Meeting: Cabinet

Date/Time: Friday, 5 February 2021 at 11.00 am Location: Sparkenhoe Committee Room, County Hall, Glenfield and via Microsoft Teams

Contact: Ms. J. Bailey (Tel. 0116 305 2583) Email: [email protected]

Membership

Mr. N. J. Rushton CC (Chairman)

Mr. R. Blunt CC Mr. J. B. Rhodes CC Mr. L. Breckon JP CC Mrs H. L. Richardson CC Mr. B. L. Pain CC Mr. R. J. Shepherd CC Mr. T. J. Pendleton CC Mrs D. Taylor CC

URGENT REPORT

Item Report by

13. Disposal of Land at Lake Terrace, Melton Director of (Pages 3 - 14) Mowbray. Corporate Resources

Democratic Services ◦ Chief Executive’s Department ◦ Leicestershire County Council ◦ County Hall Glenfield ◦ Leicestershire ◦ LE3 8RA ◦ Tel: 0116 232 3232 ◦ Email: [email protected]

www.twitter.com/leicsdemocracy www.www.leicestershire.gov.uk

This page is intentionally left blank 3 Agenda Item 13

CABINET – 5TH FEBRUARY 2021

DISPOSAL OF LAND AT LAKE TERRACE, MELTON MOWBRAY

URGENT REPORT OF THE DIRECTOR OF CORPORATE RESOURCES

PART A

Purpose of the Report

1. The purpose of this report is to seek the Cabinet’s approval to the disposal of County-owned land at Lake Terrace, Melton Mowbray which is required for access to a planned residential development.

2. This report is being brought to the attention of Cabinet following the recent Melton Borough Council cabinet decision regarding a residential development scheme in Melton which may require County Council land for it to be delivered. The County Council had not been informed by Melton Borough Council of a report to its Cabinet or the decision.

Recommendations

3. It is recommended that:

(a) The Cabinet approves the disposal of the land at Lake Terrace, Melton Mowbray (shown as shaded pink and edged red on the plan attached as Appendix B to this report);

(b) The Director of Corporate Resources, following consultation with the Cabinet Lead Member for Resources, be authorised to agree a ‘best value’ sum for the disposal of the land at (a) above and finalise the disposal.

Reasons for Recommendations

4. In accordance with s.123 of the Local Government Act 1972, the County Council has an obligation to achieve ‘best value’ in the disposal of its land subject to various criteria set out in a General Disposal Consent Order (see also paragraphs 24 to 29 of this report below).

5. The sale of this land will assist in delivering a housing scheme in Melton Mowbray which already has the benefit of a detailed planning permission from Melton Borough Council.

4

6. The sale is expected to generate a significant capital receipt for the County Council.

Timetable for Decisions (including Scrutiny)

7. Subject to the Cabinet’s agreement the sale will be pursued at the earliest opportunity to enable the development to proceed as planned.

Policy Framework and Previous Decisions

8. The Corporate Asset Management Plan requires the County Council to continually assesses its portfolio and, following due process, to dispose of surplus assets to help support its Capital Programme.

Resource Implications

9. The County Council faces a very difficult financial outlook and the disposal of this land could generate a substantial capital receipt.

10. The Director of Law and Governance has been consulted on this report.

Circulation under the Local Issues Alert Procedure

11. Mr. A. Pearson CC

Officers to Contact

Chris Tambini, Director of Corporate Resources Tel: 0116 305 7830 Email: [email protected]

Jonathan Bennett, Head of Strategic Property Services, Corporate Resources Department Tel: 0116 305 6358 Email: [email protected] 5

PART B

Background

12. In November 2020, Melton Borough Council (“the Borough Council) granted a Reserved Matters planning permission for 90 dwellings (planning application ref: 20/00317/REM) pursuant to an outline permission granted in 2017 (planning application ref:7/01500/OUT) subject to a s106 Planning Agreement on land opposite and near County Council owned land at Lake Terrace, Melton Mowbray. (See Appendix A for scheme plan)

13. The development is to be delivered by a partnership between GS Developments (a Leicester-based property development company) and Nottingham Community Housing Association. The partnership intends to build 48 affordable and 42 properties with shared on a site off Lake Terrace, with construction set to begin in March 2021 (completion summer 2022).

14. The access road known as Lake Terrace is owned by the Borough Council in part and the County Council in part, illustrated in Appendix B.

15. Without both parcels of land that form the access road, the developer cannot access the adopted highway for its permitted scheme. It therefore needs to acquire a stretch of Lake Terrace.

16. The developer’s requirement gives rise to a “ransom” situation. In such circumstances the land will be subject to a professionally recognised and understood methodology for its valuation (well known to surveyors and valuers, who apply the principles set out in Stokes v Cambridge Corporation (more on which below).

Melton Borough Council decision

17. On 20th January 2021 the Borough Council’s Cabinet approved the disposal of its land ownership on Lake Terrace so that the residential scheme could be delivered.

18. The Borough Council report stated that its land would be sold to the developer at the point when the developer entered into a section 38/section 278 agreement with the County Council so that the development land could be contiguous with the adopted highway.

19. However, the Highways extents of the County Council’s land (shown in Appendix B) stop short of the site and, as shown on the plan, the remaining land is owned by the County Council in its own right, i.e. is not held as highway land and therefore needs to be acquired by the developer.

20. The County Council learnt through the media that the Borough Council has agreed a price for its land at circa £150,000.

21. The report stated that “The sale price of for the [Borough] Council’s Lake Terrace access land has been commercially negotiated, with reference to the principles in 6

case law Stokes v Cambridge 1961 for ransom land, which sets out 1/3rd of the resultant development land value, less profit, and costs for roads, sewers and fencing, should be attached to the ransom land”.

22. By adopting a pro rata division (in terms of site area), of the Borough Council’s figure of £150,000, results in a value of less than £50,000 for the County Council land.

23. However, valuation advice from the County Council’s Head of Strategic Property Services suggests that this figure is substantially lower than the expected market value for a ransom strip linked with a sizeable residential development and that the approach taken by the Borough Council is not in accordance with the usually accepted professional valuation methodology.

S123 Local Government Act 1972 implications

24. Whilst noting there are some specific circumstances where a disposal at below ‘best value’ is permissible, (see para 27), a Local Authority is bound by s123 of the Local Government Act 1972 to achieve ‘best value’ for the disposal of land.

25. A council is able to sell a site for less than its market value, but it must seek statutory consent to do so. Specific consent is not needed where a council can demonstrate the land sale will help to secure the improvement of the economic, social or environmental wellbeing of the local area, and the undervalue is only up to £2m less than market value.

26. These are the circumstances where socio and economic benefits can be relevant. The undervalue itself still needs to comply with “normal and prudent commercial practices’, including obtaining the view of a professionally qualified valuer.

27. If the sale of land is more than £2m below best value, then the Secretary of State’s approval is required.

28. A council can be found in breach of s123 LGA 1972 if it has: -

a. failed to take proper advice; b. failed to follow proper advice for reasons that cannot be justified; or c. has followed advice that was so plainly erroneous that in accepting it, the local authority must have known, or at least ought to have known, that it was acting unreasonably.

29. Selling at undervalue may also give rise to potential State Aid issues.

Stokes v Cambridge Corporation 1961

30. If the County Council has land that can be classed as ransom land, then the findings of the case known as Stokes v. Cambridge Corporation (1961) are to be followed. This decision related to a “ransom strip” - an area of land which provides the key to unlock the development potential of adjacent land by, for example, enabling a satisfactory access to be provided. 7

31. The County Council ransom strip arises because the County Council holds some land on Lake Terrace as Highways Authority and some parcels of land in its own right, outside the Highways extents.

32. The existence of non-Highway land was made clear to the developer by the Highways Authority when it responded to enquiries as a statutory consultee during the planning process.

33. Nevertheless, no approach was made to County Council to acquire the non- Highway owned land, nor was any calculation suggested in the Borough Council’s report on 20th January. even though reference was made in that report to these separate land ownerships benefiting the County Council.

34. No approach was (or has been) made by the developer to acquire the land from the County Council via a negotiated land deal.

35. To protect the County Council’s position and to ensure that it is not in breach of its fiduciary duty to achieve best value, it will be necessary to undertake a valuation of its non-Highway land in the context of Stokes v Cambridge.

36. The Land Tribunal held in Stokes v. Cambridge, that the beneficiaries of the ransom land should share in the uplift in value that their land creates to the developer’s land.

37. Following Stokes v. Cambridge at Lake Terrace therefore, the Borough and County Councils should share the uplift in value from undeveloped farmland to fully developed residential land, having deducted developer's (profit and costs of roads, sewers, fencing, consents and contingencies). The actual amount of uplift that the ransom owners should receive was also mentioned in the findings of Stokes v Cambridge.

38. The finding of the Lands Tribunal was that the starting point should be that the ransom strip is worth 50% of the increase in value of the adjacent land; provided that the increase in value for these purposes is calculated after account has been taken of the expenditure and risk required to achieve the final increase in value (by deducting developer's profit and the cost of provision of necessary infrastructure).

39. Subsequent court decisions have upheld the 50% uplift figure namely Batchelor v Kent County Council [1992] and Ozanne and others v Hertfordshire County Council [1989].

40. Applying the above to the Lake Terrace situation is likely to give rise to a substantially higher potential capital receipt than the publicly reported figure of £150,000 for the Borough Council owned land and thus a substantial potential capital receipt for the non-Highway County Council land.

41. Fully costed professional valuations are needed to wholly understand and appraise the full ransom value of both the Borough and County Council’s land.

8

42. Only once those valuations have been completed, can the County Council then enter into meaningful negotiations with the developer mindful of the true value of its ransom land.

43. The Flood Risk Assessment dated February 2020 (as submitted by the applicant/developer as part of the Reserved Matters planning application) clearly shows at least one future phase of housing on land owned/controlled by the developer and given the access to this phase is also over the Borough and County Council’s land on Lake Terrace, this phase should also be taken into account in valuing the two Council’s ransom strips.

44. It is noted that the plan taken to the Borough Council’s Cabinet was the superseded Outline planning application plan which did not clearly show how the next (and possible more) phases of development might affect its valuation of its land ownership on Lake Terrace.

45. The County Council is mindful that the proposed use is an affordable housing scheme (with the benefit of planning permission and Homes England grant money) but it is duty bound to ensure it has achieved best value when disposing of its land interests.

46. Ransom strip valuations are not statutory valuations and so the outcome will be down to negotiations between the developer and the County Council and reasonableness from both parties.

47. The County Council (as ransom strip owner) has only the developer as a likely buyer (excepting the Borough Council), while the developer will not be able to deliver its scheme without the County Council’s ransom strip. However, the developer will not agree to a ransom value which means its scheme is no longer viable.

48. It may be that no land deal can be reached which is acceptable to both parties. This is clearly an unwelcome potential outcome, but it is one that should be considered.

49. The County Council and the developer could refer the valuation to the Upper Tribunal (Lands Chamber) to decide what the correct ransom valuation should be in circumstances where the parties cannot agree. There would be cost issues with this approach but a clear, independent, decision would be reached (although it is capable of being appealed in the courts). The Tribunal would treat the valuation as though it was a Compulsory Purchase Order valuation.

50. Alternatively, the developer may wish to consider other options in the situation of no agreement being reached. In this situation it would be for the developer to possibly consider whether to stop the project (and be liable for the losses incurred thus far) or it may consider demonstrating to the Borough Council that it is appropriate for it, as the local planning authority, to exercise its compulsory purchase powers.

9

Compulsory Purchase Order (CPO)

51. If routes other than acquiring land by agreement are to be considered, then the developer might seek to persuade the Borough Council to exercise its compulsory purchase powers to acquire the County Council’s land pursuant to s226 of the Town and Country Planning Act 1990.

52. For this route to succeed, the developer would need to indemnify the Borough Council for its costs of promoting a CPO (which could be significant assuming a public inquiry) and the costs of compensating the County Council for the land itself. Moreover, the Borough Council would need to demonstrate to the satisfaction of the Secretary of State that the exercise of its compulsory purchase powers (and subsequent works) are likely to promote or improve the economic, social or environmental wellbeing of the area.

53. Clearly as landowner, the County Council would have to be notified of any CPO and would have the right to object in which case the issue would be resolved by a public inquiry. It is only after any objections have been heard by an inspector appointed by the Secretary of State that the CPO could be confirmed.

54. The County Council and Borough Council could continue to negotiate a sale by private treaty if they so wish, even during the promotion of a CPO, and indeed the government’s guidance advises acquiring authorities to seek to acquire land by agreement and use CPO as a last resort.

55. In the event a confirmed CPO was exercised to acquire the County Council’s land, the Borough Council would be liable to pay the County Council compensation for that acquisition, including the value of the land (with any inherent ransom value), such value to be determined by the Upper Tribunal (Lands Chamber) if not agreed.

Equality and Human Rights Implications

56. At this stage, there are no equality or human rights implications directly arising from this report.

Background Papers

Report to Melton Borough Council Cabinet on 20 January 2021 “Disposal of Land to Enable Development of Affordable Housing” https://democracy.melton.gov.uk/ieListDocuments.aspx?CId=202&MId=1116&Ver=4

Appendices

Appendix A - Development Scheme Plan Appendix B - plan showing County and Borough Council land ownerships on Lake Terrace

This page is intentionally left blank R eRevisionvision: : DateDate: :

A shown and mix updated. SG 03-10-2017 B Easements shown on plan. SG 04-10-2017 C Indicative attentuation basins shown, SG 09-10-2017 red line and layout updated. D Site boundary updated to include SG 25-10-2017 southern embankment and land at site access. E Site access updated to engineer's SG 30-10-2017 proposal, red line updated accordingly. F Site access updated to engineer's SG 14-11-2017 revised layout. Additional linework removed.

68

. 90

69

.69 73

. 75

.21 70

.19 69

70.19 00

Inv.Lvl:68.97m .22 . 70 70 69 Ø:0.5m . 14 90 69.

70.15 Inv 69.09 69.10 68.97 .03 69.07 70 70.14

FB r 70.04 Inv.Lvl:68.77m MH MHCL:70.73m Ø:0.3m 69.12 70.12 70.06 70.08

Inv 69 69.12 70.08 . 68.77 .11 79 7070. Sp 00 70.00 70 99 .71 . 69 . 70.01 08 69 70.05

69.92

69

75 EXISTING TREES .91 . 70.02

69.91 69 70.01 70.00

00 .00 . 70

70

. 70 70.03

25 70.00 70.10

92 .53 25 . . 69 70 70

70 . Mkr 04 Tree Lvl:89.37m Sp .33 70 75 70 Ø 1.40m . .00 .00 69.05 69 70 98 69.87 .80 . 69 69 70 01 U/S . 69.92 . 69.59 08 INDICATIVE75 SWALE 69.91 89.37 68 85 68.92 .08 . 69.92 .74 68.87 69 13 69 . 69.96 69 69.92 92 75 . .62 . 92 69 69 68.98 69.92 68 75 69 .94 .80 . 69. 69 69 57 69 . 50

. 69.66 69.67 69 50 69.40

.30 69

69 . 53

90 75 68. .72 . 69 69.90 69 69.88 69.75 . 50 75 69.

70 47 69.92 . . 00 .93 69.51 69.41 69.84 69.84 68 69 69.89 69.74 .71 69.78

69 69.75 09 . 69

69.76 . 69.72 75 .75 75 69 60 . 00 50 .

. 69 75 .77 69 69 69.68 69.80 69.83 70 .75 69 69.73 69 69.68 69.57 .

. 15

50 .75 69 . 87 75 . 69

.99 69 69.77

68

69.61 70 . 69.67 00

69.75 75

50 . 69.79 69. 69 69 69.77 69.94 . 50 69 .50 51 .

69 69. .15 85 75 70 . 69.75 .59 69.75 69 69.70 74

.87 69.75

68 69 69.29 50 70 . . . 00 69 69.63 69 69.85 69.62 86 69.25 . 74 68.85 .63 69 50 . .14

69 69.75 70

69.31 69.47 71 70 69 69.78 . . 00

69.91 g

.94 .

50 69 25

68 . 57

69 . 69.83

.66 69 69 69.57 69 50 . 69

69.35 . 69.31 50 .86 69 .

68 50 69 64 . . 50 INDICATIVE ATTENUATION BASIN .25 70 74 69.50 69.60 69.78

69.63

63 69

. . 69.64 75 68 74 . 69 69 .

75 .18

69 70 . 70

50 69.47 69.51 69.51 69 . .75 00 69.16 .75 69.75 69 82 69.72 36 69.88 . 69.50 . 68 55 69 69.41 . 64 69.67

. 69 49 69

50 . INDICATIVE ATTENUATION BASIN .

69 .

75

25 74

. JL1

69 69 69.729 69.39 69 38 . . 68

.83 74 69.87 69.72 69

68 69 .

50 .75 . 69 50 PUBLIC OPEN SPACE Private Drive 51 36 . . 69.56 69.65 69.69 69.34 69 65

69 . 69 75

. . 31 69 50 . A

.73 69 69.39 69.79 PUBLIC OPEN SPACE 69 69.82 68 74 70 . C 69.40 75 Drive . 42

. 02

75 00 69.42 . Private .

74 69.80 69

69.70 70

50 69

. . 69

69 50

. 67 75 046 069

49

. . 69.55 50 . 69 A 69 C 69 69.77 073 042-043 69.37 C 70.05 69.32 040-041 .75 C 69 B 070 43 047 MEC2 . A Private

74.643 69 044-045 C

50 79 . 69.33 C

. B

69

91 C 074 70 70

Dx2 50

.

69 . 42 . Dx2 00 . 048 .

071 20 68 11 69

. 082

75 69 69.92 072 69 . 69.59 75 . Ex2 A 74 69 69

16 69.75 Drive

69 .44 . 066 . 52

69.56 69.61 69.70 69.30 50 . 69 74 69.64 .47 69.74 049 081 69 A

.50 69 075

69.67 69 067 065 . 69.06858 75 .70 75 69.62 69 . 70.14

69 .79 080 C

.84 69

75 C 68 03869.-44039 MEC3 050 .

69 69.752 69 076 C

. 69

80 . 69.71

50

.

69

00 . Shared 70 55 70 079 . INDICATIVE ATTENUATION BASIN 69 69 Ex2 . 051 13 . 69 75 A C 86 . 69 . 87 A 73 67 A MHCL:70.21m . 69.91

69 C 93 Post

68 . 69 70.07 . 50 064

.66 MEC1 A Surface 077 69.79 70 73 A 052

10 69.59 69.48 69.60 69

. 69.655 . A 00 50 C . .69 70 69 50 69 69 . . .61 69 . . 00 83 62 A 69 .00 69 74 .00 037 . 70 69 A A 69.25 54 . A 70 A 063 C 69.60 69 053 70.01

A 11

69 078 036 75

69 69.57 .

66 69.61 .

50 . A . 69.52 75

69 A 032 062 70 69 69.53 69.56 69 A C 083

69.79 70 . .00 70 25

69.56 035 .69 A 013 .

054 00 033 70.16 69.50 012 061 A 19 69.86 A . C 084 70 011 70 .50 .

25

034 69 69.31 69 A . A 50 A 69 A 055 060 . 010 C 69.56 69.66 57 085 A 70 . 69.95 69 C 00 95 . 69.72 50 69.34 A A . . 059 73 75 70.10 69 009 70 B . p 69 086 . 70 69 50 B .00 Private A

41 70 A

. . 69 36

. 69.48 Sewage 50 008 056 70 058 A 69.35 93 69 69.51 69.59 . 05769.96 A 94 69.55

. 69 .37

.50 73 70 . Pumping 00 69.50 . 69.97 68 69 69.53 50 007

030-031 014 Station 69.62 C Drive

C 70 .31

69.49 . 25 70 69 B

69 .64

028-029 Dx2 A 015 A B C 70 087 70.05 . 51

50 . . 006 69.90 00 69.60

A 69 71

Ø 1.40m . 088 .7975 69.55 69.38 U/S 71 72.47

08 69.64

. 70

A . 25 69 005 C 25 . 74 Dx2 . 69.60 95.59 70 70 .73 71 72 50 089 .52 69 . . C 71.50 50 69 016 A 70.15

A 69.45 69 Post06

69.46 Average Tree Lvl:95.59m . .51

69 70 70

004 . 69.84

75 71 . 00 71.46

.50 A 090 71 Ø 1.40m 75

. .57 69.56 69 69.66 .28 69.47 017 70 50 . A C 71.19 69.51 69 69003.71 .80 69 091 87 . . 69 69.43 79 72.28 C 64 .50 . 71 68 69 71 46 A .50

69.38 018 . 002 71.45

52 71 71

. 70 .34 . 70.26 69 092 25 71 C .36 . 71

69 73 30 51 . 64 . 50 45

. 69 69.87

69 50 . .

. 69.41 50 MHCL:69.96m 70 .98 71.40

.

.37 71

69 50

75 71 .

m70 70

07 . 50 019 001 69 093

C . .13 .43

70 29

.

75

70 :73 71 . 71

50 .

. Lvl 50 69 70 71.42

71

. Play71 .38Area

69.25 00 70.25 .53 MEC3A 71.35 71.47 69.51 71

094 70 Fence 71.893

.

020 00 71.84

75 06 69.88 . 71.52

64 . 69 67 . Security 71 71 . 69.42 69.77 .47 71.58

70 . 70 35 JL4 39 73 85 .

69 69.48 73.733 R 70 . 30 .

. 25 44 0 m 71 . 71.47

Depot 71

12

.

. 50

021 . 69 25 A 71 69 022 71.48 69.45 69.50 Tree Lvl:96.10m .58 72.01 71.85 70

69.36 A Ø MG 70.14 71

U/S . 70

69.36 69.37 69.45 50

. 023 00 50 Dropped kerb crossing with tactile paving to be provided . 96.10 m

.37 70

69.52 73 71 . 75 :73

linking69 the footways on both sides of the site access road

Lvl .

70

71 75

. . 71.92

92 m 25

63 69.34 . 71.68

. 2 75 50 71

. Fence .

024 . 00

69 4 71 SEWER 69 48 . 6 . 70 00 75 . . INDICATIVE m 70 70 53 Security

. 85 Tree Lvl:94.32m , 72

69.39 . .86 69.85 71 32

.

x 00070 25 A 73 72

69.29 69 Ø MG 19 00

. 71.78 . 70.24 70

025 5.50 00 71.82 71.78

. .26 m 70 50 42 71 69.39 . 25 A 026 Visibility . 69 7.70 70 Post

50 55 U/S . . 71.95

69.32 .35 70 m 38

91 JL2 70 . Private 027 70 70 .96 94.32 70

69.637 Sp 71

WoSt . :72 68 71 25 70 Post . 70 . Lvl 33 Splay 40 69.42 . . 31 . 07 41 57 71.95 Tp Fence 69.32 .25 60 69 Drive A . Sp 70 69.31 .38 .14 30 50 . 69 71 .

41 72 69.48 Security 71

69 72.14.98

. A 00 71 43

. 49

71 R 49 69.36 Sp71 .39 70 51

73 6 71.93

. . . 75 36 41 0 .

70 63 m 71 . 42

. 71

69

69.22 69 . . 70 50 25 69 .

73 42

. 45 69.15 25 69.39 . . 70 7272.45

70 .28 72.01 Subject to surveys and

09

. 07 69 72 . 25 . . 71 MEC4 74 71 69.39 42 .25 70.762 . 71 92 69.40 . Tp

71 MHCL:70.63m 71 approvals from the Local

68

.

71 75

. 70 50 2 .13 . 72.13 69.29 . 90 72 Authority and Building Control. 69.34 .12 71 70 .94 71 714 . 70 71 69 73 .99 m 52 . .25 70 71 .23 75 Tree Lvl:77.45m 50 Mkr . . 50

.01 .25 .

71 56 71 Ø MG JL3 71 69 x 45

73.240 15 . 00

. .

50 47 69.35 22 69.33 73 71 69 m U/S . . 33 Sp 24

35 77.45 2.0m wide 71 linking . 25 footway . into 33

. 71 Visibility71 71 71 39 . 69 71 . 61 53 63 . . .51 59 existing footway provision along

69.27 69

25 Boll

. Boll Boll 29

71 71 . Lake50 Terrace 69 26 69.46 69.50 . . MHCL:69.53m 69 71 53 Refuse Tip 28 Inv .67 . Splay .25 71 26 71 53 . 71 69 . ULLSWATER 94 69.40 71 7.50 . 68.96 . .

69 31 70

(public) 71 . 68 69.36 75 69 71 69.07 .87 . 69.30 Existing89 field access to be stopped up

69 69.31 PUBLIC OPEN SPACE 1 64 . .

25 71 69 69 . 69 . 60 .25 86 98

. 71 37

.

68 69.28 53 71 . a . 71 .25 88 72 2

42 Existing highway 69 69

. CTV 69 . . r 18 1 g p . Tp 0090 69.33 . 95 r g p

69 St MEC5 73 widened as it passes Mkr St 72.092 37 Lp 89 69.23 . 69 St 72 .25 properties 1 & 1a CTV ROAD

68 62 50 Sv . St

. . 04 02 .

69 69.30 St 69 .00 73 Lake 69 CTV 12

68.93 69 69.28 69.31 71 72

.

00 . CTV

25 .

. 92

00 10 3

. Architects · Project Managers ·Quantity Surveyors

69.08 Architects · Project Managers · Quantity S urveyors

69.12 00 69 .

72 St

StSt 72 72 72 St 69.18 . 46 00

. . 24 02

69.25 . 69 71

69 Terrace71 Waterloo House, 71 Princess130 NRoadew W Westalk

69

. . 25 . 95 93 72 CTV 69.17 . 50 06 . St

71 72 73 CTV 72 LLeicestereicester,, LLEE117 6JTRA . 71 . 00 25 42 96 . . . 00 St 69 . 69.44 .00 98 69 73 St

St CTV

69 .

00 69.17 CTV TTelel: :0 0116116 2 20404 5 5800800, ,F Faxax: :0 0116116 2 20404 5 8580101 69.24 69.00 St

93 . 69.24 41 Lp 69.24 .

68 69 48 . EASEMENT email: [email protected], www.rg-p.co.uk 71 email: [email protected], www.rg-p.co.uk 25 19 69 . . 71 69.13 . 69.18 80 69 71 68.90 69 . 71 84 . 86 52 . . 78 46 CTV . St 73 SEWER 69.18 00 St . 73 St 69 St

69.45 71 69

.

25 EXISTING TREES . CTV 87

69

. 00

59 . 71 CTV 69.27 .75 69 INDICATIVE 71

69.21 . 82

91 . 69 39 . 71 St

71

51 .

25 69 71 68

. 69 .

.

25 73

30 . 69 .

69.08 25 69.22 39 . . 72

. 67 69 69 00 . 05 69.17 14 . Project: 50 . 73 Project:

. EASEMENT 69 68.93 69 69.24 73

69 69.01 69.31

25

.

25 .

69 69.19 68.85 A development at Lake Terrace,

69 69.41 69.43

..2824 69 . 25 Mkr.276969 SEWER 69.27 68.83 69 28 Inv.Lvl:68.95m .18 69. Melton Mowbray 69 68.81 .28 86 .83 .27 69 . 69.26 68 69 69.27 Inv.Lvl:68.86m Ø:0.4m 68.79 68 69.39 Ø:0.3m 68.91 68.92 .31 69.01 69 .18 69.34 69.03 .09 69 69 69.35 69.13 69 .48 Inv INDICATIVE 69.13 66 Client:Client: .04 . Inv Inv 69.17 69 .21 68.95 69 U/S 69 68.86 68.95 69.13 .07 69.16 69 6989.23.46 GS Developments 69.17 69.07 69 Inv.Lvl:68.95m .77 Tree Lvl:89.46m Ø:0.4m Tree Lvl:89.46m Ø 1.20m Ø MG

68 . S hSheeteet tit ltitlee: : 69 Proposed Site Plan

R eReff: : N Ordnance Survey (c) Crown Copyright 2017. All rights reserved. Licence number 10002243241082/ 001F SCHEDULE OF ACCOMMODATION

Type Area No. of Units S cScaleale: : House Type A (2b4p) 68m2 49 1:1000 @ A1 House Type B (3b5p) 86m2 6 House Type C (3b5p) 83m2 27 Site Plan @ 1:1000 2 DaDatete: : Flat Type D (1b2p) 45m 8 2017-07-25 Flats Type E (2b3p) 58m2 4

0 10 20 30 40 50 Total 94 Drawn:Drawn: Checked:Checked: Please note that the site boundary has been taken from YB DMC documentation recieved by others. Site Area = 3.971Ha

AllAlldi mdimensionsensions to tobe bech checkedecked on onsit esite. D.o Thisnot sdrawingcale off isd rtheawi ncopyrightg. This d rofaw theing Architectis the , coandpyri gnotht otof tbehe reproducedArchitect, an withoutdnot to theirbe r epermissionproduced w. Ordnanceithout thei rSurveypermis smapion. information Orreproduceddnance S ur vwithey m permissionap informa tofio nHMSOrepro dCrownuced w Copyrightith permis reservedsion of H.MS O C rown C orgpy+rpig Ltdht r.e Tradingserved. as rg+p. rg+p Ltd. Trading as rg+p. This page is intentionally left blank Land owned by Melton Borough Council " (LT281984)

Land owned by Leicestershire County Council (LT259923)

Land is unregistered at Land RegistryDepot

County Highway Extent

32

38 57 9

4 51

13

5 5 4

4 2

2

9 9

3 3 Refuse Tip (public) U L L

S 1

1 W

A

a a 2

T

1 1

7

7 E

3 3 R

R O

A 3

3 D

Reproduced from an Ordnance Survey map with the 1 permission of the Controller of HMSO 4 ® Crown Copyright. Leicestershire County Council Licence number 100019271

1:500 @ A3 Landscape UPRN 1808 - Melton Mowbray Civic Amenity Site Strategic Property Services (Layer_106) Corporate Resources Department by Vanessa Hughes County Hall, Glenfield. Leicester. LE3 8RE October 2018 F:\GIS\Asset Man\UPRN\UPRN 1808 - MELTON MOWBRAY CIVIC AMENITY SITE This page is intentionally left blank