Addendum November 2016
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report
The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report January 2003 Ove Arup & Partners International Ltd Admiral House, Rose Wharf, 78 East Street, Leeds LS9 8EE Tel +44 (0)113 242 8498 Fax +44 (0)113 242 8573 REP/FI Job number 68772 The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report CONTENTS Page EXECUTIVE SUMMARY 1 1. INTRODUCTION 9 1.1 Scope of the Report 9 1.2 Study Background and Objectives 9 1.3 Transport Trends 10 1.4 Planning Context 10 1.5 The Integrated Transport Initiative 11 1.6 Study Approach 13 1.7 Light Rapid Transit Systems 13 2. PHASE 1 APPRAISAL 18 2.1 Introduction 18 2.2 Corridor Review 18 2.3 Development Proposals 21 2.4 The City of Edinburgh Conceptual Network 22 2.5 Priorities for Testing 23 2.6 North Edinburgh Loop 24 2.7 South Suburban Line 26 2.8 Appraisal of Long List of Corridor Schemes 29 2.9 Phase 1 Findings 47 3. APPROACH TO PHASE 2 50 3.1 Introduction 50 3.2 Technical Issues and Costs 50 3.3 Rolling Stock 54 3.4 Tram Services, Run Times and Operating Costs 55 3.5 Environmental Impact 55 3.6 Demand Forecasting 56 3.7 Appraisal 61 4. NORTH EDINBURGH LOOP 63 4.1 Alignment and Engineering Issues 63 4.2 Demand and Revenue 65 4.3 Environmental Issues 66 4.4 Integration 67 4.5 Tram Operations and Car Requirements 67 4.6 Costs 68 4.7 Appraisal 69 5. -
Planning Committee 26 February
Notice of meeting and agenda Planning Committee 10.00 am, Thursday, 26 February 2015 Dean of Guild Court Room, City Chambers, High Street, Edinburgh This is a public meeting and members of the public are welcome to attend. Contacts E-mail: [email protected]/ [email protected] Tel: 0131 529 4261/529 4105 1. Order of business 1.1 Including any notices of motion and any other items of business submitted as urgent for consideration at the meeting. 2. Declaration of interests 2.1 Members should declare any financial and non-financial interests they have in the items of business for consideration, identifying the relevant agenda item and the nature of their interest. 3. Deputations 3.1 Cramond and Barnton Community Council – email (circulated) 3.2 Friends of Granton Castle Walled Garden – letter (circulated) 4. Minutes 4.1 Planning Committee of 4 December 2014 – submitted for approval as a correct record. 4.2 Development Management Sub-Committee of 3 and 17 December 2014, 14 and 28 January and 11 February 2015 – submitted for approval as correct records. 4.3 City of Edinburgh Planning Local Review Body of 12 and 26 November, 10 December 2014, 21 January and 4 February 2015 (circulated) (for noting). 5. Planning Policy 5.1 Annual Review of Guidance – report by the Acting Director of Services for Communities (circulated) 6. Planning Process 6.1 Edinburgh Urban Design Panel: Fifth Progress Report – report by the Acting Director of Services for Communities (circulated) 6.2 Stopping Up Orders – Authorisation of Signing to Head of Planning and Building Standards – report by the Acting Director of Services for Communities (circulated) 7. -
Scotrail Franchise – Franchise Agreement
ScotRail Franchise – Franchise Agreement THE SCOTTISH MINISTERS and ABELLIO SCOTRAIL LIMITED SCOTRAIL FRANCHISE AGREEMENT 6453447-13 ScotRail Franchise – Franchise Agreement TABLE OF CONTENTS 1. Interpretation and Definitions .................................................................................... 1 2. Commencement .......................................................................................................... 2 3. Term ............................................................................................................ 3 4 Franchisee’s Obligations ........................................................................................... 3 5 Unjustified Enrichment ............................................................................................... 4 6 Arm's Length Dealings ............................................................................................... 4 7 Compliance with Laws................................................................................................ 4 8 Entire Agreement ........................................................................................................ 4 9 Governing Law ............................................................................................................ 5 SCHEDULE 1 ............................................................................................................ 7 PASSENGER SERVICE OBLIGATIONS ............................................................................................. 7 SCHEDULE 1.1 ........................................................................................................... -
Builyeon Road, South Queensferry
BUILYEON ROAD, SOUTH QUEENSFERRY Introduction This exhibition has been prepared to inform and engage the local community of an emerging residential and community development proposed by CALA Management Limited at Builyeon Road, South Queensferry. A Proposal of Application Notice was submitted to City of Edinburgh Council at the beginning of March 2020, outlining the applicant’s intent to submit a formal planning application in the coming months. This event provides the local community with an opportunity to view the proposals for the new development and provide comment ahead of the formal submission of a planning application. We welcome your views to assist us in developing the proposals further and comment forms are available on the website. The indicative masterplan provides the opportunity to achieve a strong sense of place by embracing a landscape led approach to design and layout. The creation of a new civic hub along with the provision of high quality public open space, have significant potential to benefit existing communities and future residents. Location Plan Diagram, showing the siute oin relation to the wider area. View on site to the north - showing the Queensferry Crossing, The Forth Crossing and The Forth Bridge. BUILYEON ROAD, SOUTH QUEENSFERRY Planning History The site is allocated within the current Local Development Plan (LDP) as HSG32. The site covers an area of approximately 93 acres and is allocated for approximately 900 residential units, employment and a primary school. The LDP contains a brief for the site with the following recommendations:. • Address the General Development Principles on transport and education for South Queensferry. -
YAS AGM 2015– Heriot-Watt University Parking & Directions Edinburgh Campus, Edinburgh EH14 4AS
RSE Young Academy of Scotland- 2015 Annual General Meeting www.youngacademyofscotland.org.uk YAS AGM 2015– Heriot-Watt University Parking & Directions Edinburgh Campus, Edinburgh EH14 4AS To Edinburgh City Centre YAS Parking (free)– Parks A, B, & Q Postgraduate centre: AGM Sessions College Lounge: AGM Dinner College lounge Supported by Converge Challenge: Scotland’s Entrepreneurial Competiton convergechallenge.com 1 RSE Young Academy of Scotland- 2015 Annual General Meeting www.youngacademyofscotland.org.uk Travelling to Heriot-Watt University courtesy of: www.hw.ac.uk Car: Heriot-Watt University is located about 6 miles SouthWest of Edinburgh City Centre; it is half a mile from the Calder Junction of the A720 City of Edinburgh by-pass and the A71, and you’ll see signs for Heriot- Watt University on your approach. You can get driving directions to the Edinburgh Campus through Google Maps or by using the following website: http://www.hw.ac.uk/student-life/campus-life/edinburgh/getting-around.htm Parking will be available, free of charge, in lots A, B, and Q (marked on map above with purple stars ) Bus: Lothian Buses offers local bus services 25, X25, 34, 45 and N25/N34 (night bus) to the Edinburgh Campus. The journey takes about 30–40 minutes from the city centre, depending on what time of day you’re travel- ling. All national coach services to Edinburgh arrive at St Andrew Square bus station, at the east end of Princes Street. Timetables can be found on the Citylink and National Express websites. Rail: The mainline rail network serves the centre of Edinburgh well. -
Final Report Transport Scotland Strategic Transport Projects Review
Strategic Transport Projects Review Edinburgh – Glasgow Rail Improvements October 2007 Final Report Transport Scotland Strategic Transport Projects Review Authorisation Jacobs UK Ltd in association with Tribal Consulting has great pleasure in presenting this document. Copyright Jacobs U.K. Limited. All rights reserved. No part of this report may be copied or reproduced by any means without prior written permission from Jacobs U.K. Limited. If you have received this report in error, please destroy all copies in your possession or control and notify Jacobs U.K. Limited. This report has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing by Jacobs U.K. Limited, no other party may use, make use of or rely on the contents of this report. No liability is accepted by Jacobs U.K. Limited for any use of this report, other than for the purposes for which it was originally prepared and provided. Opinions and information provided in the report are on the basis of Jacobs U.K. Limited using due skill, care and diligence in the preparation of the same and no warranty is provided as to their accuracy. It should be noted and it is expressly stated that no independent verification of any of the documents or information supplied to Jacobs U.K. Limited has been made. It should be noted that all timetables are indicative and require detailed work to prove that they can be planned and operated robustly. Authorisation & Preparation Prepared by: KMcK/GKD/ET Reviewed by: JM/GKD Approved by: JM / GKD Version History Version No. -
Lothian NHS Board Waverley Gate 2-4 Waterloo Place Edinburgh EH1 3EG
Lothian NHS Board Waverley Gate 2-4 Waterloo Place Edinburgh EH1 3EG Telephone: 0131 536 9000 www.nhslothian.scot.nhs.uk www.nhslothian.scot.nhs.uk Date: 05/04/2019 Your Ref: Our Ref: 3431 Enquiries to : Richard Mutch Extension: 35687 Direct Line: 0131 465 5687 [email protected] Dear FREEDOM OF INFORMATION – GP CATCHMENT I write in response to your request for information in relation to GP catchment areas within Lothian. I have been provided with information to help answer your request by the NHS Lothian Primary Care Contract Team. Question: Can you please provide an updated version of the Lothians GP catchment areas list as found at https://www.nhslothian.scot.nhs.uk/YourRights/FOI/RequestAndResponseRegister/2012/320 0.pdf Answer: Practice Practice Name wef Practice Boundary No 70075 Braids Medical 27/09/18 On the northern boundary – the railway line running Practice through Morningside Station. On the west – Colinton 6 Camus Avenue Road where it crosses the railway continuing into Edinburgh EH10 Colinton Mains Drive to the Tesco Roundabout, then 6QT continuing south south-east across country to the Dreghorn Link to the City By-Pass. On the south – cuts across country from the Dreghorn Link to Swanston Golf Course and around the south perimeter of Swanston Golf Course and Swanston village cutting across country in a south easterly direction to meet the Lothian Burn at Hillend Car Park and along the access road until it meets the Bigger Road (A702). Continuing south on the A702 until the triple junction where the A702 meets the A703 and Old Pentland Road, across country in a straight line, crossing the Edinburgh City Bypass (A720) passing the east end of Winton Loan and north by Morton House to Frogston Road West. -
115, Curriehill Castle Drive , Balerno, Eh14
115 CURRIEHILL CASTLE DRIVE BALERNO EH14 5TB Energy performance certificate YouEnergy can use this Performance document to: Certificate (EPC) Scotland Dwellings 115 CURRIEHILL CASTLE DRIVE, BALERNO, EH14 5TB Dwelling type: Semi-detached house Reference number: 4716-8925-7000-0570-0992 Date of assessment: 10 May 2016 Type of assessment: RdSAP, existing dwelling Date of certificate: 16 May 2016 Approved Organisation: Elmhurst Total floor area: 64 m2 Main heating and fuel: Boiler and radiators, mains Primary Energy Indicator: 358 kWh/m2/year gas You can use this document to: • Compare current ratings of properties to see which are more energy efficient and environmentally friendly • Find out how to save energy and money and also reduce CO2 emissions by improving your home Estimated energy costs for your home for 3 years* £2,823 See your recommendations report for more Over 3 years you could save* £1,077 information * based upon the cost of energy for heating, hot water, lighting and ventilation, calculated using standard assumptions Very energy efficient - lower running costs Current Potential Energy Efficiency Rating (92 plus) A This graph shows the current efficiency of your home, (81-91) B 87 taking into account both energy efficiency and fuel costs. The higher this rating, the lower your fuel bills (69-80) C are likely to be. (55-68) D 60 Your current rating is band D (60). The average rating for EPCs in Scotland is band D (61). (39-54 E (21-38) The potential rating shows the effect of undertaking all F of the improvement measures listed within your (1-20) G recommendations report. -
SECTION GC Georgemas Junction Wick
Thurso WORKING TIMETABLE SECTION GC Georgemas Junction Wick Scotscalder Altnabreac Brora HelmsdaleKildonanKinbraceForsinard Dunrobin Castle Golspie Ardgay InvershinLairg Culrain Rogart Tain Fearn Invergordon Alness Kyle of Lochalsh Dingwall Garve Attadale DuirinishPlocktonDuncraig Achanalt Stromferry Muir of Ord Strathcarron Achnasheen Lochluichart Achnashellach Beauly Kennethmont RoseWelshs StreetInverness BridgeMilburn TMD Jn Nairn Forres Elgin Keith Huntly Insch Culloden Inverurie Elgin SB Inverness Moy Dyce Clachnaharry Aberdeen Sig A27 Aberdeen Tomatin Aberdeen Clayhills Car MD Aberdeen Craiginches Berwick-upon-Tweed, North Berwick, & Ferryhill Jn South Slochd Newcraighall to Haymarket West Jn, Portlethen Benhar Jn & Carstairs Carrbridge Newtonhill Aviemore Edinburgh to Airdrie & Falkirk Carmont Stonehaven Kincraig Falkirk to Cumbernauld, Springburn Laurencekirk Kingussie & Glasgow Queen Street High Level Newtonmore Craigo Larbert Jn to Dundee & Inverness Montrose Dalwhinnie Montrose South Edinburgh to Dundee Dalnispidal Inverkeilor Dundee to Inverness Dalnacardoch Arbroath Inverness to Dingwall, Kyle Of Blair Atholl Carnoustie Pitlochry Lochalsh, Thurso & Wick Golf Street Barry Links Dunkeld & Birnan Monifieth Stanley Dundee Balmossie Errol Invergowrie Central Jn DundeeCamperdown Jn Perth Broughty Ferry Blackford Barnhill Gleneagles (Perth) Tay Bridge South Hilton Jn Dunblane SB Leuchars Dunblane Cupar Newburgh Springfield Bridge of Allan Ladybank Stirling Markinch Stirling Glenrothes With Middle CowdenbeathLochgelly Cambus CardendenThornton -
Glasgow – Edinburgh Via Shotts Glaschu Taobh Shotts
11260 ScotRail is part of the Published by (Text Relay Service – for the hard of hearing) 18001 0800 2 901 912 OR 0800 2 901 912 Disabled Assistance 0845 601 5929 scotrailcustomer.relations@firstgroup.com Relations Customer ScotRail 08457 55 00 33 ScotRail Telesales www.scotrail.co.uk ScotRail (please note, calls to this number may be recorded) 08457 48 50 49 National Rail Enquiries First ScotRail Ltd. ScotRail First National Rail network ES M I T – Dùn Èideann N I A R Calling at: Fauldhouse West Calder Livingston South Hailes Wester Slateford A BETTER WAY TO GO. TO A BETTER WAY T 18 May – 13 December 2014 Glasgow – Edinburgh via Shotts Glaschu taobh Shotts Welcome to your new train timetable Station Facilities All trains in this timetable are ScotRail services operated by First, except where otherwise Addiewell U stated. Enhancements include : Monday to Friday peak time services between Aberdeen and Bellshill S Inverurie; additional Monday to Saturday services between Glasgow and Oban; through trains Breich U between Balloch, Dalmuir and Cumbernauld; additional Monday to Friday services between Cambuslang S Glasgow and Ayr; through trains between Edinburgh and Ayr via Carstairs; additional hourly Carfin U Monday to Saturday services between Glasgow and Gourock and an additional Monday to Friday Cleland U early morning service from Wemyss Bay to Glasgow. On Sundays, enhancements include : Curriehill U additional services between Glasgow and Aberdeen; a later train from Glasgow to Wemyss Bay in Edinburgh * S the evening; an extra lunchtime train from Glasgow to Ardrossan Harbour offering an improved Fauldhouse U Campbeltown ferry connection and the introduction of Sunday services at Ardrossan Town, Glasgow Central * S Anderston and between Glasgow, Maryhill and Anniesland. -
ACTION PROGRAMME DECEMBER 2016 the Local Development Plan Sets out Policies and Proposals to Guide Development
ACTION PROGRAMME DECEMBER 2016 The Local Development Plan sets out policies and proposals to guide development. Adopted 24 November 2016 The Action Programme sets out actions to deliver the Plan. The Report of Conformity explains how engagement informed the Plan. The Habitats Regulations Appraisal assesses the Plan’s impact on internationally important bird habitats. The Transport Appraisal identifies transport actions to support the Plan. The Education Appraisal identifies new and expanded schools to support the Plan. The Equalities & Rights Impact Assessment checks what impact the Plan will have on people. The Environmental Report assesses the impact of the Plan and explains the selection of new housing sites. The Housing Land Study sets out the assumption on housing land availability which inform the Local Development Plan. See the documents, supplementary guidance, and other information at: www.edinburgh.gov.uk/localdevelopmentplan www.edinburgh.gov.uk/supplementaryguidance Published in 2011 Published in 2013 Published in 2014 MAIN ISSUES REPORT OCTOBER 2011 Edinburgh Local Development Plan Action Programme Adopted December 2016 Contents 1. Introduction 2. Education Actions and Delivery Programme 3. Transport Actions a. Strategic and general transport actions b. Transport Contribution Zones c. Site specific actions 4. Greenspace Actions 5. Healthcare and Community Facilities 6. Utilities 7. Policies Edinburgh Local Development Plan Action Programme Adopted December 2016 Introduction The Action Programme sets out how the infrastructure and services required to support the growth of the city will delivered. This is the Action Programme which accompanies the adopted Edinburgh Local Development Plan (LDP). Section 21 of the The Action Programme is intended to help align the delivery of the Planning etc. -
Local Development Plan (LDP) Provides a Clear and What This Plan Is For
EDINBURGH LOCAL DEVELOPMENT PLAN NOVEMBER 2016 The Local Development Plan sets out policies and proposals to guide development. Adopted 24 November 2016 The Action Programme sets out actions to deliver the Plan. The Report of Conformity explains how engagement informed the Plan. The Habitats Regulations Appraisal assesses the Plan’s impact on internationally important bird habitats. The Transport Appraisal identifies transport actions to support the Plan. The Education Appraisal identifies new and expanded schools to support the Plan. The Equalities & Rights Impact Assessment checks what impact the Plan will have on people. The Environmental Report assesses the impact of the Plan and explains the selection of new housing sites. The Housing Land Study sets out the assumption on housing land availability which inform the Local Development Plan. See the documents, supplementary guidance, and other information at: www.edinburgh.gov.uk/localdevelopmentplan www.edinburgh.gov.uk/supplementaryguidance Published in 2011 Published in 2013 Published in 2014 MAIN ISSUES REPORT OCTOBER 2011 Edinburgh Local Development Plan November 2016 Contents 1 Introduction 2 Appendix A Conservation Areas 136 Part 1 Strategy and Proposals Appendix B Shopping Centres 138 1 Aims and Strategy 7 Appendix C Table of Financial and Other Contributions 143 2 A Plan to Protect and Enhance the Environment 9 Appendix D CEC Land Ownership Schedule 144 3 A Plan to Provide Jobs, Homes and Services in the Right Locations 19 Appendix E Glossary 153 4 A Plan That Can Deliver 42 Appendix F Index of Policies 160 5 A Plan for All Parts of the City 43 Part 2 Policies 1 Delivering the Strategy 89 2 Design Principles for New Development 93 3 Caring for the Environment 99 4 Employment and Economic Development 108 5 Housing and Community Facilities 114 6 Shopping and Leisure 119 7 Transport 126 8 Resources and Services 132 1 Edinburgh Local Development Plan November 2016 Foreword 1 Introduction Edinburgh is a successful, growing city.