity of with northbound Reynosa/State pre-inspection of Tamaulipas facility and truck service center RGV Mexico RGV Bridge B&M Conversion of the Bridge B&M 2022 $40,000,000 SCT Mobility & Short High Stakeholders (Tamaulipas) railway bridge to (Tamaulipas) Reliability Impact vehicular bridge RGV Mexico RGV Reynosa-Pharr Construction of a at Pharr 2023 $46,000,000 SCT Mobility & Medium High Stakeholders (Tamaulipas) second span that Reynosa Reliability Impact allows to make this Bridge, Crossing. Proposed 26°04'N modernization of 98°13'W the port by SAT RGV Mexico Multiple Intermountain Project to connect the Matehuala 2021- $475,824,000 SCT Connectivity Short High Regions highway, highway - Saltillo highway from Ciudad 2022 Impact connection of the Victoria-Monterrey Matehuala- Saltillo highway with the Cd. Victoria- Monterrey highway RGV Mexico Stakeholder Nuevo Progreso- Construction of facilities for joint TBD SCT Mobility & Short High Progreso inspections (short term) Reliability Impact RGV Mexico Stakeholder Reynosa-McAllen- Construction of facilities for cargo $23,898,000 SCT Mobility & Short High Anzalduas btidge inspections (short term) Reliability Impact RGV Mexico RGV Bypass Carretera Complete bypass from Saltillo Road to TBD State Govt of Connectivity Long High Stakeholders Saltillo a Reynosa Road Nuevo Leon Impact Carretera Reynosa

10B-71

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV Mexico Tamaulipas Lucio Blanco - Relocation of the Puente 2020 $6,210,000 State of Connectivity Short High Presentation - Los Indios booth on the left Internacional Tamaulipas Impact Received international side, in order to Lucio Blanco - 10/09/2020 bridge increase the width Matamoros of the lane, which has a width of 3.89m, so it was necessary to have a free space of at least 4.60 to cross in a straight line and with it avoid maneuvers that put the entire structure at risk. RGV Mexico Tamaulipas Aldama - Nuevo The project consists Aldama and 2021 $32,200,000 State of Mobility & Short High Presentation - Progreso coastal of the Nuevo Tamaulipas Reliability Impact Received highway Modernization and Progreso 10/09/2020 Construction of the Altamira - Nuevo Progreso Highway. Total length of the Project 80.14 km. includes extending the crown width from 7.0 m to 12.0 m in the Altamira - Mariano Matamoros section (41.70 KM) and construction at a 12.0 m wide crown of the Mariano Matamoros - Nuevo Progreso section (38.5 KM)

10B-72

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV Mexico Tamaulipas Reynosa-Pharr Rehabilitation of the Reynosa 2022 $13,800,000 State of Connectivity Short High Presentation - international existing body by Tamaulipas Impact Received bridge means of a 10/09/2020 Whitetopping type pavement, build concrete slab (32 cm), prior milling (5 cm) and re-leveling of the existing asphalt layer. Construction of a frontage road in the South-North Direction, 8.0 m wide of road and 2.0 km in length for the exclusive traffic of heavy regular cargo traffic and construction of a loop to connect the traffic from Río Bravo to Bypass South II. Construction of a Vehicular Overpass at its junction with Blvd. Luis Donaldo Colosio, to connect light traffic to downtown Reynosa.

10B-73

Region Country Source CSJ Project Name Project Description Project Project Cost Project Sponsor BTMP Timeframe Impact Schedule / Source Project Category RGV Mexico Tamaulipas Rio Bravo – Construction of the Puente 2022 $9,200,000 State of Mobility & Short High Presentation - Donna second stage of the Internacional Tamaulipas Reliability Impact Received international project, expansion Rio Bravo - 10/09/2020 bridge of the Rio Bravo - Donna Donna International Bridge to open the passage of cargo vehicles through it. Access road composed of a 4.87 km long road section, A4S type section to house two traffic bodies, each body houses 2 lanes of 3.50 meters and two boundaries of 2.50 meters RGV Mexico Tamaulipas Mante - Ocampo Construction of a Mante, 2022 $299,000,000 State of Connectivity Short High Presentation - – Tula highway highway that begins Ocampo and Tamaulipas Impact Received near the town of El Tula 10/09/2020 Limón, El Mante and ends in Tula, at the Tula - Ciudad Victoria Junction (MEX-101), with a length of 106.69 kilometers. The highway will be a type A2 highway with a road width of 7.0m, RGV Mexico Tamaulipas Matamoros Construction of Matamoros $7,084,000 State of Multimodal Long High Presentation - seaport docks in the Port of seaport Tamaulipas Impact Received Matamoros, 10/09/2020 Tamaulipas, fishing facilities, potable water distribution system, dredging from main channel, perimeter fence and housing development.

10B-74