2019-2024 TIP Transportation Improvement Program

BOWLING GREEN-WARREN COUNTY MPO 1141 State Street | Bowling Green, KY 42101 www.bgareampo.org | 270.842.1953

Approved by the MPO Policy Committee: September 30, 2019

ABSTRACT ...... 1

METROPOLITAN TRANSPORTATION PLANNING PROCESS CERTIFICATION ...... 2

RESOLUTION OF THE BOWLING GREEN – WARREN COUNTY...... 3

METROPOLITAN PLANNING ORGANIZATION ...... 3

TRANSPORTATION IMPROVEMENT PROGRAM ...... 3

FISCAL YEAR 2019-2024 ...... 3

Introduction ...... 4 Transportation Improvement Program Development ...... 4 Public Participation ...... 5 Title VI of the Civil Rights Act of 1964 ...... 5 TIP Amendments & Modifications ...... 5 TIP Amendments ...... 5 TIP Administrative Modifications ...... 6 Air Quality Conformity ...... 6

Fiscal Constraint ...... 6

Project Types and Project Funds Classification ...... 7 Federal Transit Programs ...... 7 Federal Highway Programs ...... 7 State Programs ...... 7

Grouped Projects ...... 8

Summary of Funding ...... 10

Completed Projects from the Previous TIP ...... 11

Federally Funded Transportation Projects ...... 13

Transit Projects ...... 33 Financial Capacity Assessment ...... 33 Bowling Green Public Transit Program of Projects Public Review ...... 33

National Transportation Performance Measures and State Targets ...... 35 Highway Performance Measures ...... 35 Performance Measures: Safety ...... 35 Performance Measures: Asset Management ...... 35 Performance Measures: System Performance ...... 36 Anticipated Performance Measure Effects ...... 36 Transit Performance Measures ...... 40 Transit Asset Management ...... 40 APPENDIX A ...... 42 METROPOLITAN TRANSPORTATION PLAN REFERENCE ...... 42

APPENDIX B ...... 44 PUBLIC AND STAKEHOLDER COMMENTS...... 44

APPENDIX C ...... 45 RESOLUTIONS & CERTIFICATIONS ...... 45

APPENDIX D ...... 52 INFORMATIONAL SUPPLEMENT ...... 52

ABSTRACT

Title: Bowling Green – Warren County Transportation Improvement Program Fiscal Years 2019-2024

Date: September 2019

Agency: The City-County Planning Commission of Warren County is the staff agency for the Bowling Green-Warren County Metropolitan Planning Organization (MPO).

Report Abstract: The preparation of the Transportation Improvement Program (TIP) is a requirement by USDOT for Federal Highway and Federal Transit transportation funding. The TIP is a prioritized list of federally funded transportation programs and projects covering a period of five years. The TIP executes the allocation of transportation funds and outlines what phases will receive funding and the estimated cost of the projects.

It is approved by the MPO and the of and/or the Kentucky Transportation Cabinet. It provides a listing of all regionally significant highway and transit improvements that are planned for implementation by municipal, county, or state governments.

Source of Copies: Bowling Green-Warren County Metropolitan Planning Organization 1141 State Street Bowling Green, KY 42101 Phone: (270) 842-1953

Available online for free download at: www.bgareampo.org

Page | 1

Introduction

The Bowling Green-Warren County Metropolitan Planning Organization (MPO) was officially established in 2003. The Federal Highway Act of 1962 requires the formation of a MPO for any urbanized area with a population greater than 50,000. MPOs were created in order to ensure that existing and future expenditures for transportation projects and programs are based on a continuing, comprehensive, and cooperative (3-C) planning process. Federal funding for transportation projects and programs are channeled through this planning process. The MPO serves as a platform for coordination and communication between the public and local, state, and federal agencies in regard to planning issues and transportation topics, plans, programs, and projects. The MPO develops both long- and short-range multimodal transportation plans, selects and approves projects for federal funding based upon regional priorities, and develops methods to improve problematic and unsafe corridors.

The Bowling Green-Warren County MPO is made up of a Policy Committee (PC), Technical Advisory Committee (TAC), and Bicycle and Pedestrian Advisory Committee (BPAC). The Policy Committee acts as the decision-making body of the MPO, while the TAC and BPAC make planning and programming recommendations that are ultimately acted upon by the PC. Transportation Improvement Program Development Important components of the transportation planning process are the Metropolitan Transportation Plan (MTP) and the Transportation Improvement Program (TIP). The MTP is the long-range transportation plan that addresses the future needs and travel demand of the MPO for a forecasted future (20+ years) period. It lists the goals, visions, and projected transportation projects for Warren County. The TIP is a fiscally constrained, short-range program providing a compilation of all federally funded and regionally significant transportation projects, including both highway, transit, and bicycle-pedestrian elements (23 CFR § 450.326) over a six-year period.

The TIP provides an overview of how transportation revenues will be invested over a six-year period by state and local agencies that have legal responsibility to build, operate, and maintain the community’s highway, street, and public transit systems. TIP projects are derived from the MTP and reflect the investment priorities established in the MTP. Federal law requires TIP expenditures be consistent with the MTP. Projects included in this document represent the desires of Bowling Green and Warren County for developing highway, pedestrian, bicycle, and transit projects through Fiscal Years 2019-2024. The MPO TAC guides the development of the TIP, with additional collaboration from local and state governments. Upon adoption by the MPO Policy Committee, the TIP will be sent to the office of the Governor of Kentucky for approval, then included in the KTYC Statewide Transportation Improvement Program (STIP).

Inclusion of transportation projects in the TIP is a prerequisite for federal funding. A project must be included in the document in order to receive federal funding in the current year. Highway projects are customarily divided into the phases of planning, design, right-of-way acquisition, utility relocation, and construction. These phases typically occur over a period of years and are scheduled in the TIP in accordance with the project’s actual progress and the availability of funding.

Page | 4

Public Participation The TIP is prepared in accordance with the Participation Plan of the MPO. It requires that the MPO develop and utilize a participation process that provides reasonable opportunities for interested parties to comment on the MTP, TIP, and other planning documents and activities within the MPO (refer to the Participation Plan for more information).

The agency and public participation procedures for the TIP are consistent with current federal transportation planning requirements. The Bowling Green-Warren County MPO’s public participation procedures for the TIP and subsequent amendments and administrative modifications to the TIP are outlined in the Bowling Green-Warren County MPO Participation Plan, updated in 2018. As directed in the Participation Plan, a press release identifying the 30-day public review and comment of the draft TIP was issued to area media outlets and was posted on the MPO’s website on August 7, 2019. Additionally, letters/emails were sent to all required agencies identified in the Appendix of the Participation Plan and an article was written in the MPO’s online quarterly newsletter soliciting comments and feedback. Comments received from the public and local agencies are summarized in Appendix B of this document. Title VI of the Civil Rights Act of 1964 Title VI of the Civil Rights Act of 1964 ensures that no person shall, on the grounds of race, color, sex, national origin, or physical handicap, be excluded from participation in, be denied benefits of, or be otherwise subjected to discrimination under any program receiving Federal assistance from the Department of Transportation. Title 49 CRF Part 21 outlines how agencies must ensure nondiscrimination in their programs and in their use of federal funds provided through the Department of Transportation.

Subsequent federal acts that extend nondiscrimination requirements include gender (Federal Aid Highway Act 1973); disability (Rehabilitation Act of 1973 & Americans with Disabilities Act of 1990); and age (Age Discrimination Act of 1975).

Title VI analysis conducted as part of the transportation planning process was considered in the MTP and, as a subset of the MTP, the 2019-2024 TIP. This analysis may be found in the MTP on the MPO website at www.bgareampo.org. TIP Amendments & Modifications As projects and programs develop and are ready for allocation of funds, amendments and modifications to the TIP are often necessary to allow the program of funds to dynamically reflect changing conditions, costs, and project schedules. TIP Amendments are major changes to the TIP, while modifications may be implemented by MPO staff. Specifications for TIP amendments and modifications are outlined in the Participation Plan, while an overview is provided as follows:

TIP Amendments Changes to projects that are included only for illustrative purposes do not require an amendment. An amendment is a revision that requires public review and comment and a re-demonstration of fiscal constraint. Amendments to the TIP are required when: . Adding or deleting a project or project phase that requires a federal action and is not eligible for an Administrative Modification (refer to next section). . A major change is required in the design concept or scope for a project. Page | 5

. A project cost or schedule change is made that affects financial constraint.

TIP Administrative Modifications Less significant changes to project details and the addition of certain types of projects (see Grouped Projects section) may be accomplished by Administrative Modification. Modifications include minor changes to project/project phase costs, minor changes to funding sources of previously included projects, and minor changes to project/project phase initiation dates. Public review is not required for administrative changes to the TIP. Administrative Modifications will be included as agenda items for the TAC and PC meetings. The public may offer comments as part of the PC and TAC meeting’s public comment time on the agenda. All TIP administrative modifications will be posted on the MPO website and distributed to agencies/stakeholders identified on the KYTC Routing & Information Sheet.

All TIP amendments and modifications are posted on the MPO’s website at www.bgareampo.org. Air Quality Conformity The planning area for the Bowling Green-Warren County MPO is in attainment with all federal air quality regulations. An attainment area is considered to have air quality that meets or exceeds the U.S. Environmental Protection Agency (EPA) health standards set forth in the Clean Air Act.

Fiscal Constraint The Fixing America’s Surface Transportation Act (FAST) identifies federal funding sources for road, highway, transit, and other transportation related improvements. The key aspect of the FAST Act is its flexibility of funds, empowerment of local jurisdictions in assigning project priorities, public participation to a greater extent in planning and decision making, and fiscal constraint.

Federal law requires that TIPs be financially constrained. That is, this document should include the estimated cost associated with each project and the anticipated revenue source. Additionally, only those projects for which a current or proposed revenue source can be identified may be listed, thus ensuring a balance between total project costs and revenues. This requirement helps the MPO and the KYTC develop a deliverable program of projects.

Although the Bowling Green-Warren County MPO has significant input in the identification of needs and the determination of project funding priorities, it should be understood that the MPO does not have direct control over any source of funding identified herein. Final decisions regarding the allocation of funds (project selection, revenue source, schedule, etc.) are made by the KYTC and the State Legislature. Projects scheduled in the current biennium (Fiscal Years 2018-2019) of the Kentucky State Highway Plan have an associated commitment of the funding identified in the Plan by KYTC and the State Legislature. Funding identified in this document for the years 2020 and beyond represent “reasonably expected” funding to carry out those projects based on their inclusion in the Plan.

Page | 6

The table on page 10 provides a summary of costs and revenues by funding type and year (all costs and revenues here and elsewhere in this document are shown in Year-of-Expenditure dollar values). A balance between costs and revenues is indicated; therefore, financial constraint is demonstrated.

The specific projects shown in the Project Listing tables beginning on page 13 have been identified by KYTC, along with associated programmed or planned revenue source and schedule, in the KYTC Statewide Transportation Improvement Plan (STIP) and/or the Kentucky Highway Plan. To show fiscal balance and distinction of funds, the project tables (pages 15 – 33) are identified by federally funded transportation projects (Table 4). It should be expected that this program of projects will be subject to periodic changes in schedules and/or revenue sources due to the adjustments that must be made to balance costs and revenues (or maintain financial constraint) at the statewide level, and also due to various project related delays. These changes will be initiated by KYTC and will be reflected in this document by TIP Administrative Modifications or Amendments.

Project Types and Project Funds Classification In order to address the full range of transportation needs, on a statewide level and within the MPO area, the KYTC makes use of a variety of available revenue sources (or funding types). The revenue sources eligible and currently allocated for use within the Bowling Green-Warren County area are identified below:

Federal Transit Programs FTA – Federal Transit Administration Section 5307 – Capital Projects and Operating Assistance for Transit Systems Section 5310 – Enhanced Mobility for Seniors and Individuals with Disabilities Section 5339 – Bus and Bus Facilities Program

Federal Highway Programs HSIP – Highway Safety Improvement Program NHPP/NH – National Highway Performance Program BRO – Federal Bridge Replacement on Federal System IM – Interstate Maintenance NH – Federal National Highway System RRP – Safety – Railroad Protection RRS – Safety – Railroad Separation STPG/STP – Surface Transportation Block Grant Program BRX – Federal Bridge Replacement Off Federal System BRZ – Federal Bridge Replacement Local System TAP – Surface Transportation Block Grant Set-Aside (Transportation Alternatives Projects)

State Programs SP – State Construction Funds SPB – State Bonds SPP – State Construction High Priority

Page | 7

Grouped Projects

Transportation planning regulations applicable to the development and content of the TIP allow that projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area. Such projects are usually non-controversial and produce negligible impacts - other than positive benefits for safety, traffic operations, or system preservation. The TIP includes a list of these types of projects (called Grouped Projects) that may be allocated federal funding through a variety of federal funding programs. These projects are typically identified in an effort to improve existing problems/deficiencies, enhance preservation, or improve safety. They may also be the result of competitive grant awards.

For the reasons noted above, KYTC and FHWA have developed streamlined procedures for incorporating such projects into the TIP. Individual projects from grouped project categories will be incorporated into the TIP by Administrative Modification as they are defined (in terms of project description, scope, and cost) and approved. Allowing such TIP changes to be made by Administrative Modification, rather than Amendment, simplifies and streamlines TIP maintenance and project approval processes.

Grouped project categories utilized by the Bowling Green-Warren County MPO are shown in Table 1 on the following page. The list of grouped projects was developed cooperatively with KYTC and FHWA. By listing these project types in the TIP and MTP documents, planning process stakeholders and the general public are informed of the types of potential projects that may be added to the TIP in the future via streamlined procedures. TIP actions for these projects will not require additional public review, demonstration of fiscal constraint, or a conformity determination (if applicable).

When projects are identified, with estimated costs, and funding decisions (type of funds and year) are made by KYTC (on an annual or ongoing basis), the Cabinet will forward the project to the MPO for inclusion in the TIP – with a commitment of additional funding within financially constrained balances available on a statewide level. Financial constraint for grouped projects is maintained by KYTC on a statewide level and is demonstrated on an annual basis for the STIP.

Page | 8

TABLE 1 | Grouped Projects HSIP – Highway Safety Improvement Program Implementation Intersection Improvements for Safety or Efficiency Guardrail, Median Barrier, and Crash Cushion Projects Other Highway Safety Improvements Intelligent Transportation System (ITS) Projects Traffic Signal System Improvements Highway Signing Pavement Markers and Striping Pavement Resurfacing, Restoration, and Rehabilitation Bridge Replacement (no additional lanes) Bridge Rehabilitation Bridge Inspection Bridge Painting Railroad/Highway Crossing Protection Recreational Trails Projects Transportation Alternatives Projects Congestion Mitigation Air Quality (CMAQ) Projects** Commuter Ridesharing Programs Bicycle Facilities Pedestrian Facilities Park & Ride Facilities Purchase of New Buses Rehabilitation of Transit Vehicles Transit Operating Assistance Transit Operating Equipment Small Transit Passenger Shelters and Informational Kiosks Reconstruction or Renovation of Transit Facilities

**The Bowling Green MPO area is not currently eligible for Congestion Mitigation and Air Quality (CMAQ) Improvement Program funds. However, if Warren County becomes designated as a transportation air quality non-attainment area in the future, local entities would become qualified to submit applications for eligible CMAQ funded projects.

Page | 9

Summary of Funding The table below provides a summary of costs and revenues by funding type and year (all costs and revenues here and elsewhere in this document are shown in Year-of-Expenditure dollar values). A balance between costs and revenues is indicated; therefore, financial constraint is demonstrated.

TABLE 2 | SUMMARY OF HIGHWAY FUNDING TYPES FUNDING TYPE FISCAL NH HSIP STP TAP TOTAL YEAR Est. Cost $ 800,000 $ 590,000 $ 8,760,000 $ 2,158,924 $ 12,308,924 2019 Revenue $ 800,000 $ 590,000 $ 8,760,000 $ 2,158,924 $ 12,308,924 Est. Cost $ 3,910,000 $ 28,330,000 $ 32,240,000 2020 Revenue $ 3,910,000 $ 28,330,000 $ 32,240,000

Est. Cost $ 25,160,000 $ 1,250,000 $ 5,950,000 $ 32,360,000 2021 Revenue $ 25,160,000 $ 1,250,000 $ 5,950,000 $ 32,360,000 Est. Cost $ 25,290,000 $ 4,560,000 $ 29,850,000 2022 Revenue $ 25,290,000 $ 4,560,000 $ 29,850,000 Est. Cost $ 14,850,000 $ 14,850,000 2023 Revenue $ 14,850,000 $ 14,850,000 Est. Cost $ 440,000 $ 440,000 2024 Revenue $ 440,000 $ 440,000 Est. Cost $ 70,010,000 $ 1,840,000 $ 48,040,000 $ 2,158,924 $122,048,924 TOTAL Revenue $ 70,010,000 $ 1,840,000 $ 48,040,000 $ 2,158,924 $122,048,924

Page | 10

Completed Projects from the Previous TIP

Transportation planning regulations require that the TIP provide a list of projects from the previous TIP that have been completed. Table 3 below includes all projects from the previous (2016-2020) TIP that have since been completed.

TABLE 3 | FY 2016-2020 TIP COMPLETED PROJECTS PROJECT ID KYTC ID ROUTE PROJECT DESCRIPTION Surfacing for I-65 to US-31W Connector including grade and drain on US-68 2016-1 03-16.04 I-65 and US-31W. Safety improvements on KY-185 from US-68 to Double Springs Road to convert corridor from 4-lanes to 3-lanes (“Road Diet”) including micro- 2016-18 03-924 KY-185 surfacing, striping, curbed island at crosswalk, and enhanced signage for pedestrian crossing. Replace bridge on KY-234 over Drakes Creek 0.097 east of Shaker Mill Rd (CR- 2016-3 03-1077 KY-234 1121). Replace bridge over branch of Indian Creek on Lodge Hall Rd (CR-1425) 1.4 2016-4 03-1090 CR-1425 mile west of KY-185. I-65 Spur Corridor Signing: Add signing to meet Interstate standards to 2018-24 03-2042.11 WN-9007 existing Natcher Parkway from I-65 Interchange (Exit 2) in Warren County extending north to the US 60 interchange in Daviess County. 2017-21 03-2081.00 KY 446 Pavement rehabilitation on KY 446 from US 31W to I-65 (MP 0.0 - MP 0.97). Intersection improvement at US 231 and Three Springs Road/Ken Bale Blvd 2017-20 03-8702.10 US 231 for paving, striping, and median removal. Intersection improvements at the intersection of KY-526 and KY-1320; 2016-6 03-9007 KY-526 purchase ROW for sight distance improvements on KY-526 from 0.046 mile west of KY-1320 to 0.099 mile west of CR-1532A. Install reflective backplates and update signing and striping at intersection of 2018-32 03-9010.10 US-31W US 31W and Fairview Ave/Cemetery Rd. Install reflective backplates and double red signal heads, adjust entrance, and 2018-33 03-9010.20 US-68 update striping and signing at intersection of Russellville Rd and Campbell Ln. Install reflective backplates, construct right-in/right-out entrance along US 2018-34 03-9010.30 US-231 231, and install median access control along Shive Ln near the intersection of US 231 and Shive Ln.

Install reflective backplates and supplemental signal heads, construct median 2018-35 03-9010.40 US-31W access control along US 31W and Campbell Ln, and update the striping near the intersection of US 31W and Campbell Ln.

Install reflective backplates and supplemental signal heads, and update a 2018-36 03-9010.50 US-31W pedestrian signal head at the intersection of US 31W and Lehman Ave. Install reflective backplates at the intersection of US 231 and Campbell 2018-37 03-9010.60 US-231 Ln/Lovers Ln. Install reflective backplates and supplemental signal heads at the intersection 2018-38 03-9010.70 US-231 of US 231 and Three Springs Rd.

Page | 11

Table 3 cont’d… PROJECT ID KYTC ID ROUTE PROJECT DESCRIPTION

Install reflective backplates and update the signing at the intersection of US 2018-39 03-9010.80 US-231 231 and Cumberland Trace. Adjust the configuration and slightly modify the shape of the roundabout, and 2018-40 03-9010.90 US-31W update the signing and striping at the intersection of US 31W and University Blvd.

2018-27 03-20017 I-65 Address pavement condition of I-65 both directions from MP 35.616 to 42.89.

WN- Address pavement condition of I-165 (William H. Natcher Parkway) both 2018-29 03-20019 9007/I-165 directions from MP 9.2 to 20.246.

Design and construct a 5' sidewalk on KY 240 from Fletcher St. (MP 5.854) to 2018-23 KY-240 Main St. (MP 6.039) including curb, gutter, and drainage.

Page | 12

Federally Funded Transportation Projects

Following is a project overview table that describes in general the federally funded (FHWA) transportation highway and bicycle/pedestrian projects (Table 4) contained within this TIP. For transportation projects that are currently underway, the table reflects the project phases that have not yet been authorized for funding. The pages to follow provide additional information and geographic detail for each project as listed below. The KYTC ID is the identifier assigned to projects in the KYTC Highway Plan. There are no state- funded regionally significant projects.

TABLE 4 | FEDERALLY FUNDED TRANSPORTATION PROJECTS FUND TOTAL PHASE KYTC ID ROUTE LENGTH PROJECT DESCRIPTION YEAR PHASE TYPE COST ($) Reconstruct KY-185 from north of the junction with KY-263 near 2020 U 1,230,000 3-110.00 KY-185 5.62 STP Richardsville to the Butler County line. MP 6.290 to 11.913 2020 C 14,850,000 Construct a pedestrian underpass under US-31W connecting 2022 D 10,000 3-199.99 US-31W - STP Buchanon Park trail to Chaney's Dairy Barn. 2024 C 440,000 I-65 spur corridor: Improve the Natcher Parkway/US-231 3-2042.20 I-165 0.20 interchange (Exit 9) on the west side of Bowling Green. (See 3-202 NH 2021 C 8,060,000 for Design) MP 9.400 to 9.600 Funding for this project will pay for construction of a new greenway path connecting Moss Middle School to an existing greenway on 3-3205.00 GW 0.25 TAP 2019 C 175,000 Creekwood Drive. The project will include a bridge over Jennings Creek, lighting, benches and a trailhead marker.

Construct 10' bike/ped trail from Roland Bland Park to Hobson 2019 D 106,636 3-3206.00 GW 2.38 Grove Park to close the gap between Downtown Bowling Green and TAP 2019 R 122,588 the West End in Bowling Green. 2019 C 908,217 State/City project for ADA compliance and sidewalk rehabilitation by 3-3219.00 GW - TAP 2019 C 846,483 the City of Bowling Green for sidewalks on state-maintained roads. Minor widening on US-231 (Scottsville Road) from Pascoe Blvd to 3-8702.00 US-231 1.00 north of Cave Mill Road to improve turning movements and access NH 2019 C 3,910,000 control. MP 9.455 to 10.453

Page | 13

Table 4 cont’d… FUND TOTAL PHASE KYTC ID ROUTE LENGTH PROJECT DESCRIPTION YEAR PHASE TYPE COST ($) 2019 D 800,000 WN- Construct a new interchange on I-165 (Natcher Parkway) at Elrod 2021 R 8,810,000 03-8707.00 0.60 NH 9007 Road in Bowling Green. MP 3.4 - MP 4.0 2021 U 8,290,000 2022 C 25,290,000 2019 R 1,750,000 Widen US-31W from Campbell Lane (US-231) to University 3-8857.00 US-31W 1.26 STP 2019 U 5,800,000 Boulevard (US-231X). MP 10.561 to 11.817 2022 C 4,550,000 2020 R 1,660,000 Widen US-31W from Park Avenue to Fairview Avenue. MP 13.698 to 3-8904.10 US-31W 0.97 STP 2020 U 1,900,000 14.669 2020 C 4,870,000 2019 R 950,000 Major widening to improve mobility and reduce congestion on US- 3-8905.00 US-31W 1.59 STP 2020 U 950,000 31W from US-68 to Mizpah Road. MP 20.904 to 22.490 2021 C 5,950,000 Perform safety improvements on KY-234 (Cemetery Rd) from the 3-9015.00 KY-234 7.22 Warren/Allen County line to CR-1175/CR-1155 in Warren County. HSIP 2021 C 1,250,000 MP 0.0 to 7.218 Intersection and corridor improvements to reduce conflict points 3-9019.00 US-231 3.60 and enhance safety along US 231 (Scottsville Rd) from Phil Moore HSIP 2019 D 400,000 Park to south of Mt. Lebanon Rd. MP 3.0 to 6.6 Remove raised median and construct a left turn lane at Old Tram 2019 D 20,000 3-9020.00 US-68 0.20 HSIP Road and US 68 (Russellville Rd). MP 7.456 to 7.656 2019 C 80,000 Overlay and restripe US 231X (Scottsville Rd) between Wilkinson 3-9022.00 US-231X 0.720 Trace and Covington St/Smallhouse Rd to convert from a 4-lane HSIP 2019 C 90,000 section to a 5-lane section. MP 1.119 to 1.839 Address deficiencies of KY 1435 bridge over Gasper River. MP 9.445 2019 D 60,000 3-10015.00 KY-1435 0.04 STP to 9.481 2020 C 870,000 Address pavement condition of I-65 both directions. MP 13.711 to 2023 D 1,350,000 3-20016.00 I-65 11.29 NH 25.000 2023 C 13,500,000 Address pavement condition of the Natcher Parkway both 2019 D 200,000 3-20018.00 I-165 2.47 STP directions. MP 0.000 to 2.473 2020 C 2,000,000

TOTAL TIP FUNDING $122,048,924

Page | 14

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Reconstruct KY-185 from north of the junction with KY-263 near Richardsville to the 3-110.00 KY-185 5.623 Butler County line. MP 6.290 to 11.913 Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding STP U $ 1,230,000 $ 1,230,000

STP C $14,850,000 $ 14,850,000

TOTAL $ 16,080,000

Page | 15

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Construct a pedestrian underpass under US-31W connecting Buchanon Park trail 3-199.99 US-31W - to Chaney's Dairy Barn. MP 4.100 to 4.258 Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding STP D $ 10,000 $ 10,000

STP C $440,000 $ 440,000

TOTAL $ 450,000

Page | 16

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description I-65 spur corridor: Improve the Natcher Parkway/US-231 interchange (Exit 9) on 3-2042.20 I-165 0.20 the west side of Bowling Green. (See 3-202 for Design) MP 9.400 to 9.600 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding NH C $8,060,000 $ 8,060,000

TOTAL $ 8,060,000

Page | 17

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Funding for this project will pay for construction of a new greenway path connecting 3-3205.00 GW 0.25 Moss Middle School to an existing greenway on Creekwood Drive. The project will include a bridge over Jennings Creek, lighting, benches and a trailhead marker. Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding TAP C $ 175,000 $ 175,000

TOTAL $ 175,000

Page | 18

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Construct 10' bike/ped trail from Roland Bland Park to Hobson Grove Park to 3-3206.00 GW 2.38 close the gap between Downtown Bowling Green and the West End in Bowling Green. Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding TAP D $ 106,636 $ 106,636

TAP R $ 122,588 $ 122,588

TAP C $ 908,217 $ 908,217

TOTAL $1,137,441

Page | 19

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description State/City project for ADA compliance and sidewalk rehabilitation by the City of 3-3219 GW - Bowling Green for sidewalks on state-maintained roads. Fund Total Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Type Funding TAP C $846,483 $ 846,483

TOTAL $ 846,483

Page | 20

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Minor widening on US-231 (Scottsville Road) from Pascoe Blvd to north of Cave 3-8702.00 US-231 0.998 Mill Road to improve turning movements and access control. MP 9.455 to 10.453 Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding NH C $ 3,910,000 $ 3,910,000

TOTAL $ 3,910,000

Page | 21

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description WN- Construct a new interchange on I-165 (Natcher Parkway) at Elrod Road in Bowling 3-8707.00 0.600 9007 Green. MP 3.400 - MP 4.000 Fund Total Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Type Funding NH D $ 800,000 $ 800,000

NH R $ 8,810,000 $ 8,810,000

NH U $ 8,290,000 $ 8,290,000

NH C $25,290,000 $ 25,290,000

TOTAL $43,190,000

Page | 22

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description US- Widen US-31W from Campbell Lane (US-231) to University Boulevard (US-231X). 3-8857.00 1.256 31W MP 10.561 to 11.817 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding STP R $ 1,750,000 $ 1,750,000

STP U $ 5,800,000 $ 5,800,000

STP C $ 4,550,000 $ 4,550,000

TOTAL $12,100,000

Page | 23

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description US- 3-8904.10 0.971 Widen US-31W from Park Avenue to Fairview Avenue. MP 13.698 to 14.669 31W Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding STP R $ 1,660,000 $ 1,660,000

STP U $ 1,900,000 $ 1,900,000

STP C $ 4,870,000 $ 4,870,000

TOTAL $ 8,430,000

Page | 24

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description US- Major widening to improve mobility and reduce congestion on US-31W from US-68 3-8905.00 1.586 31W to Mizpah Road. MP 20.904 to 22.490 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding STP R $ 950,000 $ 950,000

STP U $ 950,000 $ 950,000

STP C $5,950,000 $ 5,950,000

TOTAL $ 7,850,000

Page | 25

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Perform safety improvements on KY-234 (Cemetery Rd) from the Warren/Allen 3-9015.00 KY-234 7.218 County line to CR-1175/CR-1155 in Warren County. MP 0.0 to 7.218 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding HSIP C $1,250,000 $ 1,250,000

TOTAL $1,250,000

Page | 26

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Intersection and corridor improvements to reduce conflict points and 3-9019.00 US-231 3.600 enhance safety along US 231 (Scottsville Rd) from Phil Moore Park to south of Mt. Lebanon Rd. MP 3.0 to 6.6 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding HSIP D $ 400,000 * $ 400,000

TOTAL $ 400,000

*Improvement details, costs, and schedule will be determined during the design phase.

Page | 27

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Remove raised median and construct a left turn lane at Old Tram Road and 3-9020.00 US-68 0.200 US 68 (Russellville Rd). MP 7.456 to 7.656 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding HSIP D $ 20,000 $ 20,000

HSIP C $ 80,000 $ 80,000

TOTAL $ 100,000

Page | 28

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Overlay and restripe US 231X (Scottsville Rd) between Wilkinson Trace and 3-9022.00 US-231X 0.720 Covington St/Smallhouse Rd to convert from a 4-lane section to a 5-lane section from MP 1.119 to 1.839. Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding HSIP C $90,000 $ 90,000

TOTAL $ 90,000

Page | 29

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description 3-10015.00 KY-1435 0.036 Address deficiencies of KY 1435 bridge over Gasper River. MP 9.445 to 9.481 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding STP D $ 60,000 $ 60,000

STP C $ 870,000 $ 870,000

TOTAL $ 930,000

Page | 30

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description 3-20016.00 I-65 11.289 Address pavement condition of I-65 both directions. MP 13.711 to 25.000 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding NH D $ 1,350,000 $ 1,350,000

NH C $13,500,000 $ 13,500,000

TOTAL $14,850,000

Page | 31

Federally Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Length Project Description Address pavement condition of the Natcher Parkway both directions. MP 0.000 3-20018.00 WN-9007 2.47 to 2.473 Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding STP D $ 200,000 $ 200,000

STP C $2,000,000 $ 2,000,000

TOTAL $2,200,000

Page | 32

Transit Projects

Financial Capacity Assessment The projects recommended in this TIP outline the capital needs for Community Action of Southern Kentucky (CASOKY) to operate GObg Transit and GO, too as contracted by the City of Bowling Green. The City of Bowling Green has determined that CASOKY has the financial capacity to carry out the projects listed in Table 5 on page 34. Likewise CASOKY has reviewed their financial capacity to provide the required local match for capital projects.

Capital and Planning costs are generally eligible for 80% federal funding, while operating is federally reimbursed at 50% after the deduction of fare box revenue from total expenses. The match for capital projects costs is usually generated through state toll credits or state matching funds. Operating match is generated by funds from the City of Bowling Green, Community Action programs, In Kind donations, and rental and advertising income. The City of Bowling Green has determined there are funds available to carry out the operating budget for Bowling Green’s public transit system in accordance with FTA Circular 7008.1.

Each of the agencies requesting funding under section 5307, 5310, 5311, or 5339 have reviewed their financial capacity to carry out the requested capital projects and has determined that there will be funds available to provide the required local match for the capital projects requested.

Bowling Green Public Transit Program of Projects Public Review CASOKY operates the Bowling Green Public Transit System known as GObg transit. Annually, GObg transit is required to prepare a Program of Projects (POP) and solicit public input for all projects receiving federal transit funding from FTA. The projects identified in the POP will be added to the TIP through an annual amendment or administrative modification. The Bowling Green-Warren County MPO Participation Plan (PP) fulfills the requirements for the Federal Transit Administration public involvement process. Public notice of public involvement activities and time established for public review and comments on the TIP, as established by the PP, are being used to satisfy the City of Bowling Green’s 5307 POP requirement.

Page | 33

TABLE 5 | TRANSIT PROJECTS Responsible Project Description Fund Type FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Agency Operating 5307 $ 643,114 $ 700,000 $ 721,000 $ 742,630 $ 764,909 $ 787,856 GObg Transit Capital 5307 $ 502,199 $ 453,403 $ 467,005 $ 481,015 $ 495,446 $ 510,309 GObg Transit Planning 5307 $ 10,000 GObg Transit

Capital 5339 $ 151,205 $ 131,414 $ 135,356 $ 139,417 $ 143,600 $ 147,908 GObg Transit

ADA Complimentary Para-transit 5307 $ 115,531 $ 115,340 $ 118,801 $ 122,365 $ 126,035 $ 129,817 GObg Transit Expenses Bus Shelters, Stops, and Signage 5307/5339 $ - $ 16,000 $ 16,480 $ 16,974 $ 17,484 $ 18,008 GObg Transit Maintenance Facility 5307/5339 $ 6,000 $ 10,000 $ 10,300 $ 10,609 $ 10,927 $ 11,255 GObg Transit Preventative Maintenance 5307 $ 245,000 $ 245,000 $ 252,350 $ 259,921 $ 267,718 $ 275,750 GObg Transit Technology/Equipment - safety, security, communication, and 5307/5339 $ 210,873 $ 50,000 $ 51,500 $ 53,045 $ 54,636 $ 56,275 GObg Transit computer software maintenance and technical support Vehicle purchase and renovation 5307/5339 $ 76,000 $ 148,477 $ 152,931 $157,519 $ 162,244 $ 167,112 GObg Transit

5307 $1,155,313 $1,153,403 $1,188,005 $1,223,645 $1,260,355 $1,298,165 TOTAL 5339 $151,205 $ 131,414 $ 135,356 $ 139,417 $ 143,600 $ 147,908 TOTAL 5307/5339 $1,306,518 $1,284,817 $1,323,362 $1,363,062 $1,403,954 $1,446,073 GRAND TOTAL 5307/5339 $ 653,404 $584,817 $602,362 $620,432 $639,045 $658,217 CAPITAL TOTAL

Page | 34

National Transportation Performance Measures and State Targets Highway Performance Measures The concept of Performance Measures was first introduced in the Moving Ahead for Progress in the 21st Century Act (MAP-21) in 2012 and was continued in the FAST Act in 2015. These Acts established and confirmed national performance goals in several key areas. In response to these national goals, the United States Department of Transportation has set defined performance measures applicable to the MPO’s planning area in the areas of safety, pavement condition, bridge condition, system reliability, and transit state of good repair. In addition, state highway agencies and MPOs are required to set specific performance targets for each performance measure. Those targets for highway-related measures have been set by KYTC as shown in the tables below, and the Bowling Green-Warren County MPO has taken formal action to support those targets by agreeing to plan and program projects to contribute toward achieving the targets. For transit state of good repair, specific targets were set by the MPO, as required, in coordination with the GObg transit system. These are listed in Table 10 on Page 40, with resolutions included in Appendix D.

Performance Measures: Safety The KYTC developed targets for five safety performance measures. These targets are expressed as rolling averages of the previous five years.

All of these targets represent a reduction in the baseline averages in calendar years 2017 and 2018 as compared to CY 2015 and 2016. This goal is shared with the SHSP and reiterates KYTC’s commitment to the shared vision of Toward Zero Deaths.

TABLE 6 | PERFORMANCE MEASURE TARGETS Baseline FY 2018 Baseline FY 2019 KYTC Safety Target (2012-16) Targets (2013-17) Targets Number of Fatalities 730.2 730 737.4 737 Number of Serious Injuries 3288.6 2800 3124.8 2991 Fatality Rate/100 M VMT 1.520 1.5 1.521 1.5 Serious Injury Rate/100 M VMT 6.852 5.76 6.451 6.07 Total # Non-Motorized Fatalities and Serious Injuries 269.6 293 277.8 276

Performance Measures: Asset Management The KYTC’s Asset Management performance measures track infrastructure conditions. The first set of measures tracks the percentage of highway miles in the state in good and poor condition

Page | 35

for highways on the Interstate and the National Highway Systems. The second set tracks the percentage of deck area on the state’s bridges on the National Highway System that are in good or poor condition.

TABLE 7 | PERFORMANCE MEASURE TARGETS Asset Management Target Pavement Performance Two-Year (2020) Four-Year (2022) % Good Interstate - 50.0% % Poor Interstate - 3.0% % Good Non-Interstate NHS 35.0% 35.0% % Poor Non-Interstate NHS 6.0% 6.0% NHS Bridge Performance % Good Condition by Deck Area 35.0% 35.0% % Poor Condition by Deck Area 3.7% 3.2%

Performance Measures: System Performance The U.S. Department of Transportation developed a series of System Performance Measures to track the percentage of highway miles traveled in the state that are rated as reliable, for highways on the Interstate and National Highway Systems. A second measure tracks the reliability of travel times for freight traffic. This Truck Travel Time Reliability (TTTR) Index indicates the likelihood of traveling through a given region in the time anticipated. A high TTTR would indicate traffic congestion that would delay on-time deliveries. Percentages in the table below represent person-miles traveled on or off interstates.

TABLE 8 | PERFORMANCE MEASURE TARGETS System Performance Target Level of Travel Time Reliability (LOTTR) Two-Year (2020) Four-Year (2022) % Reliable Interstates 93.0% 93.0% % Reliable Non-Interstate NHS - 82.5% Truck Travel Index (TTTR) 1.25 1.25

Anticipated Performance Measure Effects Sixteen (16) projects designated in the Bowling Green-Warren County MPO’s 2019-2024 TIP address these performance measures. They are enumerated in Table 9 on Page 38. There are thirteen (13) safety-related (motorized and non-motorized) projects — ones that contribute toward the goal of reducing deaths and serious injuries resulting from crashes on the nation’s roads. These projects carry an estimated combined cost of $60,788,924 over the six-year span of the TIP.

These projects are:

• KY-185 reconstruction to improve safety and mobility (3-110.00) • US-31W pedestrian underpass (3-199.99)

Page | 36

• I-65 Spur corridor: Natcher Parkway/US-231 interchange (3-2042.20) • Creekwood Greenway at Moss Middle School-Jennings Creek Elementary (3-3205) • West End Greenway from Roland Bland Park to Hobson Grove Park (3-3206) • Sidewalk Improvements/ADA Compliancy on State Roads (3-3219) • US-231 (Scottsville Rd) from Pascoe Blvd to north of Cave Mill Rd (3-8702.00) • US-31W (Nashville Rd) widening from University Blvd to Campbell Ln (3-8857.00) • US-31W Bypass widening from KY-234 to Park Ave (3-8904.10) • US-31W (Louisville Rd) from US-68 to Mizpah Rd (3-8905.00) • KY-234 (Cemetery Rd) from county line to CR-1175/CR-1155 (3-9015.00) • US-231 (Scottsville Rd) intersection and corridor improvements (3-9019.00) • US-68 (Russellville Rd) minor intersection improvements (3-9020.00)

Two (2) projects, with a combined total estimated cost of $17,050,000, address the Pavement Performance aspect of the Asset Management measure. These projects address the goal of increasing the percentage of roadway rated as being in “good” condition. One (1) project contributes to the improvement of System Reliability across the MPO area’s transportation network. These projects are:

• Address pavement condition of I-65 both directions from MP 13.711 to 25 (3-20016.00) • Address pavement condition of the Natcher Parkway both directions from MP 0 to 2.473 (3-20018.00) • Construct a new interchange on I-165 (Natcher Parkway) at Elrod Road in Bowling Green (3-8707)

Page | 37

TABLE 9 | PROJECTS CONTRIBUTING TO THE ACHIEVEMENT OF HIGHWAY PERFORMANCE TARGETS Total Phase Performance KYTC ID Route Project Description Cost Measure Reconstruct KY-185 from north of the junction 3-110.00 KY-185 with KY-263 near Richardsville to the Butler $16,080,000 Safety County line.

Construct a pedestrian underpass under US-31W Safety (non- 3-199.99 US-31W connecting Buchanon Park trail to Chaney's $ 450,000 motorized) Dairy Barn.

I-65 spur corridor: Improve the Natcher 3-2042.20 I-165 Parkway/US-231 interchange (Exit 9) on the west $ 8,060,000 Safety side of Bowling Green. (See 3-202 for Design)

Funding for this project will pay for construction of a new greenway path connecting Moss Middle School to an existing greenway on Safety (non- 3-3205.00 GW $ 175,000 Creekwood Drive. The project will include a motorized) bridge over Jennings Creek, lighting, benches and a trailhead marker.

Construct 10' bike/ped trail from Roland Bland Park to Hobson Grove Park to close the gap Safety (non- 3-3206.00 GW $ 1,137,441 between Downtown Bowling Green and the motorized) West End in Bowling Green.

State/City project for ADA compliance and Safety (non- 3-3219.00 GW sidewalk rehabilitation by the City of Bowling $846,483 motorized) Green for sidewalks on state-maintained roads.

Minor widening on US-231 (Scottsville Road) 3-8702.00 US-231 from Pascoe Blvd to north of Cave Mill Road to $ 3,910,000 Safety improve turning movements and access control.

Construct a new interchange on I-165 (Natcher WN- System 3-8707 Parkway) at Elrod Road in Bowling Green (MP $43,190,000 9007 Reliability 3.4 - MP 4.0).

Widen US-31W from Campbell Lane (US-231) to 3-8857.00 US-31W $12,100,000 Safety University Boulevard (US-231X).

Widen US-31W from Park Avenue to Fairview 3-8904.10 US-31W $ 8,430,000 Safety Avenue (MP 13.7 - 14.25).

Page | 38

Table 9 cont’d… Total Phase Performance KYTC ID Route Project Description Cost Measure Major widening to improve mobility and reduce 3-8905.00 US-31W congestion on US-31W from US-68 to Mizpah $ 7,850,000 Safety Road. Perform safety improvements on KY-234 (Cemetery Rd) from the Warren/Allen County 3-9015.00 KY-234 $ 1,250,000 Safety line to CR-1175/CR-1155 in Warren County. MP 0.0 to 7.218

Intersection and corridor improvements to 3-9019.00 US-231 reduce conflict points and enhance safety along $ 400,000 Safety US 231 (Scottsville Rd) from MP 3.0 to 6.6. Remove raised median and construct a left turn 3-9020.00 US-68 lane at Old Tram Road and US 68 (Russellville $ 100,000 Safety Rd). Asset Address pavement condition of I-065 both Management - 3-20016.00 I-65 $ 14,850,000 directions from MP 13.711 to 25. Pavement Condition Asset Address pavement condition of the Natcher Management - 3-20018.00 I-165 $ 2,200,000 Parkway both directions from MP 0 to 2.473. Pavement Condition

TOTAL TIP FUNDING $ 121,028,924 Total Safety $ 60,788,924 Total Pavement Condition $ 17,050,000 Total System Reliability $ 43,190,000

Page | 39

Transit Performance Measures Transit Asset Management The City of Bowling Green and GObg Transit established a set of Transit Asset Management (TAM) targets. These targets outline a set of strategic and systematic processes and practices for managing performance, risk, and the cost of transit assets over their entire lifecycle to deliver service reliably, safely and cost effectively. Table 5 on page 33 exemplifies anticipated transit funding for projects contributing to the achievement of the transit targets listed below.

The first target is the percentage of revenue vehicles that have met or exceeded their Useful Life Benchmark (ULB). The second is the percentage of nonrevenue vehicles and equipment that have met or exceeded their ULB. The final target is the percentage of facilities rating below a 3.0 on the Federal Transit Administration Transit Economic Requirements Model (TERM) scale.

TABLE 10 | FY 2019 MPO Transit Asset Management (TAM) Targets Asset 2018 2018 2019 Performance Measure Category Target Actual Target Rolling Stock Age - % of revenue vehicles within a particular asset class that All revenue 84% 81.3% 70% have met or exceeded their Useful Life Benchmark (ULB) vehicles Equipment Age - % of vehicles that have met or exceeded their Useful Life Non-revenue 100% 100% 65% Benchmark (ULB) vehicles Facilities Condition - % of facilities with a condition rating below 3.0 on All buildings 0% 0% 0% the FTA Transit Economic Requirements Model (TERM) Scale or structures

Page | 40

TABLE 11 | TRANSIT TARGETS Asset Category & 2018 2018 2019 2019 2020 2021 Performance Asset Class Target Actual Target Actual Target Target Measures REVENUE VEHICLES AB - Articulated Bus NA NA NA NA NA NA AO - Automobile NA NA NA NA NA NA BR - Over-the-road Bus NA NA NA NA NA NA BU - Bus NA NA NA NA NA NA CU - Cutaway Bus 68% 62.50% 60% Age - % of revenue DB - Double Decked Bus NA NA NA NA NA NA vehicles FB - Ferryboat NA NA NA NA NA NA within a particular MB - Mini- bus NA NA NA NA NA NA asset class that have met or exceeded their MV - Mini-van 100% 100% 80% Useful Life Benchmark RT- Rubber-tire Vintage NA NA NA NA NA NA (ULB) Trolley SB - School Bus NA NA NA NA NA NA SV - Sport Utility Vehicle NA NA NA NA NA NA TB – Trolley Bus NA NA NA NA NA NA VN - Van NA NA NA NA NA NA Para-transit Van NA NA NA NA NA NA EQUIPMENT Non-Revenue/ Service 100% 100% 80% Age - % of vehicles Automobile that have met or Steel Wheel Vehicles NA 5 NA NA NA NA exceeded their Useful Truck and other Rubber NA NA NA NA NA NA Life Benchmark (ULB) Tire Vehicles Computer Equipment <25% <25% 50% FACILITIES Condition - % of Administration 0% 0% 0% 0% 0% facilities with a Maintenance 0% 0% 0% 0% 0% condition rating below Parking Structures NA NA NA NA NA NA a 3.0 on the FTA Transit Economic Passenger Facilities NA NA NA NA NA NA Requirements Model (TERM) Scale

Page | 41

APPENDIX A METROPOLITAN TRANSPORTATION PLAN REFERENCE The content in this section includes the Metropolitan Transportation Plan (MTP) reference information for all federally funded transportation projects in the FY2019-24 TIP. This information is included to demonstrate the required consistency with the MTP for each project in the TIP. The 2040 MTP can be viewed on the MPO website at www.bgareampo.org.

TABLE 12 | FEDERALLY FUNDED TRANSPORTATION PROJECTS MTP REFERENCE

MTP KYTC ID ROUTE LENGTH PROJECT DESCRIPTION MTP REFERENCE NOTES REFERENCE Reconstruct KY-185 from north of the junction with KY-263 near Richardsville 3-110.00 KY-185 5.62 Table 7.2 Item No. 3-110 to the Butler County line. MP 6.290 to 11.913 Construct a pedestrian underpass under US-31W connecting Buchanon Park Grouped Projects / Bike-Ped 3-199.99 US-31W - Table 7.4 trail to Chaney's Dairy Barn. Facilities

I-65 spur corridor: Improve the Natcher Parkway/US-231 interchange (Exit 9) 3-2042.20 I-165 0.20 Table 7.2 Item No. 3-202 on the west side of Bowling Green. (See 3-202 for Design) MP 9.400 to 9.600

Funding for this project will pay for construction of a new greenway path connecting Moss Middle School to an existing greenway on Creekwood 3-3205.00 GW 0.25 Table 7.4 Grouped Projects / TAP Drive. The project will include a bridge over Jennings Creek, lighting, benches and a trailhead marker. Construct 10' bike/ped trail from Roland Bland Park to Hobson Grove Park to 3-3206.00 GW 2.38 close the gap between Downtown Bowling Green and the West End in Table 7.4 Grouped Projects / TAP Bowling Green.

State/City project for ADA compliance and sidewalk rehabilitation by the City 3-3219 GW - Table 7.4 Grouped Projects / TAP of Bowling Green for sidewalks on state-maintained roads.

Minor widening on US-231 (Scottsville Road) from Pascoe Blvd to north of 3-8702.00 US-231 1.00 Cave Mill Road to improve turning movements and access control. MP 9.455 Table 7.2 Item No. 3-8702 to 10.453

Page | 42

Table 12 cont’d… MTP KYTC ID ROUTE LENGTH PROJECT DESCRIPTION MTP REFERENCE NOTES REFERENCE Construct a new interchange on I-165 (Natcher Parkway) at Elrod Road in 03-8707 WN-9007 0.60 Table 7.2 Item No. 3-8707 Bowling Green. MP 3.4 - MP 4.0 Widen US-31W from Campbell Lane (US-231) to University Boulevard (US- 3-8857.00 US-31W 1.26 Table 7. MPO Rank 1 231X). MP 10.561 to 11.817

3-8904.10 US-31W 0.97 Widen US-31W from Park Avenue to Fairview Avenue. MP 13.698 to 14.669 Table 7.3 MPO Rank 2

Major widening to improve mobility and reduce congestion on US-31W from 3-8905.00 US-31W 1.59 Table 7.3 MPO Rank 12 US-68 to Mizpah Road. MP 20.904 to 22.490 Perform safety improvements on KY-234 (Cemetery Rd) from the Grouped Projects / HSIP - 3-9015.00 KY-234 7.22 Warren/Allen County line to CR-1175/CR-1155 in Warren County. MP 0.0 to Table 7.4 Low Cost Safety 7.218 Improvements

Intersection and corridor improvements to reduce conflict points and Grouped Projects / HSIP - 3-9019.00 US-231 3.60 enhance safety along US 231 (Scottsville Rd) from Phil Moore Park to south Table 7.4 Low Cost Safety of Mt. Lebanon Rd. MP 3.0 to 6.6 Improvements

Grouped Projects / HSIP - Remove raised median and construct a left turn lane at Old Tram Road and 3-9020.00 US-68 0.20 Table 7.4 Low Cost Safety US 68 (Russellville Rd). MP 7.456 to 7.656 Improvements Overlay and restripe US 231X (Scottsville Rd) between Wilkinson Trace and Grouped Projects / HSIP - 3-9022.00 US-231X 0.72 Covington St/Smallhouse Rd to convert from a 4-lane section to a 5-lane Table 7.4 Low Cost Safety section. Improvements

Grouped Projects / Bridge 3-10015.00 KY-1435 0.04 Address deficiencies of KY 1435 bridge over Gasper River. MP 9.445 to 9.481 Table 7.4 Replacement Grouped Projects / Pavement Resurfacing, 3-20016.00 I-65 11.29 Address pavement condition of I-65 both directions. MP 13.711 to MP 25. Table 7.4 Restoration, & Rehabilitation Grouped Projects / Address pavement condition of the Natcher Parkway both directions. MP 0 Pavement Resurfacing, 3-20018.00 I-165 2.47 Table 7.4 to MP 2.473. Restoration, & Rehabilitation

Page | 43

APPENDIX B PUBLIC AND STAKEHOLDER COMMENTS

Agency Comments

A preliminary glance at the Area of Potential Effect (APE) Kentucky Tourism, Arts and Heritage indicates that there is a possibility for the presence of Cabinet | Kentucky Heritage Council cultural resources within the vicinity of some of these project areas and further consultation will be required.

Federal Highway Administration & FHWA and FTA jointly submitted comments to the MPO Federal Transit Administration – for document changes and administrative edits. Kentucky Divisions Comments were addressed in the final TIP document.

Page | 44

APPENDIX C RESOLUTIONS & CERTIFICATIONS

Page | 45

Appendix A

KYTC Calendar Year 2018 HSIP Targets (targets are expressed as a 5-year rolling average)

Number of Fatalities: 730

Discussion: The Kentucky Transportation Cabinet has set the target goal of 730 fatalities (5- year moving average) for fiscal year 2018. Similar to the national trend, the number of fatalities on Kentucky's public roads has been increasing the past four years, after a historically low number of fatalities in 2013. This is possibly due to factors such as increased VMT and economic growth. Despite these upward trends, KYTC remains committed to the reduction of serious injuries and fatalities throughout the Commonwealth. This target represents a reduction in total fatalities in calendar years 2017 and 2018 as compared to calendar years 2015 and 2016. This goal is shared with the SHSP and reiterates KYTC's commitment to the shared vision of Toward Zero Deaths.

Number of Serious Injuries: 2800

Discussion: The Kentucky Transportation Cabinet has set the target goal of 2,800 serious injuries (5-year moving average) for fiscal year 2018. KYTC remains committed to the continued reduction of serious injuries and fatalities throughout the Commonwealth. This target represents a reduction in total serious injuries in calendar years 2017 and 2018 as compared to calendar years 2015 and 2016.This goal is shared with the SHSP and reiterates KYTC's commitment to the shared vision of Toward Zero Deaths.

Fatality Rate: 1.500

Discussion: The Kentucky Transportation Cabinet has set the target goal of a 1.50 fatality rate (5-year moving average) for fiscal year 2018. KYTC remains committed to the reduction of serious injuries and fatalities throughout the Commonwealth. This target represents a reduction in the fatality rate in calendar years 2017 and 2018 as compared to calendar years 2015 and 2016. This goal is shared with the SHSP and reiterates KYTC's commitment to the shared vision of Toward Zero Deaths.

Serious Injury Rate: 5.760

Discussion: The Kentucky Transportation Cabinet has set the target goal of a 5.76 serious injury rate for fiscal year 2018. KYTC remains committed to the reduction of serious injuries and fatalities throughout the Commonwealth. This target represents a reduction in the serious injury rate in calendar years 2017 and 2018 as compared to calendar years 2015 and 2016. This goal reiterates KYTC's commitment to the shared vision of Toward Zero Deaths.

Total Number of Non-Motorized Fatalities and Serious Injuries: 293

Discussion: The Kentucky Transportation Cabinet has set the target goal of 293 non- motorized fatalities and serious injuries for fiscal year 2018. KYTC remains committed to the reduction of serious injuries and fatalities throughout the Commonwealth. This target represents a reduction in total Non-Motorized fatalities and serious injuries in calendar years 2017 and 2018 as compared to calendar years 2015 and 2016. This goal reiterates KYTC's commitment to the shared vision of Toward Zero Deaths.

Appendix A

Kentucky Transportation Cabinet Performance Measure Summary Asset Management & System Performance

APPENDIX D INFORMATIONAL SUPPLEMENT The content in this section includes state-funded projects that are either not classified as “regionally significant” (therefore not formally required to be a part of the TIP); and/or projects that are included in the Kentucky Highway Plan with over-programmed state funding sources. Though these projects exist in the State Highway Plan, funding may not be readily available for future project development. The content provided in this section is not an official part of the TIP, but are provided in this document for informational purposes.

Page | 52

TABLE 13 | STATE FUNDED PROJECTS FUND KYTC ID ROUTE PROJECT DESCRIPTION YEAR PHASE COST TYPE Improve US-31W from south of KY-242 3-199.00 US-31W (Richpond Road) to Dillard Road. SPP 2022 C $11,690,000 BMP/EMP 4.1/6.7 Construct a dual left turn lane on US-231 3-293.00 US-231 SPP 2019 C $181,500 at the eastbound approach to US-68. Improve KY-526 from near KY-2630 to US- $250,000 3-322.00 KY-526 SPP 2020 C 31W. Three Springs Road extension from 2019 R $2,560,000 3-8818.00 KY-884 Flealand to I-165, including bridge over SPP 2021 U $3,520,000 the interstate spur. 2023 C $10,450,000 Reconstruct KY-884 from Long Road to I- 2019 R $2,370,00 3-8852.00 KY-884 165 (MP 5.516 to MP 7.438) (Bridge over SPP 2019 U $3,920,00 I-165 under 3-8818) 2019 C $5,950,000 Minor widening (2+1 concept) from 2019 R $1,550,000 3-8853.00 US-31W Warren/Simpson County line to Buchanon SPP 2019 U $4,470,000 Park. 2020 C $13,450,000 Major widening/reconstruction of 2019 D $750,000 Cemetery Road (KY-234) from Fountain 2019 R $2,000,000 3-8854.00 KY-234 SPP Trace to Roger Porter Road (MP 7.878 to 2019 U $2,500,000 MP 9.625). 2020 C $5,500,000 2019 D $840,000 Extend Shive Lane to Lovers Lane (KY 880) 2019 R $1,740,000 3-8858.00 CS-1540 SPP in Bowling Green. 2019 U $1,690,000 2019 C $3,350,000 Add left turning lane on KY 242 into 2020 R $140,000 3-80005.00 KY-242 Richpond Elementary School at MP 3.8 to SPP 2020 U $260,000 3.95. 2020 C $260,000 Safety improvements and rehabilitation 2020 D $210,000 on KY-3225. Keep existing footprint by 2021 R $1,230,000 3-80051.00 KY-3250 SPP replacing curbline in same location from 2021 U $110,000 MP 0 to MP 1.00. 2022 C $1,350,000 Extend the 5-lane section of KY 234 2021 D $290,000 (Fairview Avenue) from MP 11.9 to MP 2022 R $220,000 3-80052.00 KY-234 12.4. Improvements may include a SPP 2022 U $1,760,000 roundabout, turn lane, and a signal at Hampton Drive. 2023 C $1,710,000 Address bridge deficiencies on Old 3-10017.00 CR-1350 Richardsville Rd (CR-1350) over Barren BR 2020 C $960,000 River. (Completed by County) TOTAL SPP FUNDING $86,271,500

Page | 53

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description US- 3-199.00 Improve US-31W from south of KY-242 (Richpond Road) to Dillard Road. MP 4.1 - 6.7 31W Fund Total Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Type Funding SPP C $11,690,000 $11,690,000

$11,690,000

Page | 54

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description 3-293.00 US-231 Construct a dual left turn lane on US-231 at the eastbound approach to US-68. Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding SPP C $ 181,500 $ 181,500

$ 181,500

Page | 55

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description 3-322.00 KY-526 Improve KY-526 from near KY-2630 to US-31W. Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding SPP C $ 250,000 $ 250,000

$250,000

Page | 56

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description KY- Three Springs Road extension from Flealand to I-165, including bridge over the interstate 3-8818.00 884 spur. Fund Total Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Type Funding SPP R $ 2,560,000 $ 2,560,000

SPP U $3,520,000 $ 3,520,000

SPP C $10,450,000 $ 10,450,000

$16,530,000

Page | 57

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description KY- Reconstruct KY-884 from Long Road to I-165 (MP 5.516 to MP 7.438) (Bridge over I-165 under 3-8852.00 884 3-8818) Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding SPP R $ 2,370,000 $ 2,370,000

SPP U $ 3,920,000 $ 3,920,000

SPP C $ 5,950,000 $ 5,950,000

$12,240,000

Page | 58

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description 3-8853.00 US-31W Minor widening (2+1 concept) from Warren/Simpson County line to Buchanon Park. Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding SPP R $ 1,550,000 $ 1,550,000

SPP U $ 4,470,000 $ 4,470,000

SPP C $13,450,000 $ 13,450,000

$ 19,470,000

Page | 59

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description Major widening/reconstruction of Cemetery Road (KY-234) from Fountain Trace to Roger Porter Road 3-8854.00 KY-234 (MP 7.878 to MP 9.625). Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding SPP D $ 750,000 $ 750,000

SPP R $ 2,000,000 $ 2,000,000

SPP U $ 2,500,000 $ 2,500,000

SPP C $ 5,500,000 $ 5,500,000

$ 10,750,000

Page | 60

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description 3-8858.00 CS-1540 Extend Shive Lane to Lovers Lane (KY 880) in Bowling Green. Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding SPP D $ 840,000 $ 840,000

SPP R $ 1,740,000 $ 1,740,000

SPP U $ 1,690,000 $ 1,690,000

SPP C $ 3,350,000 $ 3,350,000

$ 7,620,000

Page | 61

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description 3-80005.00 KY-242 Add left turning lane on KY 242 into Richpond Elementary School at MP 3.8 to 3.95. Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Total Funding SPP R $ 140,000 $ 140,000

SPP U $ 260,000 $ 260,000

SPP C $ 260,000 $ 260,000

$ 660,000

Page | 62

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description KY- Safety improvements and rehabilitation on KY-3225. Keep existing footprint by replacing 3-800051.00 3250 curbline in same location from MP 0 to MP 1.00. Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding SPP D $ 210,000 $ 210,000

SPP R $1,230,000 $ 1,230,000

SPP U $ 110,000 $ 110,000

SPP C $1,350,000 $ 1,350,000

$ 2,900,000

Page | 63

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description KY- Extend the 5-lane section of KY 234 (Fairview Avenue) from MP 11.9 to MP 12.4. 3-800052.00 234 Improvements may include a roundabout, turn lane, and a signal at Hampton Drive. FY Total Fund Type Phase FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future 2019 Funding SPP D $ 290,000 $ 290,000

SPP R $ 220,000 $ 220,000

SPP U $ 1,760,000 $ 1,760,000

SPP C $1,710,000 $ 1,710,000

$ 3,980,000

Page | 64

State Funded Transportation Projects Bowling Green-Warren County MPO TIP (FY2019-2024) KYTC ID Route Project Description CR- Address bridge deficiencies on Old Richardsville Road (CR-1350) over Barren River. 3-10017.00 1350 (Completed by County) Total Fund Type Phase FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Future Funding BR C $ 960,000 $960,000

$960,000

Page | 65