Component 1 – Strengthening of Water Resources Management and Development

Table 1 : List of contract Packages of Goods, Works and Non Consulting Services to be Procured Under ICB, NCB and other Methods

Estimated Costs Procuremen P-Q Review Expected Bid Contract Ref No. Contract Description Implementation Advert Date (million US$) t Method (Yes/No) Prior/Post Open Date Award Date

Table 1A: List of Contract Packages for Goods WR-G1 Supply of GIS/Communication equipment for BWOs Offices Planned 0.450 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Public Disclosure Authorized Disclosure Authorized Public Public Actual Supply of water resources monitoring equipment Planned 2.56 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 WR-G2 Actual WR-G3 Supply of automatic weather station and standard rain gauges Planned 1.02 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual

WR-G4 Supply of groundwater, land surveying and portable water quality kits Planned 3.24 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual WR-G5 Supply of pumping test equipment Planned 0.75 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual WR-G6 Supply of working tools Planned 0.25 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual WR-G7 Supply of river gauging installation facilities (Stilling wells, Water Level Loggers Planned 0.450 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 housings, gauge posts) Actual Public Disclosure Authorized Disclosure Authorized Public Public WR-G8 Supply and installation of current meter calibration facility Planned 0.600 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual WR-G0 Supply of Laboratory Equipment and instruments for Central, Zonal and Planned 4.700 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Regional Laboratories Actual WR-G10 Supply of chemicals and reagents for 16 Laboratories Planned 1.200 ICB No Prior 15-Oct-2008 30-Dec-2008 30-Mar-2009 Actual WR-G11 Supply and installation of dam monitoring equipment at Nyumba ya Mungu Dam Planned 0.200 NCB No Post 5-Jan-2009 20-Mar-2009 20-Jun-2009 in Pangani Basin Actual Public Disclosure Authorized Disclosure Authorized Public Public

1 Public Disclosure Authorized Disclosure Authorized Public Public Estimated Costs Procuremen P-Q Review Expected Bid Contract Ref No. Contract Description Implementation Advert Date (million US$) t Method (Yes/No) Prior/Post Open Date Award Date

WR-G12 Supply and installation of pumps for augmentation of dry season irrigation in Planned 0.036 Shopping No Post 5-May-2009 30-May-2009 15-Jun-2009 Pangani basin Actual

WR-G13 Supply pumps for Internal Drainage Basin (9 Bhs) Planned 0.036 Shopping No Post 5-May-2009 30-May-2009 15-Jun-2009 Actual WR-G14 Supply pumps for Usangu Plains (9 Bhs) Planned 0.036 Shopping No Post 5-May-2009 30-May-2009 15-Jun-2009 Actual Planned 15.528 Sub Total - supply of goods Actual 0.000

Table 1B: List of Contract Packages for Works

WR-W1 Rehabilitation of offices and water lab buildings (in Moshi, Arusha, Nyumba ya Planned 0.445 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 Mungu and Tanga), and construction of new office (for Moshi – Hq office extension) and WUAs of Pangani BWO. Actual

WR-W2 Rehabilitation and construction of office and water lab buildings for Wami Ruvu Planned 0.360 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 BWO Headquarters at Morogoro and and field offices.at Dar Es Salaam and Dodoma. Actual

WR-W3 Rehabilitation of Iringa BWO field office and water lab buildings and construction Planned 0.440 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 of new office (for Iringa – Hq office extension) and Ifakara office. Actual

WR-W4 Rehabilitation and construction of office and water lab buildings for Southern Planned 0.240 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 Coast and Ruvuma BWO Headquarters at Mtwara and field offices at Lindi, and Tunduru. Actual

WR-W5 Rehabilitation and construction of office and water lab buildings for Lake Nyasa Planned 0.230 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 BWO Headquarters at Mbeya and field offices at Songea and Njombe. Actual

WR-W6 Rehabilitation and construction of office and water lab buildings for Internal Planned 0.180 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 Drainage (Singida, Shinyanga, Mto wa Mbu and Babati) BWO Headquarters and field offices. Actual

WR-W7 Rehabilitation and construction of office and water lab buildings for Lake Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 Tanganyika BWO Headquarters at Kigoma and field offices at Tabora and Kahama. Actual

2 Estimated Costs Procuremen P-Q Review Expected Bid Contract Ref No. Contract Description Implementation Advert Date (million US$) t Method (Yes/No) Prior/Post Open Date Award Date

WR-W8 Rehabilitation and construction of office and water lab buildings for Lake Rukwa Planned 0.900 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 BWO Headquarters at Mbeya and field office at Sumbawanga. Actual

WR-W9 Rehabilitation of offices, and water lab buildings for Lake Victoria BWO Planned 0.130 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 Headquarters at Mwanza and field offices at Bukoba and Musoma. Actual WR-W10 Rehabilitation/construction and installation of weather and river gauging Planned 0.100 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Pangani basin Actual WR-W11 Rehabilitation/construction and installation of weather and river gauging Planned 0.090 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Wami-Ruvu Basin Actual WR-W12 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Rufiji Basin Actual WR-W13 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Ruvuma and Southern Cost Basin Actual WR-W14 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Lake Nyasa Basin Actual

WR-W15 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in IDB Actual WR-W16 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Lake Rukwa Basin Actual

WR-W17 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Lake Tanganyika Basin Actual

WR-W18 Rehabilitation/construction and installation of weather and river gauging Planned 0.200 NCB No Post 2-Mar-2009 5-May-2009 10-Aug-2009 equipment in Lake Victoria Basin Actual

WR-W19 Drilling of boreholes and installation of pumps for Internal Drainage Basin (9 BH) Planned 0.200 NCB No Post 15-Dec-2008 20-Feb-2009 20-Apr-2009 Actual WR-W20 Drilling of boreholes and installation of pumps for Usangu plains (9 Bhs) Planned 0.200 NCB No Post 15-Dec-2008 20-Feb-2009 20-Apr-2009 Actual WR-W21 Drilling of boreholes and installation of pumps for augmentation of dry season Planned 0.700 NCB No Post 15-Dec-2008 20-Feb-2009 20-Apr-2009 irrigation in Pangani BWO (Kahe - 8 BH, Mtakuja/Sanya plains -4 BH) Actual Sub Total - Works Planned 5.815 Actual 0.000

3 Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

4 Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

5 Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

6 Component 3: Scaling Up Urban Water Supply and Sewerage (including 19 UWSAs, DAWASA, KASHWASA, 118 DUWSSs and 6 NATIONAL PROJECTS )

Table 3 : List of contract packages of Goods and Non Consulting Services to be Procured Following ICB and other Methods Table 3 A : List of contract packages for Goods Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-G1 Design, supply, Install GIS & billing system, mapping & training Planned 0.59 NCB No Post Oct-08 Nov-08 Dec-08 Actual

CW-G2 Supply 1200 water meters , 2 leak/metal detector and sewer cleaning tools Planned 0.23 NCB No Post Aug-07 Sep-07 Dec-07 Actual 0.396 NCB No Post Dec-07 Jan-08 Mar-08

CW-G3 Supply 3000 water meters Planned 0.23 NCB No Post Aug-07 Sep-07 Dec-07 Actual 0.24 NCB No Post Dec-07 Jan-08 Mar-08 CW-G4 Supply 1200 water meters , 2 ultrasonic flow meters , 2 leak & metal detector and sewer cleaning tools Planned 0.23 NCB No Post Oct-08 Nov-08 Dec-08 Actual CW-G5 Supply 1200 water meters , ultrasonic flow meters, leak & metal detector Planned 0.23 NCB No Post Dec-07 Jan-08 Feb-08 Actual 0.049 Shopping No Post Jan-08 Feb-08 Mar-08 CW-G6 Supply of (1) Station Wagon, (1) pick up and (4) motorcycles Planned 0.12 NCB No Post Oct-07 Nov-07 Mar-08 Actual 0.117 NCB No Post Nov-07 Jan-08 Mar-08 CW-G7 Supply 4 computers and accessories Planned 0.03 Shopping No Post Oct-07 Nov-07 Mar-08 Actual 0.045 Shopping No Post Nov-07 Jan-08 Mar-08 CW-G8 Supply 1300 water meter , ultrasonic flow meters, leak & metal detector, sewer cleaning tools Planned 0.23 NCB No Post Aug-07 Sep-07 Dec-07 Actual 0.047 Shopping No Post Nov-07 Jan-08 Mar-08 CW-G9 Supply (1) Station Wagon , (1) pick up and (4) motorcycles Planned 0.11 NCB No Post Oct-08 Nov-08 Dec-08 Actual CW-G10 Supply of computers (4 sets) and accessories Planned 0.03 Shopping No Post Nov-08 Dec-08 Jan-08 Actual CW-G11 Planned 0.19 NCB No Post Oct-08 Nov-08 Dec-08 Supply 2500 water meters,2 ultrasonic flow meters and 2 leak & metal detector Actual CW-G12 Planned 0.08 NCB No Post Oct-07 Nov-07 Feb-08 Supply (1) Station Wagon and (1) pick up Actual 0.080 NCB No Post Nov-07 Jan-08 Mar-08

7 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-G13 Supply (4) motorcycles Planned 0.02 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.023 Shopping No Post Nov-07 Jan-08 Mar-08 CW-G14 Supply computers (4 sets) and accessories Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.035 Shopping No Post Nov-07 Jan-08 Mar-08 CW-G15 Supply 1200 water meters , 2 ultrasonic flow meters,2 leak & metal detector and sewer cleaning tools Planned 0.23 NCB No Post Oct-07 Nov-07 Feb-08 Actual 0.048 Shopping No Post Nov-07 Jan-08 Mar-08 CW-G16 Planned 0.08 NCB No Post Aug-07 Sep-07 Nov-07 Supply (1) Station Wagon and (1) pick up Actual 0.160 NCB No Post Sep-07 Oct-07 Dec-07 CW-G17 Planned 0.02 Shopping No Post Aug-07 Sep-07 Nov-07 Supply (4) motorcycles Actual 0.017 Shopping No Post Sep-07 Oct-07 Dec-07 CW-G18 Planned 0.03 Shopping No Post Aug-07 Sep-07 Nov-07 Supply computers (3 sets) and accessories Actual 0.034 Shopping No Post Sep-07 Oct-07 Dec-07 CW-G19 Planned 0.23 NCB No Post Aug-07 Sep-07 Dec-07 Supply 1,300 water meter, leak & metal detector and ultrasonic flow meters Actual 0.048 Shopping No Post Sep-07 Oct-07 Dec-07 CW-G20 Planned 0.08 NCB No Post Aug-07 Sep-07 Nov-07 Supply (1) Station Wagon and (1) pick up Actual 0.106 NCB No Post Oct-07 Nov-07 Mar-08 CW-G21 Planned 0.02 Shopping No Post Aug-07 Sep-07 Nov-07 Supply (4) motorcycles Actual 0.022 Shopping No Post Oct-07 Nov-07 Mar-08 CW-G22 Planned 0.03 Shopping No Post Aug-07 Sep-07 Nov-07 Supply computers (4 sets) and accessories Actual 0.037 Shopping No Post Oct-07 Nov-07 Mar-08 CW-G23 Planned 0.03 Shopping No Post Aug-07 Sep-07 Nov-07 Supply (500) water meters , 2ultrasonic flow meters and 2 leak & metal detector Actual 0.038 Shopping No Post Oct-07 Nov-07 Mar-08 CW-G24 Planned 0.08 NCB No Post Aug-07 Sep-07 Nov-07 Supply (1) Station Wagon and (1) pick up Actual 0.114 NCB No Post Oct-07 Nov-07 Mar-08 CW-G25 Planned 0.02 Shopping No Post Aug-07 Sep-07 Nov-07 Supply (4) motorcycles Actual 0.022 Shopping No Post Oct-07 Nov-07 Mar-08 CW-G26 Planned 0.03 Shopping No Post Aug-07 Sep-07 Nov-07 Supply computers (4 sets) and accessories Actual 0.026 Shopping No Post Oct-07 Nov-07 Mar-08 CW-G27 Planned 0.03 Shopping No Post Aug-07 Sep-07 Nov-07 Supply (1300) water meters and leak & metal detector Actual 0.120 NCB No Post Oct-07 Nov-07 Mar-08 CW-G28 Supply (1) Station Wagon vehicles and (1) pick up Planned 0.08 NCB No Post Oct-07 Nov-07 Feb-08 Actual 0.113 NCB No Post Dec-07 Jan-08 Mar-08

8 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-G29 Supply (4) motorcycles Planned 0.02 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.020 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G30 Supply computers (4 sets) and accessories Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.036 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G31 Supply (1300) water meters and leak& metal detector Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.120 NCB No Post Dec-07 Jan-08 Mar-08 CW-G32 Supply (1) Station Wagon vehicles and (1) pick up Planned 0.08 NCB No Post Oct-07 Nov-07 Feb-08 Actual 0.117 NCB No Post Dec-07 Jan-08 Mar-08 CW-G33 Supply (4) motorcycles Planned 0.02 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.018 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G34 Supply (4 sets) computers and accessories Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.029 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G35 Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Supplier (1300) water meter , and leak& metal detector Actual 0.047 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G36 Supply (1) Station Wagon vehicles and (1) pick up Planned 0.08 NCB No Post Oct-07 Nov-07 Feb-08 Actual 0.139 NCB No Post Dec-07 Jan-08 Mar-08 CW-G37 Supply (4) motorcycles Planned 0.02 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.013 Shopping No Post Dec-07 Jan-08 Mar-08 CW-G 38 Supply computers (4 sets) and accessories Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Actual 0.036 Shopping No Post Dec-07 Jan-08 Mar-07 CW-G39 Planned 0.03 Shopping No Post Oct-07 Nov-07 Feb-08 Supply (1300) water meter , leak& metal detector (2) and ultrasonic flow meters (2) Actual 0.113 NCB No Post Apr-08 May-08 Jul-08 CW-G40 Planned 0.08 NCB No Post Sep-07 Oct-07 Dec-07 Supply (1) Station Wagon vehicles and (1) pick up Actual 0.118 NCB No Post Oct-07 Nov-07 Jan-08 CW-G41 Planned 0.02 Shopping No Post Sep-07 Oct-07 Dec-07 Supply (4) motorcycles Actual 0.022 Shopping No Post Oct-07 Nov-07 Jan-08 CW-G42 Planned 0.03 Shopping No Post Sep-07 Oct-07 Dec-07 Supply computers (4 sets) and accessories Actual 0.028 Shopping No Post Oct-07 Nov-07 Jan-08 CW-G43 Planned 0.03 Shopping No Post Sep-07 Oct-07 Dec-07 Supply 1,500 water meters, leak & metal detector and ultrasonic Actual CW-G44 Planned 0.60 ICB No Prior Nov-08 Jan-09 Mar-09 Supply of one cesspit emptier truck for Iringa UWSA Actual CW-G45 Planned 0.06 NCB No Post Nov-08 Jan-09 Mar-09 Procure Laboratory Equipment Actual CW-G46 Planned 0.42 ICB No Prior Nov-08 Jan-09 Mar-09 Supply 5000 water meters Actual

9 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

KASHWASA CW-G47 Supply and Installation of 570 KW generator with motor Planned 0.50 ICB No Prior Oct-08 Nov-08 Dec-08 Actual Planned 5.377 Sub-total - Goods Actual 2.793 Note: (15) - These are three separate contracts (3 lots) with amount of: Lot 1: Water meters USD 114,000; Lot 2 Sewer cleaning tools USD 156,000; Lot 3: Cesspit emptier USD 125,763. Note: shaded contracts - completed/awarded and goods delivered or at final stage of delivery of goods. Indicate actual cost of the contract awarded.

Table 3 B: List of Contract Packages for Works

Estimated Procurement P-Q Review Expected Bid Contract Ref. No. Contract Description Implementation Costs (million Advert date Method (Yes/No) Prior/Post Open Date Award Date US$) Arusha UWSA CW-W1 Construction and rehabilitation of water supply for Arusha Municipality Planned 1.52 ICB No Prior Mar-09 May-09 Jul-09

Actual CW-W2 Construction and rehabilitation of sewerage systems in Arusha Municipality Planned 1.50 ICB No Prior Mar-09 May-09 Jul-09

Actual CW-W3 Construction of water supply systems in Ngorongoro small town. Planned 0.45 NCB No Post Mar-09 May-09 Jul-09 Actual

10 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

Babati UWSA CW-W4 Construction of office building Planned 0.34 NCB No Post Sep-08 Oct-08 Nov-08 Actual CW-W5 Rehabilitation of water supply works in Babati Town Planned 4.50 ICB No Prior Jul-08 Sep-08 Nov-08 Actual ICB No Prior Aug-08 Sep-08 CW-W6 Drilling of Boreholes for Babati Water Supply Immediate Works Planned 0.50 NCB No Post Jul-08 Sep-08 Oct-08

Actual NCB No Post Aug-08 Sep-08 CW-W7 Construction of water supply works for Orkesumet small town Planned 0.45 NCB No Post Feb-09 Mar-09 May-09 Actual CW-W8 Construction of water supply works for Kateshi small town. Planned 0.45 NCB No Post Feb-09 Mar-09 May-09 Actual CW-W9 Construction of water supply works for Karatu small town Planned 0.45 NCB No Post Feb-09 Mar-09 May-09 Actual Bukoba UWSA CW-W10 Rehabilitation of Bukoba UWSA offices Planned 0.02 Shopping No Post Mar-09 May-09 Jun-09

Actual CW-W11 Construction of water supply works under AFD Planned 1.00 ICB No Prior Mar-09 May-09 Jun-09 Actual CW-W12 Construction of water supply works at Karagwe small town. Planned 0.45 NCB No Post Mar-09 May-09 Jun-09 Actual CW-W13 Construction of sludge ponds for tanker emptier Planned 0.07 NCB No Post Mar-09 May-09 Jun-09 Actual Dodoma UWSA CW-W14 Construction and rehabilitation of water supply works in Dodoma Municipality Planned 3.03 ICB No Prior Oct-08 Dec-08 Jan-09 Actual CW-W15 Construction of sewerage works in Dodoma Municipality Planned 0.60 NCB No Post Oct-08 Dec-08 Jan-09 Actual CW-W16 Construction of water supply system in Kibaigwa small town Planned 1.45 ICB No Prior Oct-08 Dec-08 Jan-09 Actual

11 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-W17 Construction of water supply system in Mpwapwa small town (under AFD) Planned 1.45 ICB No Prior Oct-08 Dec-08 Jan-09 Actual Iringa UWSA CW-W18 Rehabilitation of Iringa UWSA offices Planned 0.01 Shopping No Post Feb-09 Mar-09 Apr-09 Actual CW-W19 Construction of water supply works for Kilolo small town Planned 0.45 NCB No Post Feb-09 Mar-09 Apr-09 Actual CW-W20 Construction of water supply works for Makete small town Planned 0.45 NCB No Post Feb-09 Mar-09 Apr-09 actual CW-W21 Construction of sewerage extensions works in Iringa Municipality Planned 0.65 NCB No Post Feb-09 Mar-09 Apr-09 Actual Kigoma UWSA CW-W22 Rehabilitation of KUWASA offices Planned 0.02 Shopping No Post Feb-09 Mar-09 Apr-09 Actual CW-W23 Rehabilitation of water supply works in Kigoma Municipality Planned 1.45 ICB No Prior Feb-09 Mar-09 Apr-09 Actual CW-W24 Rehabilitation of water supply works Kasulu small town Planned 0.45 NCB No Post Feb-09 Mar-09 Apr-09 Actual Lindi UWSA CW-W25 Rehabilitation of the LUWASA offices Planned 0.02 Shopping No Post Feb-09 Mar-09 Apr-09 Actual CW-W26 Rehabilitation of water supply works in Lindi Municipality Planned 5.00 ICB No Prior Feb-09 Mar-09 Apr-09 Actual ICB No Prior Aug-08 CW-W27 Construction of water supply works for Kilwa Masoko small town. Planned 0.45 NCB No Post Feb-09 Mar-09 Apr-09 Actual Mbeya UWSA CW-W28 Construction of water supply works for Mbeya city Planned 1.50 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W29 Construction of water supply works for Vwawa small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 actual CW-W30 Construction of water supply works for Tunduma small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual

12 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-W31 Construction of sewerage network extension works in Mbeya Municipality Planned 0.50 NCB No Post Mar-09 Apr-09 May-09 Actual Morogoro UWSA CW-W32 Construction and rehabilitation of water supply works in Morogoro Municipality Planned 3.06 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W33 Construction of water supply works for Turiani township Planned 2.55 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W34 Construction of water supply works for Mvomero township Planned 1.45 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W35 Construction of water supply works for Kilosa township Planned 2.10 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W36 Construction of water supply works for Gairo township Planned 6.75 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W37 Construction and rehabilitation of sewerage works in Morogoro Municipality Planned 0.71 NCB No Post Mar-09 Apr-09 May-09 Actual Moshi UWSA CW-W38 Construction and rehabilitation of water supply works in Moshi Municipality Planned 3.03 ICB No Prior Jan-09 Feb-09 Mar-09 Actual CW-W39 Construction and rehabilitation of sewerage works in Moshi Municipality Planned 0.60 NCB No Post Jan-09 Feb-09 Mar-09 Actual CW-W40 Construction and rehabilitation of water supply works in Same and Mwanga small towns Planned 0.90 NCB No Post Jan-09 Feb-09 Mar-09 Actual Mtwara UWSA CW-W41 Rehabilitation of water supply works in Mtwara Municipality Planned 5.00 ICB No Prior Jul-08 Sep-08 Nov-08 Actual ICB No Prior Aug-08 CW-W42 Construction of water supply works at Masasi and Nachingwea small towns Planned 26.00 ICB Yes Prior Jul-08 Sep-08 Nov-08 Actual Musoma UWSA CW-W43 Rehabilitation of MUWSA offices Planned 0.02 Shopping No Post Sep-08 Oct-08 Nov-08 Actual CW-W44 Construction of Musoma water supply works under AFD Planned 1.00 ICB no prior Mar-09 Apr-09 May-09 Actual

13 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-W45 Construction of civil works, storage tanks and Pump House for Bunda town’s water supply. Planned 0.90 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W46 Construction of water treatment plant, and water supply expansion at Bunda town Planned 4.00 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W47 Construction of water supply works at Tarime small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W48 Construction of water supply works for Mugumu small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W49 Construction of sludge ponds disposal from cesspit emptier for Musoma town Planned 0.07 NCB No Post Mar-09 Apr-09 May-09 Actual Mwanza UWSA CW-W50 Construction and rehabilitation of water supply works in Mwanza Municipality Planned 1.95 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W51 Construction and rehabilitation of sewerage works in Mwanza Municipality Planned 0.50 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W52 Construction of water supply works for Misungwi small town. Planned 7.00 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W53 Construction of water supply works for Geita small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W54 Construction of water supply works for Ukerewe small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W55 Construction of water supply works for Magu small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W56 Construction of water supply works for Sengerema small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual Singida UWSA CW-W57 Rehabilitation of SUWASA office Planned 0.01 Shopping No Post Mar-09 Apr-09 May-09 Actual CW-W58 Construction/rehabilitation of water works in Singida Municipality (under BADEA/OFID) Planned 12.00 ICB Yes Prior Mar-09 Apr-09 May-09 Actual CW-W59 Construction of sewerage system in Singida Municipality Planned 1.00 ICB No Prior Mar-09 Apr-09 May-09 Actual

14 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

CW-W60 Construction of water supply works at Manyoni small town. Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual Songea UWSA CW-W61 Construction of water supply extension works in Songea Municipality Planned 2.00 ICB No Prior Jan-09 Feb-09 Mar-09 Actual CW-W61 Construction of sewerage network extension works in Songea Municipality Planned 0.40 NCB No Post Jan-09 Feb-09 Mar-09 Actual CW-W62 Construction of water supply works at Mbinga small town Planned 0.45 NCB No Post Jan-09 Feb-09 Mar-09 Actual Shinyanga UWSA CW-W63 Construction of water supply extensions and sewerage system in Shinyanga Municipality Planned 2.00 ICB No Prior Dec-08 Jan-09 Feb-09 Actual CW-W64 Construction of water supply works for Maswa small town. Planned 0.45 NCB No Post Dec-08 Jan-09 Feb-09 Actual CW-W65 Construction of water supply works for Ushirombo small towns. Planned 0.45 NCB No Post Dec-08 Jan-09 Feb-09 Actual CW-W66 Construction of water supply works for Kishapu small towns. Actual 0.45 NCB No Post Dec-08 Jan-09 Feb-09 Actual CW-W67 Customer connection for Shinyanga Municipality Planned 0.85 NCB No Post Dec-08 Jan-09 Feb-09 Actual CW-W68 Customer connection for Kahama Municipality Planned 0.85 NCB No Post Dec-08 Jan-09 Feb-09 Actual CW-W69 Rehabilitation of Shinyanga water supply office buildings Planned 0.02 Shoppping No Post Dec-08 Jan-09 Feb-09 Actual Sumbawanga UWSA CW-W70 Construction of transmission lines and rehabilitation of water supply system Planned 4.50 ICB No Prior Jul-08 Sep-08 Nov-08 Actual ICB No Prior Aug-08 CW-W71 Drilling of boreholes for water supply system Planned 0.50 NCB No Post Jul-08 Sep-08 Oct-08 Actual NCB No Post Aug-08 CW-W72 Construction of SUWASA office building Planned 0.30 NCB No Post Mar-09 Apr-09 May-09 Actual

15 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

Tabora UWSA CW-W73 Construction and rehabilitation of water supply works in Tabora Municipality Planned 3.06 ICB No Prior Jan-09 Feb-09 Mar-09 Actual CW-W74 Construction of water supply works for Sikonge small town. Planned 0.45 NCB No Post Jan-09 Feb-09 Mar-09 Actual CW-W75 Construction of water supply works for Urambo small town. Planned 0.45 NCB No Post Jan-09 Feb-09 Mar-09 actual CW-W76 Construction and rehabilitation of sewerage works in Tabora Municipality Planned 2.18 ICB No Post Jan-09 Feb-09 Mar-09 Actual CW-W77 Rehabilitation of Gravity Mains and Civil Works from Bulenya Dam to Igunga Town. Lot No 13 Planned 1.62 ICB No Prior - - Jul-08 (transferred from RWSSP) Actual 1.57 ICB No Prior Jul-08 CW-W78 Rehabilitation of Water Distribution System and Civil Works in Igunga Town. Lot No 14 (transferred Planned 0.96 ICB No Prior - --- Jul-08 from RWSSP) Actual 0.95 ICB No Prior Jul-08 CW-W79 Rehabilitation of Gravity Mains, Water Pipe Distribution Systems and Civil Works from Igunga Town Planned 1.25 ICB No Prior - Jul-08 to the Villages of Mbutu, Ibutamisuzi and Hindish Lot No 15 (transferred from RWSSP) Actual 1.16 ICB No Prior Jul-08

Tanga UWSA CW-W80 Construction and rehabilitation of water supply and sewerage works in Tanga Municipality Planned 2.20 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W81 Construction and rehabilitation of sewerage works in Tanga Municipality Planned 0.93 NCB No Post Mar-09 Apr-09 May-09 Actual Construction of water supply works for Muheza small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 CW-W82 Actual CW-W83 Construction of water supply works for Pangani small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual CW-W84 Construction of water supply works for Korogwe small town Planned 0.45 NCB No Post Mar-09 Apr-09 May-09 Actual DAWASA CW-W85 Construction of Secondary and Tertiary Distribution Mains Part 2E Planned 9.50 ICB No Prior Mar-09 Apr-09 May-09 Actual CW-W86 Construction of Ikwiriri water supply works Planned 1.95 ICB No Prior Mar-09 Apr-09 May-09 Actual

16 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

Construction of Kibiti water supply works Planned 2.10 ICB No Prior Mar-09 Apr-09 May-09 CW-W87 Actual Construction of Kisarawe water supply works Planned 0.45 ICB No Post Mar-09 Apr-09 May-09 CW-W88 Actual Construction of Kilindoni water supply works Planned 0.45 ICB No Post Mar-09 Apr-09 May-09 CW-W89 Actual Construction of Mkuranga water supply works Planned 0.45 ICB No Post Mar-09 Apr-09 May-09 CW-W90 Actual Drilling of 3 high yield deep borehole to augument water supply in Dar es Salaam Planned 1.95 ICB No Prior Mar-09 Apr-09 May-09 CW-W91 Actual National Projects Rehabilitation of Maswa National Water Project Planned 4.00 ICB No Prior Feb-09 Mar-09 Apr-09 CW-W92 Actual Rehabilitation of Chalinze National Water Project (under BADEA) Planned 2.50 ICB No Prior Feb-09 Mar-09 Apr-09 CW-W93 Actual Rehabilitation of Mugango/Kiabakari National Water Project Planned 4.00 ICB No Prior Feb-09 Mar-09 Apr-09 CW-W94 Actual CW-W95 Rehabilitation of Makonde National Water Project Planned 4.00 ICB No Prior Feb-09 Mar-09 Apr-09

Actual CW-W96 Rehabilitation of Wanging’ombe National Water Project Planned 3.00 ICB No Prior Feb-09 Mar-09 Apr-09 Actual CW-W97 Rehabilitation of Handeni Trunk Main National Water Project Planned 4.00 ICB No Prior Feb-09 Mar-09 Apr-09 Actual KASHWASA CW-W98 Construction of staff houses at Ihelele treatment plant site. Planned 0.20 NCB No Post Sep-08 Oct-08 Nov-08 Actual CW-W99 Construction of access road to Mabale reservoir. Planned 0.12 NCB No Post Sep-08 Oct-08 Nov-08 Actual CW-W100 Construction of billing office Planned 0.12 NCB No Post Mar-09 May-09 Jun-09 Actual CW-W101 Construction of storage tank Planned 0.07 NCB No Post Mar-09 May-09 Jun-09 Actual Planned 182.285 Sub Total Works Actual 3.680

17 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

18 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

19 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

20 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

21 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

22 Estimated Procurement P-Q Review Expected Bid Contract Ref. no Contract Description Implementation Costs (million Advert Date Method (Yes/No) Prior/Post Open Date Award Date US$)

23 Component 3: Scaling Up Urban Water Supply and Sewerage (including 19 UWSAs, DAWASA, KASHWASA, 118 DUWSSs and 6 NATIONAL PROJECTS )

Procuring Entity

19 UWSAs

Dodoma UWSA

Morogoro UWSA

Mwanza UWSA

Tabora UWSA

Iringa UWSA

Iringa UWSA

Iringa UWSA

Kigoma UWSA

Kigoma UWSA

Kigoma UWSA

Songea UWSA

24 Procuring Entity

Songea UWSA

Songea UWSA

Songea UWSA

Babati UWSA

Babati UWSA

Babati UWSA

Babati UWSA

Lindi UWSA

Lindi UWSA

Lindi UWSA

Lindi UWSA

Mtwara UWSA

Mtwara UWSA

Mtwara UWSA

Mtwara UWSA

Musoma UWSA

25 Procuring Entity

Musoma UWSA

Musoma UWSA

Musoma UWSA

Shinyanga UWSA

Shinyanga UWSA

Shinyanga UWSA

Shinyanga UWSA

Singida UWSA

Singida UWSA

Singida UWSA

Singida UWSA

S’wanga UWSA

S’wanga UWSA

S’wanga UWSA

S’wanga UWSA

Iringa UWSA

Iringa UWSA

Iringa UWSA

26 Procuring Entity

KASHWASA

Procuring Entity

Arusha UWSA

Arusha UWSA

Arusha UWSA

27 Procuring Entity

Babati UWSA

Babati UWSA

Babati UWSA

Babati UWSA

Babati UWSA

Babati UWSA

Bukoba UWSA

MoWI

Bukoba UWSA

Bukoba UWSA

Dodoma UWSA Dodoma UWSA Dodoma UWSA

28 Procuring Entity

Dodoma UWSA

Iringa UWSA

Iringa UWSA

Iringa UWSA

Iringa UWSA

Kigoma UWSA

Kigoma UWSA

Kigoma UWSA

Lindi UWSA

Lindi UWSA

Lindi UWSA

Mbeya UWSA

Mbeya UWSA

Mbeya UWSA

29 Procuring Entity

Mbeya UWSA

Morogoro UWSA Morogoro UWSA Morogoro UWSA Morogoro UWSA Morogoro UWSA Morogoro UWSA

Moshi UWSA

Moshi UWSA

Moshi UWSA

Mtwara UWSA

Mtwara UWSA

Musoma UWSA

MoWI

30 Procuring Entity

MoWI

Musoma UWSA Musoma UWSA Musoma UWSA Musoma UWSA

Mwanza UWSA Mwanza UWSA Mwanza UWSA Mwanza UWSA Mwanza UWSA Mwanza UWSA Mwanza UWSA

Singida UWSA

Singida

Singida

31 Procuring Entity

Singida UWSA

Songea UWSA

Songea UWSA

Songea UWSA

Shinyanga UWSA Shinyanga UWSA Shinyanga UWSA Shinyanga UWSA Shinyanga UWSA Shinyanga UWSA Shinyanga UWSA

S’wanga UWSA S’wanga UWSA S’wanga UWSA

32 Procuring Entity

Tabora UWSA

Tabora UWSA

Tabora UWSA

Tabora UWSA

Igunga UWSSA Igunga UWSSA

Igunga UWSSA

Tanga UWSA

Tanga UWSA

Tanga UWSA

Tanga UWSA

Tanga UWSA

DAWASA

DAWASA

33 Procuring Entity

DAWASA

DAWASA

DAWASA

DAWASA

DAWASA

Shinyanga UWSA

MoWI

Musoma UWSA

Mtwara UWSA

Iringa UWSA

Tanga UWSA

KASHWASA

KASHWASA

Iringa UWSA

Iringa UWSA

34 Procuring Entity

35 Procuring Entity

36 Procuring Entity

37 Procuring Entity

38 Procuring Entity

39 Procuring Entity

40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 Component 2 – Scaling up Rural Water Supply and Sanitation

Table 2 : List of Contract Packages of Goods, Works, Non Consulting Services to be procured Following NCB, ICB and other Methods Ref No. Contract Description Implementation Estimated Procuremen P-Q Review Advert Date Expected Bid Open Contract Award Date Procuring Entity Costs (million t Method (Yes/No) Prior/Post Date US$) Table 2A: List of Contract Packages for Goods RW-G1 Establishment of Hand pump supply chain including spare parts Planned 5.00 ICB No Prior Nov-08 Dec-08 Jan-09 MoWI outlets centres and after sales services technicians Actual RW-G2 Supply of Furniture for DWE offices in 60 LGAs Planned 0.64 Shopping (4) No Post Oct-08 Nov-08 Dec-08 LGAs Actual Shopping (4) No Post Various Various Various

RW-G3 Purchase of one (1) 5 tonnage lorry built with 3 tonnage crane Planned 0.52 NCB No Post Dec-08 Feb-09 Mar-09 MoWI Actual

Sub Total - Goods Planned 6.16 Actual 0.00

Table 2 B: List of Contract Packages for Works Ref. no Contract Description Implementation Estimated Procuremen Review Advert Date Expected Bid Open Contract Award Date Procuring Entity Costs (million t Method P-Q Prior/Post Date US$) (Yes/No)

RW-W1 Rehabilitation of 6 DWE offices Planned 0.07 Shopping (5) Post Oct-08 Nov-08 LGAs Actual RW-W2 Construction of 47 DWE new offices Planned 2.80 Shopping/NC No Post Oct-08 Nov-08 Dec-08 (5) B LGAs Actual RW-W3 Rehabilitation of 21 RS offices Planned 0.10 Shopping/NC No Post Oct-08 Nov-08 Dec-08 B RS Actual RW-W4 Rehabilitation and Construction of small water supply schemes Planned 21.40 Shopping/NC No Post Oct-08 Nov-08 Dec-08 (6) B LGAs Actual

58 Ref No. Contract Description Implementation Estimated Procuremen P-Q Review Advert Date Expected Bid Open Contract Award Date Procuring Entity Costs (million t Method (Yes/No) Prior/Post Date US$) RW-W5 Rehabilitation and Construction of medium and large water Planned 35.94 NCB/ICB (7) No Post/Prior Mar-09 Apr-09 May-09 LGAs supply schemes Actual RW-W6 Completion of Construction of Spillway No. 1 and No. 2 for Planned 0.90 NCB No Post Oct-08 Oct-08 Nov-08 Mugumu Earthfill Dam in Serengeti District MoWI Actual NCB No Post Sep-08 Oct-08

RW-W7 Exploratory Drilling and Development of Production wells in Planned 39.60 Shopping/NC 8 No Post Feb-09 Mar-09 Apr-09 LGAs B LGAs Actual Construction of Earthfill Embankment Dams and Associated Civil Planned 0.87 NCB No Post Jun-08 Aug-08 Sep-08 RW-W8 Works at Masuguru village in Bagamoyo District, Coast Actual NCB No Post Jun-08 Jul-08 MoWI Region

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.76 NCB No Post Jun-08 Aug-08 Sep-08 RW-W9 Works at Sasajila village in Dodoma (R) in Dodoma Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.50 NCB No Post Jun-08 Aug-08 Sep-08 RW-W10 Works at Ingondin village in Longido District,Arusha Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.60 NCB No Post Jun-08 Aug-08 Sep-08 RW-W11 Works at Mti Mmoja village in Monduli District in Arusha Actual NCB No Post Jun-08 Jul-08 MoWI Region Construction of Earthfill Embankment Dams and Associated Civil Planned 0.40 NCB No Post Jun-08 Aug-08 Sep-08 RW-W12 Works at Iguluba village in Iringa (R) District in Iringa Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.35 NCB No Post Jun-08 Aug-08 Sep-08 RW-W13 Works at Matwiga village in Chunya District in Mbeya Region Actual NCB No Post Jun-08 Jul-08 MoWI

59 Ref No. Contract Description Implementation Estimated Procuremen P-Q Review Advert Date Expected Bid Open Contract Award Date Procuring Entity Costs (million t Method (Yes/No) Prior/Post Date US$) Construction of Earthfill Embankment Dams and Associated Civil Planned 0.80 NCB No Post Jun-08 Aug-08 Sep-08 RW-W14 Works at Kawa village in Nkasi District, Rukwa Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.46 NCB No Posrt Jun-08 Aug-08 Sep-08 RW-W15 Works at Wegero village in Musoma (R) District in Mara Actual NCB No Post Jun-08 Jul-08 MoWI Region

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.45 NCB No Post Jun-08 Aug-08 Sep-08 RW-W16 Works at Nyambori village in Tarime District in Mara Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.85 NCB No Post Jun-08 Aug-08 Sep-08 RW-W17 Works at Salama Kati village in Bunda District in Mara Region Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.35 NCB No Post Jun-08 Aug-08 Sep-08 RW-W18 Works at Seke Ididi village in Kishapu District in Shinyanga Actual NCB No Post Jun-08 Jul-08 MoWI Region Construction of Earthfill Embankment Dams and Associated Civil Planned 0.56 NCB No Post Jun-08 Aug-08 Sep-08 RW-W19 Works at Mwanjoro village in Meatu District in Shinyanga Actual NCB No Post Jun-08 Jul-08 MoWI Region

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.90 NCB No Post Jun-08 Aug-08 Sep-08 RW-W20 Works at Habiya village in Bariadi District in Actual NCB No Post Jun-08 Jul-08 MoWI

Construction of Earthfill Embankment Dams and Associated Civil Planned 0.65 NCB No Post Jun-08 Aug-08 Sep-08 RW-W21 Works at Bulenya village in in Actual NCB No Post Jun-08 Jul-08 MoWI

RW-W22 Construction of an Earth Dam and Rehabilitation of existing Planned 0.80 NCB No Post Jan-09 Mar-09 Apr-09 piped water supply at Saunyi Village in Kilindi district Kilindi DC Actual RW-W23 Construction of Kikunde village water supply system, in Kilindi Planned 0.20 NCB No Post Jan-09 Mar-09 Apr-09 district Kilindi DC Actual RW-W24 Construction of Mafuleta village water supply system, in Kilindi Planned 0.25 NCB No Post Feb-09 Apr-09 May-09 Kilindi DC district Actual RW-W25 Construction of an Earth dam and piped water supply at Planned 0.40 NCB No Post Jan-09 Mar-09 Apr-09 Kwanyange village, in Handeni district Handeni DC Actual RW-W26 Construction of an Earth dam and piped water supply at Mkata Planned 0.35 NCB No Post Jan-09 Mar-09 Apr-09 (Kwamnara Sub Village), in Handeni district Handeni DC Actual RW-W27 Construction of an Earth dam and piped water supply at Mkata Planned 0.50 NCB No Post Feb-09 Apr-09 May-09 Handeni DC in Handeni district Actual RW-W28 Construction of Ipande village water supply in Manyoni district Planned 0.25 NCB No Post Jan-09 Mar-09 Apr-09 Manyoni DC

60 Ref No. Contract Description Implementation Estimated Procuremen P-Q Review Advert Date Expected Bid Open Contract Award Date Procuring Entity Costs (million t Method (Yes/No) Prior/Post Date US$) Manyoni DC Actual RW-W29 Construction of Chicheho village water supply in Manyoni district Planned 0.30 NCB No Post Feb-09 Apr-09 May-09 Manyoni DC Actual RW-W30 Construction of Itaja village water supply in Singida district Planned 0.35 NCB No Post Jan-09 Mar-09 Apr-09 Singida DC Actual Planned 112.71 Sub Total - Works Actual 0.00 Note: (5) - LGAs offices to be rehabilitated and/or constructed to be identified (6) - These are several small contracts involving small projects to be executed by 127 qualified LGAs - amount of fund for each qualified LGAs will depend on their allocation

(7) - These are to be constructed in LGAs as designed by the Consultants (8)-These are several small contracts involving explatory drilling and development of productive wellsin LGAs

Table 2 C: List fo Contract Packages for Non-Consultants Services RW-NC1 Innovation Window Projects Planned 0.46 NCB (9) No Prior Nov-08 Dec-08 Jan-09 MoWI Actual RW-NC2 Sanitation Marketing Planned 2.60 Shopping (10) No Post Oct-08 Nov-08 Dec-08 LGAs Actual RW-NC3 Promotion of Sanitation and Hygiene Education Planned 0.66 Shopping (11) No Post Oct-08 Nov-08 Dec-08 LGAs Actual Planned 3.26 Sub Total - Non Consultancy Services Actual 0.00 Note: (9) - These are several (10-14) small size contracts to be selected from innovative proposals submitted (10) - These are several small contracts to be executed by LGAs at an estimate of USD 19,690 for each LGA (Consultants will identify the requirements for @ LGA) (11) - These are several small contracts to be executed by LGAs at estimated cost of USD 5,000 for each LGA

61 Component 4 – Sector Institutional Strengthening and Capacity Building Table 4: List of Contract Packages of Goods, Works and Non Consulting Services to be procured following ICB and other methods Expected Contract Implement Estimated Procurement Review Ref No. Contract Description P-Q (Yes/No) Advert Date Bid Open Award ation Costs (million Method Prior/Post Date Date Table 4 A: List of Contracts Packages for Goods CB-G1 Purchase of Motor Vehicles for MoWI, Planned 8.650 ICB No Prior 13/10/08 26/11/08 24/01/08 RSs, LGAs, BWOs, Water Labs and Actual DUWSSs CB-G2 Purchase of motorcycles for LGAs, Planned 1.682 ICB No Prior 20/06/08 4/8/2008 28/11/08 BWOs and DUWSSs Actual CB-G3 Purchase of sets of computers and other Planned 3.044 ICB No Prior 10/9/2008 30/10/2008 25/01/08 office equipment for MOWI, RSs, Actual LGAs, BWOs, DUWSSs CB-G4 Purchase of MIS Equipment, for LGAs Planned 0.485 ICB No Prior 13/10/08 24/12/2008 19/03/08 & MoWI WRI, UWSAs Small towns. Actual

CB- G5 Purchase of Cummunication Motor Planned 0.080 NCB No Post 20/10/08 21/11/2008 18/01/08 vehicle Actual

CB - G6 Purchase of Computer Set, Laptop, File Planned 0.060 NCB No Post 3/7/2008 12/8/2008 30/10/08 Sever, Mail/Web Sever, Sever Cabinet, Actual UPS and Network Printer for MISU CB - G7 Purchase of Network Equipment and Planned 0.035 NCB No Post 3/7/2008 12/8/2008 30/10/08 Accessories for MISU Actual CB - G8 Purchase of Cummunication equipments Actual 0.070 NCB No Post 13/04/09 12/5/2009 10/6/2009 Planned

Drilling and Dam Construction Agency (DDCA) CB-G9 Purchase of Drilling Machines and Planned 5.750 ICB No Prior 15/10/08 2/12/2008 28/03/08 Equipment Actual CB-G10 Purchase of Ground Water Exploration Planned 0.416 ICB No Prior 2/9/2008 18/11/08 2/1/2009 Equipment Actual CB-G11 Purchase of Earthworks Machines & Planned 0.820 ICB No Prior 2/9/2008 16/10/08 2/1/2009 Equipment Actual CB-G12 Purchase of Soil Laboratory Equipment Planned 0.030 Shopping No Post 3/10/2008 27/10/08 28/12/08 Expected Contract Implement Estimated Procurement Review Ref No. Contract Description P-Q (Yes/No) Advert Date Bid Open Award ation Costs (million Method Prior/Post Date Date Actual CB-G13 Purchase of Office Equipment Planned 0.080 NCB No Post 11/10/2008 4/11/2008 17/12/08 Actual Water Resources Institute CB-G14 Purchase of Motor Vehicles (mini bus, Planned 0.138 NCB No. Post 14/11/08 16/12/08 2/2/2009 4WD Station Wagon) Actual CB-G15 Purchase of Workshops Equipment & Planned 0.092 NCB No. Post 5/10/2008 27/10/08 15/12/08 tools Actual CB-G16 Purchase of Library books Planned 0.092 NCB No. Post 5/10/2008 27/10/08 15/12/08 Actual Kurasini Maji Central Stores CB-G17 Purchase of Warehouse handling Planned 0.267 ICB No Prior 12/10/2008 29/12/08 30/02/09 equipment Actual CB-G18 Purchase of Warehouse tools and Planned 0.152 NCB No Post 1/4/2008 1/5/2008 28/09/08 Fixtures Actual CB-G19 Purchase of two ten tons Motor Planned 0.448 ICB No Prior 20/10/08 1/7/2008 10/2/2009 Vehicles Actual

Planned 22.876 Sub Total Goods Actual 0.000 Table 4B: List of Contract Packages for Works CB-W1 Rehabilitation of MoWI Offices Maji Planned 0.800 NCB No Post 02 June, 08 01 July, 08 30/09/08 Ubungo. Actual CB-W2 Construction of MoWI Office Planned 9.000 ICB No Prior 12 May, 09 25/06/09 12 Dec, 09 accommodation Actual CB-W3 Rehabilitation of MoWI Offices in Planned 0.190 NCB No Post 04 June, 08 01 July, 08 30/09/08 Dodoma Actual CB-W4 Rehabilitation of Workshops, Hostel, Planned 0.254 NCB No Post 05 Oct, 08 08 Nov, 08 20/12/08 Cafeteria, Stores and Staff residences for WRI Actual CB-W5 Construction of Classrooms, Hostel Planned 0.609 NCB No Post 12 Nov, 08 14/12/08 17/02/09 blocks, Laboratories and Conference hall Actual for WRI CB-W6 Rehabilitation of Offices and Planned 0.470 NCB No Post 05 Oct, 08 07 Nov, 08 10 Jan, 09 Warehouses for MCS Actual Expected Contract Implement Estimated Procurement Review Ref No. Contract Description P-Q (Yes/No) Advert Date Bid Open Award ation Costs (million Method Prior/Post Date Date Planned 11.323 Sub Total Works Actual 0.000 Expected Contract Implement Estimated Procurement Review Ref No. Contract Description P-Q (Yes/No) Advert Date Bid Open Award ation Costs (million Method Prior/Post Date Date Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI Procuring Entity Procuring Entity TABLE 5. WSDP TRAINING PROGRAMME

ACTIVTIVTY COST ESTIMATE Ref. No Implemen EXPECTED START DATE TRAINING GROUP PLACE OF TRAINING DURATION OF TRAINING tation (USD) MILLION DWR Start Training on decision making Planned 0.085 February, 2009 BOWs,MoWI Dar Es Salaam 2 feb, 09 T1 - 08/09 process Actual Planned March/April 2009 BOWs,MoWI Dar Es Salaam 20 March, 09 Training of staff on software for 0.403 water resources management Actual T2 - 08/09 information system (WRMIS) and DSS Planned Aprill, 2009 BOWs Dar Es Salaam 6 April, 09 Training of Trainers (ToT) for T3 - 08/09 0.080 District Facilitation Teams Actual Planned Nov/Dec BOWs Dar Es Salaam 22 Nov, 08 T4 - 08/09 Training of staff for 9 BWOs 0.740 Actual DAHR Conduct various short specific Planned Nov/Dec MoWI, RS Moro/Dar/Mwanza/ 8Nov, 08 T6 - 08/09 training and capacity building 0.300 Arusha for MoW and RS staff Actual Planned 0.025 February, 2009 WRI staff Dar Es Salaam T7 - 08/09 Staff Development for WRI Actual DCWSS Planned 0.160 Nov/Dec MOWI, UWSAs, DUWWsDar/Arusha 28-Nov-08 T8 - 08/09 Business Planning Actual Planned 0.160 Jan-09 MOWI, UWSAs, DUWWsDar/Arusha 20 Jan, 09 T9 - 08/09 Enterpreneurship Actual Marketing and Customer Planned 0.160 February, 2009 MOWI, UWSAs, DUWWsDar/Arusha 12 Feb, 09 T10 - 08/09 Service Actual Plan 0.160 March, 2009 MOWI, UWSAs, DUWWsDar/Arusha 3 March, 09 T11 - 08/09 Good Governance Actual Planned 0.160 Nov/Dec MOWI, UWSAs, DUWWsDar/Arusha 27 Nov, 08 T12 - 08/09 Labour Laws ACTIVTIVTY COST ESTIMATE Ref. No Implemen EXPECTED START DATE TRAINING GROUP PLACE OF TRAINING DURATION OF TRAINING tation T12 - 08/09 Labour Laws (USD) MILLION Actual Financial Management for Non - Planned 0.160 January/Feb, 2009 MOWI, UWSAs, DUWWsDar/Arusha 28 Jan, 09 T13 - 08/09 Financial Managers Actual ACTIVTIVTY COST ESTIMATE Ref. No Implemen EXPECTED START DATE TRAINING GROUP PLACE OF TRAINING DURATION OF TRAINING tation (USD) MILLION Computerized billing & Planned 0.160 March/April 2009 MOWI, UWSAs, DUWWsDar/Arusha 27 March, 09 T14 - 08/09 Accounting Systems including Actual IFRS T15 - 08/09 Training on procurement Act Planned 0.160 Aprill, 2009 MOWI, UWSAs, DUWWsDar/Arusha 4 April, 09 2004 Actual PMU T16 - 08/09 Procurement of Goods & Planned 0.800 January/Feb, 2009 MOWI, LGAs, ARUSHA 25 Jan, 09 Equipments Actual T17 - 08/09 Procurement of Works and Planned 0.125 February, 2009 MOWI MOMBASA 25 Feb, 09 Selection of Consultants Actual T18 - 08/09 Procurement of Works and Planned 0.800 March/April 2009 MOWI, LGAs, ARUSHA 26 March, 09 Selection of Consultants Actual T19 - 08/09 Procurement of Goods & Planned 0.125 June, 2009 MOWI MOMBASA 9 June, 09 Equipments Actual T20 - 08/09 Advanced for Goods & Planned 0.800 June/July 2009 MOWI, LGAs, ARUSHA 28 June, 09 Equipments Actual T21 - 08/09 Advanced for Works & Selection Planned 0.800 August/Sep, 2009 MOWI, LGAs, ARUSHA 26 August, 09 of Consultants Actual T21 - 08/09 Management & Consltancy skillsPlanned 0.800 August MOWI, LGAs, MOROGORO 8 Aug, 09 Actual Planned 7.163 Total-Training Actual 0.000 DURATION OF TRAINING

End 16 Feb, 09

6 March, 09

12 April, 09

5 Dec, 08

20 Dec, 08

8 Dec, 08

28 Jan, 09

20 Feb, 09

11 March,09

5 Dec, 08 DURATION OF TRAINING

8-Feb-09 DURATION OF TRAINING

5 April, 09

13 April, 09

4 Feb, 09

21 March, 09

3 April, 09

28 June, 09

7 July, 09

7 Sep, 09

18 Aug, 09

Table 1C: List of Contracts for Consulting Services Estimated Expected Review Contract Award Ref no Description of Assignment Impementation Costs (million Selection Method Advert date Proposals Prior/Post date US$) submission WR-C1 Design and Supervision of Rehabilitation, Construction of New Office Facilities and Planned 0.095 QCBS 1-Jan-2008 1-Jul-2008 1-Oct-2008 Associated External Works for Zone-One (Rufiji, Ruvuma, lake Nyasa and Lake Rukwa) Post Basin Water Offices and Water Laboratories. Actual 14-Jan-2008 14-Aug-2008

WR-C2 Design and Supervision of Rehabilitation, Construction of New Office Facilities and Planned 0.095 QCBS 1-Jan-2008 1-Jul-2008 1-Oct-2008 AssociatedExternalWorks for Zone-Two (Pangani and Wami-Ruvu) Basin Water Offices Post and Water Laboratories Actual 14-Jan-2008 14-Aug-2008 WR-C3 Design and Supervision of Rehabilitation, Construction of New Office Facilities and Planned 0.095 QCBS 1-Jan-2008 1-Jul-2008 1-Oct-2008 AssociatedExternal Works for Zone-Three (IDB, Tanganyikaand L. Victoria) Basin Water Post Offices and Water Laboratories Actual 14-Jan-2008 14-Aug-2008

WR-C4 Social Assessment for Integrated Water Resources Management Planned 0.125 QCBS Prior 1-Aug-2008 2-Feb-2009 1-May-2009 Actual

WR-C5 Facilitate formation and strengthening of WUAs for Pangani BWO Planned 0.360 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C6 Facilitate formation and strengthening of WUAs for Ruvu BWO Planned 0.300 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C7 Facilitate formation and strengthening of WUAs for Rufiji BWO Planned 0.360 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C8 Facilitate formation and strengthening of WUAs for Southern Coast and Ruvuma BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C9 Facilitate formation and strengthening of WUAs for Nyasa BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C10 Facilitate formation and strengthening of WUAs for Internal Drainage BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C11 Facilitate formation and strengthening of WUAs for Lake Tanganyika BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C12 Facilitate formation and strengthening of WUAs for Rukwa BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C13 Facilitate formation and strengthening of WUAs for Lake Victoria BWO Planned 0.180 QCBS Prior 5-Jun-2009 10-Dec-2009 15-Mar-2010 Actual

WR-C14 Preparation of integrated water resourcesmanagement and development plans (IWR&D Planned 1.700 QCBS Prior 1-Jul-2008 10-Jan-2009 7-Apr-2009 Plans) of Rufiji WBO Actual 10-Jul-2008

WR-C15 Preparation of integrated water resourcesmanagement and development plans (IWR&D Planned 1.690 QCBS Prior 1-Jul-2008 10-Jan-2009 7-Apr-2009 Plans of Internal Drainage BWO Actual 10-Jul-2008

WR-C16 Studies and design of Kikuletwa river training upstream Rundungai springs Planned 0.400 QCBS Prior 1-Nov-2008 5-Jan-2009 1-Apr-2009 Actual WR-C17 Study on Mindu dam siltation Planned 0.060 QCBS Post 1-Nov-2008 5-Jan-2009 1-Apr-2009 Actual

WR-C18 Study and design of Ndembera and other reservoirs for environmentalaugmentationand Planned 1.500 QCBS Prior 1-Nov-2008 5-Jan-2009 1-Apr-2009 improving water resources management in the Usangu plains Actual

WR-C19 Study on rehabilitation and desiltation of dams for Internal DrainageBasin Planned 0.150 QCBS Prior 1-Nov-2008 5-Jan-2009 1-Apr-2009

79 Estimated Expected Review Contract Award Ref no Description of Assignment Impementation Costs (million Selection Method Advert date Proposals Prior/Post date US$) submission Actual

WR-C20 Strengthening of Dam Safety Management Unit Planned 0.090 QCBS Post 1-Aug-2008 2-Dec-2008 1-Mar-2009 Actual 28-Aug-2008

WR-C21 Harmonization of Sector Policies for IWRM Planned 0.350 QCBS Prior 1-Jul-2008 2-Jan-2009 1-Apr-2009 Actual 28-Aug-2008

WR-C22 Development of regulations and sub-sector operational procedures and guidelines including Planned 0.020 IC Post 1-Jul-2008 2-Dec-2008 1-Mar-2009 environmental management monitoring. Actual 1-Jul-2008

WR-C23 Preparation of Water Quality Management Strategy and Pollution Control Planned 0.135 QCBS Prior 1-Aug-2008 2-Dec-2008 1-Mar-2009 Actual 28-Aug-2008

WR-C24 Study of Water Resources Management and Development Financing Options. Planned 0.210 QCBS Prior 1-Jul-2008 2-Jan-2009 1-Apr-2009 Actual 10-Jul-2008

WR-C25 Lake Management (Lakes Tanganyika, Victoria, Nyasa, Rukwa, Jipe, Chala, Eyasi and Planned 0.026 IC Post 3-Mar-2009 4-May-2009 3-Aug-2009 Manyara); development of river condition classification system and determination of Actual Environmental Flows. WR-C26 Carry out Water Resources technical reviews Planned 0.026 IC Post 3-Nov-2008 1-Sep-2008 1-Nov-2008 Actual

WR-C27 Development Financial Management System for Water Resources Management Planned 0.300 QCBS Prior 3-Aug-2008 2-Feb-2009 4-May-2009 Actual

WR-C28 Develop guidelines, manuals and toolkits for Integrated Water Resources Management Planned 0.110 QCBS Prior 3-Aug-2008 2-Feb-2009 4-May-2009 (IWRM) Actual 28-Aug-2008

WR-C29 Technical assistance in Strengthening Human Resources Development in IWRM Planned 0.146 QCBS Prior 3-Aug-2008 2-Feb-2009 4-May-2009 Actual

WR-C30 Study on declinining levels of Lake Victoria Planned 0.050 CQS Prior 20-Nov-2008 19-May-2009 20-Aug-2009 Actual WR-C31 Technical assistance on establishment of the National Water Board for WRM Planned 0.450 QCBS Prior 20-Nov-2008 19-May-2009 20-Aug-2009 Actual

WR-C32 Technical assistance on Intergrated Water Resources Management Planned 0.100 QCBS Prior 20-Nov-2008 19-May-2009 20-Aug-2009 Actual

WR-C33 Technical assistance on Good Governance of Water Resources Planned 0.450 QCBS Prior 20-Nov-2008 19-May-2009 20-Aug-2009 Actual

WR-C34 Technical assistance in Lake Basin Management Planned 0.450 QCBS Prior 20-Nov-2008 19-May-2009 20-Aug-2009 Actual WR-C35 Capacity Building for Basin Water Officers and their Accounts in Financial Management Planned 0.050 CQS 20-Nov-2008 19-May-2009 20-Aug-2009 Prior Actual Planned 10.973 Sub Total – Consultancy Services Actual 0.000

Planned 32.316 Grand Total – (Consultancy Services + Goods + Works + Non Consultancy) Actual 0.000

80 Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

81 Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

82 Table 3 C: List of Contract Packages for Consulting Services

Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission

Arusha UWSA CW-C1 Detailed engineering design and preparation of tender documents for improvement of water supply and sewerage in Arusha Municipality and Planned 1.20 QCBS Prior Nov. 2007 May-08 Aug-08 detailed engineering design and preparation of tender document for water supply for Ngorongoro township, and Construction supervision of water supply and sewerage works in Arusha Municipality and for water supply for Ngorongoro township. Actual QCBS Prior Nov. 2007 Jun-08

Babati UWSA CW-C2 Detailed engineering design, preparation of tender documents for water supply for Orkesumet, Katesh and Karatu townships and supervision of Planned 1.80 QCBS Prior Jul-07 Jan-08 Apr-08 water supply works for Babati Town. Supervision of Construction Works For Water Supply for Orkesumet, Katesh and Karatu Townships Actual 1.96 QCBS Prior Jul-07 Jan-08 Aug-08

Bukoba UWSA CW-C3 Detailed engineering design, preparation of tender documents and Planned 0.80 QCBS Prior Oct-08 Nov-08 Dec-08 construction supervision of water supply works for Karagwe township Actual CW-C4 Detailed engineering design, preparation of tender documents and Planned 0.50 QCBS Prior Oct-08 Nov-08 Dec-08 construction supervision of water supply works for Bukoba town (under AFD) Actual Dodoma UWSA CW-C5 Reviewing Detailed Designs and Tender Document and Supervision of Works for Water Supply and Sewerage System in Dodoma Municipality Planned 1.50 QCBS Prior Jul-07 Feb-08 Apr-08 and Supervision of Water Supply Works for Kibaigwa Township Actual 0.73 QCBS Prior Jul-08 Feb-08 Sep-08

Iringa UWSA Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission

CW-C6 Detailed Engineering design, preparation of tender documents for sewerage system in Iringa Municipality and Detailed Engineering design, Planned 1.10 QCBS Prior Jun-08 Jul-08 Sep-08 preparation of tender documents for water supply system in Kilolo, Makete, Mafinga, Ludewa, Makambako, Ilula, Makete small towns and Wang’ing’ombe National Project. Supervision of construction of sewerage works for Iringa Municipality and water supply works for Kilolo, Makete Kilolo, Makete, Mafinga, Ludewa, Makambako, Ilula, Makete, Njombe small towns and Wang’ing’ombe National Project. Actual QCBS Prior Jul-08

Kigoma UWSA CW-C7 Detailed Engineering design, preparation of tender documents and Planned 1.00 QCBS Prior Jul-07 Feb-08 Apr-08 supervision of water supply for Kigoma Municipality and Kasulu small town Actual QCBS Prior Jul-07 Feb-08 Lindi UWSA CW-C8 Detailed design and preparation of tender Documents for water supply in Planned 1.20 QCBS Prior Jul-07 Feb-08 Apr-08 Kilwa Masoko Township and supervision of water supply construction works for Lindi and Kilwamasoko small town Actual QCBS Prior Jul-07 Feb-08 Mbeya UWSA CW-C9 Detailed Engineering design, preparation of tender documents and supervision of construction for water supply and sewerage system Planned 1.00 QCBS Prior Jun-08 Jul-08 Sep-08 extension in Mbeya city and water supply for the small towns of Vwawa,Tunduma, Mlowo, Rujewa, Chunya, Mbalizi, Kasumulu, Itumba Tukuyu and Kyela. Actual QCBS Prior Jul-08

Morogoro UWSA CW-C10 Detailed Study, Engineering Design, Preparation of Tender Documents for Improvement of Water Supply and Sewerage Services in Morogoro Planned 1.80 QCBS Prior Sep-07 Jan-08 Apr-08 Municipality and Supervision of Construction Works for Water Supply Projects for Kilosa, Gairo, Mvomero and Turiani Small towns and Supervision of Construction Works for Improvement of Water Supply and Sewerage Services in Morogoro Municipality. Actual QCBS Prior Sep-07 Jan-08 Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission

Moshi UWSA CW-C11 Detailed Study, Engineering Design, Preparation of Tender Documents Planned 0.60 QCBS Prior Sep-07 Feb-08 Apr-08 and Supervision of Construction for Water Supply and Sewerage 469,770.0 Actual QCBS Prior Sep-08 Feb-08 Jul-08 Services in Moshi Municipality 0(Euro) CW-C12 Detailed, engineering Design, Preparation of Tender Documents and Planned 0.20 QCBS Prior Sep-07 Feb-08 Apr-08 Supervision of Construction for Water Supply in the small towns of Same and Mwanga Actual Mtwara UWSA CW-C13 Detailed, engineering Design, Preparation of Tender Documents and Planned 1.50 QCBS Prior Jun-07 Sep-07 Sep-08 Supervision of Construction for Water Supply for Mtwara Municipality and Masasi and Nachingwea Township Actual 0.86 QCBS Prior Jul-07 Feb-08 Sep-08 Musoma UWSA CW-C14 Detailed engineering design, preparation of tender documents and Planned 0.50 QCBS Prior Jan-08 Jul-08 Nov-08 construction supervision of water supply works for Musoma town (under AFD) Actual CW-C15 Detailed Engineering design, preparation of tender documents for water supply for Tarime and Serengeti and supervision of construction works Planned 1.00 QCBS Prior Jun-08 Jul-08 Sep-08 for water supply for Bunda, Tarime and Mugumu towns. Actual

Mwanza UWSA CW-C16 Detailed Study, Engineering Design, Preparation of Tender Documents for water Supply and Sewerage in Mwanza city and water supply in small towns of Missungwi, Sengerema, Magu, Geita, Nansio, Ngudu Planned 1.20 QCBS Prior Jun-08 Jul-08 Sep-08 and Ukerewe Supervision of water supply and sewerage system construction works in Mwanza City and water supply works in the small towns of Missungwi, Sengerema, Geita, Magu, Nansio,Ngudu and Nansio Actual QCBS Prior Jul-08

Singida UWSA CW-C17 Detailed engineering design, preparation of tender documents for Sewerage in Singida Municipality and water supply for the small town of Planned 1.00 QCBS Prior Jun-08 Jul-08 Sep-08 Manyoni and Supervision of sewerage construction works in Singida Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission Manyoni and Supervision of sewerage construction works in Singida Municipality and water supply in the small town of Manyoni. Actual Prior

Songea UWSA CW-C18 Detailed engineering design and preparation of tender documents and construction supervision of water supply works Songea Municipality and Planned 0.80 QCBS Prior Jun-08 Jul-08 Sep-08 Mbinga, Namtumbo and Tunduru township and sewerage for Songea Municipality. Actual QCBS Prior Jul-08

Shinyanga UWSA CW-C19 Detailed Engineering Design, Preparation of Tender Documents of the Sewerage System, Water Supply Network Expansion for Shinyanga Municipality and Detailed Engineering Design, preparation of Tender Planned 1.30 QCBS Prior Nov-07 Feb-08 Jun-08 Document for Water Supply of Maswa and Kishapu Townships and Supervision of Proposed Water Supply, Sewerage Works for Shinyanga as well as Water Supply Works for Maswa, Kishapu and Ushirombo Euro Townships. 824,303.78 Actual and Tshs QCBS Prior Nov. 2007 Feb-08 Aug-08 501,338,470 and Sumbawanga UWSA CW-C20 Supervision consultancy services for water supply and construction of Planned 0.60 QCBS Prior Jul-07 Jan-08 Apr-08 office building for Sumbawanga Urban Water and Sewerage Authority (SUWASA) Actual QCBS Prior Jul-07 Jan-08 Tabora UWSA CW-C21 Reviewing Detailed Designs and Tender Document of Water Supply and Sewerage System for Tabora Municipality and Detailed Engineering Planned 1.50 QCBS Prior Sep-07 Feb-08 Apr-08 Design and Preparation of Tender Document for Water Supply for Sikonge and Urambo Townships. Actual QCBS Prior Sep-08 Feb-08

CW-C22 Planned 0.08 QCBS Prior Sep-07 Feb-08 Apr-08 Supervision of Gravity mains and Civil works from Bulenya dam to Igunga town and villages of Mbutu, Ibutamisuzi and Hindishi Actual 0.07 QCBS Prior Jul-08 Tanga UWSA Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission

CW-C23 Detailed engineering design, preparation of tender documents and supervision for improvement of water supply and sewerage in Tanga City Planned 1.20 QCBS Prior Sep-07 Feb-08 Apr-08 and detailed engineering design, preparation of tender document and supervision for water supply for Muheza, Korogwe and Pangani townships Actual QCBS Prior Sep-08 Feb-08

Study under ACP EU Water Facility in 7 Towns CW-C24 Feasibility study, detailed design and preparation of tender document for the towns of Sumbawanga, Babati, Lindi, Kigoma, Musoma, Bukoba and Planned 2.50 QCBS Prior Jul-08 Mtwara (under EU-ACP Water Facility) Actual

DAWASA CW-C25 Construction Supervision Services for Supply and Installation of the Secondary and Tertiary Water Distribution Networks in Dar Es Salaam Planned 1.50 QCBS Prior Mar-08 May-08 Aug-08 and construction supervision for water supply works at Ikwiriri, Kibiti, Kisarawe, Kilindoni, Mkuranga and supervision of drilling 3 high yield deep boreholes Actual

CW-C26 Supervision of water supply construction works for Ikwiriri and Kibiti Planned 0.70 QCBS Prior Jul-08 Sep-08 Oct-08 Actual CW-C27 Design and Preparation of Document for Non Revenue Water Projects Planned 0.65 QCBS Prior and Rehabilitation of Secondary and Tertiary Distribution Network Part 2B and 2F Actual CW-C28 Detailed design and supervision of water supply for system in Kisarawe, Planned 0.70 QCBS Prior Oct-08 Jan-08 Feb-08 Kilindoni and Mkuranga towns Actual CW-C29 Feasibility Study, detailed design and preparation of tender document for Planned 1.20 QCBS Prior Oct-08 Jan-08 Feb-08 Kidunda dam Actual Prior Kahama Shinyanga water Supply Project CW-C30 Tariff study KASHWASA Planned 0.08 QCBS Prior Jul-08 Sep-08 Nov-08 Actual CW-C31 Design and supervision of water supply distribution network for 54 Planned 0.50 QCBS Prior Jul-08 Sep-08 Nov-08 villages benefiting from Kahama Shinyanga water supply project Actual Estimated Expected Impementati Selection Review Contract Ref no Description of Assignment Costs (million Advert date Proposals on Method Prior/Post Award date US$) submission

National Projects CW-C32 Design and supervision of water supply rehabilitation of Mugango/ Planned 0.80 QCBS Prior Nov-08 Dec-08 Jan-09 Kiabakari National project Actual CW-C33 Design and supervision of water supply rehabilitation of Handeni trunk Planned 0.80 QCBS Prior Nov-08 Dec-08 Jan-09 main National project Actual CW-C34 Design and supervision of water supply rehabilitation of Wanging’ombe Planned 0.60 QCBS Prior Nov-08 Dec-08 Jan-09 National project Actual CW-C35 Design and supervision of water supply rehabilitation of Maswa National Planned 0.80 QCBS Prior Nov-08 Dec-08 Jan-09 project Actual CW-C36 Design and supervision of water supply rehabilitation of Makonde Planned 0.80 QCBS Prior Nov-08 Dec-08 Jan-09 National project Actual CW-C37 Design and supervision of water supply rehabilitation of Chalinze Planned 0.30 QCBS Prior National project (under BADEA) Actual 2006/07

CW-C38 Planned 0.31 QCBS Prior Aug-08 Sep-08 Oct-08 Preparation of training materials for hygiene and sanitation education Actual CW-C39 Technical Consultancy- trainer of trainers Planned 0.101 QCBS Prior Aug-08 Sep-08 Oct-08 Actual Planned 35.724 Sub Total – Consultancy Services Actual 6.05

Planned 223.386 Grand Total (Consultancy Services + Works + Goods + Non Consultancy) Actual 12.518 Procuring Entity

Arusha UWSA

Babati UWSA

Bukoba UWSA

MoWI

Dodoma UWSA Procuring Entity

Iringa UWSA

Kigoma UWSA

Lindi UWSA

Mbeya UWSA

Morogoro UWSA Procuring Entity

Moshi UWSA

Moshi UWSA

Mtwara UWSA

MoWI

Musoma UWSA

Mwanza UWSA

Singida UWSA Procuring Entity

Singida UWSA

Songea UWSA

Shinyanga UWSA

Sumbawanga UWSA

Tabora UWSA

Tabora UWSA Procuring Entity

Tanga UWSA

MoWI

DAWASA

DAWASA

DAWASA

DAWASA

DAWASA

KASHWASA

KASHWASA Procuring Entity

Musoma UWSA

Tanga UWSA

Iringa UWSA

Shinyanga UWSA

Mtwara UWSA

MoWI

19 UWSAs & DAWASA 19 UWSAs & DAWASA Table 2 D: List of Contracts Packages for Consultants Services Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission RW-C1 Preparation of Guidelines for Sanitation and Hygiene Promotion Planned 0.50 QCBS Prior Nov-08 Dec-08 Jan-09 Actual Technical and Facilitation Consultancy Services for Local 132 Government Authorities (LGAs) Provision of Technical and Facilitation Consultancy Services for Planned QCBS Oct-07 Jul-08 Dec-08 0.40 Prior RW-C2 Rural Water Supply and Sanitation Projects in Tanga City Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C3 Rural Water Supply and Sanitation Projects in Handeni District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Jul-08 Nov-08 Dec-08 0.40 QCBS Prior RW-C4 Rural Water Supply and Sanitation Projects in Kilindi District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C5 Rural Water Supply and Sanitation Projects in Korogwe District Actual Oct-07

Planned Oct-07 Jul-08 Dec-08 Provision of Technical and Facilitation Consultancy Services for 0.40 QCBS Prior RW-C6 Rural Water Supply and Sanitation Projects in Korogwe town Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C7 Rural Water Supply and Sanitation Projects in Muheza District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C8 Rural Water Supply and Sanitation Projects in Mkinga District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C9 Rural Water Supply and Sanitation Projects in Pangani District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C10 Rural Water Supply and Sanitation Projects in Lushoto District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C11 Rural Water Supply and Sanitation Projects in Mosho Diatrict

95 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date Proposals Rural Water Supply and Sanitation Projects in Mosho Diatrict n Method Prior/Post Award Date RW-C11 (million US$) submission Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C12 Rural Water Supply and Sanitation Projects in Moshi Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C13 Rural Water Supply and Sanitation Projects in Same District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C14 Rural Water Supply and Sanitation Projects in Mwanga District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C15 Rural Water Supply and Sanitation Projects in Hai District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C16 Rural Water Supply and Sanitation Projects in Siha District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C17 Rural Water Supply and Sanitation Projects in Rombo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C18 Rural Water Supply and Sanitation Projects in Arusha District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C19 Rural Water Supply and Sanitation Projects in Meru District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C20 Rural Water Supply and Sanitation Projects in Arusha Municipality Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C21 Rural Water Supply and Sanitation Projects in Monduli District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C22 Rural Water Supply and Sanitation Projects in Longido District

96 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date Proposals Rural Water Supply and Sanitation Projects in Longido District n Method Prior/Post Award Date RW-C22 (million US$) submission Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C23 Rural Water Supply and Sanitation Projects in Ngorongoro District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C24 Rural Water Supply and Sanitation Projects in Karatu District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C25 Rural Water Supply and Sanitation Projects in Babati District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 Rural Water Supply and Sanitation Projects in Babati town 0.40 QCBS Prior RW-C26 Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C27 Rural Water Supply and Sanitation Projects in Simanjiro District Actual Oct-07

Planned Oct-07 Nov-08 Dec-08 Provision of Technical and Facilitation Consultancy Services for 0.40 QCBS Prior RW-C28 Rural Water Supply and Sanitation Projects in Kiteto District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C29 Rural Water Supply and Sanitation Projects in Hanang’ District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C30 Rural Water Supply and Sanitation Projects in Mbulu District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C31 Rural Water Supply and Sanitation Projects in Kibaha town Actual Oct-07 Sep-08

Planned Oct-07 Jul-08 Dec-08 Provision of Technical and Facilitation Consultancy Services for 0.40 QCBS Prior RW-C32 Rural Water Supply and Sanitation Projects in Kibaha District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C33 Rural Water Supply and Sanitation Projects in Rufiji District

97 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date RW-C33 Rural Water Supply and Sanitation Projects in Rufiji District (million US$) submission Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C34 Rural Water Supply and Sanitation Projects in Kisarawe District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C35 Rural Water Supply and Sanitation Projects in Mkuranga District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C36 Rural Water Supply and Sanitation Projects in Bagamoyo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 Prior Oct-07 Jul-08 Dec-08 RW-C37 Rural Water Supply and Sanitation Projects in Mafia District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C38 Rural Water Supply and Sanitation Projects in Temeke Municipality Actual Oct-07 Sep-08

Planned Oct-07 Jul-08 Dec-08 Provision of Technical and Facilitation Consultancy Services for 0.40 QCBS Prior RW-C39 Rural Water Supply and Sanitation Projects in Ilala Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C40 Rural Water Supply and Sanitation Projects in Kinondoni Municipality Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Jul-08 Nov-08 Dec-08 0.40 QCBS Prior RW-C41 Rural Water Supply and Sanitation Projects in Tabora Municipality Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C42 Rural Water Supply and Sanitation Projects in Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.4 QCBS Prior RW-C43 Rural Water Supply and Sanitation Projects in Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C44 Rural Water Supply and Sanitation Projects in Igunga District

98 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date RW-C44 Rural Water Supply and Sanitation Projects in Igunga District (million US$) submission Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C45 Rural Water Supply and Sanitation Projects in Actual Oct-07 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 Rural Water Supply and Sanitation Projects in 0.40 QCBS Prior RW-C46 Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C47 Rural Water Supply and Sanitation Projects in Kigoma Ujiji Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C48 Rural Water Supply and Sanitation Projects in Kigoma District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C49 Rural Water Supply and Sanitation Projects in Kasulu District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C50 Rural Water Supply and Sanitation Projects in Kibondo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C51 Rural Water Supply and Sanitation Projects in Bukoba District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C52 Rural Water Supply and Sanitation Projects in Bukoba Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C53 Rural Water Supply and Sanitation Projects in Ngara District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C54 Rural Water Supply and Sanitation Projects in Biharamulo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C55 Rural Water Supply and Sanitation Projects in Chato District 99 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date RW-C55 Rural Water Supply and Sanitation Projects in Chato District (million US$) submission Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C56 Rural Water Supply and Sanitation Projects in Misenyi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C57 Rural Water Supply and Sanitation Projects in Muleba District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C58 Rural Water Supply and Sanitation Projects in Karagwe District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C59 Rural Water Supply and Sanitation Projects in Mwanza City Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C60 Rural Water Supply and Sanitation Projects in Kwimba District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C61 Rural Water Supply and Sanitation Projects in Magu District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C62 Rural Water Supply and Sanitation Projects in Misungwi District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C63 Rural Water Supply and Sanitation Projects in Geita District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C64 Rural Water Supply and Sanitation Projects in Sengerema District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C65 Rural Water Supply and Sanitation Projects in Ukerewe District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C66 Rural Water Supply and Sanitation Projects in Musoma District 100 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date RW-C66 Rural Water Supply and Sanitation Projects in Musoma District (million US$) submission Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C67 Rural Water Supply and Sanitation Projects in Musoma Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C68 Rural Water Supply and Sanitation Projects in Serengeti District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C69 Rural Water Supply and Sanitation Projects in Bunda District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C70 Rural Water Supply and Sanitation Projects in Tarime District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C71 Rural Water Supply and Sanitation Projects in Rorya District Actual Jul-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C72 Rural Water Supply and Sanitation Projects in Shinyanga Municipality Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C73 Rural Water Supply and Sanitation Projects in Shinyanga District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C74 Rural Water Supply and Sanitation Projects in Maswa District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C75 Rural Water Supply and Sanitation Projects in Bariadi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C76 Rural Water Supply and Sanitation Projects in Meatu District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C77 Rural Water Supply and Sanitation Projects in Kahama District

101 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date RW-C77 Rural Water Supply and Sanitation Projects in Kahama District (million US$) submission Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C78 Rural Water Supply and Sanitation Projects in Bukombe District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C79 Rural Water Supply and Sanitation Projects in Kishapu District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C80 Rural Water Supply and Sanitation Projects in Mbeya City Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C81 Rural Water Supply and Sanitation Projects in Mbeya District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C82 Rural Water Supply and Sanitation Projects in Ileje District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C83 Rural Water Supply and Sanitation Projects in Mbozi District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C84 Rural Water Supply and Sanitation Projects in Rungwe District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 Rural Water Supply and Sanitation Projects in Chunya District RW-C85 Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C86 Rural Water Supply and Sanitation Projects in Kyela District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C87 Rural Water Supply and Sanitation Projects in Mbarali District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Nov-08 Dec-08 0.40 QCBS Prior RW-C88 Rural Water Supply and Sanitation Projects in Songea District

102 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C89 Rural Water Supply and Sanitation Projects in Songea Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C90 Rural Water Supply and Sanitation Projects in Namtumbo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C91 Rural Water Supply and Sanitation Projects in Mbinga District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Nov-08 Dec-08 RW-C92 Rural Water Supply and Sanitation Projects in Tunduru District Actual Oct-07

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C93 Rural Water Supply and Sanitation Projects in Iringa Municipality Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C94 Rural Water Supply and Sanitation Projects in Iringa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C95 Rural Water Supply and Sanitation Projects in Mufindi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C96 Rural Water Supply and Sanitation Projects in Makete District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C97 Rural Water Supply and Sanitation Projects in Njombe District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C98 Rural Water Supply and Sanitation Projects in Njombe town Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C99 Rural Water Supply and Sanitation Projects in Ludewa District Actual Oct-07 Sep-08

103 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C100 Rural Water Supply and Sanitation Projects in Kilolo District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C101 Rural Water Supply and Sanitation Projects in Sumbawanga District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C102 Rural Water Supply and Sanitation Projects in Sumbawanga Municipality Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C103 Rural Water Supply and Sanitation Projects in Nkasi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C104 Rural Water Supply and Sanitation Projects in Mpanda District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C105 Rural Water Supply and Sanitation Projects in Mpanda town Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C106 Rural Water Supply and Sanitation Projects in Mtwara District Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C107 Rural Water Supply and Sanitation Projects in Mtwara Municipality Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C108 Rural Water Supply and Sanitation Projects in Tandahimba District Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C109 Rural Water Supply and Sanitation Projects in Newala District Actual Oct-07 Sep-08 Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C110 Rural Water Supply and Sanitation Projects in Nanyumbu District Actual Oct-07 Sep-08

104 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C111 Rural Water Supply and Sanitation Projects in Masasi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C112 Rural Water Supply and Sanitation Projects in Lindi town Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C113 Rural Water Supply and Sanitation Projects in Lindi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C114 Rural Water Supply and Sanitation Projects in Kilwa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C115 Rural Water Supply and Sanitation Projects in Liwale District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C116 Rural Water Supply and Sanitation Projects in Nachingwea District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C117 Rural Water Supply and Sanitation Projects in Ruangwa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C118 Rural Water Supply and Sanitation Projects in Morogoro District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C119 Rural Water Supply and Sanitation Projects in Morogoro Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C120 Rural Water Supply and Sanitation Projects in Mvomero District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C121 Rural Water Supply and Sanitation Projects in Kilosa District Actual Oct-07 Sep-08

105 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C122 Rural Water Supply and Sanitation Projects in Kilombero District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C123 Rural Water Supply and Sanitation Projects in Ulanga District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C124 Rural Water Supply and Sanitation Projects in Dodoma Municipality Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C125 Rural Water Supply and Sanitation Projects in Bahi District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C126 Rural Water Supply and Sanitation Projects in Chamwino District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C127 Rural Water Supply and Sanitation Projects in Mpwapwa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C128 Rural Water Supply and Sanitation Projectsin Kongwa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C129 Rural Water Supply and Sanitation Projects in Kondoa District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned 0.40 QCBS Prior Oct-07 Jul-08 Dec-08 RW-C130 Rural Water Supply and Sanitation Projects in Manyoni District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C131 Rural Water Supply and Sanitation Projects in Singida District Actual Oct-07 Sep-08

Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C132 Rural Water Supply and Sanitation Projects in Singida Municipality Actual Oct-07 Sep-08

106 Estimated Implementatio Selection Review Expected Contract Ref no. Contract Description Costs Advert Date n Method Prior/Post Proposals Award Date (million US$) submission Provision of Technical and Facilitation Consultancy Services for Planned Oct-07 Jul-08 Dec-08 0.40 QCBS Prior RW-C133 Rural Water Supply and Sanitation Projects in Iramba District Actual Oct-07 Sep-08

Provision of Consultancy Services for Assessment of Capacity Actual 0.15 QCBS Prior Feb-09 Apr-09 May-09 RW-C134 Building Requirement to Enhance Private Sector Participation Planned

Planned 53.85 Sub Total Consultancy Services Actual

107 Procuring Entity

MoWI

Tanga City Council

Handeni District Council

Kilindi District Council

Korogwe District Council

Korogwe Town Council

Muheza District Council

Mkinga District Council

Pangani District Council

Lushoto District Council

Moshi District Council

108 Procuring Entity Moshi District Council

Moshi Municipal Council

Same District Council

Mwanga District Council

Hai District Council

Siha District Council

Rombo District Council

Arusha District Council

Meru District Council

Arusha Municipal Council

Monduli District Council

Longido District Council

109 Procuring Entity Longido District Council

Ngorongoro District Council

Karatu District Council

Babati District Council

Babati Town Council

Simanjiro District Council

Kiteto District Council

Hanang’ District Council

Mbulu District Council

Kibaha Town Council

Kibaha District Council

Rufiji District Council

110 Procuring Entity Rufiji District Council

Kisarawe District Council

Mkuranga District Council

Bagamoyo District Council

Mafia District Council

Temeke Municipal Council

Ilala Municipal Council

Kinondoni Municipal Council

Tabora Municipal Council

Uyui District Council

Nzega District Council

Igunga District Council

111 Procuring Entity Igunga District Council

Sikonge District Council

Urambo District Council

Kigoma/Ujiji Municipal Council

Kigoma District Council

Kasulu District Council

Kibondo District Council

Bukoba District Council

Bukoba Municipal Council

Ngara District Council

Biharamulo District Council

Chato District Council 112 Procuring Entity Chato District Council

Misenyi District Council

Muleba District Council

Karagwe District Council

Mwanza City Council

Kwimba District Council

Magu District Council

Misungwi District Council

Geita District Council

Sengerema District Council

Ukerewe District Council

Musoma District Council 113 Procuring Entity Musoma District Council

Musoma Municipal Council

Serengeti District Council

Bunda District Council

Tarime District Council

Rorya District Council

Shinyanga Municipal Council

Shinyanga District Council

Maswa District Council

Bariadi District Council

Meatu District Council

Kahama District Council

114 Procuring Entity Kahama District Council

Bukombe District Council

Kishapu District Council

Mbeya City Council

Mbeya District Council

Ileje District Council

Mbozi District Council

Rungwe District Council

Chunya District Council

Kyela District Council

Mbarali District Council

Songea District Council

115 Procuring Entity

Songea Municipal Council

Namtumbo District Council

Mbinga District Council

Tunduru District Council

Iringa Municipal Council

Iringa District Council

Mufindi District Council

Makete District Council

Njombe District Council

Njombe Town Council

Ludewa District Council

116 Procuring Entity

Kilolo District Council

Sumbawanga District Council

Sumbawanga Municipal Council

Nkasi District Council

Mpanda District Council

Mpanda Town Council

Mtwara District Council

Mtwara Municipal Council

Tandahimba District Council

Newala District Council

Nanyumbu District Council

117 Procuring Entity

Masasi, District Council

Lindi Town Council

Lindi District Council

Kilwa District Council

Liwale District Council

Nachingwea District Council

Ruangwa District Council

Morogoro District Council

Morogoro Municipal Council

Mvomero District Council

Kilosa District Council

118 Procuring Entity

Kilombero District Council

Ulanga District Council

Dodoma Municipal Council

Bahi District Council

Chamwino District Council

Mpwapwa District Council

Kongwa District Council

Kondoa District Council

Manyoni D.C.

Singida D.C.

Singida M.C.

119 Procuring Entity

Iramba D.C.

MoWI

120 Table 4 D: List of Contracts Packages for Consultancy Services Ref No. Contract Description Implem Estimate Selection Advert Date Expected Contrac entation d Costs method Proposals t award Review submissio Date n

Design and construction supervision of the Planned 0.500 QCBS Prior 6 July, 2008 19/09/08 15/11/08 CB-C1 MoW building Actual 10 Nov, 01 Jan, Annual sector review and stakeholders Planned 0.200 QCBS Prior 08 Oct, 08 CB-C2 08 09 consultation Actual 13 Dec, Planned 0.132 QCBS Prior 12 Nov, 08 27/01/09 CB-C3 Programme management support to CWS 08 Actual 10 Nov, 01 Jan, Planned 0.889 QCBS Prior 08 Oct, 08 CB-C4 Programme management support to DPP 08 09 Actual 07 Nov, Planned 0.075 QCBS Post 16/10/08 22/12/08 CB-C5 Programme management support to DAHR 08 Actual 13 Dec, Planned 0.077 QCBS Post 12 Nov, 08 27/01/09 CB-C6 Programme management support to CWSS 08 Actual Programme support to (PMU) procurement Planned 0.900 QCBS Prior 28/09/08 23/10/08 Oct-08 CB-C7 activities under WSDP Actual 10 Dec, Planned 0.125 QCBS Prior 12 Nov, 08 27/01/09 CB-C8 Annual ESMF/RPF audits 08 Actual 10 Dec, Planned 0.111 QCBS Prior 12 Nov, 08 27/01/09 CB-C9 Support annual financial audits 08 Ref No. Contract Description Implem Estimate Selection Advert Date Expected Contrac entation d Costs method Proposals t award Review submissio Date n

Actual CB-C10 Asses communication need and determine 02 Feb, Planned 0.100 QCBS Prior 20/11/08 18/12/08 communication required equipments for the 09 Ministry Actual CB-C11 10 Dec, Planned 0.250 QCBS Prior 12 Nov, 08 27/01/09 Annual procurement audits 08 Actual Consultancy services to review relevance of Planned 0.040 Shopping Post 08 Oct, 08 30/10/08 16/12/08 CB-C12 MCS Actual CB- C13 Design, Develop and implementation of Planned 1.400 QCBS Prior 20/11/08 22/12/08 22/02/09 MIS for Water sector MOWI, BWOs, UWSAs, LGAs, Small Towns. Actual CB - C14 Design of LAN/WAN for MOWI Planned 0.015 QCBS Post 26/05/08 18/06/08 15/09/08 Actual 26/05/08 CB - C15 Preparation of MIS strategy for MOWI Planned 0.050 CQ Post 26/05/08 18/06/08 15/09/08 Tshs 57, Actual 26/05/08 18/06/08 384,120 CB - C16 Praparation of infornation security policy & 0.021 CQ Post 15/10/08 29/10/08 28/12/08 business continuty plan CB - C17 Design and implement Task management Planned 0.020 CQ Post 15/10/08 29/10/08 28/12/08 and tracking system Actual CB - C18 Design of Transport management 0.010 12 Dec, 20 Dec, Planned CQ Post 10/10/2008 imformation system for the Ministry 2008 2008 Ref No. Contract Description Implem Estimate Selection Advert Date Expected Contrac entation d Costs method Proposals t award Review submissio Date n

Actual CB- C19 Consultancy for Design of documents Planned 0.150 management system. Actual 04 Nov, Consultancy services for development of Planned 0.030 CQ Post 12 Oct, 08 20/12/08 CB-C20 08 Curriculum of the WRI Actual

Planned 5.095 Sub Total -Consultancy Services Actual 0.050

Planned 39.294 Grand Total - (Consultancy Services + Works + Actual 0.050 Goods + Non Consultancy) Procuring Entity

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI

MoWI Procuring Entity

MoWI

MoWI

MoWI

MOWI

MoWI

MoWI

MoWI

MoWI Procuring Entity

MoWI

MoWI